CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD:

Size: px
Start display at page:

Download "CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD:"

Transcription

1 358, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/ CONTRACT ID: PROJECT: C CONTRACT: AWARD : $31,159, PROJECTED : $31,159, ADJ. PROJECTED : $31,518, CONTRACT: CONTRACTOR: SUNDT CONSTRUCTION, INC. HIGHWAY: IH 10 DISTRICT NAME: San Antonio COUNTY: BEXAR AREA ENGINEER: Marshall Heap, P.E. AREA NUMBER: 054 ESTIMATE NUMBER: 0032 LETTING DATE: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD: 08/26/2018 to 09/25/2018 NOTICE TO PROCEED DATE: 11/24/2015 ESTIMATE TYPE: PROG WORK BEGIN DATE: 03/21/2016 % COMPLETE: ACCEPTED DATE: 00/00/0000 % TIME USED: PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS $28,960, $28,553, PARTICIPATING $ $ NON-PARTICIPATING $28,960, $28,553, RETAINAGE $ $ LIQUIDATED DAMAGES ($124,32) ($51,80) INCENTIVE $90,00 $90,00 DISINCENTIVE ($120,00) ($120,00) OTHER ADJUSTMENTS $ $ $406, $ $406, $ ($72,52) $ $ $ PAID TO CONTRACTOR $28,806, $28,472, $334, CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/PROJECT ENGINEER DATE

2 CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 19 CONTRACT TIME STATEMENT WORK BEGIN DATE: 03/21/2016 ASSESSED LIQ DAMAGES: 48 TIME CHARGES BEGIN: 10/06/2015 LIQ DAMAGE RATE: $2,59 DAYS: 793 LIQUIDATED DAMAGES: 48 C. O. ADJUSTED DAYS: 0 DAYS AT CURRENT DAYS: 793 PER DAY $2,59 DAYS CHARGED : 841 TOTAL: $124,32 PHYSICAL WORK COMPLETE: 00/00/0000 DAILY BREAKDOWN Date Days or Days Charged Days Credited 08/26/ /27/ /28/ /29/ /30/ /31/ /01/ HOLIDAY TRAFFIC 09/02/ HOLIDAY TRAFFIC 09/03/ HOLIDAY TRAFFIC 09/04/ /05/ /06/ /07/ /08/ /09/ /10/ /11/ /12/ /13/ /14/ /15/ /16/ /17/ /18/ /19/ /20/ /21/ /22/ /23/ /24/ /25/ Diary Adjustment PERIOD SUMMARY Date or Days Days Days Charged Credited HOLIDAY TRAFFIC 3

3 CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 19 WORK PERFORMED THIS PERIOD PROJECT C CONTROL CATEGORY 001 ROADWAY S QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date REMOVING CONC (RIPRAP) SY $2, ,50 2, EXCAVATION (ROADWAY) CY $2,10 90,92 90, FURNISHING AND PLACING TOPSOIL (4") SY , $ , , DRILL SEEDING (TEMP) (WARM) SY , $ , , DRILL SEEDING (PERM)(WARM OR COOL) SY , $ ,97 128, SOIL RETENTION BLANKETS (CL 1) (TY A) SY , $6, , , DRILL SHAFT (NON - REINFORCED) (12 IN) LF $2, DRILL SHAFT (SIGN MTS) (24 IN) LF $12, DRILL SHAFT (RDWY ILL POLE) (30 IN) LF $8,00 1, RIPRAP (CONC)(CL B) CY $1, RIPRAP (MOW STRIP)(4 IN) CY $31, RC PIPE (CL III)(36 IN) LF $39, INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT) EA 3,000 0 $3, REMOV STR (INLET) EA $ REMOV STR (PIPE) LF $ ROCK FILTER DAMS (REMOVE) LF $5 3, PORT CTB (MOVE)(SGL SLP)(TY 1) LF ,370 $26,85 58, , PORT CTB (REMOVE)(SGL SLP)(TY 1) LF ,120 $18,36 29, , COLORED TEXTURED CONC (4") SY 60 1, $66, , CONC CURB (TY I) LF 0 30 $ ,37 36, CONC SIDEWALKS (4") SY $ ,84 17, CURB RAMPS (TY 2) EA 1,000 0 $1, MTL W-BEAM GD FEN (TIM POST) LF , $39, , , MTL W-BEAM GD FEN (STEEL POST) LF $2, SUPP DESCR Added CO DOWNSTREAM ANCHOR TERMINAL SECTION EA $ GUARDRAIL END TREATMENT (INSTALL) EA 2,700 0 $2, CRASH CUSH ATTEN (MOVE & RESET) EA $2, CRASH CUSH ATTEN (REMOVE) EA $ CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 8, $8, IN RD IL AM (TY SA) 40T-8 (250W) S EA 2, $40, IN RD IL AM (TY SA) 40T-8-8 (250W) S EA 3,500 0 $3, ELEC CONDR (NO.8) BARE LF , $3, ,02 13, ELEC CONDR (NO.8) INSULATED LF , $5, , , ALUMINUM SIGNS (TY G) SF $21,23 2, IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA $5, IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA $13, IN SM RD SN SUP&AM TYS80(1)SA(T) EA $4, IN SM RD SN SUP&AM TYS80(1)SA(U) EA $1, IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL) EA 1,000 0 $2, REMOVE SM RD SN SUP&AM EA $5, INSTALL LRSS (STRUCT STEEL) LB , $12, , , INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA $6, PAVEMENT SEALER 4" LF , $3, ,02 53,16

4 CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 19 QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date PAVEMENT SEALER 8" LF ,240 $1, ,00 6, PAVEMENT SEALER 12" LF , $1, , ELIM EXT PAV MRK & MRKS (4") LF , $ , , ELIM EXT PAV MRK & MRKS (8") LF $ ELIM EXT PAV MRK & MRKS (ARROW) EA $ ELIM EXT PAV MRK & MRKS (DBL ARROW) EA $ ELIM EXT PAV MRK & MRKS (WORD) EA $ ELIM EXT PAV MRK & MRKS (36")(YLD TRI) EA $ VEH SIG SEC (12")LED(GRN) EA $1, VEH SIG SEC (12")LED(GRN ARW) EA $ VEH SIG SEC (12")LED(YEL) EA $1, VEH SIG SEC (12")LED(YEL ARW) EA $ VEH SIG SEC (12")LED(RED) EA $1, PED SIG SEC (LED)(COUNTDOWN) EA $ PED SIG SEC (HOUSING ONLY) EA $ BACK PLATE (12")(3 SEC) EA $ BACK PLATE (12")(5 SEC) EA $ INS TRF SIG PL AM(S)1 ARM(24')LUM EA 5, $5, INS TRF SIG PL AM(S)1 ARM(28')LUM EA 5, $5, INS TRF SIG PL AM(S)1 ARM(32') EA 3,000 0 $3, INS TRF SIG PL AM(S)2 ARM(44-36')LUM EA 10, $10, PORTABLE CHANGEABLE MESSAGE SIGN DAY $12, UNIQUE CHANGE ORDER 1 DOL 1, $1, CATEGORY 003 CONTRACTOR FORCE ACCOUNT WORK QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date MATERIAL ON HAND DOL 0-61, $61, ,00 135, LAW ENFORCEMENT PERSONNEL DOL 0 8, $8, ,00 68, TOTAL EARNINGS THIS ESTIMATE $406,745.50

