1 PLYMOUTH TOWNSHIP WAYNE COUNTY, MICHIGAN PLYMOUTH TOWNSHIP BOARD OF TRUSTEES SUPERVISOR HUNTERS CREEK ROAD REHABILITATI, S.A.D. SHANN PRICE CLERK NANCY CZELMAN TREASURER R EDWARDS BOARD OF TRUSTEES STEVE MANN MICHAEL KELLY BOB DOROSHEWITZ CHUCK CURMI PLOTTED 5/19/2016 6:48:25 AM gkenda PROJECT AREA 1 INDEX OF S PROJECT MANAGER: - FIELD BOOK INFORMATI: - c:\pw_work-gkenda \d \ggg-pts-hcttesheet.dgn COVER GENERAL NOTES AND TYPICALS OVERALL PLAN CSTRUCTI S WAYNE COUNTY STANDARD DETAILS READY FOR BIDDERS Northne Rd., PO Box 10 Tayor, MI FAX: Budng reatonshps on a foundaton of exceence PREPARED UNDER THE SUPERVISI OF: DANIEL R. BROOKS #29657 DATE C W ade Trm Group, Inc.
2 REV# DATE DESCRIPTI PROJECT MANAGER: - FIELD BOOK INFORMATI: - c:\pw_work-gkenda \d \ggg-pts-hcnotes_detas.dgn PLOTTED 5/19/2016 6:48:34 AM gkenda EXISTING 7" N REINFORCED CCRETE WITH INTEGRAL CURB TO REMAIN AS DIRECTED ENGINEER EXISTING SUBGRADE (CLAY) 60 ROW CL 13.5 ROW % 2% "Msc Conc Pavt, Nonrenf, 7 nch" AS DIRECTED ENGINEER 27 ROAD CROSS SECTI REMOVE EXISTING 7" N REINFORCED CCRETE PAVEMENT PAID FOR AS "Msc Pavt, Rem, Patchng" MISCELLANEOUS QUANTITIES 1 LS Mobzaton, Max $10,000 1 LS Traffc Mantenance and Contro 2700 Sft Concrete Drve and Sdewak, Remove 200 Cyd Msc Aggregate Base, CIP 300 Syd Drveway, Nonrenf Conc, 6 nch 6 Ea Msc Structure Cover, Adj 3 Ft Msc Structure Reconstruct 100 Ft Msc Underdran, Subgrade, 6 nch 3400 Ft Route and Sea Jonts and Cracks 400 Syd Msc Seedng, Mxture THM 1 LS Msc Audo-Vdeo Rte Survey *NOTE QUANTITIES ARE ESTIMATES AND ARE SUBJECT TO CHANGES AS DIRECTED WAYNE COUNTY ENGINEER AND PLYMOUTH TOWNSHIP ENGINEER Northne Rd., PO Box 10 Tayor, MI FAX: Budng reatonshps on a foundaton of exceence REH ABILITATI, S.A.D. 2 GEN ERAL N OTES A N D TY PICALS ISSUED FOR: DATE: : C W ade Trm Group, Inc.
3 SAD LIMITS REV# DATE DESCRIPTI PROJECT MANAGER: - FIELD BOOK INFORMATI: - c:\pw_work-gkenda \d \csp-pts-hcovera Pan.dgn PLOTTED 5/19/2016 6:48:40 AM gkenda HUNTER CREEK COURT POWELL ROAD 13 OVERALL PROJECT LIMITS HUNTER CREEK DRIVE Northne Rd., PO Box 10 Tayor, MI FAX: Budng reatonshps on a foundaton of exceence REH ABILITATI, S.A.D. 3 OVERALL PLA N ISSUED FOR: DATE: : C W ade Trm Group, Inc.
4 REV# DATE DESCRIPTI PROJECT MANAGER: - FIELD BOOK INFORMATI: - c:\pw_work-gkenda \d \csp-pts-hcsheet1.dgn PLOTTED 5/19/2016 6:48:47 AM gkenda HUNTERS CREEK CT HUNTERS CREEK DR MATCH LIMIT SEE PAVEMENT REMOVAL AND REPLACEMENT CATCH BASIN SAD LIMITS MAJOR QUANTITIES THIS : TOTAL UNIT DESCRIPTI 2575 Syd Msc Pavt, Rem, Patchng 2575 Syd Msc Conc Pavt, Nonrenf, 7 nch NOTES: 1. EXACT LIMITS OF PAVEMENT REMOVAL AND REPLACMENT SHALL BE DETERMINED CSTRUCTI ENGINEER. 2. QUANTITIES ARE ESTIMATES AND ARE SUBJECT TO CHANGE AS DIRECTED WAYNE COUNTY ENGINEER AND PLYMOUTH TOWNSHIP ENGINEER Northne Rd., PO Box 10 Tayor, MI FAX: Budng reatonshps on a foundaton of exceence REH ABILITATI, S.A.D. 4 H U N TERS CREEK DRIVE H U N TERS CREEK COU RT ISSUED FOR: DATE: : C W ade Trm Group, Inc.
