Bob Rettig Construction and Consulting

Size: px
Start display at page:

Download "Bob Rettig Construction and Consulting"

Transcription

1 1 Client: Sample A, Cov B Home: (714) Property: Main St. Anytown CA Operator Info: Operator: JOE Estimator: Business: Crown Valley Parkway, Suite B505 Business: (949) BRettig@RettigConsults.com Type of Estimate: Fire Date Entered: 12/7/2007 Date Assigned: Price List: Labor Efficiency: Estimate: CABD2S7D New Construction SAMPLE_A_COVB Coverage B This estimate is a guide only to be representative of the cost and scope of work required to replace the Other Structures for a moderate, 1-Story home of approximately 1920 square feet. Each property is unique in it's construction and finishes and costs must be adjusted for these and other considerations on a home by home basis

2 2 SAMPLE_A_COVB Shed 1. Storage shed - Wood - 8' x 10' 1.00 EA , , Block - 6" x 8" x 16" - in place SF Concrete slab on grade - 4" - finished in SF place 4. Concrete anchor bolt - 1/2" x 10" 8.00 EA Exterior door - solid alder - paneled 1.00 EA , , Door lockset & deadbolt - exterior 2.00 EA Seal then paint the surface area twice ( SF coats) 8. Seal & paint trim LF Stain & finish door slab only (per side) 2.00 EA Totals: Shed 3, Site Work Note: The sitework includes the replacement of the retaining wall, finish grading for the driveway and other areas detached from the house, and backfilling the retainers at the driveway. The retaining wall sits on the driveway and must be removed when the driveway is replaced. 10. Backhoe loader and operator HR , Walk behind plate compactor and HR operator 12. General Laborer - to assist with the HR , backhoe work and hand dig for steps and retaining wall footing 13. R&R Slumpstone block - 6" width SF , Block - Add if vertical reinforcement is SF " OC 15. Foundation drainage system LF Water Truck - rental (4 hr Minimum) 1.00 EA Water costs - Allowance 1.00 EA Totals: Site Work 7, SAMPLE_A_COVB 10/14/2015 Page: 2

3 3 Flatwork Note: The costs for trenching, compacting and finish grading are included in the sitework section 18. Concrete slab on grade - 4" - finished in SF , place; includes waste 19. Concrete slab reinforcement - 6" x 6", SF #10 wire mesh 20. Concrete kneewalls - 8" wall; includes SF , waste 21. Retainer Footings - labor & materials CY Reinforced; includes waste 22. Concrete step - labor & material for 3.68 CY , lower steps; includes waste 23. Concrete step - labor & material; 1.20 CY includes waste 24. Concrete slab on grade - 4" - upper SF landing; includes waste 25. Stone veneer - natural stone SF Water Truck - rental (4 hr Minimum) 1.00 EA Water costs - Allowance 1.00 EA Totals: Flatwork 9, General Conditions 28. Architectural /Engineering Fees LS , , ALLOWANCE 29. Residential supervision - per hour HR , Temporary power usage (per month) 1.00 MO Dumpster load - Approx. 12 yards, EA ton of debris Totals: General Conditions 5, Line Item Totals: SAMPLE_A_COVB 25, SAMPLE_A_COVB 10/14/2015 Page: 3

4 4 Summary for Dwelling Line Item Total 25, Material Sales 7.750% Subtotal 26, % 2, % 2, Replacement Cost Value $31, Net Claim $31, SAMPLE_A_COVB 10/14/2015 Page: 4

5 5 Recap by Room Estimate: SAMPLE_A_COVB Shed 3, % Site Work 7, % Flatwork 9, % General Conditions 5, % Subtotal of Areas % 25, Total 25, % SAMPLE_A_COVB 10/14/2015 Page: 5

6 6 Recap by Category O&P Items Total % CONCRETE & ASPHALT 8, % GENERAL DEMOLITION % DOORS 1, % HEAVY EQUIPMENT 3, % EXCAVATION % PERMITS AND FEES 1, % FINISH HARDWARE % LABOR ONLY 4, % MASONRY 2, % PLUMBING % PAINTING % TEMPORARY REPAIRS % EXTERIOR STRUCTURES 1, % O&P Items Subtotal 25, % Material Sales 7.750% % 10.0% 2, % 10.0% 2, % Total 31, % SAMPLE_A_COVB 10/14/2015 Page: 6

7 El Toro Road, Suite 101 Lake Forest, CA Phone (949) 458- Fax (949) Client: Property: Home: Sample B, Cov B Main St. Anytown, CA Main St. Anytown, CA, CA Operator Info: Operator: SCOTT Estimator: Bob Type of Estimate: Fire Date Entered: 9/10/2004 Date Assigned: Price List: Labor Efficiency: Estimate: CASD2S5D New Construction SAMPLE_B_COVB Coverage B This estimate is a guide only to be representative of the cost and scope of work required to replace the Other Structures for a moderate, 1-Story home of approximately 1335 square feet. Each property is unique in it's construction and finishes and costs must be adjusted for these and other considerations on a home by home basis.

8 El Toro Road, Suite 101 Lake Forest, CA Phone (949) 458- Fax (949) SAMPLE_B_COVB Site Work Fencing 1. Wood fence - board on board - 5'- 6' high LF , cedar or = 2. Stain - wood fence/gate - both sides 3, SF , Wood fence 3'- 4' high - split rail - Cedar LF , or equivalent - front yard by driveway and entry 4. Stain - wood fence/gate - both sides SF Totals: Fencing 10, Masonry 5. Footing (12"x12"x35')x 4' high CMU SF , wall 6. Footings - labor and materials - fish pond 1.25 CY Stone wall - natural stone - fishpond SF , Allowance for fish pond, pump and lights 1.00 EA , , Footings - labor and materials - stone 3.00 CY wall 10. Stone retaining wall - natural stone SF , Footings - labor and materials 0.50 CY Brick - Add for basketweave pattern SF Thin brick veneer - High grade SF Compaction & Soil preparation, 6" lifts CY below stone wall foundation 15. Gas Operated hand tamper for 1.00 DA recompaction of soil Totals: Masonry 19, SAMPLE_B_COVB 10/14/2015 Page: 2

9 El Toro Road, Suite 101 Lake Forest, CA Phone (949) 458- Fax (949) Landscape Note: The insurance agent's sub-contractor has supplied a landscape cost to replace lot to existing conditions before fire. 16. Landscape sub-contractor quote 1.00 EA , , Totals: Landscape 33, Total: Site Work 63, Shed LxWxH 10'0" x 8'0" x 10'0" SF Walls SF Walls & Ceiling 8.89 SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter SF Short Wall 17. Concrete pier or footing with post 6.00 EA anchor 18. 4" x 4" square wood beam (1.33 BF per LF LF) 19. Joist - floor or ceiling - 2x6 - w/blocking LF Sheathing - plywood - 3/4" CDX SF Stud wall - 2" x 6" x 8' - 24" oc LF Joist - floor or ceiling - 2x6 - w/blocking SF " oc 23. Rafters - 2x6-24" OC (3-5/12 Gable, SF per SF of floor) 24. Sheathing - waferboard - 1/2" SF Drip edge LF tab - 25 yr. - composition shingle 1.00 SQ roofing - incl. felt 27. Detach & Reset 1" x 6"T & G Cedar EA siding (.5 BF per LF) 28. Exterior door - solid core lauan / 1.00 EA mahogany or birch flush SAMPLE_B_COVB 10/14/2015 Page: 3

10 El Toro Road, Suite 101 Lake Forest, CA Phone (949) 458- Fax (949) CONTINUED - Shed 29. Door lockset & deadbolt - exterior 1.00 EA Door opening (jamb & casing) EA "to36"wide - stain grade 31. Seal & paint/finish wood siding SF Prime & paint door slab only - exterior 2.00 EA (per side) 33. Stain & finish door/window trim & 1.00 EA jamb (per side) 34. Pegboard - along one wall SF Allowance for work bench and shelves 1.00 EA Fluorescent - one tube - 4' - fixture 1.00 EA w/lens 37. Spot light fixture - double - w/motion 1.00 EA sensor 38. Wood window - double hung, sf 1.00 EA Note: As per customer description, the work shed had; Underground electrical feed 110/220 volt electric Irrigation controls Washer & dryer hook-ups * These items are not priced and will remain an open item Totals: Shed 3, Playhouse LxWxH 6'0" x 6'0" x 8'0" SF Walls SF Walls & Ceiling 4.00 SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter SF Short Wall 39. Sheathing - plywood - 3/4" CDX SF Stud wall - 2" x 4" x 8' - 24" oc LF SAMPLE_B_COVB 10/14/2015 Page: 4