5 CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 19 CONTRACT S PROJECT CATEGORY C CONTROL ROADWAY S SUPP $ PREPARING ROW STA 10, ,790, REMOVING CONC (RIPRAP) SY , , , REMOVING CONC (MEDIANS) SY REMOVING CONC (DRIVEWAYS) SY 0 1, , , REMOVING CONC (CURB) LF , , , REMOVING CONC (CURB AND GUTTER) LF , REMOVING STAB BASE AND AH PAV (6") SY , , , REMOVING STAB BASE & AH PAV (7"-12") SY , , , EXCAVATION (ROADWAY) CY , ,090 90, , SUBGRADE WIDENING (ORD COMP) STA 1, , CO # EMBANKMENT (FINAL)(ORD COMP)(TY B) CY , , ,389, BLADING HR , FURNISHING AND PLACING TOPSOIL (4") SY , , , DRILL SEEDING (TEMP) (WARM) SY , , , DRILL SEEDING (PERM)(WARM OR COOL) SY , , , SOIL RETENTION BLANKETS (CL 1) (TY A) SY , , , PROOF ROLLING HR , D-GR HMA TY-B PG64-22 TON 70 28, , ,427, PRODUCTION PAYMENT ADJUSTMENT DOL 0 1, , , Production Bonus for D-GR HMA TY-B PG PLACEMENT PAYMENT ADJUSTMENT DOL 0 1, , , Placement Bonus for D-GR HMA TY-B PG D-GR HMA TY-C PG70-22 TON , , , PRODUCTION PAYMENT ADJUSTMENT DOL 0 1, , , Production Bonus for D-GR HMA TY-C PG PLACEMENT PAYMENT ADJUSTMENT DOL 0 1, Placement Bonus for D-GR HMA TY-C PG PLACEMENT PAYMENT ADJUSTMENT DOL -0 1, , , Placement Penaly for D-GR HMA TY-C PG FLEX PAVEMENT STRUCTURE REPAIR (8"-15") SY , CONC PVMT (CONT REINF - CRCP) (13") SY 60 57, , ,544, CEM STABIL BKFL CY , FLOWABLE BACKFILL CY , TRENCH EXCAVATION PROTECTION LF TEMPORARY L SHORING SF 10 24,430 9, , , DRILL SHAFT (NON - REINFORCED) (12 IN) LF , DRILL SHAFT (SIGN MTS) (24 IN) LF , DRILL SHAFT (RDWY ILL POLE) (30 IN) LF , , DRILL SHAFT (TRF SIG POLE) (30 IN) LF , DRILL SHAFT (TRF SIG POLE) (36 IN) LF , CL C CONC (RAIL FOUNDATION) CY , Added CO #15

6 CONTRACTOR'S ESTIMATE PACKAGE Page 6 of 19 CATEGORY 001 ROADWAY S SUPP $ APPROACH SLAB CY , CL C CONC (MISC) CY , Change Order RETAINING WALL (MSE) SF 50 68, , ,427, RETAINING WALL (TEMP WALL) SF , ,11 929, RIPRAP (CONC)(4 IN) CY , RIPRAP (CONC)(6 IN) CY , , , RIPRAP (CONC)(CL B) CY , RIPRAP (MOW STRIP)(4 IN) CY , RAIL (TY SSTR) LF 0 4, , , RAIL (TY C221) LF , RAIL (TY PR1) LF 80 3, , , GABION MATTRESSES (GALV)(18 IN) SY , CONC BOX CULV (8 FT X 4 FT) LF , RC PIPE (CL III)(18 IN) LF , RC PIPE (CL III)(24 IN) LF 90 5, , , RC PIPE (CL III)(30 IN) LF 80 1, , , RC PIPE (CL III)(36 IN) LF , MANH (COMPL)(PRM)(48IN) EA , JCTBOX(COMPL)(PJB)(3FTX3FT) EA , INLET (COMPL)(PCU)(3FT)(BOTH) EA 6, , CHANGE ORDER INLET (COMPL)(PAZD)(RC)(3FTX3FT) EA 5, , INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT) EA 3, , INLET (COMP) (TY SIDEWALK BRIDGE) EA 1, , INLET (COMPL)(RWI)(TY I) EA 7, , WINGWALL (PW - 1) (HW=12 FT) EA 7, , SET (TY II) (18 IN) (RCP) (3: 1) (P) EA , SET (TY II) (24 IN) (RCP) (3: 1) (P) EA 1, , SET (TY II) (24 IN) (RCP) (6: 1) (C) EA 1, , ADJUSTING INLET (CAP) EA REMOV STR (INLET) EA REMOV STR (SET) EA REMOV STR (WINGWALL) EA REMOV STR (HEADWALL) EA REMOV STR (PIPE) LF REMOV STR (BOX CULVERT) LF , , , MOBILIZATION LS 1,000, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15, , ROCK FILTER DAMS (INSTALL) (TY 2) LF 20 2, , , ROCK FILTER DAMS (INSTALL) (TY 3) LF , ROCK FILTER DAMS (REMOVE) LF 0 3, , CONSTRUCTION EXITS (INSTALL) (TY 1) SY , TEMP SEDMT CONT FENCE (INSTALL) LF 0 19, ,35 24, TEMP SEDMT CONT FENCE (REMOVE) LF , , FORCE ACCT-EROSION CONTROL MAINTENANCE DOL 0 1, , , CONSTRUCTING DETOURS SY , , ,923,350.92

7 CONTRACTOR'S ESTIMATE PACKAGE Page 7 of 19 CATEGORY 001 ROADWAY S SUPP $ UNIQUE CHANGE ORDER 2 DOL 6, , Change Order 3, Mill EBML Rumble Strip PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF , ,63 1,347, PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 30 28, ,12 764, PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 40 2, ,98 79, PORT CTB (MOVE)(SGL SLP)(TY 1) LF ,490-1, ,54 282, PORT CTB (MOVE)(LOW PROF)(TY 1) LF , ,52 67, PORT CTB (MOVE)(LOW PROF)(TY 2) LF ,10 6, PORT CTB (REMOVE)(SGL SLP)(TY 1) LF , ,22 60, PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 0 28, ,20 14, PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 0 2, , PERM CTB (SGL SLOPE) (TY 1) (42 ) LF , , , PERM CTB (SGL SLOPE) (TY 4) (42 ) LF , CHANGE ORDER COLORED TEXTURED CONC (4") SY , , CONC CURB (TY I) LF 0 34,080 1, , , CONC CURB (TY F3) LF , INTERSECTIONS (ACP) SY , , , DRIVEWAYS (CONC) SY , , , DRIVEWAYS (ACP) SY , , , CONC SIDEWALKS (4") SY 30 17, , , CURB RAMPS (TY 2) EA 1, , CURB RAMPS (TY 5) EA 1, , CURB RAMPS (TY 7) EA 1, , CO # CURB RAMPS (TY 10) EA , CURB RAMPS (TY 11) EA 2, , CO # CURB RAMPS (TY 21) EA 3, , CURB RAMPS (TY 22) EA 2, , CONC MEDIAN SY , MTL W-BEAM GD FEN (TIM POST) LF , , , MTL W-BEAM GD FEN (STEEL POST) LF , Added CO MTL THRIE-BEAM GD FEN (TIM POST) LF , DOWNSTREAM ANCHOR TERMINAL SECTION EA , REMOVE METAL BEAM GUARD FENCE LF 0 5, , , REMOVE TERMINAL ANCHOR SECTION EA , CABLE BARRIER TERMINAL SECTION (TL-3) EA 2, , REMOVE CABLE BARRIER LF 0 7, ,40 14, GUARDRAIL END TREATMENT (INSTALL) EA 2, , GUARDRAIL END TREATMENT (REMOVE) EA CRASH CUSH ATTEN (MOVE & RESET) EA , CRASH CUSH ATTEN (REMOVE) EA CRASH CUSH ATTEN (INSTL)(R)(N)(TL3) EA 13, , CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 8, , Change Order 1