5 16 MATCH LIMIT SEE REV# DATE DESCRIPTI PROJECT MANAGER: - FIELD BOOK INFORMATI: - c:\pw_work-gkenda \d \csp-pts-hcsheet2.dgn PLOTTED 5/19/2016 6:48:53 AM gkenda OUTLOT POWELL ROAD HUNTERS CREEK DR PAVEMENT REMOVAL AND REPLACEMENT CATCH BASIN MAJOR QUANTITIES THIS : TOTAL UNIT DESCRIPTI 810 Syd Msc Pavt, Rem, Patchng 810 Syd Msc Conc Pavt, Nonrenf, 7 nch NOTES: 1. EXACT LIMITS OF PAVEMENT REMOVAL AND REPLACMENT SHALL BE DETERMINED CSTRUCTI ENGINEER. 2. QUANTITIES ARE ESTIMATES AND ARE SUBJECT TO CHANGE AS DIRECTED WAYNE COUNTY ENGINEER AND PLYMOUTH TOWNSHIP ENGINEER Northne Rd., PO Box 10 Tayor, MI FAX: Budng reatonshps on a foundaton of exceence REH ABILITATI, S.A.D. 5 H U N TERS CREEK DRIVE ISSUED FOR: DATE: : C W ade Trm Group, Inc.
6 MANAGER: - FI ELD BOOK DB 6 Group,I nc. : W ade Tr m DATE: 05/20/16 C BID 5/19/2016 R OA D PLOTTED COU N TY STA N D A R D 6:48:59 AM D ETA ILS R EH A B ILITA TI,S.A.D. H U N TER S CR EEK W AYNE I NFORMATI : - c:\pw_work-gkenda \d \csp-p ts-hcdeta s1.dgn PROJECT ISSUED FOR: gkenda www. wadet r m. com FAX: / Tay or,m I Nor t h ne Rd.,PO Box 10 UNLESS SI GNED AND DATED: NOT VALI D FOR CSTRUCTI Bu d ng r e at onsh ps on a f oundat on ofexce ence REV# DATE DESCRI PTI
7 MANAGER: - FI ELD BOOK DB 7 Group,I nc. : W ade Tr m DATE: 05/20/16 C BID 5/19/2016 R OA D PLOTTED COU N TY STA N D A R D 6:49:19 AM D ETA ILS R EH A B ILITA TI,S.A.D. H U N TER S CR EEK W AYNE I NFORMATI : - c:\pw_work-gkenda \d \csp-p ts-hcdeta s2.dgn PROJECT ISSUED FOR: gkenda www. wadet r m. com FAX: / Tay or,m I Nor t h ne Rd.,PO Box 10 UNLESS SI GNED AND DATED: NOT VALI D FOR CSTRUCTI Bu d ng r e at onsh ps on a f oundat on ofexce ence REV# DATE DESCRI PTI
8 MANAGER: - FI ELD BOOK DB 8 Group,I nc. : W ade Tr m DATE: 05/20/16 C BID 5/19/2016 R OA D PLOTTED COU N TY STA N D A R D 6:49:42 D ETA ILS R EH A B ILITA TI,S.A.D. H U N TER S CR EEK W AYNE I NFORMATI : - c:\pw_work-gkenda \d \csp-p ts-hcdeta s3.dgn PROJECT ISSUED FOR: AM gkenda www. wadet r m. com FAX: / Tay or,m I Nor t h ne Rd.,PO Box 10 UNLESS SI GNED AND DATED: NOT VALI D FOR CSTRUCTI Bu d ng r e at onsh ps on a f oundat on ofexce ence REV# DATE DESCRI PTI
9 PROJECT MANAGER: - FIELD BOOK INFORMATI: - c:\pw_work-gkenda \d \csp-pts-hcdetas4.dgn PLOTTED 5/19/2016 6:50:08 AM gkenda Northne Rd., PO Box 10 Tayor, MI FAX: Budng reatonshps on a foundaton of exceence REV# DATE DESCRIPTI REH ABILITATI, S.A.D. 9 W A Y N E COU N TY STA N DARD DETAILS ISSUED FOR: DATE: : C W ade Trm Group, Inc.
