Roundabout Construction. SP LA 8 / US 171 Roundabout Leesville, LA Vernon Parish

Size: px
Start display at page:

Download "Roundabout Construction. SP LA 8 / US 171 Roundabout Leesville, LA Vernon Parish"

Transcription

1 Roundabout Construction SP LA 8 / US 171 Roundabout Leesville, LA Vernon Parish

2 What this presentation covers Recognition for District 08 Design and Traffic Sections Difference between a circle and a roundabout Why did DOTD elect to construct the Roundabout? Public Meeting and Public Perceptions Barrier Curb and Gutter Modifications Challenges for Sequences of Construction Time Constraints General Public Comments and End Results

3 Recognition for District 08 Design and Traffic Sections Dale Craig District 08 Traffic Section Recommended roundabout design and spearheaded the project to the design phase Jason Rachal District 08 Design Section The overall success for this project is greatly attributed to the project plans developed by Jason Rachal David Backstedt - District 08 Traffic Engineer David meet with me on the project site on numerous occasions in order to monitor the traffic flow after each construction sequence change.

4 Circle or Roundabout? Circle Area = π r 2 Roundabout

5 Why did DOTD elect to construct the Roundabout? Proposed Market Basket location Permit request for access to a proposed Market Basket grocery store Traffic Study and Evaluation Buy-in from DOTD, Market Basket and City of Leesville

6 Public Meeting and Public Perceptions

7 Public Meeting and Public Perceptions

8 Public Meeting Public Perceptions

9 Barrier Curb and Gutter Modifications Installed continuous steel reinforcement in the barrier curb section Class M Concrete Mix Design Modifications Recommend not using Grade A (Size 57) coarse aggregate (100% passing the 1 ½ US Sieve) Recommend changing mix design to max size Grade P (Size 67) coarse aggregate (100% passing the ¾ US Sieve)

10 Barrier Curb and Gutter Modifications Installed Bolster Blocks behind sharp angled corners of curb section

11 Time Constraints Project Letting Date: July 21, 2010 Work Order Date: September 24, 2010 Roundabout Opening Date: August 1, 2011 Market Basket Grand Opening Date: August 4, 2011 Governor s Ribbon Cutting Date: August 5, 2011

12 Sequence of Construction - Phase I

13 Sequence of Construction - Phase I Traffic congestion along US 171 South Bound Lane Temporary Traffic Signals installed at intersection of LA 8 and US 171 Temporary Traffic Signals

14 Sequence of Construction - Phase I

15 Sequence of Construction - Phase I

16 Sequence of Construction - Phase I

17 Sequence of Construction - Phase I

18 Sequence of Construction - Phase I

19 Sequence of Construction - Phase I

20 Sequence of Construction - Phase I

21 Sequence of Construction - Phase I

22 Sequence of Construction - Phase I Temporary Traffic Signals installed at intersection of LA 8 and US 171

23 Sequence of Construction - Phase II

24 Sequence of Construction - Phase II

25 Sequence of Construction - Phase II

26 Sequence of Construction - Phase II

27 Sequence of Construction - Phase III

28 Sequence of Construction - Phase III

29 Sequence of Construction - Phase III Removed temporary traffic signals Staged flagmen at each access point into the roundabout Utilized dynamic message signs cautioning traveling public that roundabout is open and there is a yield condition ahead Installed do not enter signs on temporary stands at each connection point to the roundabout

30 Sequence of Construction - Phase III

31 General Public Comments and End Results All of the Politicians and most of the general public have very favorable comments in regards to the functionality of the Roundabout From 2007 to 2010 there was an average of 10 injuries per year with only 1 fatality during that time period. Since 2010 there has only been one injury, which occurred in January 2013.

