HABITAT FOR HUMANITY 2129 Nantes Street Detailed Noise Study

Size: px
Start display at page:

Download "HABITAT FOR HUMANITY 2129 Nantes Street Detailed Noise Study"

Transcription

1 HABITAT FOR HUMANITY 2129 Nantes Street Detailed Noise Study

2 HABITAT FOR HUMANITY 2129 Nantes Street DETAILED NOISE STUDY Prepared by: NOVATECH ENGINEERING CONSULTANTS LTD. 240 Michael Cowpland Drive, Suite 200 Ottawa, Ontario, K2M 1P6 May 11, 2011 Revised April 3, 2012 Ref: R&2011&095 Novatech File No

3 April 3, 2012 BY COURIER City of Ottawa Planning and Growth Management Department Development Review Services: Suburban East Infrastructure Approvals Division 110 Laurier Avenue West, 4 th Floor Ottawa, ON K1P 1J1 Attention: Mr. John Sevigny, Project Manager Re: Habitat for Humanity 2129 Nantes Street Detailed Noise Study Our File No.: Please find enclosed five (5) copies of the revised Detailed Noise Study for the proposed Habitat for Humanity residential development located at 2129 Nantes Street. This report is submitted in support of the Site Plan Application for the above noted site. Do not hesitate to contact the undersigned if you have any questions or require additional information. Sincerely, NOVATECH ENGINEERING CONSULTANTS LTD. Kevin Murphy, P.Eng. Project Engineer cc: Richard Hughes (Habitat for Humanity) David Kardish (Trim Road Inc. c/o Regional Group) Gord Lorimer (Hobin Architects) M:\2010\110215\DATA\Reports\Noise\Detailed Noise Study ( ).docx

4 Detailed Noise Study Habitat for Humanity 2129 Nantes Street TABLE OF CONTENTS 1.0 INTRODUCTION CITY OF OTTAWA ENVIRONMENTAL NOISE CONTROL GUIDELINES SOUND LEVEL CRITERIA NOISE ATTENUATION REQUIREMENTS NOISE SOURCES PORTOBELLO BOULEVARD NOISE LEVEL PREDICTIONS MODELING NOISE WALL BUILDING COMPONENT ASSESSMENT CONCLUSIONS AND RECOMMENDATIONS... 1 LIST OF FIGURES Figure 1.1 Key Plan Figure 1.2 Aerial View Figure 1.3 Proposed Site Plan Figure 3.1 Noise Sources Figure 5.1 Noise Barrier, Construction Requirements and Warning Clauses LIST OF TABLES Table 2.1 Outdoor Sound Level Criteria Table 2.2 Indoor Sound Level Criteria Table 2.3 Outdoor, Ventilation and Warning Clause Requirements Table 3.1 Innes Road Noise Parameters Table 4.1 OLA Noise Level Summary Table 4.2 POW Noise Level Summary LIST OF APPENDICIES Appendix A: Stamson Model Output Appendix B: Proposed Grading Plan ( GR) Novatech Engineering Consultants Ltd. i

5 Detailed Noise Study Habitat for Humanity 2129 Nantes Street 1.0 INTRODUCTION The proposed site is located at 2129 Nantes Street, in the City of Ottawa. The property is bounded by vacant future development lands to the north, Portobello Boulevard to the west, vacant lands including the future planned road to the east and Nantes Street as well as Trim Road Subdivision (Phase 2) residential lots to the south as shown in Figure 1.1. Figure 1.1 Key Plan The legal description of the property is designated as Block 173, Plan 4M1062, in the former City of Cumberland. The site covers an approximate area of 0.22 hectares and is currently a vacant parcel of land within a registered subdivision as shown in Figure 1.2. The proposed development will consist of four townhouse blocks (three blocks along Nantes Street and the fourth along the future planned road) and one bungalow (along Nantes Street). There will be a combined total of nine (9) units, as shown in Figure 1.3. This report assesses potential noise sources that could affect the development, analyzes the sound levels, and makes specific recommendations for compliance with the City of Ottawa Environmental Noise Control Guidelines (ENCG). Novatech Engineering Consultants Ltd. Page 1