A L A BA M A L A W R E V IE W
A L A BA M A L A W R E V IE W Volume 52 Fall 2000 Number 1 B E F O R E D I S A B I L I T Y C I V I L R I G HT S : C I V I L W A R P E N S I O N S A N D TH E P O L I T I C S O F D I S A B I L I T Y I N
More informationP a g e 5 1 of R e p o r t P B 4 / 0 9
P a g e 5 1 of R e p o r t P B 4 / 0 9 J A R T a l s o c o n c l u d e d t h a t a l t h o u g h t h e i n t e n t o f N e l s o n s r e h a b i l i t a t i o n p l a n i s t o e n h a n c e c o n n e
More informationFranklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation
2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:
More informationI M P O R T A N T S A F E T Y I N S T R U C T I O N S W h e n u s i n g t h i s e l e c t r o n i c d e v i c e, b a s i c p r e c a u t i o n s s h o
I M P O R T A N T S A F E T Y I N S T R U C T I O N S W h e n u s i n g t h i s e l e c t r o n i c d e v i c e, b a s i c p r e c a u t i o n s s h o u l d a l w a y s b e t a k e n, i n c l u d f o l
More information401 PLANTMIX BITUMINOUS PAVEMENTS GENERAL Rev. June 10, 2004 401.03.16 SURFACING MISCELLANEOUS AREAS: Surfacing of road approaches and connections, street intersection areas, frontage roads, island areas,
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:
29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94
More informationNew Business and Commercial Building Applicants
New Business and Commercial Building Applicants A Helpful Guide - Z o n i n g P e r m i t A p p l i c a t i o n - B u s i n e s s Q u e s t i o n n a i r e - P r e -Ap p ro va ls f o r C o n s t r u c
More informationOH BOY! Story. N a r r a t iv e a n d o bj e c t s th ea t e r Fo r a l l a g e s, fr o m th e a ge of 9
OH BOY! O h Boy!, was or igin a lly cr eat ed in F r en ch an d was a m a jor s u cc ess on t h e Fr en ch st a ge f or young au di enc es. It h a s b een s een by ap pr ox i ma t ely 175,000 sp ect at
More information0.143 Hickory Circle
Rank Width Leng ROAD NAME Total Feet Miles Cregar Road House 132 to Muni Bound 37.3 20' to 32 0.343 Mill Street McDonald Street to Trail 32.8 20 0.133 Academy Street 32.3 18 0.066 Sunset Drive 32.3 33
More informationSummary of Bids Received For
Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: 10370045 Firm Name Bid Total $ $1,074,100.00 Howell Contractors Inc. $1,083,694.00 Sunesis Construction
More informationBoxing Blends Sub step 2.2 Focus: Beginning, Final, and Digraph Blends
Boxing Blends Sub step 2.2 Focus: Beginning, Final, and Digraph Blends Boxing Blends Game Instructions: (One Player) 1. Use the game board appropriate for your student. Cut out the boxes to where there
More informationSoftware Process Models there are many process model s in th e li t e ra t u re, s om e a r e prescriptions and some are descriptions you need to mode
Unit 2 : Software Process O b j ec t i ve This unit introduces software systems engineering through a discussion of software processes and their principal characteristics. In order to achieve the desireable
More information176 5 t h Fl oo r. 337 P o ly me r Ma te ri al s
A g la di ou s F. L. 462 E l ec tr on ic D ev el op me nt A i ng er A.W.S. 371 C. A. M. A l ex an de r 236 A d mi ni st ra ti on R. H. (M rs ) A n dr ew s P. V. 326 O p ti ca l Tr an sm is si on A p ps
More informationAddendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address
CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing
More informationCONTRACTOR'S ESTIMATE PACKAGE
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55
More informationTOWN OF SEVERANCE, COLORADO. NOTICE OF PUBLIC HEARINGS FOR A PROJECT Hunters Crossing Annexation & Zoning
TOWN OF SEVERANCE, COLORADO NOTICE OF PUBLIC HEARINGS FOR A PROJECT Hunters Crossing Annexation & Zoning NOTICE IS HEREBY GIVEN that the Public Hearing required by C.R.S. 31-12-108 before the Severance
More informationT h e C S E T I P r o j e c t
T h e P r o j e c t T H E P R O J E C T T A B L E O F C O N T E N T S A r t i c l e P a g e C o m p r e h e n s i v e A s s es s m e n t o f t h e U F O / E T I P h e n o m e n o n M a y 1 9 9 1 1 E T
More informationCITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY
CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works
More informationBid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services
Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services JOB SITES: GreenTrees of Huntley 11417 E. Main Street Huntley, IL 60142 SilverTrees Apartments 5901 Milwaukee Street Richmond,
More informationAgenda Rationale for ETG S eek ing I d eas ETG fram ew ork and res u lts 2
Internal Innovation @ C is c o 2 0 0 6 C i s c o S y s t e m s, I n c. A l l r i g h t s r e s e r v e d. C i s c o C o n f i d e n t i a l 1 Agenda Rationale for ETG S eek ing I d eas ETG fram ew ork
