PLYMOUTH TOWNSHIP WAYNE COUNTY, MICHIGAN

Size: px
Start display at page:

Download "PLYMOUTH TOWNSHIP WAYNE COUNTY, MICHIGAN"

Transcription

1 PLYMOUTH TOWNSHIP WAYNE COUNTY, MICHIGAN PLYMOUTH TOWNSHIP BOARD OF TRUSTEES SUPERVISOR HUNTERS CREEK ROAD REHABILITATI, S.A.D. SHANN PRICE CLERK NANCY CZELMAN TREASURER R EDWARDS BOARD OF TRUSTEES STEVE MANN MICHAEL KELLY BOB DOROSHEWITZ CHUCK CURMI PLOTTED 5/19/2016 6:48:25 AM gkenda PROJECT AREA 1 INDEX OF S PROJECT MANAGER: - FIELD BOOK INFORMATI: - c:\pw_work-gkenda \d \ggg-pts-hcttesheet.dgn COVER GENERAL NOTES AND TYPICALS OVERALL PLAN CSTRUCTI S WAYNE COUNTY STANDARD DETAILS READY FOR BIDDERS Northne Rd., PO Box 10 Tayor, MI FAX: Budng reatonshps on a foundaton of exceence PREPARED UNDER THE SUPERVISI OF: DANIEL R. BROOKS #29657 DATE C W ade Trm Group, Inc.

2 REV# DATE DESCRIPTI PROJECT MANAGER: - FIELD BOOK INFORMATI: - c:\pw_work-gkenda \d \ggg-pts-hcnotes_detas.dgn PLOTTED 5/19/2016 6:48:34 AM gkenda EXISTING 7" N REINFORCED CCRETE WITH INTEGRAL CURB TO REMAIN AS DIRECTED ENGINEER EXISTING SUBGRADE (CLAY) 60 ROW CL 13.5 ROW % 2% "Msc Conc Pavt, Nonrenf, 7 nch" AS DIRECTED ENGINEER 27 ROAD CROSS SECTI REMOVE EXISTING 7" N REINFORCED CCRETE PAVEMENT PAID FOR AS "Msc Pavt, Rem, Patchng" MISCELLANEOUS QUANTITIES 1 LS Mobzaton, Max $10,000 1 LS Traffc Mantenance and Contro 2700 Sft Concrete Drve and Sdewak, Remove 200 Cyd Msc Aggregate Base, CIP 300 Syd Drveway, Nonrenf Conc, 6 nch 6 Ea Msc Structure Cover, Adj 3 Ft Msc Structure Reconstruct 100 Ft Msc Underdran, Subgrade, 6 nch 3400 Ft Route and Sea Jonts and Cracks 400 Syd Msc Seedng, Mxture THM 1 LS Msc Audo-Vdeo Rte Survey *NOTE QUANTITIES ARE ESTIMATES AND ARE SUBJECT TO CHANGES AS DIRECTED WAYNE COUNTY ENGINEER AND PLYMOUTH TOWNSHIP ENGINEER Northne Rd., PO Box 10 Tayor, MI FAX: Budng reatonshps on a foundaton of exceence REH ABILITATI, S.A.D. 2 GEN ERAL N OTES A N D TY PICALS ISSUED FOR: DATE: : C W ade Trm Group, Inc.

3 SAD LIMITS REV# DATE DESCRIPTI PROJECT MANAGER: - FIELD BOOK INFORMATI: - c:\pw_work-gkenda \d \csp-pts-hcovera Pan.dgn PLOTTED 5/19/2016 6:48:40 AM gkenda HUNTER CREEK COURT POWELL ROAD 13 OVERALL PROJECT LIMITS HUNTER CREEK DRIVE Northne Rd., PO Box 10 Tayor, MI FAX: Budng reatonshps on a foundaton of exceence REH ABILITATI, S.A.D. 3 OVERALL PLA N ISSUED FOR: DATE: : C W ade Trm Group, Inc.

4 REV# DATE DESCRIPTI PROJECT MANAGER: - FIELD BOOK INFORMATI: - c:\pw_work-gkenda \d \csp-pts-hcsheet1.dgn PLOTTED 5/19/2016 6:48:47 AM gkenda HUNTERS CREEK CT HUNTERS CREEK DR MATCH LIMIT SEE PAVEMENT REMOVAL AND REPLACEMENT CATCH BASIN SAD LIMITS MAJOR QUANTITIES THIS : TOTAL UNIT DESCRIPTI 2575 Syd Msc Pavt, Rem, Patchng 2575 Syd Msc Conc Pavt, Nonrenf, 7 nch NOTES: 1. EXACT LIMITS OF PAVEMENT REMOVAL AND REPLACMENT SHALL BE DETERMINED CSTRUCTI ENGINEER. 2. QUANTITIES ARE ESTIMATES AND ARE SUBJECT TO CHANGE AS DIRECTED WAYNE COUNTY ENGINEER AND PLYMOUTH TOWNSHIP ENGINEER Northne Rd., PO Box 10 Tayor, MI FAX: Budng reatonshps on a foundaton of exceence REH ABILITATI, S.A.D. 4 H U N TERS CREEK DRIVE H U N TERS CREEK COU RT ISSUED FOR: DATE: : C W ade Trm Group, Inc.

