1 Gary Lee Moore, P.E., City Engineer Vince Jones, P.E., Deputy City Engineer WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report

2 White Point Landslide Geotechnical Investigation November 2012 Status Report Page 2 November 29, 2012 TABLE OF CONTENTS 1.0 Background 2.0 Site Observations and Activities for the Period Ending November 29, Landslide Monitoring for the Period Ending November 29, Geotechnical Investigation Attachment 1 Status Report Prepared by Shannon & Wilson, Inc. for Period Ending September 27, 2012 White Point Landslide Investigation Attachment 2 Summary of Survey Monitoring Points White Point Landslide, prepared by the Bureau of Engineering, Period Ending September 29, 2012

3 White Point Landslide Geotechnical Investigation November 2012 Status Report Page 3 November 29, Background This Status Report provides a progress summary of the activities for the White Point Landslide project for the period ending November 29, Since the date of the last posted status report in March of 2012, the Bureau of Engineering (BOE) has continued to oversee and support the geotechnical investigation of the landslide being conducted by Shannon & Wilson, Inc., a private consulting firm. BOE has provided presentations of findings at several community meetings over this time, posted the Final Geotechnical Report for the White Point Landslide on line and has responded to comments on the report. Monthly monitoring of the landslide has continued by surveying of the established set of monitoring stations, and by readings and measurements of instrumentation in groundwater monitoring wells and borings with inclinometers. Attached to this report are the September 28, 2012 Status Report by Shannon & Wilson, Inc. (Attachment 1) and a Summary of Survey Monitoring Points by the Bureau of Engineering (Attachment 2). 2.0 Site Observations and Activities for the Period Ending November 29, 2012 Shannon & Wilson, Inc. completed geotechnical investigation of the landslide and their final report was posted to the Bureau of Engineering (BOE) White Point Landslide web site. As recommended by Shannon & Wilson, Inc., and authorized by BOE, investigative studies and geotechnical analyses have continued in order to evaluate and design stabilization improvement measures. These measures, as conceptually described in the Final Geotechnical Report of the White Point Landslide (see BOE web site) are: install a subsurface dewatering system, construct soil anchors on the beach bluff east the landslide, construct traffic control measures, and perform limited grading in the headward area of the landslide. BOE is working to implement these recommendations with an emphasis on tasks that help prepare for this winter season. An initial shape and trim phase of grading in the landslide area, designed to remove debris, improve safety of the steep slope around the edge of the landslide, and to improve drainage conditions at the head of the landslide, is near completion. Shannon & Wilson, Inc. continue with the geotechnical investigation of the landslide and have completed drilling and instrumentation in two additional borings on the east side of the landslide. Stability and hydrogeologic analyses for the de-watering project are completed. Preliminary plans and a draft geotechnical report for the de-watering system are complete and currently under review by the Bureau. Th slope anchor system stabilization improvement measure design is on-going. Interim measures to improve traffic in the area, such as re-striping the street at the corner of Paseo del Mar and Weymouth, are being implemented. 3.0 Landslide Monitoring for the Period March 29, 2012 to November 29, 2012 Survey Monitoring The BOE continues to survey the established survey monitor stations and monitor points set on the street, curb and ground around the landslide to check for evidence of ground movement which might indicate landslide movement or enlargement. No variation in the survey data has

4 White Point Landslide Geotechnical Investigation November 2012 Status Report Page 4 November 29, 2012 been noted which would indicate evidence of ground movement, with one recent exception. Survey data for Monitoring Station MS-1 located on the curb near the intersection of Paseo del Mar and Weymouth has shown five one hundredths of a foot of displacement. This detected movement is very small and several measurements over time were required for it s confirmation. A summary table of the survey monitoring is provided in Attachment 2. The survey data as of the date of this report shows no indication of surface ground movement near the landslide which might signal landslide enlargement. Instrument Monitoring Geologists from both BOE and Shannon & Wilson, Inc. continue to conduct site observation of the landslide and surrounding area. A status report prepared by Shannon & Wilson, Inc. and dated September 28, 2012 is presented in Attachment 1. As described, Shannon & Wilson, Inc. continues with the inclinometer monitoring (measurement of devices that were placed in some borings to detect ground movement) and water well readings. Subsurface movement or offset was detected in the inclinometer in boring B-7 at a depth of approximately 60 feet. As reported by Shannon & Wilson, Inc., the recent data suggests that movement of approximately 0.1 inches has occurred in the southward direction. These conclusions are preliminary and subject to change as more readings are obtained over time to verify this very small displacement amount and track any changes. Shannon & Wilson, Inc. report that readings of the installed inclinometers indicate that no measurable ground movement has occurred in the areas of the inclinometers between September 27 and October Geotechnical Investigation As noted above, the geotechnical investigation conducted by Shannon & Wilson, Inc. was completed and posted to the Bureau of Engineering (BOE) web site. Shannon & Wilson, Inc. have also completed a draft report for the design and construction of the de-watering system. The attached Status Report by Shannon & Wilson summarizes September 2012 status of some of the ongoing geotechnical studies which are part of the scope of work for stabilization improvement measures. As indicated in the report, Shannon & Wilson, Inc. have completed additional field investigation with laboratory analyses and stability analyses. Some ground cracks developed near the edge of the landslide during the interim grading project and were subsequently removed by the trim grading. Other than these ground cracks, Shannon & Wilson, Inc. report that no new significant ground cracks have been observed in the area between the fence and main landslide mass during the latest monitoring period.

5 Attachment 1 Status Report Prepared By Shannon & Wilson, Inc.

6 ALASKA CALIFORNIA COLORADO FLORIDA MISSOURI OREGON WASHINGTON September 28, 2012 Bureau of Engineering 1149 South Broadway, Suite 120 Los Angeles, California Attn: Mr. Mark Oborne RE: STATUS REPORT THROUGH 9/27/12 WHITE POINT LANDSLIDE INVESTIGATION CITY OF LOS ANGELES W.O. E , TOS SHANNON & WILSON PROJECT NO This letter provides an update to the subtask status for the period ending September 27, Shannon & Wilson is currently completing a geotechnical exploration and design program of the White Point Landslide following the landslide on November 20, We have recorded recent groundwater depths in the inclinometer borings and wells that were installed along the landslide perimeter including new borings B-10 and B-11 (Figure 1). During the most recent reporting period, the groundwater surface or piezometric surface was measured at depths ranging from approximately 22 to 101 feet below ground surface. Groundwater levels measured within the completed wells and inclinometers appear to be relatively stable with only minor fluctuations (Table 1). As discussed previously, the anomalously high groundwater level within B-1 on the west side of the site appears to have lowered to the levels measured in January of During the course of our services, we have not observed new surface cracks related to landslide movement outside of the fenced perimeter of the landslide. No new significant ground cracks have been observed in the area between the fence and main landslide mass during the latest monitoring period. Ongoing visual observation of the existing cracks adjacent to the main head scarp within the fenced-off area suggest that the material immediately adjacent to the scarp continues to move or rotate into the graben area. We expect to see periodic detachment of the scarp material throughout the upcoming winter and spring months if the corrective grading is not completed prior to the rainy season. The main landslide mass will likely move ocean-ward during and after periods of heavy precipitation. As previously reported to the Bureau of Engineering (BOE), we have detected minor subsurface movement or offset in the inclinometer in boring B-7 at a depth of approximately 60 feet. The recent data suggests that movement of approximately 0.1 inches has occurred in the direction to the south (towards the ocean slope). 664 WEST BROADWAY GLENDALE, CALIFORNIA

