1 CITY OF PUYALLUP PIERCE COUNTY WASHINGTON TOSCANOS SINKHOLE EVALUATION G&O #15470 OCTOBER 2015

2

3

4

5 TABLE OF CONTENTS BACKGROUND...1 EXISTING SYSTEM...1 Stormwater Conveyance System...1 Video Inspection...2 Geotechnical Investigation...2 Hydrologic and Hydraulic Model...2 ALTERNATIVES...3 Do Nothing...3 Repair the Detention System...3 Replace the Detention System...4 Abandon the Detention System...4 RECOMMENDATION...4 LIST OF TABLES No. Table Page 1 Hydrologic Model Summary...3 LIST OF FIGURES No. Figure Follows Page 1 Vicinity Map Drainage Area Survey Base Map Abandon Existing Detention System...4 APPENDICES Appendix A Geotechnical Investigation Appendix B Model Results Appendix C Cost Estimates Appendix D Existing System Hydraulic Profile Appendix E New System Hydraulic Profile i

6

7 Gray & Osborne, Inc., Consulting Engineers BACKGROUND In 2012, multiple surface settlements (sinkholes) appeared in the parking lot of the Toscanos Italian Grill restaurant in the vicinity of a stormwater detention system. The detention system is adjacent to Toscanos and located beneath the parking lot of a small commercial development along 29 th Street NE. This stormwater detention system in the vicinity of the intersection of East Main Avenue and 5 th Avenue NE in the City of Puyallup currently fails to function as designed. The City wishes to evaluate the feasibility of removing or rehabilitating the existing stormwater detention system to alleviate the drainage issues currently on site. EXISTING SYSTEM The existing system was installed in 1979 as part of the development of the nearby Linden Estates. Another portion of the system was installed as part of the Riverside Commercial Development in The detention system is comprised of 36-inch and 54-inch CMP pipes and is approximately 440 feet long. It extends within a 20-foot easement located in the parking lots of two retail/services buildings and Toscanos Italian Grill. The sinkholes seem to be on the downstream (northeast) end at the Toscanos Italian Grill parking lot at approximately th Street NE. Lots 4 and 5 (including the Toscanos restaurant) were developed in 2003, almost 25 years aer installation of the detention system. The detention system discharges flows to the northeast to an outfall on the Puyallup River. Figure 1 indicates the location of the project site. STORMWATER CONVEYANCE SYSTEM Figure 2 shows the drainage basins that are tributary to the detention system and to the 24-inch concrete outfall. An area of approximately 38.7 acres is tributary to the 24-inch concrete outfall pipe. The detention system collects flows from approximately 24.5 acres of this area. The entire subbasin is fully developed and contains commercial retail buildings, apartments, and condominiums. Land cover in the subbasin is approximately 90 percent impervious. The City identifies the larger drainage basin as the Puyallup River South basin. The City has a stormwater base map in both AutoCAD and GIS, which was used to explore the existing system. The City s GIS base map includes infrastructure quality data from 2009, 2011, or 2013, when the various sections of the stormwater system in the project area were surveyed. All of the pipes, manholes, and inlets in the project s subbasin are labeled as being in good quality. The stormwater conveyance elements in the subbasin are partially commercially owned and partially publicly owned. Gray & Osborne conducted survey as part of this study in order to determine exact pipe sizes, slopes, materials, and locations, as well as to investigate the condition of the existing stormwater infrastructure. The survey base map may be seen on Figure 3. City of Puyallup 1 Toscanos Sinkhole Evaluation October 2015

8 Gray & Osborne, Inc., Consulting Engineers VIDEO INSPECTION The City of Puyallup maintenance staff completed a television inspection of the detention system in the summer of 2012 to investigate the potential pipe leakage. The investigation found many areas of groundwater infiltration into the pipe and found a large void about 19 feet to the west of Catch Basin D in one of the 48-inch sections of the detention system. The pipe to the west of Catch Basin D appears to be the primary source of the sinkhole problem. The other pipes in the system were found to have smaller amounts of infiltration that included material migration. These areas of infiltration are identified on Figure 3. In 2012, City crews filled the sinkhole using controlled density fill (CDF) within the parking lot. No video inspection was provided post repair. It is recommended that a re-inspection of the detention system be conducted to see if the infiltration continues to include material migration, as was apparent in The detention system should be thoroughly cleaned prior to the video inspection. GEOTECHNICAL INVESTIGATION A geotechnical investigation was conducted as part of this feasibility study by PanGEO, Inc. in June 2015 and is included as Appendix A. The investigation found soils on site to be comprised mostly of alluvium. Alluvium consists of dense sand, silt, and clay. The geotechnical investigation analyzed the subsurface condition surrounding the sinkholes with respect to groundwater levels and soil types. A cone penetration test (CPT) was conducted as part of the geotechnical investigation. That test found no evidence of voids or zones of disturbance within the parking lot. HYDROLOGIC AND HYDRAULIC MODEL A stormwater hydrologic model using the Santa Barbara Unit Hydrograph (SBUH) was used with an XP-SWMM hydraulic model methodology to determine peak flow and system capacity. For comparison, peak flow rates were also determined using the Western Washington Hydrology Model (WWHM). A summary of the results of the two models is shown in Table 1. 2 City of Puyallup October 2015 Toscanos Sinkhole Evaluation