5 16 MATCH LIMIT SEE REV# DATE DESCRIPTI PROJECT MANAGER: - FIELD BOOK INFORMATI: - c:\pw_work-gkenda \d \csp-pts-hcsheet2.dgn PLOTTED 5/19/2016 6:48:53 AM gkenda OUTLOT POWELL ROAD HUNTERS CREEK DR PAVEMENT REMOVAL AND REPLACEMENT CATCH BASIN MAJOR QUANTITIES THIS : TOTAL UNIT DESCRIPTI 810 Syd Msc Pavt, Rem, Patchng 810 Syd Msc Conc Pavt, Nonrenf, 7 nch NOTES: 1. EXACT LIMITS OF PAVEMENT REMOVAL AND REPLACMENT SHALL BE DETERMINED CSTRUCTI ENGINEER. 2. QUANTITIES ARE ESTIMATES AND ARE SUBJECT TO CHANGE AS DIRECTED WAYNE COUNTY ENGINEER AND PLYMOUTH TOWNSHIP ENGINEER Northne Rd., PO Box 10 Tayor, MI FAX: Budng reatonshps on a foundaton of exceence REH ABILITATI, S.A.D. 5 H U N TERS CREEK DRIVE ISSUED FOR: DATE: : C W ade Trm Group, Inc.

6 MANAGER: - FI ELD BOOK DB 6 Group,I nc. : W ade Tr m DATE: 05/20/16 C BID 5/19/2016 R OA D PLOTTED COU N TY STA N D A R D 6:48:59 AM D ETA ILS R EH A B ILITA TI,S.A.D. H U N TER S CR EEK W AYNE I NFORMATI : - c:\pw_work-gkenda \d \csp-p ts-hcdeta s1.dgn PROJECT ISSUED FOR: gkenda www. wadet r m. com FAX: / Tay or,m I Nor t h ne Rd.,PO Box 10 UNLESS SI GNED AND DATED: NOT VALI D FOR CSTRUCTI Bu d ng r e at onsh ps on a f oundat on ofexce ence REV# DATE DESCRI PTI

7 MANAGER: - FI ELD BOOK DB 7 Group,I nc. : W ade Tr m DATE: 05/20/16 C BID 5/19/2016 R OA D PLOTTED COU N TY STA N D A R D 6:49:19 AM D ETA ILS R EH A B ILITA TI,S.A.D. H U N TER S CR EEK W AYNE I NFORMATI : - c:\pw_work-gkenda \d \csp-p ts-hcdeta s2.dgn PROJECT ISSUED FOR: gkenda www. wadet r m. com FAX: / Tay or,m I Nor t h ne Rd.,PO Box 10 UNLESS SI GNED AND DATED: NOT VALI D FOR CSTRUCTI Bu d ng r e at onsh ps on a f oundat on ofexce ence REV# DATE DESCRI PTI

8 MANAGER: - FI ELD BOOK DB 8 Group,I nc. : W ade Tr m DATE: 05/20/16 C BID 5/19/2016 R OA D PLOTTED COU N TY STA N D A R D 6:49:42 D ETA ILS R EH A B ILITA TI,S.A.D. H U N TER S CR EEK W AYNE I NFORMATI : - c:\pw_work-gkenda \d \csp-p ts-hcdeta s3.dgn PROJECT ISSUED FOR: AM gkenda www. wadet r m. com FAX: / Tay or,m I Nor t h ne Rd.,PO Box 10 UNLESS SI GNED AND DATED: NOT VALI D FOR CSTRUCTI Bu d ng r e at onsh ps on a f oundat on ofexce ence REV# DATE DESCRI PTI

9 PROJECT MANAGER: - FIELD BOOK INFORMATI: - c:\pw_work-gkenda \d \csp-pts-hcdetas4.dgn PLOTTED 5/19/2016 6:50:08 AM gkenda Northne Rd., PO Box 10 Tayor, MI FAX: Budng reatonshps on a foundaton of exceence REV# DATE DESCRIPTI REH ABILITATI, S.A.D. 9 W A Y N E COU N TY STA N DARD DETAILS ISSUED FOR: DATE: : C W ade Trm Group, Inc.

A L A BA M A L A W R E V IE W

A L A BA M A L A W R E V IE W A L A BA M A L A W R E V IE W Volume 52 Fall 2000 Number 1 B E F O R E D I S A B I L I T Y C I V I L R I G HT S : C I V I L W A R P E N S I O N S A N D TH E P O L I T I C S O F D I S A B I L I T Y I N

More information

P a g e 5 1 of R e p o r t P B 4 / 0 9

P a g e 5 1 of R e p o r t P B 4 / 0 9 P a g e 5 1 of R e p o r t P B 4 / 0 9 J A R T a l s o c o n c l u d e d t h a t a l t h o u g h t h e i n t e n t o f N e l s o n s r e h a b i l i t a t i o n p l a n i s t o e n h a n c e c o n n e

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:

More information

I M P O R T A N T S A F E T Y I N S T R U C T I O N S W h e n u s i n g t h i s e l e c t r o n i c d e v i c e, b a s i c p r e c a u t i o n s s h o

I M P O R T A N T S A F E T Y I N S T R U C T I O N S W h e n u s i n g t h i s e l e c t r o n i c d e v i c e, b a s i c p r e c a u t i o n s s h o I M P O R T A N T S A F E T Y I N S T R U C T I O N S W h e n u s i n g t h i s e l e c t r o n i c d e v i c e, b a s i c p r e c a u t i o n s s h o u l d a l w a y s b e t a k e n, i n c l u d f o l

More information

401 PLANTMIX BITUMINOUS PAVEMENTS GENERAL Rev. June 10, 2004 401.03.16 SURFACING MISCELLANEOUS AREAS: Surfacing of road approaches and connections, street intersection areas, frontage roads, island areas,