7 Mr. Mark Oborne City of Los Angeles September 28, 2012 Page 2 of 3 The interpretation of these data from B-7 required several readings to determine the movement amount and direction. These conclusions are preliminary and are subject to change as our studies develop. The most recent inclinometer data for the site are included in Table 2. The status of each subtask is listed below: SUBTASK STATUS Subtask Status 1. Health and Safety Plan 100% Complete 2. Geologic Mapping 75% Complete 3. Interim Grading Plan 75% Complete 4. Subsurface Exploration 100% Complete 5. Waste Handling and Management Ongoing - 20% Complete 6. Geophysical Downhole Logging 100% Complete 7. Laboratory Testing of Samples 100% Complete 8. Geologic Cross Sections Ongoing - 50% Complete 9. Stability Analysis Ongoing - 25% Complete 10. Meetings Ongoing - 10% Complete 11. Dewatering (Hydrauger) Design Ongoing - 50% Complete 12. Slope Stabilization Design Ongoing 10% Complete For this work period, tasks completed include: TASKS COMPLETED FOR THIS PERIOD Completion of borings B-10 and B-11. Meeting with Wagner Engineering for Interim Grading Plan on 8/28/12. Field Meeting with BOE and Wagner Engineering for Interim Grading Plan on 8/31/12. Initial slope stability analysis. Instrumentation reading dates shown in Tables 1 and 2. Instrumentation will be read on monthly basis for the subsequent months to monitor the landslide area for groundwater elevations and possible subsurface movement. Site observations for landslide movement during the weeks of 7/23/12 through 8/27/12. Project Team Meetings with the City of Los Angeles BOE at the downtown office, and field meetings on site L01 Rev 1/wp/d

8

9 PIPE 145 AS R ASPH DIRT DIRT GNV ASPH ASPH Filename: I:\PROJECTS\10052 San Pedro Landslide\Graphics\PROPOSED BORING LOCATIONS.MXD !( Boring PIPE ASPH 138.3!. Groundwater Well!> Inclinometer PIPE LEGEND? GNV ASPH ASPH Nike Missile Base ROCKS ASPH Silo Silo? Qsf 7.2 Head Scarp GNV GNV B-1!> DIRT PIPE 41.0 PIPE ROCKS DIRT 82.7 PIPES ASPH ASPH DIRT 64.7 DIRT PIPES ASPH PIPES GNV PIPES GNV VC R VC UB VC VC VC VC VC DI ROCKS B-2 B-5!( inch = 100 feet B-9!>!> Feet GNV B-6! B !( Perimeter Hiking Trail B-3!. ASPH B ROCKS B-8!. 5.5 DIRT B-10 Paseo Del Mar!>!> 6.2 B-11 PIPES !> 6.4 TREES R AT5 ASPH Weymouth Ave TREES PIPE TREES ASPH White Point Landslide San Pedro District Los Angeles, California ³ VC SITE AND EXPLORATION PLAN September FIG. 1 N 1,718,800 N 1,71 PASEO DEL MAR LANDSLIDE Photo Date: Contour Interval=.5 Ft. Map Scale: 1" - 40' prepared by gital Maps, Inc

10 White Point Landslide City of Los Angeles Table 1 Groundwater Data Shannon & Wilson, Inc. Well/ VWP Reading Date B-1 B-3 Elev ft. Elev ft. Elev ft. Screened Elev. = to B-5 B-6 B-7 B-8 B-9 Elev ft. Elev ft. Elev ft. Elev ft. Screened Elev. = to Screened Elev. = to VWP Elev. = 1.8 VWP Elev. = VWP Elev. = 6.41 VWP Elev. = VWP Elev. = 7.31 VWP Elev. = VWP Elev. = VWP Elev. = Depth 1 Depth 2 Depth 1 Depth 2 Depth 1 Depth 2 Depth 1 Depth 1 VWP Elev. = Depth 1 VWP Elev. = VWP Elev. = VWP Elev. = VWP Elev. = Depth 1 Depth 1 Depth 1 Depth 1 1/11/ /21/ /29/ (3) /2/ /8/ (3) /16/ (3) /30/ /4/ /11/ /18/ /25/ /27/ /22/ /23/ /28/ /27/ /24/ /27/ /27/ B-10 Elev ft. B-11 Elev ft. Notes: 1. Measured using vibrating wire piezometer (VWP). 2. Measured using electronic well sounder between 12/8/11 and 6/27/12 and VWP thereafter. 3. Measured during drilling. 10/16/2012, GW and Inclinometer Tables.xlsx, JXM Page 1 of

11 White Point Landslide City of Los Angeles Inclinometer Reading Date Table 2 Inclinometer Data Cumulative Displacement(in.) B-1 B-5 B-7 B-9 B-10 B-11 12/28/2011 Baseline Baseline Baseline Baseline 1/4/2012 <0.1 <0.1 <0.1 <0.1 1/11/2012 <0.1 <0.1 <0.1 <0.1 1/18/2012 <0.1 <0.1 <0.1 <0.1 1/25/2012 <0.1 <0.1 <0.1 <0.1 2/27/2012 <0.1 <0.1 <0.1 <0.1 3/2/2012 <0.1 <0.1 <0.1 <0.1 4/23/2012 <0.1 <0.1 <0.1 <0.1 5/28/2012 <0.1 <0.1 <0.1 <0.1 6/27/2012 <0.1 <0.1 <0.1 <0.1 7/24/2012 <0.1 <0.1 <0.1 <0.1 8/14/ Baseline Baseline 8/22/ <0.1 <0.1 8/27/2012 <0.1 < <0.1 <0.1 <0.1 9/7/ <0.1 <0.1 9/28/2012 <0.1 < <0.1 <0.1 <0.1 Shannon Wilson, Inc. Notes: 1. Measured using inclinometer. Baseline: Three series of measurements to determine starting point used for comparisons. 10/16/2012, GW and Inclinometer Tables.xlsx, JXM Page 1 of

12 Attachment 2 Summary of Survey Monitoring Points

13 WHITE POINT SLIDE MONITORING STATIONS REPORT FIGURE 2 CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING Monitoring Station Reference Position Date Offset Station Northing Easting MS1 O\S= L31.428' STA= ' N= ' E= ' EL= ' MS2 O\S= L30.113' STA= ' N= ' E= ' EL= ' 01/26/ ' 0.001' 0.002' 0.000' 0.000' 02/09/ ' ' 0.001' 0.001' 0.003' 02/16/ ' ' ' 0.005' 0.001' 02/23/ ' ' ' 0.001' 0.007' 02/29/ ' ' ' 0.001' 0.011' 03/09/ ' 0.001' ' ' 0.007' 03/21/ ' ' ' 0.004' 0.011' 04/27/ ' ' ' 0.007' 0.004' 05/24/ ' ' ' ' ' 06/21/ ' 0.001' ' ' ' 07/31/ ' ' ' 0.010' ' 08/31/ ' ' ' 0.000' ' 09/27/ ' 0.002' ' ' ' 01/26/ ' ' 0.001' 0.004' 0.002' 02/09/ ' 0.001' 0.005' 0.001' ' 02/16/ ' ' 0.004' 0.002' ' 02/23/ ' ' 0.001' 0.002' ' 02/29/ ' ' ' 0.004' ' 03/09/ ' 0.001' 0.005' 0.000' 0.001' 03/21/ ' 0.003' 0.004' ' ' 04/27/ ' ' 0.002' 0.011' 0.002' 05/24/ ' 0.005' 0.004' ' ' 06/21/ ' 0.002' 0.002' ' 0.001' 07/31/ ' 0.003' 0.002' ' ' 08/31/ ' 0.003' ' ' 0.006' 09/27/ ' 0.007' 0.000' ' 0.004'

