Technical Report COASTAL ENGINEERING ANALYSIS, REMEDIATION CONCEPT DESIGN AND IMPACT ANALYSIS PORT OF SAN FRANCISCO CENTRAL BASIN, CALIFORNIA

Size: px
Start display at page:

Download "Technical Report COASTAL ENGINEERING ANALYSIS, REMEDIATION CONCEPT DESIGN AND IMPACT ANALYSIS PORT OF SAN FRANCISCO CENTRAL BASIN, CALIFORNIA"

Transcription

1 Technical Report COASTAL ENGINEERING ANALYSIS, REMEDIATION CONCEPT DESIGN AND IMPACT ANALYSIS PORT OF SAN FRANCISCO CENTRAL BASIN, CALIFORNIA

2 Technical Report COASTAL ENGINEERING ANALYSIS, REMEDIATION CONCEPT DESIGN AND IMPACT ANALYSIS PORT OF SAN FRANCISCO CENTRAL BASIN, CALIFORNIA This Technical Report presents the results of coastal engineering analysis and concept design performed by Coast & Harbor Engineering to develop coastal engineering design criteria and remediation (capping) design concepts, and impact analysis conducted for various proposed activities within Central Basin for the Port of San Francisco, CA. Prepared by Scott W. Fenical, PE 155 Montgomery Street, Suite 301 San Francisco, CA Phone: Fax:

3 TABLE OF CONTENTS Executive Summary Introduction Coastal Conditions Analysis Vertical Datums Wind Analysis Wind-Waves Tidal Currents and Sedimentation Tidal Current Model Setup and Validation Measured Sedimentation Analysis Sedimentation Model Calibration Sediment Remediation Concept Design Design Criteria Remediation Concept Design Impact Analyses Effects of Wharf 8 Removal on Waves in Central Basin Effects of Wharf 8 Removal on Sedimentation in Central Basin Effects of Crane Cove Park Beach Construction on Sedimentation in Central Basin Effects of Deepening Dredge Units 1-3 on Sedimentation in Central Basin Conclusions References...22 Appendix A Remediation Concept Design Drawings Appendix B Remediation Construction Cost Estimate by M. Lee Corporation FIGURES Figure 1. San Francisco Central Basin location...2 Figure 2. Wind speed and direction distribution (wind rose) at Alameda NAS wind station...4 Figure 3. Extreme sustained wind speed and direction for return periods between 2 and 100 years5 Figure 4. Wind-wave modeling domain for San Francisco Bay (left) and nearshore domain at project site (right)...5 Figure year significant wave heights on Bay...6 Figure year significant wave heights in project area...7 Figure 7. Tidal current modeling domain (Pacific Ocean extents not fully shown)...8 Figure 8. Typical current speeds and directions during peak ebb (top) and flood (bottom) currents around Central Basin. A color contour legend is presented at top left of each snapshot....9

4 Figure 9. Validation of tidal current model with predicted tides at Alameda (top) and observed current near Wharf 8 (bottom)...10 Figure 10. Hydrographic survey data used in measured sedimentation analysis, 1999 (top) and 2013 (bottom)...11 Figure 11. Measured sedimentation rates in Central Basin...11 Figure 12. Model predicted sedimentation rates in Central Basin, with measured rates noted in white boxes...12 Figure 13. Proposed remediation area boundary (hatched area)...13 Figure 14. Storm wave heights (significant wave heights) chosen for remediation area design (does not include effects of proposed sheetpile wall)...14 Figure 15. Bottom velocities generated by the tug Delta Billie after reaching approximately steady flow conditions...14 Figure 16. Required armor stone diameter for stability under propeller wash forces...16 Figure 17. View from north end of Wharf 8 looking south (left) and timber screen on Wharf 8 (right), looking west...17 Figure 18. FLOW-3D storm wave transmission under/through Wharf Figure 19. Sedimentation rates with Wharf 8 in place (left) and rates/changes in rates following Wharf 8 removal (right)...19 Figure 20. Modeling domain bathymetry for existing conditions (left) and with installation of Crane Cove Park Beach (right)...20 Figure 21. Sedimentation rates before (left) and after (right) installation of Crane Cove Park Beach...20 Figure 22. Existing elevations around Dredge Units 1-3, and proposed deepening (right)...21 Figure 23. Sedimentation rates before (left) and after (right) deepening of Dredge Units TABLES Table 1. Datum Elevations at Pier 22.5 (Epoch )...3 Table 2. Differences in Elevations between Golden Gate and Pier 22.5 (Epoch )...3 Table 3. Tug Particulars for Propeller Wash Modeling...14

5 Technical Report Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis, Port of San Francisco Central Basin, CA Executive Summary Coast & Harbor Engineering.(CHE) was contracted by the Port of San Francisco (POSF) to develop coastal engineering design criteria and remediation (capping) design concepts, as well as impact analysis for various proposed activities within the Central Basin. Impact analysis included the potential removal of Wharf-8 and its effect on tidal circulation and wave climate in the Central Basin, as well as impacts of installing the Crane Cove Park Beach, and deepening Dredge Units 1-3 in Central Basin to depth 35 feet (MLLW). Coastal engineering design criteria were developed to support the Crane Cove Park Beach design effort by others, including extreme storm conditions, tidal current and sedimentation conditions, and propeller wash conditions generated by nearby tug activities. A concept design was generated for remediation of contaminated sediment at the southwest corner of Central Basin. The concept design consisted of limited excavation, installation of a rock cap, and protective breakwater structure to protect the area from excessive tug-induced propeller wash. Analysis results in recommendations for remediation cap location, total thickness, and armor stone size. Impact analyses performed in Central Basin indicated the following: Removal of Wharf 8 is not likely to significantly affect the wave climate or extreme wave heights within Central Basin Removal of Wharf 8 can be expected to slightly increase the overall sedimentation in Central Basin and shift the general sedimentation patterns Crane Cove Park Beach construction is not likely to significantly affect the tidal currents or sedimentation within Central Basin Deepening of Dredge Units 1-3 to 35 feet (MLLW) +2 feet over-dredging can be expected to increase the overall sedimentation in Central Basin and shift the general sedimentation patterns Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 1

6 Technical Report Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis, Port of San Francisco Central Basin, CA 1. Introduction Coast & Harbor Engineering.(CHE) was contracted by the Port of San Francisco (POSF) to develop coastal engineering design criteria and remediation (capping) design concepts, as well as impact analysis for various proposed activities within the Central Basin (Figure 1, left). Impact analysis included the potential removal of Wharf-8, shown in Figure 1 (right) and its effect on tidal circulation and wave climate in the Central Basin, as well as impacts of installing the Crane Cove Park Beach, and deepening Dredge Units 1-3 in Central Basin to depth 35 feet (MLLW). Figure 1. San Francisco Central Basin location 2. Coastal Conditions Analysis CHE evaluated coastal hydrodynamic conditions in Central Basin, including storm waves, propeller wash and tidal currents/sedimentation. Numerical modeling tools were developed to predict storm wind-waves on a Bay-wide scale, CFD modeling was performed to estimate potential tug-induced bottom velocities from propeller wash, and tidal current/sedimentation modeling on a Bay-wide scale was performed to determine existing and future sedimentation rates under a variety of proposed modifications within the area. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 2

7 2.1. Vertical Datums Tides in San Francisco Bay are semi-diurnal (two low tides and two high tides each day). Predicted tide data from the National Oceanic and Atmospheric Administration (NOAA) Pier 22.5 Station (Latitude N, Longitude W) were used to develop tidal elevation statistics. Table 1 shows the fixed and tidal datum information available for the Pier 22.5 location which was used to approximate tidal fluctuations at the Central Basin site. Table 2 shows tidal elevation differences between the Presidio station at the Golden Gate and the Pier 22.5 station. Table 1. Datum Elevations at Pier 22.5 (Epoch ) Datum Elevation [feet, MLLW] Elevation [feet, CITY DATUM] Highest Observed Water Level (1/27/1983) n/a n/a Highest Astronomical Tide (12/31/1990) Mean Higher-High Water Mean High Water Mean Tide Level Mean Sea Level Mean Diurnal Tide Level Mean Low Water Mean Lower-Low Water Lowest Astronomical Tide (5/25/1986) Lowest Observed Water Level (12/17/1933) n/a n/a Table 2. Differences in Elevations between Golden Gate and Pier 22.5 (Epoch ) Difference Datum Description [feet] EHW Highest Observed Water Level (1/27/1983) N/A HAT Highest Astronomical Tide (12/31/1990) 0.38 MHHW Mean Higher-High Water 0.42 MHW Mean High Water 0.41 MTL Mean Tide Level 0.20 MSL Mean Sea Level 0.15 DTL Mean Diurnal Tide Level 0.21 MLW Mean Low Water MLLW Mean Lower-Low Water 0.00 LAT Lowest Astronomical Tide (5/25/1986) 0.03 ELW Lowest Observed Water Level (12/17/1933) N/A Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 3