9 Approximate Tributary Basin Stormwater Outfall Project Site LEGEND: City Limits Storm Pipes 10' Topo streams ,000 CITY OF PUYALLUP ± TOSCANOS SINKHOLE FEASIBILITY STUDY FIGURE 1 - VICINITY MAP 2,000 Feet M:\PUYALLUP\15470 Toscanos Sinkhole Evaluation\GIS\Figure1.mxd

10

11 LEGEND: City Limits Storm Pipes Manholes Inlets Parcels Storm Basins 10' Topo streams CITY OF PUYALLUP ± TOSCANOS SINKHOLE FEASIBILITY STUDY FIGURE 2 - DRAINGE AREA 500 Feet M:\PUYALLUP\15470 Toscanos Sinkhole Evaluation\GIS\toscano basin.mxd

12

13 PLAN Areas of infiltration Identified on video inspection ' 0 20' 40' SCALE: 1"=40' CITY OF PUYALLUP TOSCONOS SINKHOLE EVALUATION FIGURE 3 SITE PLAN AND PROFILE PROFILE

14

15 Gray & Osborne, Inc., Consulting Engineers TABLE 1 Hydrologic Model Summary SBUH WWHM Peak Flow Peak Peak Flow Peak Storm Event Frequency Design Storm at Detention System (cfs) Flow at Outfall (cfs) at Detention System (cfs) Flow at Outfall (cfs) 25-Year 3.5", Type 1A Year 4.1", Type 1A The hydraulic model assumed no backwater condition at the outfall to the Puyallup River. The maximum hydraulic grade, as well as applicable model results, may be seen for the 25- and 100-year storm events in Appendix B. Although the downstream stormwater conveyance does not have an open-channel flow capacity (based on Mannings equation) for the 25- or 100-year storm events, the model indicates that the hydraulic grade line (HGL) for these events are below the ground surface. The hydraulic model output shows that the maximum water elevation downstream of the detention system during the 25- and 100-year storm events is 6.3 and 4.4 feet below the ground surface, respectively. ALTERNATIVES The following alternatives were considered for the detention system and discussed below: Do Nothing Repair the Detention System Replace the Detention System Remove the Detention System Detailed cost estimates for each of the alternatives may be seen in Appendix C. DO NOTHING Because the surface settlements caused by the failing detention system require frequent ongoing maintenance to correct, doing nothing to this system is likely to lead to additional failures and is not considered to be a feasible alternative. REPAIR THE DETENTION SYSTEM The detention system may be lined in situ to eliminate the groundwater infiltration and material migration. Cured-in-place pipe (CIPP) lining is feasible for pipes as large as 96-inch diameter. A video inspection of the pipe, following cleaning, would confirm that City of Puyallup 3 Toscanos Sinkhole Evaluation October 2015

16 Gray & Osborne, Inc., Consulting Engineers the pipe is in adequate condition to be repaired by CIPP lining. Following CIPP lining, pressure grouting should be completed in the locations of active infiltration. The estimated cost to repair the detention system is $440,000. REPLACE THE DETENTION SYSTEM The detention system could be replaced with a new stormwater pipe. If the existing detention system was excavated and the top half of the pipe removed, a new pipe could be placed within the bottom half of the pipe at a slightly higher invert elevation. The new pipe could be backfilled in the same location as the current detention pipe. The hydraulic profile of the system using 24-inch diameter or 30-inch diameter pipes to replace the existing detention system is included in Appendix D. Following installation of the new pipe, pressure grouting should be completed in the locations of active infiltration. The estimated cost to replace the detention system is $344,000. ABANDON THE DETENTION SYSTEM The detention system could be abandoned if a new stormwater conveyance system was installed in 29 th Street NE and 5 th Avenue NE. The stormwater conveyance system would include 18- and 30-inch diameter pipe. The approximate alignment of the new conveyance system is shown on Figure 4. The hydraulic profile of the new system is included in Appendix E. The estimated cost to abandon the detention system is $517,000. RECOMMENDATION In the short term, it is recommended that another video inspection of the detention system be conducted, following a thorough cleaning of the system, to indicate if material is being actively transported through the system. This video inspection will be used to confirm the feasibility of the recommended long-term alternative of lining the detention system. 4 City of Puyallup October 2015 Toscanos Sinkhole Evaluation

17 4TH AVE NE 25' 12.5' 0 25' 50' SCALE: 1"=50' JOHN L SCOTT TOSCONOS CAFE CITY OF PUYALLUP TOSCONOS SINKHOLE EVALUATION FIGURE 4 ABANDON EXISTING DETENTION SYSTEM

