Preliminary Access and Circulation Evaluation of the Rossmoor Town Center Project in Walnut Creek, CA

Size: px
Start display at page:

Download "Preliminary Access and Circulation Evaluation of the Rossmoor Town Center Project in Walnut Creek, CA"

Transcription

1 Attachment 7 April 23, 2015 Dwight Belden Chief Operating Officer Citivest Commercial Investments, LLC 4340 Von Karman Avenue, Suite 110 Newport Beach, CA Subject: Preliminary Access and Circulation Evaluation of the Rossmoor Town Center Project in Walnut Creek, CA Dear Mr. Belden: This report transmits the results of the revised access and circulation evaluation of the proposed Rossmoor Town Center improvement project. This revision responds to the City of Walnut Creek s comments on the original submittal, specifically Traffic Study comments 5-10: The project net new floor area was updated to match the current plan at 28,895 net new square feet; The intersections of /Rolling Hills Drive and Tice Valley Boulevard/Olympic Boulevard were added to the analysis; Traffic from two local area pending projects the Sufi Temple and Saranap Village were added to the study intersections; The trip distribution was adjusted to reflect more Project traffic distributed to/from the west (37% as opposed to the original 10%); The stop sign recommendation on Figure 6 is removed; and Editorial changes were made per the City comments. INTRODUCTION Rossmoor Retail Partners is proposing a remodel of the existing Rossmoor Town Center shopping center at the intersection of Rossmoor Parkway and in Walnut Creek. The remodel will upgrade the buildings and infrastructure on the site, and add 28,895 net new square feet to the current site. This report evaluates site access and circulation, as well as off-site traffic 100 Pringle Avenue Suite 600 Walnut Creek, CA (925) Fax (925)

2 Mr. Dwight Belden April 23, 2015 Page 2 of 12 impacts, based on the Preliminary Review Team initial direction and the additional comments referenced above. The report includes the following sections: I. Existing Conditions Description of Site Existing Traffic, Pedestrian and Bicycle Volumes Current Site Driveway Operations Intersection Level of Service II. Near-Term With Project Conditions Project Trip Generation Project Trip Distribution and Assignment Traffic from Other Near-Term Projects Near-Term with Project Volumes and LOS Site Plan Access and Circulation Review I. EXISTING CONDITIONS Description of Site The Rossmoor Town Center Shopping Center is located at the northwest corner of Tice Valley Boulevard and Rossmoor Parkway in Walnut Creek, as shown in Figure 1 (all figures are provided at the end of this document). The current center has 105,381 gross square feet of leasable area occupied by a Safeway, CVS Pharmacy, U.S. Post Office, small office buildings, banks and restaurants. 1 The existing site provides a total of 631 parking spaces. A Chevron gas station is located at the southeast corner of the project site. Olympic Boulevard is an east-west two to four-lane arterial with a posted speed limit of 35 miles per hour. Olympic Boulevard provides access to Interstate 680 and downtown Walnut Creek. West of Tice Valley Road, Olympic Boulevard is a two lane collector providing access to Stanley. 1 Note that the current floor area was defined as 106,280 KSF in October 2014, and thus this value is reflected in Table 4 in which the site-specific trip generation rate is derived; the difference does not significantly affect the analysis and findings.

3 Mr. Dwight Belden April 23, 2015 Page 3 of 12 is a north-south four-lane arterial roadway with a posted speed limit of 35 miles per hour. It connects to Olympic Boulevard, which provides access to Interstate 680 and downtown Walnut Creek. The roadway is approximately 60 feet wide with no on-street parking permitted within the project area. Class II bicycle facilities (bike lanes) are provided along Tice Valley Boulevard in both directions. Sidewalks are provided on the north side of the roadway along the project frontage, although the sidewalks are interrupted by the site s inbound and outbound right turn only driveways. On the south side of the roadway, sidewalks are only provided east of the Del Valle Education Center entrance. Rossmoor Parkway is a north-south four-lane divided arterial roadway with a posted speed limit of 35 miles per hour. It serves as the central spine roadway for the Rossmoor community south of, and provides access to senior residential facilities and a small neighborhood north of. The roadway is 60 feet wide with on-street parking currently permitted north of the intersection. Sidewalks are provided on both sides of the street in the vicinity of the project site. A bus system provides circulation within the Rossmoor community with five bus routes (Blue, Purple, White, Red, and Yellow) serving Rossmoor Town Center. Two bus routes (Blue, White, Red, and Yellow) serve the Rossmoor Town Center with a stop provided in front of the existing CVS Pharmacy location. The other three bus routes serve that stop on a request basis. Dial-a-ride, para-transit, and scheduled service are provided, with headways of approximately 40 minutes. Service is also provided to locations outside the community, such as the Walnut Creek BART station and downtown Walnut Creek. Existing Traffic, Pedestrian, and Bicycle Volumes Weekday morning (7:00 to 9:00 AM) and evening (4:00 to 6:00 PM) peak period intersection vehicle counts were conducted on October 8, 2014 at all site driveways, shown in Figure 2, including the one driveway north of the site on Rossmoor Parkway in case cut-through traffic to the site was observed. The existing peak hour driveway count data are presented on Figure 3. The peak hours for driveway counts are 8:00-9:00 AM and 4:00-5:00 PM. Fehr & Peers staff observed operations at the intersection of /Rossmoor Parkway and the site driveways on the count day. Pedestrian volumes at the intersection of and Rossmoor Parkway were relatively light at 14 trips in both the AM and PM peak hours. Bicycle volumes at the intersection were 3 trips in the AM peak hour and 2 trips in the PM peak hour traveling along.

4 Mr. Dwight Belden April 23, 2015 Page 4 of 12 The City of Walnut Creek provided May 2014 peak hour counts of vehicles, bicycles and pedestrians at the three study intersections. The volumes provided by the City of Walnut Creek were used to determine the existing level of service and vehicle delay. We note that the May 2014 counts provided by the City for the intersection of /Rossmoor Parkway were slightly higher than those collected by Fehr & Peers in October 2014, so they were used in the updated analysis presented here. Current Site Driveway Operations Based on the single-day counts, driveways #3 and #10 on Rossmoor Parkway and Rolling Hills Drive, respectively, are the most heavily used locations to enter and exit the shopping center during both peak hours. Driveway #4 on Rossmoor Parkway is heavily used by exiting traffic in the PM peak hour. Driveways #8 and #9 along are relatively lightly used to enter and exit the project site, respectively. These driveways serve only right turns to and from. Fehr & Peers field observations did not show any weaving difficulties at these driveways despite their unusual configuration and proximity to the Del Valle Education Center driveway located across the street, the gas station driveways, and the Tice Valley Boulevard/Rossmoor Parkway intersection. Intersection Level of Service Methodology The operational performance of a roadway network is commonly described with the term level of service (LOS). LOS is a qualitative description of operating conditions, ranging from LOS A (free flow traffic conditions with little or no delay) to LOS F (oversaturated conditions where traffic flows exceed design capacity, resulting in long queues and delays). The LOS analysis methods outlined in the Transportation Research Board s Highway Capacity Manual (HCM) were used in this study for the two City of Walnut Creek intersections adjacent to the site in keeping with the City s standard procedure for assessing operations of intersections directly adjacent to development sites. 2 For the intersection of /Olympic Boulevard, the 2 Note that HCM 2000 was used instead of HCM 2010 for intersection at Rossmoor Parkway/, because the 2010 methodology in the Synchro software does not handle the signal timing and lane configuration characteristics at /Rossmoor Parkway correctly. Specifically, the combination of exclusive and shared lanes on an approach are not handled correctly with the HCM 2010 method in Synchro. However, the results with HCM 2000 are considered similar to what would be found with HCM 2010, as the methods are essentially consistent.

5 Mr. Dwight Belden April 23, 2015 Page 5 of 12 CCTALOS methodology was used, consistent with the County s standard methodology for impact analysis. The City of Walnut Creek also uses CCTALOS for impact assessment for off-site intersections, and therefore the CCTALOS method is used for impact assessment at all three intersections. The HCM and CCTALOS methods for calculating LOS for signalized intersections are described below. HCM Methodology for Signalized Intersections The HCM method incorporates characteristics such as the signal timing plan, the effects of pedestrians on signal phase duration, traffic volume peaking characteristics, and motorist behavioral characteristics, as well as others. A signalized intersection s LOS is based on the weighted average control delay measured in seconds per vehicle. Control delay includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration. Table 1 summarizes the relationship between the control delay and LOS for signalized intersections. TABLE 1: SIGNALIZED INTERSECTION LOS CRITERIA HCM Level of Service A B C D E F Description Operations with very low delay occurring with favorable traffic signal progression and/or short cycle lengths. Operations with low delay occurring with good progression and/or short cycle lengths. Operations with average delays resulting from fair progression and/or longer cycle lengths. Individual cycle failures begin to appear. Operations with longer delays due to a combination of unfavorable progression, long cycle lengths, or high V/C ratios. Many vehicles stop and individual cycle failures are noticeable. Operations with high delay values indicating poor progression, long cycle lengths, and high V/C ratios. Individual cycle failures are frequent occurrences. This is considered to be the limit of acceptable delay. Operations with delays unacceptable to most drivers occurring due to over-saturation, poor progression, or very long cycle lengths. Average Control Delay (Seconds) < 10.0 > 10.0 to 20.0 > 20.0 to 35.0 > 35.0 to 55.0 > 55.0 to 80.0 > 80.0 Source: Highway Capacity Manual, Transportation Research Board. The City of Walnut Creek maintains a LOS standard of High D, V/C= for arterial intersections outside the downtown core. This standard applies to the intersections of Tice Valley