8 2.2. Wind Analysis San Francisco Bay has an energetic wind climate, with winds at Central Basin predominantly from the westerly directions. Wind analysis was performed to quantify the wind climate in the area, and for development of extreme winds to be used as coastal and structural engineering design criteria. Wind data were collected from the Alameda Naval Air Station (NAS) anemometer, from which more than 60 years of data are available. The Alameda NAS station is suitable for wind-wave generation due to its long record and location in the Central Bay which is representative of winds generating waves over-water, in particular the strong SE winds that generated design waves of interest in Central Basin. Figure 2 shows the distribution of measured wind speed and direction at Alameda NAS in the form of a wind rose. The data show that winds are most commonly from the west. The Alameda NAS hourly wind records were analyzed and the largest measured wind events were extracted. These extreme events were fit to a Weibull distribution, and sustained wind speeds were predicted for extreme events with recurrence intervals ranging from 2 to 100 years from all directions. Figure 3 shows the predicted extreme wind speeds for all return periods and directions. Frequency of Occurrence, % Wind Speed [mph] > Direction of Origin, deg T Figure 2. Wind speed and direction distribution (wind rose) at Alameda NAS wind station Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 4

9 Figure 3. Extreme sustained wind speed and direction for return periods between 2 and 100 years 2.3. Wind-Waves The wind extreme events developed in Section 2.2 were used to develop storm waves at the project site. Wind-wave growth and transformation modeling was performed using the two-dimensional spectral model SWAN (Holthuijsen et al., 2004). Figure 4 shows the SWAN input bathymetry for San Francisco Bay (left) constructed using historical data (U.S. Army Corps of Engineers, NOAA) as well as recent survey data, and a close-up of the model bathymetry near the project site (right) which included June 2013 multibeam survey data (etrac Engineering 2013). Figure 4. Wind-wave modeling domain for San Francisco Bay (left) and nearshore domain at project site (right) Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 5

10 The results of the SWAN model included spatial distributions of significant wave height (approximately the average of the highest one-third of the waves) and peak wave period, as well as other parameters. The extreme winds were used as input into the San Francisco Bay model for events with return periods of 100 years from all directions. Modeling was performed at MHHW tidal elevation to produce conservative wave conditions. Model testing indicates slightly lower extreme wave heights at MLLW tidal elevation. Figure 5 shows example wind-wave growth and transformation modeling results (significant wave height) for 100-year winds from east-southeast, which generates the largest waves at the site. Figure 6 shows the same results with a close-up view of Central Basin. These results are based on the conservative assumption that Wharf-8 and the BAE facilities do not limit wave penetration to the project area. This scenario results in significant wave heights varying from 2.5 to 3.9 feet in the remediation area with peak wave period 5.2 seconds. Figure year significant wave heights on Bay Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 6

11 Figure year significant wave heights in project area 2.4. Tidal Currents and Sedimentation Tidal current and sediment transport analysis was performed at the project site to determine likely conditions at the proposed Crane Cove Park Beach, current speeds for design of remediation area alternatives, and to develop tools for conducting various impact analyses Tidal Current Model Setup and Validation Tidal currents were evaluated on a Bay-wide scale using the depth-averaged finite volume fully unstructured hydrodynamic model MORPHO (Kolomiets et al., 2009). The model simulates water level and current velocity fluctuations generated by forcing from tides, winds and waves. The model was forced with predicted tidal constituents in the Pacific Ocean (LeProvost et al., 1994), and covers the entire San Francisco Bay with some extension upstream into the Sacramento and San Joaquin Rivers. No river flows were included as they have a negligible effect on flows in Central Basin. Figure 7 shows the majority of the modeling domain, with the exception of the areas far offshore of the Bay. Figure 8 shows snapshots of the tidal current speeds and directions around Central Basin during peak ebb (top) and flood (bottom) currents. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 7

12 Figure 7. Tidal current modeling domain (Pacific Ocean extents not fully shown) Sediment transport was modeled using a cohesive sediment excess shear formulation which computes erosion and deposition based on an erosion rate parameter and critical shear values for erosion and deposition. No artificial sediment inputs were included; therefore all sediment entering Central Basin areas was suspended in other parts of the Bay within the modeling domain. Cursory tidal current model validations were performed using predicted tides at Alameda and a peak ebb current speed measured at Wharf 8 via boat with tracers and GPS units. Figure 9 shows the validation with predicted tides at Alameda (top) which were readily available, and the observed current velocity at Wharf 8. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 8

13 Figure 8. Typical current speeds and directions during peak ebb (top) and flood (bottom) currents around Central Basin. A color contour legend is presented at top left of each snapshot. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 9

14 Figure 9. Validation of tidal current model with predicted tides at Alameda (top) and observed current near Wharf 8 (bottom) Measured Sedimentation Analysis Analysis of measured sedimentation in Central Basin was performed using hydrographic surveys. Surveys from 1998, 1999 and 2013 were available for analysis. Given the small changes that occurred between 1998 and 1999, only the differences in the 1999 and 2013 surveys were used for the analysis. The outer dredging area was apparently maintained during that time, hence sedimentation rates in that area cannot be calculated. Figure 10 shows the two hydrographic survey datasets used in the analysis, with 1999 being taken from a Port of San Francisco survey chart and the 2013 from a multibeam by etrac Engineering (etrac Engineering 2013). Sedimentation rates were calculated using the volume of sedimentation in each of several zones, broken down by the locations of previous dredging areas. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 10

15 Figure 11 shows the sedimentation rates measured between the two surveys in inches per year. Generally, the sedimentation rates vary between 1 and 9 inches per year, largely depending on depth and location. Deeper areas farther east were subject to the highest sedimentation rates. Figure 10. Hydrographic survey data used in measured sedimentation analysis, 1999 (top) and 2013 (bottom) Figure 11. Measured sedimentation rates in Central Basin Sedimentation Model Calibration Sediment transport/morphology model calibration was performed by simulating one month of tidal currents, and allowing the Bay-wide model to pick up sediment on its own and transport around San Francisco Bay, and transport the sediment into Central Basin. Model calibration results show an overall excellent match in terms of volumes of sediment deposited into the various zones in Central Basin. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 11

16 Figure 12 shows the model predicted sedimentation (one month results scaled linearly to one year), and callouts indicating the measured rates. Overall, the predicted sedimentation rates from the calibration exercise are slightly higher than the measured rates. The calibration resulted in a reliable tool for evaluation of sedimentation in Central Basin following implementation of various potential projects. Figure 12. Model predicted sedimentation rates in Central Basin, with measured rates noted in white boxes 3. Sediment Remediation Concept Design The POSF proposes to remediate an area of known contaminated sediment in Central Basin near the site of the proposed Crane Cove Park. The proposed remediation consists of capping the sediment using a rock cap and sheetpile wall to protect the cap from strong tuginduced bottom velocities that may exist at the site in the future. Figure 13 shows the proposed remediation area boundary provided by the POSF. The remediation design concepts were all required to contain all sediments within this polygon subject to 100-year design conditions. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 12

17 Figure 13. Proposed remediation area boundary (hatched area) 3.1. Design Criteria Design criteria for the remediation (capping) include storm waves and propeller wash bottom velocities. Storm wave conditions developed in Section 2 were evaluated and 100-year storm significant wave heights ranging from 2.6 to 3.9 feet with peak period 5.2 seconds were selected for design. Figure 14 shows the storm significant wave heights used for sizing the rock cap materials and where they occur in the area. Propeller wash modeling was performed using the commercial CFD code FLOW3D (Flow Science 2014). FLOW3D is a volume of fluids three-dimensional general purpose hydrodynamic code used for a variety of hydraulic processes. The tug Delta Billie was used as the prototype vessel, and assumed to operate in a dredged area that does not presently exist but may in the future (personal communication with BAE, 2014). Delta Billie was used as the design tug boat as it was reported to be the most powerful tug (maximum thrust) likely to be used at the terminal (personal communication with BAE, 2014). Table 3 provides the particulars of the tug. The tug was assumed to operate a maximum power and direct the propeller wash directly at the remediation area. Figure 15 shows a semi-steady state bottom velocity distribution generated by the tug. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 13

18 Figure 14. Storm wave heights (significant wave heights) chosen for remediation area design (does not include effects of proposed sheetpile wall) Table 3. Tug Particulars for Propeller Wash Modeling Vessel Particular Tug Length Tug Beam Tug Draft Propeller Diameter Bollard Pull Prop. Dist. Below Water Level Power Delivered Value 100 feet 40 feet 19.0 feet 9.18 feet 94 Tons 14.4 feet 6,800 hp Figure 15. Bottom velocities generated by the tug Delta Billie after reaching approximately steady flow conditions Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 14