8 CONTRACTOR'S ESTIMATE PACKAGE Page 8 of 19 CATEGORY 001 ROADWAY S SUPP $ MAILBOX INSTALL-S (TWG-POST) TY 1 EA , MAILBOX INSTALL-M (TWG-POST) TY 1 EA IN RD IL AM (TY SA) 40T-8 (250W) S EA 2, , IN RD IL AM (TY SA) 40T-8-8 (250W) S EA 3, , IN RD IL AM (TY ) 48S (400W) S EA 3, , CONDT (PVC) (SCH 40) (2") LF , , , CONDT (PVC) (SCH 80) (2") LF , , , CONDT (PVC) (SCH 80) (2") (BORE) LF 10 1, , CONDT (PVC) (SCH 80) (3") LF , CONDT (PVC) (SCH 80) (3") (BORE) LF , ELEC CONDR (NO.8) BARE LF , , , ELEC CONDR (NO.8) INSULATED LF , , , ELEC CONDR (NO.6) BARE LF 0 1, ELEC CONDR (NO.6) INSULATED LF GROUND BOX TY A (122311)W/APRON EA , GROUND BOX TY D (162922)W/APRON EA , ELC SRV TY A 240/ (NS)SS(E)TP(O) EA 3, , FORCE ACCOUNT ID 1 DOL 0 1, , , Item Invoice for Connection Charge ELC SRV TY D 120/ (NS)AL(N)PS(U) EA 3, , ALUMINUM SIGNS (TY G) SF 20 2, , IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA , IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA , IN SM RD SN SUP&AM TYS80(1)SA(T) EA , IN SM RD SN SUP&AM TYS80(1)SA(U) EA , IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL) EA 1, , IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 1, , REMOVE SM RD SN SUP&AM EA , INSTALL LRSS (STRUCT STEEL) LB , , , REMOVE LRSA EA 1, , INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA , WK ZN PAV MRK REMOV (W)4"(BRK) LF , ,44 4, WK ZN PAV MRK REMOV (W)4"(SLD) LF , ,500 32,12 16, WK ZN PAV MRK REMOV (Y)4"(SLD) LF ,980 1, , , PAVEMENT SEALER 4" LF , ,16 5, PAVEMENT SEALER 8" LF , ,35 1, PAVEMENT SEALER 12" LF , , ELIM EXT PAV MRK & MRKS (4") LF , , , ELIM EXT PAV MRK & MRKS (8") LF ELIM EXT PAV MRK & MRKS (ARROW) EA ELIM EXT PAV MRK & MRKS (DBL ARROW) EA ELIM EXT PAV MRK & MRKS (WORD) EA ELIM EXT PAV MRK & MRKS (36")(YLD TRI) EA PAV SURF PREP FOR MRK (4") LF , , VEH SIG SEC (12")LED(GRN) EA , VEH SIG SEC (12")LED(GRN ARW) EA VEH SIG SEC (12")LED(YEL) EA , VEH SIG SEC (12")LED(YEL ARW) EA

9 CONTRACTOR'S ESTIMATE PACKAGE Page 9 of 19 CATEGORY 001 ROADWAY S SUPP $ VEH SIG SEC (12")LED(RED) EA , PED SIG SEC (LED)(COUNTDOWN) EA PED SIG SEC (HOUSING ONLY) EA BACK PLATE (12")(3 SEC) EA BACK PLATE (12")(5 SEC) EA INS TRF SIG PL AM(S)1 ARM(24')LUM EA 5, , CHANGE ORDER INS TRF SIG PL AM(S)1 ARM(28')LUM EA 5, , CHANGE ORDER INS TRF SIG PL AM(S)1 ARM(32') EA 3, , INS TRF SIG PL AM(S)2 ARM(44-36')LUM EA 10, , CHANGE ORDER LITTER REMOVAL CYC , PORTABLE CHANGEABLE MESSAGE SIGN EA 14, , PORTABLE CHANGEABLE MESSAGE SIGN DAY , Change Order UNIQUE CHANGE ORDER 1 DOL 1, , Change Order 1/Provide & Maintain Project Field Office/Month UNIQUE CHANGE ORDER 3 DOL 6, , Added CO 11-Relocate Sign Exit UNIQUE CHANGE ORDER 4 DOL 1, , Added CO 11-Lane Closure for Emergency Repairs UNIQUE CHANGE ORDER 5 DOL 8, , Added CO 12-Underdrain Sump Pit EBFR Sta /- Lt UNIQUE CHANGE ORDER 6 DOL 120, ,00 CHANGE ORDER 14/DISINCENTIVE OFFSET/LS UNIQUE CHANGE ORDER 7 DOL 13, , RAC-R Work Prior to Revision Paid by LS UNIQUE CHANGE ORDER 8 DOL 81, ,96 Added CO LF Unused Precast Single Slope Barrier CATEGORY 002 IH 10 - Fredericksburg and Culverts 4, 8, 8 A, 10, 10 A Category Subtotal $26,498, SUPP $ DRILL SHAFT (36 IN) LF , EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL , DS 36 extra depth 5'-15' pay by the LF DRILL SHAFT (42 IN) LF , CL C CONC (ABUT) CY , CL C CONC (BENT) CY 1, , REINF CONC SLAB SF 10 24, ,60 246, PRESTR CONC GIRDER (TX46) LF 160 2, , , RAIL (TY SSTR) LF , SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF ,96

10 CONTRACTOR'S ESTIMATE PACKAGE Page 10 of 19 CATEGORY 002 IH 10 - Fredericksburg and Culverts 4, 8, 8 A, 10, 10 A SUPP $ CONC BOX CULV (8 FT X 5 FT) LF 580 1, ,77 1,026,60 Culvert WINGWALL (PW - 1) (HW=8 FT) EA 4, ,00 Culvert CL C CONC (MISC) CY , Change Order 17 CATEGORY 003 CONTRACTOR FORCE ACCOUNT WORK Category Subtotal $2,121, SUPP $ MATERIAL ON HAND DOL 0 1, , , FORCE ACCOUNT - SAFETY CONTINGENCY DOL 0 1, , , LAW ENFORCEMENT PERSONNEL DOL 0 1, , , FORCE ACCOUNT ID 3 DOL 0 1, , , Repair of Crash Cushion Repair PROJECT CATEGORY ROW CONTROL JOINT UTILITY Category Subtotal $271, SUPP $ ADJUST EXISTING VALVE BOX EA , ADJUST AUTO AIR RELEASE VALVE (COMPL) EA 1, , TRENCH EXCAVATION PROTECTION LF FLOWABLE BACKFILL CY ,35 Category Subtotal $69, PROJECT C CONTROL CATEGORY 001 ROADWAY S SUPP ($) OBLITERATING ABANDONED ROAD STA VEGETATIVE WATERING MG , AGGR (TY-B GR-4) CY AH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR) GAL , PRODUCTION PAYMENT ADJUSTMENT DOL -0 1, Production Penalty for D-GR HMA TY-B PG PLACEMENT PAYMENT ADJUSTMENT DOL -0 1, Placement Penalty for D-GR HMA TY-B PG D-GR HMA TY-C SAC-B PG70-22 TON 70 15, PRODUCTION PAYMENT ADJUSTMENT DOL 0 1, Production Bonus for D-GR HMA TY-C SAC-B PG70-22

