1 Department of National Defence B-Jetty Reconstruction CFB Esquimalt, BC Presented by: Stantec & Golder Associates February 2, 2016

2 Agenda 1 B-Jetty Project Background 2 Distinguishing Project Features 3 Structural Schemes Considered 4 Design Considerations 5 Structural Pile Considerations 6 Analysis 7 Dredging and Soil Remediation

3 ESQUIMALT VICTORIA

4 Project Background

5 Existing B-Jetty Finger pier constructed in early 1940 s Reconstructed in 1956 Timber pile/pile cap structure with pre- cast concrete deck panels Original design vessel 2000 tons About 190 m long and 18 m wide Fixed crane

6 B-Jetty Replacement Project To accommodate the next class of offshore patrol vessels, frigates and supply vessels (JSS, AOPS, CSC, Subs) Design vessel - 20,000 Tonnes displacement Finger pier About 270 m long and 26 m wide Rail mounted crane Services tunnel around jetty perimeter Stub section to align with future A-Jetty replacement project

7 B JETTY A JETTY C JETTY DRYDOCK

8 B JETTY A JETTY C JETTY DRYDOCK

9 Distinguishing Project Features

10 Geotechnical Field Investigations Geophysical and geotechnical investigations were undertaken to obtain information on subsurface conditions Geophysical investigations consisted of multibeam (high resolution) bathymetry survey and sub-bottom profiling of an area comprising both B- and A-Jetties Geotechnical investigations consisted of cone penetration tests and samples boreholes with rock coring and sampling to depths varying from 10 to 20 m Geophysical televiewer surveys were also carried out in the rock core holes

11 Geotechnical Results Geophysical Surveys (Non-intrusive) Inferred Glacial Till/Bedrock Surface Inferred Seabed Surface

12 Geotechnical Borehole Investigation Area-3 Area-1 Area-2

13 Geotechnical Subsurface Conditions Shallow bedrock near shore Bedrock slopes sharply down in seaward direction Marine sediments vary from non-existent near shore to 10 m thick offshore Marine sediments are underlain by Victoria Clay to depths in excess of 70 m from seabed Clay underlain by thin till layer and bedrock Bedrock quality varies with severe fracturing/ jointing and low intact strength in upper 1 9 m

14 Soil Stratigraphy - B Jetty

15 Geotechnical Shear Strength Profile Victoria Clay and Marine Sediments

16 Earthquakes

17 Earthquake Loading (2010 NBCC)

18 Earthquake Loading (2010 NBCC)

19 Tsunami Cause and Effects of a Tsunami M9 megathrust earthquake Mike 21 modelling package Water level rise 1.6 m to 1.8 m Time of arrival after EQ ~ 90 minutes Current speed ~ 6 m/s Wave hits broadside to finger pier Run-up

20 Tsunami

21 Tsunami B Jetty 0 m 50 m 100 m NAD83 UTM Zone 10 Projection

22 Tsunami

23 Tsunami

24 Tsunami Computed Run-Up (Shaded)

25 Structural Schemes Considered

26 Structural Schemes Steel Sheet Piles and Concrete Caissons Apply sustained loads to weak and compressible overburden soils Would result in large, on-going total and differential settlements Not acceptable Steel Pipe Piles Vertical loads transferred to bedrock No settlement Pile lengths vary from less than 5 m near shore to more than 90 m at the seaward end

27 Preferred Structural Scheme Steel Pipe Piles Rock anchored steel pipe piles Reinforced concrete pile caps, support beams and deck But still a significant challenge to construct due to thick overburden and deep bedrock at seaward end

28 Design Considerations

29 Vessels & Operational Loads Water depth 11.5 m max (varies) 20,000 Tonnes Displacement max Deck live load 30 kpa Rail mounted crane Berthing loads, Mooring loads (60 knots) Geotechnical Shallow bedrock at shoreward end, very deep bedrock at seaward end Bedrock quality varies with severe fracturing/ jointing and low intact strength in upper 1 9 m

30 Earthquakes 2,475 year return period (NBCC) Importance Factor 1.5 (Post-Disaster) Analyses based on both National Building Code of Canada and Canadian Highway Bridge Design Code Tsunami Current speed ~ 6 m/s Wave hits broadside to finger pier Current force on berthed Joint Supply Ship (JSS) Governs over earthquakes loads

31 Structural Pile Configurations

32 Concept 1 Mix of battered and vertical piles Battered piles provide lateral bracing Challenge to install in deep bedrock zones

33 Concept 2 All vertical piles More lateral movement under high loads (EQ, Tsunami) than battered piles Challenge to install in deep bedrock zones but less than for battered piles

34 Preferred Configuration Concept 2 All Vertical piles Main Consideration - Constructability

35 Analysis

36 Analysis SAP 2000 Classic Line Diagram Solid Surface Diagram

37 Displacement (Tsunami) TSUNAMI FORCE Governing load combination generally due to Tsunami Forces SOIL INTERACTION LINEAR SPRINGS AT DISCRETE POINTS, BUT NON-LINEAR ALONG THE LENGTH OF PILE

38 Jetty Deflection Tsunami West to East (Incoming) TSUNAMI 180 mm

39 Stresses - Tsunami Required: 1067 mm dia, rock anchored, concrete filled pipe piles Post-tensioned longitudinal beams and deck