32 End Results

33 Size Comparison between the Alexandria South Traffic Circle and the Leesville Roundabout

34 Photo of the intersection of LA 8 and US 171, prior to construction Proposed Market Basket location

35 Completed Roundabout Aerial Photo of the intersection of LA 8 and US 171 Photo taken by SURDEX Corporation

36

37 Questions?

Katrina. Katrina... 2/27/2009 4

Katrina. Katrina... 2/27/2009 4 Some History Concept Developed over 25 Years Ago Featured in Numerous Research Efforts & Publications Over 60 Currently Operating AASHTO s 2002 National Award for Innovation More History 2002 LADOTD and

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road STAFF REPORT ACTION REQUIRED Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road Date: October 28, 2008 To: From: Toronto and East York Community Council Director, Transportation

More information

Roundabout Level of Service

Roundabout Level of Service Roundabout Level of Service Rahmi Akçelik Director Akcelik & Associates Pty Ltd email: rahmi.akcelik@sidrasolutions.com web: www.sidrasolutions.com 8 January 2009 Contents 1. Introduction... 1 2. Fundamental

More information

Critchfield Rd / SR-129

Critchfield Rd / SR-129 NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2

More information

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00

More information

Annual Collision Report

Annual Collision Report 2016 Annual Collision Report Contents The Annual Collision Report is a summary of statistics associated with traffic collisions that occurred in the City of Winnipeg. This information is provided by Manitoba

More information

Neighborhood Locations and Amenities

Neighborhood Locations and Amenities University of Maryland School of Architecture, Planning and Preservation Fall, 2014 Neighborhood Locations and Amenities Authors: Cole Greene Jacob Johnson Maha Tariq Under the Supervision of: Dr. Chao

More information

Parking Analysis. Introduction. School Information. Parking Analysis. September 26, To:

Parking Analysis. Introduction. School Information. Parking Analysis. September 26, To: Parking Analysis To: Mr. Michael Longanecker Richardson Independent School District From: Christy Lambeth, P.E., PTOE Lambeth Engineering Associates, PLLC, F-19508 September 26, 2018 Date: September 26,

More information

Construction complete on all HSDRRS projects across storm evacuation routes

Construction complete on all HSDRRS projects across storm evacuation routes Task Force Hope Status Report August 29, 2013 Construction complete on all HSDRRS projects across storm evacuation routes Eastern Tie-In Swing Gates positioned across Hwy. 23 By Susan Spaht If a tropical

More information

TAKE ROLL CALL TO DETERMINE IF THERE IS A QUORUM OF MEMBERS PRESENT

TAKE ROLL CALL TO DETERMINE IF THERE IS A QUORUM OF MEMBERS PRESENT LAWRENCE SIGN CODE BOARD OF APPEALS AGENDA JULY 5, 2018 6:35 P.M., CITY COMMISSION MEETING ROOM, FIRST FLOOR OF CITY HALL, SIXTH AND MASSACHUSETTS STREET, LAWRENCE, KANSAS CALL THE MEETING TO ORDER TAKE

More information

West Tennessee Construction June 14-21, 2017

West Tennessee Construction June 14-21, 2017 FOR IMMEDIATE RELEASE Wednesday, June 14, 2017 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction June 14-21, 2017 BENTON COUNTY, I-40 Truck Climbing Lane Wednesday, June 7 through

More information

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance Endo Engineering Traffic Engineering Air Quality Studies Noise Assessments July 13, 2015 Mr. Ed Freeman Pinnacle View, LLC P.O. Box 1754 Lake Oswego, OR 97035-0579 Subject: Desert Palisades Specific Plan

More information

Linear Referencing Systems (LRS) Support for Municipal Asset Management Systems

Linear Referencing Systems (LRS) Support for Municipal Asset Management Systems Linear Referencing Systems (LRS) Support for Municipal Asset Management Systems Esri Canada Infrastructure Asset Management Leadership Forum November 1, 2017 Toronto, ON David Loukes, P. Eng., FEC Andy

More information

City of Laramie, Wyoming SNOW AND ICE POLICY

City of Laramie, Wyoming SNOW AND ICE POLICY City of Laramie, Wyoming SNOW AND ICE POLICY 11/02/89; rev 10/15/2007 I. INTRODUCTION The intention of this Policy is to set reasonable goals and general practices as a guide for the conduct of snow and

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

A Study of Red Light Cameras in Kansas City, MO

A Study of Red Light Cameras in Kansas City, MO A Study of Red Light s in Kansas City, MO Prepared by the Special Operations Division Executive Summary This paper will analyze the crash data for the 29 red light cameras located in 17 intersections in

More information

GEOGRAPHIC INFORMATION SYSTEMS

GEOGRAPHIC INFORMATION SYSTEMS GEOGRAPHIC INFORMATION SYSTEMS 4-H Round-Up Community Transitions Workshop Daniel Hanselka June 14, 2011 Goals of the Workshop Answer the question: What is GIS? Uses of GIS. Some of the Common Terminology