6 Mr. Dwight Belden April 23, 2015 Page 6 of 12 Boulevard/Rossmoor Parkway and /Rolling Hills Drive, which are within the City of Walnut Creek. This standard correlates to a HCM LOS of D, delay less than or equal to 55 seconds. CCTALOS Methodology for Signalized Intersections This method uses various intersection characteristics, such as traffic volumes, lane geometry, and signal phasing, to estimate an intersection s volume-to-capacity (V/C) ratio. Table 2 shows the relationship between the V/C ratio and LOS for signalized intersections. TABLE 2: SIGNALIZED INTERSECTION LEVEL OF SERVICE CRITERIA CCTALOS LOS A B C D E F Description Progression is extremely favorable and most vehicles arrive during the green phase. Most vehicles do not stop at all. Short cycle lengths may also contribute to low delay. Progression is good, cycle lengths are short, or both. More vehicles stop than with LOS A, causing higher levels of average delay. Higher congestion may result from fair progression, longer cycle lengths, or both. Individual cycle failures may begin to appear at this level, though many vehicles still pass through the intersection without stopping. The influence of congestion becomes more noticeable. Longer delays may result from some combination of unfavorable progression, long cycle lengths, and/or high V/C ratios. Many vehicles stop, and the proportion of vehicles not stopping declines. Individual cycle failures are noticeable. This level is considered by many agencies to be the limit of acceptable delay. High delay values generally indicate poor progression, long cycle lengths, and high V/C ratios. Individual cycle failures are frequent occurrences. This level is considered unacceptable with oversaturation, which is when arrival flow rates exceed the capacity of the intersection. This level may also occur at high V/C ratios below 1.0 with many individual cycle failures. Poor progression and long cycle lengths may also be contributing factors to such delay levels. Source: Technical Procedures (Contra Costa Transportation Authority, 2013.) Sum of Critical V/C Ratio < > 1.00 Contra Costa County maintains a LOS standard of D, v/c=0.85, for intersections on non-regional routes. This standard applies to the /Olympic Boulevard intersection, which is maintained by Contra Costa County. As noted above, the City of Walnut Creek maintains a LOS standard of High D, V/C= The results of the existing conditions LOS analysis are presented in Table 3. Tice Valley Boulevard/Rossmoor Parkway operates at LOS C in both peak hours, and Tice Valley

7 Mr. Dwight Belden April 23, 2015 Page 7 of 12 Boulevard/Rolling Hills Drive operates at LOS A in both peak hours, according to the HCM methodology. Using the CCTALOS methodology, these intersections operate at LOS A in both peak hours. The intersection of /Olympic Boulevard operates at LOS A in both peak hours, according to the CCTALOS methodology. TABLE 3: EXISTING PEAK HOUR LEVEL OF SERVICE (LOS) Intersection Control Peak Hour 1. Tice Valley Road at Rossmoor Parkway 2.Tice Valley Road at Rolling Hills Drive 3.Tice Valley Road at Olympic Boulevard Signal Signal Signal AM PM AM PM AM PM Notes: 1. Delay in seconds [volume-to-capacity ratio] 2. LOS = Level of Service Source: Fehr & Peers, April Methodology HCM [CCTALOS] HCM [CCTALOS] CCTALOS Existing Delay [V/C] 1 LOS [0.33] 28.4 [0.37] 4.1 [0.28] 4.7 [0.35] C [A] C [A] A [A] A [A] 0.45 A 0.50 A II. NEAR-TERM WITH PROJECT CONDITIONS Project Trip Generation Trip generation refers to the process of estimating the amount of vehicular traffic a project would add to the surrounding roadway system. Typically the trip generation is defined for the AM and PM peak commute hours, when traffic congestion on area roadways is heaviest. The trip generation rates derived from the site s existing driveway counts are shown in Table 4. Note that the internal driveways between the gas station and the main shopping center parking lot were not included in the trip generation rate calculation, as this would double-count trips.

8 Mr. Dwight Belden April 23, 2015 Page 8 of 12 TABLE 4: EXISTING TRIP GENERATION Land Use KSF 1 AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Total Trips Derived Trip Rate 2 In Out Total In Out Total In Out Total In Out Total Shopping Center Notes: 1. KSF=1000 square feet 2. Derived Trip Rate = (Total Peak Hour Trips)/(Gross Leasable Floor Area, KSF) Source: Fehr and Peers, April The derived rates from the existing driveway count data were compared to the Institute of Transportation Engineers Trip Generation (9 th Edition) rates for land use code 820 (shopping center), as shown in Table 5. The rates derived from the site counts are substantially higher than the ITE Trip Generation rates. Therefore, the site-specific rates were used to project future traffic growth with the project s larger retail floor area. TABLE 5: ROSSMOOR TOWN CENTER EXISTING TRIP GENERATION RATE COMPARISON (WEEKDAY) Shopping Center Rate Source Rate AM Peak Hour PM Peak Hour ITE Average Rate ITE Fitted Curve Rate Project Site Rate Notes: 1. ITE Linear Equation 2. ITE Fitted Curve Equation 3. Trip generation rate derived from existing driveway count data : Total Peak Hour Trips/Gross Leasable Floor Area Source: Trip Generation, (9 th Edition), 2012, ITE; Fehr & Peers, April The resulting trip generation estimate using the Project site rates is shown in Table 6. The Project is expected to generate approximately 102 new AM peak hour vehicle trips and 213 new PM peak hour vehicle trips. TABLE 6: PROPOSED PROJECT TRIP GENERATION Land Use KSF 1 AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Site-Specific Derived Rate Total Trips In Out Total In Out Total In Out Total In Out Total Shopping Center Notes: 1. KSF = 1000 square feet Source: Fehr & Peers, April 2015.

9 Mr. Dwight Belden April 23, 2015 Page 9 of 12 Project Trip Distribution and Assignment The new vehicle trips expected to be generated by the Project were assigned to the roadway system based on existing travel patterns as demonstrated in the driveway and intersection volumes, the location of the new buildings on-site, the Project site driveway locations, and the distribution of parking on the Project site plan. The estimated trip distribution percentages and Project driveway volumes are shown on Figure 5. Traffic from Other Near-Term Projects At the request of City staff, the projected traffic from two pending area projects were added to the existing traffic volumes. Turning movements for the Sufi Temple project and the Saranap Village project were obtained from the EIR traffic studies for those projects. 4 Since those EIRs did not cover the /Rolling Hills Drive and /Rossmoor Parkway intersections, Fehr & Peers derived turning movements based the assignment of those projects traffic to south of Olympic Boulevard and the existing traffic patterns at the other two intersections. Near-Term With Project Traffic Volumes and LOS Peak hour intersection operations for the three intersections were evaluated for the Near-Term and Near-Term With Project cases, and are shown in Table 7. As shown, the addition of Project traffic along with the traffic from other near-term projects would not change the service level at the intersections, and the service levels would continue to meet the relevant standards of the City of Walnut Creek and Contra Costa County. 4 Contra Costa County Department of Conservation and Development, Saranap Village Project Draft EIR, September 2014; Contra Costa County Department of Conservation and Development, New Sanctuary for Sufism Reoriented Project Final EIR, September 2011.

10 Mr. Dwight Belden April 23, 2015 Page 10 of 12 TABLE 7: INTERSECTION LEVEL OF SERVICE NEAR-TERM WITH PROJECT Intersection 1. Tice Valley Road at Rossmoor Parkway 2.Tice Valley Road at Rolling Hills Drive 3.Tice Valley Road at Olympic Boulevard Control Signal Signal Signal Peak Hour AM PM AM PM AM PM Notes: 1. Delay in seconds [volume-to-capacity ratio] 2. LOS = Level of Service Source: Fehr & Peers, April Methodology HCM [CCTALOS] HCM [CCTALOS] CCTALOS Scenarios Near-Term Near-Term With Project Delay [V/C] 1 LOS 2 Delay [V/C] 1 LOS [0.33] 29.0 [0.38] 4.1 [0.29] 4.7 [0.36] C [A] C [A] A [A] A [A] A A 25.9 [0.35] 30.2 [0.41] 4.5 [0.31] 5.3 [0.39] C [A] C [A] A [A] A [A] A A Site Plan Access and Circulation Review The proposed Project site plan dated 3/30/15 was reviewed relative to the comments made by Fehr & Peers in our review of the earlier site plan, and adjusted to reflect the comments that are still relevant as well as City direction. The following discussion summarizes the review. The site plan was reviewed to determine if adequate on-site circulation would be provided, including issues such as potential vehicle conflicts, excessive queuing, driver way-finding difficulties, and adequate parking and aisle dimensions. The site plan does not change most driveway locations or dimensions, with one exception: the long right turn in and right turn out driveways on would be consolidated into a standard T driveway configuration; however, the driveway would still operate under right turn only control. Based on the existing and projected volumes at this intersection, a side-street stop-control on the driveway will provide for adequate operations. However, see recommendation 4 below which will prevent unsafe maneuvers at this driveway. Figure 7 presents Fehr & Peers recommendations for further Project site plan refinement. They are summarized below.