40 Dredging and Soil Remediation

41 Dredging and Soil Remediation Contaminated Soil Remediation Significant effort to remove contaminated harbor sediment Remediated areas to be capped with a 300 mm thick layer of sand (Residual Management Cover). RMS Cover 14,000 m 2 Soft Sediment Dredging For soil remediation and for water depth at berths Estimated Quantity 40,000 m 3 All dredged material to be barged to offsite offload location for land disposal

42 Dredging and Soil Remediation Bedrock Dredging For infrastructure installation For water depth at vessel berths For rock removal adjacent to Future A-Jetty location Estimated Quantity 6,500 m 3

43 Limits of Dredging NON-REMEDIATED REMEDIATED

44 Limits of Dredging m m SED TO BR m SED TO BR - 15 m SLOPE UP TO - 4 m REMOVE 1 TO 2.2 m SOFT SEDIMENT DREDGING TO BEDROCK SOFT SEDIMENT DREDGING TO DEPTH (REMEDIATED)

45 Limits of Dredging m m m m SOFT SEDIMENT DREDGING TO DEPTH (NON- REMEDIATED) BEDROCK DREDGING

46 Bedrock Dredging/Blasting Bedrock removal both onshore and within the harbor, required for infrastructure installation and for water depth at vessel berths Must be carried out near existing historic structures including buildings, quay wall and drydock Mitigating effects on local marine mammals are also an important consideration for the blasting program Blasting program includes low yield charges, bubble curtain, marine life exclusion zone

47

48 Questions?

SYDNEY MARINE TERMINAL Second Berth Progress

SYDNEY MARINE TERMINAL Second Berth Progress SYDNEY MARINE TERMINAL Second Berth Progress Second Berth - Project Proponents Second Berth - Project Partners Second Berth - Key Stakeholder Second Berth Project Components New Second Berth: 1 2 Main

More information

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer Engineer (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer (Random House Webster s College Dictionary, 1991) CE100 Introduction to Civil Geotechnical

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

INTRODUCTION TO STATIC ANALYSIS PDPI 2013

INTRODUCTION TO STATIC ANALYSIS PDPI 2013 INTRODUCTION TO STATIC ANALYSIS PDPI 2013 What is Pile Capacity? When we load a pile until IT Fails what is IT Strength Considerations Two Failure Modes 1. Pile structural failure controlled by allowable

More information

Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation

Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation Patterns Project Memo H345670 To: Capt. David Kyle From:

More information

Deep Foundations 2. Load Capacity of a Single Pile

Deep Foundations 2. Load Capacity of a Single Pile Deep Foundations 2 Load Capacity of a Single Pile All calculations of pile capacity are approximate because it is almost impossible to account for the variability of soil types and the differences in the

More information

14 Geotechnical Hazards

14 Geotechnical Hazards Volume 2: Assessment of Environmental Effects 296 14 Geotechnical Hazards Overview This Chapter provides an assessment of the underlying geotechnical conditions to identify: any potential liquefaction

More information

Liquefaction and Foundations

Liquefaction and Foundations Liquefaction and Foundations Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Seismic Design of Reinforced Concrete Buildings 26 30 November, 2012 What is Liquefaction? Liquefaction

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

Design of Piles in Liquefiable and Laterally Spreading Soil Conditions, Low Level Road Project, North Vancouver, BC

Design of Piles in Liquefiable and Laterally Spreading Soil Conditions, Low Level Road Project, North Vancouver, BC Design of Piles in Liquefiable and Laterally Spreading Soil Conditions, Low Level Road Project, North Vancouver, BC Henrik Kristiansen, M.A.Sc., P.Eng. Principal, Stantec Consulting Ltd., Burnaby, BC.

More information

Geophysical Site Investigation (Seismic methods) Amit Prashant Indian Institute of Technology Gandhinagar

Geophysical Site Investigation (Seismic methods) Amit Prashant Indian Institute of Technology Gandhinagar Geophysical Site Investigation (Seismic methods) Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Aspects of Earthquake Engineering 04 08 March, 2013 Seismic Waves

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

SEISMIC PERFORMANCE OF URBAN, RECLAIMED AND PORT AREAS -FULL SCALE EXPERIMENT USING BLAST TECHNIQUE. Takahiro SUGANO 1) and Eiji KOHAMA 2)

SEISMIC PERFORMANCE OF URBAN, RECLAIMED AND PORT AREAS -FULL SCALE EXPERIMENT USING BLAST TECHNIQUE. Takahiro SUGANO 1) and Eiji KOHAMA 2) SEISMIC PERFORMANCE OF URBAN, RECLAIMED AND PORT AREAS -FULL SCALE EXPERIMENT USING BLAST TECHNIQUE by Takahiro SUGANO 1) and Eiji KOHAMA 2) ABSTRACT A full scale lateral spreading experiment was carried

More information

Proposed New Westridge Marine Terminal, Trans Mountain Expansion Project, Burnaby, BC, Canada

Proposed New Westridge Marine Terminal, Trans Mountain Expansion Project, Burnaby, BC, Canada Appendix F Golder Associates Geotechnical Factual Report on Westridge Marine Terminal Offshore Geotechnical Investigations, December 23, 2016 23 December 2016 GEOTECHNICAL FACTUAL REPORT ON WESTRIDGE MARINE