More information

Coefficient of Thermal Expansion of Concrete Pavements

Coefficient of Thermal Expansion of Concrete Pavements Coefficient of Thermal Expansion of Concrete Pavements Erwin Kohler Ramon Alvarado David Jones University of California Pavement Research Center TRB Annual Meeting, Washington D.C. January 24 th, 2007

More information

RECORD OF MEETING. Region Five Development Commission

RECORD OF MEETING. Region Five Development Commission SRF No. 0117586 RECORD OF MEETING Study Review Committee Meeting #2 Wednesday, April 4, 2012 3:00 P.M. - 5:30 P.M. Wadena Commission Chambers Members in Attendance: Representing: Jake Huebsch Region Five

More information

General Decision Number: FL /20/2013 FL286. State: Florida. Construction Type: Highway. County: Pinellas County in Florida.

General Decision Number: FL /20/2013 FL286. State: Florida. Construction Type: Highway. County: Pinellas County in Florida. Page 1 of 5 > General Decision Number: FL130286 09/20/2013 FL286 State: Florida Construction Type: Highway County: Pinellas County in Florida. HIGHWAY CONSTRUCTION PROJECTS Modification Number Publication

More information

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy Page 1 CITY OF AIRDRIE Snow and Ice Control Effective Date: Approved By: Approved On: March 17, 2015 City Council March 16, 2015 Revision Date: Resolution #: ------ PURPOSE: The City of Airdrie is responsible

More information

Monitoring Survey in the Vicinity of St. Marys Cement: Interim Report

Monitoring Survey in the Vicinity of St. Marys Cement: Interim Report Technical Memorandum 2017-2018 Monitoring Survey in the Vicinity of St. Marys Cement: Interim Report Ontario Ministry of the Environment & Climate Change Report Prepared by: Terrestrial Assessment and

More information

Organized Chain-Up and VSL

Organized Chain-Up and VSL Organized Chain-Up and VSL Jim Mahugh, PE WSDOT SC Region Traffic Engineer North/West Passage VSL Peer Exchange January 28, 2015 Snoqualmie Pass 2 Limits of VSL EB: MP 48.12 to 66.56 WB: MP 46.69 to 66.90

More information

National Rural ITS Conference 2006

National Rural ITS Conference 2006 National Rural ITS Conference 2006 Design of Automated Variable Speed Limits and Lane Assignments in Rural Areas Presented by: Tom Blaine P. E., POE New Mexico Department of Transportation Intelligent

More information

WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report

WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report Gary Lee Moore, P.E., City Engineer Vince Jones, P.E., Deputy City Engineer WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report White Point Landslide Geotechnical Investigation

More information

The Use of Expanded Shale, Clay and Slate Lightweight Aggregates in Granular Geotechnical Fills

The Use of Expanded Shale, Clay and Slate Lightweight Aggregates in Granular Geotechnical Fills Information Sheet 6660.0 January 2017 The Use of Expanded Shale, Clay and Slate Lightweight Aggregates in Granular Geotechnical Fills For over 50 years Rotary Kiln produced Expanded Shale, Clay & Slate

More information

RESOLUTION NO INTRODUCTION

RESOLUTION NO INTRODUCTION RESOLUTION NO. 0824 A RESOLUTION TO ESTABLISH THIS CITY S SNOW AND ICE CONTROL POLICY DURING WINTER MONTHS, SPECIFICALLY DEFINED AS NOVEMBER THROUGH MARCH. BE IT RESOLVED BY THE CITY COUNCIL OF SOLON,

More information

HSIP FUNDING APPLICATION

HSIP FUNDING APPLICATION Page 1 Lucas County - Sylvania Ave at Centennial Rd DATE 5/1/2013 Project Information: COUNTY Lucas County LOCATION TYPE PROJECT SERVICE LIFE 20 years SEGMENT INFORMATION ROUTE BEGIN SLM END SLM PRESENT

More information

CVS Derwood. Local Area Transportation Review

CVS Derwood. Local Area Transportation Review CVS Derwood Montgomery County, Maryland May 27, 2016 Local Area Transportation Review Prepared for: JC Bar Properties, Inc. Steve Fleming, PE 415 Fallowfield Road, Suite 301 Camp Hill, Pennsylvania 17011

