1 Cost Estimate Report Title Page Plan J. without trails Springfield, Missouri Flood Risk Management Feasibility Study Class 4 Cost Estimate P2 Number Estimated by Designed by Prepared by Cost Engineering Section City of Springfield, MO & CESWL-EC-D George Losak Preparation Date 12/20/2012 Effective Date of Pricing 12/20/2012 Estimated Construction Time 836 Days This report is not copyrighted, but the information contained herein is For Official Use Only.

2 Cost Estimate Report Table of Contents Description Page Library Properties i Project Notes ii Markup Properties iii Alternate View 1 New Alt. View 1 01 Lands & Damages 1 J E1 01 Lands and Damages - Reach E1 1 J E0N Lands and Damages - E0N Basin 11 1 J E0N 11c 01 Lands and Damages - E0N Basin 11C 1 J E0S Lands and Damages - E0S Basin 06 1 J E0S Lands and Damages - E0S Basin 07 1 J E0S 09b 01 Lands and Damages - E0S Basin 9B 1 02 Relocations 1 J E1 02 Relocations - Reach E1 1 J E0S Relocations - E0S Basin Channels & Channels 1 J E1 09 Channels and Canals - Reach E Floodway Control and Diversion Structures 1 J E0N Floodway Control and Diversion Structures - E0N Basin 11 1 J E0N 11c 15 Floodway Control and Diversion Structures - E0N Basin 11c 1 J E0S Floodway Control and Diversion Structures - E0S Basin 06 1 J E0S Floodway Control and Diversion Structures - E0S Basin 07 1 J E0S 09b 15 Floodway Control and Diversion Structures - E0S Basin 09b 1 30 Planning, Engineering, and Design 1 30 E1 Planning Engineering and Design - Reach E1 1 J E0N Planning, Engineering and Design - E0N Basin 11 1 J E0N 11c 30 Planning, Engineering and Design - E0N Basin 11c 1 J E0S Planning, Engineering and Design - E0S Basin 06 1 J E0S Planning, Engineering and Design - E0S Basin 07 1 J E0S 09b 30 Planning, Engineering and Design - E0S Basin 09b 1 31 Contract Supervision and Administration 1 31 Contract Supervision and Administration 2 Contract Supervision and Administration - Reach E1 2 J E0N Contract Supervision and Administration - E0N Basin 11 2 J E0N 11c 31 Contract Supervision and Administration - E0N Basin 11c 2 J E0S Contract Supervision and Administration - E0S Basin 06 2 J E0S Contract Supervision and Administration - E0S Basin 07 2 J E0S 09b 31 Contract Supervision and Administration - E0S Basin 09b 2 Reach Level 3

3 Cost Estimate Report Table of Contents Description Page J E1 Reach E1, Wilson's Creek 3 J E0N E0N North Reach. Detention Basins 3 J E0S E0S South Reach. Detention Basins 3 Feature & Subfeature Level 4 J E1 Reach E1, Wilson's Creek 4 J E1 01 Lands and Damages 4 J E1 02 Relocations 4 J E1 09 Channels and Canals 4 Planning Engineering and Design 4 Contract Supervision and Administration 4 J E0N E0N North Reach. Detention Basins 4 J E0N 11 Basin 11 4 J E0N 11c Basin 11c 4 J E0S E0S South Reach. Detention Basins 4 J E0S 06 Basin 6 4 J E0S 07 Basin 7 5 J E0S 09b Basin 9B 5 Direct Cost 6 J E1 Reach E1, Wilson's Creek 6 J E1 01 Lands and Damages 6 J E1 01A Project Planning 6 Easement Values - Nonfederal 6 Channel Improvement Easement 6 Temporary Work Area Easement 6 Acquisition Documents by Nonfederal Sponsor 6 Review of Acquisition Documents - Federal 6 J E1 02 Relocations 6 J E Automobile Roads, Construction Activities 6 J E Existing Conditions 6 J E Demolition 6 J E Pulverize Asphalt Pavement of the Existing Street - Bennett Street 6 Construction Zone Temporary Barricades 6 Saw Cut Upper and Lower Limits 6 Pulverize Pavement 6 Hauling 6 J E Structure Demolition 6 J E Demolish Scenic Bridge 6 Demolition 6 Bust up Concrete 7

4 Cost Estimate Report Table of Contents Description Page Remove guardrail 7 Demolish Bridge concrete 7 E Break up Concrete 7 Load for Hauling 7 Hauling 7 J E Exterior Improvements 7 J E Bases, Ballasts, and Paving 7 J E Raise Road Subgrade and pave with Asphalt Bennett Street 7 Imported Fill 7 Hauling 7 Spread and Compaction 7 Grading 7 Aggregate Base - 6 inch layer 7 Fine Grading 7 Paving - 3" asphalt 7 Hauling 7 J E Railroads, Construction Activities. 7 J E Mobilization, Demobilization and Preparatory Work 7 J E Existing Conditions 7 Demolition of Existing RR Track and bridge structure 7 Cut Track 7 Cut Track 8 Load and Haul away rails and ties. 8 Remove Bridge Girders 8 J E Cemeteries, Utilities, and Structures, Construction Activities 8 J E Existing Conditions 8 J E Demolition 8 J E Selective Demolition of Water and Sewer Piping & Fittings 8 Sanitary Sewer - Demolish and Remove 8 inch Line 8 Trench Excavation 8 Breakup and Removal of Pipe - 8 inch Dia. 8 Hauling Away Debris 8 Backfill With Compaction 8 Storm Sewer - Remove 15" Reinforce Concrete Pipe 8 Trench Excavation 8 Removal of 15 inch RCP 8 Hauling Away Debris 8 J E Utilities 8 J E Water Lines 8

5 Cost Estimate Report Table of Contents Description Page J E Waterline - 12 inch 8 Trench Excavation 8 Pipe 8 Valves with boxes 8 Backfill With Compaction 8 Backfill With Compaction 9 Hauling 9 J E Sanitary Sewer Lines 9 J E Sanitary Sewer - 8 inch 9 Trench Excavation 9 Pipe - 9 Manholes 9 Tie into Existing Manhole 9 Backfill With Compaction 9 Hauling 9 J E Plug Existing Manhole 9 J E Encase existing 42 inch SS line in Concrete 9 J E Lower Manhole Top 9 D E Trench Excavation 9 D E Cut Top of Manhole 9 D E New Manhole top 9 J E Natural Gas Distribution 9 Lower 4" Intermediate Pressure Line 9 Trench Excavation Conventional 9 Pipe and fittings 9 Backfill With Compaction 9 Valves 9 J E Electrical Utility Transmission and Sistribution 9 Wilson Creek Station Wilson Creek Station Relocate Existing 90 Ft Pole 10 Install New Steel Pole 10 Demo Existing 90 Ft Wood Pole 10 Under Bridge Lighting-Wilson Creek Railroad Bridge 10 Site Exterior Lighting 10 Pole Mounted Transformer 10 Pole Top Structure assembly 10 Underground Ductbank and Conductors 10 Trenching 10