18

19 APPENDIX A GEOTECHNICAL INVESTIGATION

20

21 June 29, 2015 File No. P-3681 Geotechnical & Earthquake Engineering Consultants Mr. Barry Baker, P.E. Gray & Osborne, Inc th St. NE, Suite B210 Arlington, WA Subject: Summary of Subsurface Exploration Settlement Evaluation th Street NE, Puyallup, WA (Toscanos Italian Grill) Dear Mr. Baker, As requested, we completed a subsurface surface exploration program to assist the City with the settlement evaluation at the subject site. The approximate location of the site is shown in Figure 1. We understand that a city-owned storm pipe located in the parking lot in front of the subject building failed several years ago, and resulted in subsidence of ground surface. The City subsequently replaced a section of the storm pipe, and backfilled the excavation to repair the subsidence. We understand the City intends to evaluate if potential ground disturbance (i.e., if piping of soils) are present near the existing storm facility that may adversely impact the area in the future. SUBSURFACE EXPLORATION To evaluate if voids or disturbed zones may be present below the parking lot, Cone Penetration Test (CPT) was conducted at five locations on June 13, The approximate CPT locations (CPT-1 through CPT-5) are indicated on the attached Figures 2 and 3. The test was completed by In Situ Engineering of Snohomish, Washington, under a subcontract to PanGEO. In Situ Engineering uses an instrumented cone approximately 1½ inches in diameter, which is pushed against a truck at a slow steady rate into the soil to measure tip resistance (Qc), side friction (Fs), pore water pressure (u), and inclination (i). The readings on the soil are usually taken at about Eastlake Avenue East, Suite B Seattle, WA Tel: (206) Fax: (206)

22 Geotechnical Engineering Study Settlement Evaluation: th Street NE, Puyallup, WA June 29, 2015 inch vertical intervals, and provide a nearly continuous readout of soil stratigraphy, strength and other parameters. The results from the CPT are plotted on the CPT logs included in Appendix A. GEOLOGY According to the geologic map of the area compiled by Troost (in review), the surficial geologic unit at the project site is alluvium (map unit Qal). Alluvium typically consists of a sequence of loose to dense sand and silty sand, and so to stiff silt and clay. SUMMARY INTERPRETATION OF CPT DATA In general, the CPT data from the five test locations are quite consistent, and consisted of approximately 1½ to 3 feet thick crust of well-compacted granular soils. This upper crust is likely structural fill that was placed for the construction of the parking lot. Below the crust, an interbedded sequence of loose to medium dense sand to medium stiff to stiff silt was encountered in the CPT. We interpret this layer as the native alluvium. The measured CPT tip resistance within this layer is consistent with undisturbed alluvium typically found in this region. In summary, based on our evaluation of the CPT data, it is our opinion that no evidence of voids or zones of disturbance were encountered at the CPT locations. Please call should you have any questions regarding this proposal. Sincerely, Siew L. Tan, P.E. Principal Geotechnical Engineer Enclosures: Figure 1 Figure 2 Figure 3 Appendix A Vicinity Map Site and Exploration Plan Photos of Site Conditions with CPT Locations Summary CPT Logs (CPT-1 through CPT-5) Toscano Settlement Evaluation Page 2 of 2 PanGEO, Inc.

23 Fig1_vicinity.ppt 6/29/2015(1:12 PM) JC Crop map to 6.85 x 7 SITE LOCATION Image Credit: Google Maps N Not to Scale Settlement Evaluation th Street NE Puyallup, Washington Project No. VICINITY MAP Figure No

24

25 29th St NE CPT-1 CPT-2 CPT-5 CPT-3 CPT-4 file.grf w/ file.dat 6/29/15 (8:32 ) TEA2 LEGEND: CPT Location Settlement Evaluation th Street NE Puyallup, WA SITE AND EXPLORATION PLAN Project No. Figure No

26

27 CPT-4 CPT-3 CPT-1 CPT-5 CPT-2 file.grf w/ file.dat 6/29/15 (8:31 ) TEA2 Settlement Evaluation th Street NE Puyallup, WA Project No. PHOTOS OF SITE CONDITIONS WITH CPT LOCATIONS Figure No

28

29 Geotechnical Engineering Study Settlement Evaluation: th Street NE, Puyallup, WA June 29, 2015 Appendix A Summary CPT Logs

30

31 PanGeo Toscanos CPT-01 Operator: Brown/Mayfield Sounding: CPT-01 Cone Used: DDG1327 CPT Date/Time: 6/13/2015 7:16:57 AM Location: Toscanos Puyallup Job Number: Tip Resistance Friction Ratio Pore Pressure Soil Behavior Type* SPT N* 0 0 Qc TSF 160 Fs/Qc (%) 0 8 Pw PSI Zone: UBC % Hammer Depth () Maximum Depth = feet Depth Increment = feet 1 sensitive fine grained 2 organic material 3 clay InSitu Engineering 4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt 7 silty sand to sandy silt 8 sand to silty sand 9 sand 10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*) *Soil behavior type and SPT based on data from UBC-1983

32 PanGeo Toscanos CPT-02 Operator: Brown/Mayfield Sounding: CPT-02 Cone Used: DDG1327 CPT Date/Time: 6/13/2015 7:40:01 AM Location: Toscanos Puyallup Job Number: Tip Resistance Friction Ratio Pore Pressure Soil Behavior Type* SPT N* 0 0 Qc TSF 160 Fs/Qc (%) 0 8 Pw PSI Zone: UBC % Hammer Depth () Maximum Depth = feet Depth Increment = feet 1 sensitive fine grained 2 organic material 3 clay InSitu Engineering 4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt 7 silty sand to sandy silt 8 sand to silty sand 9 sand 10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*) *Soil behavior type and SPT based on data from UBC-1983