11 CONTRACTOR'S ESTIMATE PACKAGE Page 11 of PRODUCTION PAYMENT ADJUSTMENT DOL -0 1, Production Penalty for D-GR HMA TY-C SAC-B PG PLACEMENT PAYMENT ADJUSTMENT DOL 0 1, Placement Bonus for D-GR HMA TY-C SAC-B PG PLACEMENT PAYMENT ADJUSTMENT DOL -0 1, Placement Penalty for D-GR HMA TY-C SAC-B PG PRODUCTION PAYMENT ADJUSTMENT DOL -0 1, Production Penalty for D-GR HMA TY-C PG RIDE BONUS/PENALTY ( 360) DOL 0 1, Surface Test Type B, Pay Adjustment Schedule CUT & RESTORING PAV SY CL C CONC (RAC-R) CY RC PIPE (CL III)(42 IN) LF INLET (COMPL)(PCU)(4FT)(BOTH) EA 9, INLET (COMPL)(PAZD)(RC)(4FTX4FT) EA 5, INLET (COMPL)(TY AZR) EA 5, HEADWALL (CH - FW - 0) (DIA= 42 IN) EA 5, CHANGE ORDER HEADWALL (CH - PW - 0) (DIA= 30 IN) EA 1, WINGWALL (FW - 0) (HW=9 FT) EA 3, WINGWALL (PW - 1) (HW=11 FT) EA 6, WINGWALL (PW - 1) (HW=5 FT) EA 1, WINGWALL (PW - 1) (HW=6 FT) EA 2, WINGWALL (PW - 1) (HW=7 FT) EA 2, WINGWALL (PW - 1) (HW=8 FT) EA 4, WINGWALL (PW - 1) (HW=9 FT) EA 4, SET (TY II) (18 IN) (RCP) (3: 1) (C) EA SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 1, SET (TY II) (36 IN) (CMP) (3: 1) (P) EA 1, SET (TY II) (36 IN) (RCP) (3: 1) (P) EA 2, SET (TY II) (42 IN) (RCP) (3: 1) (P) EA 1, CONSTRUCTION EXITS (REMOVE) SY BIODEG EROSN CONT LOGS (INSTL) (12") LF CONC CURB (TY C1) LF GUARDRAIL END TREATMENT (MOVE & RESET) EA 1, Change Order MAILBOX INSTALL-D (TWG-POST) TY 1 EA IN RD IL AM (U/P) (TY 1) (150W) S EA 1, IN RD IL AM (TY SA) 40T-12 (250W) S EA 3, Change Order CONDT (RM) (1") LF ELEC CONDR (NO.12) BARE LF ELEC CONDR (NO.12) INSULATED LF TRAY CABLE (4 CONDR) (12 AWG) LF FORCE ACCOUNT ID 2 DOL 0 1, Item Invoice for Connection Charge INSTL DEL ASSM (D-SW)SZ 1(FLX)GND EA INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA INSTL DEL ASSM (D-DW)SZ 1(FLX)GND EA INSTL OM ASSM (OM-2Z)(FLX)GND EA INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2 EA

12 CONTRACTOR'S ESTIMATE PACKAGE Page 12 of REFL PAV MRK TY I (W)4"(DOT)(100MIL) LF REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF , REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF , REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF , REFL PAV MRK TY I (W)(ARROW)(100MIL) EA REFL PAV MRK TY I(W)(DBL ARROW)(100MIL) EA REFL PAV MRK TY I(W)(UTURN ARW)(100MIL) EA REFL PAV MRK TY I (W)(NUMBER)(100MIL) EA REFL PAV MRK TY I (W)(WORD)(100MIL) EA REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA REFL PAV MRK TY I (Y)8"(SLD)(100MIL) LF PAVEMENT SEALER 10" LF , PAVEMENT SEALER (NUMBER) EA RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF , RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF ,590-2, RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF , , PREFAB PAV MRK TY B (W)(6")(BRK)CNTST LF , REFL PAV MRKR TY I-R EA REFL PAV MRKR TY II-A-A EA REFL PAV MRKR TY II-C-R EA , PAV SURF PREP FOR MRK (8") LF , PAV SURF PREP FOR MRK (10") LF , PAV SURF PREP FOR MRK (12") LF PAV SURF PREP FOR MRK (NUMBER) EA INSTALL HWY TRF SIG (ISOLATED) EA 5, REMOVING TRAFFIC SIGNALS EA 1, TRF SIG CBL (TY A)(12 AWG)(4 CONDR) LF , TRF SIG CBL (TY A)(12 AWG)(7 CONDR) LF , TRF SIG CBL (TY C)(14 AWG)(2 CONDR) LF , INS TRF SIG PL AM (S)STR(TY C)(28')LUM EA 3, INS TRF SIG PL AM(S)1 ARM(36')LUM EA 3, INS TRF SIG PL AM(S)1 ARM(44') EA 3, INS TRF SIG PL AM(S)1 ARM(44')LUM EA 3, INS TRF SIG PL AM(S)1 ARM(48')LUM EA 3, PED POLE ASSEMBLY EA 1, PED DETECT PUSH BUTTON (STANDARD) EA FULL - WIDTH MOWING CYC 1, VIVDS PROCESSOR SYSTEM EA 3, VIVDS CAMERA ASSEMBLY EA VIVDS SET-UP SYSTEM EA VIVDS COMMUNICATION CABLE (COAXIAL) LF RADAR PRESENCE DETECTOR EA 6, CHANGE ORDER RADAR PRESENCE DETECTOR COMM CABLE LF RADAR ADVANCED DETECTION DEVICE EA 6, RADAR ADVANCED DETECTION DEVICE EA 7, CHANGE ORDER 22/L INS LED WW SGN W/BASIC SOL PWR KIT EA 1, UNIQUE CHANGE ORDER 2 DOL 9, CO 7/Replace TS Pole and Remove Mast Ralph Fair/LS UNIQUE CHANGE ORDER 9 DOL Change Order 19/Culvert Clean-Out/HR