More information

Lower 8.3 Miles of the Lower Passaic River Operable Unit 2 Presentation to The Passaic River Community Advisory Group. September 14, 2017

Lower 8.3 Miles of the Lower Passaic River Operable Unit 2 Presentation to The Passaic River Community Advisory Group. September 14, 2017 Lower 8.3 Miles of the Lower Passaic River Operable Unit 2 Presentation to The Passaic River Community Advisory Group September 14, 2017 Agenda Pre-Design Investigation (PDI) Status Geophysical, Bathymetric,

More information

Neutral Plane Method for Drag Force of Deep Foundations and the AASHTO LRFD Bridge Design Specifications

Neutral Plane Method for Drag Force of Deep Foundations and the AASHTO LRFD Bridge Design Specifications Neutral Plane Method for Drag Force of Deep Foundations and the AASHTO LRFD Bridge Design Specifications Timothy C. Siegel, P.E., G.E., D.GE Dan Brown and Associates, PC, Knoxville, Tennessee USA Rich

More information

Innovative Geotechnical Investigation and Construction Procedures for the Foundations of the New Champlain Bridge, Montreal

Innovative Geotechnical Investigation and Construction Procedures for the Foundations of the New Champlain Bridge, Montreal Innovative Geotechnical Investigation and Construction Procedures for the Foundations of the New Champlain Bridge, Montreal Louis D Amours, Eng., M.A.Sc., Vice-President, Business Development, SNC-Lavalin

More information

Proposed New Westridge Marine Terminal, Trans Mountain Expansion Project, Burnaby, BC, Canada

Proposed New Westridge Marine Terminal, Trans Mountain Expansion Project, Burnaby, BC, Canada Appendix F Golder Associates Geotechnical Factual Report on Westridge Marine Terminal Offshore Geotechnical Investigations, December 23, 2016 GEOTECHNICAL FACTUAL REPORT ON WESTRIDGE MARINE TERMINAL OFFSHORE

More information

Module 9 : Foundation on rocks. Content

Module 9 : Foundation on rocks. Content FOUNDATION ON ROCKS Content 9.1 INTRODUCTION 9.2 FOUNDATION TYPES ON ROCKS 9.3 BEARING CAPCITY- SHALLOW FOUNDATION 9.3.1 Ultimate bearing capacity 9.3.2 Safe bearing pressure 9.3.3 Estimation of bearing

More information

S E C T I O N 1 2 P R O D U C T S E L E C T I O N G U I D E - H E L I C A L S C R E W P I L E F O U N D A T I O N S

S E C T I O N 1 2 P R O D U C T S E L E C T I O N G U I D E - H E L I C A L S C R E W P I L E F O U N D A T I O N S 1. P R O D U C T S E L E C T I O N G U I D E - H E L I C A L S C R E W P I L E F O U N D A T I O N S Helical foundation pile includes a lead and extension(s). The lead section is made of a central steel

More information

Lesson 25. Static Pile Load Testing, O-cell, and Statnamic. Reference Manual Chapter 18

Lesson 25. Static Pile Load Testing, O-cell, and Statnamic. Reference Manual Chapter 18 Lesson 25 Static Pile Load Testing, O-cell, and Statnamic Reference Manual Chapter 18 STATIC LOAD TESTING Most accurate method to determine static pile capacity Perform at design or construction stage

More information

Introduction to Geotechnical Engineering. ground

Introduction to Geotechnical Engineering. ground Introduction to Geotechnical Engineering ground 1 Typical Geotechnical Project Geo-Laboratory ~ for testing soil properties Design Office ~ for design & analysis construction site 2 Shallow Foundations

More information

DETAILED INVESTIGATION OF PILES DAMAGED BY HYOGOKEN NAMBU EARTHQUAKE

DETAILED INVESTIGATION OF PILES DAMAGED BY HYOGOKEN NAMBU EARTHQUAKE DETAILED INVESTIGATION OF PILES DAMAGED BY HYOGOKEN NAMBU EARTHQUAKE Kenichi HORIKOSHI 1, Akira TATEISHI 2 And Hiroyasu OHTSU 3 SUMMARY Since the 199 Hyogoken Nambu earthquake, a number of detailed investigations

More information

Internal C Unit Dilatanc y

Internal C Unit Dilatanc y 2 Grimsby Sub was not at any time definitively established. The preliminary analysis provided by Thurber Engineering Ltd indicates the slope should be stable with a factor of safety of 1.23 for a deep

More information

The Arctic - A New Frontier The geological, environmental and engineering challenges for submarine telecommunication cables

The Arctic - A New Frontier The geological, environmental and engineering challenges for submarine telecommunication cables The Arctic - A New Frontier The geological, environmental and engineering challenges for submarine telecommunication cables Ryan Wopschall 5 September 2013 Oceanology International China, Shanghai Fugro

More information

STUDY OF THE BEHAVIOR OF PILE GROUPS IN LIQUEFIED SOILS

STUDY OF THE BEHAVIOR OF PILE GROUPS IN LIQUEFIED SOILS STUDY OF THE BEHAVIOR OF PILE GROUPS IN LIQUEFIED SOILS Shin-Tower Wang 1, Luis Vasquez 2, and Lymon C. Reese 3, Honorary Member,, ASCE ABSTRACT : 1&2 President & Project Manager, Ensoft, Inc. Email: ensoft@ensoftinc.com