6 Cost Estimate Report Table of Contents Description Page Conduit 10 Panelboard 10 Areal Lighting 10 Under Bridge Conduit & Wiring 10 Pole Riser Conduit 10 Grounding System 10 Light Controller 10 J E1 09 Channels and Canals 10 G E Channels 10 G E Earthwork 10 G E Excavation - unclassified 10 Excavation to Enlarge Channel 10 Hauling 10 Excavation 10 Excavation Support including side slope shaping 10 Excavation Support including side slope shaping 11 Dust Control 11 G E Erosion Control 11 G E Temporary Erosion Control - Silt Fence 11 Erosion Control Mat 11 Channel Stabiliization 11 Riprap at Low Flow Channel 11 G E Imported Fill for Channel Improvement 11 Hauling 11 Spread and Compaction 11 Grading 11 G E Clearing and Grubbing 11 G E Clearing and Grubbing Land 11 Removal of trees including stumps in the Work Area 11 Haul Off Chipped material 11 G E Rock Excavation with excavator and pneumatic hammer 11 G E Break up Rock 12 G E Load for Hauling 12 G E Hauling 12 G E Exterior Improvements 12 G E Turf and Grasses 12 Plant Native Species Mix including wild flowers 12 G E Retaining Walls 12 Retaining Wall located at Wilson's Creek to

7 Cost Estimate Report Table of Contents Description Page Excavate Foundation. Sta to and to Hauling 12 Retaining Wall located at Wilson's Creek to G E Fabricated Bridges 12 G E Fabricated Roadway Bridges 12 G E Modify Bridge Foundation to accomodate Channel Improvement. - Scenic Street 12 G ED Excavate for Additional Foundations Including additional piling. 12 Excavation 12 G E Additional Piling - pipe with reinforced concrete fill 12 G E Additional Piling - pipe with reinforced concrete fill 13 G E Concrete Pile Cap footing 13 Forming 13 Reinforcement 13 Concrete 13 G E New Railroad Bridge Over Wilson's Creek 13 Planning Engineering and Design 13 Contract Supervision and Administration 13 J E0N E0N North Reach. Detention Basins 13 J E0N 11 Basin J E0N Lands and Damages 13 Basin Land Cost 13 Acquisition Cost - Non-Federal 13 Acquisition Cost - Federal 13 J E0N Floodway Control and Diversion Structures 13 J E0N Mobilization & Demobilization 13 J E0N Earthwork Clearing and Grubbing Land Clearing 13 Loading and Hauloff of Clearing Debris Unclassified Excavation - Exported 13 Haul Road Maintenance 13 Haul Road Maintenance 14 Shaping of Disposal Material 14 Erosion Control 14 Shape the Detention Pond Unclassified Excavation used as fill 14 Excavation 14 Hauling 14

8 Cost Estimate Report Table of Contents Description Page Dump, spread and Compaction 14 J E0N Exterior Improvements 14 Seeding & Fertilzation 14 Mulching & Disk Anchoring 14 J E0N Concrete - Outlet structurre 14 Forming 14 Turndown Footing 14 Floor Slab 14 Sidewalls 14 Weir Crest 14 Steel Reinforcement 14 New Dowels to Secure New Crest Wall into Existing Structure 14 Concrete 14 Concrete 15 Footing 15 Finishing & Curing 15 Sidewalls & Curing 15 Finishing 15 Weir 15 Finishing & Curing 15 Floor Slab 15 Finishing & Curing 15 J E0N Utilities Storm Sewer 15 Pipe & Fittings Demo Existing Pavement Cut & Pulverize Load, Haul & Disposal Excavate Trench 15 Storm Sewer Backfill 15 J E0N Planning, Engineering and Design 15 J E0N Contract Supervision and Administration 15 J E0N 11c Basin 11c 15 J E0N 11c 01 Lands and Damages 15 Basin 11c 15 Acquisition Cost - Non-Federal 15 Acquisition Cost - Federal 15 Land Cost 15 J E0N 11c 15 Floodway Control and Diversion Structures 15

9 Cost Estimate Report Table of Contents Description Page J E0N 11c 15 Floodway Control and Diversion Structures 16 J E0N 11c 1501 Mobilization & Demobilization 16 J E0N 11c 1503 Concrete - Outlet structurre 16 Forming 16 Turndown Footing 16 Floor Slab 16 Sidewalls 16 Weir Crest 16 Steel Reinforcement 16 Concrete 16 Footing 16 Finishing & Curing 16 Sidewalls & Curing 16 Finishing 16 Weir 16 Finishing & Curing 16 Floor Slab 16 Finishing & Curing 16 J E0N 11c 1531 Earthwork 16 11c Clearing and Grubbing Land Clearing 16 Loading Clearing Debris 16 11c Unclassified Excavation - Exported 16 Haul Road Maintenance 16 Shaping of Disposal Material 16 Shaping of Disposal Material 17 Erosion Control 17 Shape the Detention Pond 17 11c Unclassified Excavation used as fill 17 Excavation 17 Hauling 17 Dump, spread and Compaction 17 Shape the Pond Embankment 17 J E0N 11c 1532 Exterior Improvements 17 Seeding & Fertilzation 17 Mulching & Disk Anchoring 17 J E0N 11c 30 Planning, Engineering and Design 17 J E0N 11c 31 Contract Supervision and Administration 17 J E0S E0S South Reach. Detention Basins 17

10 Cost Estimate Report Table of Contents Description Page J E0S 06 Basin 6 17 J E0S Lands and Damages 17 Basin 6 17 Land Cost 17 Acquisition Cost - Non-Federal 17 Acquisition Cost - Federal 17 J E0S Floodway Control and Diversion Structures 17 J E0S Mobilization & Demobilization 17 J E0S Earthwork 17 J E0S Earthwork Clearing and Grubbing Land Clearing 18 Loading Clearing Debris 18 Unclassified Excavation used as fill 18 Excavation 18 Hauling 18 Dump, spread and Compaction Unclassified Excavation - Exported 18 Haul Road Maintenance 18 Shaping of Disposal Material 18 Erosion Control 18 Shape the Detention Pond 18 J E0S Exterior Improvements 18 Seeding & Fertilzation 18 Mulching & Disk Anchoring 18 J E0S Concrete - Outlet structurre 18 Forming 18 Turndown Footing 18 Floor Slab 18 Sidewalls 18 Weir Crest 18 Steel Reinforcement 18 Steel Reinforcement 19 Concrete 19 Footing 19 Finishing & Curing 19 Sidewalls & Curing 19 Finishing 19 Weir 19

11 Cost Estimate Report Table of Contents Description Page Finishing & Curing 19 Floor Slab 19 Finishing & Curing 19 J E0S Planning, Engineering and Design 19 J E0S Contract Supervision and Administration 19 J E0S 07 Basin 7 19 J E0S Lands and Damages 19 Basin 7 19 Land Cost 19 Acquisition Cost - Non-Federal 19 Acquisition Cost - Federal 19 J E0S Relocations 19 J E0S Cemeteries, Utilities, and Structures, Construction Activities 19 J E0S Utilities Earthwork 19 Trenching 19 Water Supply 19 Sanitary Sewer 19 Manholes 19 Manholes 20 Natural Gas 20 Trench Back Fill including Bedding 20 Water Supply 20 Natural Gas 20 Sanitary Sewer 20 Sanitary Sewer - Manholes Exterior Improvements 20 Pavement Repair Utiltities Water Supply 20 Piping 20 8 inch ductile Iron 20 6 inch ductile Iron 20 Fittings & Valves Sanitary Sewer 20 Piping 15 inch 20 Piping - 12 inch 20 Piping - 10 inch 20 Manholes 20