13 CONTRACTOR'S ESTIMATE PACKAGE Page 13 of UNIQUE CHANGE ORDER 10 DOL Change Order 19/Culvert Clean-Out/Flagging/HR UNIQUE CHANGE ORDER 11 DOL Change Order 19/Culvert Clean-Out/Water Sevices/HR FORCE ACCOUNT ID 5 DOL ,000 0 Change Order 21/Pavement/Pothole Repair ALUMINUM SIGNS (TY A) SF Change Order 22 CATEGORY 002 IH 10 - Fredericksburg and Culverts 4, 8, 8 A, 10, 10 A Category Subtotal SUPP ($) EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL DS 36 extra depth over 15' pay by the LF EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL DS 42 extra depth 5'-15' pay by the LF EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL DS 42 extra depth over 15' pay by the LF WINGWALL (PW - 1) (HW=9 FT) EA 4, Culvert WINGWALL (PW - 1) (HW=8 FT) EA 4, Culvert 8 A WINGWALL (PW - 1) (HW=8 FT) EA 4, Culvert WINGWALL (PW - 1) (HW=11 FT) EA 6, Culvert 10 A WINGWALL (PW - 1) (HW=7 FT) EA 2, Culvert 10 A CATEGORY 003 CONTRACTOR FORCE ACCOUNT WORK Category Subtotal SUPP ($) PAYMENT ADJUSTMENT-POS DOL 0 1, PAYMENT ADJUSTMENT-NEG DOL -0 12, FORCE ACCOUNT-COMMER LAB USE DEDUCTION DOL -0 1, ON THE JOB TRAINING DOL 0 1, RUC DAMAGE ONLY DOL -1, IH 10 FR EB PS 42 Pay per Lane, per Hour RUC DAMAGE ONLY DOL IH 10 FR WB PS 42 Pay per Lane, per Hour CALD CREDIT FOR EARLY COMPLETION DOL 3, pay by Day FORCE ACCOUNT ID 4 DOL 0 1, Repair of MBGF and Guardrial End Treatments Category Subtotal

14 CONTRACTOR'S ESTIMATE PACKAGE Page 14 of 19 PROJECT ROW CONTROL CATEGORY 001 JOINT UTILITY SUPP ($) SANITARY SEWER (ADJUST MANHOLE) EA Category Subtotal TOTAL EARNINGS THIS CONTRACT $28,960,737.16

15 CONTRACTOR'S ESTIMATE PACKAGE Page 15 of 19 CONSTRUCTION ESTIMATE COMBINED ($) PREPARING ROW STA 10, ,790, REMOVING CONC (RIPRAP) SY ,50 2, , REMOVING CONC (MEDIANS) SY REMOVING CONC (DRIVEWAYS) SY 0 1, , , REMOVING CONC (CURB) LF , , , REMOVING CONC (CURB AND GUTTER) LF , REMOVING STAB BASE AND AH PAV (6") SY ,64 7, , REMOVING STAB BASE & AH PAV (7"-12") SY ,13 49, , EXCAVATION (ROADWAY) CY , , , SUBGRADE WIDENING (ORD COMP) STA 1, , CO # EMBANKMENT (FINAL)(ORD COMP)(TY B) CY , , ,389, BLADING HR , FURNISHING AND PLACING TOPSOIL (4") SY , , , DRILL SEEDING (TEMP) (WARM) SY , , , DRILL SEEDING (PERM)(WARM OR COOL) SY ,97 128, , SOIL RETENTION BLANKETS (CL 1) (TY A) SY , , , PROOF ROLLING HR , D-GR HMA TY-B PG64-22 TON 70 28,67 34, ,427, D-GR HMA TY-C PG70-22 TON , , , PRODUCTION PAYMENT ADJUSTMENT DOL 0 2,00 6, , Production Bonus for D-GR HMA TY-B PG PLACEMENT PAYMENT ADJUSTMENT DOL -0 3,00 8, , Placement Penalty for D-GR HMA TY-B PG PLACEMENT PAYMENT ADJUSTMENT DOL 0 3,00 4, , Placement Bonus for D-GR HMA TY-B PG FLEX PAVEMENT STRUCTURE REPAIR (8"-15") SY , CONC PVMT (CONT REINF - CRCP) (13") SY 60 57,97 59, ,544, CEM STABIL BKFL CY , FLOWABLE BACKFILL CY , TRENCH EXCAVATION PROTECTION LF TEMPORARY L SHORING SF 10 24,43 20, , DRILL SHAFT (36 IN) LF , DRILL SHAFT (42 IN) LF , DRILL SHAFT (NON - REINFORCED) (12 IN) LF , DRILL SHAFT (SIGN MTS) (24 IN) LF , DRILL SHAFT (RDWY ILL POLE) (30 IN) LF , , DRILL SHAFT (TRF SIG POLE) (30 IN) LF , DRILL SHAFT (TRF SIG POLE) (36 IN) LF , CL C CONC (ABUT) CY , CL C CONC (BENT) CY 1, , CL C CONC (RAIL FOUNDATION) CY , Added CO # CL C CONC (MISC) CY ,482.12

16 CONTRACTOR'S ESTIMATE PACKAGE Page 16 of 19 Change Order REINF CONC SLAB SF 10 24,60 24, , APPROACH SLAB CY , RETAINING WALL (MSE) SF 50 68,69 68, ,427, RETAINING WALL (TEMP WALL) SF ,11 53, , PRESTR CONC GIRDER (TX46) LF 160 2, , , RIPRAP (CONC)(4 IN) CY , RIPRAP (CONC)(6 IN) CY ,07 2, , RIPRAP (CONC)(CL B) CY , RIPRAP (MOW STRIP)(4 IN) CY , RAIL (TY SSTR) LF 0 5,55 5, , RAIL (TY C221) LF , RAIL (TY PR1) LF 80 3, , , SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF , GABION MATTRESSES (GALV)(18 IN) SY , CONC BOX CULV (8 FT X 4 FT) LF , CONC BOX CULV (8 FT X 5 FT) LF 580 1, ,770 1,026,60 Culvert RC PIPE (CL III)(18 IN) LF , RC PIPE (CL III)(24 IN) LF 90 5,16 4, , RC PIPE (CL III)(30 IN) LF 80 1, , , RC PIPE (CL III)(36 IN) LF , MANH (COMPL)(PRM)(48IN) EA , JCTBOX(COMPL)(PJB)(3FTX3FT) EA , INLET (COMPL)(PCU)(3FT)(BOTH) EA 6, , CHANGE ORDER INLET (COMPL)(PAZD)(RC)(3FTX3FT) EA 5, , INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT) EA 3, , INLET (COMP) (TY SIDEWALK BRIDGE) EA 1, , INLET (COMPL)(RWI)(TY I) EA 7, , WINGWALL (PW - 1) (HW=12 FT) EA 7, , WINGWALL (PW - 1) (HW=8 FT) EA 4, ,00 Culvert SET (TY II) (18 IN) (RCP) (3: 1) (P) EA , SET (TY II) (24 IN) (RCP) (3: 1) (P) EA 1, , SET (TY II) (24 IN) (RCP) (6: 1) (C) EA 1, , ADJUSTING INLET (CAP) EA REMOV STR (INLET) EA REMOV STR (SET) EA REMOV STR (WINGWALL) EA REMOV STR (HEADWALL) EA REMOV STR (PIPE) LF REMOV STR (BOX CULVERT) LF ,13 1, , MOBILIZATION LS 1,000, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15, , ROCK FILTER DAMS (INSTALL) (TY 2) LF 20 2,63 1, , ROCK FILTER DAMS (INSTALL) (TY 3) LF , ROCK FILTER DAMS (REMOVE) LF 0 3, , CONSTRUCTION EXITS (INSTALL) (TY 1) SY ,17