6 Detailed Noise Study Habitat for Humanity 2129 Nantes Street Figure 1.2 Aerial View Figure 1.3 Proposed Site Plan Novatech Engineering Consultants Ltd. Page 2

7 Detailed Noise Study Habitat for Humanity 2129 Nantes Street 2.0 CITY OF OTTAWA ENVIRONMENTAL NOISE CONTROL GUIDELINES 2.1 Sound Level Criteria The City of Ottawa is concerned with noise from aircraft, roads, railways and transitways as expressed in Section of the Official Plan. These policies are supported by the Environmental Noise Control Guidelines (ENCG) which is a technical document that outlines the specific sound level criteria. The mandate of the acoustic engineer is typically to analyze, and where required, design an acceptable acoustic environment that complies with the ENCG document to the extent that is both reasonable and practical. The areas which must be assessed for acoustic protection include the Outdoor Living Area (OLA), Outdoor Plane of Window (POW), the Indoor Daytime Environment, and the Indoor NightTime Environment. The Outdoor Living Area is defined as that part of the outdoor amenity area provided for the quiet enjoyment of the outdoor environment during the daytime period. These amenity areas are typically backyards, gardens, terraces and patios. The OLA noise target for traffic noise sources is 55 dba. This criterion may be exceeded by an amount not greater than 5 dba, subject to justification and the use of a Warning Clause. The residential Plane of Window noise target for traffic noise sources is 55 dba during the day and 50 dba at night. If this criterion is exceeded, the property may be subject to building component analysis and warning clauses. The sound criterion is broadly summarized in Table 2.1. Table 2.1 Outdoor Sound Level Criteria TIME PERIOD RECEIVER LOCATION SOUND LEVEL CRITERIA Daytime (07:00 23:00 hrs) Plane of Living Room Window 55 dba Night time (23:00 07:00 hrs) Plane of Bedroom Window 50 dba Compliance with the outdoor sound level criteria generally ensures compliance with the indoor sound level criteria which is summarized below in Table 2.2. Table 2.2 Indoor Sound Level Criteria TIME PERIOD RECEIVER LOCATION SOUND LEVEL CRITERIA Daytime (07:00 23:00 hrs) General offices and reception areas, retail stores, etc. 50 dba Daytime (07:00 23:00 hrs) Living/Dining Rooms of residential dwelling units, hospitals, schools, nursing homes, daycare centres, theatres, places of worship, individual or semiprivate offices, conference rooms etc. 45 dba Night Time (23:00 07:00 hrs) Sleeping quarters of hotels/motels. 45 dba Night Time (23:00 07:00 hrs) Sleeping quarters of residential units, hospitals, nursing homes, senior citizen homes, etc. 40 dba Novatech Engineering Consultants Ltd. Page 3

8 Detailed Noise Study Habitat for Humanity 2129 Nantes Street 2.2 Noise Attenuation Requirements When sound levels are predicted to be less than the specified criteria for daytime and night time conditions, no attenuation measures are required on the part of the proponent. As the noise criteria are exceeded, a combination of attenuation measures are recommended by the City of Ottawa to modify the development environment. These attenuation measures may include any or all of the following: construction of a noise barrier wall and/or berm; installation of a forced air ventilation system with provision for central air; installation of central air; acoustically selected building façade components Where excessive noise levels may adversely affect property or its use, the City of Ottawa requires notices in the form of a Warning Clause to be placed on title in order to alert the buyer or renter of a possible environmental noise condition or a limitation on his/her property rights. The notices on title must be included in the Development Agreement(s) and in the Agreement(s) or Offer(s) of Purchase and Sale. Table 2.3 outlines the noise attenuation measures required for various noise levels predicted at the Plane of Window (POW) of the proposed development. Table 2.3 Outdoor, Ventilation and Warning Clause Requirements Assessment Location Outdoor Living Area (OLA) Plane Of Living Room Window (POW) Plane Of Bedroom Window (POW) L eq (dba) Ventilation Requirements Outdoor Control Measures Warning Clause Less than 55 N/A None required None required Control measures Required if resultant Between 55 and (barriers) may not be N/A L 60 required but should eq exceeds 55 dba Type A be considered. Required if resultant More than 60 N/A Barriers required L eq exceeds 55 dba Type B Less than 55 None Required N/A None Required Between 55 and 65 More Than 65 Forced air heating with provision for central air conditioning Central Air Conditioning N/A N/A Required Type C Required Type D Less than 50 None Required N/A None Required Forced air heating conditioning Between 50 and with provision for 60 central air N/A Required Type C More than 60 Central Air Conditioning N/A Required Type D Novatech Engineering Consultants Ltd. Page 4