More informationProject T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox
Compare Responses Event #: 1702 Status: Pending award Event Name: Curb Replacement Project T 841046.05 Number Of s: 7 Fit Excavating Quality Built Construction Dinkel Construction II, LLC Concrete Solutions,LLC
More informationFr anchi s ee appl i cat i on for m
Other Fr anchi s ee appl i cat i on for m Kindly fill in all the applicable information in the spaces provided and submit to us before the stipulated deadline. The information you provide will be held
More informationDISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD
HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION
More informationP a g e 3 6 of R e p o r t P B 4 / 0 9
P a g e 3 6 of R e p o r t P B 4 / 0 9 p r o t e c t h um a n h e a l t h a n d p r o p e r t y fr om t h e d a n g e rs i n h e r e n t i n m i n i n g o p e r a t i o n s s u c h a s a q u a r r y. J
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:
15,466.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 136-11.00 2.00 CONTRACT ID: 180801028 PROJECT: STP 1502(152)HES CONTRACT: 05153036 AWARD : $2,602,993.61 PROJECTED : $2,602,993.61 ADJ. PROJECTED
More informationI N A C O M P L E X W O R L D
IS L A M I C E C O N O M I C S I N A C O M P L E X W O R L D E x p l o r a t i o n s i n A g-b eanste d S i m u l a t i o n S a m i A l-s u w a i l e m 1 4 2 9 H 2 0 0 8 I s l a m i c D e v e l o p m e
More informationTABULATION OF TENDERS
SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering
More informationS ca le M o d e l o f th e S o la r Sy ste m
N a m e ' D a t e ' S ca le M o d e l o f th e S o la r Sy ste m 6.1 I n t r o d u c t i o n T h e S olar System is large, at least w hen com pared to distances we are fam iliar w ith on a day-to-day basis.
More informationRanking accounting, banking and finance journals: A note
MPRA Munich Personal RePEc Archive Ranking accounting, banking and finance ournals: A note George Halkos and Nickolaos Tzeremes University of Thessaly, Department of Economics January 2012 Online at https://mpra.ub.uni-muenchen.de/36166/
More informationNational Oilwell Varco Survey Report
Conoco Phillips Andrews County University Andrews 3604HL Surveys: 192`MD - 1369`MD Survey Date: Friday, January 22, 2016 National Oilwell Varco Survey Report Monday, January 25, 2016 UWI No. 42-003-47296
More informationDOCUMENTATION WORKBOOK FY 2018
DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00
More informationInstruction Sheet COOL SERIES DUCT COOL LISTED H NK O. PR D C FE - Re ove r fro e c sed rea. I Page 1 Rev A
Instruction Sheet COOL SERIES DUCT COOL C UL R US LISTED H NK O you or urc s g t e D C t oroug y e ore s g / as e OL P ea e rea g product PR D C FE RES - Re ove r fro e c sed rea t m a o se e x o duct
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:
27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84
More informationBRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT
BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital
More informationREQUEST FOR PROPOSALS
West Q Avenue, Kalamazoo, MI P: () - F: () - www.texastownship.org REQUEST FOR PROPOSALS - Winter Snow Removal Services Proposals The Charter Township of Texas, Kalamazoo County Michigan, is requesting
More informationEvolution Strategies for Optimizing Rectangular Cartograms
Evolution Strategies for Optimizing Rectangular Cartograms Kevin Buchin 1, Bettina Speckmann 1, and Sander Verdonschot 2 1 TU Eindhoven, 2 Carleton University September 20, 2012 Sander Verdonschot (Carleton
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:
295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:
3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27
More informationExecutive Committee and Officers ( )
Gifted and Talented International V o l u m e 2 4, N u m b e r 2, D e c e m b e r, 2 0 0 9. G i f t e d a n d T a l e n t e d I n t e r n a t i o n a2 l 4 ( 2), D e c e m b e r, 2 0 0 9. 1 T h e W o r
More informationTable of C on t en t s Global Campus 21 in N umbe r s R e g ional Capac it y D e v e lopme nt in E-L e ar ning Structure a n d C o m p o n en ts R ea
G Blended L ea r ni ng P r o g r a m R eg i o na l C a p a c i t y D ev elo p m ent i n E -L ea r ni ng H R K C r o s s o r d e r u c a t i o n a n d v e l o p m e n t C o p e r a t i o n 3 0 6 0 7 0 5
More informationAGENDA. 6. AB 475 and SB 386: require rear amber strobe lights on horse-drawn vehicles for safety after dark and during inclement
AGENDA Eau Claire County Highway Committee Thursday January 4th, 2018 / 6:15 am Eau Claire County Highway Department - Room 101 2000 Spooner Avenue, Altoona, WI 54720 1. Call the meeting to order. 2. Confirmation
More informationTENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL
SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.