11 Mr. Dwight Belden April 23, 2015 Page 11 of Check pullout length against expected shuttle vehicle size. 2. Install Do Not Enter sign. Eliminates vehicle conflicts between vehicles entering the project site from Tice Valley Boulevard and vehicles exiting the CVS pharmacy drive through. 3. Install Right Turn Only sign to ensure vehicles do not attempt a left turn from the CVS pharmacy drive-through. 4. Install roadway delineators or extend median to prevent outbound left turns. This would prevent potentially dangerous outbound left-turn attempts by drivers headed toward eastbound and southbound Rossmoor Parkway. 5. Add stop sign for vehicles exiting project site onto This will clarify right-of-way control at this intersection. 6. Relocate pharmacy pick-up window and add bypass lane. The current pharmacy pick-up window location does not provide for vehicle queues that may develop, and queues would block the parking aisle and prevent parked vehicles from exiting. Delivery trucks parked in the service area next to building 1 may also obstruct parked vehicles access to the pharmacy window. A gridlock situation may occur west of building 1 when the service area is occupied while parked vehicles attempt to exit as pharmacy pick-up window patrons form a queue to use the drive-through. 7. Lengthen service area if needed based on expected delivery vehicle length. 8. Close aisle closest to Rolling Hills Drive. Vehicles exiting this parking aisle to exit the project site using the Rolling Hills driveway would create conflicts with entering traffic, and sight distance is limited in this area. 9. Stripe centerline. Stripe centerline along main project site aisle to prevent vehicles from using opposing lanes to maneuver around turning vehicles. 10. Consider raised intersection. Providing a raised intersection at the center of the project site will encourage slower speeds and provide a pedestrian-friendly arrival point for the center. This concludes our revised traffic evaluation of the Rossmoor Town Center project. Please call us at (925) if you have any questions about this report.

12 Mr. Dwight Belden April 23, 2015 Page 12 of 12 Sincerely, FEHR & PEERS Ellen M. Poling, PE Senior Associate Jackson Lo, EIT Engineer/Planner I WC Attachments: Figures 1 7 Appendix A Traffic Counts Appendix B LOS Reports

13 Flora Ave Sunset Loop Newell Ct 24 Ruth Ct LAFAYETTE El Curtola Blvd Freeman Rd King Dr Kinney Dr Abbey Ct Olympic Blvd Camino Diablo Juanita Dr Acacia Rd Ponderosa Ln Kendall Rd Kendall Ct Lucy Ln Garden Ct Iris Ln Boulevard Ct Richard Ln Warren Rd Center Ct 3 Regency Ct Boulevard Way Rose St Center St Cottage Ln Hillcrest Rd Panoramic Way Springbrook Rd Whyte Park Ave Alder Ave Baja Ln Sequoia Ave Dewing Ln Park Ave Oakland Blvd Nicholson Rd Del Hambre Cir Bonita Ln Blade Way Olympic Blvd 680 Acorn Ct Villa Way Rider Ct Villa Way Bont Ln Magnolia Way Parkmead Ct Shuey Ave Sharpe Ave Mt Diablo Blvd Alpine Rd Paulson Ln Camelia Ln Azalea Dr Poplar Dr Del Monte Ct Bonanza St Alma Ave Twin Peaks Dr Del Monte Dr Spyrock Ct California Blvd Botelho Dr Arbutus Dr Locust St Circle Dr Main St Newell Ave Arlene Ln Castle Gate Rd Arlene Dr Glen View Dr Glen Ct Broadway Plz Broadway Ln Lilac Dr Alta Vista Dr WALNUT CREEK Clifton Ct Lancaster Ct Orchard Ln Capwell Ln Lancaster Rd Maria Ln Broadway Nursery Ln Webb Ln 680 Fern Dr Norman Ct Castle Hill Rd WALNUT CREEK 2 Rolling Hills Dr Julianne Ct Meadow Rd Meadow Ln WC _1_SiteVic Oakmont Dr Golden Rain Rd Pine Knoll Dr Wales Dr Tice Creek Dr Comstock Dr ROSSMOOR Rossmoor Pkwy 1 Tice Valley Ln Ellery Ct Montecillo Dr Winship Ln Coventry Ct Woodhaven Ln ALAMO Creekdale Rd Countryside Ct Tice Valley Blvd Don Cir LEGEND # Signalized Study Intersection Project Site Figure 1 Project Site Vicinity and Study Intersection Location

14 1 (E) DaVita Dialysis Center (NOT A PART) Rolling Hills Drive 10 Parking Building 700 (2-STORY) Building 800 Main Plaza (E) Bldgs to be Removed Building 900 Parking Building 1000 Safeway Building Rossmoor 3 Parking Building 600 Parking Parking Building Parkway Building 400 (E) Chevron Gas Station 5 WC _2_SitePlanLocs LEGEND # Driveway Location 1 Counts Conducted at Driveway Location Outside of Project Site Figure 2 Existing Site Plan Driveway Locations

15 (19) 12 3 (11) (134) (97) (E) DaVita Dialysis Center (NOT A PART) (0) 7 8 (8) Rossmoor Parkway (2-STORY) Building 800 Main Plaza Building 900 Building 1000 Safeway Parking Parking Building 600 Building 500 Building 400 Building 700 Parking (E) Bldgs to be Removed Parking (0) 0 0 (0) Building 1100 Parking (7) 34 (108) 8 (E) Chevron Gas Station tion (11) (3) (29) 22 6 (6) 24 (35) 20 (62) 20 (70) 64 (64) (4) 5 30 (114) 5 (8) 12 (17) Figure 3 Existing Conditions (May 2014) Peak Hour Driveway Volumes Rolling Hills Drive LEGEND XX (YY) AM (PM) Peak Hour Traffic Volumes WC _3_SitePlanVols

16 Tice Newell Ct Freeman Rd Olympic Blvd King Dr Ponderosa Ln oulevard Ct Cen Richard Ln 3 Rose St Center St Cottage Ln Panoramic Way Whyte Park Ave Alder Ave Park Ave Sequoia Ave Olympic Blvd Rider Ct Magnolia Way Parkmead Ct Azalea Dr Poplar Dr Del Monte Ct Twin Peaks Dr Del Monte Dr Spyrock Ct Arbutus Dr Arlene Ln Arlene Dr Glen Ct Clifton Ct Lancaster Ct Webb Ln Orchard Ln Lancaster Rd 680 Fern Dr Norman Ct Castle Gate Rd Glen View Dr Castle Hill Rd WALNUT CREEK 2 Rolling Hills Dr Julianne Ct Meadow Rd Meadow Ln WC _1_SiteVic WC _4_ExVols Golden Rain Rd Pine Knoll Dr Oakmont Dr 1. Rossmoor Parkway/Tice Valley Road 46 (36) LEGEND 93 (145) 37 (78) Signalized Study Intersection # Tice Valley Road 50 (136) 69 (221) 32 (54) ACCF 173 (116) 157 (136) 344 (516) Rossmoor Parkway ACCF ACCF ABCF 474 (541) 64 (114) 78 (69) Wales Dr Tice Creek Dr Comstock Dr ROSSMOOR Rossmoor Pkwy Project Site 1 2. Tice Valley Blvd./Rolling Hill Dr 794 (742) 139 (108) ACC Tice Valley Blvd. AF 34 (96) 6 (31) CCF 559 (851) 13 (15) Tice Valley Ln (30) 88 (108) ACF26 44 (81) 31 (39) 196 (228) 303 (265) Ellery Ct ACCF Montecillo Dr AACF ACF 210 (307) 65 (90) 329 (604) Winship Ln Coventry Ct 3. Tice Valley Road/Olympic Boulevard Olympic Boulevard Tice Valley Road 122 (106) 340 (328) 573 (471) Woodhaven Ln ALAMO Creekdale Rd Countryside Ct Tice Valley Blvd Don Cir Figure 1 Project Site Vicinity and Study Intersection Location LEGEND XX (YY) AM (PM) Peak Hour Traffic Volumes Signalized Intersection # Signalized Study Intersection Project Site Source: May 2014 counts provided by the City of Walnut Creek Figure 4 Existing Conditions (May 2014) Peak Hour Traffic Volumes, Traffic Control and Lane Configurations