19 3.2. Remediation Concept Design The remediation area was broken into two sections; Phase 1 at the western end, and Phase 2 at the eastern end. Storm waves govern remediation area armoring requirements for the Phase 1 area. In the Phase 1 area, the recommended cap would consist of at least a 1.5-ft thick layer of armor stone, with stone size six inches or more in diameter and with a total cap thickness of at least two feet. This recommendation assumes that regular maintenance is conducted to ensure that the minimum cap thickness is maintained. The two-foot initial cap thickness was estimated as a reasonable minimum constructible thickness to accommodate the armor stone and smaller bedding stone. In the Phase 1 area where the Crane Cove Beach is to be installed, other considerations may apply which could result in a lower cap thickness in those sub- beach areas. If the beach were to be installed over the cap, and specific beach sand maintenance requirements were in place, a smaller cap thickness could be acceptable. Specific details on the rock specifications and layering for the Phase 1 area should be developed during preliminary and final engineering design. Assuming BAE Systems widens the nearby berth and tugs can access the area adjacent to the remediation area, analysis indicates that a rock cap is not feasible in the Phase 2 area without further protection from the propeller wash. Therefore, a breakwater concept was developed in coordination with POSF and analyzed. Figure 16 shows the required armor stone sizes calculated with FWERI (2005) that are required to resist tug-induced propeller wash after installation of the breakwater. The calculated rock sizes take into account the spatially variable bottom velocities and spatially variable bottom slopes. It should be noted that the breakwater shown here was a submerged toe-wall; however, the POSF prefers a full-height emergent structure. Analysis indicates that with the breakwater installed, the recommended armor stone size is at least 9-12 inches with a total cap thickness of at least three feet as a practical, constructible minimum. While not specifically evaluated in the analysis, if BAE Systems does not widen the adjacent berth, it appears that insufficient space and depth exists for large tugs to maneuver close to the Phase 2 remediation area. In this case, it is possible that storm waves would once again govern the design and a breakwater would not be required. Specific details on the rock specifications and layering for the Phase 2 area should also be developed during preliminary and final engineering design. In all areas, placement of an additional cap width of 10 feet is recommended as sacrificial scour protection, in lieu of more invasive toe scour protection measures (i.e. toe embedment) to minimize disturbance of the contaminated sediments. Final scour protection/toe protection details should be developed during preliminary and final engineering design. All capping areas will include geotextile filter fabric, followed by a bedding layer of smaller material, followed by a double layer of armor stone. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 15

20 Figure 16. Required armor stone diameter for stability under propeller wash forces Appendix A provides concept design drawings describing the proposed remediation concept design. Appendix B provides a cost estimate for construction of the remediation design by M. Lee Corporation. The conceptual-level cost estimate was based on the following: 1. Conceptual Design Submittal plans, total of 5 sheets, prepared by Coast & Harbor Engineering dated 6/5/ Draft Geotechnical Study Report for Pier 70, total of 146 pages, prepared by AGS, dated May titled "central basin remediation - breakwater cost", detailing breakwater dimensions and material, dated 6/12/ Clarification with design team Conceptual cost estimates were generated assuming that 1) Phase 1 and Phase 2 are constructed at the same time, and 2) Phase 2 is constructed approximately two (2) years after completion of Phase 1. The conceptual cost estimates are the following: Option 1: Phase 1 & Phase 2 Combined: $2,861,000 Option 2: Phase 1 & Phase 2 Separately: $3,043,000 Further details on the assumptions and limitations included in the cost estimate can be found in Appendix B. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 16

21 4. Impact Analyses The potential removal of Wharf 8, construction of Crane Cove Park, and deepening of Dredge Units 1-3 to 35 feet (MLLW) were evaluated in terms of their potential impacts to other areas of Central Basin. Wharf 8 removal was evaluated in terms of changes in hydrodynamics, wave climate, and sedimentation. Potential impacts of Crane Cove Park Beach construction and deepening of Dredge Units 1-3 were evaluated in terms of changes in hydrodynamics and sedimentation Effects of Wharf 8 Removal on Waves in Central Basin Wharf 8 is composed of a 1,300-ft long, 82-ft wide pile-supported pier running in the roughly north-south direction that is connected to land by a perpendicular 700-ft section of pier. The wharf has been out of use for many years. The north-south span is supported by rows of circular steel pile (3 wide) which are spanned by 3-ft steel girders running along the length of the pier. At high tide, the bottom of the girders could offer some protection from storm waves and the pile arrangement of the pier results in a shadow region of reduced tidal current velocity during ebb-tide. A 300-ft section of the wharf also has a vertical timber screen which could offer additional protection. Photos of the Wharf 8 structure and timber screen are shown in Figure 17. Figure 17. View from north end of Wharf 8 looking south (left) and timber screen on Wharf 8 (right), looking west Computational fluid dynamics modeling was performed to analyze the impact of removing Wharf-8 on the extreme wave climate of the central basin. The 100-year wave has wave height of 6.6 feet and peak period of 6.0 seconds which was used in the modeling to calculate transmission through Wharf 8. Figure 18 shows snapshots of the modeling results (wave profiles color contoured with pressures) over the course of a single wave period. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 17

22 Figure 18. FLOW-3D storm wave transmission under/through Wharf 8 Time histories of the water surface elevation behind Wharf 8 were analyzed both with and without the structure in place to determine the relative levels of wave transmission through the structure, and whether the structure provides any significant wave protection due to the low-hanging breams. Results indicate that even at MHHW tidal elevation, when the wave crest does impact the down-standing beams on the wharf, there was 95% transmission below/through the structure. Kriebel (2004) was applied to determine the transmission across the timber screen section of the wharf. Using conservative assumptions regarding the timber screen draft and porosity (i.e., assumptions that limit transmission further), results still indicate greater than 90% wave transmission through the screen section. Based on the modeling and analysis results, it appears that removal of Wharf 8 will have little effect on the storm wave climate in Central Basin Effects of Wharf 8 Removal on Sedimentation in Central Basin Wharf 8 affects tidal currents and sedimentation patterns in Central Basin. Therefore, changes in sedimentation patterns and rates should be expected was therefore estimated with the sediment transport model. Wharf 8 was previously included in the modeling; hence, an evaluation of the effects of its removal was made by removing the Wharf 8 representation from the model and performing an identical simulation in all other respects. Figure 19 shows sedimentation rates before (left) and after (right) removal of Wharf 8. Clearly the removal of Wharf 8 affects sedimentation patterns in the area. In some areas the sedimentation rate is increased, and in some areas it is decreased, as flows more easily enter the Central Basin. This figure also shows the increase or decrease in annual sedimentation volumes predicted to occur following Wharf 8 removal in each of the delineated areas. The removal of Wharf 8 does result in a slight overall increase in sedimentation in the Central Basin; however, it is small. The overall increase in sedimentation volume in all zones shown is approximately Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 18

23 2,300 cubic yards per year. The primary change is a redistribution of sedimentation farther into the basin and farther south in the ship operations/drydock areas. Figure 19. Sedimentation rates with Wharf 8 in place (left) and rates/changes in rates following Wharf 8 removal (right) 4.3. Effects of Crane Cove Park Beach Construction on Sedimentation in Central Basin Crane Cove Park includes a beach design that will result in filling in a small portion of the southeast corner of Central Basin with sand. Hydrodynamic modeling was performed to determine if this relatively small change may affect tidal current or sedimentation patterns in Central Basin. Figure 20 shows modeling domain bathymetry before (left) and after (right) installation of the beach. Figure 21 shows sedimentation rates before (left) and after (right) installation of Crane Cove Park Beach. The beach installation does not significantly affect transport or sedimentation patterns in Central Basin. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 19

24 Figure 20. Modeling domain bathymetry for existing conditions (left) and with installation of Crane Cove Park Beach (right) Figure 21. Sedimentation rates before (left) and after (right) installation of Crane Cove Park Beach 4.4. Effects of Deepening Dredge Units 1-3 on Sedimentation in Central Basin The POSF may perform deepening within Dredge Units 1-3 in Central Basin to allow deeper-draft vessels to use the ship repair and drydock facilities operated by BAE. Hydrodynamic and sedimentation modeling was also performed to determine if this change may adversely affect tidal current or sedimentation patterns in Central Basin. Figure 22 shows the modeling domain bathymetry before (left) and after (right) deepening to -37 feet (MLLW). Figure 23 shows sedimentation rates before (left) and after (right) the deepening operations. The deepening has a measurable impact on sedimentation rates within the basin, generally increasing sedimentation in all areas except a small zone in the center of the basin. The overall increase in sedimentation volume in all zones shown is approximately 8,300 cubic yards per Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 20

25 year. This additional sedimentation in the entire Central Basin area should be considered prior to the proposed deepening to confirm the economic benefit to the POSF. Figure 22. Existing elevations around Dredge Units 1-3, and proposed deepening (right) Figure 23. Sedimentation rates before (left) and after (right) deepening of Dredge Units Conclusions Coast & Harbor Engineering.(CHE) was contracted by the Port of San Francisco (POSF) to develop coastal engineering design criteria and remediation (capping) design concepts, as well as impact analysis for various proposed activities within the Central Basin. Impact analysis included the potential removal of Wharf-8 and its effect on tidal circulation and wave climate in the Central Basin, as well as impacts of installing the Crane Cove Park Beach, and deepening Dredge Units 1-3 in Central Basin to depth 35 feet (MLLW). Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 21