More informationBase Design Considerations for Jointed Concrete. Dan G. Zollinger, Ph.D., P.E. Texas A&M University, College Station, TX, USA
Base Design Considerations for Jointed Concrete Dan G. Zollinger, Ph.D., P.E. Texas A&M University, College Station, TX, USA Discussion What is Erosion Effects on Performance Erosion Testing Use of Erosion
More informationC11 EDR - STRONGHOLD BUILDING STORM WATER QUALITY MANAGEMENT PLAN ROBSTOWN, TEXAS, COUNTY ROAD 69 MUNOZ ENGINEERING CIVIL STRUCTURAL MARINE
RMIII 6/3/7 U I U I TENTION POND REV ISSUED FOR CONSTRUCTION PHONE: 36-946-4848 38 ANDREA LN CORPUS CHRISTI, TX, 7844 TBPE FIRM No. F-4 TENTION DITCH LEGEND PROPOSED STORMWATER / DRAINAGE FLOW DIRECTION
More informationCity of Lee s Summit Public Works Operations
City of Lee s Summit Public Works Operations 2015 2016 Snow Operations August 3, 2015 GOAL The City of Lee s Summit s snow and ice goal is to provide a high level of customer service to our citizens within
More informationHDD PA-LA SR (S-K34, S-K35, PEM-K32)
HDD PA-LA-0004.0000-SR (S-K34, S-K35, PEM-K32) Given the design, the threat of inadvertent return has been reduced to the maximum extent practicable and in this case that threat is considered to be low.
More informationTown of Morrison 2014 Budget vs. Actual Detail Jan-Dec Actual vs Jan-Dec Budget October
Income Town of Morrison 0200-TAX COLLECTIONS 002-4000 Tax collection total 002-400-2-Levy 0.00 479,208.64-479,208.64 463,188.00 002-4000 Tax collection total - Ot 1,340,531.43 Total 002-4000 Tax collection
More informationrhtre PAID U.S. POSTAGE Can't attend? Pass this on to a friend. Cleveland, Ohio Permit No. 799 First Class
rhtr irt Cl.S. POSTAG PAD Cllnd, Ohi Prmit. 799 Cn't ttnd? P thi n t frind. \ ; n l *di: >.8 >,5 G *' >(n n c. if9$9$.jj V G. r.t 0 H: u ) ' r x * H > x > i M
More informationHDD PA-IN RD (W-N57 and W-N56)
HDD PA-IN-0048.0000-RD (W-N57 and W-N56) Given the design, the threat of inadvertent return has been reduced to the maximum extent practicable and in this case that threat is considered to be low. Implementing
More informationLake Township Proposed Budget Fiscal Year
Fiscal Year Apriil 1, 2017 through March 31, 2018 Tentative Taxable Value for 2017 Tax Spread General Operating Millage Subject to Headlee Rollback Extra Voted Millage Rate Subject to Headlee Rollback
More informationTOWN OF WESTLAKE GPS CONTROL MONUMENTS 1-10
GPS CONTROL MONUMENTS 1-1 GPS MONUMENT NO. 1 September 22, 1999 NAO 1983 (H.A.R.N. 1993) POSTON Latitude: Longitude: 32 58' 16.59982" N 97 1' 42.52797" W TEXAS GRD COORDNATES - North Central Zone (422)
More informationSPECIALIZES IN GENERATORS & TRANSFER SWITCHES
P.O. Box 32 One Energy Place, New London, OH 44851 419-929-1571 1-800-533-8658 www.firelandsec.com AREA ELECTRICIANS The following electricians serve parts or all of the Firelands Electric service territory.