33 PanGeo Toscanos CPT-3 Operator: Brown/Mayfield Sounding: CPT-03 Cone Used: DDG1327 CPT Date/Time: 6/13/2015 8:15:45 AM Location: Toscanos Puyallup Job Number: Tip Resistance Friction Ratio Pore Pressure Soil Behavior Type* SPT N* 0 0 Qc TSF 160 Fs/Qc (%) 0 8 Pw PSI Zone: UBC % Hammer Depth () Maximum Depth = feet Depth Increment = feet 1 sensitive fine grained 2 organic material 3 clay InSitu Engineering 4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt 7 silty sand to sandy silt 8 sand to silty sand 9 sand 10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*) *Soil behavior type and SPT based on data from UBC-1983

34 PanGeo Toscanos CPT-04 Operator: Brown/Mayfield Sounding: CPT-04 Cone Used: DDG1327 CPT Date/Time: 6/13/2015 8:33:49 AM Location: Toscanos Puyallup Job Number: Tip Resistance Friction Ratio Pore Pressure Soil Behavior Type* SPT N* 0 0 Qc TSF 160 Fs/Qc (%) 0 8 Pw PSI Zone: UBC % Hammer Depth () Maximum Depth = feet Depth Increment = feet 1 sensitive fine grained 2 organic material 3 clay InSitu Engineering 4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt 7 silty sand to sandy silt 8 sand to silty sand 9 sand 10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*) *Soil behavior type and SPT based on data from UBC-1983

35 PanGeo Toscanos CPT-05 Operator: Brown/Mayfield Sounding: CPT-05 Cone Used: DDG1327 CPT Date/Time: 6/13/2015 8:55:21 AM Location: Toscanos Puyallup Job Number: Tip Resistance Friction Ratio Pore Pressure Soil Behavior Type* SPT N* 0 0 Qc TSF 160 Fs/Qc (%) 0 8 Pw PSI Zone: UBC % Hammer Depth () Maximum Depth = feet Depth Increment = feet 1 sensitive fine grained 2 organic material 3 clay InSitu Engineering 4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt 7 silty sand to sandy silt 8 sand to silty sand 9 sand 10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*) *Soil behavior type and SPT based on data from UBC-1983

36

37 APPENDIX B MODEL RESULTS

38

39 Untitled Day [0] Time 00:01:00 Step 1 Conduit from D to D Conduit 406 from D to D Conduit 404 from D to D

40

41 Pipes Name Upstream Node Name Downstream Node Name Diameter (Height) Length Downstream Invert Elevation Upstream Invert Elevation Maximum Water Elevation (US) Design Full Flow cfs Max Flow cfs Pipe Surcharge at U/S m Duration of Surcharged Flow min 404 D D D D D D D D D D D D D D D D D D D D D D D D D Max Depth 09/11/15 14:47:04 1/1

42 Manholes Name Ground Invert Max Water Volume of Duration of EGL Surcharge Subcatchme Rainfall Max Flow Freeboard nt Elevation (Spill Elevation Elevation Ponded Flow Surcharge Reference cfs Elevation at Max Crest) Stored (min) HGL ^ sec D D D Yr SCS D D Yr SCS D Yr SCS D D Yr SCS D D D D D Yr SCS /11/15 14:45:05 1/1

43 Untitled Day [0] Time 00:01:00 Step 1 Conduit from D to D Conduit 406 from D to D Conduit 404 from D to D

44

45 Pipes Name Upstream Node Name Downstream Node Name Diameter (Height) Length Downstream Invert Elevation Upstream Invert Elevation Maximum Water Elevation (US) Design Full Flow cfs Max Flow cfs Pipe Surcharge at U/S m Duration of Surcharged Flow min D D D D D D D D D D D D D D D D D D D D D D D D D Max Depth 09/11/15 14:55:13 1/1

46 Manholes Name Ground Invert Max Water Volume of Duration of EGL Surcharge at Subcatchme Rainfall Max Flow Freeboard nt Elevation Elevation Elevation Ponded Surcharge Reference cfs Elevation Max HGL (Spill Crest) Flow Stored (min) ^ sec D D D Yr S D D Yr S D Yr S D D Yr S D D D D Yr S D /11/15 14:54:00 1/1

47 APPENDIX C COST ESTIMATES

48

49 City of Puyallup Preliminary Construction Cost Estimate Toscanos Sinkhole Evaluation Repair Existing Detention System August 2015 Item Quantity Unit Cost Total 1 Mobilization/Demobilization 1 LS $ 25,000 $ 25,000 2 Minor Changes 1 LS $ 5,000 $ 5,000 3 Surveying, Staking and Record Dwgs 1 LS $ 2,000 $ 2,000 4 Traffic Control 1 LS $ 2,000 $ 2,000 5 Environmental Controls 1 LS $ 3,000 $ 3,000 6 Trench Excavation Safety Systems 0 LS $ 1,000 $ - 7 Dewatering 1 LS $ 1,000 $ 1,000 8 Removal of Structure and Obstruction 1 LS $ 1,000 $ 1,000 9 Locate Existing Utilities 1 LS $ 1,000 $ 1, Cast In Place Pipe 430 LF $ 350 $ 150, Pressure Grouting 6 EA $ 3,000 $ 18, Cement Concrete Sidewalk 0 SY $ 50 $ - 13 Bankrun Gravel for Trench Backfill 0 TN $ 25 $ - 14 Crushed Surfacing Base Course 0 TN $ 25 $ - 15 Hot Mix Asphalt 4 TN $ 100 $ Landscaping Restoration 0 LS $ 1,000 $ - Subtotal $ 208,900 Contingency (25%) $ 52,225 Subtotal $ 261,125 Sales Tax (9.4%) $ 24,546 Total $ 285,671 Total Construction Cost (Rounded) $ 286,000 All Overhead (25%) $ 72,000 Total Project Cost (Rounded) $ 358,000 M:\PUYALLUP\15470 Toscanos Sinkhole Evaluation\Costs Toscanos.xlsx\Repair 8/28/2015