26 Coastal engineering design criteria were developed to support the Crane Cove Park Beach design effort by others, including extreme storm conditions, tidal current and sedimentation conditions, and propeller wash conditions generated by nearby tug activities. A concept design was generated for remediation of contaminated sediment at the southwest corner of Central Basin. The concept design consisted of limited excavation, installation of a rock cap, and protective breakwater structure to protect the area from excessive tug-induced propeller wash. Analysis results in recommendations for remediation cap location, total thickness, and armor stone size. Impact analyses performed in Central Basin indicated the following: 6. References Removal of Wharf 8 is not likely to significantly affect the wave climate or extreme wave heights within Central Basin Removal of Wharf 8 can be expected to slightly increase the overall sedimentation in Central Basin and shift the general sedimentation patterns Crane Cove Park Beach construction is not likely to significantly affect the tidal currents or sedimentation within Central Basin Deepening of Dredge Units 1-3 to 35 feet (MLLW) +2 feet over-dredging can be expected to increase the overall sedimentation in Central Basin and shift the general sedimentation patterns etrac Engineering June 2013 Multibeam Hydrographic Survey. Flow Science FLOW3D Computational Fluid Dynamics Model. FWERI Bulletin No. 88, Principles for the Design of Bank and Bottom Protection for Inland Waterways. Holthuijsen, L.H., Booij, N., Ris, R.C., Haagsma, I.J.G., Kieftenburg, A.T.M.M., Kriezi, E.E., Zijlema, M. and A.J. van der Westhuysen SWAN Cycle III Version User Manual. Le Provost, C., Genco, M.L., Lyard, F., Vincent, P., and Canceil, P Spectroscopy of the World Ocean Tides from a Finite Element Hydrological Model. J. Geophysical research, 99, Kolomiets, P., Sorockin, M., Kivva, S. and M. Zheleznyak MORPHO-UNS-PAR Unstructured Hydrodynamic Model. Kriebel, D. L A Design Method for Timber Wave Screens. Coastal Engineering Conference (Vol. 29, No. 4, p. 3891). ASCE. Coastal Engineering Analysis, Remediation Concept Design, and Impact Analysis Page 22

27 APPENDIX A Remediation Concept Design Drawings

28 AST & NG HA R BOR EE NG

29 AST & H A R BOR NG EE NG

30 AST & H A R BOR NG EE NG

31 AST & H A R BOR NG EE NG

32 AST & H A R BOR NG EE NG

33 APPENDIX B Remediation Construction Cost Estimate By M. Lee Corporation

34 M Lee Corporation PORT OF SAN FRANCISCO CENTRAL BASIN REMEDIATION SAN FRANCISCO, CA BASED ON CONCEPTUAL DESIGN Owner: PORT OF SAN FRANCISCO Prepared for: COAST & HARBOR ENGINEERING 155 Montgomery Street, Suite 301 San Francisco, CA Phone: Attention: Scott Fenical, PE Prepared by: M LEE CORPORATION Construction Management & Consulting 311 California Street, Suite 610 San Francisco, CA Phone: Attention: Martin Lee, PE, CPE mlee@mleecorp.com Date: 10/03/ Central Basin Remediation Conceptual Estimate xlsx Prepared for: Coast and Harbor Eng. Prepared by: M Lee Corp Cover Page 1 of 9

35 M Lee Corporation CENTRAL BASIN REMEDIATION BASED ON CONCEPTUAL DESIGN Table of Contents: Page No. 1.0 Preamble (Basis of Estimate) Estimate Summary Estimate Details 7-9 Date: 10/03/2014 Prepared for: Coast and Harbor Eng. Prepared by: M Lee Corp Cover Page 2 of 9

36 M Lee Corporation PORT OF SAN FRANCISCO CENTRAL BASIN REMEDIATION CONCEPTUAL ESTIMATE OF PROBABLE CONSTRUCTION COST BASED ON CONCEPTUAL DESIGN PREAMBLE (BASIS OF ESTIMATE) Date: 10/03/2014 A) Basis of Estimate: This Estimate is based on the following: 1 Conceptual Design Submittal plans, total of 5 sheets, prepared by Coast & Harbor Engineering, dated 6/5/ Draft Geotechnical Study Report for Pier 70, total of 146 pages, prepared by AGS, dated May titled "central basin remediation - breakwater cost", detailing breakwater dimensions and material, dated 6/12/ Clarification with design team B) General Scope of Work The general scope is as follows: Phase 1 Dredging of sediment in the bay and capping of shore with geotextile fabric & rock armor Phase 2 Capping with geotextile fabric & rock armor and construction of a 80 ft high steel sheetpile breakwater structure C) Exclusions The estimate specifically excludes the following items: 1 Permit and plan check fees 2 Administration costs such as bidding, advertising and contract award 3 Professional fees for architect, engineers, consultants, construction management and other soft costs 4 Costs for third party independent soil testing, inspection and sample confirmation 5 Construction change orders 6 Cost escalation beyond the assumed construction schedule 7 Project reserve and project contingency It is assumed that the above items, if needed, are included elsewhere in the owner's overall project budget. D) Assumptions & Qualifications 1 This estimate presents costs for two different scenarios of construction: Option 1: Phase 1 & Phase 2 completed during the same construction phase. Option 2: Phase 1 & Phase 2 completed separately and independently, with Phase 2 construction starting approximately 2 years after completion of Phase 1. Work is assumed to be done during normal working hours 2 Schedule Option 1: Based on a construction period of 5 months from June 2015 to November 2015 for completion of both Phases. Prepared for: Coast and Harbor Eng. Prepared by: M Lee Corp 1.0 Preamble Page 3 of 9

37 M Lee Corporation PORT OF SAN FRANCISCO CENTRAL BASIN REMEDIATION CONCEPTUAL ESTIMATE OF PROBABLE CONSTRUCTION COST BASED ON CONCEPTUAL DESIGN PREAMBLE (BASIS OF ESTIMATE) Date: 10/03/2014 Option 2: Based on a construction period of 5 months from June 2015 to November 2015 for Phase 1 and a construction period of 5 months from June 2017 to November 2017 for Phase 2 3 The estimate is based on the following: Quantities for the armor layer include a 10 ft wide sacrificial toe area Assumed riprap / rock armor density of 1.8 tons/cy Sediment removal in front of Slipway 4 done by clamshell on barge during high tide Assumed dredged sediment density of 1.4 tons/cy Assumed dredged sediment to be Class I RCRA hazardous waste, to be transported and disposed 275 miles from site 4 The estimate is based on estimated prices current as of June 2014, with four to five responsible and responsive bids under a competitive bidding environment for a fixed price lump sum contract (a fair market condition). Note: Experience indicates that fewer bidders may result in higher bids, and conversely more bidders may result in more competitive bids. Therefore it is important to obtain as many bids as possible. The following table provides a general guideline for probable impacts due to number of bids: 1 bid +15% to +40% 2-3 bids +8% to +12% 4-5 bids -4% to +4% 6-7 bids -7% to -5% 8 or more bids -12% to -8% 5 The following is a list of some items that may affect the cost estimate: Modifications to the scope of work or assumptions included in this estimate Unforeseen sub-surface conditions Special phasing requirements Restrictive technical specifications or excessive contract conditions Any specified item of equipment, material, or product that cannot be obtained from at least three different sources Any other non-competitive bid situations 6 The estimate represents M Lee Corp's opinion of probable construction costs based on current market conditions and the assumptions and qualifications in this Preamble 7 The estimate is intended to be a determination of fair market value for the project construction. It is not a prediction of low bid. Since we have no control over market conditions and other factors which may affect the bid prices, we cannot and do not warrant nor guarantee that bids or ultimate construction costs will not vary from the cost estimate. We make no other warranties, either expressed or implied, and are not responsible for the interpretation by others of the contents herein the cost estimate. 8 Unit costs include costs for material, labor, equipment, sales tax, and contractor's markup. Prepared for: Coast and Harbor Eng. Prepared by: M Lee Corp 1.0 Preamble Page 4 of 9

38 M Lee Corporation PORT OF SAN FRANCISCO CENTRAL BASIN REMEDIATION CONCEPTUAL ESTIMATE OF PROBABLE CONSTRUCTION COST BASED ON CONCEPTUAL DESIGN PREAMBLE (BASIS OF ESTIMATE) Date: 10/03/ Based on a projected cost escalation at 4.5% per year to the assumed mid-point of construction is included in the unit cost of the estimate. D) Basis of Pricing In pricing the estimate, we have made references to the following sources for cost data: 1 Historical cost data of similar projects RS Means Building Construction Cost Data by RS Means RS Means Heavy Construction Cost Data by RS Means National Construction Estimator by Craftsman 5 Construction Economics in Engineering-News-Record (ENR) 6 Walker's Building Estimator's Reference Book by Frank R. Walker Company Based on the above cost sources, our analysis of the project specific requirements and our judgment of the current market conditions, we have determined the unit costs specifically for this project. E) Abbreviations used in the estimate: CF = cubic foot CY = cubic yard (E) = existing EA = each LB = pound LF = linear foot LOC = location LS = lump sum MTH = months (N) = new NIC = not in contract PR = pair SF = square foot TN = ton Prepared for: Coast and Harbor Eng. Prepared by: M Lee Corp 1.0 Preamble Page 5 of 9