17 18 (29) 14 (41) 5% (N) Elevator #1924 A #1924 B (SECOND LEVEL) 1 1% (N) Monument Sign 2 (6) 27 (43) (E) 2 5' A I S L E (E) DaVita Dialysis Center (NOT A PART) 2 Rolling Hills Drive M O D I F I E D P A R K I N G M O D I F I E D P A R K I N G T #1920B #1920 #1928 #1920C #1928A #1928B #1930 # ' A I S L E EV EV Main Plaza EV EV #1940A #1940D #1940C #1942 #1942A #1944 #1948 (N) Bus Shelter #1950/ #1952 P A R K I N G 16 #1956 #1954 #1958 (N) Plaza T #1966 T (E) Service # ' A I S L E #1988 #1986 #1984 #1992 Exp. #1994 (E) P A R K I N G 3 Parkway 8 (13) 7 (20) 0 (0) 0 (0) (N) Monument Sign 37% WC _5_PTA 59'-0" PATIO 41 #1900 Service Area #1910B #1910 #1908D #1908C #1908A Tice 2 5 ' A I S L E 73'-0" Valley 68 28'-0" 48'-0" TRUCK TRAVEL PATH M O D I F I E D P A R K I N G T ' A I S L E Service Area 2 5' A I S L E 111' T 9 15'-0" 137' Bldg 1 PHARMACY PICK-UP WINDOW Boulevard 59'-0" BUS DROP OFF ZONE 2 5 ' DRIVE 51' 30' 59'-0" 55' 42' Bldg 2 59' EV EV Bldg 3 M O D I F I E D P A R K I N G ' A I S L E 33' 17' EV EV 31' 54' ' 8 8.5' X 18' SPACE, TYP A I S L E TRASH (N) Gateway Plaza (E) Sewer Easement 12 Bldg 4 (E) CHEVRON GAS STATION EXISTING 32' ENTRY/EXIT 64' # (17) 0 (0) 11 0 (0) 0 (0) 6 Rossmoor 4 (N) Monument Sign 0 (0) 15 (45) 5 0 (0) 0 (0) 37% 20% Project Informatio Ref Bldg 1 Area 14,500 Bldg 2 6,600 Bldg 3 4,600 Bldg 4 2,000 Total 27,700 LEGEND XX (YY) AM (PM) Peak Hour Traffic Volumes X% Project Trip Distribution Propos Figure 5 Project Trip Distribution and Driveway Assignment

18 1. Rossmoor Parkway/Tice Valley Road 2. Tice Valley Blvd./Rolling Hills Dr 3. Tice Valley Road/Olympic Boulevard C13 (24) Existing Conditions Tice Valley Road 50 (136) 69 (221) 32 (54) ACCF 173 (116) 157 (136) 344 (516) Rossmoor Parkway ACCF ACCF 46 (36) 93 (145) 37 (78) ABCF 474 (541) 64 (114) 78 (69) 794 (742) 139 (108) ACC Tice Valley Blvd. AF 34 (96) 6 (31) CCF 559 (851) 13 (15) Rolling Hills Drive Olympic Boulevard (30) 88 (108) ACF26 44 (81) 31 (39) 196 (228) 303 (265) Tice Valley Road ACCF AACF 122 (106) 340 (328) 573 (471) ACF 210 (307) 65 (90) 329 (604) 1. Rossmoor Parkway/Tice Valley Road 2. Tice Valley Blvd./Rolling Hill Dr 3. Tice Valley Road/Olympic Boulevard WC _4_ExVols Near-Term Project Trips Tice Valley Road 5 (5) 12 (13) Rossmoor Parkway CF C 4 (7) A9 (17) 17 (18) C Tice Valley Blvd. Rolling Hills Drive Olympic Boulevard (5) 17 (18) ACF6 18 (19) A5 (8) Tice Valley Road F 13 (25) C13 (24) 1. Rossmoor Parkway/Tice Valley Road Project Trips Tice Valley Road AC AC 19 (30) 4 (8) C14 (41) 2. Tice Valley Blvd./Rolling Hills Dr 3. Tice Valley Road/Olympic Boulevard 14 (41) 8 (23) Rossmoor Parkway CF 3 (4) 10 (16) 24 (38) A Tice Valley Blvd. Rolling Hills Drive Olympic Boulevard 3 (4) C F8 (12) Tice Valley Road A 13 (21) ACF 5 (13) 2(4) 8 (24) 1. Rossmoor Parkway/Tice Valley Road 2. Tice Valley Blvd./Rolling Hills Dr 3. Tice Valley Road/Olympic Boulevard Near-Term With Project Tice Valley Road 50 (136) 83 (262) 40 (76) ACCF 173 (116) 162 (141) 356 (529) Rossmoor Parkway ACCF ACCF 49 (40) 107 (168) 37 (78) ABCF 502 (588) 68 (121) 78 (69) 811 (760) 163 (145) ACC Tice Valley Blvd. AF 34 (96) 6 (31) CCF 586 (916) 13 (15) Rolling Hills Drive Olympic Boulevard (32) 108 (130) ACF32 62 (100) 36 (63) 196 (228) 311 (277) Tice Valley Road ACCF AACF 135 (131) 340 (328) 586 (518) ACF 215 (320) 80 (118) 337 (628) LEGEND XX (YY) AM (PM) Peak Hour Traffic Volumes Signalized Intersection Figure 6 Near-Term with Project Intersection Volumes Peak Hour Traffic Volumes, Traffic Control and Lane Configurations

19 8. Close aisle 9. Stripe centerline 10. Consider raised intersection Rolling Hills Drive 890SF 1. Check pullout length against expected shuttle vehicle size WC _4_PTA 7. Lengthen if needed based on expected Use delivery Proposed Area vehicle (SF) length ing 1 CVS 14,500 SF ing 2 Retail 6,600 SF ing 3 Retail 4,600 SF ing 4 PAD 2,000 SF ing 1900 Office 3,200 SF ing 1908 Retail/Office 4,700 SF ing 1910 Retail 16,988 SF ing 1920 (E) Retail 10,000 SF ing 1920 (N) Retail 2,830 SF ing 1930 Retail/Office 11,941 SF ing Retail/Office 22,068 SF ing 1972 Safeway 25,191 SF ing 1980 Office 1,804 SF ing 1990 (E) Retail/Office 6,964 SF ing 1990 (N) Retail/Office 890 SF Proposed Building Area: 134,276 *SF (E) Building Area 105,381 SF uilding To Be Removed 2,525 SF (N) in Building Area: 31,420 SF R.: 20% 6. Relocate pharmacy pick-up window and add bypass lane Tic c e 5. Add stop sign on driveway Valley Boulevard 4. Install roadway delineators or extend median to prevent outbound left turns. Æô!"$ 3. Install Right Turn Only sign (E) Easement 2. Install Do Not Enter sign Figure 7 Site Plan Recommendations April 2015

20 APPENDIX A EXISTING (MAY 2014) TRAFFIC COUNTS

21 City of Walnut City All Vehicles on Unshifted Peds & Bikes on Bank 1 Nothing on Bank 2 ALL TRAFFIC DATA (916) orders@atdtraffic.com File Name : Date : Rossmoor Parkway-.ppd 5/8/2014 Unshifted Count = All Vehicles Rossmoor Parkway Rossmoor Parkway Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Uturn Total 07: : : : Total : : : : Total : : : : Total : : : : Total : : : : Total : : : : Total Grand Total Apprch % 12.6% 52.4% 35.0% 0.0% 29.3% 52.3% 18.4% 0.0% 74.9% 14.0% 11.1% 0.0% 21.0% 18.1% 60.9% 0.0% Total % 2.0% 8.3% 5.5% 0.0% 15.7% 3.3% 5.9% 2.1% 0.0% 11.4% 26.4% 4.9% 3.9% 0.0% 35.3% 7.9% 6.8% 22.9% 0.0% 37.7% 100.0%

22 ALL TRAFFIC DATA City of Walnut City (916) All Vehicles on Unshifted File Name : Rossmoor Parkway-.ppd Peds & Bikes on Bank 1 Date : 5/8/2014 Nothing on Bank 2 Unshifted Count = All Vehicles AM PEAK Rossmoor Parkway Rossmoor Parkway HOUR Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 08:00 to 09:00 Peak Hour For Entire Intersection Begins at 08:00 08: : : : Total Volume % App Total 21.2% 45.7% 33.1% 0.0% 21.0% 52.8% 26.1% 0.0% 76.9% 10.4% 12.7% 0.0% 25.7% 23.3% 51.0% 0.0% PHF NOON Rossmoor Parkway Rossmoor Parkway PEAK Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 11:30 to 12:30 Peak Hour For Entire Intersection Begins at 11:30 11: : : : Total Volume % App Total 8.2% 58.0% 33.8% 0.0% 35.9% 47.5% 16.6% 0.0% 72.6% 18.2% 9.2% 0.0% 21.2% 12.1% 66.7% 0.0% PHF PM PEAK HOUR Rossmoor Parkway Southbound Westbound Rossmoor Parkway Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 16:00 to 17:00 Peak Hour For Entire Intersection Begins at 16:00 16: : : : Total Volume % App Total 13.1% 53.8% 33.1% 0.0% 30.1% 56.0% 13.9% 0.0% 74.7% 15.7% 9.5% 0.0% 15.1% 17.7% 67.2% 0.0% PHF

23 ALL TRAFFIC DATA City of Walnut City (916) All Vehicles on Unshifted Peds & Bikes on Bank 1 orders@atdtraffic.com File Name : Rossmoor Parkway-.ppd Date : 5/8/2014 Nothing on Bank 2 Bank 1 Count = Peds & Bikes Rossmoor Parkway Rossmoor Parkway Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL Total Ped Total 07: : : : Total : : : : Total : : : : Total : : : : Total : : : : Total : : : : Total Grand Total Apprch % 0.0% 0.0% 0.0% 18.2% 81.8% 0.0% 60.0% 20.0% 20.0% 0.0% 80.0% 20.0% Total % 0.0% 0.0% 0.0% 0.0% 7.7% 34.6% 0.0% 42.3% 11.5% 3.8% 3.8% 19.2% 0.0% 30.8% 7.7% 38.5% 100.0%