More informationNew Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS
PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB
More informationc. What is the average rate of change of f on the interval [, ]? Answer: d. What is a local minimum value of f? Answer: 5 e. On what interval(s) is f
Essential Skills Chapter f ( x + h) f ( x ). Simplifying the difference quotient Section. h f ( x + h) f ( x ) Example: For f ( x) = 4x 4 x, find and simplify completely. h Answer: 4 8x 4 h. Finding the
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:
2,852.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 49 CONTRACT ID: 001607132 PROJECT: IM 0352(341) CONTRACT: 02133206 AWARD : $287,874.50 PROJECTED : $287,874.50 ADJ. PROJECTED : $290,726.58
More informationACET 406 Mid-Term Exam B
ACET 406 Mid-Term Exam B SUBJECT: ACET 406, INSTRUCTOR: Dr Antonis Michael, DATE: 24/11/09 INSTRUCTIONS You are required to answer all of the following questions within the specified time (90 minutes).you
More information,\ I. . <- c}. " C:-)' ) I- p od--- -;::: 'J.--- d, cl cr -- I. ( I) Cl c,\. c. 1\'0\ ~ '~O'-_. e ~.\~\S
Math 3306 - Test 1 Name: An d {"0v\ ( _ roj ~ ed Date: l'( ~0 { 1\ Fall 2011 1. (to Pts) Let S == {I, 2, 3,4, 5,6,7,8,9, 10}. of each of the following types of mappings, provide justification for why the
More informationCATAVASII LA NAȘTEREA DOMNULUI DUMNEZEU ȘI MÂNTUITORULUI NOSTRU, IISUS HRISTOS. CÂNTAREA I-A. Ήχος Πα. to os se e e na aș te e e slă ă ă vi i i i i
CATAVASII LA NAȘTEREA DOMNULUI DUMNEZEU ȘI MÂNTUITORULUI NOSTRU, IISUS HRISTOS. CÂNTAREA I-A Ήχος α H ris to os s n ș t slă ă ă vi i i i i ți'l Hris to o os di in c ru u uri, în tâm pi i n ți i'l Hris
More informationSystem Mapping Case Studies
System Mapping Case Studies 1. Madison Getting Started Three Step Approach 2. Rocky Hill Maximizing resources 3. Putman Boots on the ground CT Map Rocky Hill Putnam Madison Madison Community Profile Getting
More informationAverage Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016
Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION
More informationo C *$ go ! b», S AT? g (i * ^ fc fa fa U - S 8 += C fl o.2h 2 fl 'fl O ' 0> fl l-h cvo *, &! 5 a o3 a; O g 02 QJ 01 fls g! r«'-fl O fl s- ccco
> p >>>> ft^. 2 Tble f Generl rdnes. t^-t - +«0 -P k*ph? -- i t t i S i-h l -H i-h -d. *- e Stf H2 t s - ^ d - 'Ct? "fi p= + V t r & ^ C d Si d n. M. s - W ^ m» H ft ^.2. S'Sll-pl e Cl h /~v S s, -P s'l
More informationAGGREGATES BID DATE: 11/6/08 CONTRACT PERIOD: 1/1/09 12/31/09
BID DATE: 11/6/08 CONTRACT PERIOD: 1/1/09 12/31/09 BIDDERS ADDRESS PHONE PLANT LOCATION Almond Aggregates,LLC 1140 McHenry Valley Road, Almond, NY 14804 (607) 276-6864 1140 McHenry Valley Road, Almond,
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:
More informationPROOF/ÉPREUVE ISO INTERNATIONAL STANDARD. Space environment (natural and artificial) Galactic cosmic ray model
INTERNATIONAL STANDARD ISO 15390 First edition 2004-##-## Space environment (natural and artificial) Galactic cosmic ray model Environnement spatial (naturel et artificiel) Modèle de rayonnement cosmique
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:
-58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31
More informationSolutions 1F and 2F. 1) correct 12) 2 8 = 4 13) Q = 22 4Q = 13 Q = 13/4 = 3 1/4. 2) correct R 6 S 9. 13) R 6 S -9 or 2) 1 YX YX.