17 CONTRACTOR'S ESTIMATE PACKAGE Page 17 of TEMP SEDMT CONT FENCE (INSTALL) LF 0 19,95 12,350 24, TEMP SEDMT CONT FENCE (REMOVE) LF ,95 1, CONSTRUCTING DETOURS SY ,37 40, ,923, PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF ,63 30,630 1,347, PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 30 28,44 20, , PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 40 2,24 1,980 79, PORT CTB (MOVE)(SGL SLP)(TY 1) LF ,49 56, , PORT CTB (MOVE)(LOW PROF)(TY 1) LF ,22 22,520 67, PORT CTB (MOVE)(LOW PROF)(TY 2) LF ,100 6, PORT CTB (REMOVE)(SGL SLP)(TY 1) LF ,63 20,220 60, PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 0 28,44 7,200 14, PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 0 2, , PERM CTB (SGL SLOPE) (TY 1) (42 ) LF , , , PERM CTB (SGL SLOPE) (TY 4) (42 ) LF , COLORED TEXTURED CONC (4") SY , , CONC CURB (TY I) LF 0 34,08 36, , CONC CURB (TY F3) LF , INTERSECTIONS (ACP) SY ,24 2, , DRIVEWAYS (CONC) SY , , , DRIVEWAYS (ACP) SY ,45 3, , CONC SIDEWALKS (4") SY 30 17,50 17, , CURB RAMPS (TY 2) EA 1, , CURB RAMPS (TY 5) EA 1, , CURB RAMPS (TY 7) EA 1, , CO # CURB RAMPS (TY 10) EA , CURB RAMPS (TY 11) EA 2, , CO # CURB RAMPS (TY 21) EA 3, , CURB RAMPS (TY 22) EA 2, , CONC MEDIAN SY , MTL W-BEAM GD FEN (TIM POST) LF ,29 5, , MTL W-BEAM GD FEN (STEEL POST) LF , Added CO MTL THRIE-BEAM GD FEN (TIM POST) LF , DOWNSTREAM ANCHOR TERMINAL SECTION EA , REMOVE METAL BEAM GUARD FENCE LF 0 5,70 6, , REMOVE TERMINAL ANCHOR SECTION EA , CABLE BARRIER TERMINAL SECTION (TL-3) EA 2, , REMOVE CABLE BARRIER LF 0 7, ,400 14, GUARDRAIL END TREATMENT (INSTALL) EA 2, , GUARDRAIL END TREATMENT (REMOVE) EA CRASH CUSH ATTEN (MOVE & RESET) EA , CRASH CUSH ATTEN (REMOVE) EA CRASH CUSH ATTEN (INSTL)(R)(N)(TL3) EA 13, , CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 8, , MAILBOX INSTALL-S (TWG-POST) TY 1 EA , MAILBOX INSTALL-M (TWG-POST) TY 1 EA IN RD IL AM (TY SA) 40T-8 (250W) S EA 2, ,00

18 CONTRACTOR'S ESTIMATE PACKAGE Page 18 of IN RD IL AM (TY SA) 40T-8-8 (250W) S EA 3, , IN RD IL AM (TY ) 48S (400W) S EA 3, , CONDT (PVC) (SCH 40) (2") LF , , , CONDT (PVC) (SCH 80) (2") LF , , , CONDT (PVC) (SCH 80) (2") (BORE) LF 10 1, , CONDT (PVC) (SCH 80) (3") LF , CONDT (PVC) (SCH 80) (3") (BORE) LF , ELEC CONDR (NO.8) BARE LF ,10 13, , ELEC CONDR (NO.8) INSULATED LF ,18 28, , ELEC CONDR (NO.6) BARE LF 0 1, ELEC CONDR (NO.6) INSULATED LF GROUND BOX TY A (122311)W/APRON EA , GROUND BOX TY D (162922)W/APRON EA , ELC SRV TY A 240/ (NS)SS(E)TP(O) EA 3, , ELC SRV TY D 120/ (NS)AL(N)PS(U) EA 3, , ALUMINUM SIGNS (TY G) SF 20 2, , IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA , IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA , IN SM RD SN SUP&AM TYS80(1)SA(T) EA , IN SM RD SN SUP&AM TYS80(1)SA(U) EA , IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL) EA 1, , IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 1, , REMOVE SM RD SN SUP&AM EA , INSTALL LRSS (STRUCT STEEL) LB , , , REMOVE LRSA EA 1, , INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA , WK ZN PAV MRK REMOV (W)4"(BRK) LF , ,440 4, WK ZN PAV MRK REMOV (W)4"(SLD) LF , ,120 16, WK ZN PAV MRK REMOV (Y)4"(SLD) LF ,98 179, , PAVEMENT SEALER 4" LF ,55 53,160 5, PAVEMENT SEALER 8" LF , ,350 1, PAVEMENT SEALER 12" LF , , ELIM EXT PAV MRK & MRKS (4") LF , , , ELIM EXT PAV MRK & MRKS (8") LF ELIM EXT PAV MRK & MRKS (ARROW) EA ELIM EXT PAV MRK & MRKS (DBL ARROW) EA ELIM EXT PAV MRK & MRKS (WORD) EA ELIM EXT PAV MRK & MRKS (36")(YLD TRI) EA PAV SURF PREP FOR MRK (4") LF ,55 16, VEH SIG SEC (12")LED(GRN) EA , VEH SIG SEC (12")LED(GRN ARW) EA VEH SIG SEC (12")LED(YEL) EA , VEH SIG SEC (12")LED(YEL ARW) EA VEH SIG SEC (12")LED(RED) EA , PED SIG SEC (LED)(COUNTDOWN) EA PED SIG SEC (HOUSING ONLY) EA BACK PLATE (12")(3 SEC) EA BACK PLATE (12")(5 SEC) EA INS TRF SIG PL AM(S)1 ARM(24')LUM EA 5, ,302.50

19 CONTRACTOR'S ESTIMATE PACKAGE Page 19 of INS TRF SIG PL AM(S)1 ARM(28')LUM EA 5, , INS TRF SIG PL AM(S)1 ARM(32') EA 3, , INS TRF SIG PL AM(S)2 ARM(44-36')LUM EA 10, , LITTER REMOVAL CYC , PORTABLE CHANGEABLE MESSAGE SIGN DAY , PORTABLE CHANGEABLE MESSAGE SIGN EA 14, , ADJUST EXISTING VALVE BOX EA , ADJUST AUTO AIR RELEASE VALVE (COMPL) EA 1, , TRENCH EXCAVATION PROTECTION LF FLOWABLE BACKFILL CY , MATERIAL ON HAND DOL 0 1,00 135, , EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL , DS 36 extra depth 5'-15' pay by the LF FORCE ACCOUNT ID 1 DOL 0 1,00 9, , Item Invoice for Connection Charge FORCE ACCOUNT ID 3 DOL 0 1,00 56, , Repair of Crash Cushion Repair LAW ENFORCEMENT PERSONNEL DOL 0 1,00 68, , FORCE ACCT-EROSION CONTROL MAINTENANCE DOL 0 1,00 17, , FORCE ACCOUNT - SAFETY CONTINGENCY DOL 0 1,00 11, , UNIQUE CHANGE ORDER 1 DOL 1, , UNIQUE CHANGE ORDER 2 DOL 6, , UNIQUE CHANGE ORDER 3 DOL 6, , Added CO 11-Relocate Sign Exit UNIQUE CHANGE ORDER 4 DOL 1, , Added CO 11-Lane Closure for Emergency Repairs UNIQUE CHANGE ORDER 5 DOL 8, , Added CO 12-Underdrain Sump Pit EBFR Sta /- Lt UNIQUE CHANGE ORDER 6 DOL 120, ,00 CHANGE ORDER 14/DISINCENTIVE OFFSET/LS UNIQUE CHANGE ORDER 7 DOL 13, , RAC-R Work Prior to Revision Paid by LS UNIQUE CHANGE ORDER 8 DOL 81, ,96 Added CO LF Unused Precast Single Slope Barrier TOTAL EARNINGS $28,960,737.16