24 ALL TRAFFIC DATA City of Walnut City (916) All Vehicles on Unshifted Peds & Bikes on Bank 1 orders@atdtraffic.com File Name : Rossmoor Parkway-.ppd Date : 5/8/2014 Nothing on Bank 2 Bank 1 Count = Peds & Bikes AM PEAK Rossmoor Parkway Rossmoor Parkway HOUR Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL Total Peak Hour Analysis From 08:00 to 09:00 Peak Hour For Entire Intersection Begins at 08:00 08: : : : Total Volume % App Total 0.0% 0.0% 0.0% 0.0% 100.0% 0.0% 50.0% 0.0% 50.0% 0.0% 100.0% 0.0% PHF NOON Rossmoor Parkway Rossmoor Parkway PEAK Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL Total Peak Hour Analysis From 11:30 to 12:30 Peak Hour For Entire Intersection Begins at 11:30 11: : : : Total Volume % App Total 0.0% 0.0% 0.0% 50.0% 50.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 50.0% PHF PM PEAK Rossmoor Parkway Rossmoor Parkway HOUR Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL Total Peak Hour Analysis From 16:00 to 17:00 Peak Hour For Entire Intersection Begins at 16:00 16: : : : Total Volume % App Total 0.0% 0.0% 0.0% 0.0% 100.0% 0.0% 0.0% 100.0% 0.0% 0.0% 100.0% 0.0% PHF

25 City of Walnut City All Vehicles on Unshifted Peds & Bikes on Bank 1 Nothing on Bank 2 ALL TRAFFIC DATA (916) orders@atdtraffic.com File Name : Date : Rolling Hills Drive.ppd 5/8/2014 Unshifted Count = All Vehicles Rolling Hills Drive Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Uturn Total 07: : : : Total : : : : Total : : : : Total : : : : Total : : : : Total : : : : Total Grand Total Apprch % 12.0% 86.4% 0.0% 1.6% 21.9% 0.0% 78.1% 0.0% 0.0% 97.7% 2.2% 0.1% 0.0% 0.0% 0.0% 0.0% Total % 6.0% 43.4% 0.0% 0.8% 50.2% 1.2% 0.0% 4.4% 0.0% 5.7% 0.0% 43.1% 1.0% 0.1% 44.1% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0%

26 ALL TRAFFIC DATA City of Walnut City (916) All Vehicles on Unshifted File Name : Rolling Hills Drive.ppd Peds & Bikes on Bank 1 Date : 5/8/2014 Nothing on Bank 2 Unshifted Count = All Vehicles AM PEAK Rolling Hills Drive HOUR Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 08:00 to 09:00 Peak Hour For Entire Intersection Begins at 08:00 08: : : : Total Volume % App Total 13.3% 85.1% 0.0% 1.6% 15.0% 0.0% 85.0% 0.0% 0.0% 97.7% 2.3% 0.0% 0.0% 0.0% 0.0% 0.0% PHF NOON Rolling Hills Drive PEAK Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 11:30 to 12:30 Peak Hour For Entire Intersection Begins at 11:30 11: : : : Total Volume % App Total 13.7% 84.8% 0.0% 1.5% 26.1% 0.0% 73.9% 0.0% 0.0% 96.9% 3.0% 0.1% 0.0% 0.0% 0.0% 0.0% PHF PM PEAK HOUR Southbound Rolling Hills Drive Westbound Northbound Eastbound START TIME LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL LEFT THRU RIGHT UTURNS APP.TOTAL Total Peak Hour Analysis From 16:00 to 17:00 Peak Hour For Entire Intersection Begins at 16:00 16: : : : Total Volume % App Total 10.7% 87.3% 0.0% 2.0% 24.4% 0.0% 75.6% 0.0% 0.0% 98.3% 1.7% 0.0% 0.0% 0.0% 0.0% 0.0% PHF

27 ALL TRAFFIC DATA City of Walnut City (916) All Vehicles on Unshifted Peds & Bikes on Bank 1 orders@atdtraffic.com File Name : Rolling Hills Drive.ppd Date : 5/8/2014 Nothing on Bank 2 Bank 1 Count = Peds & Bikes Rolling Hills Drive Southbound Westbound Northbound Eastbound START TIME LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL LEFT THRU RIGHT PEDS APP.TOTAL Total Ped Total 07: : : : Total : : : : Total : : : : Total : : : : Total : : : : Total : : : : Total Grand Total Apprch % 0.0% 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 0.0% 0.0% 0.0% 0.0% Total % 0.0% 15.8% 0.0% 15.8% 0.0% 0.0% 0.0% 0.0% 0.0% 84.2% 0.0% 84.2% 0.0% 0.0% 0.0% 0.0% 100.0%

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Subject: Revised Castle Hills BASIS Charter School Traffic Impact Analysis Review City of Castle Hills,

More information

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For TRAFFIC IMPACT STUDY For Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) February 2015 Revised: August 2015 April 2016 July 2016 September 2016 Prepared for: KB Home

More information

Traffic Impact Study

Traffic Impact Study Traffic Impact Study Statham DRI One University Parkway Prepared for: Barrow County Prepared by: October 2012 Table of Contents Executive Summary i Section 1. Introduction 1 Project Description 1 Methodology

More information

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections:

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections: MEMORANDUM DATE: JULY 6, 2012 TO: FROM: RE: CC: MELANIE KNIGHT BRAD BYVELDS/ JENNIFER LUONG 1050 SOMERSET STREET PRELIMINARY TRAFFIC ANALYSIS OUR FILE NO. 111152 NEIL MALHOTRA The purpose of this memo

More information

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 Executive Summary Page 2.0 Introduction 2.1 DEVELOPMENT

More information

FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005

FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005 FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005 Prepared For: EDAW, Inc. 1420 Kettner Boulevard, Suite 620

More information

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Prepared by: Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite

More information

CVS Derwood. Local Area Transportation Review

CVS Derwood. Local Area Transportation Review CVS Derwood Montgomery County, Maryland May 27, 2016 Local Area Transportation Review Prepared for: JC Bar Properties, Inc. Steve Fleming, PE 415 Fallowfield Road, Suite 301 Camp Hill, Pennsylvania 17011

More information

DOLLAR GENERAL PROJECT FOCUSED TRAFFIC ANALYSIS (REVISED) May 20, 2015

DOLLAR GENERAL PROJECT FOCUSED TRAFFIC ANALYSIS (REVISED) May 20, 2015 DOLLAR GENERAL PROJECT FOCUSED TRAFFIC ANALYSIS (REVISED) May 20, 2015 May 20, 2015 Mr. Dan Biswas, VP of Development CJS DEVELOPMENT II, LLC 5111 North Scottsdale Road, Suite 200 Scottsdale, CA 85250

More information

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone: JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH 45243 Email: jackpflum1@gmail.com Telephone: 513.919.7814 MEMORANDUM REPORT Traffic Impact Analysis Proposed Soccer

More information

PLAZA MEXICO RESIDENCES

PLAZA MEXICO RESIDENCES PLAZA MEXICO RESIDENCES TRAFFIC STUDY PREPARED FOR: 3000 E. IMPERIAL, LLC. 6940 Beach Boulevard, D-501 Buena Park, California 90621 PREPARED BY: OCTOBER 5, 2017 translutions the transportatio n solutions

More information

Focused Traffic Analysis for the One Lincoln Park Project

Focused Traffic Analysis for the One Lincoln Park Project September 15, 2015 Mr. Bill Johnson Coldwell Banker 511 Sir Francis Drake Boulevard Greenbrae, CA 94904 Focused Traffic Analysis for the One Lincoln Park Project Dear Mr. Johnson; As requested, W-Trans

More information

SUBJECT: SUMMARY OF FINDINGS. October 29, Mr. Carter Redish Carter Group Architects, Inc S. El Camino Real, Suite F San Clemente, CA 92672

SUBJECT: SUMMARY OF FINDINGS. October 29, Mr. Carter Redish Carter Group Architects, Inc S. El Camino Real, Suite F San Clemente, CA 92672 October 29, 2018 Mr. Carter Redish Carter Group Architects, Inc. 1810 S. El Camino Real, Suite F San Clemente, CA 92672 SUBJECT: CANYON STEEL FOCUSED TRAFFIC IMPACT ANALYSIS Dear Mr. Carter Redish: Urban

More information

Per your request and authorization, we have prepared this traffic evaluation for the above referenced project.