50 City of Puyallup Preliminary Construction Cost Estimate Toscanos Sinkhole Evaluation Replace Existing Detention System August 2015 Item Quantity Unit Cost Total 1 Mobilization/Demobilization 1 LS $ 25,000 $ 25,000 2 Minor Changes 1 LS $ 5,000 $ 5,000 3 Surveying, Staking and Record Dwgs 1 LS $ 2,000 $ 2,000 4 Traffic Control 1 LS $ 2,000 $ 2,000 5 Environmental Controls 1 LS $ 3,000 $ 3,000 6 Trench Excavation Safety Systems 1 LS $ 1,000 $ 1,000 7 Dewatering 1 LS $ 1,000 $ 1,000 8 Removal of Structure and Obstruction 1 LS $ 20,000 $ 20,000 9 Locate Existing Utilities 1 LS $ 2,000 $ 2, " CPEP (Including bedding, backfill) 430 LF $ 80 $ 34, Pressure Grouting 6 EA $ 5,000 $ 30, Cement Concrete Sidewalk 310 SY $ 50 $ 15, Bankrun Gravel for Trench Backfill 900 TN $ 25 $ 22, Crushed Surfacing Base Course 180 TN $ 25 $ 4, Hot Mix Asphalt 320 TN $ 100 $ 32, Landscaping Restoration 1 LS $ 1,000 $ 1,000 Subtotal $ 200,900 Contingency (25%) $ 50,225 Subtotal $ 251,125 Sales Tax (9.4%) $ 23,606 Total $ 274,731 Total Construction Cost (Rounded) $ 275,000 All Overhead (25%) $ 69,000 Total Project Cost (Rounded) $ 344,000 M:\PUYALLUP\15470 Toscanos Sinkhole Evaluation\Costs Toscanos.xlsx\Replace 8/24/2015

51 City of Puyallup Preliminary Construction Cost Estimate Toscanos Sinkhole Evaluation Abandon Existing Detention System August 2015 Item Quantity Unit Cost Total 1 Mobilization/Demobilization 1 LS $ 35,000 $ 35,000 2 Minor Changes 1 LS $ 5,000 $ 5,000 3 Surveying, Staking and Record Dwgs 1 LS $ 2,000 $ 2,000 4 Traffic Control 1 LS $ 8,000 $ 8,000 5 Environmental Controls 1 LS $ 4,000 $ 4,000 6 Trench Excavation Safety Systems 1 LS $ 4,000 $ 4,000 7 Dewatering 1 LS $ 2,000 $ 2,000 8 Removal of Structure and Obstruction 1 LS $ 5,000 $ 5,000 9 Locate Existing Utilities 1 LS $ 5,000 $ 5, " CPEP (Including bedding, backfill) 240 LF $ 100 $ 24, " CPEP (Including bedding, backfill) 380 LF $ 70 $ 26, " CPEP (Including bedding, backfill) 120 LF $ 60 $ 7, Catch Basin, Type 2, 48" (Basic to 8') 2 EA $ 2,500 $ 5, Catch Basin, Type 2, 54" (Basic to 8') 4 EA $ 3,000 $ 12, Catch Basin, Type 2, 54" (Over 8') 27 VF $ 200 $ 5, Connection to Existing System 2 EA $ 2,000 $ 4, Foundation Gravel 10 TN $ 20 $ CDF to Abandon Existing Detention System 160 CY $ 150 $ 24, Cement Concrete Sidewalk 360 SY $ 50 $ 18, Bankrun Gravel for Trench Backfill 1,500 TN $ 25 $ 37, Crushed Surfacing Base Course 300 TN $ 25 $ 7, Hot Mix Asphalt 550 TN $ 100 $ 55, Landscaping Restoration 1 LS $ 5,000 $ 5,000 Subtotal $ 301,400 Contingency (25%) $ 75,350 Subtotal $ 376,750 Sales Tax (9.4%) $ 35,415 Total $ 412,165 Total Construction Cost (Rounded) $ 413,000 All Overhead (25%) $ 104,000 Total Project Cost (Rounded) $ 517,000 M:\PUYALLUP\15470 Toscanos Sinkhole Evaluation\Costs Toscanos.xlsx\Abandon 8/24/2015

52

53 APPENDIX D EXISTING SYSTEM HYDRAULIC PROFILE

54

55 Conduit from D to D Untitled Day [0] Time 00:01:00 Step 1 Conduit 406 from D to D Conduit 404 from D to D D D D D D D D D D D D D D