39 M Lee Corporation PORT OF SAN FRANCISCO CENTRAL BASIN REMEDIATION CONCEPTUAL ESTIMATE OF PROBABLE CONSTRUCTION COST BASED ON CONCEPTUAL DESIGN ESTIMATE SUMMARY Date: 10/03/2014 Estimated DESCRIPTION Cost $ Option 1: Phase 1 & Phase 2 Combined 2,861,000 Option 2: Phase 1 & Phase 2 Separately 3,043,000 Phase 1: Dredging of sediment in the bay and capping of shore with geotextile fabric & rock armor Phase 2: Capping with geotextile fabric & rock armor and construction of a 80 ft high steel sheetpile breakwater structure Prices are based on 4 to 5 competitive bids escalated to assumed mid-point of construction It is important to read the attached "Preamble" and "Estimate Details" for assumptions, exclusions, qualifications and scope of work Prepared for: Coast and Harbor Eng. Prepared by: M Lee Corp 2.0 Estimate Summary Page 6 of 9

40 M Lee Corporation PORT OF SAN FRANCISCO CENTRAL BASIN REMEDIATION CONCEPTUAL ESTIMATE OF PROBABLE CONSTRUCTION COST BASED ON CONCEPTUAL DESIGN ESTIMATE DETAILS Date: 10/03/2014 Line Component Description Quantity Unit Unit Cost $ Estimated Cost $ 2 Option 1: Phase 1 & Phase 2 Combined 3 4 Silt curtain, 5' H 800 LF ,400 5 Remove debris & miscellaneous structures 38,000 SF ,000 6 Remove (E) concrete structures 1 LS 10, , Phase 1 9 Dredging 10 Mobilize clamshell on barge 1 LS 30, , Dredge 822 CY , Haul-off of contaminated dredged material 1,151 Ton , Disposal of contaminated material, Class I RCRA 1,151 Ton , ft thick rock cap 16 Geotextile fabric 19,724 SF , " bedding layer 365 CY , " armor layer 1,972 Ton , Phase ft thick rock cap 22 Geotextile fabric 11,354 SF , " bedding layer 421 CY , " armor layer 1,514 Ton , ft thick rock cap 27 Geotextile fabric 5,939 SF , " bedding layer 110 CY , " armor layer 594 Ton , Breakwater wall 32 Mobilize pile driver on barge 1 LS 50, , Galvanized steel sheet pile, 60' embed, 20' exposed 7,200 SF ,800 height, 80' H total 34 Cast-in-place concrete cap 90 LF , Option 1: Phase 1 & Phase 2 Combined - Subtotal 1,666, Option 1 Total Direct Cost 1,666, Design / Estimate Contingency 30% 499, General Contractor's General Conditions 16% 346, Bonds and Insurances 2% 50, Overhead and Profit 6% 153, Subtotal 2,717, Cost Escalation to Mid-point of Construction August % 4.5% per Year OPTION 1 TOTAL ESTIMATED CONSTRUCTION COSTS 2,861, rounded 2,861,000 Prepared for: Coast and Harbor Eng. Prepared by: M Lee Corp 3.0 Estimate Details Page 7 of 9

41 M Lee Corporation PORT OF SAN FRANCISCO CENTRAL BASIN REMEDIATION CONCEPTUAL ESTIMATE OF PROBABLE CONSTRUCTION COST BASED ON CONCEPTUAL DESIGN ESTIMATE DETAILS Date: 10/03/2014 Line Component Description Quantity Unit Unit Cost $ Estimated Cost $ Option 2: Phase 1 & Phase 2 Separately Phase 1 53 Silt curtain, 5' H 370 LF , Remove debris & miscellaneous structures 20,000 SF , Dredging 57 Mobilize clamshell on barge 1 LS 30, , Dredge 822 CY , Haul-off of contaminated dredged material 1,151 Ton , Disposal of contaminated material, Class I RCRA 1,151 Ton , ft thick rock cap 63 Geotextile fabric 19,724 SF , " bedding layer 365 CY , " armor layer 1,972 Ton , Option 2: Phase 1 Subtotal 617, Option 2: Phase 1 Direct Cost 617, Design / Estimate Contingency 30% 185, General Contractor's General Conditions 16% 128, Bonds and Insurances 2% 18, Overhead and Profit 6% 56, Subtotal 1,006, Cost Escalation to Mid-point of Construction August % 4.5% per Year OPTION 2 PHASE 1 ESTIMATED CONSTRUCTION COSTS 1,059, Phase 2 81 Silt curtain, 5' H 680 LF , Remove debris & miscellaneous structures 18,000 SF , Remove (E) concrete structures 1 LS 10, , ft thick rock cap 86 Geotextile fabric 11,354 SF , " bedding layer 421 CY , " armor layer 1,514 Ton , ft thick rock cap 91 Geotextile fabric 5,939 SF , " bedding layer 110 CY , " armor layer 594 Ton , Breakwater wall Prepared for: Coast and Harbor Eng. Prepared by: M Lee Corp 3.0 Estimate Details Page 8 of 9

42 M Lee Corporation PORT OF SAN FRANCISCO CENTRAL BASIN REMEDIATION CONCEPTUAL ESTIMATE OF PROBABLE CONSTRUCTION COST BASED ON CONCEPTUAL DESIGN ESTIMATE DETAILS Date: 10/03/2014 Line Component Description Quantity Unit Unit Cost $ Estimated Cost $ 96 Mobilize pile driver on barge 1 LS 50, , Galvanized steel sheet pile, 60' embed, 20' exposed 7,200 SF ,800 height, 80' H total 98 Cast-in-place concrete cap 90 LF , Option 2: Phase 2 Subtotal 1,054, Option 2: Phase 2 Direct Cost 1,054, Design / Estimate Contingency 30% 316, General Contractor's General Conditions 16% 219, Bonds and Insurances 2% 31, Overhead and Profit 6% 97, Subtotal 1,718, Cost Escalation to Mid-point of Construction August % 4.5% per Year OPTION 2 PHASE 2 ESTIMATED CONSTRUCTION COSTS 1,983, OPTION 2 TOTAL ESTIMATED CONSTRUCTION COSTS 3,042, rounded 3,043,000 Prepared for: Coast and Harbor Eng. Prepared by: M Lee Corp 3.0 Estimate Details Page 9 of 9

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review Appendix I Dredged Volume Estimates Draft Contractor Document: Subject to Continuing Agency Review Interoffice Correspondence Date: April 6, 2007 To: L. Bossi (WHI) Copy: S. Thompson (WHI), B. Fidler (NNJ)

More information

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Project Memo H345670 To: Capt. David Kyle From: O. Sayao/L. Absalonsen December

More information

Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation

Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation Patterns Project Memo H345670 To: Capt. David Kyle From:

More information

Annual transport rates at two locations on the fore-slope.

Annual transport rates at two locations on the fore-slope. Sediment Transport by Currents Fore-slope Sediment transport rates and sediment concentrations were computed from the hydrodynamic model runs as well as from direct measurements of current velocities at

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Highland Lake Bathymetric Survey

Highland Lake Bathymetric Survey Highland Lake Bathymetric Survey Final Report, Prepared For: The Town of Highland Lake 612 Lakeshore Drive Oneonta, AL 35121 Prepared By: Tetra Tech 2110 Powers Ferry Road SE Suite 202 Atlanta, GA 30339

More information

SAVANNAH HARBOR EXPANSION BANK EROSION STUDY UPDATE

SAVANNAH HARBOR EXPANSION BANK EROSION STUDY UPDATE CESAS-EN-GS SAVANNAH HARBOR EXPANSION BANK EROSION STUDY UPDATE GEOTECHNICAL AND HTRW BRANCH SOILS SECTION CITY FRONT, BIGHT SECTION, FORT PULASKI & NORTH TYBEE ISLAND GEORGIA 23 June 2011 CESAW-TS-EG

More information

MISSISSIPPI COASTAL IMPROVEMENTS

MISSISSIPPI COASTAL IMPROVEMENTS MISSISSIPPI COASTAL IMPROVEMENTS PROGRAM (MsCIP) Comprehensive Barrier 237 27 200 237 27 200 Island 237 Restoration 27 200 Plan 80 9 27 252 74.59 255 255 255 0 0 0 63 63 63 3 32 22 239 65 53 0 35 20 2

More information

Department of National Defence B-Jetty Reconstruction

Department of National Defence B-Jetty Reconstruction Department of National Defence B-Jetty Reconstruction CFB Esquimalt, BC Presented by: Stantec & Golder Associates February 2, 2016 Agenda 1 B-Jetty Project Background 2 Distinguishing Project Features

More information

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA Dr. Gamal A. Sallam 1 and Dr. Medhat Aziz 2 ABSTRACT Bridges are critical structures that require a substantial investment to construct and serve an important