11 El Toro Road, Suite 101 Lake Forest, CA Phone (949) 458- Fax (949) CONTINUED - Playhouse 41. Joist - floor or ceiling - 2x4 - w/blocking SF " oc 42. Rafters - 2x6-24" OC (3-5/12 Gable, SF per SF of floor) 43. Sheathing - waferboard - 1/2" SF Drip edge LF tab - 25 yr. - composition shingle 1.00 SQ roofing - incl. felt 46. Detach & Reset 1" x 6"T & G Cedar EA siding (.5 BF per LF) 47. Exterior door - solid core lauan / 1.00 EA mahogany or birch flush 48. Door lockset - exterior 1.00 EA Door opening (jamb & casing) EA "to36"wide - stain grade 50. Seal & paint/finish wood siding SF Prime & paint door slab only - exterior 2.00 EA (per side) 52. Stain & finish door/window trim & 1.00 EA jamb (per side) 53. Light fixture 1.00 EA Totals: Playhouse 1, General Conditions 54. General Conditions - (prorated amount LS , , based on general conditions percentage) Totals: General Conditions 5, Line Item Totals: SAMPLE_B_COVB 74, SAMPLE_B_COVB 10/14/2015 Page: 5

12 El Toro Road, Suite 101 Lake Forest, CA Phone (949) 458- Fax (949) Grand Total Areas: SF Walls SF Ceiling SF Walls and Ceiling SF Floor SY Flooring LF Floor Perimeter SF Long Wall SF Short Wall LF Ceil. Perimeter 0.00 Floor Area 0.00 Total Area 0.00 Interior Wall Area 0.00 Exterior Wall Area 0.00 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length SAMPLE_B_COVB 10/14/2015 Page: 6

13 El Toro Road, Suite 101 Lake Forest, CA Phone (949) 458- Fax (949) Summary for Dwelling Line Item Total 74, Material Sales 7.750% 2, Subtotal 77, % 7, % 7, Replacement Cost Value $91, Net Claim $91, Bob SAMPLE_B_COVB 10/14/2015 Page: 7

14 El Toro Road, Suite 101 Lake Forest, CA Phone (949) 458- Fax (949) Recap by Room Estimate: SAMPLE_B_COVB Area: Site Work Fencing 10, % Masonry 19, % Landscape 33, % Area Subtotal: Site Work 63, % Shed 3, % Playhouse 1, % General Conditions 5, % Subtotal of Areas % 74, Total 74, % SAMPLE_B_COVB 10/14/2015 Page: 8

15 El Toro Road, Suite 101 Lake Forest, CA Phone (949) 458- Fax (949) Recap by Category O&P Items Total % CONCRETE 3, % DOORS % EQUIPMENT % EXCAVATION % FENCING 8, % FINISH CARPENTRY / TRIMWORK % FINISH HARDWARE % FRAMING & ROUGH CARPENTRY 2, % LIGHT FIXTURES % MASONRY 14, % PANELING & WOOD WALL FINISHES % PAINTING 2, % ROOFING % SPECIALTY ITEMS 1, % WINDOWS - WOOD % EXTERIOR STRUCTURES 33, % O&P Items Subtotal 69, % Non-O&P Items Total % PERMITS AND FEES 5, % Non-O&P Items Subtotal 5, % O&P Items Subtotal 69, % Material Sales 7.750% 2, % 10.0% 7, % 10.0% 7, % Total 91, % SAMPLE_B_COVB 10/14/2015 Page: 9

16 1 Client: Sample C, Cov G Home: (760) Property: Main St. Cellular: (760) Anytown, CA Operator Info: Operator: BOB Estimator: Company: Rettig, Bob Bob Rettig Construction Consulting Type of Estimate: Fire Date Entered: 5/30/2008 Date Assigned: Price List: Labor Efficiency: Estimate: CASD2S7D New Construction SAMPLE_C_COVB Coverage B This estimate is a guide only to be representative of the cost and scope of work required to replace the Other Structures for a moderate, 1-Story home of approximately 1300 square feet. Each property is unique in it's construction and finishes and costs must be adjusted for these and other considerations on a home by home basis

17 2 SAMPLE_C_COVB Shed #2 LxWxH 8'0" x 6'0" x 8'0" SF Walls SF Walls & Ceiling 5.33 SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter SF Short Wall Framing 1. Drilled bottom plate - 2" x 4" treated LF lumber 2. Stud wall - 2x4 (per BF) BF " x 4" lumber (.667 BF per LF) - fire LF blocking 4. 4" x 4" rafters (1.33 BF per LF) LF Sheathing - 2" x 6" - tongue and groove SF , Note: The walls and siding were made of the same material, corrugated iron 6. Walls and siding - corrugated iron SF , Roofing 7. Roof Decking only - corrugated iron SF , Painting 8. Prime & paint metal siding - corrugated SF Totals: Shed #2 9, Work Shop Formula Gable Roof & Box 20'0" x 20'0" x 9'0" SF Walls 1, SF Walls & Ceiling SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter SF Short Wall Footing SAMPLE_C_COVB 10/14/2015 Page: 2

18 3 CONTINUED - Work Shop 9. Footings - labor & materials - Reinforced; 3.00 CY , includes waste 10. Concrete pier or footing with post EA , anchor Framing 11. Joist - floor - 4x4 - w/blocking - 24" oc SF Sheathing - plywood - 5/8" - tongue and SF groove 13. Drilled bottom plate - 2" x 4" treated LF lumber 14. Stud wall - 2x4 (per BF) BF " x 4" lumber (.667 BF per LF) - fire LF blocking 16. 6" x 6" rafters (3 BF per LF) LF , Sheathing - 2" x 6" - tongue and groove SF , Siding - board & batten - cedar SF , Plumbing 19. Rough in plumbing - per fixture 1.00 EA Water supply line - copper with fitting LF and hanger, 1" 21. Sink - single 1.00 EA Electrical 22. Breaker subpanel amp 1.00 EA Trunk cable - light gauge copper LF conductors 24. PVC schedule 40 conduit, 1" LF Light fixture 4.00 EA Outlet 8.00 EA Switch 2.00 EA Roofing 28. Roll roofing 4.84 SQ Drip edge LF Interior 30. Masonite paneling SF Shelving - 24" - in place LF , Paint wood shelving, 12"- 24" width LF coat SAMPLE_C_COVB 10/14/2015 Page: 3

19 4 CONTINUED - Work Shop Painting 33. Seal & paint/finish wood siding SF Seal & paint masonite paneling SF Flooring 35. Oak flooring - #2 common - no finish SF , Sand and seal wood floor SF , Totals: Work Shop 23, Cabin Bldg #5 LxWxH 24'0" x 14'0" x 8'0" SF Walls SF Walls & Ceiling SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter SF Short Wall Footing 37. Footings - labor & materials CY , Reinforced; includes waste 38. Concrete pier or footing with post EA , anchor Framing 39. Joist - floor - 4x4 - w/blocking - 24" oc SF Sheathing - plywood - 5/8" - tongue and SF groove 41. Drilled bottom plate - 2" x 4" treated LF lumber 42. Stud wall - 2x4 (per BF) BF " x 4" lumber (.667 BF per LF) - fire LF blocking 44. 6" x 6" rafters (3 BF per LF) LF , Sheathing - 2" x 6" - tongue and groove SF , Sheathing - plywood - 1/2" CDX SF exterior walls under 1x4 siding SAMPLE_C_COVB 10/14/2015 Page: 4

20 5 CONTINUED - Cabin Bldg #5 47. Siding - cedar slat, 1" x 4" over plywood SF , (excludes ply) Plumbing Plumbing 48. Sink - single 1.00 EA Toilet 1.00 EA Toilet seat 1.00 EA Water supply line - copper with fitting LF , and hanger, 1" 52. Exterior faucet 6.00 EA Electrical 53. Breaker subpanel amp 1.00 EA Trunk cable - light gauge copper LF , conductors 55. PVC schedule 40 conduit, 1" LF Light fixture 4.00 EA Outlet EA Switch 4.00 EA Roofing 59. Roll roofing 4.16 SQ Drip edge LF Painting 61. Seal & paint/finish wood siding SF Flooring 62. Oak flooring - #2 common - no finish SF , Sand and seal wood floor SF Totals: Cabin Bldg #5 21, SAMPLE_C_COVB 10/14/2015 Page: 5

21 6 Cabin Bldg #6 LxWxH 14'0" x 7'0" x 8'0" SF Walls SF Walls & Ceiling SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter SF Short Wall Footing 64. Footings - labor & materials CY Reinforced; includes waste 65. Concrete pier or footing with post 6.13 EA anchor Framing 66. Joist - floor - 4x4 - w/blocking - 24" oc SF Sheathing - plywood - 5/8" - tongue and SF groove 68. Drilled bottom plate - 2" x 4" treated LF lumber 69. Stud wall - 2x4 (per BF) BF " x 6" rafters (3 BF per LF) LF , Sheathing - 2" x 6" - tongue and groove SF Sheathing - plywood - 1/2" CDX SF exterior walls under 1x4 siding 73. Siding - cedar slat, 1" x 4" over plywood SF , (excludes ply) 74. Enclosure - Full Screen - Standard grade SF Plumbing 75. Sink - single 1.00 EA Toilet 1.00 EA Toilet seat 1.00 EA Water supply line - copper with fitting LF , and hanger, 1" 79. Exterior faucet 6.00 EA Electrical 80. Breaker subpanel amp 1.00 EA Trunk cable - light gauge copper LF , conductors 82. PVC schedule 40 conduit, 1" LF SAMPLE_C_COVB 10/14/2015 Page: 6