More information

2267 N o r t h 1500 W C l i n t o n U T 84015

2267 N o r t h 1500 W C l i n t o n U T 84015 P l a n n i n g C o m m i s s i o n M e m b e r s C h a i r J a c o b B r i g g s V i c e C h a i r G a r y T y l e r T o n y T h o m p s o n J o l e n e C r e s s a l l A n d y H a l e D e r e c k B a

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Prepared by: Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite

More information

The Trade Area Analysis Model

The Trade Area Analysis Model The Trade Area Analysis Model Trade area analysis models encompass a variety of techniques designed to generate trade areas around stores or other services based on the probability of an individual patronizing

More information

Tsukuba, Japan International Institute of Seismology and Earthquake Engineering Building Research Institute STUDY TRIP TO ITAKO CITY

Tsukuba, Japan International Institute of Seismology and Earthquake Engineering Building Research Institute STUDY TRIP TO ITAKO CITY Tsukuba, Japan International Institute of Seismology and Earthquake Engineering Building Research Institute STUDY TRIP TO ITAKO CITY A Technical Report By MARTINEZ BRAVO Delvin Abdiel (MEE10515) Disaster

More information

Counties: Pulaski and Radford* Counties in Virginia. HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building

Counties: Pulaski and Radford* Counties in Virginia. HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building Decision Number: VA190186 01/04/2019 VA186 Superseded General Decision Number: VA20180197 State: Virginia Construction Type: Highway Counties: Pulaski and Radford* Counties in Virginia. *including the

More information

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots City of Mt. Pleasant Administrative Memo #1-85 Issued: January 1, 1985 SUBJECT: Snow and Ice Control Policy SUMMARY: The intent of this policy is to construct a basic guideline to effectively and efficiently

More information

DRY LAND APPROVED JURISDICTIONAL DETERMINATION FORM 1 U.S.

DRY LAND APPROVED JURISDICTIONAL DETERMINATION FORM 1 U.S. DRY LAND APPROVED JURISDICTIONAL DETERMINATION FORM 1 U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook.

More information

Resolution Number: (2) Resolution Title: Snow Policy Date Signed: 11/26/12. DAVIS COUNTY Snow Policy Resolution

Resolution Number: (2) Resolution Title: Snow Policy Date Signed: 11/26/12. DAVIS COUNTY Snow Policy Resolution Resolution Number: 112612(2) Resolution Title: Snow Policy Signed: 11/26/12 DAVIS COUNTY Snow Policy Resolution A RESOLUTION TO ESTABLISH THE POLICY AND LEVEL OF SERVICE IN RESPECT TO CLEARANCE OF SNOW

More information

401 PLANTMIX BITUMINOUS PAVEMENTS GENERAL Rev. June 10, 2004 401.03.16 SURFACING MISCELLANEOUS AREAS: Surfacing of road approaches and connections, street intersection areas, frontage roads, island areas,

More information

For personal use only

For personal use only Annual General Meeting Results ELEMENTAL MINERALS LIMITED Level 3, 888 William Street, Perth, Western Australia 6000 Telephone: +61 (8) 9463 2463 Facsimile: +61 (8) 9463 2499 EMAIL AND WEBSITE info@elementalminerals.com

More information

VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS

VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS Christopher D. McDonald, PE, PTOE Regional Operations Director, Southwest Region NRITS and ITS Arizona Annual Conference October

More information

Significant Events: A Multi-Level Approach to Significant Event Response

Significant Events: A Multi-Level Approach to Significant Event Response Significant Events: A Multi-Level Approach to Significant Event Response Denise Markow, P.E. Administrator Bureau of Transportation Systems Management and Operations (TSMO) NHDOT Multi Level Approach to

More information

I-95/I-85 INTERCHANGE ROADWAY SAFETY ASSESSMENT

I-95/I-85 INTERCHANGE ROADWAY SAFETY ASSESSMENT FINAL REPORT I-95/I-85 INTERCHANGE ROADWAY SAFETY ASSESSMENT Prepared for: Prepared by: 117306012.B MARCH 2013 Final Report March 2013 I-95/I-85 Interchange ROADWAY SAFETY ASSESSMENT Prepared for: Prepared