9 Detailed Noise Study Habitat for Humanity 2129 Nantes Street In summary, a forced air heating system with provision for a central air conditioning system is required if the daytime noise levels are between 55 and 65 dba and/or the night time noise levels are between 50 and 60 dba. The criteria shall be modified to require installation of a central air conditioning system when the daytime noise level exceeds 65 dba and/or the night time noise level exceeds 60 dba; furthermore, the exterior building components must be analyzed to ensure the indoor sound level targets are achieved. This includes analysis of the exterior wall, door, and/or glazing system specifications as appropriate. The Warning Clauses to be placed on title and included in both the Development Agreement and within the Offer of Purchase and Sale are described in the conclusions section of this document. The clauses are extracted from Section of the ENCG as appropriate. 3.0 NOISE SOURCES Figure 3.1 shows the noise sources which have an impact on this development. Portobello Boulevard is the most significant vehicular noise source due to it s proximity to the units. A future transitway is planned approximately 200m north of the proposed site, however due to the distance from the development site it will have negligible effect on the total noise levels and has been excluded from calculations. 3.1 Portobello Boulevard Portobello Boulevard is classified as a 4Lane Major Collector (4UMC) Roadway in the 2008 Transportation Master Plan. An Annual Average Daily Traffic (AADT) value of 24,000 is specified for this type of road, and the Day/Night Split (92/8), Medium (7) and Heavy Truck (5) percentages are used as outlined in Table 1.7 of the ENCG. The posted speed limit in the area of the proposed development is 50 km/hr. Per the ENCG, Portobello Boulevard northbound and southbound lanes will be modelled as two separate segments. The closest building is located 25.4m from the centreline of the northbound lanes and 35.4m from the southbound lanes. The roadway noise parameters are summarized below in Table 3.1 and show in Figure 3.1. Table 3.1 Portobello Boulevard Noise Parameters Roadway Classification Annual Average Daily Traffic (AADT) 4Lane Urban Major Collector 24,000 veh/day Day/Night Split (%) 92/8 Heavy Trucks (%) 5 Medium Trucks (%) 7 Posted Speed Limit 50 km/hr Road Gradient 0% The property slopes upwards from west to east, with the centerline road elevation along the property at approximately 89.55m and the proposed terrace elevation at the building face between and 90.50m. The proposed grading plan is attached in Appendix B. Novatech Engineering Consultants Ltd. Page 5

10 Detailed Noise Study Habitat for Humanity 2129 Nantes Street Figure 3.1 Noise Sources 4.0 NOISE LEVEL PREDICTIONS 4.1 Modeling Noise levels are calculated using the STAMSON computer program, version Road data is input into the program as applicable, whereupon the program calculates an Aweighted 16 hour L eq noise level for the daytime and an 8 hour L eq noise level for the night time. The result of these computer calculations are presented in Appendix A and summarized in Table 4.1 and Table 4.2. Table 4.1 OLA Noise Level Summary LOCATION OUTDOOR LIVING AREA NOISE LEVEL L eq < (dba) Unit 1 (No Wall) Unit 1 (Wall on West Property Line) Unit 1 (Future Extended Wall) Unit Unit Unit Unit Future Units 8 and Novatech Engineering Consultants Ltd. Page 6