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94

More information

New Business and Commercial Building Applicants

New Business and Commercial Building Applicants New Business and Commercial Building Applicants A Helpful Guide - Z o n i n g P e r m i t A p p l i c a t i o n - B u s i n e s s Q u e s t i o n n a i r e - P r e -Ap p ro va ls f o r C o n s t r u c

More information

OH BOY! Story. N a r r a t iv e a n d o bj e c t s th ea t e r Fo r a l l a g e s, fr o m th e a ge of 9

OH BOY! Story. N a r r a t iv e a n d o bj e c t s th ea t e r Fo r a l l a g e s, fr o m th e a ge of 9 OH BOY! O h Boy!, was or igin a lly cr eat ed in F r en ch an d was a m a jor s u cc ess on t h e Fr en ch st a ge f or young au di enc es. It h a s b een s een by ap pr ox i ma t ely 175,000 sp ect at

More information

0.143 Hickory Circle

0.143 Hickory Circle Rank Width Leng ROAD NAME Total Feet Miles Cregar Road House 132 to Muni Bound 37.3 20' to 32 0.343 Mill Street McDonald Street to Trail 32.8 20 0.133 Academy Street 32.3 18 0.066 Sunset Drive 32.3 33

More information

Summary of Bids Received For

Summary of Bids Received For Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: 10370045 Firm Name Bid Total $ $1,074,100.00 Howell Contractors Inc. $1,083,694.00 Sunesis Construction

More information

Boxing Blends Sub step 2.2 Focus: Beginning, Final, and Digraph Blends

Boxing Blends Sub step 2.2 Focus: Beginning, Final, and Digraph Blends Boxing Blends Sub step 2.2 Focus: Beginning, Final, and Digraph Blends Boxing Blends Game Instructions: (One Player) 1. Use the game board appropriate for your student. Cut out the boxes to where there

More information

Software Process Models there are many process model s in th e li t e ra t u re, s om e a r e prescriptions and some are descriptions you need to mode

Software Process Models there are many process model s in th e li t e ra t u re, s om e a r e prescriptions and some are descriptions you need to mode Unit 2 : Software Process O b j ec t i ve This unit introduces software systems engineering through a discussion of software processes and their principal characteristics. In order to achieve the desireable

More information

176 5 t h Fl oo r. 337 P o ly me r Ma te ri al s

176 5 t h Fl oo r. 337 P o ly me r Ma te ri al s A g la di ou s F. L. 462 E l ec tr on ic D ev el op me nt A i ng er A.W.S. 371 C. A. M. A l ex an de r 236 A d mi ni st ra ti on R. H. (M rs ) A n dr ew s P. V. 326 O p ti ca l Tr an sm is si on A p ps

More information

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing

More information

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACTOR'S ESTIMATE PACKAGE CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55

More information

TOWN OF SEVERANCE, COLORADO. NOTICE OF PUBLIC HEARINGS FOR A PROJECT Hunters Crossing Annexation & Zoning

TOWN OF SEVERANCE, COLORADO. NOTICE OF PUBLIC HEARINGS FOR A PROJECT Hunters Crossing Annexation & Zoning TOWN OF SEVERANCE, COLORADO NOTICE OF PUBLIC HEARINGS FOR A PROJECT Hunters Crossing Annexation & Zoning NOTICE IS HEREBY GIVEN that the Public Hearing required by C.R.S. 31-12-108 before the Severance

More information

T h e C S E T I P r o j e c t

T h e C S E T I P r o j e c t T h e P r o j e c t T H E P R O J E C T T A B L E O F C O N T E N T S A r t i c l e P a g e C o m p r e h e n s i v e A s s es s m e n t o f t h e U F O / E T I P h e n o m e n o n M a y 1 9 9 1 1 E T

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services

Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services JOB SITES: GreenTrees of Huntley 11417 E. Main Street Huntley, IL 60142 SilverTrees Apartments 5901 Milwaukee Street Richmond,

More information

Agenda Rationale for ETG S eek ing I d eas ETG fram ew ork and res u lts 2

Agenda Rationale for ETG S eek ing I d eas ETG fram ew ork and res u lts 2 Internal Innovation @ C is c o 2 0 0 6 C i s c o S y s t e m s, I n c. A l l r i g h t s r e s e r v e d. C i s c o C o n f i d e n t i a l 1 Agenda Rationale for ETG S eek ing I d eas ETG fram ew ork

More information

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox Compare Responses Event #: 1702 Status: Pending award Event Name: Curb Replacement Project T 841046.05 Number Of s: 7 Fit Excavating Quality Built Construction Dinkel Construction II, LLC Concrete Solutions,LLC

More information

Fr anchi s ee appl i cat i on for m

Fr anchi s ee appl i cat i on for m Other Fr anchi s ee appl i cat i on for m Kindly fill in all the applicable information in the spaces provided and submit to us before the stipulated deadline. The information you provide will be held

More information

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION

More information

P a g e 3 6 of R e p o r t P B 4 / 0 9

P a g e 3 6 of R e p o r t P B 4 / 0 9 P a g e 3 6 of R e p o r t P B 4 / 0 9 p r o t e c t h um a n h e a l t h a n d p r o p e r t y fr om t h e d a n g e rs i n h e r e n t i n m i n i n g o p e r a t i o n s s u c h a s a q u a r r y. J

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 15,466.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 136-11.00 2.00 CONTRACT ID: 180801028 PROJECT: STP 1502(152)HES CONTRACT: 05153036 AWARD : $2,602,993.61 PROJECTED : $2,602,993.61 ADJ. PROJECTED

More information

I N A C O M P L E X W O R L D

I N A C O M P L E X W O R L D IS L A M I C E C O N O M I C S I N A C O M P L E X W O R L D E x p l o r a t i o n s i n A g-b eanste d S i m u l a t i o n S a m i A l-s u w a i l e m 1 4 2 9 H 2 0 0 8 I s l a m i c D e v e l o p m e

More information

TABULATION OF TENDERS

TABULATION OF TENDERS SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering

More information

S ca le M o d e l o f th e S o la r Sy ste m

S ca le M o d e l o f th e S o la r Sy ste m N a m e ' D a t e ' S ca le M o d e l o f th e S o la r Sy ste m 6.1 I n t r o d u c t i o n T h e S olar System is large, at least w hen com pared to distances we are fam iliar w ith on a day-to-day basis.