12 Cost Estimate Report Table of Contents Description Page Manholes - 8 feet deep 20 Manhles - 12 feet deep Natural Gas inch Black Steel 20 2 inch Black Steel 20 Demolition 20 Demolish 12 inch diameter vitrified clay sewer pipe 20 Demolish 12 inch diameter vitrified clay sewer pipe 21 Sanitary Sewer - Trench backfill 21 Haul off and Disposal of Pipe 21 J E0S Structures Exterior Improvements Remove and Replace Playground Equipment 21 Small Equipment Items 21 Prepared playground material/surfacing 21 Large Equipment 21 Prepared playground material/surfacing 21 Basket Ball Courts & Tennis Courts. 21 Basketball Court 21 Demolition 21 Load and Haul off Debris including disposal 21 Tennis Court Complete with Fence 21 J E0S Floodway Control and Diversion Structures 21 J E0S Mobilization & Demobilization 21 J E0S Earthwork Clearing and Grubbing Land Clearing 21 Loading Clearing Debris 21 Shape the Detention Pond 21 Shape the Detention Pond Unclassified Excavation - Exported 22 Haul Road Maintenance 22 Shaping of Disposal Material 22 Erosion Control Unclassified Excavation used as fill 22 Excavation 22 Hauling 22 Dump, spread and Compaction 22 J E0S Exterior Improvements 22

13 Cost Estimate Report Table of Contents Description Page Seeding & Fertilzation 22 Mulching & Disk Anchoring 22 J E0S Concrete - Outlet structurre 22 Forming 22 Turndown Footing 22 Floor Slab 22 Sidewalls 22 Weir Crest 22 Steel Reinforcement 22 Concrete 22 Footing 22 Finishing & Curing 22 Finishing & Curing 23 Sidewalls & Curing 23 Finishing 23 Weir 23 Finishing & Curing 23 Floor Slab 23 Finishing & Curing 23 J E0S Utilities 23 J E0S Storm Sewer 23 Pipe & Fittings 23 Junction Boxes Demo Existing Pavement Cut & Pulverize Load, Haul & Disposal Excavate Trench 23 Storm Sewer Backfill 23 J E0S Planning, Engineering and Design 23 J E0S Contract Supervision and Administration 23 J E0S 09b Basin 9B 23 J E0S 09b 01 Lands and Damages 23 Basin 9b 23 Land Cost 23 Acquisition Cost - Non-Federal 23 Acquisition Cost - Federal 23 J E0S 09b 15 Floodway Control and Diversion Structures 23 J E0S Mobilization & Demobilization 23 J E0S Mobilization & Demobilization 24

14 Cost Estimate Report Table of Contents Description Page J E0S Earthwork Clearing and Grubbing Land Clearing 24 Loading Clearing Debris Unclassified Excavation - Exported 24 Haul Road Maintenance 24 Shaping of Disposal Material 24 Erosion Control 24 Shape the Detention Pond Unclassified Excavation used as fill 24 Excavation 24 Hauling 24 Dump, spread and Compaction 24 J E0S Exterior Improvements 24 Seeding & Fertilzation 24 Mulching & Disk Anchoring 24 J E0S Concrete - Outlet structurre 24 Forming 24 Turndown Footing 24 Floor Slab 24 Sidewalls 24 Weir Crest 25 Steel Reinforcement 25 Concrete 25 Footing 25 Finishing & Curing 25 Sidewalls & Curing 25 Finishing 25 Weir 25 Finishing & Curing 25 Floor Slab 25 Finishing & Curing 25 J E0S Utilities Storm Sewer 25 Pipe & Fittings Demo Existing Pavement Cut & Pulverize Load, Haul & Disposal Excavate Trench 25

15 Cost Estimate Report Table of Contents Description Page Storm Sewer Backfill 25 J E0S 09b 30 Planning, Engineering and Design 25 J E0S Contract Supervision and Administration 25 InDirect Cost 26 J E1 Reach E1, Wilson's Creek 26 J E1 01 Lands and Damages 26 J E1 01A Project Planning 26 Easement Values - Nonfederal 26 Channel Improvement Easement 26 Temporary Work Area Easement 26 Acquisition Documents by Nonfederal Sponsor 26 Review of Acquisition Documents - Federal 26 J E1 02 Relocations 26 J E Automobile Roads, Construction Activities 26 J E Existing Conditions 26 J E Demolition 26 J E Exterior Improvements 27 J E Bases, Ballasts, and Paving 27 J E Railroads, Construction Activities. 27 J E Mobilization, Demobilization and Preparatory Work 27 J E Existing Conditions 27 J E Cemeteries, Utilities, and Structures, Construction Activities 28 J E Existing Conditions 28 J E Demolition 28 J E Utilities 28 J E Water Lines 28 J E Sanitary Sewer Lines 28 J E Sanitary Sewer Lines 29 J E Natural Gas Distribution 29 J E Electrical Utility Transmission and Sistribution 29 J E1 09 Channels and Canals 30 G E Channels 30 G E Earthwork 30 G E Excavation - unclassified 30 G E Erosion Control 31 G E Imported Fill for Channel Improvement 31 G E Clearing and Grubbing 31 G E Rock Excavation with excavator and pneumatic hammer 31 G E Exterior Improvements 32

16 Cost Estimate Report Table of Contents Description Page G E Turf and Grasses 32 G E Retaining Walls 32 G E Fabricated Bridges 32 Planning Engineering and Design 33 Contract Supervision and Administration 33 J E0N E0N North Reach. Detention Basins 33 J E0N 11 Basin J E0N Lands and Damages 33 Basin Land Cost 33 Acquisition Cost - Non-Federal 33 Acquisition Cost - Federal 33 J E0N Floodway Control and Diversion Structures 33 J E0N Mobilization & Demobilization 33 J E0N Earthwork Clearing and Grubbing Land Unclassified Excavation - Exported Unclassified Excavation used as fill 33 J E0N Exterior Improvements 34 Seeding & Fertilzation 34 Mulching & Disk Anchoring 34 J E0N Concrete - Outlet structurre 34 Forming 34 Steel Reinforcement 34 Concrete 34 J E0N Utilities Storm Sewer 35 J E0N Planning, Engineering and Design 35 J E0N Contract Supervision and Administration 35 J E0N 11c Basin 11c 35 J E0N 11c 01 Lands and Damages 35 Basin 11c 35 Acquisition Cost - Non-Federal 35 Acquisition Cost - Federal 35 Land Cost 35 J E0N 11c 15 Floodway Control and Diversion Structures 35 J E0N 11c 1501 Mobilization & Demobilization 35 J E0N 11c 1503 Concrete - Outlet structurre 35 Forming 35

17 Cost Estimate Report Table of Contents Description Page Steel Reinforcement 36 Concrete 36 J E0N 11c 1531 Earthwork 36 11c Clearing and Grubbing Land 36 11c Unclassified Excavation - Exported 36 11c Unclassified Excavation used as fill 36 J E0N 11c 1532 Exterior Improvements 37 Seeding & Fertilzation 37 Mulching & Disk Anchoring 37 J E0N 11c 30 Planning, Engineering and Design 37 J E0N 11c 31 Contract Supervision and Administration 37 J E0S E0S South Reach. Detention Basins 37 J E0S 06 Basin 6 37 J E0S Lands and Damages 37 Basin 6 37 Land Cost 37 Acquisition Cost - Non-Federal 37 Acquisition Cost - Federal 37 J E0S Floodway Control and Diversion Structures 37 J E0S Mobilization & Demobilization 37 J E0S Earthwork Clearing and Grubbing Land 37 Unclassified Excavation used as fill Unclassified Excavation - Exported 37 J E0S Exterior Improvements 38 Seeding & Fertilzation 38 Mulching & Disk Anchoring 38 J E0S Concrete - Outlet structurre 38 Forming 38 Steel Reinforcement 38 Concrete 38 J E0S Planning, Engineering and Design 38 J E0S Planning, Engineering and Design 39 J E0S Contract Supervision and Administration 39 J E0S 07 Basin 7 39 J E0S Lands and Damages 39 Basin 7 39 Land Cost 39 Acquisition Cost - Non-Federal 39