F F ) ) ) 7 ) Q Q Q Q / / ) correct ) correct ) ) ) R S or R S ) ()P P P ) 0 ) ( 0 ) 0 ) 7) 7 ) A D C ) [ 0 7] 00 0 00 ) 7Q( ) ) A B( A B) ) ) ) 0 () () 0 Z() () Z ) [ 0 07C] 000 ) 0 70C 7 70C C 7/70 7/70
More information5. Atmospheric Supply of Mercury to the Baltic Sea in 2015
Atmospheric Supply of Mercury to the Baltic Sea in 2015 69 5. Atmospheric Supply of Mercury to the Baltic Sea in 2015 In this chapter the results of model evaluation of mercury atmospheric input to the
More informationSAMPLE AUDIT FORMAT. Pre Audit Notification Letter Draft. Dear Registrant:
Pre Audit Notification Letter Draft Dear Registrant: The Pennsylvania Department of Transportation (PennDOT) is a member of the Federally Mandated International Registration Plan (IRP). As part of this
More informationROAD INVENTORY FOR CERTIFICATION OF MILEAGE
ROD INVENTORY FOR CERTIFICTION OF MILEGE Kay F outs Road Inventory Supervisor, IS H C ISHC ROD IN V E N T O R Y SECTIO N ND DT C O L L E C T IO N s provided in the Indiana Code, the Indiana State Highway
More informationLARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT
LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Nancy M. Trimble, Associate Planner DATE: October 26, 2017 TITLE: Review and action
More informationTwo-Digit Number Times Two-Digit Number
Lesson Two-Digit Number Times Two-Digit Number Common Core State Standards 4.NBT.B.5 Multiply a whole number of up to four digits by a one-digit whole number, and multiply two two-digit numbers, using
More informationF l a s h-b a s e d S S D s i n E n t e r p r i s e F l a s h-b a s e d S S D s ( S o-s ltiad t e D r i v e s ) a r e b e c o m i n g a n a t t r a c
L i f e t i m e M a n a g e m e n t o f F l a-b s ah s e d S S D s U s i n g R e c o v e r-a y w a r e D y n a m i c T h r o t t l i n g S u n g j i n L e, e T a e j i n K i m, K y u n g h o, Kainmd J
More informationAPPENDIX B WORKSHEETS & EXHIBITS
APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions
More informationSPXTIN : Fresh Concrete Floor Adapter
0 SPXTIN00-0: resh oncrete loor dapter eight Safety Lifting Load ontrol Safety Management TNIL T SpanSet ustralia Ltd Pullman Place mu Plains NSW 0 ustralia Telephone + 9 ax + 0 -mail sales@spanset.com.au
More informationEvaluating 2-DNF Formulas on Ciphertexts
Evaluating 2-DNF Formulas on Ciphertexts Dan Boneh, Eu-Jin Goh, and Kobbi Nissim Theory of Cryptography Conference 2005 Homomorphic Encryption Enc. scheme is homomorphic to function f if from E[A], E[B],
More information800mA and 1A Low Dropout Positive Regulator 2.85V, 3V, 3.3V, 5V, and Adjustable
A 8mA and A Low Dropout Positive Regulator.85V, 3V, 3.3V, 5V, and Adjustable FEATURES.85V, 3V, 3.3V, 5V, and ADJUSTABLE VERSIONS.85V MODEL FOR SCSI- ACTIVE TERMINATION OUTPUT CURRENT: : 8mA max A: A max
More informationMaricopa County Department of Transportation (MCDOT) GIS Innovations in Transportation Asset Management
Maricopa County Department of Transportation (MCDOT) GIS Innovations in Transportation Asset Management Presented By Steve Hossack, GIS Database Administrator 2018 ITE/IMSA Spring Conference Maricopa County
More informationI was dete rm i ne d that t h ere would be n o a v o i d a b l e waste and that e v e ry th in g t h a t could be used sh o u l d be
TH E P R E P A R AT I ON THE HAY OF COM POST 1 58 P R E PA HAT I O N O F C O M P O S T I N T H E LI NG CHA U L BP R O SA R I U M, H O N G KONG N. D. F R A S ER, M. B., CH. B : [ NOTE : -No origina l i
More informationTOWNSHIP OF NUTLEY PURCHASE OF SURPLUS EQUIPMENTNEHICLES SPECIFICATIONS AND PROPOSALS FOR ESSEX COUNTY NEW JERSEY
TOWNSHIP OF NUTLEY ESSEX COUNTY NEW JERSEY SPECIFICATIONS AND PROPOSALS FOR PURCHASE OF SURPLUS EQUIPMENTNEHICLES NOTICE TO BIDDERS NOTICE IS HEREBY GIVEN that sealed bids will be received by the Municipal
More informationAASHTO Rigid Pavement Design
AASHTO Rigid Pavement Design Dr. Antonis Michael Frederick University Notes Courtesy of Dr. Christos Drakos University of Florida 1. Introduction Empirical design based on the AASHO road test: Over 200
More information17, , , , , , , , , , , , ,526.