More information

Ranking accounting, banking and finance journals: A note

Ranking accounting, banking and finance journals: A note MPRA Munich Personal RePEc Archive Ranking accounting, banking and finance ournals: A note George Halkos and Nickolaos Tzeremes University of Thessaly, Department of Economics January 2012 Online at https://mpra.ub.uni-muenchen.de/36166/

More information

National Oilwell Varco Survey Report

National Oilwell Varco Survey Report Conoco Phillips Andrews County University Andrews 3604HL Surveys: 192`MD - 1369`MD Survey Date: Friday, January 22, 2016 National Oilwell Varco Survey Report Monday, January 25, 2016 UWI No. 42-003-47296

More information

DOCUMENTATION WORKBOOK FY 2018

DOCUMENTATION WORKBOOK FY 2018 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00

More information

Instruction Sheet COOL SERIES DUCT COOL LISTED H NK O. PR D C FE - Re ove r fro e c sed rea. I Page 1 Rev A

Instruction Sheet COOL SERIES DUCT COOL LISTED H NK O. PR D C FE - Re ove r fro e c sed rea. I Page 1 Rev A Instruction Sheet COOL SERIES DUCT COOL C UL R US LISTED H NK O you or urc s g t e D C t oroug y e ore s g / as e OL P ea e rea g product PR D C FE RES - Re ove r fro e c sed rea t m a o se e x o duct

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS West Q Avenue, Kalamazoo, MI P: () - F: () - www.texastownship.org REQUEST FOR PROPOSALS - Winter Snow Removal Services Proposals The Charter Township of Texas, Kalamazoo County Michigan, is requesting

More information

Evolution Strategies for Optimizing Rectangular Cartograms

Evolution Strategies for Optimizing Rectangular Cartograms Evolution Strategies for Optimizing Rectangular Cartograms Kevin Buchin 1, Bettina Speckmann 1, and Sander Verdonschot 2 1 TU Eindhoven, 2 Carleton University September 20, 2012 Sander Verdonschot (Carleton

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: 295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27

More information

Executive Committee and Officers ( )

Executive Committee and Officers ( ) Gifted and Talented International V o l u m e 2 4, N u m b e r 2, D e c e m b e r, 2 0 0 9. G i f t e d a n d T a l e n t e d I n t e r n a t i o n a2 l 4 ( 2), D e c e m b e r, 2 0 0 9. 1 T h e W o r

More information

Table of C on t en t s Global Campus 21 in N umbe r s R e g ional Capac it y D e v e lopme nt in E-L e ar ning Structure a n d C o m p o n en ts R ea

Table of C on t en t s Global Campus 21 in N umbe r s R e g ional Capac it y D e v e lopme nt in E-L e ar ning Structure a n d C o m p o n en ts R ea G Blended L ea r ni ng P r o g r a m R eg i o na l C a p a c i t y D ev elo p m ent i n E -L ea r ni ng H R K C r o s s o r d e r u c a t i o n a n d v e l o p m e n t C o p e r a t i o n 3 0 6 0 7 0 5

More information

AGENDA. 6. AB 475 and SB 386: require rear amber strobe lights on horse-drawn vehicles for safety after dark and during inclement

AGENDA. 6. AB 475 and SB 386: require rear amber strobe lights on horse-drawn vehicles for safety after dark and during inclement AGENDA Eau Claire County Highway Committee Thursday January 4th, 2018 / 6:15 am Eau Claire County Highway Department - Room 101 2000 Spooner Avenue, Altoona, WI 54720 1. Call the meeting to order. 2. Confirmation

More information

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.

More information

Base Design Considerations for Jointed Concrete. Dan G. Zollinger, Ph.D., P.E. Texas A&M University, College Station, TX, USA

Base Design Considerations for Jointed Concrete. Dan G. Zollinger, Ph.D., P.E. Texas A&M University, College Station, TX, USA Base Design Considerations for Jointed Concrete Dan G. Zollinger, Ph.D., P.E. Texas A&M University, College Station, TX, USA Discussion What is Erosion Effects on Performance Erosion Testing Use of Erosion

More information

C11 EDR - STRONGHOLD BUILDING STORM WATER QUALITY MANAGEMENT PLAN ROBSTOWN, TEXAS, COUNTY ROAD 69 MUNOZ ENGINEERING CIVIL STRUCTURAL MARINE

C11 EDR - STRONGHOLD BUILDING STORM WATER QUALITY MANAGEMENT PLAN ROBSTOWN, TEXAS, COUNTY ROAD 69 MUNOZ ENGINEERING CIVIL STRUCTURAL MARINE RMIII 6/3/7 U I U I TENTION POND REV ISSUED FOR CONSTRUCTION PHONE: 36-946-4848 38 ANDREA LN CORPUS CHRISTI, TX, 7844 TBPE FIRM No. F-4 TENTION DITCH LEGEND PROPOSED STORMWATER / DRAINAGE FLOW DIRECTION

More information

City of Lee s Summit Public Works Operations

City of Lee s Summit Public Works Operations City of Lee s Summit Public Works Operations 2015 2016 Snow Operations August 3, 2015 GOAL The City of Lee s Summit s snow and ice goal is to provide a high level of customer service to our citizens within

More information

HDD PA-LA SR (S-K34, S-K35, PEM-K32)

HDD PA-LA SR (S-K34, S-K35, PEM-K32) HDD PA-LA-0004.0000-SR (S-K34, S-K35, PEM-K32) Given the design, the threat of inadvertent return has been reduced to the maximum extent practicable and in this case that threat is considered to be low.