More information

ABP Southampton. Environmental Statement for Port of Southampton: Berth 201/202 Works. Appendix B. Dredge Material Characterisation

ABP Southampton. Environmental Statement for Port of Southampton: Berth 201/202 Works. Appendix B. Dredge Material Characterisation ABP Southampton Environmental Statement for Port of Southampton: Berth 201/202 Works Appendix B Dredge Material Characterisation Appendix B Dredge Material Characterisation Environmental Statement for

More information

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) J. Al Azhar University Gaza 2004, Vol. 7, NO. 2 P 15-26 LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) Isam G. Jardaneh (1), Jalal Al-Dabeek (2), Abdel hakeem Al-Jawhari

More information

APPROACH FILL DESIGN OF NORTH SASKATCHEWAN RIVER BRIDGE. A.F. Ruban, EBA Engineering Consultants Ltd., Edmonton, Alberta, Canada

APPROACH FILL DESIGN OF NORTH SASKATCHEWAN RIVER BRIDGE. A.F. Ruban, EBA Engineering Consultants Ltd., Edmonton, Alberta, Canada APPROACH FILL DESIGN OF NORTH SASKATCHEWAN RIVER BRIDGE A.F. Ruban, EBA Engineering Consultants Ltd., Edmonton, Alberta, Canada Paper prepared for presentation at the Slope and Embankment Engineering for

More information

STUDIES ON SEVARAL COUNTERMEASURES AGAINST LIQUEFACTION-INDUCED FLOW AND AN APPLIVATION OF A MEASURE TO EXISTING BRIDGES IN TOKYO

STUDIES ON SEVARAL COUNTERMEASURES AGAINST LIQUEFACTION-INDUCED FLOW AND AN APPLIVATION OF A MEASURE TO EXISTING BRIDGES IN TOKYO Journal of Japan Association for Earthquake Engineering, Vol.4, No.3 (Special Issue), 2004 STUDIES ON SEVARAL COUNTERMEASURES AGAINST LIQUEFACTION-INDUCED FLOW AND AN APPLIVATION OF A MEASURE TO EXISTING

More information

Residual Deformation Analyses to Demonstrate the Effect of Thin Steel Sheet Piles on Liquefaction-Induced Penetration Settlement of Wooden Houses

Residual Deformation Analyses to Demonstrate the Effect of Thin Steel Sheet Piles on Liquefaction-Induced Penetration Settlement of Wooden Houses 6 th International Conference on Earthquake Geotechnical Engineering 1-4 November 2015 Christchurch, New Zealand Residual Deformation Analyses to Demonstrate the Effect of Thin Steel Sheet Piles on Liquefaction-Induced

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Geophysical Site Surveys

Geophysical Site Surveys Geophysical Site Surveys Simon Oakley Geoscience Team Leader Fugro Survey Limited 16/04/2014 Contents Menu Introduction Section 1 - Geophysical Site Surveys - Seabed Bathymetry - Shallow Geology - Seabed

More information

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Annual transport rates at two locations on the fore-slope.

Annual transport rates at two locations on the fore-slope. Sediment Transport by Currents Fore-slope Sediment transport rates and sediment concentrations were computed from the hydrodynamic model runs as well as from direct measurements of current velocities at

More information

Earthquake Engineering and the Alaskan Way Viaduct

Earthquake Engineering and the Alaskan Way Viaduct Earthquake Engineering and the Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington Structural Caused by excessive ground shaking Strongly influenced by local soil conditions Geotechnical

More information

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills Construction over Mine Spoil Fills Wayne A. Karem, PhD, PE, PG, D.GE 2014 KSPE Annual Conference Background Strip mining; mountaintop and contour mining Creates huge quantities of mine spoil The mine spoil

More information

Site characterization for the HZM immersed tunnel

Site characterization for the HZM immersed tunnel DGF 2013-09-12 (18 th ICSMGE Paris; Discussion Session TC102) Site characterization for the HZM immersed tunnel HKSAR Jørgen S. Steenfelt COWI, Denmark Co-authors: S. Yding, A. Rosborg, J.G. Hansen, R.

More information

Chapter (11) Pile Foundations

Chapter (11) Pile Foundations Chapter (11) Introduction Piles are structural members that are made of steel, concrete, or timber. They are used to build pile foundations (classified as deep foundations) which cost more than shallow

More information

Special edition paper

Special edition paper Development of New Aseismatic Structure Using Escalators Kazunori Sasaki* Atsushi Hayashi* Hajime Yoshida** Toru Masuda* Aseismatic reinforcement work is often carried out in parallel with improvement

More information

Bored Sockets in weathered Basalt

Bored Sockets in weathered Basalt Bored Sockets in weathered Basalt L. Maertens Manager Engineering Department Besix, Belgium Associate Professor Catholic University Leuven Keywords: sockets, open-end piles, tensile piles, basalt ABSTRACT:

More information

Geotechnical Modeling Issues

Geotechnical Modeling Issues Nonlinear Analysis of Viaducts and Overpasses Geotechnical Modeling Issues Steve Kramer Pedro Arduino Hyung-Suk Shin University of Washington The Problem Approach Soil Soil Soil Soil Soil Soil Soil Soil