18 Cost Estimate Report Table of Contents Description Page Acquisition Cost - Federal 39 J E0S Relocations 39 J E0S Cemeteries, Utilities, and Structures, Construction Activities 39 J E0S Utilities 39 J E0S Structures 40 J E0S Floodway Control and Diversion Structures 41 J E0S Mobilization & Demobilization 41 J E0S Earthwork Clearing and Grubbing Land 41 Shape the Detention Pond Unclassified Excavation - Exported Unclassified Excavation used as fill 41 J E0S Exterior Improvements 41 J E0S Exterior Improvements 42 Seeding & Fertilzation 42 Mulching & Disk Anchoring 42 J E0S Concrete - Outlet structurre 42 Forming 42 Steel Reinforcement 42 Concrete 42 J E0S Utilities 42 J E0S Storm Sewer 42 J E0S Planning, Engineering and Design 43 J E0S Contract Supervision and Administration 43 J E0S 09b Basin 9B 43 J E0S 09b 01 Lands and Damages 43 Basin 9b 43 Land Cost 43 Acquisition Cost - Non-Federal 43 Acquisition Cost - Federal 43 J E0S 09b 15 Floodway Control and Diversion Structures 43 J E0S Mobilization & Demobilization 43 J E0S Earthwork Clearing and Grubbing Land Unclassified Excavation - Exported Unclassified Excavation used as fill Unclassified Excavation used as fill 44 J E0S Exterior Improvements 44 Seeding & Fertilzation 44

19 Cost Estimate Report Table of Contents Description Page Mulching & Disk Anchoring 44 J E0S Concrete - Outlet structurre 44 Forming 44 Steel Reinforcement 44 Concrete 44 J E0S Utilities Storm Sewer 45 J E0S 09b 30 Planning, Engineering and Design 45 J E0S Contract Supervision and Administration 45

20 Cost Estimate Report Library Properties Page i Designed by Design Document City of Springfield, MO & CESWL-EC-D Document Date 3/16/2012 Estimated by District Little Rock District Cost Engineering Section Contact George Losak Prepared by Budget Year 2013 George Losak UOM System Original Direct Costs Timeline/Currency LaborCost Preparation Date 12/20/2012 EQCost Escalation Date 10/31/2012 MatlCost Eff. Pricing Date 12/20/2012 SubBidCost Estimated Duration 836 Day(s) UserCost1 UserCost2 Currency US dollars Exchange Rate Costbook CB10EB: MII English Cost Book 2010 Labor Rates LaborCost1 LaborCost2 LaborCost3 LaborCost4 Labor MO 2 12: Labor Missouri 2012 Area 2 Equipment EP11R05: MII Equipment 2011 Region MIDWEST Fuel Shipping Rates Sales Tax 7.50 Electricity Over 0 CWT Working Hours per Year 1,400 Gas Over 240 CWT Labor Adjustment Factor 0.98 Diesel Off-Road Over 300 CWT Cost of Money 1.75 Diesel On-Road Over 400 CWT 9.32 Cost of Money Discount Over 500 CWT 5.72 Tire Recap Cost Factor 1.50 Over 700 CWT 5.30 Tire Recap Wear Factor 1.80 Over 800 CWT 4.05 Tire Repair Factor 0.15 Equipment Cost Factor 1.00 Standby Depreciation Factor 0.50

21 Cost Estimate Report Project Notes Page ii Date Author Note 12/5/2012 Losak LEVEL OF DESIGN: Pilot Feasibility Study. LEVEL OF COST ESTIMATE: Class 3. SYNOPSIS: The purpose of this project is to manage (reduce) the flood damages to structures in low lying areas along upper Wilson's Creek and Jordan Creek within the city limits of Springfield, Missouri. The work for this alternative includes channel excavation (earth and rock), bridge and culvert enlargement or replacement segmental block retaining walls, highway bridge pier reinforcement, and utility relocations interfering or blocking the flow area within the enlarged channels section within Reach E1 and construction of flood water detention basins in. Some sections of the channel are concrete lined with vertical side slopes. The work area land use for this alternative is to sparsely developed industrial areas in west central Springfield. Excavation quantities are thought to be well quantified since they were derived by the civil designer from over five hundred cross sections. These cross sections were first used for the hydrology and hydraulics studies.assumptions: 1. There will sufficient land easements for working room for trucks to drive through access so that the hydraulic excavators may continue to work at near optimum rate.2. All excavated material is required to be hauled off site for disposal. 3. Waste excavated material (earth and rock) is assumed to be disposed of within 10 miles of the worksite. The sponsor has stated that there are always contractors wanting fill material. 4. Hazardous, toxic, and radiological waste (HTRW) will be removed by the Springfield from the work area before construction begins. 5. The working room for construction of the Phelps Street reinforced concrete box culvert is too little to accommodate using pre-cast concrete boxes units so it was assumed that utilizing cast in place construction is required. X. See folder notes with in the cost estimate for additional notes.inclusions IN THE COST ESTIMATE:1. Job Office Overhead (JOOH) of 13.0 percent in the Class 4 estimates and calculated JOOH in the two (Plans F & G) final alternatives. 2. Home Office Overhead of 8.0 percent in all alternatives based upon common rates. 3. Profit of 9.38 percent derived from the weighted guidelines method. 4. Bond of 0.98 percent based upon the MII embedded bond table.

22 Cost Estimate Report Markup Properties Page iii Direct Cost Markups Category Method Productivity Productivity Productivity Overtime Overtime Overtime Days/Week Hours/Shift Shifts/Day 1st Shift 2nd Shift 3rd Shift Standard Actual Day OT Factor Working OT Percent FCCM Percent Monday 1.50 Yes Tuesday 1.50 Yes Wednesday 1.50 Yes Thursday 1.50 Yes Friday 1.50 Yes Saturday 1.50 No Sunday 2.00 No Sales Tax TaxAdj Running % on Selected Costs MatlCost Small Tools MiscDirect Running % on Selected Costs LaborCost Contractor Markups Category Method JOOH Calc (Small Tools) Allowance % of Labor JOOH Calc JOOH JOOH (Calculated) JOOH 13% JOOH Running % JOOH 12% JOOH Running % HOOH HOOH Running % HOOH 7% HOOH Running % Profit Profit Profit Weighted Guidelines Guideline Value Weight Percentage Risk Difficulty Size Period Invest (Contractor's) Assist (Assistance by) SubContracting Total Profit 7.5% Profit Profit Weighted Guidelines

23 Cost Estimate Report Markup Properties Page iv Guideline Value Weight Percentage Risk Difficulty Size Period Invest (Contractor's) Assist (Assistance by) SubContracting Total Bond Bond Bond Table Class B, Tiered, 24 months, 1.00% Surcharge Contract Price Bond Rate 500, ,000, ,500, ,500, ,500, Excise Tax Excise Running % Owner Markups Category Method Escalation Escalation Escalation StartDate StartIndex EndDate EndIndex Escalation 2/15/ /15/ % Contingency Contingency Running % 20% Contingency Contingency Running % 23% Contingency Contingency Running % 25% Contingency Contingency Running % 30% Contingency Contingency Running % 10% SIOH SIOH Running % 8% SIOH SIOH Running % 10% PED MiscOwner Contract % 8.5% PED MiscOwner Contract %