More information

Town of Morrison 2014 Budget vs. Actual Detail Jan-Dec Actual vs Jan-Dec Budget October

Town of Morrison 2014 Budget vs. Actual Detail Jan-Dec Actual vs Jan-Dec Budget October Income Town of Morrison 0200-TAX COLLECTIONS 002-4000 Tax collection total 002-400-2-Levy 0.00 479,208.64-479,208.64 463,188.00 002-4000 Tax collection total - Ot 1,340,531.43 Total 002-4000 Tax collection

More information

rhtre PAID U.S. POSTAGE Can't attend? Pass this on to a friend. Cleveland, Ohio Permit No. 799 First Class

rhtre PAID U.S. POSTAGE Can't attend? Pass this on to a friend. Cleveland, Ohio Permit No. 799 First Class rhtr irt Cl.S. POSTAG PAD Cllnd, Ohi Prmit. 799 Cn't ttnd? P thi n t frind. \ ; n l *di: >.8 >,5 G *' >(n n c. if9$9$.jj V G. r.t 0 H: u ) ' r x * H > x > i M

More information

HDD PA-IN RD (W-N57 and W-N56)

HDD PA-IN RD (W-N57 and W-N56) HDD PA-IN-0048.0000-RD (W-N57 and W-N56) Given the design, the threat of inadvertent return has been reduced to the maximum extent practicable and in this case that threat is considered to be low. Implementing

More information

Lake Township Proposed Budget Fiscal Year

Lake Township Proposed Budget Fiscal Year Fiscal Year Apriil 1, 2017 through March 31, 2018 Tentative Taxable Value for 2017 Tax Spread General Operating Millage Subject to Headlee Rollback Extra Voted Millage Rate Subject to Headlee Rollback

More information

TOWN OF WESTLAKE GPS CONTROL MONUMENTS 1-10

TOWN OF WESTLAKE GPS CONTROL MONUMENTS 1-10 GPS CONTROL MONUMENTS 1-1 GPS MONUMENT NO. 1 September 22, 1999 NAO 1983 (H.A.R.N. 1993) POSTON Latitude: Longitude: 32 58' 16.59982" N 97 1' 42.52797" W TEXAS GRD COORDNATES - North Central Zone (422)

More information

SPECIALIZES IN GENERATORS & TRANSFER SWITCHES

SPECIALIZES IN GENERATORS & TRANSFER SWITCHES P.O. Box 32 One Energy Place, New London, OH 44851 419-929-1571 1-800-533-8658 www.firelandsec.com AREA ELECTRICIANS The following electricians serve parts or all of the Firelands Electric service territory.

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB

More information

c. What is the average rate of change of f on the interval [, ]? Answer: d. What is a local minimum value of f? Answer: 5 e. On what interval(s) is f

c. What is the average rate of change of f on the interval [, ]? Answer: d. What is a local minimum value of f? Answer: 5 e. On what interval(s) is f Essential Skills Chapter f ( x + h) f ( x ). Simplifying the difference quotient Section. h f ( x + h) f ( x ) Example: For f ( x) = 4x 4 x, find and simplify completely. h Answer: 4 8x 4 h. Finding the

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD: 2,852.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 49 CONTRACT ID: 001607132 PROJECT: IM 0352(341) CONTRACT: 02133206 AWARD : $287,874.50 PROJECTED : $287,874.50 ADJ. PROJECTED : $290,726.58

More information

ACET 406 Mid-Term Exam B

ACET 406 Mid-Term Exam B ACET 406 Mid-Term Exam B SUBJECT: ACET 406, INSTRUCTOR: Dr Antonis Michael, DATE: 24/11/09 INSTRUCTIONS You are required to answer all of the following questions within the specified time (90 minutes).you

More information

,\ I. . <- c}. " C:-)' ) I- p od--- -;::: 'J.--- d, cl cr -- I. ( I) Cl c,\. c. 1\'0\ ~ '~O'-_. e ~.\~\S

,\ I. . <- c}.  C:-)' ) I- p od--- -;::: 'J.--- d, cl cr -- I. ( I) Cl c,\. c. 1\'0\ ~ '~O'-_. e ~.\~\S Math 3306 - Test 1 Name: An d {"0v\ ( _ roj ~ ed Date: l'( ~0 { 1\ Fall 2011 1. (to Pts) Let S == {I, 2, 3,4, 5,6,7,8,9, 10}. of each of the following types of mappings, provide justification for why the

More information

CATAVASII LA NAȘTEREA DOMNULUI DUMNEZEU ȘI MÂNTUITORULUI NOSTRU, IISUS HRISTOS. CÂNTAREA I-A. Ήχος Πα. to os se e e na aș te e e slă ă ă vi i i i i