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

NON-LINEAR ANALYSIS OF SOIL-PILE-STRUCTURE INTERACTION UNDER SEISMIC LOADS

NON-LINEAR ANALYSIS OF SOIL-PILE-STRUCTURE INTERACTION UNDER SEISMIC LOADS NON-LINEAR ANALYSIS OF SOIL-PILE-STRUCTURE INTERACTION UNDER SEISMIC LOADS Yingcai Han 1 and Shin-Tower Wang 2 1 Fluor Canada Ltd., Calgary AB, Canada Email: yingcai.han@fluor.com 2 Ensoft, Inc. Austin,

More information

Gapping effects on the lateral stiffness of piles in cohesive soil

Gapping effects on the lateral stiffness of piles in cohesive soil Gapping effects on the lateral stiffness of piles in cohesive soil Satyawan Pranjoto Engineering Geology, Auckland, New Zealand. M. J. Pender Department of Civil and Environmental Engineering, University

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

PECivilExam.com. Copyright 2015 Pecivilexam.com all rights reserved- E-Book Geotechnical Depth Exam: 80 problems

PECivilExam.com. Copyright 2015 Pecivilexam.com all rights reserved- E-Book Geotechnical Depth Exam: 80 problems PECivilExam.com PE Civil Exam 80- Geotechnical Questions & Answers (pdf Format) For Depth Exam (Evening Session) PE Civil Depth Exam (Evening Session): This practice exam contains 80- Geotechnical questions,

More information

BELFAST SEWERS PROJECT

BELFAST SEWERS PROJECT BELFAST SEWERS PROJECT Adam Green - Atkins Tunnelling Scheme Overview New stormwater interceptor Tunnel Scheme within Belfast City Centre to alleviate flooding and divert storm water flows from existing

More information

FOUNDATIONS FOR OFFSHORE STRUCTURES

FOUNDATIONS FOR OFFSHORE STRUCTURES FOUNDATIONS FOR OFFSHORE STRUCTURES DELHI CHAPTER Pradeep Hora It takes less time to do a thing right than explain why you did it wrong. - Henry Wadsworth Longfellow 2 1 Site Investigations (Survey) What

More information

Use of CPT in Geotechnical Earthquake Engineering

Use of CPT in Geotechnical Earthquake Engineering Use of CPT in Geotechnical Earthquake Engineering Prof. Scott M. Olson, PhD, PE Use of Cone Penetration Test for Foundation Analysis and Design 2006 Annual Meeting Transportation Research Board Geotechnical

More information

GEOTECHNICAL EARTHQUAKE ENGINEERING ASPECTS OF THE DESIGN OF FOUNDATIONS OF THE VANCOUVER CONVENTION CENTER EXPANSION PROJECT

GEOTECHNICAL EARTHQUAKE ENGINEERING ASPECTS OF THE DESIGN OF FOUNDATIONS OF THE VANCOUVER CONVENTION CENTER EXPANSION PROJECT GEOTECHNICAL EARTHQUAKE ENGINEERING ASPECTS OF THE DESIGN OF FOUNDATIONS OF THE VANCOUVER CONVENTION CENTER EXPANSION PROJECT Upul Atukorala 1, Humberto Puebla 2, Viji Fernando 2, Yogi Yogendrakumar 1,

More information

Prof. Dr.-Ing. Martin Achmus Institute of Soil Mechanics, Foundation Engineering and Waterpower Engineering. Offshore subsoil investigations

Prof. Dr.-Ing. Martin Achmus Institute of Soil Mechanics, Foundation Engineering and Waterpower Engineering. Offshore subsoil investigations Prof. Dr.-Ing. Martin Achmus Institute of Soil Mechanics, Foundation Engineering and Waterpower Engineering Offshore subsoil investigations Addis Ababa, September 2010 Offshore subsoil investigations Presentation

More information

Introduction and Background

Introduction and Background Introduction and Background Itasca Consulting Group, Inc. (Itasca) has been participating in the geomechanical design of the underground 118-Zone at the Capstone Minto Mine (Minto) in the Yukon, in northwestern

More information

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION

More information

CHRACTERISTICS OF LANDSLIDE OCCURRED IN LOPARE, BOSNIA AND HERZEGOVINA

CHRACTERISTICS OF LANDSLIDE OCCURRED IN LOPARE, BOSNIA AND HERZEGOVINA CHRACTERISTICS OF LANDSLIDE OCCURRED IN LOPARE, BOSNIA AND HERZEGOVINA Jun Sugawara 1 and Takao Aizawa 2 1 WorleyParsons, Australia 2 Suncoh Consultants, Japan ABSTRACT This paper presents results of detailed

More information

A STUDY ON DAMAGE TO STEEL PIPE PILE FOUNDATION ON RECLAIMED LAND DURING HYOGO-KEN-NANBU EARTHQUAKE

A STUDY ON DAMAGE TO STEEL PIPE PILE FOUNDATION ON RECLAIMED LAND DURING HYOGO-KEN-NANBU EARTHQUAKE A STUDY ON DAMAGE TO STEEL PIPE PILE FOUNDATION ON RECLAIMED LAND DURING HYOGO-KEN-NANBU EARTHQUAKE Takaaki IKEDA 1, Shigeru MIWA And Hiroshi OH-OKA 3 SUMMARY Damage investigation was conducted on steel