14 Monitoring Station Reference Position Date Offset Station Northing Easting MS3 O\S= L28.890' STA= N= ' E= ' EL= ' MS4 O\S= R ' STA= ' N= ' E= ' EL= ' MS5 O\S= R ' STA= ' N= ' E= ' EL= ' 01/26/ ' 0.002' 0.000' ' ' 02/09/ ' ' 0.000' 0.003' ' 02/16/ ' 0.003' 0.000' ' 0.002' 02/23/ ' ' 0.001' 0.003' ' 02/29/ ' 0.005' 0.003' ' ' 03/09/ ' ' 0.002' 0.001' 0.002' 03/21/ ' 0.005' 0.002' ' 0.002' 04/27/ ' 0.003' 0.005' ' ' 05/24/ ' ' 0.003' 0.007' ' 06/21/ ' 0.000' 0.005' 0.001' 0.001' 07/31/ ' ' 0.004' 0.004' ' 08/31/ ' 0.006' 0.006' ' 0.002' 09/27/ ' 0.001' 0.008' 0.001' ' 01/26/ ' ' 0.000' 0.010' ' 02/09/ ' 0.016' ' ' ' 02/16/ ' 0.016' ' ' ' 02/23/ ' 0.000' ' 0.000' ' 02/29/ ' 0.013' 0.015' ' 0.005' 03/09/ ' 0.003' ' ' 0.008' 03/21/ ' ' ' ' ' 04/27/ ' 0.003' ' ' ' 05/24/ ' ' ' 0.008' ' 06/21/ ' ' ' 0.016' ' 07/31/ ' ' ' 0.009' 0.010' 08/31/ ' ' ' 0.020' 0.011' 09/27/ ' ' ' 0.019' ' 01/26/ ' ' 0.002' 0.022' 0.014' 02/09/ ' 0.016' ' ' ' 02/16/ ' 0.013' ' ' 0.019' 02/23/ ' 0.008' ' ' 0.007' 02/29/ ' 0.010' ' ' 0.009' 03/09/ ' ' ' 0.003' 0.014' 03/21/ ' ' ' 0.014' 0.004' 04/27/ ' ' ' 0.008' 0.002' 05/24/ ' ' ' 0.012' ' 06/21/ ' ' ' 0.011' ' 07/31/ ' ' ' 0.020' ' 08/31/ ' ' ' 0.011' 0.005' 09/27/ ' ' ' 0.011' '

15 Monitoring Station Reference Position Date Offset Station Northing Easting MS6 O\S= L25.617' STA= ' N= ' E= ' EL= ' MS7 O\S= L25.719' STA= ' N= ' E= ' EL= ' MS8 O\S= L25.063' STA= ' N= ' E= ' EL= ' 01/26/ ' 0.003' 0.002' ' 0.000' 02/09/ ' ' ' 0.007' 0.001' 02/16/ ' 0.002' 0.004' ' 0.001' 02/23/ ' 0.000' ' ' ' 02/29/ ' 0.002' 0.003' ' 0.004' 03/09/ ' 0.002' 0.004' ' 0.004' 03/21/ ' 0.001' 0.001' ' 0.002' 04/27/ ' 0.003' 0.010' 0.000' 0.001' 05/24/ ' 0.002' ' ' 0.002' 06/21/ ' ' ' 0.007' 0.004' 07/31/ ' 0.002' ' ' 0.000' 08/31/ ' ' ' 0.007' 0.007' 09/27/ ' 0.003' 0.005' ' 0.007' 01/26/ ' 0.007' 0.008' ' ' 02/09/ ' 0.007' ' ' 0.002' 02/16/ ' 0.007' 0.001' ' ' 02/23/ ' 0.007' ' ' ' 02/29/ ' 0.018' 0.015' ' ' 03/09/ ' ' 0.014' 0.007' 0.000' 03/21/ ' 0.008' 0.006' ' ' 04/27/ ' 0.018' 0.005' ' ' 05/24/ ' 0.007' ' ' 0.001' 06/21/ ' 0.007' ' ' ' 07/31/ ' 0.007' ' ' ' 08/31/ ' 0.008' 0.003' ' 0.003' 09/27/ ' 0.007' ' ' 0.006' 01/26/ ' 0.000' 0.003' 0.001' 0.000' 02/09/ ' ' ' 0.004' 0.005' 02/16/ ' 0.005' 0.001' ' 0.002' 02/23/ ' 0.003' 0.004' ' ' 02/29/ ' 0.011' 0.013' ' 0.002' 03/09/ ' 0.002' 0.007' 0.000' 0.003' 03/21/ ' 0.003' 0.008' ' 0.002' 04/27/ ' 0.013' 0.005' ' 0.001' 05/24/ ' 0.002' ' ' 0.004' 06/21/ ' 0.011' 0.001' ' ' 07/31/ ' 0.002' ' ' ' 08/31/ ' 0.003' ' ' ' 09/27/ ' 0.002' ' ' '

16 Monitoring Station Reference Position Date Offset Station Northing Easting MS9 O\S= R2.519' STA= ' N= ' E= ' EL= ' MS10 O\S= R45.174' STA= ' N= ' E= ' EL= ' MS11 O\S= R95.696' STA= ' N= ' E= ' EL= ' 01/26/ ' ' 0.000' 0.003' 0.001' 02/09/ ' 0.011' ' ' 0.011' 02/16/ ' 0.011' ' ' 0.000' 02/23/ ' 0.011' 0.003' ' ' 02/29/ ' 0.029' 0.018' ' 0.005' 03/09/ ' 0.008' 0.016' ' 0.008' 03/21/ ' 0.010' 0.006' ' 0.000' 04/27/ ' 0.010' 0.003' ' 0.007' 05/24/ ' 0.001' ' ' 0.006' 06/21/ ' 0.009' ' ' 0.008' 07/31/ ' 0.009' ' ' 0.005' 08/31/ ' 0.011' 0.000' ' 0.002' 09/27/ ' 0.000' ' 0.001' 0.004' 01/26/ ' 0.005' 0.003' ' 0.002' 02/09/ ' ' ' 0.005' 0.006' 02/16/ ' 0.004' 0.001' ' ' 02/23/ ' ' ' 0.013' 0.003' 02/29/ ' 0.015' ' ' 0.007' 03/09/ ' ' ' 0.012' 0.005' 03/21/ ' 0.005' ' ' ' 04/27/ ' 0.000' ' ' 0.002' 05/24/ ' ' ' 0.016' 0.004' 06/21/ ' ' ' 0.007' 0.001' 07/31/ ' ' ' 0.006' 0.000' 08/31/ ' ' ' 0.004' ' 09/27/ ' ' ' 0.018' ' 01/26/ ' ' 0.007' 0.012' ' 02/09/ ' ' 0.008' 0.006' 0.006' 02/16/ ' 0.019' 0.008' ' ' 02/23/ ' ' ' 0.011' 0.000' 02/29/ ' ' 0.008' 0.004' 0.004' 03/09/ ' ' 0.003' 0.011' ' 03/21/ ' 0.002' 0.002' ' 0.001' 04/27/ ' 0.003' 0.008' 0.000' 0.004' 05/24/ ' ' ' 0.000' 0.001' 06/21/ ' 0.003' 0.005' ' 0.009' 07/31/ ' 0.013' 0.012' ' 0.001' 08/31/ ' 0.011' 0.008' ' 0.004' 09/27/ ' 0.012' 0.011' ' '