CATAVASII LA NAȘTEREA DOMNULUI DUMNEZEU ȘI MÂNTUITORULUI NOSTRU, IISUS HRISTOS. CÂNTAREA I-A. Ήχος Πα. to os se e e na aș te e e slă ă ă vi i i i i CATAVASII LA NAȘTEREA DOMNULUI DUMNEZEU ȘI MÂNTUITORULUI NOSTRU, IISUS HRISTOS. CÂNTAREA I-A Ήχος α H ris to os s n ș t slă ă ă vi i i i i ți'l Hris to o os di in c ru u uri, în tâm pi i n ți i'l Hris

More information

System Mapping Case Studies

System Mapping Case Studies System Mapping Case Studies 1. Madison Getting Started Three Step Approach 2. Rocky Hill Maximizing resources 3. Putman Boots on the ground CT Map Rocky Hill Putnam Madison Madison Community Profile Getting

More information

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016 Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION

More information

o C *$ go ! b», S AT? g (i * ^ fc fa fa U - S 8 += C fl o.2h 2 fl 'fl O ' 0> fl l-h cvo *, &! 5 a o3 a; O g 02 QJ 01 fls g! r«'-fl O fl s- ccco

o C *$ go ! b», S AT? g (i * ^ fc fa fa U - S 8 += C fl o.2h 2 fl 'fl O ' 0> fl l-h cvo *, &! 5 a o3 a; O g 02 QJ 01 fls g! r«'-fl O fl s- ccco > p >>>> ft^. 2 Tble f Generl rdnes. t^-t - +«0 -P k*ph? -- i t t i S i-h l -H i-h -d. *- e Stf H2 t s - ^ d - 'Ct? "fi p= + V t r & ^ C d Si d n. M. s - W ^ m» H ft ^.2. S'Sll-pl e Cl h /~v S s, -P s'l

More information

AGGREGATES BID DATE: 11/6/08 CONTRACT PERIOD: 1/1/09 12/31/09

AGGREGATES BID DATE: 11/6/08 CONTRACT PERIOD: 1/1/09 12/31/09 BID DATE: 11/6/08 CONTRACT PERIOD: 1/1/09 12/31/09 BIDDERS ADDRESS PHONE PLANT LOCATION Almond Aggregates,LLC 1140 McHenry Valley Road, Almond, NY 14804 (607) 276-6864 1140 McHenry Valley Road, Almond,

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:

More information

PROOF/ÉPREUVE ISO INTERNATIONAL STANDARD. Space environment (natural and artificial) Galactic cosmic ray model

PROOF/ÉPREUVE ISO INTERNATIONAL STANDARD. Space environment (natural and artificial) Galactic cosmic ray model INTERNATIONAL STANDARD ISO 15390 First edition 2004-##-## Space environment (natural and artificial) Galactic cosmic ray model Environnement spatial (naturel et artificiel) Modèle de rayonnement cosmique

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD: -58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31

More information

Solutions 1F and 2F. 1) correct 12) 2 8 = 4 13) Q = 22 4Q = 13 Q = 13/4 = 3 1/4. 2) correct R 6 S 9. 13) R 6 S -9 or 2) 1 YX YX.

Solutions 1F and 2F. 1) correct 12) 2 8 = 4 13) Q = 22 4Q = 13 Q = 13/4 = 3 1/4. 2) correct R 6 S 9. 13) R 6 S -9 or 2) 1 YX YX. F F ) ) ) 7 ) Q Q Q Q / / ) correct ) correct ) ) ) R S or R S ) ()P P P ) 0 ) ( 0 ) 0 ) 7) 7 ) A D C ) [ 0 7] 00 0 00 ) 7Q( ) ) A B( A B) ) ) ) 0 () () 0 Z() () Z ) [ 0 07C] 000 ) 0 70C 7 70C C 7/70 7/70

More information

5. Atmospheric Supply of Mercury to the Baltic Sea in 2015

5. Atmospheric Supply of Mercury to the Baltic Sea in 2015 Atmospheric Supply of Mercury to the Baltic Sea in 2015 69 5. Atmospheric Supply of Mercury to the Baltic Sea in 2015 In this chapter the results of model evaluation of mercury atmospheric input to the

More information

SAMPLE AUDIT FORMAT. Pre Audit Notification Letter Draft. Dear Registrant:

SAMPLE AUDIT FORMAT. Pre Audit Notification Letter Draft. Dear Registrant: Pre Audit Notification Letter Draft Dear Registrant: The Pennsylvania Department of Transportation (PennDOT) is a member of the Federally Mandated International Registration Plan (IRP). As part of this

More information

ROAD INVENTORY FOR CERTIFICATION OF MILEAGE

ROAD INVENTORY FOR CERTIFICATION OF MILEAGE ROD INVENTORY FOR CERTIFICTION OF MILEGE Kay F outs Road Inventory Supervisor, IS H C ISHC ROD IN V E N T O R Y SECTIO N ND DT C O L L E C T IO N s provided in the Indiana Code, the Indiana State Highway

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT

LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT LARAMIE COUNTY PLANNING & DEVELOPMENT DEPARTMENT Planning Building MEMORANDUM TO: FROM: Laramie County Planning Commission Nancy M. Trimble, Associate Planner DATE: October 26, 2017 TITLE: Review and action

More information

Two-Digit Number Times Two-Digit Number

Two-Digit Number Times Two-Digit Number Lesson Two-Digit Number Times Two-Digit Number Common Core State Standards 4.NBT.B.5 Multiply a whole number of up to four digits by a one-digit whole number, and multiply two two-digit numbers, using