22 7 CONTINUED - Cabin Bldg #6 83. Light fixture 4.00 EA Outlet EA Switch 4.00 EA Roofing 86. Roll roofing 1.44 SQ Drip edge LF Interior 88. Masonite paneling SF Painting 89. Seal & paint/finish wood siding SF Seal & paint masonite paneling SF Flooring 91. Oak flooring - #2 common - no finish SF Sand and seal wood floor SF Windows and Doors 93. Window screen, sf 3.00 EA Note: The windows on cabins 6 & 11 had wooden shutters. These were basic wood framed, painted shutters with hinges and a hook latch. 94. Sheathing - plywood - 1/2" CDX SF " x 4" lumber (.333 BF per LF) LF Door hinges (set of 2) 3.00 EA Paint plywood sheathing SF Totals: Cabin Bldg #6 13, Cabin Bldg # SF Walls SF Walls & Ceiling SY Flooring SF Long Wall LF Ceil. Perimeter LxWxH 22'0" x 12'0" x 8'0" SF Ceiling SF Floor LF Floor Perimeter SF Short Wall SAMPLE_C_COVB 10/14/2015 Page: 7

23 8 CONTINUED - Cabin Bldg #10 Footing 98. Footings - labor & materials CY Reinforced; includes waste 99. Concrete pier or footing with post EA , anchor Framing 100. Joist - floor - 4x4 - w/blocking - 24" oc SF Sheathing - plywood - 5/8" - tongue SF and groove 102. Drilled bottom plate - 2" x 4" treated LF lumber 103. Stud wall - 2x4 (per BF); includes BF framing for built-in closet " x 6" rafters (3 BF per LF) LF , Sheathing - 2" x 6" - tongue and SF , groove 106. Sheathing - plywood - 1/2" CDX SF exterior walls under 1x4 siding 107. Siding - cedar slat, 1" x 3" over SF , plywood (excludes ply) Closet 108. Closet shelf and rod package 4.00 LF Paint wood shelving, 12"- 24" width LF coat Plumbing 110. Water supply line - copper with fitting LF , and hanger, 1" 111. Exterior faucet 2.00 EA Electrical 112. Breaker subpanel amp 1.00 EA Trunk cable - light gauge copper LF , conductors 114. PVC schedule 40 conduit, 1" LF Light fixture 2.00 EA Outlet 4.00 EA Switch 1.00 EA Roofing 118. Roll roofing 3.36 SQ SAMPLE_C_COVB 10/14/2015 Page: 8

24 9 CONTINUED - Cabin Bldg # Drip edge LF Interior 120. Masonite paneling SF Painting 121. Seal & paint/finish wood siding SF Seal & paint masonite paneling; SF includes built-in closet Flooring 123. Oak flooring - #2 common - no finish SF , Sand and seal wood floor SF Windows and Doors 125. Window screen, sf 4.00 EA Interior door closet 1.00 EA Door knob - closet 1.00 EA Paint door slab only - 2 coats (per side) 2.00 EA closet Totals: Cabin Bldg #10 19, Cabin Bldg # SF Walls SF Walls & Ceiling SY Flooring SF Long Wall LF Ceil. Perimeter LxWxH 14'0" x 14'0" x 8'0" SF Ceiling SF Floor LF Floor Perimeter SF Short Wall Footing 129. Footings - labor & materials CY Reinforced; includes waste 130. Concrete pier or footing with post EA , anchor Framing 131. Joist - floor - 4x4 - w/blocking - 24" oc SF SAMPLE_C_COVB 10/14/2015 Page: 9

25 10 CONTINUED - Cabin Bldg # Sheathing - plywood - 5/8" - tongue SF and groove 133. Drilled bottom plate - 2" x 4" treated LF lumber 134. Stud wall - 2x4 (per BF) BF " x 6" rafters (3 BF per LF) LF Sheathing - 2" x 6" - tongue and SF , groove 137. Sheathing - plywood - 1/2" CDX SF exterior walls under 1x4 siding 138. Siding - cedar slat, 1" x 3" over SF , plywood (excludes ply) Plumbing 139. Water supply line - copper with fitting LF and hanger, 1" 140. Exterior faucet 2.00 EA Electrical 141. Breaker subpanel amp 1.00 EA Trunk cable - light gauge copper LF conductors 143. PVC schedule 40 conduit, 1" LF Light fixture 2.00 EA Outlet 4.00 EA Switch 2.00 EA Roofing 147. Roll roofing 2.56 SQ Drip edge LF Interior 149. Masonite paneling SF Painting 150. Seal & paint/finish wood siding SF Seal & paint masonite paneling SF Flooring 152. Oak flooring - #2 common - no finish SF , Sand and seal wood floor SF Windows and Doors SAMPLE_C_COVB 10/14/2015 Page: 10

26 11 CONTINUED - Cabin Bldg # Window screen, sf 4.00 EA Note: The windows on cabins 6 & 11 had wooden shutters. These were basic wood framed, painted shutters with hinges and a hook latch Sheathing - plywood - 1/2" CDX SF " x 4" lumber (.333 BF per LF) LF Door hinges (set of 2) 4.00 EA Paint plywood sheathing SF Totals: Cabin Bldg #11 12, Shed Bldg #13 LxWxH 12'0" x 8'0" x 8'0" SF Walls SF Walls & Ceiling SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter SF Short Wall Footing 159. Footings - labor & materials CY Reinforced; includes waste 160. Concrete pier or footing with post 4.00 EA anchor Framing 161. Joist - floor - 4x4 - w/blocking - 24" oc SF Sheathing - plywood - 5/8" - tongue SF and groove 163. Drilled bottom plate - 2" x 4" treated LF lumber 164. Stud wall - 2x4 (per BF) BF " x 4" lumber (.667 BF per LF) - fire LF blocking " x 6" rafters (3 BF per LF) LF Sheathing - 2" x 6" - tongue and SF groove 168. Siding - board & batten - cedar SF , SAMPLE_C_COVB 10/14/2015 Page: 11

27 12 CONTINUED - Shed Bldg #13 Plumbing 169. Water supply line - copper with fitting LF , and hanger, 1" 170. Exterior faucet 2.00 EA Electrical 171. Breaker subpanel amp 1.00 EA Trunk cable - light gauge copper LF conductors 173. PVC schedule 40 conduit, 1" LF Light fixture 1.00 EA Outlet 1.00 EA Switch 1.00 EA Roofing 177. Roll roofing 1.40 SQ Drip edge LF Interior 179. Masonite paneling SF Painting 180. Seal & paint/finish wood siding SF Seal & paint masonite paneling SF Flooring 182. Oak flooring - #2 common - no finish SF Sand and seal wood floor SF Windows and Doors 184. Window screen, sf 2.00 EA Totals: Shed Bldg #13 9, SAMPLE_C_COVB 10/14/2015 Page: 12

28 13 Imp Shed Bldg # SF Walls 1, SF Walls & Ceiling SY Flooring SF Long Wall LF Ceil. Perimeter LxWxH 30'0" x 20'0" x 8'0" SF Ceiling SF Floor LF Floor Perimeter SF Short Wall Footing 185. Footings - labor & materials CY , Reinforced; includes waste Framing 186. Drilled bottom plate - 2" x 4" treated LF lumber 187. Stud wall - 2x4 (per BF) BF , " x 4" lumber (.667 BF per LF) - fire LF blocking 189. Timber joist, 4x12 - Garage header LF " x 4" rafters (1.33 BF per LF) LF Sheathing - 2" x 6" - tongue and SF , groove Note: The walls and siding were made of the same material, corrugated aluminum Walls and Siding - aluminum (.024 1, SF , thickness), corrugated or equal Plumbing 193. Water supply line - copper with fitting LF , and hanger, 1" 194. Exterior faucet 2.00 EA Electrical 195. Breaker subpanel amp 1.00 EA Trunk cable - light gauge copper LF conductors 197. Light fixture 2.00 EA Exterior light fixture 1.00 EA Outlet 4.00 EA Switch 4.00 EA Roofing 201. Roof Decking only - Corrugated SF , SAMPLE_C_COVB 10/14/2015 Page: 13