More information

Information for File MVP RMM

Information for File MVP RMM Information for File MVP-2013-03320-RMM Applicant: City of St. Cloud Corps Contact: Ryan Malterud Address: 180 Fifth Street East, Suite 700, St. Paul, MN 55101 E-Mail: Ryan.M.Malterud@usace.army.mil Phone:

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED Appeal by Fast Signs of the Decision of the Chief Building Official for One Variance Respecting a Proposed First Party Wall Sign 10-21 Four Seasons Place Date: January 18,

More information

Counties: Fairfax, Fairfax* and Falls Church* Counties in. *including the independent cities of Falls Church and Fairfax

Counties: Fairfax, Fairfax* and Falls Church* Counties in. *including the independent cities of Falls Church and Fairfax General Decision Number: VA190116 01/04/2019 VA116 Superseded General Decision Number: VA20180116 State: Virginia Construction Type: Highway Counties: Fairfax, Fairfax* and Falls Church* Counties in Virginia.

More information

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox Compare Responses Event #: 1702 Status: Pending award Event Name: Curb Replacement Project T 841046.05 Number Of s: 7 Fit Excavating Quality Built Construction Dinkel Construction II, LLC Concrete Solutions,LLC

More information

The Joplin Tornado: Lessons Learned from the NIST Investigation

The Joplin Tornado: Lessons Learned from the NIST Investigation February 4, 2014 AMS Annual Meeting The Joplin Tornado: Lessons Learned from the NIST Investigation Franklin T. Lombardo, NIST Erica Kuligowski, NIST Marc Levitan, NIST Long Phan, NIST David Jorgensen,

More information

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. UPDATES

More information

Taft Stormwater Quest

Taft Stormwater Quest Taft Stormwater Quest Oregon Coast Quests is an Oregon Sea Grant program based at Oregon State University's Hatfield Marine Science Center. The Oregon Coast Book, 2017 18 Edition 43 Use this map to help

More information

Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945

Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945 Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945 Introduction The Brigham Young University Institute of Transportation Engineers student chapter (BYU ITE) completed

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

Active Traffic & Safety Management System for Interstate 77 in Virginia. Chris McDonald, PE VDOT Southwest Regional Operations Director

Active Traffic & Safety Management System for Interstate 77 in Virginia. Chris McDonald, PE VDOT Southwest Regional Operations Director Active Traffic & Safety Management System for Interstate 77 in Virginia Chris McDonald, PE VDOT Southwest Regional Operations Director Interstate 77 at Fancy Gap Mountain Mile markers 0-15 Built in late

More information

New Mapping, Recent Events What do we know? June 9, 2011

New Mapping, Recent Events What do we know? June 9, 2011 New Mapping, Recent Events What do we know? June 9, 2011 e FEMA Mapping Process Current Flood Insurance Rate Maps (FIRMs) or Floodplain Maps date back to the early 1970 s. The District contracted with

More information

Minimum Standards for Wetland Delineations

Minimum Standards for Wetland Delineations Minimum Standards for Wetland Delineations Jason Gipson Chief, Utah/Nevada Regulatory Branch Sacramento District Regulatory Program Workshop 16 Mar 2016 US Army Corps of Engineers Delineation Report Minimum

More information

The Joplin Tornado: Lessons Learned from the NIST Investigation

The Joplin Tornado: Lessons Learned from the NIST Investigation February 4, 2014 AMS Annual Meeting The Joplin Tornado: Lessons Learned from the NIST Investigation Franklin T. Lombardo, NIST/RPI Erica Kuligowski, NIST Marc Levitan, NIST Long Phan, NIST David Jorgensen,

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

Monroe County: Key West and Lower Keys

Monroe County: Key West and Lower Keys FDOT PROJECT UPDATES June 15-21, 2015 Monroe County: Key West and Lower Keys Monroe County projects website: www.fdotmonroe.com Opt Out: If you no longer wish to receive these weekly notifications, please

More information

Traffic Impact Study

Traffic Impact Study Traffic Impact Study Statham DRI One University Parkway Prepared for: Barrow County Prepared by: October 2012 Table of Contents Executive Summary i Section 1. Introduction 1 Project Description 1 Methodology

More information

Shenandoah University. (PowerPoint) LESSON PLAN *

Shenandoah University. (PowerPoint) LESSON PLAN * Shenandoah University (PowerPoint) LESSON PLAN * NAME DATE 10/28/04 TIME REQUIRED 90 minutes SUBJECT Algebra I GRADE 6-9 OBJECTIVES AND PURPOSE (for each objective, show connection to SOL for your subject

More information

Copyright 2017 Edmentum - All rights reserved.