More information

3. MARINE HABITAT RESTORATION

3. MARINE HABITAT RESTORATION Feasibility Study for Restoration of Titlow Lagoon Fish Passage South Puget Sound Salmon Enhancement Group 3. MARINE HABITAT RESTORATION Marine habitat restoration at Titlow Park could include restoration

More information

SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA

SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA Prepared by: Louisiana Coastal Protection and Restoration Authority Engineering Division March 2016 The geology of Louisiana s coastal zone is intimately

More information

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling Attachment B-1 Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling 1 October 2012 Lower Susquehanna River Watershed Assessment Evaluation of AdH Model Simplifications

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information

Erosion Information Paper - Barrow, Alaska Current as of September 14, 2007

Erosion Information Paper - Barrow, Alaska Current as of September 14, 2007 U.S. Army Corps of Engineers ALASKA BASELINE EROSION ASSESSMENT Erosion Information Paper - Barrow, Alaska Current as of September 14, 2007 Community Information Barrow (BARE-row, a.k.a. Ukpeagvik), population

More information

Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine

Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine University of Southern Maine USM Digital Commons Publications Casco Bay Estuary Partnership (CBEP) 2015 Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine Stantec Follow

More information

Port of Kalama, 2013 TEMCO Berth Maintenance Dredging and In-water Flow-Lane Placement Project

Port of Kalama, 2013 TEMCO Berth Maintenance Dredging and In-water Flow-Lane Placement Project 2014 WEDA ENVIRONMENTAL EXCELLENCE AWARDS Category: Navigation Dredging Port of Kalama, 2013 TEMCO Berth Maintenance Dredging and In-water Flow-Lane Placement Project Port of Kalama, Washington 18 April

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

Tom Blackman Project Lead. Mékell Mikell Communications Representative

Tom Blackman Project Lead. Mékell Mikell Communications Representative Sediment Cleanup Middle River Complex, 2016-17 Season 1 Project Photo Tour Updated November 15, 2016 Tom Blackman Project Lead Mékell Mikell Communications Representative 1 Sediment Cleanup - Season 1

More information

Sessom Creek Sand Bar Removal HCP Task 5.4.6

Sessom Creek Sand Bar Removal HCP Task 5.4.6 Sessom Creek Sand Bar Removal HCP Task 5.4.6 Prepared by: Dr. Thomas Hardy Texas State University Dr. Nolan Raphelt Texas Water Development Board January 6, 2013 DRAFT 1 Introduction The confluence of

More information

Countermeasure Calculations and Design

Countermeasure Calculations and Design Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,

More information

Coastal and Hydraulics Laboratory

Coastal and Hydraulics Laboratory ERDC/CHL TR-05-6 Texas City Ship Channel Deepening Study, Hydrodynamic Model Lisa M. Lee, Jennifer N. Tate, and R. C. Berger August 2005 Coastal and Hydraulics Laboratory Approved for public release; distribution

More information

Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study

Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study 2015 Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study Appendix B Civil Design USACE Chicago District August 2015 TABLE OF CONTENTS INTRODUCTION... 3 General...

More information

Multibeam Hydrographic Survey Use for Construction Control of Filling and Ground Improvement Activities

Multibeam Hydrographic Survey Use for Construction Control of Filling and Ground Improvement Activities Multibeam Hydrographic Survey Use for Construction Control of Filling and Ground Improvement Activities WEDA Cincinnati April 10, 2014 Ray Wood C.Eng Executive Vice President Fugro Consultants Inc Advantages

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Sunset Harbour / Huntington Harbour Maintenance Dredging and Waterline Installation Project. CMANC 21 January 2016

Sunset Harbour / Huntington Harbour Maintenance Dredging and Waterline Installation Project. CMANC 21 January 2016 Sunset Harbour / Huntington Harbour Maintenance Dredging and Waterline Installation Project CMANC 21 January 2016 County of Orange Footprint Huntington Harbour Operational and Dredging Cost Sharing Agreements

More information

Appendix O. Sediment Transport Modelling Technical Memorandum

Appendix O. Sediment Transport Modelling Technical Memorandum Appendix O Sediment Transport Modelling Technical Memorandum w w w. b a i r d. c o m Baird o c e a n s engineering l a k e s design r i v e r s science w a t e r s h e d s construction Final Report Don

More information

8.1 Attachment 1: Ambient Weather Conditions at Jervoise Bay, Cockburn Sound

8.1 Attachment 1: Ambient Weather Conditions at Jervoise Bay, Cockburn Sound 8.1 Attachment 1: Ambient Weather Conditions at Jervoise Bay, Cockburn Sound Cockburn Sound is 20km south of the Perth-Fremantle area and has two features that are unique along Perth s metropolitan coast

More information

CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH

CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH 5.1 Overview Plaquemines Parish is the area where the last portion of the Mississippi River flows out into the Gulf of Mexico (see Figures

More information

Draft exercise for share fair at Bozeman workshop only. This exercise is not ready for distribution. Please send helpful suggestions to

Draft exercise for share fair at Bozeman workshop only. This exercise is not ready for distribution. Please send helpful suggestions to Draft exercise for share fair at Bozeman workshop only. This exercise is not ready for distribution. Please send helpful suggestions to foleyd@plu.edu Figure list 1. Trailer photograph 2. Location map

More information

3.0 ROBERTS BANK TIDAL FLAT MORPHOLOGY

3.0 ROBERTS BANK TIDAL FLAT MORPHOLOGY Vancouver Port Authority Northwest Hydraulic Consultants Ltd. /Triton Consultants Ltd. Roberts Bank Container Expansion File: 33863 Coastal Geomorphology Study - 19 - November 2004 3.0 ROBERTS BANK TIDAL

More information

Stabilization Study. Prepared For: The Town of Bethlehem. Henry Hudson Park Shoreline Stabilization Study. June 2011

Stabilization Study. Prepared For: The Town of Bethlehem. Henry Hudson Park Shoreline Stabilization Study. June 2011 Henry Hudson Park Shoreline Stabilization Study Prepared For: The Town of Bethlehem 1 Company Introduction - OCC Ocean and Coastal Consultants (OCC) is a 50 person engineering consulting firm that specializes

More information

Design of Levee Breaches in Sheltered Water for Flood Risk Reduction & Marsh Restoration ASFMP; June 5, 2014 Presented By:

Design of Levee Breaches in Sheltered Water for Flood Risk Reduction & Marsh Restoration ASFMP; June 5, 2014 Presented By: Design of Levee Breaches in Sheltered Water for Flood Risk Reduction & Marsh Restoration ASFMP; June 5, 2014 Presented By: Rohin Saleh Alameda County Flood Control District Matt Powers, P.E. GEI Consultants

More information

Seagrass Transplantation & Environmental & Marine Consulting Services, Inc. Drew Campbell, Vice President & Lead Scientst.

Seagrass Transplantation & Environmental & Marine Consulting Services, Inc. Drew Campbell, Vice President & Lead Scientst. Indian River Lagoon Symposium Seagrass Transplantation & Project Considerations Environmental & Marine Consulting Services, Inc. Drew Campbell, Vice President & Lead Scientst March 26 th, 2013 Regulatory

More information

Prediction of changes in tidal system and deltas at Nakdong estuary due to construction of Busan new port

Prediction of changes in tidal system and deltas at Nakdong estuary due to construction of Busan new port Prediction of changes in tidal system and deltas at Nakdong estuary due to construction of Busan new port H. Gm1 & G.-Y. park2 l Department of Civil & Environmental Engineering, Kookmin University, Korea

More information

IRENE: Visitor from the Extratidal World

IRENE: Visitor from the Extratidal World IRENE: Visitor from the Extratidal World John Boon Professor Emeritus Virginia Institute of Marine Science School of Marine science College of William and Mary Hurricane Irene did not come to Hampton Roads

More information

A SEDIMENT BUDGET ANALYSIS AND MANAGEMENT STRATEGY FOR FORT PIERCE INLET, FL

A SEDIMENT BUDGET ANALYSIS AND MANAGEMENT STRATEGY FOR FORT PIERCE INLET, FL A SEDIMENT BUDGET ANALYSIS AND MANAGEMENT STRATEGY FOR FORT PIERCE INLET, FL By Elba Rodriguez and Robert G. Dean Department of Civil and Coastal Engineering University of Florida Gainesville, FL 32611,

More information

Redwood City Harbor, California, Navigation Improvement Feasibility Study. Appendix D. Geotechnical Engineering. DRAFT April 2015

Redwood City Harbor, California, Navigation Improvement Feasibility Study. Appendix D. Geotechnical Engineering. DRAFT April 2015 1 Redwood City Harbor, California, Navigation Improvement Feasibility Study Appendix D Geotechnical Engineering DRAFT April 2015 2 Contents 1 Purposes of Report... 3 2 Background... 3 3 References and

More information

UPPER COSUMNES RIVER FLOOD MAPPING

UPPER COSUMNES RIVER FLOOD MAPPING UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe