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD: 123,812.90 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 465 CONTRACT ID: 007207068 PROJECT: STP 1602(184)MM CONTRACT: 06163016 AWARD : $7,586,328.53 PROJECTED : $7,586,328.51 ADJ. PROJECTED : $7,710,141.41

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 462,346.70 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 332 13 CONTRACT ID: 000514080 PROJECT: IM 0201(189) CONTRACT: 04153049 AWARD : $11,801,426.99 PROJECTED : $12,168,144.19 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD: 20,521.28 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18-24.00 105 CONTRACT ID: 030001080 PROJECT: NH 1702(331) CONTRACT: 08173204 AWARD AMOUNT: $18,990,864.89 PROJECTED AMOUNT: $18,990,864.89 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 38,587.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 208 5.00 CONTRACT ID: 091800267 : STP 1702(453) CONTRACT: 07173236 AWARD : $1,699,468.03 ED : $1,727,168.03 ADJ. ED : $1,765,756.00 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 102 CONTRACT ID: 057401029 : BR 2018(319) CONTRACT: 12173211 AWARD : $2,595,950.00 ED : $2,833,949.00 ADJ. ED : $2,833,949.00 CONTRACT: CONTRACTOR:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: 295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 140,750.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17-6.00 200 CONTRACT ID: 071801064 PROJECT: C 718-1-64 CONTRACT: 11153002 AWARD : $32,541,855.76 PROJECTED : $33,273,455.77 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACTOR'S ESTIMATE PACKAGE CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 31 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 31 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 241,240.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 444 CONTRACT ID: 016211001 PROJECT: STP 1502(488) CONTRACT: 11153201 AWARD AMOUNT: $105,980,139.92 PROJECTED AMOUNT: $108,981,339.92 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: 304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD: -58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 231,995.19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 579 6 CONTRACT ID: 002407058 PROJECT: NH 1502(164) CONTRACT: 05153203 AWARD : 22,716,470.32 PROJECTED : 22,716,470.31 ADJ. PROJECTED : 22,948,465.50

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD: 112,067.24 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 167-13.00 35.00 CONTRACT ID: 008701104 PROJECT: NH 2014(565) CONTRACT: 04143012 AWARD : $3,126,804.84 PROJECTED : $3,176,515.84 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: IH 10 COUNTY: 05/02/2017 ESTIMATE PAID: AWARD DATE: 05/25/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: IH 10 COUNTY: 05/02/2017 ESTIMATE PAID: AWARD DATE: 05/25/2017 ESTIMATE PERIOD: 262,998.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 247 6.00 CONTRACT ID: 007207041 PROJECT: NH 2017(990) CONTRACT: 05173001 AWARD : 63,063,378.38 PROJECTED : 63,063,378.38 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD: 220,119.27 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 124 CONTRACT ID: 054303067 PROJECT: STP 2018(416)MM CONTRACT: 01183201 AWARD AMOUNT: $30,289,272.41 PROJECTED AMOUNT: $31,279,648.40 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 15,466.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 136-11.00 2.00 CONTRACT ID: 180801028 PROJECT: STP 1502(152)HES CONTRACT: 05153036 AWARD : $2,602,993.61 PROJECTED : $2,602,993.61 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED: 389,480.02 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 294-4.00-17.00 CONTRACT ID: 050601105 PROJECT: NH 1602(416) CONTRACT: 10163002 AWARD : $13,863,443.80 PROJECTED : $14,081,920.80 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD: 118,116.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 419 9 CONTRACT ID: 074704059 PROJECT: STP 2009(879)MM CONTRACT: 08093020 AWARD AMOUNT: $2,833,448.12 PROJECTED AMOUNT: $2,858,448.12 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 5,047,590.65 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 617 289.00 CONTRACT ID: 005006086 PROJECT: NH 1502(184) CONTRACT: 05153002 AWARD AMOUNT: $36,840,375.34 PROJECTED AMOUNT: $37,065,377.33

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD: 455,691.25 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 542 59.00 CONTRACT ID: 000505102 PROJECT: DMO 2012(263) CONTRACT: 05133202 AWARD : 18,434,933.58 PROJECTED : 18,604,933.60 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD: 3,933,355.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 791 CONTRACT ID: 628572001 PROJECT: RMC - 628572001 CONTRACT: 05164007 AWARD AMOUNT: $20,967,966.00 PROJECTED AMOUNT: $20,970,966.00 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD: 2,852.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 49 CONTRACT ID: 001607132 PROJECT: IM 0352(341) CONTRACT: 02133206 AWARD : $287,874.50 PROJECTED : $287,874.50 ADJ. PROJECTED : $290,726.58

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD: 1,554,603.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 792 73 CONTRACT ID: 629050001 PROJECT: SUP - 629050001 CONTRACT: 10154031 AWARD AMOUNT: $1,697,780.64 PROJECTED AMOUNT: $1,697,780.64 ADJ.

More information

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing

More information

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation 5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road

More information

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016 Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION

More information

DOCUMENTATION WORKBOOK FY 2018

DOCUMENTATION WORKBOOK FY 2018 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

Exhibit "A" Date: 1/27/2011

Exhibit A Date: 1/27/2011 Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

TABULATION OF TENDERS

TABULATION OF TENDERS SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering

More information

SAN ANTONIO WATER SYSTEM

SAN ANTONIO WATER SYSTEM G:\TXC\Projects\SAWS\SAWS - Glad\03_CADD\01_Sheets\Glad_Water\01_Sheets\1 GLAD WATR CVR.dwg Sep 13, 2017-1:44pm acalderon SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5025 2017 SMP GLAD FROM PIEDMONT

More information

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1. Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and

More information

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.

More information

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results of the research. The presentation is regarded as fully

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units)

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) 10/23/2017 Header Information Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) Bridge Name: D-02-PR-030A Inspection Date: 12/2/2015 Sufficiency Rating: Inspection

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Case Histories and Practical Examples

Case Histories and Practical Examples SUMMER SCHOOL SIIV 2012 - ROAD SAFETY MANAGEMENT Theoretical principles and practical application in the framework of the European Directive 2008/96/CE Catania 24-28 September 2012 Case Histories and Practical

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

Closure of Remote Historic Underground Mines in Desert Environments

Closure of Remote Historic Underground Mines in Desert Environments Closure of Remote Historic Underground Mines in Desert Environments James A. Cremeens Agapito Associates, Inc. Michael H. Rauschkolb U.S. Borax, Inc. 2002 SME Annual Meeting and Exhibit Geotechnical solutions

More information

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report Cost Estimate Report Title Page Plan J. without trails Springfield, Missouri Flood Risk Management Feasibility Study Class 4 Cost Estimate P2 Number 354082 Estimated by Designed by Prepared by Cost Engineering

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

Critchfield Rd / SR-129

Critchfield Rd / SR-129 NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2

More information

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager Welcome to the Business Owner Task Force Selma Stockstill SouthGate Constructors Public Information Manager Interim Project Limits SH 183 SH 121 to IH 35E SH 114 International Parkway to SH 183 Loop 12