Copyright 2017 Edmentum - All rights reserved. Study Island Copyright 2017 Edmentum - All rights reserved. Generation Date: 11/30/2017 Generated By: Charisa Reggie 1. The Little Shop of Sweets on the Corner sells ice cream, pastries, and hot cocoa.

More information

Recognition Of Harpooning Danger Is A Very Long And Slow Learning Curve

Recognition Of Harpooning Danger Is A Very Long And Slow Learning Curve Recognition Of Harpooning Danger Is A Very Long And Slow Learning Curve Posting Date: 6-Nov-2016 Figure 1: News media photo from February 21, 2016 of a car that was harpooned by a horizontal railing at

More information

CLEARING THE WAY CAUTION. brampton.ca/snow

CLEARING THE WAY CAUTION. brampton.ca/snow CLEARING THE WAY CAUTION brampton.ca/snow Who clears the roads? Not all roads in Brampton are the responsibility of the City of Brampton. The Region of Peel does winter maintenance on the major roads highlighted

More information

GCSE LINKED PAIR PILOT 4361/02 APPLICATIONS OF MATHEMATICS UNIT 1: APPLICATIONS 1 HIGHER TIER

GCSE LINKED PAIR PILOT 4361/02 APPLICATIONS OF MATHEMATICS UNIT 1: APPLICATIONS 1 HIGHER TIER Surname Other Names Centre Number 0 Candidate Number GCSE LINKED PAIR PILOT 4361/02 APPLICATIONS OF MATHEMATICS UNIT 1: APPLICATIONS 1 HIGHER TIER A.M. MONDAY, 16 January 2012 2 hours ADDITIONAL MATERIALS

More information

The Urbana Free Library Parking and Transportation Study

The Urbana Free Library Parking and Transportation Study CHAMPAIGN COUNTY REGIONAL PLANNING COMMISSION The Urbana Free Library Parking and Transportation Study Final Report 7/18/2013 Champaign Urbana Urbanized Area Transportation Study (CUUATS) TABLE OF CONTENTS

More information

Perth County Road Fatal Head-on Collision - A Common and Dangerous Issue

Perth County Road Fatal Head-on Collision - A Common and Dangerous Issue Perth County Road Fatal Head-on Collision - A Common and Dangerous Issue Posting Date: 25-Aug-2016 Figure 1: View looking east long "Speeders Alley" - a more appropriate name for the long, straight and

More information

Expanding the GSATS Model Area into

Expanding the GSATS Model Area into Appendix A Expanding the GSATS Model Area into North Carolina Jluy, 2011 Table of Contents LONG-RANGE TRANSPORTATION PLAN UPDATE 1. Introduction... 1 1.1 Background... 1 1.2 Existing Northern Extent of

More information

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION The responsibility for providing snow and ice control on East Peoria s 240 lane miles of streets and alleys rests with the Street Divisions

More information

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone: JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH 45243 Email: jackpflum1@gmail.com Telephone: 513.919.7814 MEMORANDUM REPORT Traffic Impact Analysis Proposed Soccer

More information

1. Departmental Presentation - Away Goes Trouble Down the Drain - Highway Division. 3. Continued Discussion an Ordinance for Disorderly Residences

1. Departmental Presentation - Away Goes Trouble Down the Drain - Highway Division. 3. Continued Discussion an Ordinance for Disorderly Residences City of Keene New Hampshire MUNICIPAL SERVICES, FACILITIES AND INFRASTRUCTURE COMMITTEE AGENDA Council Chambers B October 11, 2017 6:00 PM Janis O. Manwaring Randy L. Filiault Robert J. O'Connor Stephen

More information

SNOW AND ICE REMOVAL PROCEDURES

SNOW AND ICE REMOVAL PROCEDURES SNOW AND ICE REMOVAL PROCEDURES Policy: Expeditious removal of ice and snow from vehicle and pedestrian access ways is essential for the safe operation of the University as referenced in the University