17 Monitoring Station Reference Position Date Offset Station Northing Easting MS12 O\S= R ' STA= ' N= ' E= ' EL= ' MS13 O\S= R ' STA= ' N= ' E= ' EL= ' MS14 O\S= R ' STA= ' N= ' E= ' EL= ' 01/26/ ' ' ' 0.003' ' 02/09/ ' ' 0.003' 0.014' ' 02/16/ ' 0.009' 0.009' ' ' 02/23/ ' ' ' 0.013' ' 02/29/ ' ' 0.003' 0.005' 0.006' 03/09/ ' ' ' 0.007' 0.000' 03/21/ ' ' ' 0.010' 0.003' 04/27/ ' 0.005' ' ' 0.000' 05/24/ ' ' ' 0.014' ' 06/21/ ' 0.001' 0.001' ' 0.005' 07/31/ ' 0.001' 0.001' ' 0.002' 08/31/ ' ' 0.000' 0.001' 0.008' 09/27/ ' 0.006' 0.009' ' ' 01/26/ ' 0.000' ' ' ' 02/09/ ' 0.005' ' ' ' 02/16/ ' ' ' 0.001' 0.006' 02/23/ ' ' ' 0.000' 0.005' 02/29/ ' ' ' 0.007' ' 03/09/ ' 0.011' 0.004' ' 0.005' 03/21/ ' 0.000' ' ' 0.006' 04/27/ ' 0.001' ' ' 0.009' 05/24/ ' ' ' ' 0.004' 06/21/ ' ' ' 0.013' ' 07/31/ ' ' ' 0.020' ' 08/31/ ' ' ' 0.010' 0.001' 09/27/ ' ' ' 0.015' ' 01/26/ ' 0.002' 0.008' 0.003' ' 02/09/ ' ' ' ' ' 02/16/ ' 0.002' ' ' 0.005' 02/23/ ' 0.004' ' ' 0.010' 02/29/ ' 0.008' 0.007' ' 0.004' 03/09/ ' 0.010' 0.000' ' 0.010' 03/21/ ' 0.000' ' 0.003' 0.003' 04/27/ ' ' ' 0.004' 0.014' 05/24/ ' ' ' 0.012' 0.003' 06/21/ ' ' ' 0.019' 0.002' 07/31/ ' ' ' 0.013' ' 08/31/ ' ' ' 0.013' ' 09/27/ ' ' ' 0.020' 0.005'

18 Monitoring Station Reference Position Date Offset Station Northing Easting MS15 O\S= R ' STA= ' N= ' E= ' EL= ' MS16 O\S= R ' STA= ' N= ' E= ' EL= ' MS17 O\S= R ' STA= ' N= ' E= ' EL= ' 01/26/ ' ' ' 0.007' ' 02/09/ ' ' ' 0.000' ' 02/16/ ' 0.001' ' ' 0.010' 02/23/ ' ' 0.001' 0.003' 0.009' 02/29/ ' ' 0.010' 0.007' 0.002' 03/09/ ' 0.006' 0.004' ' 0.014' 03/21/ ' 0.001' ' ' 0.010' 04/27/ ' ' ' 0.004' 0.012' 05/24/ ' 0.003' ' ' 0.009' 06/21/ ' 0.004' ' ' 0.004' 07/31/ ' 0.003' ' ' 0.004' 08/31/ ' ' 0.018' 0.009' 0.010' 09/27/ ' 0.000' 0.002' 0.001' 0.003' 01/26/ ' ' ' 0.003' ' 02/09/ ' 0.000' 0.012' 0.003' ' 02/16/ ' 0.002' 0.006' 0.000' 0.004' 02/23/ ' ' 0.006' 0.005' 0.004' 02/29/ ' ' 0.011' 0.009' 0.002' 03/09/ ' ' 0.012' 0.006' 0.005' 03/21/ ' 0.000' 0.010' 0.003' 0.004' 04/27/ ' ' 0.011' 0.008' 0.009' 05/24/ ' ' 0.008' 0.008' ' 06/21/ ' ' 0.008' 0.004' 0.001' 07/31/ ' 0.004' ' ' 0.006' 08/31/ ' ' ' 0.028' 0.009' 09/27/ ' ' 0.004' 0.003' ' 01/26/ ' ' ' 0.003' ' 02/09/ ' ' ' 0.012' ' 02/16/ ' ' ' 0.003' 0.001' 02/23/ ' 0.010' 0.002' ' 0.019' 02/29/ ' ' ' 0.000' 0.005' 03/09/ ' 0.004' ' ' 0.005' 03/21/ ' 0.000' ' ' 0.005' 04/27/ ' ' ' 0.001' ' 05/24/ ' ' 0.000' 0.002' ' 06/21/ ' ' ' 0.001' 0.004' 07/31/ ' ' 0.005' 0.004' 0.008' 08/31/ ' ' ' 0.020' 0.008' 09/27/ ' ' 0.002' 0.003' '

19 Monitoring Station Reference Position Date Offset Station Northing Easting MS18 O\S= R ' STA= ' N= ' E= ' EL= ' MS19 O\S= R74.056' STA= ' N= ' E= ' EL= ' MS20 O\S= R ' STA= ' N= ' E= ' EL= ' 01/26/ ' ' ' 0.008' ' 02/09/ ' ' ' 0.021' ' 02/16/ ' 0.003' ' ' 0.002' 02/23/ ' 0.004' 0.010' ' 0.015' 02/29/ ' ' 0.005' 0.005' 0.000' 03/09/ ' 0.004' 0.008' ' 0.001' 03/21/ ' 0.000' 0.002' 0.001' 0.010' 04/27/ ' ' ' 0.001' 0.009' 05/24/ ' 0.001' 0.003' 0.000' 0.004' 06/21/ ' ' ' 0.001' 0.002' 07/31/ ' 0.001' ' ' 0.002' 08/31/ ' ' ' 0.028' 0.010' 09/27/ ' ' ' 0.000' 0.000' 01/26/ ' ' ' 0.012' ' 02/09/ ' ' ' 0.016' ' 02/16/ ' 0.004' ' ' 0.003' 02/23/ ' 0.029' ' ' 0.003' 02/29/ ' ' 0.005' 0.018' 0.006' 03/09/ ' 0.003' 0.012' 0.001' 0.007' 03/21/ ' 0.001' ' ' 0.005' 04/27/ ' 0.001' ' ' 0.005' 05/24/ ' ' 0.008' 0.005' 0.005' 06/21/ ' ' ' 0.000' 0.002' 07/31/ ' 0.000' 0.005' 0.002' 0.009' 08/31/ ' ' ' 0.030' 0.006' 09/27/ ' ' 0.000' 0.029' ' 01/26/ ' ' ' 0.004' ' 02/09/ ' 0.009' 0.006' ' ' 02/16/ ' 0.002' ' ' 0.007' 02/23/ ' ' ' 0.002' ' 02/29/ ' 0.004' 0.008' 0.001' 0.003' 03/09/ ' ' 0.004' 0.011' ' 03/21/ ' 0.012' 0.001' ' 0.003' 04/27/ ' ' 0.000' 0.021' 0.006' 05/24/ ' ' ' 0.020' 0.005' 06/21/ ' ' ' 0.020' ' 07/31/ ' ' ' 0.010' ' 08/31/ ' ' ' 0.020' ' 09/27/ ' ' 0.004' 0.021' '