11 Detailed Noise Study Habitat for Humanity 2129 Nantes Street Table 4.2 POW Noise Level Summary LOCATION PLANE OF WINDOW (POW) NOISE LEVEL L eq < (dba) DAYTIME NIGHT TIME Unit 1 Level 1 (Side Facing Portobello Blvd) Unit 1 Level Unit 2 Level Unit 3 Level Unit 4 Level Future Units 8 and 9 Level Unit 2 Level Unit 3 Level Unit 4 Level Unit 5 Level Unit 6 Level Future Units 8 and 9 Level Noise Wall When noise levels exceed 60 dba in the Outdoor Living Area, control measures (barriers) are required to reduce the L eq to below 60 dba and as close to 55 dba as technically, economically and administratively feasible. The L eq for Unit 1 with no control measures would be just above the limit at dba. The most appropriate place for a noise barrier is along the property line adjacent to Portobello Boulevard, however due to the configuration of the site this amounts to a very short section of noise barrier (approximately 12m). With a 2.2m high noise barrier at this location, the modeled L eq is 59.67dBA. A privacy fence will be installed along the north property line which will give some extra noise attenuation, so the occupants of Unit 1 will experience outdoor noise volumes below 60 dba. When the property to the north is developed it is likely that a noise wall will be required along Portobello Boulevard and the 12m noise barrier will be extended dropping the modeled L eq to If a noise wall is not required, the residential units themselves will provide additional shielding from the traffic noise bringing the L eq closer to 55 dba. The noise wall shall be compliant with the City Standard for Noise Barriers and have the following characteristics: 2.2m high; situated 0.3m away from the City rightofway; have a surface mass density not less than 20kg/sq.m; and have no holes or gaps Novatech Engineering Consultants Ltd. Page 7

12 Detailed Noise Study Habitat for Humanity 2129 Nantes Street 4.3 Building Component Assessment When noise levels exceed 65 dba (daytime) or 60 dba (night time) the exterior cladding system of the building envelope must be acoustically assessed to ensure the indoor noise criteria is achieved. In the proposed development the sound level at every wall will be below 65 dba (daytime) and 60 dba (night time). Therefore, as long as the buildings are compliant with the Ontario Building Code, they will be compliant with the City of Ottawa s indoor noise criteria. 5.0 CONCLUSIONS AND RECOMMENDATIONS To comply with the ENCG policies, a noise barrier shall be constructed along the west property line as described above in Section 4.2. Units 14 must have a warning clause of Type A. The warning clause shall be incorporated into the development agreement, registered on title, and included in the Agreement of Purchase and Sale. Units 15, 8 and 9 must have forced air heating with provision for central air conditioning, and a warning clause of Type C. The warning clause shall be incorporated into the development agreement, registered on title, and included in the Agreement of Purchase and Sale. The noise barrier, construction requirements and warning clauses required are shown below in Figure 5.1. Warning Clause Type A Purchasers/tenants are advised that sound levels due to increasing road traffic may occasionally interfere with some activities of the dwelling occupants as the sound levels exceed the City s and the Ministry of the Environment s noise criteria. Warning Clause Type C This dwelling unit has been fitted with a forced air heating system and the ducting, etc. was sized to accommodate central air conditioning. Installation of central air conditioning by the occupant will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the City s and the Ministry of the Environment s noise criteria. (Note: The location and installation of the outdoor air conditioning device should be done so as to comply with noise criteria of MOE Publication NPC216, Residential Air Conditioning Devices and thus minimize the noise impacts both on and in the immediate vicinity of the subject property.) Novatech Engineering Consultants Ltd. Page 8

13 Detailed Noise Study Habitat for Humanity 2129 Nantes Street Figure 5.1 Noise Barrier, Construction Requirements and Warning Clauses If you have any questions or comments with regards to this report please do not hesitate to contact the undersigned. Respectfully issued, NOVATECH ENGINEERING CONSULTANTS LTD. Prepared By: Reviewed By: Kevin Murphy, P.Eng. Project Engineer Melanie Riddell, P.Eng. Project Manager Novatech Engineering Consultants Ltd. Page 9

14 Detailed Noise Study Habitat for Humanity 2129 Nantes Street APPENDIX A Stamson Model Output Novatech Engineering Consultants Ltd.