24 Cost Estimate Report Alternate View Page 1 Description Quantity UOM ContractCost ProjectCost Alternate View New Alt. View 15,966, ,523, Lands & Damages EA 3,824, ,589, J E1 01 Lands and Damages - Reach E EA 881, ,058, J E0N Lands and Damages - E0N Basin EA 794, , J E0N 11c 01 Lands and Damages - E0N Basin 11C EA 570, , J E0S Lands and Damages - E0S Basin EA 561, , J E0S Lands and Damages - E0S Basin EA 482, , J E0S 09b 01 Lands and Damages - E0S Basin 9B EA 533, , Relocations EA 1,406, ,729, J E1 02 Relocations - Reach E EA 394, , J E0S Relocations - E0S Basin EA 1,011, ,244, Channels & Channels EA 5,631, ,926, J E1 09 Channels and Canals - Reach E EA 5,631, ,926, Floodway Control and Diversion Structures EA 3,437, ,228, J E0N Floodway Control and Diversion Structures - E0N Basin EA 577, , J E0N 11c 15 Floodway Control and Diversion Structures - E0N Basin 11c EA 364, , J E0S Floodway Control and Diversion Structures - E0S Basin EA 521, , J E0S Floodway Control and Diversion Structures - E0S Basin EA 1,621, ,994, J E0S 09b 15 Floodway Control and Diversion Structures - E0S Basin 09b EA 353, , Planning, Engineering, and Design EA 846, ,041, E1 Planning Engineering and Design - Reach E EA 486, , J E0N Planning, Engineering and Design - E0N Basin EA 46, , J E0N 11c 30 Planning, Engineering and Design - E0N Basin 11c EA 29, , J E0S Planning, Engineering and Design - E0S Basin EA 42, , J E0S Planning, Engineering and Design - E0S Basin EA 213, , J E0S 09b 30 Planning, Engineering and Design - E0S Basin 09b EA 28, ,241.00

25 Cost Estimate Report Alternate View Page 2 Description Quantity UOM ContractCost ProjectCost 31 Contract Supervision and Administration EA 819, ,008, Contract Supervision and Administration - Reach E EA 464, , J E0N Contract Supervision and Administration - E0N Basin EA 46, , J E0N 11c 31 Contract Supervision and Administration - E0N Basin 11c EA 29, , J E0S Contract Supervision and Administration - E0S Basin EA 41, , J E0S Contract Supervision and Administration - E0S Basin EA 210, , J E0S 09b 31 Contract Supervision and Administration - E0S Basin 09b EA 28, ,806.00

26 Cost Estimate Report Reach Level Page 3 Description UOM Quantity ContractCost Escalation Contingency MiscOwner SIOH ProjectCost Reach Level 15,966, ,557, ,523,493 J E1 Reach E1, Wilson's Creek EA 1.0 7,857, ,780, ,638,031 J E0N E0N North Reach. Detention Basins EA 1.0 2,458, , ,982,659 J E0S E0S South Reach. Detention Basins EA 1.0 5,650, ,252, ,902,803

27 Cost Estimate Report Feature & Subfeature Level Page 4 Description UOM Quantity ContractCost Escalation Contingency MiscOwner SIOH ProjectCost Feature & Subfeature Level 15,966, ,557, ,523,493 J E1 Reach E1, Wilson's Creek EA 1.0 7,857, ,780, ,638,031 J E1 01 Lands and Damages EA , , ,058,184 J E1 01A Project Planning EA , , ,058,184 J E1 02 Relocations EA , , ,137 J E Automobile Roads, Construction Activities EA , , ,070 J E Railroads, Construction Activities. EA , , ,517 J E Cemeteries, Utilities, and Structures, Construction Activities EA , , ,550 J E1 09 Channels and Canals EA 1.0 5,631, ,295, ,926,210 G E Channels EA 1.0 5,631, ,295, ,926,210 Planning Engineering and Design EA , , ,780 Contract Supervision and Administration EA , , ,720 J E0N E0N North Reach. Detention Basins EA 1.0 2,458, , ,982,659 J E0N 11 Basin 11 EA 1.0 1,464, , ,778,073 J E0N Lands and Damages EA , , ,400 J E0N Floodway Control and Diversion Structures EA , , ,313 J E0N Planning, Engineering and Design EA , , ,535 J E0N Contract Supervision and Administration EA , , ,825 J E0N 11c Basin 11c EA , , ,204,585 J E0N 11c 01 Lands and Damages EA , , ,600 J E0N 11c 15 Floodway Control and Diversion Structures EA , , ,877 J E0N 11c 30 Planning, Engineering and Design EA , , ,278 J E0N 11c 31 Contract Supervision and Administration EA , , ,830 J E0S E0S South Reach. Detention Basins EA 1.0 5,650, ,252, ,902,803 J E0S 06 Basin 6 EA 1.0 1,166, , ,417,961 J E0S Lands and Damages EA , , ,800 J E0S Floodway Control and Diversion Structures EA , , ,966

28 Cost Estimate Report Feature & Subfeature Level Page 5 Description UOM Quantity ContractCost Escalation Contingency MiscOwner SIOH ProjectCost J E0S Planning, Engineering and Design EA , , ,918 J E0S Contract Supervision and Administration EA , , ,277 J E0S 07 Basin 7 EA 1.0 3,539, , ,339,518 J E0S Lands and Damages EA , , ,000 J E0S Relocations EA 1.0 1,011, , ,244,576 J E0S Floodway Control and Diversion Structures EA 1.0 1,621, , ,994,456 J E0S Planning, Engineering and Design EA , , ,362 J E0S Contract Supervision and Administration EA , , ,123 J E0S 09b Basin 9B EA , , ,145,325 J E0S 09b 01 Lands and Damages EA , , ,200 J E0S 09b 15 Floodway Control and Diversion Structures EA , , ,078 J E0S 09b 30 Planning, Engineering and Design EA , , ,241 J E0S Contract Supervision and Administration EA , , ,806

29 Cost Estimate Report Direct Cost Page 6 Description UOM Quantity DirectLabor DirectEQ DirectMatl DirectSubBid DirectCost ContractCost ProjectCost Direct Cost 2,391, ,323, ,271, , ,405, ,966, ,523, J E1 Reach E1, Wilson's Creek EA ,090, , , , ,867, ,857, ,638, J E1 01 Lands and Damages EA , , ,058, J E1 01A Project Planning EA , , ,058, Easement Values - Nonfederal ACR , , , Channel Improvement Easement ACR , , , Temporary Work Area Easement ACR , , , Acquisition Documents by Nonfederal Sponsor EA , , , Review of Acquisition Documents - Federal EA , , , J E1 02 Relocations EA , , , , , , , J E Automobile Roads, Construction Activities EA , , , , , , J E Existing Conditions EA , , , , , , J E Demolition EA , , , , , , J E Pulverize Asphalt Pavement of the Existing Street - Bennett Street SY , , , , , , Construction Zone Temporary Barricades FT , , , , (Note: 24 x 2 x.70 =) Saw Cut Upper and Lower Limits FT , , , (Note: Includes cutting aprons to Archimca plant. Assumed thickness of asphalt pavement 3 inches. Assumed production rate of 3o feet per hour.) Pulverize Pavement SF 15, , , , , (Note: It is assumed the milled asphalt debris is to be used as fill.) Hauling LCY , , , , , J E Structure Demolition EA , , , , , J E Demolish Scenic Bridge EA , , , , , Demolition SF 1, , , , , ,852.35