29 14 CONTINUED - Imp Shed Bldg #14 Totals: Imp Shed Bldg #14 18, Garage Formula Gable Roof & Box 20'0" x 20'0" x 9'0" SF Walls 1, SF Walls & Ceiling SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter SF Short Wall Footing 202. Footings - labor & materials CY Reinforced; includes waste Framing 203. Drilled bottom plate - 2" x 4" treated LF lumber 204. Stud wall - 2x4 (per BF) BF " x 4" lumber (.667 BF per LF) - fire LF blocking 206. Timber joist, 4x12 - Garage header LF " x 6" rafters (3 BF per LF) LF , Sheathing - 2" x 6" - tongue and SF , groove Note: The walls had corrugated iron sheathing on the inside and outside 209. Walls and siding - corrugated iron 2, SF , Roofing 210. Roof Decking only - corrugated iron SF , Painting 211. Prime & paint metal siding SF corrugated Roofing 212. Roof Decking only - Corrugated SF , Plumbing 213. Water supply line - copper with fitting LF , and hanger, 1" SAMPLE_C_COVB 10/14/2015 Page: 14

30 15 CONTINUED - Garage 214. Exterior faucet 2.00 EA Electrical 215. Breaker subpanel amp 1.00 EA Trunk cable - light gauge copper LF , conductors 217. PVC schedule 40 conduit, 1" LF Light fixture 6.00 EA Exterior light fixture 1.00 EA Outlet 4.00 EA Switch 5.00 EA Painting 222. Seal & paint/finish wood siding SF Doors 223. Sliding door - agricultural use - 7' high 1.00 EA x 8' wide WOOD BENCH Note: The custom bench is 20 lf. It is based on being constructed of 4x material " x 6" x 12' - fir/larch post - material 7.00 EA only - (82 lf required) 225. Carpenter - General Framer - per hour 8.00 HR to build bench 226. Miscellaneous framing material 1.00 EA Totals: Garage 28, Driveways LxWxH 540'0" x 16'0" x 6" SF Walls 9, SF Walls & Ceiling SY Flooring SF Long Wall 1, LF Ceil. Perimeter 8, SF Ceiling 8, SF Floor 1, LF Floor Perimeter 8.00 SF Short Wall SAMPLE_C_COVB 10/14/2015 Page: 15

31 16 CONTINUED - Driveways Subroom 1: Driveway #2 LxWxH 999'0" x 16'0" x 6" 1, SF Walls 16, SF Walls & Ceiling 1, SY Flooring SF Long Wall 2, LF Ceil. Perimeter 15, SF Ceiling 15, SF Floor 2, LF Floor Perimeter 8.00 SF Short Wall Subroom 2: Driveway #2 offset LxWxH 21'0" x 16'0" x 6" SF Walls SF Walls & Ceiling SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter 8.00 SF Short Wall Subroom 3: Driveway #3 LxWxH 300'0" x 16'0" x 6" SF Walls 5, SF Walls & Ceiling SY Flooring SF Long Wall LF Ceil. Perimeter 4, SF Ceiling 4, SF Floor LF Floor Perimeter 8.00 SF Short Wall 227. Skid steer loader and operator to scrape HR , and remove dirt at existing driveway to allow for placement of new D.G Decomposed granite - materials only TN , basic sand color 229. Delivery charge per truck (12 yards) EA , Trackhoe/excavator and operator to HR , place D.G Riding drum compactor and operator HR , Totals: Driveways 25, Windows & Doors SAMPLE_C_COVB 10/14/2015 Page: 16

32 17 CONTINUED - Windows & Doors Note: The following line item is a count for all windows and doors in the related outbuildings Wood window - horizontal sliding, EA , sf 233. Exterior door - flush or panel style 9.00 EA , Seal & paint wood window (per side) EA , Door lockset & deadbolt - exterior 9.00 EA Paint door slab only - 2 coats (per side) EA Totals: Windows & Doors 22, Fencing 237. Barbed wire fence - 5' high - 5 strand 16, LF , Totals: Fencing 117, Landscaping 238. Bid for landscape - (ALLOWANCE) 1.00 BD , , Totals: Landscaping 30, General Conditions 239. General and progressive clean - up HR , Final cleanup crew - 4 laborers DA , supervisor 241. Temporary toilet (per month) 3.00 MO Temporary power usage (per month) 3.00 MO SAMPLE_C_COVB 10/14/2015 Page: 17

33 18 CONTINUED - General Conditions 243. Temporary storage container 3.00 MO Architectural & Engineering fees 1.00 EA , , (including Title 24 calculations) - 6% of construction costs - ALLOWANCE Totals: General Conditions 41, Line Item Totals: SAMPLE_C_COVB 395, Grand Total Areas: 6, SF Walls 32, SF Ceiling 39, SF Walls and Ceiling 32, SF Floor 3, SY Flooring 4, LF Floor Perimeter 2, SF Long Wall 1, SF Short Wall 4, LF Ceil. Perimeter 0.00 Floor Area 0.00 Total Area 0.00 Interior Wall Area 0.00 Exterior Wall Area 0.00 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length SAMPLE_C_COVB 10/14/2015 Page: 18

34 19 Summary for Dwelling Line Item Total 395, Material Sales 7.750% 10, Subtotal 406, % 60, % 60, Replacement Cost Value $527, Net Claim $527, Rettig, Bob SAMPLE_C_COVB 10/14/2015 Page: 19

35 20 Recap by Room Estimate: SAMPLE_C_COVB Shed #2 9, % Work Shop 23, % Cabin Bldg #5 21, % Cabin Bldg #6 13, % Cabin Bldg #10 19, % Cabin Bldg #11 12, % Shed Bldg #13 9, % Imp Shed Bldg #14 18, % Garage 28, % Driveways 25, % Windows & Doors 22, % Fencing 117, % Landscaping 30, % General Conditions 41, % Subtotal of Areas % 395, Total 395, % SAMPLE_C_COVB 10/14/2015 Page: 20

36 21 Recap by Category O&P Items Total % AWNINGS & PATIO COVERS 20, % CLEANING 11, % CONCRETE & ASPHALT 12, % DOORS 2, % ELECTRICAL 15, % EXCAVATION 25, % FLOOR COVERING - WOOD 12, % PERMITS AND FEES 28, % FENCING 117, % FINISH CARPENTRY / TRIMWORK 2, % FINISH HARDWARE % FRAMING & ROUGH CARPENTRY 47, % LIGHT FIXTURES 1, % LANDSCAPING 30, % PLUMBING 16, % PANELING & WOOD WALL FINISHES 2, % PAINTING 8, % ROOFING 1, % SIDING 17, % TIMBER FRAMING % TEMPORARY REPAIRS % WINDOW REGLAZING & REPAIR % WINDOWS - WOOD 17, % O&P Items Subtotal 395, % Material Sales 7.750% 10, % 15.0% 60, % 15.0% 60, % Total 527, % SAMPLE_C_COVB 10/14/2015 Page: 21

37 1 Client: Home: Sample D, Cov B Main St. Anytown, CA Operator Info: Operator: ROB Estimator: Bob Reference: Company: Bob Rettig Construction & Consulting Type of Estimate: Fire Price List: Labor Efficiency: Estimate: CABD2S5C New Construction SAMPLE_D_COVB Coverage B This estimate is a guide only to be representative of the cost and scope of work required to replace the Other Structures for a moderate, 2-Story home of approximately 1373 square feet. Each property is unique in it's construction and finishes and costs must be adjusted for these and other considerations on a home by home basis.

38 2 SAMPLE_D_COVB Driveway LxWxH 30'0" x 23'0" x 6" SF Walls SF Walls & Ceiling SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter SF Short Wall 1. Building foundation excavation 8.52 CY Walk behind plate compactor and 3.45 HR operator 3. Concrete slab on grade - 4" - finished in SF , place 4. Concrete slab reinforcement - 6" x 6", SF #10 wire mesh 5. Concrete pump setup charge 1.00 EA Concrete pump per yard 8.52 CY Totals: Driveway 4, General Conditions 7. General Conditions - (prorated amount LS , , based on general conditions percentage) Totals: General Conditions 1, Line Item Totals: SAMPLE_D_COVB 6, SAMPLE_D_COVB 10/14/2015 Page: 2

39 3 Grand Total Areas: SF Walls SF Ceiling SF Walls and Ceiling SF Floor SY Flooring LF Floor Perimeter SF Long Wall SF Short Wall LF Ceil. Perimeter 0.00 Floor Area 0.00 Total Area 0.00 Interior Wall Area 0.00 Exterior Wall Area 0.00 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length SAMPLE_D_COVB 10/14/2015 Page: 3

40 4 Summary for Dwelling Line Item Total 6, Material Sales 7.750% Subtotal 6, % % Replacement Cost Value $7, Less Depreciation (1,667.60) Actual Cash Value $5, Net Claim $5, Total Recoverable Depreciation 1, Net Claim if Depreciation is Recovered $7, Bob SAMPLE_D_COVB 10/14/2015 Page: 4

41 5 Recap by Room Estimate: SAMPLE_D_COVB Driveway 4, % General Conditions 1, % Subtotal of Areas % 6, Total 6, % SAMPLE_D_COVB 10/14/2015 Page: 5

42 6 Recap by Category with Depreciation O&P Items RCV Deprec. ACV CONCRETE 4, , , EXCAVATION O&P Items Subtotal 4, , , Non-O&P Items RCV Deprec. ACV PERMITS AND FEES 1, , Non-O&P Items Subtotal 1, , O&P Items Subtotal 4, , , Material Sales 7.750% % % Total 7, , , SAMPLE_D_COVB 10/14/2015 Page: 6

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

CNC Catastrophe & National Claims

CNC Catastrophe & National Claims 1 Insured: Howard Odom Cellular: (903) 235-9546 Property: 2860 Highway 4A Century, FL 32535 Claim Rep.: Jenielle Desmangles Business: (561) 988-9170 x 3591 Company: People's Trust Insurance Company Business:

More information

Claim Rep.: Don Draughon Business: (818) Estimator: Michael Miller Business: (760)

Claim Rep.: Don Draughon Business: (818) Estimator: Michael Miller Business: (760) 1 Insured: Property: Venice Motel 1114 N. Golden State Blvd Turlock, CA 95380 Claim Rep.: Don Draughon Business: (818) 721-4280 Estimator: Michael Miller Business: (760) 985-9951 Contractor: Business:

More information

Rapid Response Team, LLC

Rapid Response Team, LLC 1 Insured: Cordero, Esther Home: (407) 433-6956 Property: 602 Green Dr. Kissimmee, FL 34759 Claim Rep.: Taye Garnett Business: (561) 988-9170 x 3612 Position: Claims Adjuster E-mail: tgarnett@peoplestrustinsurance.