56

57 Pipes Name Upstream Node Name Downstream Node Name Diameter (Height) Length Downstream Invert Elevation Upstream Invert Elevation Maximum Water Elevation (US) Design Full Flow cfs Max Flow cfs Pipe Surcharge at U/S m Duration of Surcharged Flow min 8576 D D D D D D D D D D D D D D D D D D D D D D D D D Max Depth 08/12/15 07:56:24 1/1

58 Manholes Name Ground Subcatchme Elevation nt (Spill Crest) Invert Elevation Max Water Elevation Volume of Ponded Flow Stored Duration of Surcharge (min) sec Rainfall Reference Max Flow cfs EGL Elevation Surcharge at Max HGL D D D Yr SCS D D Yr SCS D D Yr SCS D D D Yr SCS D D D Yr SCS Freeboard 08/12/15 07:53:57 1/1

59 Conduit from D to D Untitled Day [0] Time 00:01:00 Step 1 Conduit 406 from D to D Conduit 404 from D to D D D D D D D D D D D D D D

60

61 Pipes Name Upstream Node Name Downstream Node Name Diameter (Height) Length Downstream Invert Elevation Upstream Invert Elevation Maximum Water Elevation (US) Design Full Flow cfs Max Flow cfs Pipe Surcharge at U/S m Duration of Surcharged Flow min 8576 D D D D D D D D D D D D D D D D D D D D D D D D D Max Depth 08/12/15 08:10:42 1/1

62 Manholes Name Subcatchme nt Ground Elevation (Spill Crest) Invert Elevation Max Water Elevation Volume of Ponded Flow Stored ^3 Duration of Surcharge (min) sec Rainfall Reference Max Flow cfs EGL Elevation Surcharge at Max HGL Freeboard D D D Yr SC D D Yr SC D D Yr SC D D D Yr SC D D D Yr SC /12/15 08:09:37 1/1

63 APPENDIX E NEW SYSTEM HYDRAULIC PROFILE

64

65 Conduit from D to D Conduit 6 from D to CB5 Untitled Day [0] Time 00:01:00 Step 1 Conduit 406 from D to D Conduit 404 from D to D D D D CB CB CB CB CB D D D D D

66

67 Pipes Name Upstream Node Name Downstream Node Name Diameter (Height) Length Downstream Invert Elevation Upstream Invert Elevation Maximum Water Elevation (US) Design Max Full Flow Flow cfs cfs Pipe Surcharge at U/S m 8576 D D D D D D D D D CB1 D CB2 CB CB3 CB CB4 CB CB5 CB D CB D D D D Max Depth 08/14/15 09:25:38 1/1

68 Manholes Name Ground Subcatchme Elevation nt (Spill Crest) Invert Elevation Max Water Elevation Volume of Ponded Flow Stored ^3 Duration of Surcharge (min) sec Rainfall Reference Max Flow cfs EGL Elevation Surcharge at Max HGL D D D Yr SC D D Yr SC CB CB CB CB Yr SC CB Yr SC D D D Yr SC Freeboard 08/14/15 09:15:47 1/1

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Stormwater Capacity Analysis for Westover Branch Watershed

Stormwater Capacity Analysis for Westover Branch Watershed Stormwater Capacity Analysis for Westover Branch Watershed Pimmit Run Little Pimmit Run, Mainstem Stohman's Run Gulf Branch Pimmit Run Tributary Little Pimmit Run, W. Branch Little Pimmit Run, E. Branch

More information

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units June 26, 2007: Low Impact Development 1 Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 24, 2012 How & Where does infiltration work? Summary of

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

3301 East 120 th Avenue Assited Living & Memory Care

3301 East 120 th Avenue Assited Living & Memory Care UTILITY REPORT FOR 3301 East 120 th Avenue Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 Prepared for: 3301 E. 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

September 7, 2017 (Revised November 1, 2017)

September 7, 2017 (Revised November 1, 2017) September 7, 2017 (Revised November 1, 2017) Project No. 10113.002 Environmental Advisors 2400 East Katella Avenue, Suite 800 Anaheim, California 92806 Attention: Subject: Mr. Greg McCafferty Response

More information

IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA

IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA David Harro The G3 Group, 2509 Success Drive, Suite 1, Odessa, FL 33556, david.harro@geo3group.com

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

Mitigation of Liquefaction Potential Using Rammed Aggregate Piers

Mitigation of Liquefaction Potential Using Rammed Aggregate Piers ASCE 2011 557 Mitigation of Liquefaction Potential Using Rammed Aggregate Piers R.W. Rudolph, M. ASCE, G.E. 1, B. Serna, M. ASCE, P.E. 2, and T. Farrell, M. ASCE, G.E. 3 1 Principal Consultant, ENGEO,

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) Stormwater Guidelines and Case Studies CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Goals and Challenges for Manual State Stormwater Policy More Widespread

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION. Marion County Industrial Park Lot 4. Marion County, South Carolina S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION. Marion County Industrial Park Lot 4. Marion County, South Carolina S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION Marion County Industrial Park Lot 4 Marion County, South Carolina S&ME Project No. 1633-12-332 Prepared By: 133 Highway 1 Business Conway, South Carolina

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

Eastlake Assited Living & Memory Care

Eastlake Assited Living & Memory Care UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.