More information

PTM: A Lagrangian Particle Tracking Model. Joseph Gailani

PTM: A Lagrangian Particle Tracking Model. Joseph Gailani PTM: A Lagrangian Particle Tracking Model Joseph Gailani Joe.Z.Gailani@usace.army.mil OUTLINE Motivation for sediment/constituent modeling system Objectives of modeling system Description of PTM PTM Example

More information

South San Francisco Bay Shoreline Studies for EIA 11 with Project Conditions

South San Francisco Bay Shoreline Studies for EIA 11 with Project Conditions South San Francisco Bay Shoreline Studies for EIA 11 with Project Conditions U.S. Army Corps of Engineers San Francisco District Ms. Lisa Andes Mr. Craig Conner Dr. Frank Wu Dr. Jen-Men Lo Dr. Michael

More information

SHORELINE AND BEACH PROCESSES: PART 2. Implications for Coastal Engineering

SHORELINE AND BEACH PROCESSES: PART 2. Implications for Coastal Engineering SHORELINE AND BEACH PROCESSES: PART 2 Implications for Coastal Engineering Objectives of the lecture: Part 2 Show examples of coastal engineering Discuss the practical difficulties of ocean engineering

More information

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),

More information

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION DEPARTMENT OF THE ARMY SAN FRANCISCO DISTRICT, U.S. ARMY CORPS OF ENGINEERS 1455 MARKET STREET SAN FRANCISCO, CALIFORNIA 94103-1398 SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS

More information

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2 MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

12.0 COASTAL PROCESSES

12.0 COASTAL PROCESSES 12.0 COASTAL PROCESSES 12.1 Introduction This Chapter of the EIS considers the potential and likely significant effects of the proposed alterations to the permitted development. The purpose of this chapter

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Relatively little hard substrate occurs naturally in the

Relatively little hard substrate occurs naturally in the CHAPTER FIVE Rock Habitats Relatively little hard substrate occurs naturally in the estuary, owing mainly to the vast quantities of fine sediment that have been deposited by the rivers. Rock habitat is

More information

Preliminary Data Release for the Humboldt Bay Sea Level Rise Vulnerability Assessment: Humboldt Bay Sea Level Rise Inundation Mapping

Preliminary Data Release for the Humboldt Bay Sea Level Rise Vulnerability Assessment: Humboldt Bay Sea Level Rise Inundation Mapping Preliminary Data Release for the Humboldt Bay Sea Level Rise Vulnerability Assessment: Humboldt Bay Sea Level Rise Inundation Mapping Prepared by: Jeff Anderson, Northern Hydrology & Engineering (jeff@northernhydrology.com)

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

Parametric study on the Prediction of Wave-induced Liquefaction using an Artificial Neural Network Model

Parametric study on the Prediction of Wave-induced Liquefaction using an Artificial Neural Network Model Parametric study on the Prediction of Wave-induced Liquefaction using an Artificial Neural Network Model Author Zhang, Hong, Jeng, Dong-Sheng, Blumenstein, Michael Published 2007 Journal Title Journal

More information

Old Stone Sewer Main Street

Old Stone Sewer Main Street Bangor Landing Bangor, Maine Case Study-Sediment Sediment Investigation Maine Department of Environmental Protection City of Bangor, with RMT, Inc. Site Location and Local Site Features 1 Bangor Landing

More information

ENGINEERING APPROACHES TO SHORELINE PLACEMENT FROM COAST TO COAST

ENGINEERING APPROACHES TO SHORELINE PLACEMENT FROM COAST TO COAST ENGINEERING APPROACHES TO SHORELINE PLACEMENT FROM COAST TO COAST 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 83 36 118 110 135 120 112 92 56 62 102 130 Comparing

More information

WIND DATA REPORT FOR THE YAKUTAT JULY 2004 APRIL 2005

WIND DATA REPORT FOR THE YAKUTAT JULY 2004 APRIL 2005 WIND DATA REPORT FOR THE YAKUTAT JULY 2004 APRIL 2005 Prepared on July 12, 2005 For Bob Lynette 212 Jamestown Beach Lane Sequim WA 98382 By John Wade Wind Consultant LLC 2575 NE 32 nd Ave Portland OR 97212

More information

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING PREPARED BY: LandC, etc, LLC TABLE OF CONTENTS 1 Introduction... 1 2 Methods... 1 2.1 Hydraulic Model... 1 2.2

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX A PRELIMINARY FLOODWALL DESIGN

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX A PRELIMINARY FLOODWALL DESIGN HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX A PRELIMINARY FLOODWALL DESIGN March 2014Revised March 2015 UNITED STATES ARMY CORPS OF ENGINEERS

More information

Appendix A STORM SURGE AND WAVE HEIGHT ANALYSIS

Appendix A STORM SURGE AND WAVE HEIGHT ANALYSIS Appendix A STORM SURGE AND WAVE HEIGHT ANALYSIS Memo To: Jeff Robinson, P.E., GEC, Inc. From: Silong Lu, Ph.D., P.E., D.WRE, Dynamic Solutions, LLC. Date: 1/9/2014 CC: Re: Chris Wallen, Vice President,

More information

PRESENTATION TITLE. Regional Sediment Management Application of a Coastal Model at the St. Johns River Entrance BUILDING STRONG

PRESENTATION TITLE. Regional Sediment Management Application of a Coastal Model at the St. Johns River Entrance BUILDING STRONG PRESENTATION TITLE Regional Sediment Management Application of a Coastal Model at the St. Johns River Entrance Steven Bratos Senior Coastal Engineer U.S. Army Corps of Engineers Jacksonville District February

More information

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.)

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.) Run 027 RNZ Full Bridge Simulation Run Plots Final Report Be-Software August 2016 Prepared for Royal Haskoning DHV on behalf of Refining New Zealand Limited 27 Run 028 (Note: error in UKC at start of exercise

More information

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES Parsons P:\Honeywell -SYR\444576 2008 Capping\09 Reports\9.3 December 2009_Capping and

More information

Benchmarking of Hydrodynamic Models for Development of a Coupled Storm Surge Hazard-Infrastructure Modeling Method to improve Inundation Forecasting

Benchmarking of Hydrodynamic Models for Development of a Coupled Storm Surge Hazard-Infrastructure Modeling Method to improve Inundation Forecasting Benchmarking of Hydrodynamic Models for Development of a Coupled Storm Surge Hazard-Infrastructure Modeling Method to improve Inundation Forecasting Abstract Fragility-based models currently used in coastal

More information

COASTAL DATA APPLICATION

COASTAL DATA APPLICATION 2015 Coastal GeoTools Proactive By Design. Our Company Commitment COASTAL DATA APPLICATION Projecting Future Coastal Flood Risk for Massachusetts Bay Bin Wang, Tianyi Liu, Daniel Stapleton & Michael Mobile

More information

10/24/2017. Determining Location. Where in the World are We Geodetically Speaking. Meades Ranch

10/24/2017. Determining Location. Where in the World are We Geodetically Speaking. Meades Ranch Determining Location Where in the World are We Geodetically Speaking Meades Ranch 1 How do we find the Mark? KG0640 DESCRIBED BY COAST AND GEODETIC SURVEY 1948 (MZB) KG0640 STATION IS LOCATED ABOUT 12

More information

Inspection of Waterfront Facilities Using Vessel-Based Remote Sensing Mitchell, Del Bello, Suarez

Inspection of Waterfront Facilities Using Vessel-Based Remote Sensing Mitchell, Del Bello, Suarez Inspection of Waterfront Facilities Using Vessel-Based Remote Sensing Mitchell, Del Bello, Suarez American Association of Port Authorities Facilities Engineering Conference October 20-22, 2015 Waterfront

More information

Superstorm Sandy Willis Re s post-event field damage survey preliminary report

Superstorm Sandy Willis Re s post-event field damage survey preliminary report HURRICANE DAMAGE SURVEY REPORT event November 8, 2012 Superstorm Sandy Willis Re s post-event field damage survey preliminary report Immediately after Sandy s landfall, representatives of Willis Re s Catastrophe

More information

NSW Ocean Water Levels

NSW Ocean Water Levels NSW Ocean Water Levels B Modra 1, S Hesse 1 1 Manly Hydraulics Laboratory, NSW Public Works, Sydney, NSW Manly Hydraulics Laboratory (MHL) has collected ocean water level and tide data on behalf of the

More information

Analysis of Hydraulic Impacts on the Schuylkill River

Analysis of Hydraulic Impacts on the Schuylkill River Analysis of Hydraulic Impacts on the Schuylkill River Manayunk Sewer Basin Construction Project and the Venice Island Recreation Center Reconstruction Project Venice Island, Manayunk, Philadelphia, PA

More information

Coastal and Hydraulics Laboratory

Coastal and Hydraulics Laboratory ERDC/CHL TR-09-6 Houston-Galveston Navigation Channels, Texas Project Navigation Channel Sedimentation Study, Phase 2 Plan Simulations Jennifer N. Tate and Cassandra G. Ross August 2009 Coastal and Hydraulics

More information

Ed Curtis, PE, CFM, FEMA Region IX and Darryl Hatheway, CFM, AECOM ASFPM 2016, Grand Rapids, MI

Ed Curtis, PE, CFM, FEMA Region IX and Darryl Hatheway, CFM, AECOM ASFPM 2016, Grand Rapids, MI Methodology to Determine Process-Based Total Water Level Profiles in Areas Dominated by Wave Runup Ed Curtis, PE, CFM, FEMA Region IX and Darryl Hatheway, CFM, AECOM ASFPM 2016, Grand Rapids, MI Thurs.