More information

BUILDING HOME CONSTRUCTION

BUILDING HOME CONSTRUCTION 1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68

More information

Business: Address, City, State, zip code

Business: Address, City, State, zip code Insured: Property: X X X X X X X X X Reference: Company: XXXXX Sample State Insurance Contractor: xxxxxx xxxx Business: (xxx) xxx-xxxx Company: xxxxx xxxxx xxx. E-mail: xxxxxx@gmail.com Business: Claim

More information

HomeWorks Construction

HomeWorks Construction 1 Client: Kain - Put Back Home: Property: 11888 N. Coquillard Dr. South Bend, IN 46617 Operator: NKAIN Estimator: Adam Brown Business: (574) 876-8060 Company: Home Works E-mail: abrown@gohomeworks.com

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Property: Sample A, Coverage A Main St. Anytown 92341 Operator Info: Operator: JOE Estimator: Bob Type of Estimate: Fire Date Entered: 10/14/2015 Date Assigned: Price List: Labor Efficiency:

More information

Claim Number: Policy Number: Type of Loss: Fire

Claim Number: Policy Number: Type of Loss: Fire 1 Insured: Property: Claim Rep.: Estimator: Claim Number: Policy Number: Type of Loss: Fire Date of Loss: 2016 Date Received: 2016 Date Inspected: Date Entered: 2016 Price List: Estimate: The preceding

More information

Contractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587

Contractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587 Property: Any Street Pasadena, TX 77505 Estimator: Butch Bragg Contractor: Business: (281) 998-1800 Company: A- Select Services Business: suite 200 South Houston, TX 77587 Claim Number: Policy Number:

More information

Barrier Free Accessibility

Barrier Free Accessibility 1 Insured: George Robertson Home: (555) 555-5555 Property: 7930 Marshalls Corner Rd Pomfret, MD 20675 Claim Rep.: - Estimator: Tom Balmes Business: (586) 859-8042 Company: REPS Business: 26215 Pattow Roseville,

More information

The Highland - List of materials needed to construct a weather tight home.

The Highland - List of materials needed to construct a weather tight home. Page:1 The Highland - List of materials needed to construct a weather tight home. PLEASE NOTE: 1. 'While every attempt has been made in the preparation of this materals list to avoid mistakes, B&H Cedar

More information

Remediation One Corporation

Remediation One Corporation 1 Insured: Property: William Monteagudo & Yirenia Benitez 10400 SW 164 Street Miami, FL 33157 Claim Rep.: Jose R. Armas Business: (844) 473-6663 E-mail: info@remediationone.com Estimator: Jose R. Armas

More information

Insured: Ana Cid Home: (714) Property: Vista View Lake Elsinore, CA 92530

Insured: Ana Cid Home: (714) Property: Vista View Lake Elsinore, CA 92530 1 Insured: Ana Cid Home: (714) 515-9871 Property: 15002 Vista View Lake Elsinore, CA 92530 Claim Rep.: Doug Felberg Business: (916) 694-8006 E-mail: d.felberg@pacificspecialty.com Estimator: Bryan Reece

More information

Insured: Ana Cid Home: (714) Property: Vista View Lake Elsinore, CA 92530

Insured: Ana Cid Home: (714) Property: Vista View Lake Elsinore, CA 92530 1 Insured: Ana Cid Home: (714) 515-9871 Property: 15002 Vista View Lake Elsinore, CA 92530 Claim Rep.: Doug Felberg Business: (916) 694-8006 E-mail: d.felberg@pacificspecialty.com Estimator: Bryan Reece

More information

Restoration Management Company

Restoration Management Company 1 Insured: Sandoval, Evangelina Home: (209) 669-6960 Property: 4112 Summerfield Drive Turlock, CA 95382 Claim Rep.: Pacific Specialty/ Chima, Mandy Business: (916) 637-8231 Fax: (650) 780-4820 E-mail:

More information

Rainbow International of Buena Park

Rainbow International of Buena Park 1 Insured: TRAN KATHY Home: (626) 214-6947 Property: 15634 Briarbank St La Puente, CA 91744 Claim Rep.: Erika Lister Business: (650) 644-8218 Company: Pacific Specialty Estimator: Nathan Lingurar Business:

More information

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226 1 Insured: Property: SHANE KATZ 198 S. HOLLAND ST. LAKEWOOD, CO 80226 Estimator: James Mosel Business: (720) 456-8329 Business: E-mail: james@trinityconstructionserv Aurora, CO 80017 ices.com Claim Number:

More information

OUR TEAM SHEET INDEX CIVIL C O V E R S H E E T. T H E C O V E A T P A C I F I C A S A N J U A N S a n J u a n C a p i s t r a n o, C A

OUR TEAM SHEET INDEX CIVIL C O V E R S H E E T. T H E C O V E A T P A C I F I C A S A N J U A N S a n J u a n C a p i s t r a n o, C A OUR TEAM SHEET INDEX OWNER/DEVELOPER: PACIFIC POINT DEVELOPMEN PARTNERS LLC CONTACT: MATTHEW LAND 100 SPECTRUM CENTER DR, SUITE 1450 BUSINESS: (949) 341-1237 IRVINE, CA 92618 ARCHITECT / PLANNER: BASSENIAN

More information

OUR TEAM SHEET INDEX CIVIL C O V E R S H E E T. T H E C O V E A T P A C I F I C A S A N J U A N S a n J u a n C a p i s t r a n o, C A

OUR TEAM SHEET INDEX CIVIL C O V E R S H E E T. T H E C O V E A T P A C I F I C A S A N J U A N S a n J u a n C a p i s t r a n o, C A OUR TEAM SHEET INDEX OWNER/DEVELOPER: PACIFIC POINT DEVELOPMEN PARTNERS LLC CONTACT: MATTHEW LAND 100 SPECTRUM CENTER DR, SUITE 1450 BUSINESS: (949) 341-1237 IRVINE, CA 92618 ARCHITECT / PLANNER: BASSENIAN

More information

E-Invoice. Total. ibuild,inc. Subtotal. Sales Tax (0.0%) 3000 S Jamiaca Ct Suite 210 Aurora, CO Date 12/2/

E-Invoice. Total. ibuild,inc. Subtotal. Sales Tax (0.0%) 3000 S Jamiaca Ct Suite 210 Aurora, CO Date 12/2/ Item Description Qty U/M Rate 3 Bedroom 2 1/2 Bath Two Story 1962 Square Feet Flooring Misc Flooring 100% Solution Dyed BCF Polyester 970 0.00T Misc Flooring 5lbs 3/8 Rebond pad 970 0.00T Misc Flooring

More information

Lumber Supplies and Equipment. South Texas Moulding DBA Texas Wood Supply. McCoy's Building Supply. Precision Saw & Tooltex, Inc.

Lumber Supplies and Equipment. South Texas Moulding DBA Texas Wood Supply. McCoy's Building Supply. Precision Saw & Tooltex, Inc. Regular Lumber 2X4 Pre cut studs 1 200 Each 2x4-8' White pine 2 200 Each 2x4-12' White pine 3 200 Each 2x4-14' White pine 4 200 Each 2x4-16' White pine 5 200 Each 2x6-8' White pine 6 200 Each 2.88 0.29

More information

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days Independent Government Estimate Updated 6/22/18 Title Page Estimated by NAVFAC Cost Designed by Prepared by NAVFAC Cost Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction

More information

Prime6400 Software. Furnish and Install: Architectural Metalwork. SS Counter Tops Metal Brackets Metal Tops Metal Wall Panels

Prime6400 Software. Furnish and Install: Architectural Metalwork. SS Counter Tops Metal Brackets Metal Tops Metal Wall Panels To: Prime Estimating & Software Services, LLC 4248 Kensington High Street Naples, Florida, U.S.A. 3405 Att: Doug Baxter Phone: (239) 213-1237 Fax: (239) 213-1237 Project: Mock Metalwork Project Address:

More information

2018 North Carolina Residential Code Prescriptive Tables for Selection of Support Elements for Beams, Girders, and Headers: Example Problems

2018 North Carolina Residential Code Prescriptive Tables for Selection of Support Elements for Beams, Girders, and Headers: Example Problems 2018 North Carolina Residential Code Prescriptive Tables for Selection of Support Elements for Beams, Girders, and Structural Building Components Association (SBCA) August 10, 2018 SBCA is an APPROVED

More information

Getting to know you and your home.