More information

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

WATER MANAGEMENT REPORT FOR PAGE ESTATES

WATER MANAGEMENT REPORT FOR PAGE ESTATES WATER MANAGEMENT REPORT FOR PAGE ESTATES SLB Consulting of SW Florida, LLC PO Box 2826 Bonita Springs, FL. 34133 Phone: 239-948-9566 sandra@slbconsult.com C.O.A. # 25395 September 1, 2014 Sandra L. Bottcher

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

GEOLOGY, SOILS, AND SEISMICITY

GEOLOGY, SOILS, AND SEISMICITY 4.9 GEOLOGY, SOILS, AND SEISMICITY 4.9.1 Introduction Information about the geological conditions and seismic hazards in the study area was summarized in the FEIR, and was based on the Geotechnical Exploration

More information

APPENDIX B DRAINAGE REPORT

APPENDIX B DRAINAGE REPORT APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,

More information

LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS

LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS Antonio Fernandez, Ph.D. 1 ABSTRACT Paul C. Rizzo Associates,

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

PRELIMINARY GEOTECHNICAL EXPLORATION Additional MeadWestvaco Ridgeville Property 331 acres Dorchester County, South Carolina S&ME Project No. 1131-09-259A Prepared For: BP Barber & Associates Post Office

More information

14 Geotechnical Hazards

14 Geotechnical Hazards Volume 2: Assessment of Environmental Effects 296 14 Geotechnical Hazards Overview This Chapter provides an assessment of the underlying geotechnical conditions to identify: any potential liquefaction

More information

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1. February 10,2017 25506400 Ontario Ltd. Foxboro, ON Attention: Brad Newbatt Re: Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION

More information

Villages at Riverdale Thornton, CO

Villages at Riverdale Thornton, CO FINAL UTILITY REPORT Villages at Riverdale Thornton, CO October 14, 216 Revised: March 29, 217 JN: 1539 Prepared for: PCS Group, Inc. 11 16 th Street #3 B-18 Denver, CO 8265 P: 33.531.495 Prepared by:

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams TECHNICAL MEMORANDUM No. 1 TO: Michael Bowen California Coastal Conservancy Geotechnical & Earthquake Engineering Consultants CC: Eric Ginney Philip Williams & Associates PREPARED BY: Paul Grant SUBJECT:

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION. Marion County Industrial Park. Marion County, South Carolina S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION. Marion County Industrial Park. Marion County, South Carolina S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION Marion County Industrial Park Marion County, South Carolina S&ME Project No. 1633-12-186 Prepared By: 133 Highway 1 Business Conway, South Carolina 2926 August

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Hydrology Study Report

Hydrology Study Report Hafeez Consulting www.hafeezconsulting.com Civil/ Structural Engineering, Design & Construction 1451 S. Hacienda St. Anaheim CA 92804 (714) 225-4565 Fax (714)917-2977 engineer@hafeezconsulting.com Hydrology

More information

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. SOIL INVESTIGATION REPORT PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. Prepared for: FCS Consultants 7a Barbados Avenue Kingston 5, Jamaica Prepared by: NHL Engineering Limited

More information

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402 October 26, 2017 Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402 Re: Soo Line Dump Site 2017 Annual Soil Cover Inspection Dear Aimee: The purpose of this letter

More information

SD-100 SD-200 SITE AND EXPLORATION PLAN SODO SEGMENT. FIG. 3 Sheet 4 of 9. Seattle Monorail Project Seattle, Washington Scale in Feet

SD-100 SD-200 SITE AND EXPLORATION PLAN SODO SEGMENT. FIG. 3 Sheet 4 of 9. Seattle Monorail Project Seattle, Washington Scale in Feet Central Parking Lot potential downhole arrary location (site visit //) PREFERRED New Parking Area File: I: \Drafting \\- \plans \-- Plans.dwg Date: -- Author: LR Current downhole array location LEGEND

More information

(THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM

(THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM C A U T I O N!! (THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM EQLique&Settle2. THE AUTHOR IS HEREBY RELEASED OF ANY LIABILITY FOR ANY INCORRECT USE OF THIS SAMPLE

More information

Continuing Education Course #101 Drainage Design with WinTR-55

Continuing Education Course #101 Drainage Design with WinTR-55 1 of 5 Continuing Education Course #101 Drainage Design with WinTR-55 1. WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

Chapter 5 CALIBRATION AND VERIFICATION

Chapter 5 CALIBRATION AND VERIFICATION Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax: MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA 23149 Phone: 804-758-3382 Fax: 804-758-0061 LAND DISTURBANCE PERMIT SUBMISSION REQUIREMENTS In order to expedite

More information

CPT Data Interpretation Theory Manual

CPT Data Interpretation Theory Manual CPT Data Interpretation Theory Manual 2016 Rocscience Inc. Table of Contents 1 Introduction... 3 2 Soil Parameter Interpretation... 5 3 Soil Profiling... 11 3.1 Non-Normalized SBT Charts... 11 3.2 Normalized

More information

An Introduction to Field Explorations for Foundations

An Introduction to Field Explorations for Foundations An Introduction to Field Explorations for Foundations J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report Pursuant to: 40 CFR 257.60 40 CFR 257.61 40 CFR 257.62 40 CFR 257.63 40 CFR 257.64 Submitted to: Consumers Energy Company