More information

Material Workshop. Galveston District 2012 Beneficial Use of Dredged. Material Workshop. Custodians of the Coast

Material Workshop. Galveston District 2012 Beneficial Use of Dredged. Material Workshop. Custodians of the Coast Galveston District 2012 Beneficial Use of Dredged Material Workshop Galveston District 2012 Beneficial Use of Dredged Material Workshop US Army Corps of Engineers BUILDING STRONG Welcome Opening Remarks

More information

Aquatic Transfer Facility (ATF) San Pablo Bay (SPB) Proposed Region of ATF. Proposed Seabed Pipeline

Aquatic Transfer Facility (ATF) San Pablo Bay (SPB) Proposed Region of ATF. Proposed Seabed Pipeline Aquatic Transfer Facility (ATF) San Pablo Bay (SPB) Proposed Region of ATF Proposed Seabed Pipeline Technical Studies An Overview Scope: Provide background and new scientific information and analysis for

More information

Lower 8.3 Miles of the Lower Passaic River Operable Unit 2 Presentation to The Passaic River Community Advisory Group. September 14, 2017

Lower 8.3 Miles of the Lower Passaic River Operable Unit 2 Presentation to The Passaic River Community Advisory Group. September 14, 2017 Lower 8.3 Miles of the Lower Passaic River Operable Unit 2 Presentation to The Passaic River Community Advisory Group September 14, 2017 Agenda Pre-Design Investigation (PDI) Status Geophysical, Bathymetric,

More information

Decline of Lake Michigan-Huron Levels Caused by Erosion of the St. Clair River

Decline of Lake Michigan-Huron Levels Caused by Erosion of the St. Clair River Decline of Lake Michigan-Huron Levels Caused by Erosion of the St. Clair River W.F. & Associates Coastal Engineers (in association with Frank Quinn) April 13, 2005 Outline Problem Definition Understanding

More information

ΛTKINS. Applications of Regional Sediment Management Concepts in Texas Estuarine Restoration Projects. Riparian Workshop Fort Worth, October 17, 2012

ΛTKINS. Applications of Regional Sediment Management Concepts in Texas Estuarine Restoration Projects. Riparian Workshop Fort Worth, October 17, 2012 Juan C Moya, PhD., PG Coastal Planning and Restoration Applications of Regional Sediment Management Concepts in Texas Estuarine Restoration Projects Riparian Workshop Fort Worth, October 17, 2012 West

More information

Monitoring Hurricane Rita Inland Storm Surge

Monitoring Hurricane Rita Inland Storm Surge Monitoring Hurricane Rita Inland Storm Surge By Benton D. McGee, Roland W. Tollett, and Burl B. Goree Pressure transducers (sensors) are accurate, reliable, and cost-effective tools to measure and record

More information

Redcliffs Park Coastal inundation and coastal erosion

Redcliffs Park Coastal inundation and coastal erosion 48 Hereford Street Christchurch 8013 Attention: Deb Taylor Dear Deb 1 Introduction The (MoE) are looking to relocate Redcliffs School to a new school development at and are currently undertaking their

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

Hurricanes and Storm Surge : Before coming to lab, visit the following web site:

Hurricanes and Storm Surge : Before coming to lab, visit the following web site: Geol 108 Lab #7 Week of October 15-19, 2012 Coastal Studies Hurricanes and Storm Surge : Before coming to lab, visit the following web site: http://www.usatoday.com/graphics/weather/gra/gsurge/flash.htm

More information

Tool 2.1.4: Inundation modelling of present day and future floods

Tool 2.1.4: Inundation modelling of present day and future floods Impacts of Climate Change on Urban Infrastructure & the Built Environment A Toolbox Tool 2.1.4: Inundation modelling of present day and future floods Authors M. Duncan 1 and G. Smart 1 Affiliation 1 NIWA,

More information

Mapping of Future Coastal Hazards. for Southern California. January 7th, David Revell, Ph.D. E.

Mapping of Future Coastal Hazards. for Southern California. January 7th, David Revell, Ph.D. E. Mapping of Future Coastal Hazards for Southern California January 7th, 2014 David Revell, Ph.D. drevell@esassoc.com E. Vandebroek, 2012 Outline Coastal erosion hazard zones Flood hazard zones: Coastal

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

SYDNEY MARINE TERMINAL Second Berth Progress

SYDNEY MARINE TERMINAL Second Berth Progress SYDNEY MARINE TERMINAL Second Berth Progress Second Berth - Project Proponents Second Berth - Project Partners Second Berth - Key Stakeholder Second Berth Project Components New Second Berth: 1 2 Main

More information

GEOSYNTEC CONSULTANTS

GEOSYNTEC CONSULTANTS GEOSYNTEC CONSULTANTS 2100 Main Street, Suite 150 Huntington Beach, CA 92648 USA Tel (714) 969-0800 Fax (714) 969-0820 15 February 2006 Ms. Tamara Zeier, P.E. Project Manager Project Navigator, Ltd. One

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

FRIENDS OF THE EEL RIVER

FRIENDS OF THE EEL RIVER FRIENDS OF THE EEL RIVER Working for the recovery of our Wild & Scenic River, its fisheries and communities. Frank Blackett, Regional Engineer Office of Energy Projects Division of Dam Safety and Inspections

More information

Project No India Basin Shadow Study San Francisco, California, USA

Project No India Basin Shadow Study San Francisco, California, USA Project No. 432301 India Basin Shadow Study San Francisco, California, USA Numerical Modelling Studies 04 th June 2018 For Build Inc. Report Title: India Basin Shadow Study San Francisco, California, USA

More information

Sacramento River Bank Protection Project

Sacramento River Bank Protection Project 2005 - FIELD RECONNAISSANCE REPORT OF BANK EROSION SITES - SACRAMENTO RIVER FLOOD CONTROL LEVEES AND TRIBUTARIES Sacramento River Bank Protection Project Project No. 32-0530.10, Task 3 Prepared for: U.S.

More information

Predicting the Evolution of Tidal Channels in Muddy Coastlines

Predicting the Evolution of Tidal Channels in Muddy Coastlines Predicting the Evolution of Tidal Channels in Muddy Coastlines Sergio Fagherazzi Address Department of Earth Sciences and Center for Computational Science, Boston University, Boston MA 02215 Phone: 617-353-2092

More information

Flow estimations through spillways under submerged tidal conditions

Flow estimations through spillways under submerged tidal conditions Computational Methods and Experimental Measurements XIII 137 Flow estimations through spillways under submerged tidal conditions P. D. Scarlatos 1, M. Ansar 2 & Z. Chen 2 1 Department of Civil Engineering

More information

GSA DATA REPOSITORY

GSA DATA REPOSITORY GSA DATA REPOSITORY 2009206 Miner et al. Supplemental Material Bathymetric Survey Methods The bathymetric data for the area were gathered using a single-beam bathymetric survey rig mounted aboard a 21-foot

More information

PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF:

PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Paulsboro Marine Terminal Sediment and Benthic Sampling and Characterization Plan Addendum No. 1 SUBMISSION DEADLINE: May 27, 2009 at 11:00 A.M. FAIR

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

HEC-RAS Reservoir Transport Simulation of Three Reservoirs in the Lower Susquehanna River Basin. Mike Langland and Ed Koerkle

HEC-RAS Reservoir Transport Simulation of Three Reservoirs in the Lower Susquehanna River Basin. Mike Langland and Ed Koerkle HEC-RAS Reservoir Transport Simulation of Three Reservoirs in the Lower Susquehanna River Basin Mike Langland and Ed Koerkle Topics Background / Project Objectives Data Selection - Sediment and Geometric

More information

Phase II Storm Surge Analysis

Phase II Storm Surge Analysis Phase II Storm Surge Analysis Post 45 Project, Charleston, SC Prepared for: USACE Charleston District Charleston, SC Prepared by: Water Environment Consultants Mount Pleasant, SC October 21, 2016 Table

More information

Anderson-Ketron PSDDA Disposal Site Fate and Transport Modeling

Anderson-Ketron PSDDA Disposal Site Fate and Transport Modeling Pierce County Washington Anderson-Ketron PSDDA Disposal Site Fate and Transport Modeling Design Memorandum September 2014 Table of Contents 1 Introduction... 3 1.1 Purpose and Scope... 3 1.2 Project Description:

More information

Coastal Storms of the New Jersey Shore

Coastal Storms of the New Jersey Shore Coastal Storms of the New Jersey Shore Dr. Steven G. Decker Dept. of Environmental Sciences School of Environmental and Biological Sciences Rutgers University May 25, 2011 Overview Threats Historical Examples

More information