15 STAMSON 5.0 NORMAL REPORT Date: :46:26 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u1olarev.te Time Period: Day/Night 16/8 hours Description: Unit 1 OLA (No Wall Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m

16 Road data, segment # 3: Unit 1 N (day/night) Car traffic volume : 1600/800 veh/timeperiod Medium truck volume : 320/160 veh/timeperiod Heavy truck volume : 160/80 veh/timeperiod Posted speed limit : 100 km/h Data for Segment # 3: Unit 1 N (day/night) --- Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 2 (Flat/gentle slope; with barrier) Barrier angle1 : deg Angle2 : deg Barrier height : 6.00 m Barrier receiver distance : 3.00 / 3.00 m Source elevation : 0.00 m Receiver elevation : 0.00 m Barrier elevation : 0.00 m Road data, segment # 4: Unit 1 S (day/night) Car traffic volume : 1600/800 veh/timeperiod Medium truck volume : 320/160 veh/timeperiod Heavy truck volume : 160/80 veh/timeperiod Posted speed limit : 100 km/h Data for Segment # 4: Unit 1 S (day/night) --- Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 2 (Flat/gentle slope; with barrier) Barrier angle1 : deg Angle2 : deg Barrier height : 6.00 m Barrier receiver distance : 3.00 / 3.00 m Source elevation : 0.00 m Receiver elevation : 0.00 m Barrier elevation : 0.00 m

17 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Results segment # 3: Unit 1 N (day) Source height = 1.67 m Barrier height for grazing incidence Source! Receiver! Barrier! Elevation of Height (m)! Height (m)! Height (m)! Barrier Top (m) ! 1.50! 1.51! 1.51 ROAD ( ) = dba Segment Leq : dba

18 Results segment # 4: Unit 1 S (day) Source height = 1.67 m Barrier height for grazing incidence Source! Receiver! Barrier! Elevation of Height (m)! Height (m)! Height (m)! Barrier Top (m) ! 1.50! 1.51! 1.51 ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): 60.01

19 STAMSON 5.0 NORMAL REPORT Date: :53:30 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u1olwrev.te Time Period: Day/Night 16/8 hours Description: Unit 1 OLA (Wall Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 2 (Flat/gentle slope; with barrier) Barrier angle1 : deg Angle2 : deg Barrier height : 2.20 m Barrier receiver distance : / m Source elevation : 0.00 m Receiver elevation : 0.00 m Barrier elevation : 0.00 m Road data, segment # 2: Portobello (day/night)

20 Data for Segment # 2: Portobello (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 2 (Flat/gentle slope; with barrier) Barrier angle1 : deg Angle2 : deg Barrier height : 2.20 m Barrier receiver distance : / m Source elevation : 0.00 m Receiver elevation : 0.00 m Barrier elevation : 0.00 m Road data, segment # 3: Unit 1 N (day/night) Car traffic volume : 1600/800 veh/timeperiod Medium truck volume : 320/160 veh/timeperiod Heavy truck volume : 160/80 veh/timeperiod Posted speed limit : 100 km/h Data for Segment # 3: Unit 1 N (day/night) --- Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 2 (Flat/gentle slope; with barrier) Barrier angle1 : deg Angle2 : deg Barrier height : 6.00 m Barrier receiver distance : 3.00 / 3.00 m Source elevation : 0.00 m Receiver elevation : 0.00 m Barrier elevation : 0.00 m Road data, segment # 4: Unit 1 S (day/night) Car traffic volume : 1600/800 veh/timeperiod Medium truck volume : 320/160 veh/timeperiod Heavy truck volume : 160/80 veh/timeperiod Posted speed limit : 100 km/h Data for Segment # 4: Unit 1 S (day/night) --- Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 2 (Flat/gentle slope; with barrier) Barrier angle1 : deg Angle2 : deg Barrier height : 6.00 m