More information

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates Drilled Shaft Foundations in Limestone Dan Brown, P.E., Ph.D. Dan Brown and Associates Foundation Engineering How we teach our students Fundamental understanding of soil and rock behavior (good!) Focus

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

GEOTECHNICAL POLICIES AND PROCEDURES MANUAL CHAPTER 5 GEOTECHNICAL INVESTIGATION PLANNING GUIDELINES

GEOTECHNICAL POLICIES AND PROCEDURES MANUAL CHAPTER 5 GEOTECHNICAL INVESTIGATION PLANNING GUIDELINES GEOTECHNICAL POLICIES AND PROCEDURES MANUAL CHAPTER 5 GEOTECHNICAL INVESTIGATION PLANNING GUIDELINES GEOTECHNICAL INVESTIGATION PLANNING GUIDELINES 5-i TABLE OF CONTENTS 1. PURPOSE... 1 2. INTRODUCTION...

More information

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 Regional Workshop on Volcanic, Seismic, and Tsunami Hazard Assessment Related to NPP Siting Activities and

More information

Geological Mapping using Geophysics

Geological Mapping using Geophysics Geological Mapping using Geophysics Pugin, A.J.M. and T.H. Larson Illinois State Geological Survey, 615 E Peabody Dr., Champaign, IL 61820; E-mail: A.J.M. Pugin at pugin@isgs.uiuc.edu Mapping Techniques.

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

Applied Geophysics for Environmental Site Characterization and Remediation

Applied Geophysics for Environmental Site Characterization and Remediation Applied Geophysics for Environmental Site Characterization and Remediation MSECA Webinar September 24, 2015 John Mundell, P.E., L.P.G. Ryan Brumbaugh, L.P.G. MUNDELL & ASSOCIATES, INC. Webinar Objective

More information

Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton

Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton REPORT Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton REPORT Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton Report

More information

Piles in Lateral Spreading due to Liquefaction: A Physically Simplified Method Versus Centrifuge Experiments

Piles in Lateral Spreading due to Liquefaction: A Physically Simplified Method Versus Centrifuge Experiments "Pile-Group Response to Large Soil Displacements and Liquefaction: Centrifuge Experiments Versus A Physically Simplified Analysis", Journal of Geotechnical and Geoenvironmental Engineering, ASCE, Vol.

More information

DOWN-HOLE SEISMIC SURVEY AND VERTICAL ELECTRIC SOUNDINGS RABASKA PROJECT, LÉVIS, QUÉBEC. Presented to :

DOWN-HOLE SEISMIC SURVEY AND VERTICAL ELECTRIC SOUNDINGS RABASKA PROJECT, LÉVIS, QUÉBEC. Presented to : DOWN-HOLE SEISMIC SURVEY AND VERTICAL ELECTRIC SOUNDINGS RABASKA PROJECT, LÉVIS, QUÉBEC Presented to : TERRATECH 455, René-Lévesque Blvd. West Montreal, Québec HZ 1Z3 Presented by : GEOPHYSICS GPR INTERNATIONAL

More information

Area-wide geotechnical information summary for CERA zoning review panel

Area-wide geotechnical information summary for CERA zoning review panel Area-wide geotechnical information summary for CERA zoning review panel This document contains all the area-wide geotechnical information which was considered by CERA as part of the process for making

More information

GEOTECHNICAL ENGINEERING INVESTIGATION HANDBOOK Second Edition

GEOTECHNICAL ENGINEERING INVESTIGATION HANDBOOK Second Edition GEOTECHNICAL ENGINEERING INVESTIGATION HANDBOOK Second Edition Roy E. Hunt Taylor & Francis Taylor & Francis Croup Boca Raton London New York Singapore A CRC title, part of the Taylor & Francis imprint,

More information

Seabed instability and 3D FE jack-up soil-structure interaction analysis

Seabed instability and 3D FE jack-up soil-structure interaction analysis Seabed instability and 3D FE jack-up soil-structure interaction analysis Lindita Kellezi, GEO Danish Geotechnical Institute, Denmark Gregers Kudsk, Maersk Contractors, Denmark Hugo Hofstede, Marine Structure

More information

Experimental Investigation of Interface Stresses between Soil and Laterally Loaded Shaft

Experimental Investigation of Interface Stresses between Soil and Laterally Loaded Shaft Experimental Investigation of Interface Stresses between Soil and Laterally Loaded Shaft K.D. Janoyan & M.J. Whelan Clarkson University, Potsdam, New York, USA ABSTRACT: Presented are results of a field

More information

HORIZONTAL LOAD DISTRIBUTION WITHIN PILE GROUP IN LIQUEFIED GROUND

HORIZONTAL LOAD DISTRIBUTION WITHIN PILE GROUP IN LIQUEFIED GROUND 4 th International Conference on Earthquake Geotechnical Engineering June 2-28, 7 Paper No. 127 HORIZONTAL LOAD DISTRIBUTION WITHIN PILE GROUP IN LIQUEFIED GROUND Hiroko SUZUKI 1 and Kohji TOKIMATSU 2