Getting to know you and your home. Getting to know you and your home. Date of Meeting Customer Name(s) Property Address Sales Associate Seller Assessment Please share with me why you re moving. What is your ideal timeframe in making this

More information

COST SEGREGATION. For Building Owners

COST SEGREGATION. For Building Owners 180 Montgomery Street Suite 1950 San Francisco, CA 94104 phone : 415.394.7200 fax : 415.398.6501 web : moskowitzllp.com COST SEGREGATION For Building Owners 2 Moskowitz, LLP What is Cost Segregation? Cost

More information

Sample Preliminary Cost Estimate Solana Consultants

Sample Preliminary Cost Estimate Solana Consultants Sample Preliminary Cost Estimate Solana Project Number: Project Name: Address: 1111 Summer St., Anywhere, CA 99990 Date: 1/1/2007 Estimator: Norman Shaw 05-102 Sample Preliminary Estimate Privileged information

More information

Abitare Homeowners Association. Reserve Management Plan Type 1

Abitare Homeowners Association. Reserve Management Plan Type 1 Reserve Management Plan Type 1 Reserve Study With On-Site Analysis For 30-Year Projection Period Beginning January 1, 2016 Cover January 1, 2016 Page 2 Abitare Homeowners Association Reserve Management

More information

Getting to Know You and Your Home.

Getting to Know You and Your Home. Getting to Know You and Your Home. Date of Meeting Customer Name Property Address Sales Associate Seller Assessment Please share with me why you re moving. What is your ideal timeframe in making this move?

More information

Simple Building Estimating. Example Reports

Simple Building Estimating. Example Reports Simple Building Estimating Example Reports Image franckito / 123RF Stock Photo Table of Contents Software and data Snape Computers Ltd 1996 2017 Full Labour, Material, Plant, SubContract, etc Detailed

More information

RECAP Bid # Due Date:

RECAP Bid # Due Date: Page 1 of 9 01 2 X 4 X 8 STUDS, HEM FIR 3.88 2.99 2.99 02 2 X 4 X 8 STUDS 3.88 3.60 3.60 03 2 X 4 X 92-5/8 STUDS, HEM FIR 4.14 3.15 3.15 04 2 X 4 X 10 HEM FIR 4.85 4.50 4.50 05 2 X 4 X 12 HEM FIR 5.83

More information

REMARKS. WALLS Damaged q yes q no

REMARKS. WALLS Damaged q yes q no KITCHEN CEILING Damaged q yes q no q tiles q nail pops q stains/tested dry q advise small cosmetic repairs WALLS Damaged q yes q no q vinyl q nail pops q stains/tested dry q advise small cosmetic repairs

More information

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) BUILDING AND SAFETY DIVISION TELEPHONE (949) 724-6300 BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) Payment: When a plan is required by the Administrative Authority to be submitted, a plan check

More information

Tropical E.S. - BUDGET

Tropical E.S. - BUDGET Tropical E.S. - BUDGET Replace HVAC Chiller and Cooling Tower Description Budget COMMENTS GMP Design $45,90.92 Heard Construction $5,885.00 DDC Engineering Sub-Total Overhead @ 0% Profit @ 5% Contingency

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/11/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/11/2013 BUILDING SURVEY DATE 0912 201 HAZELWOOD DRIVE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.137 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,205,100 LABORATORY BUILDING GROSS SQUARE FEET

More information

PROPACIFIC BUILDERS CORPORATION

PROPACIFIC BUILDERS CORPORATION EXHIBIT A - COST PROPOSAL (1 of 10) PROPACIFIC BUILDERS CORPORATION (Formerly Guam Yooshin Corp.) P.O. Box 7446 TAMUNING, GUAM 96931 TEL 671-477-3109, FAX 671-477-7424 EMAIL: jgyc@guam.net September 01,

More information

Introduction...COMB-2 Design Considerations and Examples...COMB-3

Introduction...COMB-2 Design Considerations and Examples...COMB-3 SECTION DIRECTORY General Information Introduction...COMB-2 Design Considerations and Examples...COMB-3 Combination Assembly Recommendations and Limitations Composite Configurations...COMB-4 Typical Sealant

More information

Estate Sale Pros. Only 1Day. LIVING ESTATE SALE Saturday August 8 NOON 5:00pm. L i v i n g E s t a t e S a l e Mount Royal

Estate Sale Pros. Only 1Day. LIVING ESTATE SALE Saturday August 8 NOON 5:00pm. L i v i n g E s t a t e S a l e Mount Royal Estate Sale Pros L i v i n g E s t a t e S a l e Mount Royal Only 1Day 1305 Frontenac Ave. SW Calgary, AB T2T 1C1 LIVING ESTATE SALE Saturday August 8 NOON 5:00pm Contents for Sale by Owner/Executor Welcome

More information

OnSight PROS Report Professional Documentation

OnSight PROS Report Professional Documentation OnSight PROS Report Professional Documentation The Attached Report is performed by OnSight PROS, LLC Certified Field Inspectors and thus should not be confused with an inspection performed by Licensed

More information

NAIL SECTION TABLE OF CONTENTS

NAIL SECTION TABLE OF CONTENTS NAIL SECTION TABLE OF CONTENTS ANCHOR TRUSS BOX NAILS-1 NAILS-1 COMMMON NAILS-1 & 2 DECK NAILS NAILS-2 & 3 DRYWALL DUPLEX FINISH FLOOR - HARD SCREW NAILS-4 NAILS-4 NAILS-5 NAILS-5 MASONRY - STUB NAILS-6

More information

Temple City Unified School District Committed to 21 st Century Academic Excellence

Temple City Unified School District Committed to 21 st Century Academic Excellence Temple City Unified School Committed to 21 st Century Academic Excellence Board of Education Members Vinson Bell George M. Goold Kenneth Knollenberg Lawrence A. Marston John Pomeroy Superintendent Kathryn

More information

Historic Cultural Properties Inventory (HCPI) Base Form (FORM 1)

Historic Cultural Properties Inventory (HCPI) Base Form (FORM 1) Historic Cultural Properties Inventory (HCPI) Base Form (FORM 1) Historic Preservation Division, New Mexico Office of Cultural Affairs For HPD Office use only: HCPI No. District No. NRHP: SRCP: Criteria:

More information

Home Inspection Report

Home Inspection Report Home Inspection Report Michael Donitzen 3460 White Oak Drive Harrisonburg, Va 22801 540-830-0259 VA Lic# 2705151782~WVa Lic# HI8300259-0515~NRPP Radon #102759RT WV Radon # RT000575~CMI Mold # 81931~NACHI#

More information

S a c r a m e n t o S t r e e t, S a n F r a n c i s c o. M a l i n G i d d i n g s & M a x A r m o u r

S a c r a m e n t o S t r e e t, S a n F r a n c i s c o. M a l i n G i d d i n g s & M a x A r m o u r PAC I F I C H E I G H T S H i s t o r i c Q u e e n A n n e M a n s i o n 2 2 2 0 S a c r a m e n t o S t r e e t, S a n F r a n c i s c o P r e s e n t e d b y : M a l i n G i d d i n g s & M a x A r

More information

a s o p h i s t i c a t e d t r a n s l a t i o n o f t h e c o n t e m p o r a r y l i f e s t y l e

a s o p h i s t i c a t e d t r a n s l a t i o n o f t h e c o n t e m p o r a r y l i f e s t y l e a s o p h i s t i c a t e d t r a n s l a t i o n o f t h e c o n t e m p o r a r y l i f e s t y l e B E D R O O M s i m p l e a n d u n e n c u m b e r e d, f r e s h d e s i g n i s i n s p i r e d

More information

Snow Melting Design Guide: Heated Walkways and Paths

Snow Melting Design Guide: Heated Walkways and Paths Snow Melting Design Guide: Heated Walkways and Paths What is a Snow Melting System? Have you ever seen snow fall on an already warm car? It melts instantly. This is the essential idea behind snow melting

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

FILED: QUEENS COUNTY CLERK 11/03/ :30 PM INDEX NO /2016 NYSCEF DOC. NO. 1 RECEIVED NYSCEF: 11/03/2016

FILED: QUEENS COUNTY CLERK 11/03/ :30 PM INDEX NO /2016 NYSCEF DOC. NO. 1 RECEIVED NYSCEF: 11/03/2016 FILED: QUEENS COUNTY CLERK 11/03/2016 01:30 PM INDEX NO. 713208/2016 NYSCEF DOC. NO. 1 RECEIVED NYSCEF: 11/03/2016 SUPREME COURT OF THE STATE OF NEW YORK COUNTY OF QUEENS Our File Number: 42012961 In the

More information

13 PRAIRIE 1A A LOW E R B LOW E R C UPPER D UPPER E UPPER UNIT B UNIT A

13 PRAIRIE 1A A LOW E R B LOW E R C UPPER D UPPER E UPPER UNIT B UNIT A B U I L D I N G M O D E L E L E V A T I O N 13 PRAIRIE 1A UNIT B UNIT A S I T E P L A N K E Y B U I L D I N G M O D E L E L E V A T I O N 13 PRAIRIE 1A UNIT D UNIT C UNIT E W W W. C O P P E R R A N C H.