20 Monitoring Station Reference Position Date Offset Station Northing Easting MS21 O\S= R ' STA= ' N= ' E= ' EL= ' MS22 O\S= R ' STA= ' N= ' E= ' EL= ' MS23 O\S= R ' STA= ' N= ' E= ' EL= ' 01/26/ ' 0.005' 0.005' ' ' 02/09/ ' 0.004' 0.019' 0.000' ' 02/16/ ' 0.001' 0.014' 0.002' ' 02/23/ ' ' 0.000' 0.000' 0.000' 02/29/ ' 0.010' ' ' 0.000' 03/09/ ' 0.012' 0.002' ' 0.006' 03/21/ ' 0.002' ' ' 0.009' 04/27/ ' ' ' 0.017' 0.002' 05/24/ ' ' 0.002' 0.016' 0.003' 06/21/ ' ' ' 0.000' 0.000' 07/31/ ' 0.000' 0.000' ' 0.001' 08/31/ ' ' 0.002' 0.006' ' 09/27/ ' ' 0.002' 0.007' ' 01/26/ ' 0.008' ' ' ' 02/09/ ' 0.005' 0.018' ' ' 02/16/ ' 0.005' 0.014' ' ' 02/23/ ' 0.010' 0.008' ' 0.000' 02/29/ ' 0.005' ' ' 0.000' 03/09/ ' ' 0.005' 0.010' 0.001' 03/21/ ' 0.002' 0.003' ' 0.012' 04/27/ ' ' 0.008' 0.020' ' 05/24/ ' ' 0.000' 0.010' 0.005' 06/21/ ' ' 0.000' 0.003' ' 07/31/ ' ' 0.004' 0.012' ' 08/31/ ' ' ' 0.024' ' 09/27/ ' ' 0.008' 0.020' ' 01/26/ ' ' ' 0.015' ' 02/09/ ' 0.013' 0.009' ' ' 02/16/ ' ' 0.014' 0.024' 0.003' 02/23/ ' ' 0.012' 0.007' 0.003' 02/29/ ' ' 0.003' 0.014' 0.001' 03/09/ ' ' ' 0.004' 0.006' 03/21/ ' 0.001' 0.003' 0.000' 0.007' 04/27/ ' ' ' 0.005' 0.006' 05/24/ ' ' 0.002' 0.012' 0.002' 06/21/ ' ' 0.008' 0.016' 0.003' 07/31/ ' ' ' 0.008' 0.003' 08/31/ ' ' ' 0.005' ' 09/27/ ' ' 0.006' 0.024' 0.004'

21 Monitoring Station Reference Position Date Offset Station Northing Easting MS24 O\S= R83.317' STA= ' N= ' E= ' EL= ' MS25 O\S= R31.427' STA= ' N= ' E= ' EL= ' MS26 O\S= L8.070' STA= ' N= ' E= ' EL= ' 01/26/ ' ' ' 0.001' 0.006' 02/09/ ' ' ' ' ' 02/16/ ' 0.008' 0.015' ' 0.006' 02/23/ ' 0.010' 0.020' ' ' 02/29/ ' ' ' 0.008' 0.007' 03/09/ ' 0.007' 0.007' ' 0.007' 03/21/ ' ' ' 0.000' 0.002' 04/27/ ' ' ' 0.001' 0.005' 05/24/ ' ' 0.005' 0.006' ' 06/21/ ' ' 0.000' 0.005' ' 07/31/ ' 0.008' 0.000' ' ' 08/31/ ' ' ' 0.020' 0.002' 09/27/ ' 0.006' 0.007' ' 0.003' 01/26/ ' 0.006' ' ' ' 02/09/ ' ' ' ' ' 02/16/ ' ' 0.005' 0.005' ' 02/23/ ' ' ' 0.018' 0.007' 02/29/ ' ' ' 0.024' 0.006' 03/09/ ' 0.001' 0.008' 0.001' ' 03/21/ ' 0.010' 0.002' ' 0.005' 04/27/ ' ' ' 0.036' 0.003' 05/24/ ' ' ' 0.006' 0.002' 06/21/ ' 0.006' ' ' ' 07/31/ ' 0.014' ' ' ' 08/31/ ' ' ' 0.007' ' 09/27/ ' ' ' 0.025' ' 01/26/ ' 0.000' ' ' ' 02/09/ ' 0.001' ' ' ' 02/16/ ' 0.006' 0.013' ' 0.009' 02/23/ ' ' ' 0.027' ' 02/29/ ' ' ' 0.012' 0.014' 03/09/ ' 0.003' 0.012' 0.001' 0.007' 03/21/ ' ' ' 0.007' 0.006' 04/27/ ' ' 0.000' 0.008' ' 05/24/ ' ' ' 0.007' 0.005' 06/21/ ' 0.000' ' 0.000' 0.005' 07/31/ ' ' 0.004' 0.008' 0.006' 08/31/ ' ' ' 0.034' 0.013' 09/27/ ' ' ' 0.023' 0.004'

22 Control Points Pt # Northing Easting CP 1 CP 2 CP 6 CP 7 CP

23

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

Data Report for White Point Landslide Boring B-12 W.O. E Task Order Solicitation San Pedro District Los Angeles, California

Data Report for White Point Landslide Boring B-12 W.O. E Task Order Solicitation San Pedro District Los Angeles, California Data Report for White Point Landslide Boring B-12 W.O. E1907483 Task Order Solicitation 11-087 San Pedro District Los Angeles, California Submitted To: Mr. Christopher F. Johnson, P.E., G.E. City of Los

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

APPENDIX B SUBSURFACE EXPLORATIONS

APPENDIX B SUBSURFACE EXPLORATIONS APPENDIX B SUBSURFACE EXPLORATIONS 51-1-10079-028 APPENDIX B SUBSURFACE EXPLORATIONS TABLE OF CONTENTS Page B.1. B.2. B.3. B.4. B.5. B.6. B.7. GENERAL...B-1 HEALTH AND SAFETY PLAN...B-1 DRILLING PROCEDURES...B-1

More information

Attachment 3. Draft Preliminary Geotechnical Report. City of Los Angeles, Bureau of Engineering

Attachment 3. Draft Preliminary Geotechnical Report. City of Los Angeles, Bureau of Engineering Attachment 3 Draft Preliminary Geotechnical Report City of Los Angeles, Bureau of Engineering Preliminary Geotechnical Report White Point Landslide San Pedro District Los Angeles, California W.O. E1907483

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT February 18, 2003 File: 15-76-11 Alberta Transportation Room 223, Provincial Building 4709 44 Avenue Stony Plain, Alberta T7Z 1N4 Attention: Mr. Rob Lonson, P.Eng. NORTH CENTRAL REGION LANDSLIDE ASSESSMENT

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

COTTON, SHIRES AND ASSOCIATES, INC. CONSULTING ENGINEERS AND GEOLOGISTS

COTTON, SHIRES AND ASSOCIATES, INC. CONSULTING ENGINEERS AND GEOLOGISTS COTTON, SHIRES AND ASSOCIATES, INC. CONSULTING ENGINEERS AND GEOLOGISTS June 23, 2016 G5056 TO: SUBJECT: Sam Herzberg Senior Planner SAN MATEO COUNTY PARKS DEPARTMENT 455 County Center, 4 th Floor Redwood

More information

DRAFT. PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA. Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835

DRAFT. PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA. Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835 PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835 Prepared by: Northern Geotechnical Engineering, Inc. d.b.a. Terra

More information

An Introduction to Field Explorations for Foundations

An Introduction to Field Explorations for Foundations An Introduction to Field Explorations for Foundations J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years

More information

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LABC 7006.3, 7014.1 Effective: 01-01-2017 DOCUMENT NO.: P/BC 2017-049 Revised: 12-21-2016 Previously Issued As: P/BC 2014-049 SLOPE STABILITY

More information

January 17, 2008 File:

January 17, 2008 File: January 17, 2008 File: 15-85-73 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations. CHAPTER 19.07 GEOLOGICALLY HAZARDOUS AREAS 19.07.010 Applicability. Geologically hazardous areas may pose a threat to the health and safety of citizens when incompatible development is sited in areas of

More information

Appendix C Surface Water and Groundwater Interaction Memorandum

Appendix C Surface Water and Groundwater Interaction Memorandum Texas Custodial Trust 2301 West Paisano Drive El Paso, Texas 79922 Appendix C Surface Water and Groundwater Interaction Memorandum 6835001 Malcolm Pirnie, Inc. 410 N. 44 th Street, Suite 1000 Phoenix,

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

FRIENDS OF THE EEL RIVER

FRIENDS OF THE EEL RIVER FRIENDS OF THE EEL RIVER Working for the recovery of our Wild & Scenic River, its fisheries and communities. Frank Blackett, Regional Engineer Office of Energy Projects Division of Dam Safety and Inspections

More information

The following information is provided for your use in describing climate and water supply conditions in the West as of April 1, 2003.