Per your request and authorization, we have prepared this traffic evaluation for the above referenced project. Memorandum To: From: Re: Marc Stout, P.E. City Engineer, City of Roseville Chris Gregerson, P.E., T.E. Matt Weir, P.E., T.E., PTOE Douglas Boulevard Coffee Kiosk Traffic Evaluation Roseville, California

More information

6711 LEE HIGHWAY TRAFFIC IMPACT STUDY ARLINGTON, VIRGINIA

6711 LEE HIGHWAY TRAFFIC IMPACT STUDY ARLINGTON, VIRGINIA 6711 TRAFFIC IMPACT STUDY ARLINGTON, VIRGINIA Prepared for: NVR, Inc. Prepared by: Wells + Associates, Inc. Michael J. Workosky, PTP, TOPS, TSOS John J. Andrus William L. Zeid, PE 703.917.6620 May 4, 2017

More information

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management Transportation Impact Analysis Market Street PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for TerraPointe Services, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc.

More information

Appendix C Traffic Study

Appendix C Traffic Study Final Environmental Impact Statement Appendix C Traffic Study Schofield Generating Station Project, Hawaii October 2015 C-1 Final Environmental Impact Statement This page intentionally left blank. Schofield

More information

ALTA VISTA COMMERCIAL/ RESIDENTIAL PROJECT

ALTA VISTA COMMERCIAL/ RESIDENTIAL PROJECT ALTA VISTA COMMERCIAL/ RESIDENTIAL PROJECT TRAFFIC IMPACT ANALYSIS Prepared For: Paul Conzelman SC Development 2151 Michelson Drive, Suite 140 Irvine, CA 92612 Prepared By: 2030 Main Street, Suite 1200

More information

Appendix I: Traffic Study

Appendix I: Traffic Study City of Fontana Sierra Lakes Commerce Center Draft EIR Appendix I: Traffic Study FirstCarbon Solutions H:\Client (PN JN)\0144\01440050\EIR\1 ADEIR\01440050 Sec99 99 Appendix Dividers.doc THIS PAGE INTENTIONALLY

More information

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519 January 12, 2018 Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519 Re: Proposed Reserve at Rivertown Mixed-Use Development Updated Trip Generation and Site Driveway

More information

Travel Demand Management Plan

Travel Demand Management Plan Travel Demand Management Plan Tryg s & Apartment Building 8 West Lake Street Minneapolis, MN AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mr. Johnny Carlson Trammell Crow Chicago Development, Inc. 5 South

More information

Table of Contents Introduction... 4 Study Area... 5

Table of Contents Introduction... 4 Study Area... 5 Table of Contents Introduction... 4 Study Area... 5 Streets and s... 5 Traffic Volumes... 8 Recent and Anticipated Development... 10 Crash Analysis... 10 Projected Traffic Volumes... 11 Trip Generation...

More information

HALFF 16196? TRAFFIC MANAGEMENT PLAN. Richardson ISD Aikin Elementary School Dallas, Texas North Bowser Road Richardson, Texas 75081

HALFF 16196? TRAFFIC MANAGEMENT PLAN. Richardson ISD Aikin Elementary School Dallas, Texas North Bowser Road Richardson, Texas 75081 30280 16196? TRAFFIC MANAGEMENT PLAN Exhibit 572B Aikin Elementary School Planned Development District No. 572 Approved City Plan Commission October20, 2016 July 12, 2016 Prepared for HALFF AVO 31586 PHO1

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY TERRE HAUTE CONVENTION CENTER WABASH AVENUE & 9 TH STREET TERRE HAUTE, INDIANA PREPARED FOR 8365 Keystone Crossing, Suite 201 Indianapolis, IN 46240 Phone: (317) 202-0864 Fax: (317)

More information

The Highline Development Traffic Impact Study

The Highline Development Traffic Impact Study The Highline Development Traffic Impact Study Columbia Falls, Montana Prepared For: TD&H Engineering 450 Corporate Drive, Suite 101 Kalispell, MT 59901 June, 2018 130 South Howie Street Helena, Montana

More information

Traffic Impact Analysis. for the STARBUCKS STORE. Located at 9900 BALBOA BOULEVARD. Submitted to CITY OF LOS ANGELES. January 2017.

Traffic Impact Analysis. for the STARBUCKS STORE. Located at 9900 BALBOA BOULEVARD. Submitted to CITY OF LOS ANGELES. January 2017. Traffic Impact Analysis for the STARBUCKS STORE Located at 9900 BALBOA BOULEVARD Submitted to CITY OF LOS ANGELES January 2017 Submitted By January 5, 2017 Ken A. Aitchison, P.E. Transportation Engineering

More information

TRANSPORTATION AND TRAFFIC ANALYSIS REPORT

TRANSPORTATION AND TRAFFIC ANALYSIS REPORT Square One Drive Extension Municipal Class Environmental Assessment Environmental Study Report Appendix B Transportation and Traffic Analysis Report TRANSPORTATION AND TRAFFIC ANALYSIS REPORT FINAL DRAFT

More information

MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015

MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015 MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015 TABLE OF CONTENTS... 3 Proposed Development... 3 Methodology... 3 Phase 1 Development...

More information

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006 DRAFT TRAFFIC IMPACT STUDY FOR PHASED DEVELOPMENT OF TAMU CC Prepared for 3D/International, Inc. 1900 West Loop South, Suite 400 Houston, Texas 77027 November 2006 Interim Review Only Document Incomplete:

More information

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 Appendix C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 CONTENTS List of Figures-... 3 List of Tables... 4 Introduction... 1 Application of the Lubbock Travel Demand

More information

Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles

Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles Traffic Study August 31, 2015 AECOM 515 South Flower Street, 4 th Floor Los Angeles, CA 90071 Job Number: 60323255

More information

TRAFFIC STUDY FOR THE GAFFEY POOL PROJECT LOS ANGELES, CALIFORNIA CITY OF LOS ANGELES, BUREAU OF ENGINEERING OCTOBER 2013 PREPARED FOR PREPARED BY

TRAFFIC STUDY FOR THE GAFFEY POOL PROJECT LOS ANGELES, CALIFORNIA CITY OF LOS ANGELES, BUREAU OF ENGINEERING OCTOBER 2013 PREPARED FOR PREPARED BY TRAFFIC STUDY FOR THE GAFFEY POOL PROJECT LOS ANGELES, CALIFORNIA OCTOBER 2013 PREPARED FOR CITY OF LOS ANGELES, BUREAU OF ENGINEERING PREPARED BY DRAFT TRAFFIC STUDY FOR THE GAFFEY POOL PROJECT October

More information

TRAFFIC IMPACT STUDY MANUFACTURING COMPANY

TRAFFIC IMPACT STUDY MANUFACTURING COMPANY TRAFFIC IMPACT STUDY For MANUFACTURING COMPANY Prepared For: Airway Heights, WA Prepared By: SUNBURST ENGINEERING, P. S. 4310 S. Ball Dr. Veradale, WA 99037 April, 2013 TRAFFIC IMP ACT STUDY Manufacturing

More information

The Sunland Park flyover ramp is set to close the week of March 19 until early summer

The Sunland Park flyover ramp is set to close the week of March 19 until early summer March 2, 2018 The Sunland Park flyover ramp is set to close the week of March 19 until early summer GO 10 is targeting the week of March 19 to close the Sunland Park Drive flyover entrance ramp to I 10

More information

CHAPTER 3 TRANSPORTATION

CHAPTER 3 TRANSPORTATION CHAPTER 3 TRANSPORTATION This chapter presents information on transportation impacts of Section 2 of the Project that have changed from those identified in the published Westside Subway Extension Final

More information

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road STAFF REPORT ACTION REQUIRED Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road Date: October 28, 2008 To: From: Toronto and East York Community Council Director, Transportation

More information

City of Hermosa Beach Beach Access and Parking Study. Submitted by. 600 Wilshire Blvd., Suite 1050 Los Angeles, CA

City of Hermosa Beach Beach Access and Parking Study. Submitted by. 600 Wilshire Blvd., Suite 1050 Los Angeles, CA City of Hermosa Beach Beach Access and Parking Study Submitted by 600 Wilshire Blvd., Suite 1050 Los Angeles, CA 90017 213.261.3050 January 2015 TABLE OF CONTENTS Introduction to the Beach Access and Parking

More information

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance Endo Engineering Traffic Engineering Air Quality Studies Noise Assessments July 13, 2015 Mr. Ed Freeman Pinnacle View, LLC P.O. Box 1754 Lake Oswego, OR 97035-0579 Subject: Desert Palisades Specific Plan

More information

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov February 9, 2018 I-10 East at Redd closes for 24 hours this Sunday, Feb 11

More information

Signalized Intersections

Signalized Intersections Signalized Intersections Kelly Pitera October 23, 2009 Topics to be Covered Introduction/Definitions D/D/1 Queueing Phasing and Timing Plan Level of Service (LOS) Signal Optimization Conflicting Operational

More information

VHD Daily Totals. Population 14.5% change. VMT Daily Totals Suffolk 24-hour VMT. 49.3% change. 14.4% change VMT

VHD Daily Totals. Population 14.5% change. VMT Daily Totals Suffolk 24-hour VMT. 49.3% change. 14.4% change VMT 6.9 Suffolk 6-54 VMT Population and Travel Characteristics Population 14.5% change 2014 1,529,202 VHD Daily Totals 2014 251,060 49.3% change 2040 1,788,175 2040 374,850 VMT Daily Totals 2014 39,731,990

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output

MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output Rev. April 29, 2005 MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output Table of