More information

Effectiveness of Experimental Transverse- Bar Pavement Marking as Speed-Reduction Treatment on Freeway Curves

Effectiveness of Experimental Transverse- Bar Pavement Marking as Speed-Reduction Treatment on Freeway Curves Effectiveness of Experimental Transverse- Bar Pavement Marking as Speed-Reduction Treatment on Freeway Curves Timothy J. Gates, Xiao Qin, and David A. Noyce Researchers performed a before-and-after analysis

More information

LOGISTICS CLUSTER SOUTH SUDAN ASSESSMENT

LOGISTICS CLUSTER SOUTH SUDAN ASSESSMENT RUMBEK- LEER- BENTIU- YIROL ROAD MISSION Date(s): 30 August - 06 September 2012 Location(s): Rumbek, Mayendit, Leer, Mir Mir, Bentiu, Aluakluak and Yirol Participant(s): Logistics Cluster GIS Officer,

More information

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes Fairview Ave. and Main St. Improvements and Local Streets Plan Appendices Ada County Highway District Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes January 3, 207 Appendices

More information

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing

More information

Revised Test Plan for Seasonal Monitoring Program using HWD Testing

Revised Test Plan for Seasonal Monitoring Program using HWD Testing April 2005 Revised Test Plan for Seasonal Monitoring Program using HWD Testing Partnered Pavement Research Prepared for: California Department of Transportation Prepared by: University of California Berkeley

More information

Any student who registers as a new attendee of Teaneck High School after August 15 th will have an extra week to complete the summer assignment.

Any student who registers as a new attendee of Teaneck High School after August 15 th will have an extra week to complete the summer assignment. Dear Parents and Students: All students entering Algebra I or Algebra I Honors in September are required to complete this assignment. This assignment is comprised of two components: a review of essential

More information

Traffic and Road Monitoring and Management System for Smart City Environment

Traffic and Road Monitoring and Management System for Smart City Environment Traffic and Road Monitoring and Management System for Smart City Environment Cyrel Ontimare Manlises Mapua Institute of Technology Manila, Philippines IoT on Traffic Law Enforcement to Vehicles with the

More information

Good Spirit School Division Parents/Guardians

Good Spirit School Division Parents/Guardians Photo by: Macdonald School Bus Driver, Louise Szumutku, 2018 Good Spirit School Division Parents/Guardians With winter approaching we wanted to take this opportunity to remind all our families about procedures

More information

Construction Exits Vibration grids

Construction Exits Vibration grids Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]

More information

7. New Business 7.1 New items that the Committee or District Staff would like to discuss.

7. New Business 7.1 New items that the Committee or District Staff would like to discuss. TEMPLE CITY UNIFIED SCHOOL DISTRICT CITIZENS OVERSIGHT COMMITTEE MEETING AGENDA January 22, 2015, 5:30 PM Dr. Doug Sears Learning Center, Room 1 (Posted January 21, 2015) 1. Call to Order 2. Roll Call

More information

State Highway Log. Planning Report Olympic Region. Washington State Department of Transportation. Strategic Planning Division

State Highway Log. Planning Report Olympic Region. Washington State Department of Transportation. Strategic Planning Division State Highway Log Planning Report 2009 Olympic Region Washington State Department of Transportation Strategic Planning Division March 8, 2010 Highway Log Users Re: 2009 State Highway Log Dear User: The

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

Vol. II-F: Paleontological Identification Report (PIR)/ Paleontological Evaluation Report (PER)

Vol. II-F: Paleontological Identification Report (PIR)/ Paleontological Evaluation Report (PER) Vol. II-F: Paleontological Identification Report (PIR)/ Paleontological Evaluation Report (PER) MOUNT VERNON AVENUE BRIDGE PROJECT Bridge No. 53C-0066 City of San Bernardino, California 08-SBd-0-SBD prepared

More information

METRO Blue Line LRT Extension (BLRT) 5514 West Broadway Avenue, Suite 200, Crystal, MN

METRO Blue Line LRT Extension (BLRT) 5514 West Broadway Avenue, Suite 200, Crystal, MN Robbinsdale Open House July 28, 2015 *All comments are recorded verbatim from comment cards and discussion worksheets. No grammatical, word choice changes or spelling has been corrected. If handwriting