30 Cost Estimate Report Direct Cost Page 7 Description UOM Quantity DirectLabor DirectEQ DirectMatl DirectSubBid DirectCost ContractCost ProjectCost (Note: Road surface Area. Concrete deck, sidewalls and wingwalls.) Bust up Concrete EA , , , , , Remove guardrail FT Demolish Bridge concrete SF 1, , , , , , (Note: Includes deck, sidewalls, and wingwalls (4).) E Break up Concrete SF 1, , , , , , Load for Hauling CY , , , , , Hauling LCY , , , , , J E Exterior Improvements EA , , , , , , J E Bases, Ballasts, and Paving EA , , , , , , J E Raise Road Subgrade and pave with Asphalt Bennett Street SY , , , , , , Imported Fill LCY , , , , , (Note: Source of fill is borrow are within 10 miles of point of use. Swell factor is ECY is 363.) Hauling LCY , , , , , Spread and Compaction ECY , , , Grading SY 4, Aggregate Base - 6 inch layer SY , , , , Fine Grading SY , Paving - 3" asphalt SY , , , , , , Hauling LCY , , , , , J E Railroads, Construction Activities. EA , , , , , J E Mobilization, Demobilization and Preparatory Work EA , , , , , J E Existing Conditions EA , , , , , Demolition of Existing RR Track and bridge FT , , , , , structure (Note: South of Archimica Plant)

31 Cost Estimate Report Direct Cost Page 8 Description UOM Quantity DirectLabor DirectEQ DirectMatl DirectSubBid DirectCost ContractCost ProjectCost Cut Track EA , , Load and Haul away rails and ties. CY , , Remove Bridge Girders FT , , , , , (Note: Bridge is 54 feet long.) J E Cemeteries, Utilities, and Structures, Construction Activities EA , , , , , , , J E Existing Conditions EA , , , , J E Demolition EA , , , , J E Selective Demolition of Water and Sewer Piping & Fittings EA , , , , Sanitary Sewer - Demolish and Remove 8 inch Line FT , , , , Trench Excavation BCY Breakup and Removal of Pipe - 8 inch EA , , Dia. Hauling Away Debris LCY Backfill With Compaction CY , Storm Sewer - Remove 15" Reinforce Concrete Pipe FT , Trench Excavation BCY Removal of 15 inch RCP FT Hauling Away Debris LCY (Note: Minimum haul time to segregate debris. 1.5 hours minimum.) J E Utilities FT , , , , , , , J E Water Lines EA , , , , , J E Waterline - 12 inch FT , , , , , Trench Excavation BCY , , Pipe FT , , , , , Valves with boxes EA , , , , ,999.93

32 Cost Estimate Report Direct Cost Page 9 Description UOM Quantity DirectLabor DirectEQ DirectMatl DirectSubBid DirectCost ContractCost ProjectCost Backfill With Compaction CY , , , , , Hauling LCY J E Sanitary Sewer Lines EA , , , , , , , J E Sanitary Sewer - 8 inch FT , , , , , , , Trench Excavation BCY , , , , Pipe - FT , , , , , , Manholes EA , , , , Tie into Existing Manhole EA , Backfill With Compaction CY , , , , , Hauling LCY J E Plug Existing Manhole EA J E Encase existing 42 inch SS line in Concrete FT , , , , , (Note: 37 LF sewer pipe. Assume ductile iron material. 6 iinch encasement.) J E Lower Manhole Top EA , , , , , , D E Trench Excavation BCY D E Cut Top of Manhole FT , , , , (Note: 5 ft x 3.14 = 15.7 ft) D E New Manhole top EA , , , , , (Note: Reuse Existing manhole cast iron ring and cover) J E Natural Gas Distribution FT , , , , , Lower 4" Intermediate Pressure Line FT , , , , , Trench Excavation Conventional BCY Pipe and fittings FT , , , , , Backfill With Compaction CY , , , Valves EA , , , , J E Electrical Utility Transmission and Sistribution EA , , , , , ,056.36

33 Cost Estimate Report Direct Cost Page 10 Description UOM Quantity DirectLabor DirectEQ DirectMatl DirectSubBid DirectCost ContractCost ProjectCost Wilson Creek Station EA , , , , , , Relocate Existing 90 Ft Pole EA , , , , , Install New Steel Pole EA , , , , , Demo Existing 90 Ft Wood Pole EA , , Under Bridge Lighting-Wilson Creek Railroad Bridge EA , , , , , Site Exterior Lighting EA , , , , , Pole Mounted Transformer EA , , , Pole Top Structure assembly EA , , , Underground Ductbank and Conductors EA , , , , , Trenching EA , , Conduit FT , , , , Panelboard EA , , , Areal Lighting EA , , , , , Under Bridge Conduit & Wiring FT , , , , , Pole Riser Conduit EA Grounding System EA Light Controller EA J E1 09 Channels and Canals EA ,005, , , , ,833, ,631, ,926, G E Channels EA ,005, , , , ,833, ,631, ,926, G E Earthwork EA , , , ,526, ,852, ,508, G E Excavation - unclassified CY , , ,220, ,315, ,848, Excavation to Enlarge Channel BCY 82, , , ,220, ,315, ,848, (Note: Excavated Material is to be haul away to disposal area. Assumed distance to disposal area is 10 miles. Right of way permits trucks to pull to excavator and exit at the opposite end. ) Hauling LCY 103, , , , ,901, ,338, Excavation BCY 82, , , , , ,396.12

34 Cost Estimate Report Direct Cost Page 11 Description UOM Quantity DirectLabor DirectEQ DirectMatl DirectSubBid DirectCost ContractCost ProjectCost Excavation Support including side slope shaping HR , , , , , (Note: road shaping.) Dust Control HR , , , , , G E Erosion Control EA , , , , , , G E Temporary Erosion Control - Silt Fence FT 3, , , , , , (Note: on both sides of channel. Quantity rounded up to the next 10.) Erosion Control Mat SF 16, , , , , , Channel Stabiliization EA , , , , , , Riprap at Low Flow Channel SF 16, , , , , , , (Note: 3 feet wide x 1.5 feet thick x L. Truck dumps rock on top of slope. Dozer puts rock in final location.) G E Imported Fill for Channel Improvement LCY 1, , , , , , , (Note: Source of fill is borrow are within 10 miles of point of use. Swell factor is 1.3 from CCY to LCY. ECY = 1,454 CY) Hauling LCY 1, , , , , , Spread and Compaction ECY 1, , , , , , , Grading SY , , G E Clearing and Grubbing EA , , , , , G E Clearing and Grubbing Land SF 246, , , , , , Removal of trees including stumps in the Work Area SF 211, , , , , , (Note: Method of clearing is for the dozer to uproot trees and push to chipper. Excavator with grapple will feed the trees into the chipper.) Haul Off Chipped material CY 1, , , , , , (Note: Assumed 300 CY of chipped debris generated per acre of cleared trees. Tree size is mostly moderate 12 inches. Disposal area unknown but is believed to be within 10 miles of site.) G E Rock Excavation with excavator and pneumatic hammer CY 4, , , , , ,254.48

MAJOR REHABILITATION REPORT: BASELINE COST ESTIMATE FOR RECOMMENDED PLAN

MAJOR REHABILITATION REPORT: BASELINE COST ESTIMATE FOR RECOMMENDED PLAN MAJOR REHABILITATION REPORT: BASELINE COST ESTIMATE FOR RECOMMENDED PLAN BOLIVAR DAM SANDY CREEK OF THE TUSCARAWAS RIVER, OHIO PREPARED BY: COST ENGINEERING SECTION, USACE, HUNTINGTON DISTRICT AUGUST 2008

More information

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days Independent Government Estimate Updated 6/22/18 Title Page Estimated by NAVFAC Cost Designed by Prepared by NAVFAC Cost Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

APPENDIX C COST ENGINEERING REPORT DETROIT BEACH, SECTION 205 FRENCHTOWN, MICHIGAN

APPENDIX C COST ENGINEERING REPORT DETROIT BEACH, SECTION 205 FRENCHTOWN, MICHIGAN APPENDIX C COST ENGINEERING REPORT DETROIT BEACH, SECTION 205 FRENCHTOWN, MICHIGAN C-1 APPENDIX C COST ENGINEERING REPORT DETROIT BEACH, SECTION 205 FRENCHTOWN, MICHIGAN TABLE OF CONTENTS 1. Introduction

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study

Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study 2015 Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study Appendix B Civil Design USACE Chicago District August 2015 TABLE OF CONTENTS INTRODUCTION... 3 General...