More information

MEMORANDUM. Trip Generation Analysis

MEMORANDUM. Trip Generation Analysis MEMORANDUM To: RMC Architects From: Matthew Palmer, PE Subject: Trip Generation, Parking Analysis & Level of Service Project: Port of Everett, GTC #13-053 Date: August 25, 2014 The trip generation and

More information

TRANSPORTATION IMPACT STUDY WHEELER STREET CLOSURE

TRANSPORTATION IMPACT STUDY WHEELER STREET CLOSURE TRANSPORTATION IMPACT STUDY WHEELER STREET CLOSURE Village of Greene, Chenango County, New York Prepared for: VILLAGE OF GREENE 49 Genesee Street Greene, NY 13778 Prepared by: LARSON DESIGN GROUP 1000

More information

KAISER SOUTH NORTHERN VIRGINIA HUB TRAFFIC IMPACT STUDY PRINCE WILLIAM COUNTY, VIRGINIA TABLE OF CONTENTS. Section 2 BACKGROUND INFORMATION 12

KAISER SOUTH NORTHERN VIRGINIA HUB TRAFFIC IMPACT STUDY PRINCE WILLIAM COUNTY, VIRGINIA TABLE OF CONTENTS. Section 2 BACKGROUND INFORMATION 12 KAISER SOUTH NORTHERN VIRGINIA HUB TRAFFIC IMPACT STUDY PRINCE WILLIAM COUNTY, VIRGINIA TABLE OF CONTENTS Page EXECUTIVE SUMMARY 1 Purpose of Report and Study Objectives... 1 Site Location and Study Area...

More information

Date: April 3, 2018 Revised May 15, Project #: Re: Burlington Mall Retail Collection Transportation Evaluation

Date: April 3, 2018 Revised May 15, Project #: Re: Burlington Mall Retail Collection Transportation Evaluation To: Chuck Schneider Burlington S&S, LLC 225 West Washington Street Indianapolis, IN 46204 From: Patrick Dunford, P.E. Senior Project Manager Date: April 3, 2018 Revised May 15, 2018 Project #: 13482.01

More information

MEMORANDUM (DRAFT) DRAFT

MEMORANDUM (DRAFT) DRAFT 117 Commercial St. NE, Suite 310 Salem, OR 97301 503.391.8773 www.dksassociates.com MEMORANDUM (DRAFT) DATE: February 15, 2017 TO: FROM: SUBJECT: Alex Dupey, MIG Scott Mansur, PE, PTOE; Garth Appanaitis,

More information

California Urban Infill Trip Generation Study. Jim Daisa, P.E.

California Urban Infill Trip Generation Study. Jim Daisa, P.E. California Urban Infill Trip Generation Study Jim Daisa, P.E. What We Did in the Study Develop trip generation rates for land uses in urban areas of California Establish a California urban land use trip

More information

FARM 1065 PORTION 1, ATLANTIS TRAFFIC IMPACT ASSESSMENT

FARM 1065 PORTION 1, ATLANTIS TRAFFIC IMPACT ASSESSMENT FARM 1065 PORTION 1, ATLANTIS TRAFFIC IMPACT ASSESSMENT February 2018 FIRST ISSUE Prepared by: JG AFRIKA (PTY) LTD Branch: Cape Town PO Box 38561 Postal code: 7430 Telephone: 021 530 1800 Email: wink@

More information

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS 2018 WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS Introduction Woodruff Road is the main road to and through the commercial area in Greenville, South Carolina. Businesses along the corridor have

More information

The Urbana Free Library Parking and Transportation Study

The Urbana Free Library Parking and Transportation Study CHAMPAIGN COUNTY REGIONAL PLANNING COMMISSION The Urbana Free Library Parking and Transportation Study Final Report 7/18/2013 Champaign Urbana Urbanized Area Transportation Study (CUUATS) TABLE OF CONTENTS

More information

Prepared for: San Diego Association Of Governments 401 B Street, Suite 800 San Diego, California 92101

Prepared for: San Diego Association Of Governments 401 B Street, Suite 800 San Diego, California 92101 Activity-Based Travel Model Validation for 2012 Using Series 13 Data: Coordinated Travel Regional Activity Based Modeling Platform (CT-RAMP) for San Diego County Prepared for: San Diego Association Of

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

Policy Title: Snow Removal & Ice Control Policy #: PW

Policy Title: Snow Removal & Ice Control Policy #: PW Village of Fruitvale Corporate Policy Manual Policy Title: Snow Removal & Ice Control Policy #: PW-2012-01 Section: PUBLIC WORKS Initially Approved: 2012 06 04 Last Reviewed: 2013 05 06 Council Approval:

More information

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016 Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist

More information

Background and Planning Context 1.1 INTRODUCTION 1.2 PROJECT LOCATION

Background and Planning Context 1.1 INTRODUCTION 1.2 PROJECT LOCATION Chapter 1: Background and Planning Context 1.1 INTRODUCTION Metro-North Commuter Railroad Company ( Metro-North or the Project Sponsor ) is proposing the construction of a new, expanded parking garage

More information

Final City of Colusa STREETS & ROADWAYS MASTER PLAN. October J Street Suite 390 Sacramento, CA 95814

Final City of Colusa STREETS & ROADWAYS MASTER PLAN. October J Street Suite 390 Sacramento, CA 95814 Final City of Colusa STREETS & ROADWAYS MASTER PLAN October 2009 660 J Street Suite 390 Sacramento, CA 95814 TABLE OF CONTENTS I. INTRODUCTION... 1 Report Organization...1 II. ANALYSIS METHODOLOGY... 2

More information

FY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission

FY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission FY 2010 Continuing i Planning Program Product Report Local Transportation and Traffic Data Travel Time and Delay Data for Belpre and Marietta, Ohio Wood-Washington-Wirt Interstate Planning Commission CONTINUING

More information

Appendix J: Transportation and Circulation

Appendix J: Transportation and Circulation Appendix J: Transportation and Circulation J 1: Transportation Analysis Report J 2: Los Angeles Department of Transportation (LADOT) Approval Letter J 3: Construction Traffic Analysis J 1: Transportation

More information

City of Camrose Winter Road Maintenance Policy

City of Camrose Winter Road Maintenance Policy City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.

More information

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes Fairview Ave. and Main St. Improvements and Local Streets Plan Appendices Ada County Highway District Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes January 3, 207 Appendices

More information

1.0 INTRODUCTION AND SUMMARY...

1.0 INTRODUCTION AND SUMMARY... TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY... 1 1.1 Purpose and Study Objective... 1 1.2 Executive Summary... 1 2.0 ROADWAY CONDITIONS... 5 2.1 Granville Parkway (South Intersection)... 8 2.2 Tuscany

More information

Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945

Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945 Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945 Introduction The Brigham Young University Institute of Transportation Engineers student chapter (BYU ITE) completed

More information

US 169/I-70 North Loop Planning & Environmental Linkages Study

US 169/I-70 North Loop Planning & Environmental Linkages Study US 169/I-70 North Loop Planning & Environmental Linkages Study VISSIM Calibration Document Draft April 13, 2018 Page i Table of Contents 1. Overview... 1 2. Data Types... 2 3. Model Parameter Adjustments...

More information

930 Old Northern Rd & 4 Post Office Rd, Glenorie

930 Old Northern Rd & 4 Post Office Rd, Glenorie Proposed Mixed Use Development 930 Old Northern & 4, Glenorie TRAFFIC AND PARKING ASSESSMENT REPORT 13 December 2016 Ref 16264 Suite 6, 20 Young Street, Neutral Bay NSW 2089 - PO Box 1868, Neutral Bay

More information

CHAPTER 3. CAPACITY OF SIGNALIZED INTERSECTIONS

CHAPTER 3. CAPACITY OF SIGNALIZED INTERSECTIONS CHAPTER 3. CAPACITY OF SIGNALIZED INTERSECTIONS 1. Overview In this chapter we explore the models on which the HCM capacity analysis method for signalized intersections are based. While the method has

More information

TRAFFIC IMPACT STUDY FOR SOUTH BAY SALT POND RESTORATION PROJECT PHASE 2

TRAFFIC IMPACT STUDY FOR SOUTH BAY SALT POND RESTORATION PROJECT PHASE 2 APPENDIX G TRAFFIC IMPACT STUDY FOR SOUTH BAY SALT POND RESTORATION PROJECT PHASE 2 South Bay Salt Pond Restoration Project Phase II May 2015 Draft Environmental Impact Statement/Report Traffic Impact

More information

APPENDIX IV MODELLING

APPENDIX IV MODELLING APPENDIX IV MODELLING Kingston Transportation Master Plan Final Report, July 2004 Appendix IV: Modelling i TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 OBJECTIVE... 1 3.0 URBAN TRANSPORTATION MODELLING

More information

Monroe County: Key West and Lower Keys

Monroe County: Key West and Lower Keys FDOT PROJECT UPDATES June 15-21, 2015 Monroe County: Key West and Lower Keys Monroe County projects website: www.fdotmonroe.com Opt Out: If you no longer wish to receive these weekly notifications, please