More information

F l a s h-b a s e d S S D s i n E n t e r p r i s e F l a s h-b a s e d S S D s ( S o-s ltiad t e D r i v e s ) a r e b e c o m i n g a n a t t r a c

F l a s h-b a s e d S S D s i n E n t e r p r i s e F l a s h-b a s e d S S D s ( S o-s ltiad t e D r i v e s ) a r e b e c o m i n g a n a t t r a c L i f e t i m e M a n a g e m e n t o f F l a-b s ah s e d S S D s U s i n g R e c o v e r-a y w a r e D y n a m i c T h r o t t l i n g S u n g j i n L e, e T a e j i n K i m, K y u n g h o, Kainmd J

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

SPXTIN : Fresh Concrete Floor Adapter

SPXTIN : Fresh Concrete Floor Adapter 0 SPXTIN00-0: resh oncrete loor dapter eight Safety Lifting Load ontrol Safety Management TNIL T SpanSet ustralia Ltd Pullman Place mu Plains NSW 0 ustralia Telephone + 9 ax + 0 -mail sales@spanset.com.au

More information

Evaluating 2-DNF Formulas on Ciphertexts

Evaluating 2-DNF Formulas on Ciphertexts Evaluating 2-DNF Formulas on Ciphertexts Dan Boneh, Eu-Jin Goh, and Kobbi Nissim Theory of Cryptography Conference 2005 Homomorphic Encryption Enc. scheme is homomorphic to function f if from E[A], E[B],

More information

800mA and 1A Low Dropout Positive Regulator 2.85V, 3V, 3.3V, 5V, and Adjustable

800mA and 1A Low Dropout Positive Regulator 2.85V, 3V, 3.3V, 5V, and Adjustable A 8mA and A Low Dropout Positive Regulator.85V, 3V, 3.3V, 5V, and Adjustable FEATURES.85V, 3V, 3.3V, 5V, and ADJUSTABLE VERSIONS.85V MODEL FOR SCSI- ACTIVE TERMINATION OUTPUT CURRENT: : 8mA max A: A max

More information

Maricopa County Department of Transportation (MCDOT) GIS Innovations in Transportation Asset Management

Maricopa County Department of Transportation (MCDOT) GIS Innovations in Transportation Asset Management Maricopa County Department of Transportation (MCDOT) GIS Innovations in Transportation Asset Management Presented By Steve Hossack, GIS Database Administrator 2018 ITE/IMSA Spring Conference Maricopa County

More information

I was dete rm i ne d that t h ere would be n o a v o i d a b l e waste and that e v e ry th in g t h a t could be used sh o u l d be

I was dete rm i ne d that t h ere would be n o a v o i d a b l e waste and that e v e ry th in g t h a t could be used sh o u l d be TH E P R E P A R AT I ON THE HAY OF COM POST 1 58 P R E PA HAT I O N O F C O M P O S T I N T H E LI NG CHA U L BP R O SA R I U M, H O N G KONG N. D. F R A S ER, M. B., CH. B : [ NOTE : -No origina l i

More information

TOWNSHIP OF NUTLEY PURCHASE OF SURPLUS EQUIPMENTNEHICLES SPECIFICATIONS AND PROPOSALS FOR ESSEX COUNTY NEW JERSEY

TOWNSHIP OF NUTLEY PURCHASE OF SURPLUS EQUIPMENTNEHICLES SPECIFICATIONS AND PROPOSALS FOR ESSEX COUNTY NEW JERSEY TOWNSHIP OF NUTLEY ESSEX COUNTY NEW JERSEY SPECIFICATIONS AND PROPOSALS FOR PURCHASE OF SURPLUS EQUIPMENTNEHICLES NOTICE TO BIDDERS NOTICE IS HEREBY GIVEN that sealed bids will be received by the Municipal

More information

AASHTO Rigid Pavement Design

AASHTO Rigid Pavement Design AASHTO Rigid Pavement Design Dr. Antonis Michael Frederick University Notes Courtesy of Dr. Christos Drakos University of Florida 1. Introduction Empirical design based on the AASHO road test: Over 200

More information

17, , , , , , , , , , , , ,526.

17, , , , , , , , , , , , ,526. BID OPENING: FRIDAY, January,0 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. A^ flr~l // wmjl JlT Xhu Brisfn D. Stacy, P.E. County Engineer Engineer s (D

More information

PROJECT REVIEW REPORT

PROJECT REVIEW REPORT PROJECT REVIEW REPORT EVALUATION OF THE URETEK DEEP INJECTION (UDI) PROCESS FOR IMPROVING PERFORMANCE OF US 65 CARROLL COUNTY, MISSOURI Prepared by Randall W. Brown, PhD, PE Rick Gatewood Amy B. Hyde URETEK

More information

Appendix C Benchmarking Cost Estimates

Appendix C Benchmarking Cost Estimates REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall

More information

Ceu Approved as to form: Barbara Y. hinpoch, Mayor

Ceu Approved as to form: Barbara Y. hinpoch, Mayor CTY OF RENTON, WASHNGTON ORDNANCE NO 4028 AN ORDNANCE OF THE CTY OF RENTON, WASHNGTON, ESTABLSHNG A SPECAL ASSESSMENT DSTRCT FOR SANTARY SEWER SERCE N THE ADAMS STA LD NO 25 SERCE AREA AND ESTABLSHNG THE

More information

ART BY VIKRAM. Oil, Acrylic, Pen & Ink and Watercolor works currently available for sale. Fa l l C a t a l o g