The following information is provided for your use in describing climate and water supply conditions in the West as of April 1, 2003. Natural Resources Conservation Service National Water and Climate Center 101 SW Main Street, Suite 1600 Portland, OR 97204-3224 Date: April 8, 2003 Subject: April 1, 2003 Western Snowpack Conditions and

More information

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 98.0508 Effective: 1-26-84 DOCUMENT NO. P/BC 2002-049 Revised: 11-1-02 Previously Issued As: RGA #1-84 SLOPE STABILITY EVALUATION AND ACCEPTANCE

More information

Monitoring and Characterization of the Meadowview Lane Landslide: Boyd County, KY

Monitoring and Characterization of the Meadowview Lane Landslide: Boyd County, KY Monitoring and Characterization of the Meadowview Lane Landslide: Boyd County, KY Matt Crawford Appalachian Coalition for Geologic Hazards in Transportation 13 th Annual Technical Forum Harrisonburg, VA

More information

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519 January 12, 2018 Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519 Re: Proposed Reserve at Rivertown Mixed-Use Development Updated Trip Generation and Site Driveway

More information

ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING RESULTS

ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING RESULTS ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING RESULTS SPRING 1 SECTION C SITE PH7-1: HWY 9:, DEADWOOD SLIDE 1. OBSERVATIONS 1.1 Field Program and Instrumentation

More information

WEST QUESNEL LAND STABILITY PROGRAM ANNUAL MONITORING REPORT Prepared for:

WEST QUESNEL LAND STABILITY PROGRAM ANNUAL MONITORING REPORT Prepared for: AMEC Earth & Environmental A division of AMEC Americas Limited 3456 Opie Crescent, Prince George, BC Canada V2N 2P9 Tel +1 (250) 564-3243 Fax +1 (250) 562-7045 www.amec.com WEST QUESNEL LAND STABILITY

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

Bridging Subsurface Geologic Databases with Cross-Sections in GIS

Bridging Subsurface Geologic Databases with Cross-Sections in GIS Bridging Subsurface Geologic Databases with Cross-Sections in GIS Eva E. von Thury ESRI International User Conference Padre Associates, Inc. Project Geologist / GIS Analyst June 29, 2016 Outline Introduction

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

Appendix D Rock Blasting Report

Appendix D Rock Blasting Report Appendix D Rock Blasting Report 02-2500-01 May 20, 2005 Frank Arciero Jr. Fallingstar Homes 27231 Burbank Foothill Ranch, California 92610 Subject: ANTICIPATED ROCK EXCAVATION FRAZIER PARK ESTATES DEVELOPMENT

More information

Downtown Anchorage Seismic Risk Assessment & Land Use Regulations to Mitigate Seismic Risk

Downtown Anchorage Seismic Risk Assessment & Land Use Regulations to Mitigate Seismic Risk Prepared for: The Municipality of Anchorage Planning Department and the Geotechnical Advisory Commission Downtown Anchorage Seismic Risk Assessment & Land Use Regulations to Mitigate Seismic Risk Prepared

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 27, 2017 Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

CHAPTER FIVE 5.0 STABILITY OF CUT SLOPES IN THE STUDY AREA. them limited by a thick canopy of vegetation and steep slope angles.

CHAPTER FIVE 5.0 STABILITY OF CUT SLOPES IN THE STUDY AREA. them limited by a thick canopy of vegetation and steep slope angles. CHAPTER FIVE 5.0 STABILITY OF CUT SLOPES IN THE STUDY AREA 5.1. Introduction Ukay Perdana area is a developing community with continuous building activities and road construction. There are thus only left

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES TAKING THE MYSTERY OUT OF USACE S ER 1110-1-1807 DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65

More information

Budge Road Landslide Jackson Extensometer installation report April 2014 with data to 20 May

Budge Road Landslide Jackson Extensometer installation report April 2014 with data to 20 May Budge Road Landslide Jackson Extensometer installation report 23-27 April 14 with data to May Four extensometers were installed across fissures at the head of the Budge Road landslide on the East Gros

More information

Project No India Basin Shadow Study San Francisco, California, USA

Project No India Basin Shadow Study San Francisco, California, USA Project No. 432301 India Basin Shadow Study San Francisco, California, USA Numerical Modelling Studies 04 th June 2018 For Build Inc. Report Title: India Basin Shadow Study San Francisco, California, USA

More information

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Subject: Revised Castle Hills BASIS Charter School Traffic Impact Analysis Review City of Castle Hills,

More information

GEOLOGY, SOILS, AND SEISMICITY

GEOLOGY, SOILS, AND SEISMICITY 4.9 GEOLOGY, SOILS, AND SEISMICITY 4.9.1 Introduction Information about the geological conditions and seismic hazards in the study area was summarized in the FEIR, and was based on the Geotechnical Exploration

More information

COMMENT CARD RESPONSES (SEISMIC)

COMMENT CARD RESPONSES (SEISMIC) COMMENT CARD 1 1. Please explain once and for all why the original route isn t an option while it s safer and cheaper, instead of going under the high school? Response: Please refer to the November Community

More information

ENGINEERING EVALUATION OF THE STANLEY MINE ADVENTURE PARK AREA CLEAR CREEK COUNTY, COLORADO. Prepared for:

ENGINEERING EVALUATION OF THE STANLEY MINE ADVENTURE PARK AREA CLEAR CREEK COUNTY, COLORADO. Prepared for: braun Braun Consulting Engineers ENGINEERING EVALUATION OF THE STANLEY MINE ADVENTURE PARK AREA CLEAR CREEK COUNTY, COLORADO Prepared for: STANLEY MINES ADENTURE PARK 3375 W. POWERS CIRCLE LITTLETON, COLORADO

More information

Response to Leighton Consulting Report

Response to Leighton Consulting Report ` Contract No. PS-4350-2000 Response to Leighton Consulting Report Prepared for: Prepared by: 777 South Figueroa Street Suite 1100 Los Angeles, California 90017 May 14, 2012 1.0 Introduction 1.0 INTRODUCTION

More information

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS

More information

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon By the Oregon Board of Geologist Examiners and the Oregon

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

Sacramento Modesto Roseville Pleasanton September 19, 2013 Marcia Medina GHD Inc. 417 Montgomery Street, Suite 700 San Francisco, CA Subject: GE

Sacramento Modesto Roseville Pleasanton September 19, 2013 Marcia Medina GHD Inc. 417 Montgomery Street, Suite 700 San Francisco, CA Subject: GE Sacramento Modesto Roseville Pleasanton September 19, 2013 Marcia Medina GHD Inc. 417 Montgomery Street, Suite 700 San Francisco, CA 94104 Subject: GEOTECHNICAL REPORT AMENDMENT Stonybrook Creek Crossings