21 Barrier receiver distance : 3.00 / 3.00 m Source elevation : 0.00 m Receiver elevation : 0.00 m Barrier elevation : 0.00 m Results segment # 1: Portobello N (day) Barrier height for grazing incidence Source! Receiver! Barrier! Elevation of Height (m)! Height (m)! Height (m)! Barrier Top (m) ! 1.50! 1.50! 1.50 ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello (day) Barrier height for grazing incidence Source! Receiver! Barrier! Elevation of Height (m)! Height (m)! Height (m)! Barrier Top (m) ! 1.50! 1.50! 1.50 ROAD ( ) = dba Segment Leq : dba

22 Results segment # 3: Unit 1 N (day) Source height = 1.67 m Barrier height for grazing incidence Source! Receiver! Barrier! Elevation of Height (m)! Height (m)! Height (m)! Barrier Top (m) ! 1.50! 1.51! 1.51 ROAD ( ) = dba Segment Leq : dba Results segment # 4: Unit 1 S (day) Source height = 1.67 m Barrier height for grazing incidence Source! Receiver! Barrier! Elevation of Height (m)! Height (m)! Height (m)! Barrier Top (m) ! 1.50! 1.51! 1.51 ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): 59.67

23 STAMSON 5.0 NORMAL REPORT Date: :26:33 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u1olw2r.te Time Period: Day/Night 16/8 hours Description: Unit 1 OLA (Future Wall Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 2 (Flat/gentle slope; with barrier) Barrier angle1 : deg Angle2 : deg Barrier height : 2.20 m Barrier receiver distance : / m Source elevation : 0.00 m Receiver elevation : 0.00 m Barrier elevation : 0.00 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : deg deg

24 Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 2 (Flat/gentle slope; with barrier) Barrier angle1 : deg Angle2 : deg Barrier height : 2.20 m Barrier receiver distance : / m Source elevation : 0.00 m Receiver elevation : 0.00 m Barrier elevation : 0.00 m Results segment # 1: Portobello N (day) Barrier height for grazing incidence Source! Receiver! Barrier! Elevation of Height (m)! Height (m)! Height (m)! Barrier Top (m) ! 1.50! 1.50! 1.50 ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) Barrier height for grazing incidence Source! Receiver! Barrier! Elevation of Height (m)! Height (m)! Height (m)! Barrier Top (m) ! 1.50! 1.50! 1.50 ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): 54.80

25 STAMSON 5.0 NORMAL REPORT Date: :39:15 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u2olarev.te Time Period: Day/Night 16/8 hours Description: Unit 2 OLA (Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m

26 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): 57.40

27 STAMSON 5.0 NORMAL REPORT Date: :43:33 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u3olarev.te Time Period: Day/Night 16/8 hours Description: Unit 3 OLA (Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m

28 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): 56.63

29 STAMSON 5.0 NORMAL REPORT Date: :46:59 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u4olarev.te Time Period: Day/Night 16/8 hours Description: Unit 4 OLA (Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m

30 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): 55.30

31 STAMSON 5.0 NORMAL REPORT Date: :50:04 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u5olarev.te Time Period: Day/Night 16/8 hours Description: Unit 5 OLA (Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 4.50 m

32 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): 54.62

33 STAMSON 5.0 NORMAL REPORT Date: :53:08 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u1011olr.te Time Period: Day/Night 16/8 hours Description: Unit 8 & 9 OLA (Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 7.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 7.50 m

34 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): 54.53

35 STAMSON 5.0 NORMAL REPORT Date: :14:55 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u1frrev.te Time Period: Day/Night 16/8 hours Description: Unit 1 POW Front (Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 1.50 m Topography : 2 (Flat/gentle slope; with barrier) Barrier angle1 : deg Angle2 : 8.00 deg Barrier height : 2.20 m Barrier receiver distance : / m Source elevation : 0.00 m Receiver elevation : 0.00 m Barrier elevation : 0.00 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : deg deg