More information

Wilson Area School District Planned Course Guide

Wilson Area School District Planned Course Guide Wilson Area School District Planned Course Guide Title of planned course: AP Physics C Independent Study Subject Area: Science Grade Level: 12 Course Description: AP Physics is our advanced placement course

More information

225 Bush Street Suite 1700 San Francisco, CA phone fax

225 Bush Street Suite 1700 San Francisco, CA phone fax 225 Bush Street Suite 1700 San Francisco, CA 94104 415.896.5900 phone 415.896.0332 fax www.esassoc.com memorandum date July 29, 2009 to from subject Craig Nikitas, San Francisco Planning Department Daniel

More information

How GIS Can Help With Tribal Safety Planning

How GIS Can Help With Tribal Safety Planning How GIS Can Help With Tribal Safety Planning Thomas A. Horan, PhD Brian Hilton, PhD Arman Majidi, MAIS Center for Information Systems and Technology Claremont Graduate University Goals & Objectives This

More information

Quiz 1. Department of Mathematical Sciences Instructor: Markus Schmidmeier Calculus II August 26, 2016

Quiz 1. Department of Mathematical Sciences Instructor: Markus Schmidmeier Calculus II August 26, 2016 Department of Mathematical Sciences Instructor: Markus Schmidmeier Calculus II August 26, 2016 Name: Quiz 1 1. Consider an object moving long a line with velocity v(t) = 6 2t during the time interval [0,

More information

FDOT Level 2 Roundabout b/c Evaluation

FDOT Level 2 Roundabout b/c Evaluation FDOT Level 2 Roundabout b/c Evaluation This spreadsheet tool compares the cost of a roundabout to the cost of a traditional intersection, as specified by the user. A traditional intersection is defined

More information

STATISTICAL ANALYSIS OF LAW ENFORCEMENT SURVEILLANCE IMPACT ON SAMPLE CONSTRUCTION ZONES IN MISSISSIPPI (Part 1: DESCRIPTIVE)

STATISTICAL ANALYSIS OF LAW ENFORCEMENT SURVEILLANCE IMPACT ON SAMPLE CONSTRUCTION ZONES IN MISSISSIPPI (Part 1: DESCRIPTIVE) STATISTICAL ANALYSIS OF LAW ENFORCEMENT SURVEILLANCE IMPACT ON SAMPLE CONSTRUCTION ZONES IN MISSISSIPPI (Part 1: DESCRIPTIVE) Tulio Sulbaran, Ph.D 1, David Marchman 2 Abstract It is estimated that every

More information

6 th Line Municipal Class Environmental Assessment

6 th Line Municipal Class Environmental Assessment 6 th Line Municipal Class Environmental Assessment County Road 27 to St John s Road Town of Innisfil, ON September 6, 2016 APPENDIX L: TRAVEL DEMAND FORECASTING MEMORANDUM Accessible formats are available

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

APPENDIX D SUMMARY OF EXISTING SIMPLIFIED METHODS

APPENDIX D SUMMARY OF EXISTING SIMPLIFIED METHODS APPENDIX D SUMMARY OF EXISTING SIMPLIFIED METHODS D-1 An extensive literature search revealed many methods for the calculation of live load distribution factors. This appendix will discuss, in detail,

More information

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes City of New Castle Presentation Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes New Castle Conservation District DNREC August 22, 2012 Agenda Project Background

More information

Historic Cultural Properties Inventory (HCPI) Base Form (FORM 1)

Historic Cultural Properties Inventory (HCPI) Base Form (FORM 1) Historic Cultural Properties Inventory (HCPI) Base Form (FORM 1) Historic Preservation Division, New Mexico Office of Cultural Affairs For HPD Office use only: HCPI No. District No. NRHP: SRCP: Criteria:

More information

What is 511? Need for 511 Services. Development & Deployment of Regional Road and Weather Information Supporting 511 Traveler Services

What is 511? Need for 511 Services. Development & Deployment of Regional Road and Weather Information Supporting 511 Traveler Services Development & Deployment of Regional Road and Weather Information Supporting 511 Traveler Services Leon F. Osborne University of North Dakota Regional Weather Information Center Grand Forks, ND David L.

More information