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 27, 2017 Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Veterans Parkway Bridge Approaches Investigation Savannah, Georgia July 20, 2015 Terracon Project No. ES155020 Prepared for: Chatham County Engineering Department Savannah, Georgia

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION. Coastal Technology Park. Georgetown County, South Carolina S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION. Coastal Technology Park. Georgetown County, South Carolina S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION Coastal Technology Park Georgetown County, South Carolina S&ME Project No. 1633-11-27 Prepared By: 133 Highway 1 Business Conway, South Carolina 2926 November

More information

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS

More information

Minnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0)

Minnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0) This Cone Penetration Test (CPT) Sounding follows ASTM D 778 and was made by ordinary and conventional methods and with care deemed adequate for the Department's design purposes. Since this sounding was

More information

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon By the Oregon Board of Geologist Examiners and the Oregon

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS Presented by: W. Morgan NeSmith, P.E. Berkel & Company Contractors Inc. 770.941.5100 mnesmith@berkelapg.com SC Engineering Conference

More information

The last three sections of the main body of this report consist of:

The last three sections of the main body of this report consist of: Threatened and Endangered Species Geological Hazards Floodplains Cultural Resources Hazardous Materials A Cost Analysis section that provides comparative conceptual-level costs follows the Environmental

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

GEOTECHNICAL EXPLORATION REPORT ROPOSED COMMERCIAL/RETAIL DEVELOPMENT 7967, & 8015 BEVERLY BOULEVARD

GEOTECHNICAL EXPLORATION REPORT ROPOSED COMMERCIAL/RETAIL DEVELOPMENT 7967, & 8015 BEVERLY BOULEVARD ADDENDUM TO GEOTECHNICAL EXPLORATION REPORT PROPOSED COMMERCIAL/RETAIL DEVELOPMENT 7967, 8001-8011 & 8015 BEVERLY BOULEVARD CITY OF LOS ANGELES, CALIFORNIA Prepared for: OPT Beverly, LLC 6400 South Fiddlers

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

SUMMARY OF SOIL CONDITIONS CITYWIDE SIDEWALK IMPROVEMENT PROJECT JIMMY DURANTE BOULEVARD, VIA DE LA VALLE, AND CAMINO DEL MAR DEL MAR, CALIFORNIA

SUMMARY OF SOIL CONDITIONS CITYWIDE SIDEWALK IMPROVEMENT PROJECT JIMMY DURANTE BOULEVARD, VIA DE LA VALLE, AND CAMINO DEL MAR DEL MAR, CALIFORNIA SUMMARY OF SOIL CONDITIONS CITYWIDE SIDEWALK IMPROVEMENT PROJECT JIMMY DURANTE BOULEVARD, VIA DE LA VALLE, AND CAMINO DEL MAR DEL MAR, CALIFORNIA PREPARED FOR NASLAND ENGINEERING SAN DIEGO, CALIFORNIA

More information

Evaluation of Geotechnical Hazards

Evaluation of Geotechnical Hazards Evaluation of Geotechnical Hazards by Geoffrey R. Martin Appendix B: Evaluation of Geotechnical Hazards Describes Evaluation Procedures Soil Liquefaction Soil Settlement Surface Fault Rupture Flooding

More information

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229 Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

More information

TREASURE EXCAVATION MANAGEMENT PLAN. PREPARED FOR: MPE INC. PO BOX 2429 PARK CITY, UTAH

TREASURE EXCAVATION MANAGEMENT PLAN. PREPARED FOR: MPE INC. PO BOX 2429 PARK CITY, UTAH TREASURE EXCAVATION MANAGEMENT PLAN PREPARED FOR: MPE INC. PO BOX 2429 PARK CITY, UTAH 84060 psbro23@mac.com December 15, 2008 December 15, 2008 Park City Municipal Corporation Planning Commission P.O.

More information

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report CCR Surface Impoundment Information Name: Operator:

More information

Cone Penetration Test (CPT) Interpretation

Cone Penetration Test (CPT) Interpretation Cone Penetration Test (CPT) Interpretation Gregg uses a proprietary CPT interpretation and plotting software. The software takes the CPT data and performs basic interpretation in terms of soil behavior

More information

SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM DRAFT. MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS. February 11, 2014.

SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM DRAFT. MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS. February 11, 2014. SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS February 11, 2014 Prepared by: J-U-B ENGINEERS, INC. 240 West Center Street, Suite 200 Orem,

More information

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 17, 2018 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0337367 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

SPRINGVILLE CITY, UTAH

SPRINGVILLE CITY, UTAH SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS February 11, 2014 Adopted May 20, 2014 Prepared by: J-U-B ENGINEERS, INC. 240 West Center Street,

More information

Nine Minimum Controls No. 2

Nine Minimum Controls No. 2 Nine Minimum Controls No. 2 2.0 MAXIMIZATION OF STORAGE IN THE COLLECTION SYSTEM 2.1 OVERVIEW The 2 nd NMC is titled Maximization of Storage in the Collection system. EPA s NMC Guidance explains that this

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water. Design Manual Chapter - Stormwater D - Storm Sewer Design D- Storm Sewer Sizing A. Introduction The purpose of this section is to outline the basic hydraulic principles in order to determine the storm

More information