More information

Exhibit "A" Date: 1/27/2011

Exhibit A Date: 1/27/2011 Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase

More information

Appendix C Benchmarking Cost Estimates

Appendix C Benchmarking Cost Estimates REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00

More information

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016 Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION

More information

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation 5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed

More information

DRAFT. Fort Worth Central City Preliminary Design. Current Working Estimate. Appendix E. January 2005 Updated April 2005

DRAFT. Fort Worth Central City Preliminary Design. Current Working Estimate. Appendix E. January 2005 Updated April 2005 Fort Worth Central City Preliminary Design Current Working Estimate Appendix E January 2005 Updated April 2005 DRAFT Images courtesy of CDM, Gideon Toal, and Bing Thom Architects TARRANT WATER REGINAL

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

Analysis of Hydraulic Impacts on the Schuylkill River

Analysis of Hydraulic Impacts on the Schuylkill River Analysis of Hydraulic Impacts on the Schuylkill River Manayunk Sewer Basin Construction Project and the Venice Island Recreation Center Reconstruction Project Venice Island, Manayunk, Philadelphia, PA

More information

BUILDING HOME CONSTRUCTION

BUILDING HOME CONSTRUCTION 1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

Public Building Commission of Chicago Contractor Payment Information

Public Building Commission of Chicago Contractor Payment Information Public Building Commission of Chicago Contractor Payment Information Project: CTA Bus Garage Program Contract Number: C16FT101914777 General Contractor: Co. Payment Application: #8R Amount Paid: $ 1,333,451.78

More information

Insured: Ana Cid Home: (714) Property: Vista View Lake Elsinore, CA 92530

Insured: Ana Cid Home: (714) Property: Vista View Lake Elsinore, CA 92530 1 Insured: Ana Cid Home: (714) 515-9871 Property: 15002 Vista View Lake Elsinore, CA 92530 Claim Rep.: Doug Felberg Business: (916) 694-8006 E-mail: d.felberg@pacificspecialty.com Estimator: Bryan Reece

More information

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # 3805010019 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FEBRUARY 2013 FINAL RATING: MINIMALLY ACCEPTABLE

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: 295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED

More information

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 Spike in Tree Elevation = 102.95 Elevation

More information

How Much Can it Cost to Remediate a Large Landslide? Theme Session No. 10 at GSA Cordilleran Section Meeting, May 13-15, 2002

How Much Can it Cost to Remediate a Large Landslide? Theme Session No. 10 at GSA Cordilleran Section Meeting, May 13-15, 2002 How Much Can it Cost to Remediate a Large Landslide? Theme Session No. 10 at GSA Cordilleran Section Meeting, May 13-15, 2002 Author and Presenter: Charles M. Hammond, CEG, Landslide Technology, 10250

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

DOCUMENTATION WORKBOOK FY 2018

DOCUMENTATION WORKBOOK FY 2018 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, 2014 5:30 p.m. Allison Hollow Road Reconstruction Project A. William Kiehl called the Special Meeting of Tuesday March 11, 2014, at 5:30

More information

Insured: Ana Cid Home: (714) Property: Vista View Lake Elsinore, CA 92530

Insured: Ana Cid Home: (714) Property: Vista View Lake Elsinore, CA 92530 1 Insured: Ana Cid Home: (714) 515-9871 Property: 15002 Vista View Lake Elsinore, CA 92530 Claim Rep.: Doug Felberg Business: (916) 694-8006 E-mail: d.felberg@pacificspecialty.com Estimator: Bryan Reece

More information

ROAD DISTRICT RESIDENT HANDBOOK

ROAD DISTRICT RESIDENT HANDBOOK ROAD DISTRICT RESIDENT HANDBOOK REV. 2 12-11-15 A Message From the Road District Dear Resident: The Wheatland Township Road District is pleased to provide this resident handbook. The handbook addresses

More information

3.11 Floodplains Existing Conditions

3.11 Floodplains Existing Conditions Other stormwater control practices may be needed to mitigate water quality impacts. In addition to detention facilities, other practices such as vegetated basins/buffers, infiltration basins, and bioswales

More information

Community Erosion Assessment Napakiak, Alaska 15 January 2008

Community Erosion Assessment Napakiak, Alaska 15 January 2008 1. Community: Napakiak, Alaska Community Erosion Assessment Napakiak, Alaska 15 January 2008 Figure 1: Napakiak Location & Vicinity Map 2. Community Profile Summary: Napakiak is a 2 nd class city of 378

More information

How Can DOT Operations and Maintenance Prepare for Extreme Weather Events?

How Can DOT Operations and Maintenance Prepare for Extreme Weather Events? How Can DOT Operations and Maintenance Prepare for Extreme Weather Events? Gregory C. Johnson, P.E. Chief Operations Officer Michigan Department of Transportation November 17, 2012 Michigan s Climate Four

More information

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805030008 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: AUGUST 2014 PERIODIC

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes City of New Castle Presentation Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes New Castle Conservation District DNREC August 22, 2012 Agenda Project Background

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94

More information

Greater New Orleans Hurricane and Storm Damage Risk Reduction System 101

Greater New Orleans Hurricane and Storm Damage Risk Reduction System 101 Greater New Orleans Hurricane and Storm Damage Risk Reduction System 101 René Poché New Orleans District U.S. Army Corps of Engineers US Army Corps of Engineers BUILDING STRONG 1878 Gentilly Ridge Metairie

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

3 DESCRIPTION OF THE PROPOSED DEVELOPMENT

3 DESCRIPTION OF THE PROPOSED DEVELOPMENT 3 DESCRIPTION OF THE PROPOSED DEVELOPMENT As described in Chapter 2, the Preferred Option for the Bandon River (Bandon) Drainage Scheme comprises a combination of flood defences and dredging. The proposed

More information

Tom Blackman Project Lead. Mékell Mikell Communications Representative

Tom Blackman Project Lead. Mékell Mikell Communications Representative Sediment Cleanup Middle River Complex, 2016-17 Season 1 Project Photo Tour Updated November 15, 2016 Tom Blackman Project Lead Mékell Mikell Communications Representative 1 Sediment Cleanup - Season 1

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Quarterly Project Status Report September 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update TxDot s contractor has nearly completed the superstructure false work

More information

Tropical E.S. - BUDGET

Tropical E.S. - BUDGET Tropical E.S. - BUDGET Replace HVAC Chiller and Cooling Tower Description Budget COMMENTS GMP Design $45,90.92 Heard Construction $5,885.00 DDC Engineering Sub-Total Overhead @ 0% Profit @ 5% Contingency