More information

SHEET PILE WALLS. Mehdi Mokhberi Islamic Azad University

SHEET PILE WALLS. Mehdi Mokhberi Islamic Azad University SHEET PILE WALLS Mehdi Mokhberi Islamic Azad University Lateral Support In geotechnical engineering, it is often necessary to prevent lateral soil movements. Tie rod Anchor Sheet pile Cantilever retaining

More information

TINTAGEL CASTLE FOOTBRIDGE OPTIONS APPRAISAL. Feasibility Report July 2014

TINTAGEL CASTLE FOOTBRIDGE OPTIONS APPRAISAL. Feasibility Report July 2014 TINTAGEL CASTLE FOOTBRIDGE OPTIONS APPRAISAL Feasibility Report July 2014 THE SETTING LOCATION Proposed alignment of bridge 09 ALIGNMENT 01 03 02 04 05 07 09 Key 1. Lower Mainland Courtyard 06 2. Existing

More information

THE 4Gs IN PRACTICE: INVESTIGATING HOW THE 4Gs ARE APPLIED IN THE OIL & GAS INDUSTRY

THE 4Gs IN PRACTICE: INVESTIGATING HOW THE 4Gs ARE APPLIED IN THE OIL & GAS INDUSTRY THE 4Gs IN PRACTICE: INVESTIGATING HOW THE 4Gs ARE APPLIED IN THE OIL & GAS INDUSTRY Society for Underwater Technology, Evening Technical Meeting 14 AUGUST 2013 GEOPHYSICS & PORT DEVELOPMENTS EXPLORING

More information

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.)

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.) Run 027 RNZ Full Bridge Simulation Run Plots Final Report Be-Software August 2016 Prepared for Royal Haskoning DHV on behalf of Refining New Zealand Limited 27 Run 028 (Note: error in UKC at start of exercise

More information

Field Investigation and Dynamic Analysis of Damaged Structure on Pile Foundation during the 2011 off the Pacific Coast of Tohoku Earthquake

Field Investigation and Dynamic Analysis of Damaged Structure on Pile Foundation during the 2011 off the Pacific Coast of Tohoku Earthquake Field Investigation and Dynamic Analysis of Damaged Structure on Pile Foundation during the 2011 off the Pacific Coast of Tohoku Earthquake Masatoshi Yamazoe Kobori Research Complex Inc., Japan Joji Sakuta

More information

Area-wide geotechnical information summary for CERA zoning review panel

Area-wide geotechnical information summary for CERA zoning review panel Area-wide geotechnical information summary for CERA zoning review panel This document contains all the area-wide geotechnical information which was considered by CERA as part of the process for making

More information

Lecture 7. Pile Analysis

Lecture 7. Pile Analysis Lecture 7 14.5 Release Pile Analysis 2012 ANSYS, Inc. February 9, 2013 1 Release 14.5 Pile definition in Mechanical - There are a number of methods that can be used to analyze piled foundations in ANSYS

More information

Canada Line Project. Stability of the Twin Bored Tunnels Under False Creek. Vancouver, British Columbia

Canada Line Project. Stability of the Twin Bored Tunnels Under False Creek. Vancouver, British Columbia Canada Line Project Stability of the Twin Bored Tunnels Under False Creek Vancouver, British Columbia By: Catherine Paul, Jen Ramesch, Matt Gellis, Matthew Yip, and Rhaul Sharma Canada Line Canada Line

More information

R.SUNDARAVADIVELU Professor IIT Madras,Chennai - 36.

R.SUNDARAVADIVELU Professor IIT Madras,Chennai - 36. Behaviour of Berthing Structure under Changing Slope in Seismic Condition - A Case Study K.MUTHUKKUMARAN Research Scholar Department of Ocean Engineering, R.SUNDARAVADIVELU Professor IIT Madras,Chennai

More information

IZMIT BAY BRIDGE SOUTH APPROACH VIADUCT: SEISMIC DESIGN NEXT TO THE NORTH ANATOLIAN FAULT

IZMIT BAY BRIDGE SOUTH APPROACH VIADUCT: SEISMIC DESIGN NEXT TO THE NORTH ANATOLIAN FAULT Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey IZMIT BAY BRIDGE SOUTH APPROACH VIADUCT: SEISMIC DESIGN NEXT TO THE NORTH ANATOLIAN FAULT A. Giannakou 1, J. Chacko 2 and W. Chen 3 ABSTRACT

More information

NCP3 NCP4 EXISTING CONDITIONS NOTES: RIP-RAP FAILED WALL SECTION NORTH WAREHOUSE CEMEX SILOS BULKHEAD WALL

NCP3 NCP4 EXISTING CONDITIONS NOTES: RIP-RAP FAILED WALL SECTION NORTH WAREHOUSE CEMEX SILOS BULKHEAD WALL UGE UGE UGE UGE UGE UGE UGE N SCALE: " = 4 6 ' 445 CHALLENGER RD., SUITE () 799-6 () 799-8 (FA) SCALE: JOB # NOTED - P RIP-RAP CEME SILOS DOLPHIN RD. FAILED WALL SECTION NORTH WAREHOUSE BULKHEAD WALL NCP4