More information

September 7, 2017 (Revised November 1, 2017)

September 7, 2017 (Revised November 1, 2017) September 7, 2017 (Revised November 1, 2017) Project No. 10113.002 Environmental Advisors 2400 East Katella Avenue, Suite 800 Anaheim, California 92806 Attention: Subject: Mr. Greg McCafferty Response

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

Should you have any questions regarding this clarification, please contact the undersigned at or (925)

Should you have any questions regarding this clarification, please contact the undersigned at or (925) October 8, 2015 Revised October 13, 2015 Contra Costa Community College District 500 Court Street Martinez, CA 94553 Attention: Ron Johnson Subject: Clarification of Grading Requirements Diablo Valley

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

August 10, 2007 File:

August 10, 2007 File: August 10, 2007 File: 15-85-72 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, AB T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL AREA)

More information

CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING GEOTECHNICAL ENGINEERING GROUP (GEO)

CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING GEOTECHNICAL ENGINEERING GROUP (GEO) CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING GEOTECHNICAL ENGINEERING GROUP (GEO) GEOTECHNICAL REAL ESTATE DISCLOSURE REPORT MASTER REPORT FOR CITY OWNED LOTS 15205, 15209, 15213,

More information

2. Initial Summary of Preliminary Expert Opinion of Converse and Psomas Reports

2. Initial Summary of Preliminary Expert Opinion of Converse and Psomas Reports UNITED WALNUT TAXPAYERS PRELIMINARY REVIEW OF NEGATIVE GEOTECHNICAL AND GEOLOGICAL ASPECTS OF CONSTRUCTING EARTHFILL PAD FOR A SOLAR FARM ON THE WEST PARCEL - DRAFT 1. Introduction A licensed Engineering

More information

PHIMF Project - Limited Geotechnical Investigation - Feasibility-Level Report RESPONSE TO INITIAL REVIEW LETTER

PHIMF Project - Limited Geotechnical Investigation - Feasibility-Level Report RESPONSE TO INITIAL REVIEW LETTER Connie Christian, P.E. County Sanitation Districts of Los Angeles County 1955 Workman Mill Road Whittier, California 90601 Project No. BAS 04-02E January 29, 2008 Subject: PHIMF Project - Limited Geotechnical

More information

Table 1 - Infiltration Rates

Table 1 - Infiltration Rates Stantec Consulting Ltd. 100-300 Hagey Boulevard, Waterloo ON N2L 0A4 November 14, 2017 File: 161413228/10 Attention: Mr. Michael Witmer, BES, MPA, MCIP, RPP City of Guelph 1 Carden Street Guelph ON N1H

More information

January 12, 2006 File:

January 12, 2006 File: January 12, 2006 File: 15-85-13 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL

More information

PEACE RIVER EAST HILL - HWY 2:60 (PH2) SELECT PHOTOGRAPHS August 22, 2007 File: Photo E003. Station May 2007

PEACE RIVER EAST HILL - HWY 2:60 (PH2) SELECT PHOTOGRAPHS August 22, 2007 File: Photo E003. Station May 2007 Photo E003 0+000 Viewing looking upslope at Site 4 from highway. Conditions unchanged from 2006. Photo E018 0+000 Localized erosion within road fill on upslope side of highway. Photo E022 0+250 Looking

More information

PRELIMINARY WORKING DRAFT Work in Progress

PRELIMINARY WORKING DRAFT Work in Progress IV. ENVIRONMENTAL IMPACT ANALYSIS H. MINERAL RESOURCES 1.0 INTRODUCTION This section addresses the potential impacts of the Proposed Project on mineral resources (i.e., sand, gravel and petroleum). The

More information

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

EXHIBIT H LOT 317 GRADING AND SITE PLAN

EXHIBIT H LOT 317 GRADING AND SITE PLAN EXHIBIT H LOT 317 GRADING AND SITE PLAN EXHIBIT I LOT 317 ELEVATIONS ridge height 4915'-6" GENERAL & KEYED NOTES ridge height 4905'-9" 3 7 4 A5.1 1 5 ridge height 4910'-6" 2 ridge height 4906'-3" 1 Provide

More information

Illinois Drought Update, December 1, 2005 DROUGHT RESPONSE TASK FORCE Illinois State Water Survey, Department of Natural Resources

Illinois Drought Update, December 1, 2005 DROUGHT RESPONSE TASK FORCE Illinois State Water Survey, Department of Natural Resources Illinois Drought Update, December 1, 2005 DROUGHT RESPONSE TASK FORCE Illinois State Water Survey, Department of Natural Resources For more drought information please go to http://www.sws.uiuc.edu/. SUMMARY.

More information

Mass Movements. Rock Weathering. Accumulation of Debris on Slopes. Landslides 12/8/2014

Mass Movements. Rock Weathering. Accumulation of Debris on Slopes. Landslides 12/8/2014 Mass Movements Already talked a little about landslides with earthquakes AKA mass wasting A mass movement is any displacement of large amounts of soil down slopes over (often) a comparatively short period

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2 MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report

More information

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES Parsons P:\Honeywell -SYR\444576 2008 Capping\09 Reports\9.3 December 2009_Capping and

More information

Need of Proper Development in Hilly Urban Areas to Avoid

Need of Proper Development in Hilly Urban Areas to Avoid Need of Proper Development in Hilly Urban Areas to Avoid Landslide Hazard Dr. Arvind Phukan, P.E. Cosultant/Former Professor of Civil Engineering University of Alaska, Anchorage, USA RI District Governor

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533 State of California Natural Resources Agency Edmund G. Brown Jr., Governor Department of Conservation John G. Parrish, Ph.D., State Geologist California Geological Survey 801 K Street MS 12-31 Sacramento,

More information

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. UPDATES

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

A Preliminary Finite-Element Analysis of a Shallow Landslide in the Alki Area of Seattle, Washington

A Preliminary Finite-Element Analysis of a Shallow Landslide in the Alki Area of Seattle, Washington A Preliminary Finite-Element Analysis of a Shallow Landslide in the Alki Area of Seattle, Washington By S. Debray and W.Z. Savage Open-File Report 01-0357 2001 This report is preliminary and has not been

More information

Forces in Earth s Crust

Forces in Earth s Crust Name Date Class Earthquakes Section Summary Forces in Earth s Crust Guide for Reading How does stress in the crust change Earth s surface? Where are faults usually found, and why do they form? What land

More information

March 1, 2003 Western Snowpack Conditions and Water Supply Forecasts

March 1, 2003 Western Snowpack Conditions and Water Supply Forecasts Natural Resources Conservation Service National Water and Climate Center 101 SW Main Street, Suite 1600 Portland, OR 97204-3224 Date: March 17, 2003 Subject: March 1, 2003 Western Snowpack Conditions and

More information

A design Model for Pile Walls Used to Stabilize Landslides

A design Model for Pile Walls Used to Stabilize Landslides WV DOH RP #121 Experimental and Analytical Behavior of Slide Suppressors Embedded in Bedrock A design Model for Pile Walls Used to Stabilize Landslides By: Tia Maria Richardson, P.E. Principal Investigator

More information

Weather and Climate Summary and Forecast January 2019 Report

Weather and Climate Summary and Forecast January 2019 Report Weather and Climate Summary and Forecast January 2019 Report Gregory V. Jones Linfield College January 4, 2019 Summary: December was mild and dry over much of the west, while the east was much warmer than