BID OPENING: FRIDAY, January,0 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. A^ flr~l // wmjl JlT Xhu Brisfn D. Stacy, P.E. County Engineer Engineer s (D
More informationPROJECT REVIEW REPORT
PROJECT REVIEW REPORT EVALUATION OF THE URETEK DEEP INJECTION (UDI) PROCESS FOR IMPROVING PERFORMANCE OF US 65 CARROLL COUNTY, MISSOURI Prepared by Randall W. Brown, PhD, PE Rick Gatewood Amy B. Hyde URETEK
More informationAppendix C Benchmarking Cost Estimates
REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall
More informationCeu Approved as to form: Barbara Y. hinpoch, Mayor
CTY OF RENTON, WASHNGTON ORDNANCE NO 4028 AN ORDNANCE OF THE CTY OF RENTON, WASHNGTON, ESTABLSHNG A SPECAL ASSESSMENT DSTRCT FOR SANTARY SEWER SERCE N THE ADAMS STA LD NO 25 SERCE AREA AND ESTABLSHNG THE
More informationART BY VIKRAM. Oil, Acrylic, Pen & Ink and Watercolor works currently available for sale. Fa l l C a t a l o g
C a t a l o g Oil, Acrylic, Pen & Ink and Watercolor works currently available for sale. Fa l l 2 017 P r i c e s v a l i d t h r o u g h D e c 2017 W w w. V i k r a m M a d a n. c o m 24 H 18 W N o r
More informationAsh Wednesday. First Introit thing. * Dómi- nos. di- di- nos, tú- ré- spi- Ps. ne. Dó- mi- Sál- vum. intra-vé-runt. Gló- ri-
sh Wdsdy 7 gn mult- tú- st Frst Intrt thng X-áud m. ns ní- m-sr-cór- Ps. -qu Ptr - m- Sál- vum m * usqu 1 d fc á-rum sp- m-sr-t- ó- num Gló- r- Fí- l- Sp-rí- : quó-n- m ntr-vé-runt á- n-mm c * m- quó-n-
More informationROCK EXCAVATION (GRADING) OPSS 206 INDEX
206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6
More informationADDENDUM 1. Boiler Masters Inc. Attachments: Pre-Bid Meeting Agenda Project: Guilford County Schools Pre-Bid Meeting Sign-Up
ADDENDUM 1 To: Plan olders: ssued By: Daniel Chay (DC) Star Electric Mechanical Maintenance Date: May 15, 2013 Central Builders Superior Mechanical Services Cc: Tracy Nance, GCS (TN) Jeff argett Mechanical
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS 10782 Wattsburg Road Erie, PA 16509 The WATTSBURG AREA SCHOOL DISTRICT invites qualified vendors to submit proposals for CONTRACTED SNOW REMOVAL MANDATORY PRE-SUBMISSION MEETING All
More informationU.S. General Services Administration FOIA Requester Service Center (H1F) 1800 F Street, NW, Room 7308 Washington, DC Fax:
Description of document: Requested date: Released date: Posted date: Source of document: List of General Services Administration (GSA) properties from the REXUS (Real Estate Across the United States) database
More informationMAX4636EUB -40 C to +85 C 10 µmax 1 NO1 IN1 GND. 3 x 3 THIN QFN OFF ON ON OFF SWITCHES SHOWN FOR "0" INPUT. Maxim Integrated Products 1
9-79; Rev ; /3 Fast, Low-Voltage, Dual 4 SPDT General Description The are fast, dual 4 singlepole/double-throw (SPDT) analog switches that operate with supply voltages from +.8V to +.V. High switching
More informationPrinciples and techniques for system modelling which: Ð aim to produce a model of a system Ð provide notations and methods Advantages for software
Unit 4 : Object -Oriented Analysis - Principles O b j ec t i ves To introduce the basic principles of object -orientation : objects; classes of object; encapsulation; inheritance; and p o ly m o rp h i
More informationBROWN COUNTY FARMLAND AUCTION
BROWN COUNTY FARMLAND AUCTION CROP - PASTURE - HUNTING - INVESTMENT 62 Acres +/- TUESDAY, NOVEMBER, 1 :30am Auction Location: The DEC (Dakota Event Center) - Lamont St. - Aberdeen, SD 5401 Mercier & Ravina
More informationWe are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.
We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.
More informationBFMEXMTH 2013/04/30 16:36:12 WASHINGTON COUNTY AUDITOR Page: 1. Expense Account Report w/ MTD AS OF: 04/30/2013
BFMEXMTH 2013/04/30 16:36:12 WASHINGTON COUNTY AUDITOR 5.4.0 Page: 1 0100 COMMISSIONERS 100-0100-51000 SALARIES OFFICIALS 166,572.00 12,813.24 51,252.96 0.00 115,319.04 69 100-0100-51001 SALARIES EMPLOYEES
More informationSeries CCT-58S Multi-Throw DC 18 GHz, SP7T & SP8T Normally Open Coaxial Switch
PART NUMBER CCT-58S DESCRIPTION Commercial Normally Open Multi-throw, DC-18 GHz The CCT-58S/CT-58S is an internally terminated, broadband, multi-throw, electromechanical coaxial switch designed to switch
More informationFranklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation
5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road
More informationForeword by Yvo de Boer Prefa ce a n d a c k n owledge m e n ts List of abbreviations
Cont ent s Foreword by Yvo de Boer Prefa ce a n d a c k n owledge m e n ts List of abbreviations page xii xv xvii Pa r t 1 I ntro duct ion 1 1 Grasping the essentials of the climate change problem 3 1.1
More information