More information

COUNCIL POLICY MANUAL

COUNCIL POLICY MANUAL COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs

More information

APPENDIX. Sutter Street Bicycle Lanes Stockton, CA January 2010

APPENDIX. Sutter Street Bicycle Lanes Stockton, CA January 2010 APPENDIX reet Bicycle Lanes Stockton, CA January 2010 1. Traffic count locations 2. Turning movement counts o AM PEAK - El Dorado Street at Ingram Street o PM PEAK - El Dorado Street at Ingram Street o

More information

North Carolina s First Quadrant Left: History and Lessons Learned

North Carolina s First Quadrant Left: History and Lessons Learned North Carolina s First Quadrant Left: History and Lessons Learned Michael P. Reese, P.E. (Corresponding Author) Congestion Management Section Project Engineer North Carolina Department of Transportation

More information

1.0 BACKGROUND. January 6, 2006 Proj #

1.0 BACKGROUND. January 6, 2006 Proj # January 6, 2006 Proj # 4565-01 Mr. Eugene Wat Director of Engineering City of Port Moody 100 Newport Drive Box 36 Port Moody, BC V3H 3E1 Dear Mr. Wat: RE: ALDERSIDE ROAD & IOCO ROAD PEDESTRIAN CROSSING

More information

CITY OF MINOT SNOW REMOVAL PLAN November 2017

CITY OF MINOT SNOW REMOVAL PLAN November 2017 CITY OF MINOT SNOW REMOVAL PLAN November 2017 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS 3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS In order to better determine future roadway expansion and connectivity needs, future population growth and land development patterns were analyzed as part of

More information

North Carolina s First Quadrant Left: History and Lessons Learned

North Carolina s First Quadrant Left: History and Lessons Learned 0 0 0 North Carolina s First Quadrant Left: History and Lessons Learned Michael P. Reese, P.E. (Corresponding Author) Congestion Management Section Project Engineer North Carolina Department of Transportation

More information

CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors]

CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors] CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors] Travel Time and Delay Analysis for Belpre (OH) and Marietta (OH) Fiscal Year 2009 Report WOOD WASHINGTON

More information

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas.

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas. NOTICE OF PUBLIC HEARING CITY PLANNING COMMISSION CITY OF OVERLAND PARK, KANSAS Notice is hereby given that the City Planning Commission of Overland Park, Kansas, will hold a public hearing Monday, July

More information

CE351 Transportation Systems: Planning and Design

CE351 Transportation Systems: Planning and Design CE351 Transportation Systems: Planning and Design TOPIC: Level of Service (LOS) at Traffic Signals 1 Course Outline Introduction to Transportation Highway Users and their Performance Geometric Design Pavement

More information

TOWN OF WINCHESTER OFFICE OF THE PLANNING DEPARTMENT. 71 Mount Vernon Street. Winchester, MA 01890

TOWN OF WINCHESTER OFFICE OF THE PLANNING DEPARTMENT. 71 Mount Vernon Street. Winchester, MA 01890 BRIAN SZEKELY TOWN PLANNER Winchester Board of Selectmen 71 Mt. Vernon St. Winchester, MA 01890 TOWN OF WINCHESTER OFFICE OF THE PLANNING DEPARTMENT 71 Mount Vernon Street Winchester, MA 01890 August 11,

More information

CHAPTER 5 DELAY ESTIMATION FOR OVERSATURATED SIGNALIZED APPROACHES

CHAPTER 5 DELAY ESTIMATION FOR OVERSATURATED SIGNALIZED APPROACHES CHAPTER 5 DELAY ESTIMATION FOR OVERSATURATED SIGNALIZED APPROACHES Delay is an important measure of effectiveness in traffic studies, as it presents the direct cost of fuel consumption and indirect cost

More information

TOWN OF GRAND FALLS WINDSOR

TOWN OF GRAND FALLS WINDSOR TOWN OF GRAND FALLS WINDSOR DEPARTMENT OF ENGINEERING AND WORKS FREQUENTLY ASKED QUESTIONS FOR WINTER OPERATIONS... What streets are the first to be plowed & salted/sanded? The roads crews are each assigned

More information

III. FORECASTED GROWTH

III. FORECASTED GROWTH III. FORECASTED GROWTH In order to properly identify potential improvement projects that will be required for the transportation system in Milliken, it is important to first understand the nature and volume

More information

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3 Page 1 of 12 Winter Operations Table of Contents WINTER CONTROL Objectives 2 WINTER CONTROL Season 3 SNOW ACCUMULATION Road Plowing 4,5 ICY ROADWAYS Application of Deicers/Abrasives 6 SNOW ACCUMULATION

More information

Committee Meeting November 6, 2018

Committee Meeting November 6, 2018 Committee Meeting November 6, 2018 Agenda Where we are in the process Land Use Plan Transportation Element Housing & Neighborhoods Elements Next Steps Schedule November 6: Plan Elements December: Plan

More information

Roundabout Level of Service

Roundabout Level of Service Roundabout Level of Service Rahmi Akçelik Director Akcelik & Associates Pty Ltd email: rahmi.akcelik@sidrasolutions.com web: www.sidrasolutions.com 8 January 2009 Contents 1. Introduction... 1 2. Fundamental

More information

DOWNTOWN SUB-AREA. Final Parking Study. Prepared for: City of Bellingham. March Prepared by:

DOWNTOWN SUB-AREA. Final Parking Study. Prepared for: City of Bellingham. March Prepared by: Final Parking Study DOWNTOWN SUB-AREA Prepared for: City of Bellingham March 2013 Prepared by: 11730 118 th Avenue NE, Suite 600 Kirkland, WA 98034-7120 Phone: 425-821-3665 Fax: 425-825-8434 www.transpogroup.com

More information

Establishment of Local Trip Generation Rates or Equations for Mixed-Use Developments in Kansas

Establishment of Local Trip Generation Rates or Equations for Mixed-Use Developments in Kansas Report No. K-TRAN: KU-11-7 FINAL REPORT October 2012 Establishment of Local Trip Generation Rates or Equations for Mixed-Use Developments in Kansas Mehrdad Givechi, P.E., PTOE George Sarkodee The University

More information

Appendix B.1 EMME Model Calibration Memo

Appendix B.1 EMME Model Calibration Memo Appendix B.1 EMME Model Calibration Memo itrans 144 Front Street West, Suite 655 Toronto, ON M5J 2L7 Tel: (416) 847-0005 Fax: (905) 882-1557 www.hdrinc.com www.itransconsulting.com File: 2.0 Memorandum

More information

SHADE/SHADOW REPORT. For the Proposed 8777 Washington Project. Culver City, CA. Prepared for:

SHADE/SHADOW REPORT. For the Proposed 8777 Washington Project. Culver City, CA. Prepared for: SHADE/SHADOW REPORT For the Proposed 8777 Washington Project Culver City, CA Prepared for: VITRUVIAN CULVER CITY LLC (THE APPLICANT) 5822 WEST WASHINGTON BOULEVARD CULVER CITY, CALIFORNIA 90232 Prepared

More information

City of Grand Island Tuesday, August 14, 2018 Council Session

City of Grand Island Tuesday, August 14, 2018 Council Session City of Grand Island Tuesday, August 14, 2018 Council Session Item I-1 #2018-240 - Consideration of Approving Update to Resolution No. 2015-120; Designated Truck Routes within the City of Grand Island

More information

Septem ber 28, 2016 EL PASO, Texas

Septem ber 28, 2016 EL PASO, Texas September 28, 2016 EL PASO, Texas Crews from Paso del Norte Trackworks will finalize underground utility work and begin laying rail on a portion of Kansas Street thru Downtown El Paso in the coming weeks,

More information

2129 NORTH MAIN STREET HOTE PROJECT ULI SHARED PARKING STUDY City of Santa Ana, California

2129 NORTH MAIN STREET HOTE PROJECT ULI SHARED PARKING STUDY City of Santa Ana, California 2129 NORTH MAIN STREET HOTE PROJECT ULI SHARED PARKING STUDY City of Santa Ana, California Prepared for: NET DEVELOPMENT COMPANY 3130 Airway Avenue Costa Mesa, CA 92626 Prepared by: RK ENGINEERING GROUP,

More information

CITY OF MINOT SNOW REMOVAL PLAN October 2018

CITY OF MINOT SNOW REMOVAL PLAN October 2018 CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

Planning Commission Staff Report

Planning Commission Staff Report Planning Commission Staff Report April 7, 2016 PROJECT: Dutch Bros Coffee at Sheldon FILE: EG-15-042 REQUEST: Conditional Use Permit (CUP) and Major Design Review Amendment (DR) LOCATION: 8821, 8829, 8835,

More information

Greater Toronto Area Cordon Count Summary Analysis of Traffic Trends 1985 to 2011

Greater Toronto Area Cordon Count Summary Analysis of Traffic Trends 1985 to 2011 Greater Toronto Area Cordon Count Summary Analysis of Traffic Trends 1985 to 2011 Prepared by: Data Management Group Department of Civil Engineering University of Toronto Telephone: (416) 978-3916 Table

More information

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. UPDATES

More information

A Study of Red Light Cameras in Kansas City, MO

A Study of Red Light Cameras in Kansas City, MO A Study of Red Light s in Kansas City, MO Prepared by the Special Operations Division Executive Summary This paper will analyze the crash data for the 29 red light cameras located in 17 intersections in

More information