More information

Erosion Information Paper - South Naknek, Alaska Current as of November 14, 2007

Erosion Information Paper - South Naknek, Alaska Current as of November 14, 2007 U.S. Army Corps of Engineers ALASKA BASELINE EROSION ASSESSMENT Erosion Information Paper - South Naknek, Alaska Current as of November 14, 2007 Community Information South Naknek (NACK-neck), originally

More information

3/8/17. #20 - Landslides: Mitigation and Case Histories. Questions for Thought. Questions for Thought

3/8/17. #20 - Landslides: Mitigation and Case Histories. Questions for Thought. Questions for Thought #20 - Landslides: Mitigation and Case Histories Web Exercise #3 (Volcanoes) Due Wednesday There is a 2-point penalty for every day the assignment is late. Exam 1 Scores Scores and exam key are posted Vaiont

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone: JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH 45243 Email: jackpflum1@gmail.com Telephone: 513.919.7814 MEMORANDUM REPORT Traffic Impact Analysis Proposed Soccer

More information

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS Presented by: W. Morgan NeSmith, P.E. Berkel & Company Contractors Inc. 770.941.5100 mnesmith@berkelapg.com SC Engineering Conference

More information

Memo. I. Executive Summary. II. ALERT Data Source. III. General System-Wide Reporting Summary. Date: January 26, 2009 To: From: Subject:

Memo. I. Executive Summary. II. ALERT Data Source. III. General System-Wide Reporting Summary. Date: January 26, 2009 To: From: Subject: Memo Date: January 26, 2009 To: From: Subject: Kevin Stewart Markus Ritsch 2010 Annual Legacy ALERT Data Analysis Summary Report I. Executive Summary The Urban Drainage and Flood Control District (District)

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the Proposed Project. The Geotechnical Engineering Investigation (the

More information

Bedrock Associated with the Ranch House at the Tallgrass Prairie National Preserve, Chase County, Kansas

Bedrock Associated with the Ranch House at the Tallgrass Prairie National Preserve, Chase County, Kansas Bedrock Associated with the Ranch House at the Tallgrass Prairie National Preserve, Chase County, Kansas KGS OPEN-FILE REPORT 2008-10 KANSAS GEOLOGICAL SURVEY 1930 Constant Ave. - Campus West Lawrence,

More information

RAINFALL AVERAGES AND SELECTED EXTREMES FOR CENTRAL AND SOUTH FLORIDA. Thomas K. MacVicar

RAINFALL AVERAGES AND SELECTED EXTREMES FOR CENTRAL AND SOUTH FLORIDA. Thomas K. MacVicar TECHNICAL PUBLICATION #83-2 March 1983 RAINFALL AVERAGES AND SELECTED EXTREMES FOR CENTRAL AND SOUTH FLORIDA by Thomas K. MacVicar "This public document was promulgated at an annual cost of $136.74, or

More information

Appendix C: Groundwater modelling methodology

Appendix C: Groundwater modelling methodology Appendix C: Groundwater modelling methodology ENVIRONMENTAL AND ENGINEERING CONSULTANTS C1. Introduction For the purpose of this study, the objective has been to generate a water table surface for the

More information

Team 09 Nguyen chau lan (Vietnam) Dilum Wannigasekara (Sri lanka)

Team 09 Nguyen chau lan (Vietnam) Dilum Wannigasekara (Sri lanka) Team 09 Nguyen chau lan (Vietnam) Dilum Wannigasekara (Sri lanka) contents Part I: Landslide in Vietnam Part II: Case study of Landslide in sri lanka Part I: Introduction of Landslide in hoa binh province

More information

Prepared By: John Blair Sean Donahue Celeste Hoffman Kimberly Klinkers Megan Slater

Prepared By: John Blair Sean Donahue Celeste Hoffman Kimberly Klinkers Megan Slater Prepared By: John Blair Sean Donahue Celeste Hoffman Kimberly Klinkers Megan Slater Green River Basin Location Green River Basin Stratigraphic Correlation Chart showing Study Map Units Sample of Existing

More information

Missouri River Basin Water Management

Missouri River Basin Water Management Missouri River Basin Water Management US Army Corps of Engineers Missouri River Navigator s Meeting February 12, 2014 Bill Doan, P.E. Missouri River Basin Water Management US Army Corps of Engineers BUILDING

More information

The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference.

The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference. Main Street @ Coconut Creek DRI QUESTION 9 MAPS The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference. Map

More information

ENSO: Recent Evolution, Current Status and Predictions. Update prepared by: Climate Prediction Center / NCEP 9 November 2015

ENSO: Recent Evolution, Current Status and Predictions. Update prepared by: Climate Prediction Center / NCEP 9 November 2015 ENSO: Recent Evolution, Current Status and Predictions Update prepared by: Climate Prediction Center / NCEP 9 November 2015 Outline Summary Recent Evolution and Current Conditions Oceanic Niño Index (ONI)

More information

SUMMARY OF SOIL CONDITIONS CITYWIDE SIDEWALK IMPROVEMENT PROJECT JIMMY DURANTE BOULEVARD, VIA DE LA VALLE, AND CAMINO DEL MAR DEL MAR, CALIFORNIA

SUMMARY OF SOIL CONDITIONS CITYWIDE SIDEWALK IMPROVEMENT PROJECT JIMMY DURANTE BOULEVARD, VIA DE LA VALLE, AND CAMINO DEL MAR DEL MAR, CALIFORNIA SUMMARY OF SOIL CONDITIONS CITYWIDE SIDEWALK IMPROVEMENT PROJECT JIMMY DURANTE BOULEVARD, VIA DE LA VALLE, AND CAMINO DEL MAR DEL MAR, CALIFORNIA PREPARED FOR NASLAND ENGINEERING SAN DIEGO, CALIFORNIA

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

Preliminaries to Erosion: Weathering and Mass Wasting

Preliminaries to Erosion: Weathering and Mass Wasting Preliminaries to Erosion: Weathering & Mass Wasting All things deteriorate in time. Virgil 1 Preliminaries to Erosion: Weathering and Mass Wasting Denudation The Impact of Weathering and Mass Wasting on

More information

Hydrogeology of Karst NE Wisconsin. Dr. Maureen A. Muldoon UW-Oshkosh Geology Department

Hydrogeology of Karst NE Wisconsin. Dr. Maureen A. Muldoon UW-Oshkosh Geology Department Hydrogeology of Karst NE Wisconsin Dr. Maureen A. Muldoon UW-Oshkosh Geology Department WI Bedrock Outline Karst Landscapes Existing WQ Data Flow in Karst Aquifers Overview of Silurian Aquifer Water Level

More information

CALIFORNIA GEOLOGICAL SURVEY

CALIFORNIA GEOLOGICAL SURVEY STATE OF CALIFORNIA, NATURAL RESOURCES AGENCY DEPARTMENT OF CONSERVATION EDMUND G. BROWN, JR., GOVERNOR CALIFORNIA GEOLOGICAL SURVEY SCHOOL REVIEW UNIT 801 K STREET, MS 12-32 SACRAMENTO, CALIFORNIA 95814

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border

Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border Brook Brosi, CPG, PG USACE Lisa Nowicki Perks, PG USACE Kimberly Heenan, PE AECOM US Army Corps of Engineers BUILDING

More information

Section 3. Slopes and Landscapes. What Do You See? Think About It. Investigate. Learning Outcomes

Section 3. Slopes and Landscapes. What Do You See? Think About It. Investigate. Learning Outcomes Chapter 4 Surface Processes Section 3 Slopes and Landscapes What Do You See? Learning Outcomes In this section, you will Calculate the angle of repose for different kinds of soils and other granular materials.

More information