More information

Peavine Estates HOA. Annual Review Without Site Visit. Better Reserve Consultants. Start Date: 01/01/2015. Mari Jo Betterley, RSS

Peavine Estates HOA. Annual Review Without Site Visit. Better Reserve Consultants. Start Date: 01/01/2015. Mari Jo Betterley, RSS Peavine Estates HOA Annual Review Without Site Visit Start Date: 01/01/2015 Better Reserve Consultants Mari Jo Betterley, RSS 0000025 Table of Contents Introduction Page 1 Important Information Page 8

More information

Snow Melting Design Guide: Accessibility Ramps (Concrete and Pavers)

Snow Melting Design Guide: Accessibility Ramps (Concrete and Pavers) Snow Melting Design Guide: Accessibility Ramps (Concrete and Pavers) What is a Snow Melting System? Have you ever seen snow fall on an already warm car? It melts instantly. This is the essential idea behind

More information

m e a d o w v i e w H A I L W E S T O N t h r e e e x c l u s i v e d e t a c h e d f a m i l y h o m e s s e t i n a r u r a l l o c a t i o n

m e a d o w v i e w H A I L W E S T O N t h r e e e x c l u s i v e d e t a c h e d f a m i l y h o m e s s e t i n a r u r a l l o c a t i o n m e a d o w v i e w t h r e e e x c l u s i v e d e t a c h e d f a m i l y h o m e s s e t i n a r u r a l l o c a t i o n P L O T O N E F o u r b e d r o o m d e t a c h e d P L O T O N E F o u r b e

More information

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET ALAMEDA ISLES PROPOSED BUDGET FACT SHEET These sheets outline the proposed 2015/2016 budget in two parts. The first part is the operating budget which shows our income and anticipated expenses with a comparative

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

EXHIBIT H LOT 317 GRADING AND SITE PLAN

EXHIBIT H LOT 317 GRADING AND SITE PLAN EXHIBIT H LOT 317 GRADING AND SITE PLAN EXHIBIT I LOT 317 ELEVATIONS ridge height 4915'-6" GENERAL & KEYED NOTES ridge height 4905'-9" 3 7 4 A5.1 1 5 ridge height 4910'-6" 2 ridge height 4906'-3" 1 Provide

More information

Public Building Commission of Chicago Contractor Payment Information

Public Building Commission of Chicago Contractor Payment Information Public Building Commission of Chicago Contractor Payment Information Project: CTA Bus Garage Program Contract Number: C16FT101914777 General Contractor: Co. Payment Application: #8R Amount Paid: $ 1,333,451.78

More information

Check Sheet Only FOR PPI s

Check Sheet Only FOR PPI s Page 1 Check Sheet Only FOR PPI s Weather conditions at the time of the inspection: ( ) Dry ( ) Wet ( ) Intermittent rain Access: Are there any areas and/or section to which access should be gained ( )

More information

Building Envelope Requirements Overview Page 3-4

Building Envelope Requirements Overview Page 3-4 Building Envelope Requirements Overview Page 3-4 The benefit of a high reflectance surface is obvious: while dark surfaces absorb the sun s energy (visible light, invisible infrared. and ultraviolet radiation)

More information

Sample Condominium Association. Supplementary Schedules Reserve Management Plan. Example only. Reserve Study with On-Site Analysis.

Sample Condominium Association. Supplementary Schedules Reserve Management Plan. Example only. Reserve Study with On-Site Analysis. Supplementary Schedules Reserve Management Plan Reserve Study with On-Site Analysis Cover For 30-Year Projection Period Beginning January 1, 2016 Attached exhibits consist of component level detail reports.

More information

a t ra d i t i o n a l l o o k o f c l a s s i c s o l i d w a l n u t t h a t captures the essence of a classic American farmhouse

a t ra d i t i o n a l l o o k o f c l a s s i c s o l i d w a l n u t t h a t captures the essence of a classic American farmhouse Vintage Walnut a t ra d i t i o n a l l o o k o f c l a s s i c s o l i d w a l n u t t h a t captures the essence of a classic American farmhouse Opposite Page 35-041B Secretary Base, 35-041D Secretary

More information

confront fury

confront fury confront WINTER S fury WITH A COTECH SNOW PLOW www.cotech.ca table of content mission...2 Snow Removal Equipment...4 Snow plows with a trip system... 4 Extendable Reversible Snow Plows... 6 Inverted Snow

More information

c e l e b r a t i n g t h e m a r r i a g e o f S h a k e r a n d C o n t e m p o r a r y d e s i g n

c e l e b r a t i n g t h e m a r r i a g e o f S h a k e r a n d C o n t e m p o r a r y d e s i g n c e l e b r a t i n g t h e m a r r i a g e o f S h a k e r a n d C o n t e m p o r a r y d e s i g n B E D R O O M g r a c e f u l c u r v e s a n d t a p e r e d l e g s a r e d e f i n e d b y e i t

More information

12300 SWANHAVEN DR, OK 73170, OKLAHOMA CITY, OK

12300 SWANHAVEN DR, OK 73170, OKLAHOMA CITY, OK 300 SWANHAVEN DR, OK 73170, OKLAHOMA CITY, OK 73170 942 Property Address 300 SWANHAVEN DR, OK 73170 OKLAHOMA CITY, OK 73170 Latitude: 40.00001 Longitude: -90.00001 Details Claim Number: RAM-5623448 Requested:

More information

a t r a n s i t i o n a l s t y l e d c o l l e c t i o n i n s p i r e d b y t h e I t a l i a n R e n a i s s a n c e

a t r a n s i t i o n a l s t y l e d c o l l e c t i o n i n s p i r e d b y t h e I t a l i a n R e n a i s s a n c e a t r a n s i t i o n a l s t y l e d c o l l e c t i o n i n s p i r e d b y t h e I t a l i a n R e n a i s s a n c e B E D R O O M t r a n s i t i o n a l s t y l e i n w h i c h I t a l i a n R e n

More information

PONDEROSA. June 4, Troy Fujimoto Senior Planner City of Pleasant Hill 100 Gregory Lane Pleasant Hill, CA

PONDEROSA. June 4, Troy Fujimoto Senior Planner City of Pleasant Hill 100 Gregory Lane Pleasant Hill, CA Attachment B PONDEROSA June 4, 2018 Troy Fujimoto Senior Planner City of Pleasant Hill 100 Gregory Lane Pleasant Hill, CA 94523. H 0 M ES Re: Reliez Terrace ARC Study Session Submittal Dear Troy, Ponderosa

More information

Woodside Homes Association

Woodside Homes Association Woodside Homes Association Full Reserve Study Start Date: 01/01/2017 Better Reserve Consultants RSS Mari Jo Betterley, RSS 0000025 Table of Contents Introduction Page 3 Important Information Page 11 Pictures

More information

Appendix C Benchmarking Cost Estimates

Appendix C Benchmarking Cost Estimates REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall

More information

Real Estate Investor Calculator Project Workbook. Quick Estimate Factors MAIN DATA ENTRY

Real Estate Investor Calculator Project Workbook. Quick Estimate Factors MAIN DATA ENTRY MAIN DATA ENTRY 1 2 Current List / Asking Price: $ 175,000.00 Project Updated: 12/18/17 Original or Current Appraised / Market Value / AsIs: $ 180,000.00 AsIs Date: 12/18/17 Est. Resale Value / Post Renovations

More information

e v o l v i n g t h e c l a s s i c g r a c e o f a u t h e n t i c L o u i s P h i l i p p e s t y l i n g a n d b e a u t y

e v o l v i n g t h e c l a s s i c g r a c e o f a u t h e n t i c L o u i s P h i l i p p e s t y l i n g a n d b e a u t y e v o l v i n g t h e c l a s s i c g r a c e o f a u t h e n t i c L o u i s P h i l i p p e s t y l i n g a n d b e a u t y Opposite Page 53-105 Drawer Chest 1 B E D R O O M shown in Antique Brown shown

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

Allowable Design Stresses (psi)

Allowable Design Stresses (psi) 8 0 0. 2 2 1. 2 3 2 6 w w w. a n t h o n y f o r e s t. c o m 2 Allowable Design Stresses (psi) Power Beam Section Properties and Allowable Capacities 7.0 9.0 9.2 10.9 11.6 13.6 15.6 17.5 11.1 14.1 14.5