More information

Capping of contaminated seabed in Norway lessons learned

Capping of contaminated seabed in Norway lessons learned Capping of contaminated seabed in Norway lessons learned Jens Laugesen, DNV GL, Hoevik, Norway Espen Eek, NGI, Oslo, Norway Jeanette Beckius and Erik Høygaard, Norwegian Environment Agency, Oslo, Norway

More information

H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE)

H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE) DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE) Parsons P:\Honeywell -SYR\444576 2008 Capping\09

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

SUBSIDENCE MONITORING AS KEY FACTOR FOR ENVIRONMENTAL SUSTAINABILITY OF THE OIL AND GAS PROJECTS

SUBSIDENCE MONITORING AS KEY FACTOR FOR ENVIRONMENTAL SUSTAINABILITY OF THE OIL AND GAS PROJECTS SUBSIDENCE MONITORING AS KEY FACTOR FOR ENVIRONMENTAL SUSTAINABILITY OF THE OIL AND GAS PROJECTS Fabio Casolini e Francesco Italiano, Eni E&P Bologna, 12 giugno 2012 www.eni.it SUBSIDENCE it is a slow

More information

September 18, 2017 Project No.: 5077

September 18, 2017 Project No.: 5077 #109 3011 Underhill Avenue Burnaby, BC V5A 3C2 Phone: (604) 421-3288 Email: info@terrangeo.com September 18, 2017 Project No.: 5077 Kevin Brooks City of Campbell River 301 St. Ann s Road Campbell River,

More information

Marine Geophysical Methods: What Can and Cannot Be Done to Iden8fy Hazards to Dredging & Marine Construc8on

Marine Geophysical Methods: What Can and Cannot Be Done to Iden8fy Hazards to Dredging & Marine Construc8on Marine Geophysical Methods: What Can and Cannot Be Done to Iden8fy Hazards to Dredging & Marine Construc8on Marine Geophysics Sham or Savior? Seen alternatively as the silver bullet or snake oil, marine

More information

12.0 COASTAL PROCESSES

12.0 COASTAL PROCESSES 12.0 COASTAL PROCESSES 12.1 Introduction This Chapter of the EIS considers the potential and likely significant effects of the proposed alterations to the permitted development. The purpose of this chapter

More information

Review of Geotechnical and Archaeological Conditions at the Money Pit ( ) Oak Island, Nova Scotia

Review of Geotechnical and Archaeological Conditions at the Money Pit ( ) Oak Island, Nova Scotia Review of Geotechnical and Archaeological Conditions at the Money Pit (1967 2005) Oak Island, Nova Scotia Money Pit Presentation By Les MacPhie August 13, 2005 Geotechnical and Archaeological Conditions

More information

Comparison of Static and Dynamic Pile Load Tests at Thi Vai International Port in Viet Nam

Comparison of Static and Dynamic Pile Load Tests at Thi Vai International Port in Viet Nam Comparison of Static and Dynamic Pile Load Tests at Thi Vai International Port in Viet Nam Le Phan Ta, Ph.D student, Graduate School of Kanazawa University, Japan (HCMC University of Architecture, Viet

More information

Structures on and within Man-made Deposits - Kansai International Airport -

Structures on and within Man-made Deposits - Kansai International Airport - Structures on and within Man-made Deposits - Kansai International Airport - Osaka University Kazuhiro ODA Structures on and within Man-made Deposits - Kansai Airport - Outline of Kansai International Airport

More information

SASKATCHEWAN STRATIGRAPHY GLACIAL EXAMPLE BOULDERS IN GLACIAL DEPOSITS

SASKATCHEWAN STRATIGRAPHY GLACIAL EXAMPLE BOULDERS IN GLACIAL DEPOSITS SASKATCHEWAN STRATIGRAPHY GLACIAL EXAMPLE BOULDERS IN GLACIAL DEPOSITS 51 SASKATCHEWAN STRATIGRAPHY GLACIAL SURFICIAL STRATIFIED DEPOSITS 52 SASKATCHEWAN STRATIGRAPHY GLACIAL EXAMPLE OF SEDIMENT DEPOSITION

More information

Transcendent foundation solutions

Transcendent foundation solutions Spirit of Krebs Ovesen Session - Challenges in geotechnical engineering XIV ECSMGE Transcendent foundation solutions Jørgen S. Steenfelt, COWI, Denmark 1 Spirit of Krebs Ovesen Session - Challenges in

More information

Area-wide geotechnical information summary for CERA zoning review panel

Area-wide geotechnical information summary for CERA zoning review panel Area-wide geotechnical information summary for CERA zoning review panel This document contains all the area-wide geotechnical information which was considered by CERA as part of the process for making

More information

Annex B. Engineering & Planning Information Requirements

Annex B. Engineering & Planning Information Requirements Annex B Engineering & Planning Information Requirements Project Memo 21 August 2008 TO: Zoë Day FROM: Ellen Campbell cc: Ken Russell KR HMG JV Alan Wijnberg AW PRDW Justin Cross JC PRDW Kenneth Pederson

More information

Performance of Port Facilities in Southern Chile during the February 27, Maule Earthquake

Performance of Port Facilities in Southern Chile during the February 27, Maule Earthquake Performance of Port Facilities in Southern Chile during the February 27, Maule Earthquake S. Brunet, J.C de la Llera Pontificia Universidad Católica de Chile, Chile SUMMARY This article describes the seismic

More information