More information

Appendix C Benchmarking Cost Estimates

Appendix C Benchmarking Cost Estimates REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

OC Public Works El Niño Storm Preparation 2015

OC Public Works El Niño Storm Preparation 2015 OC Public Works El Niño Storm Preparation 2015 December 8, 2015 Overview About OC Public Works Storm Preparation Pre-Storm During Storm Post-Storm Storm Preparation Canyon and Burn Areas County Department

More information

Summary of Bids Received For

Summary of Bids Received For Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: 10370045 Firm Name Bid Total $ $1,074,100.00 Howell Contractors Inc. $1,083,694.00 Sunesis Construction

More information

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management

More information

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 MISSOURI RIVER FLOOD OF 2011 M I C H A E L J. K E N N E R L Y P. E. D I R E C T O R O F T H E O F F I C E O F D E S I G N I O W A D

More information

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES GENERAL NOTES. NEW & RELOCATED ROADWAY SIGNS NOT SHOWN FOR CLARITY BUT, ARE INCLUDING IN CONCEPTUAL DESIGN COST ESTIMATE. KEYNOTES E X I S T I N G D E V E L O P M E N T. NEW 5' WIDE CONCRETE SIDEWALK.

More information

WELCOME APWA How Best to Protect Asphalt Overlays with Interlayers - Delay Deterioration and Extend Pavement Life

WELCOME APWA How Best to Protect Asphalt Overlays with Interlayers - Delay Deterioration and Extend Pavement Life WELCOME APWA 2015 How Best to Protect Asphalt Overlays with Interlayers - Delay Deterioration and Extend Pavement Life Dennis Rogers, Tensar Pavement Maintenance Manager, West All Data & analysis courtesy

More information

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 Spike in Tree Elevation = 102.95 Elevation

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

West Tennessee Construction June 14-21, 2017

West Tennessee Construction June 14-21, 2017 FOR IMMEDIATE RELEASE Wednesday, June 14, 2017 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction June 14-21, 2017 BENTON COUNTY, I-40 Truck Climbing Lane Wednesday, June 7 through

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

Case Study of a Decision-Making/Support Process to Schedule Multiple Highway Construction Projects

Case Study of a Decision-Making/Support Process to Schedule Multiple Highway Construction Projects Case Study of a Decision-Making/Support Process to Schedule Multiple Highway Construction Projects Arlys Silva The University of Southern Mississippi Hattiesburg, MS Tulio Sulbaran The University of Southern

More information

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) BUILDING AND SAFETY DIVISION TELEPHONE (949) 724-6300 BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) Payment: When a plan is required by the Administrative Authority to be submitted, a plan check

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

ORIGINATOR: CITY OF MADISON STREETS DIVISION REV. DATE: _ PLOT NAME: _ PLOT SCALE: _ SHORELINE TREATMENT SCHEDULE PROJECT NO. 10332/10529 U-10 SHORELINE TREATMENT SCHEDULE MAINLAND CITY OF MADISON MAINLAND

More information

CONSTRUCTION EXIT SEDIMENT BARRIER

CONSTRUCTION EXIT SEDIMENT BARRIER 241428_itizen ield Guide_v3 2/22/06 11:09 M Page 1 (1,1) ONSTRUTION EXIT stone pad located where traffic leaves a construction site to eliminate the transport of soil to public streets. SEDIMENT BRRIER

More information

Commonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

Commonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for Commonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation 14 Pages LABORATORY TESTING SECTION Method of Test for SAMPLING ROADWAY BITUMINOUS CONCRETE 1. SCOPE 1.1 This method covers

More information

Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio

Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio Mitchell W. Weber, P.G. Gannett Fleming Engineers & Architects, P.C. Greg Bachman, P.E., P.S. County of Summit Engineer Robert

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

Fast and Furious Rebuilding and Widening the I-90 West Corridor

Fast and Furious Rebuilding and Widening the I-90 West Corridor Fast and Furious Rebuilding and Widening the I-90 West Corridor Peter Foernssler, P.E., S.E. Deputy Chief, Illinois Tollway Marty Ross, P.E. Design Corridor Manager, TranSystems Jason Wenberg, P.E. Construction

More information

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite

More information

ALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN

ALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN ALUMINUM STRUCTURAL PLATE EADWALLS AASTO LRFD BASIS OF DESIGN LANE ENTERPRISES, INC. www.lane-enterprises.com Required Backfill and Load Cases: ALUMINUM STRUCTURAL PLATE EADWALLS BASIS OF DESIGN Backfill

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS 10782 Wattsburg Road Erie, PA 16509 The WATTSBURG AREA SCHOOL DISTRICT invites qualified vendors to submit proposals for CONTRACTED SNOW REMOVAL MANDATORY PRE-SUBMISSION MEETING All

More information

Preliminary Hydraulic Report

Preliminary Hydraulic Report Tarrant County, Texas Preliminary Hydraulic Report Prepared for: Texas Department of Transportation Fort Worth District Prepared by: AECOM Corporation Scott C. Williams, P.E. No. 101334, Date 2009 This

More information

CUSTER COUNTY SNOW REMOVAL PROCEDURES

CUSTER COUNTY SNOW REMOVAL PROCEDURES CUSER COUNY SNOW REMOVAL PROCEDURES Prioritization of Plow Routes County-maintained roads are plowed based upon the following prioritization criteria: 1. Arterial Roadways and School Bus routes: Arterial

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

SNOW AND ICE CONTROL GUIDELINES

SNOW AND ICE CONTROL GUIDELINES SNOW AND ICE CONTROL GUIDELINES 2017-2018 I. PERSONNEL All Department of Public Works and Parks and Recreation personnel shall be available for snow and ice control operations. The City may also utilize

More information

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, 2014 5:30 p.m. Allison Hollow Road Reconstruction Project A. William Kiehl called the Special Meeting of Tuesday March 11, 2014, at 5:30

More information

SPECIFICATION FOR RAMM UPDATING OF ROADS

SPECIFICATION FOR RAMM UPDATING OF ROADS SPECIFICATION FOR RAMM UPDATING OF ROADS 1. SCOPE This specification sets out the general requirements for consultants specialising in, and being fully conversant with Road Assessment and Maintenance Management

More information

RETAINING WALL LOADS: Horizontal Equivalent Fluid Pressure = pcf. (Load Case = Soil)

RETAINING WALL LOADS: Horizontal Equivalent Fluid Pressure = pcf. (Load Case = Soil) QuickWall 8.0 - RETAINING WALL ANALYSIS AND DESIGN ================================================================================ Job ID : Job Description : Designed By : ================================================================================

More information

Tropical E.S. - BUDGET

Tropical E.S. - BUDGET Tropical E.S. - BUDGET Replace HVAC Chiller and Cooling Tower Description Budget COMMENTS GMP Design $45,90.92 Heard Construction $5,885.00 DDC Engineering Sub-Total Overhead @ 0% Profit @ 5% Contingency

More information

9/12/2014 O V E RV I E W

9/12/2014 O V E RV I E W K E E P I N G T H E N E W M I S S I O N R E AC H C L E A N T R A S H & F L O ATA B L E S B M P S T U D Y Russell Persyn, P.E., Ph.D. (SARA) Cris Parker, P.E., CFM (HDR) September 4, 2014 O V E RV I E W»

More information

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable

More information