ART BY VIKRAM. Oil, Acrylic, Pen & Ink and Watercolor works currently available for sale. Fa l l C a t a l o g C a t a l o g Oil, Acrylic, Pen & Ink and Watercolor works currently available for sale. Fa l l 2 017 P r i c e s v a l i d t h r o u g h D e c 2017 W w w. V i k r a m M a d a n. c o m 24 H 18 W N o r

More information

Ash Wednesday. First Introit thing. * Dómi- nos. di- di- nos, tú- ré- spi- Ps. ne. Dó- mi- Sál- vum. intra-vé-runt. Gló- ri-

Ash Wednesday. First Introit thing. * Dómi- nos. di- di- nos, tú- ré- spi- Ps. ne. Dó- mi- Sál- vum. intra-vé-runt. Gló- ri- sh Wdsdy 7 gn mult- tú- st Frst Intrt thng X-áud m. ns ní- m-sr-cór- Ps. -qu Ptr - m- Sál- vum m * usqu 1 d fc á-rum sp- m-sr-t- ó- num Gló- r- Fí- l- Sp-rí- : quó-n- m ntr-vé-runt á- n-mm c * m- quó-n-

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

ADDENDUM 1. Boiler Masters Inc. Attachments: Pre-Bid Meeting Agenda Project: Guilford County Schools Pre-Bid Meeting Sign-Up

ADDENDUM 1. Boiler Masters Inc. Attachments: Pre-Bid Meeting Agenda Project: Guilford County Schools Pre-Bid Meeting Sign-Up ADDENDUM 1 To: Plan olders: ssued By: Daniel Chay (DC) Star Electric Mechanical Maintenance Date: May 15, 2013 Central Builders Superior Mechanical Services Cc: Tracy Nance, GCS (TN) Jeff argett Mechanical

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS 10782 Wattsburg Road Erie, PA 16509 The WATTSBURG AREA SCHOOL DISTRICT invites qualified vendors to submit proposals for CONTRACTED SNOW REMOVAL MANDATORY PRE-SUBMISSION MEETING All

More information

U.S. General Services Administration FOIA Requester Service Center (H1F) 1800 F Street, NW, Room 7308 Washington, DC Fax:

U.S. General Services Administration FOIA Requester Service Center (H1F) 1800 F Street, NW, Room 7308 Washington, DC Fax: Description of document: Requested date: Released date: Posted date: Source of document: List of General Services Administration (GSA) properties from the REXUS (Real Estate Across the United States) database

More information

MAX4636EUB -40 C to +85 C 10 µmax 1 NO1 IN1 GND. 3 x 3 THIN QFN OFF ON ON OFF SWITCHES SHOWN FOR "0" INPUT. Maxim Integrated Products 1

MAX4636EUB -40 C to +85 C 10 µmax 1 NO1 IN1 GND. 3 x 3 THIN QFN OFF ON ON OFF SWITCHES SHOWN FOR 0 INPUT. Maxim Integrated Products 1 9-79; Rev ; /3 Fast, Low-Voltage, Dual 4 SPDT General Description The are fast, dual 4 singlepole/double-throw (SPDT) analog switches that operate with supply voltages from +.8V to +.V. High switching

More information

Principles and techniques for system modelling which: Ð aim to produce a model of a system Ð provide notations and methods Advantages for software

Principles and techniques for system modelling which: Ð aim to produce a model of a system Ð provide notations and methods Advantages for software Unit 4 : Object -Oriented Analysis - Principles O b j ec t i ves To introduce the basic principles of object -orientation : objects; classes of object; encapsulation; inheritance; and p o ly m o rp h i

More information

BROWN COUNTY FARMLAND AUCTION

BROWN COUNTY FARMLAND AUCTION BROWN COUNTY FARMLAND AUCTION CROP - PASTURE - HUNTING - INVESTMENT 62 Acres +/- TUESDAY, NOVEMBER, 1 :30am Auction Location: The DEC (Dakota Event Center) - Lamont St. - Aberdeen, SD 5401 Mercier & Ravina

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.

More information

BFMEXMTH 2013/04/30 16:36:12 WASHINGTON COUNTY AUDITOR Page: 1. Expense Account Report w/ MTD AS OF: 04/30/2013

BFMEXMTH 2013/04/30 16:36:12 WASHINGTON COUNTY AUDITOR Page: 1. Expense Account Report w/ MTD AS OF: 04/30/2013 BFMEXMTH 2013/04/30 16:36:12 WASHINGTON COUNTY AUDITOR 5.4.0 Page: 1 0100 COMMISSIONERS 100-0100-51000 SALARIES OFFICIALS 166,572.00 12,813.24 51,252.96 0.00 115,319.04 69 100-0100-51001 SALARIES EMPLOYEES

More information

Series CCT-58S Multi-Throw DC 18 GHz, SP7T & SP8T Normally Open Coaxial Switch

Series CCT-58S Multi-Throw DC 18 GHz, SP7T & SP8T Normally Open Coaxial Switch PART NUMBER CCT-58S DESCRIPTION Commercial Normally Open Multi-throw, DC-18 GHz The CCT-58S/CT-58S is an internally terminated, broadband, multi-throw, electromechanical coaxial switch designed to switch

More information

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation 5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road

More information

Foreword by Yvo de Boer Prefa ce a n d a c k n owledge m e n ts List of abbreviations

Foreword by Yvo de Boer Prefa ce a n d a c k n owledge m e n ts List of abbreviations Cont ent s Foreword by Yvo de Boer Prefa ce a n d a c k n owledge m e n ts List of abbreviations page xii xv xvii Pa r t 1 I ntro duct ion 1 1 Grasping the essentials of the climate change problem 3 1.1

More information