More information

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing

More information

Hanson Overhead Garage Door Company proudly presents: Residential 400 Series

Hanson Overhead Garage Door Company proudly presents: Residential 400 Series Hanson Overhead Garage Door Company proudly presents: Residential 400 Series 410 411 Traditional Raised Panel 410 411 EFFICIENCY 6.85 R-VALUE INTERIOR VINYL SKIN Constructed of top quality materials, highly

More information

SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B )

SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B ) SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B ) Sl. 1 2 Description of Work Supply,Erection & Commissioning of 2 x 3.15 MVA, New 33/11 KV Primary

More information

Source: % % FINANCING SHORT TERM HOLDING / RESALE. 30 Maximun Offer to Resell (Fix/Flip): $ 424,000.00

Source: % % FINANCING SHORT TERM HOLDING / RESALE. 30 Maximun Offer to Resell (Fix/Flip): $ 424,000.00 MAIN DATA ENTRY Current List / Asking Price: $ 499,000.00 Project Updated: 11/15/17 Original or Current Appraised / Market Value / AsIs: $ 520,000.00 AsIs Date: 11/1/17 Est. Resale Value / Post Renovations

More information

6 2 2 C u r t i s S t r e e t A l b a n y, C A

6 2 2 C u r t i s S t r e e t A l b a n y, C A S e c o n d S t o r y A d d i t i o n 6 C u r t i s S t r e e t A l b a n y, C A architect P r o j e c t D a t a P r o j e c t D e s c r i p t i o n S y m b o l s a n d A b b r e v i a t i o n s I n d

More information

Learning Outcome 4 Measurement

Learning Outcome 4 Measurement Maths in Context Learning Outcome 4 Measurement Exercise Book Learning Outcome 4 Exercise 1 Select the most appropriate metric units for measuring each item. 1. The height of a person: (A) mm (B) cm (c)

More information

A new concept in stove fitting

A new concept in stove fitting Proud to be British A new concept in stove fitting Create the perfect fireplace for your stove The Stove Box has been designed to keep site work to a minimum, cutting this down from a 2 day job into less

More information

https://www.bpofulfillment.com/.aspx?control=findbpo&assetid=&orderid=2005494 1h : 59m : 54s Order : Inspection Date: 11 / 02 / 2013 Information Source: Tax data Property Type: SFD APN (Tax ID number):

More information

Executive Landing HOA Reserve Study - Level I as of January 1, 2015

Executive Landing HOA Reserve Study - Level I as of January 1, 2015 Reserve Study - Level I as of January 1, 2015 % Best Management Anywhere, Georgia 30127 c/o Best Management Contact: Christine 5200 Dallas Hwy Suite 200 PMB 274 Anywhere, GA 30127 Copyright 1989-2011 All

More information

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM

More information

Exhibit "A" Date: 1/27/2011

Exhibit A Date: 1/27/2011 Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase

More information

ST. DAVID S COURT DUBLIN 5

ST. DAVID S COURT DUBLIN 5 ST. DAVID S COURT DUBLIN 5 ST. DAVID S COURT DUBLIN 5 St. David s Court is a modern development of four and five-bedroom family homes nestled in a quiet suburban setting located off the Malahide Road.

More information

Sign Code Amendment: Illustrated Definitions. Prepared for the Monday, May 15, 2017 Planning Commission Work Session Meeting

Sign Code Amendment: Illustrated Definitions. Prepared for the Monday, May 15, 2017 Planning Commission Work Session Meeting Sign Code Amendment: Illustrated Definitions Prepared for the Monday, May 15, 2017 Planning Commission Work Session Meeting SIGN Any o letter, o word or symbol, o poster, o picture, o reading matter, or

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

D U P L E X D E S I G N G U I D E L I N E S

D U P L E X D E S I G N G U I D E L I N E S PURPOSE As The City Beautiful, Orlando s vision is defined by a focus on its amenities. One of the key elements of that vision is strong urban design. Attention to building design encourages an aesthetically

More information

Handsome Traditional East Wilmette Home

Handsome Traditional East Wilmette Home p 847.446.9600 T h e h u d s o n c o m p a n y 851 spruce street, Winnetka, Illinois 60093 6 0 6 L a k e A v e n u e Handsome Traditional East Wilmette Home Listing agent Contact mary bradbury and julie

More information

Visit any one of our 30 locations or visit us on line at

Visit any one of our 30 locations or visit us on line at TYPE IA ALUMINUM 2886509079 2886501870 2886510013 2886510010 2886510014 2886504441 AS3002 2' TYPE IA AS3003 3' TYPE IA AS3004 4' TYPE IA AS3006 6' TYPE IA AS3008 8' TYPE IA AS3010 10' TYPE IA 34.99 57.99

More information

Independent Accountant's Compilation Report

Independent Accountant's Compilation Report MILLER, BRUSSELL, EBBEN AND GLAESKE LLC CERTIFIED PUBLIC ACCOUNTANTS POST OFFICE BOX 585 PORTAGE, WISCONSIN 53901 Independent Accountant's Compilation Report Saddle Ridge Association Ltd A Wisconsin Homeowners

More information

Fee Schedule. Inspections Department City of Burlington, NC

Fee Schedule. Inspections Department City of Burlington, NC Fee Schedule Inspections Department City of Burlington, NC Effective 2012 Table of Contents Building Permit Fees Residential 3 Commercial 4 Electrical Permit Fees 5 Mechanical Permit Fees 6 Plumbing Permit

More information

Walnut Creek Mutual No. Sixty-Eight Comparison of 2017 Budget to 2018 Budget Per Manor per Month

Walnut Creek Mutual No. Sixty-Eight Comparison of 2017 Budget to 2018 Budget Per Manor per Month Comparison of 2017 Budget to Per Manor per Month Mutual Operations & Maintenance 2017 2018 Increase/ % $/M/M $/M/M (Decrease) Change Expenses MOD Management Fee 44.88 48.73 3.85 8.6% Building Maint. &

More information

From Table 1 4. DL = [12 lb/ft 2 # in.(6 in.)] (15 ft)(10 ft) = 10,800 lb. LL = (250 lb/ft 2 )(15 ft)(10 ft) = 37,500 lb.

From Table 1 4. DL = [12 lb/ft 2 # in.(6 in.)] (15 ft)(10 ft) = 10,800 lb. LL = (250 lb/ft 2 )(15 ft)(10 ft) = 37,500 lb. 1 1. The floor of a heavy storage warehouse building is made of 6-in.-thick stone concrete. If the floor is a slab having a length of 15 ft and width of 10 ft, determine the resultant force caused by the

More information

Independent Accountant's Compilation Report

Independent Accountant's Compilation Report MILLER, BRUSSELL, EBBEN AND GLAESKE LLC CERTIFIED PUBLIC ACCOUNTANTS POST OFFICE BOX 585 PORTAGE, WISCONSIN 53901 Independent Accountant's Compilation Report Saddle Ridge Association Ltd A Wisconsin Homeowners

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00

More information

KEY: R-1 Low Density Residential. R-2 Medium Density Residential. R-3 High Density Residential. S-C Service Commercial. D-C Downtown Commercial

KEY: R-1 Low Density Residential. R-2 Medium Density Residential. R-3 High Density Residential. S-C Service Commercial. D-C Downtown Commercial KEY: R-1 Low Density Residential R-2 Medium Density Residential R-3 High Density Residential S-C Service Commercial D-C Downtown Commercial M-C Medical Commercial H-I Heavy Industrial PARKING MATRIX A

More information

Closure of Remote Historic Underground Mines in Desert Environments

Closure of Remote Historic Underground Mines in Desert Environments Closure of Remote Historic Underground Mines in Desert Environments James A. Cremeens Agapito Associates, Inc. Michael H. Rauschkolb U.S. Borax, Inc. 2002 SME Annual Meeting and Exhibit Geotechnical solutions

More information

PART III DRAWINGS AND PHOTOGRAPHS Note: Drawings are intended to be as accurate as possible; however, Contractor is responsible for insuring that all items will fit as shown. Bulkhead DRIVER SIDE Bulkhead

More information

1040 SLIDING MALL FRONT

1040 SLIDING MALL FRONT APRIL, 00 00 SLIDING MALL FRONT INDEX INDEX... ELEVATIONS/VERTICAL SECTION DETAILS... HORIZONTAL SECTION DETAILS... EGRESS DOOR... - STACK AREA LAYOUT... - SIZE LIMITATIONS... HARDWARE...0 LAWS AND BUILDING

More information

Snow Melting Design Guide: Outdoor Stairs (Pavers)

Snow Melting Design Guide: Outdoor Stairs (Pavers) Snow Melting Design Guide: Outdoor Stairs (Pavers) What is Snow Melting? Have you ever seen snow fall on an already warm car? It melts instantly. This is the essential idea behind snow melting systems

More information