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

White River Update. Jeanne Stypula, Supervising Engineer. Advisory Committee Meeting April 26, 2016

White River Update. Jeanne Stypula, Supervising Engineer. Advisory Committee Meeting April 26, 2016 White River Update Jeanne Stypula, Supervising Engineer Advisory Committee Meeting April 26, 2016 Department of Natural Resources and Parks Water and Land Resources Division River and Floodplain Management

More information

NCP3 NCP4 EXISTING CONDITIONS NOTES: RIP-RAP FAILED WALL SECTION NORTH WAREHOUSE CEMEX SILOS BULKHEAD WALL

NCP3 NCP4 EXISTING CONDITIONS NOTES: RIP-RAP FAILED WALL SECTION NORTH WAREHOUSE CEMEX SILOS BULKHEAD WALL UGE UGE UGE UGE UGE UGE UGE N SCALE: " = 4 6 ' 445 CHALLENGER RD., SUITE () 799-6 () 799-8 (FA) SCALE: JOB # NOTED - P RIP-RAP CEME SILOS DOLPHIN RD. FAILED WALL SECTION NORTH WAREHOUSE BULKHEAD WALL NCP4

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Summary of Bids Received For

Summary of Bids Received For Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: 10370045 Firm Name Bid Total $ $1,074,100.00 Howell Contractors Inc. $1,083,694.00 Sunesis Construction

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills Construction over Mine Spoil Fills Wayne A. Karem, PhD, PE, PG, D.GE 2014 KSPE Annual Conference Background Strip mining; mountaintop and contour mining Creates huge quantities of mine spoil The mine spoil

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

Design and Construction

Design and Construction Design and Construction Stream Simulation With power point slides shamelessly stolen from: Forest Service AOP Training Course Bob Gubernick Paul Anderson John Kattell USDA Forest Service Interim Directive

More information

Crop Enterprise Budget Sugar Beets, Thick-Planted, Wheatland Area

Crop Enterprise Budget Sugar Beets, Thick-Planted, Wheatland Area Crop Enterprise Budget Sugar Beets, Thick-Planted, Wheatland Area John P. Hewlett, Farm/Ranch Management Extension Specialist Chris Bastian, Research Associate MP-72.3 University of Wyoming - August, 1994

More information

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226 1 Insured: Property: SHANE KATZ 198 S. HOLLAND ST. LAKEWOOD, CO 80226 Estimator: James Mosel Business: (720) 456-8329 Business: E-mail: james@trinityconstructionserv Aurora, CO 80017 ices.com Claim Number:

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Quarterly Project Status Report May 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Construction of North Main Street Bridge by TxDOT s bridge contractor, Texas

More information

Chutes Part 5: Rock linings

Chutes Part 5: Rock linings Chutes Part 5: Rock linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] Chutes

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction

More information

Erosion and Sediment Control Measures 2.7 Silt Fences

Erosion and Sediment Control Measures 2.7 Silt Fences Erosion and Sediment Control Measures Silt fences are designed to intercept sheet flow sediment laden stormwater run-off and filter out both the larger and smaller particles of sediment. Silt fences and

More information

NCEES Fundamentals of Engineering (FE) Examination CIVIL EXAM SPECIFICATIONS

NCEES Fundamentals of Engineering (FE) Examination CIVIL EXAM SPECIFICATIONS NCEES Fundamentals of Engineering (FE) Examination CIVIL EXAM SPECIFICATIONS Effective Beginning with the April 2009 Examinations The FE examination is an 8-hour supplied-reference examination: 120 questions

More information

MATERIAL MODELS FOR CRUMB RUBBER AND TDA. California State University, Chico

MATERIAL MODELS FOR CRUMB RUBBER AND TDA. California State University, Chico MATERIAL MODELS FOR CRUMB RUBBER AND TDA California State University, Chico Waste Tire Products for CE Applications Whole Tires Tire Shreds (TDA) Crumb Rubber/Tire Buffings Whole Tires TIRE DERIVED AGGREGATE

More information

Appendix F Channel Grade Control Structures

Appendix F Channel Grade Control Structures Stream Simulation Appendix F Channel Grade Control Structures This appendix briefly describes permanent grade control structures that are sometimes needed in the upstream and/or downstream reaches adjacent

More information

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

3. MARINE HABITAT RESTORATION

3. MARINE HABITAT RESTORATION Feasibility Study for Restoration of Titlow Lagoon Fish Passage South Puget Sound Salmon Enhancement Group 3. MARINE HABITAT RESTORATION Marine habitat restoration at Titlow Park could include restoration

More information

HomeWorks Construction

HomeWorks Construction 1 Client: Kain - Put Back Home: Property: 11888 N. Coquillard Dr. South Bend, IN 46617 Operator: NKAIN Estimator: Adam Brown Business: (574) 876-8060 Company: Home Works E-mail: abrown@gohomeworks.com

More information

Design Data 17. Partial Flow Conditions of Box Culverts

Design Data 17. Partial Flow Conditions of Box Culverts Design Data 17 Partial Flow Conditions of Box Culverts Sewers, both sanitary and storm, are designed to carry a peak flow based on anticipated land development. The hydraulic capacity of sewers or culverts

More information

The last three sections of the main body of this report consist of:

The last three sections of the main body of this report consist of: Threatened and Endangered Species Geological Hazards Floodplains Cultural Resources Hazardous Materials A Cost Analysis section that provides comparative conceptual-level costs follows the Environmental

More information

Stream Simulation: A Simple Example

Stream Simulation: A Simple Example Stream Simulation: A Simple Example North Thompson Creek, CO Paul T. Anderson U.S.D.A. Forest Service Here s How We Started May 2011 2-1 USDA-Forest Service Here s How We Finished Forest Service Aquatic

More information

CITY OF PUYALLUP TOSCANOS SINKHOLE EVALUATION

CITY OF PUYALLUP TOSCANOS SINKHOLE EVALUATION CITY OF PUYALLUP PIERCE COUNTY WASHINGTON TOSCANOS SINKHOLE EVALUATION G&O #15470 OCTOBER 2015 TABLE OF CONTENTS BACKGROUND...1 EXISTING SYSTEM...1 Stormwater Conveyance System...1 Video Inspection...2

More information

Rock Sizing for Small Dam Spillways

Rock Sizing for Small Dam Spillways Rock Sizing for Small Dam Spillways STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined spillway on a construction site sediment basin Photo 2 Rock-lined spillway on a small farm dam 1. Introduction A chute

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

**Temporary Erosion Control**

**Temporary Erosion Control** Construction operations And methods **Temporary Erosion Control** The test will more than likely just have a basic word problem dealing with Erosion control, if it has anything on the test. So just review,

More information

HAZUS-MH: Earthquake Event Report

HAZUS-MH: Earthquake Event Report HAZUS-MH: Earthquake Event Report Region Name: El Paso County Earthquake Scenario: El Paso County Random EQ Print Date: February 08, 2006 Disclaimer: The estimates of social and economic impacts contained

More information

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Appendix E Guidance for Shallow Flooding Analyses and Mapping Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding

More information

Rucker Pond. Background

Rucker Pond. Background Rucker Pond Background The Rucker Basin consists of two subbasins (East and West) that drain to a single area known as Rucker Pond. Both subbasins have the same hydraulic parameters, but have different

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD: 2,852.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 49 CONTRACT ID: 001607132 PROJECT: IM 0352(341) CONTRACT: 02133206 AWARD : $287,874.50 PROJECTED : $287,874.50 ADJ. PROJECTED : $290,726.58

More information