36 Receiver source distance : / m Receiver height : 1.50 / 1.50 m Topography : 2 (Flat/gentle slope; with barrier) Barrier angle1 : deg Angle2 : 8.00 deg Barrier height : 2.20 m Barrier receiver distance : / m Source elevation : 0.00 m Receiver elevation : 0.00 m Barrier elevation : 0.00 m Results segment # 1: Portobello N (day) Barrier height for grazing incidence Source! Receiver! Barrier! Elevation of Height (m)! Height (m)! Height (m)! Barrier Top (m) ! 1.50! 1.50! 1.50 ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) Barrier height for grazing incidence Source! Receiver! Barrier! Elevation of Height (m)! Height (m)! Height (m)! Barrier Top (m) ! 1.50! 1.50! 1.50 ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba

37 Results segment # 1: Portobello N (night) -- Barrier height for grazing incidence Source! Receiver! Barrier! Elevation of Height (m)! Height (m)! Height (m)! Barrier Top (m) ! 1.50! 1.50! 1.50 ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (night) -- Barrier height for grazing incidence Source! Receiver! Barrier! Elevation of Height (m)! Height (m)! Height (m)! Barrier Top (m) ! 1.50! 1.50! 1.50 ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 55.16

38 STAMSON 5.0 NORMAL REPORT Date: :23:05 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u1sirev.te Time Period: Day/Night 16/8 hours Description: Unit 1 POW Side (Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 1.50 / 1.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 1.50 / 1.50 m

39 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Portobello N (night) -- ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (night) -- ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 50.91

40 STAMSON 5.0 NORMAL REPORT Date: :38:02 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u2rev.te Time Period: Day/Night 16/8 hours Description: Unit 2 POW (Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 1.50 / 1.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 1.50 / 1.50 m

41 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Portobello N (night) -- ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (night) -- ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 49.01

42 STAMSON 5.0 NORMAL REPORT Date: :37:44 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: unit3rev.te Time Period: Day/Night 16/8 hours Description: Unit 3 POW (Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 1.50 / 1.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 1.50 / 1.50 m

43 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Portobello N (night) -- ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (night) -- ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 48.30

44 STAMSON 5.0 NORMAL REPORT Date: :41:28 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: unit4rev.te Time Period: Day/Night 16/8 hours Description: Unit 4 POW (Revised) Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 1.50 / 1.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 1.50 / 1.50 m

45 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Portobello N (night) -- ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (night) -- ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 47.13

46 STAMSON 5.0 NORMAL REPORT Date: :07:51 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u89.te Time Period: Day/Night 16/8 hours Description: Unit 8 & 9 POW Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 1.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 1.50 / 1.50 m

47 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Portobello N (night) -- ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (night) -- ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 46.57

48 STAMSON 5.0 NORMAL REPORT Date: :34:10 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u22rev.te Time Period: Day/Night 16/8 hours Description: Unit 2 POW2 Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 4.50 / 4.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 4.50 / 4.50 m

49 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Portobello N (night) -- ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (night) -- ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 49.67

50 STAMSON 5.0 NORMAL REPORT Date: :36:40 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u32rev.te Time Period: Day/Night 16/8 hours Description: Unit 3 POW2 Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 4.50 / 4.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 4.50 / 4.50 m

51 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Portobello N (night) -- ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (night) -- ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 49.00

52 STAMSON 5.0 NORMAL REPORT Date: :41:01 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u42rev.te Time Period: Day/Night 16/8 hours Description: Unit 4 POW2 Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 4.50 / 4.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 4.50 / 4.50 m

53 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Portobello N (night) -- ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (night) -- ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 47.94

54 STAMSON 5.0 NORMAL REPORT Date: :45:35 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u52rev.te Time Period: Day/Night 16/8 hours Description: Unit 5 POW2 Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 4.50 / 4.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 4.50 / 4.50 m

55 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Portobello N (night) -- ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (night) -- ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 47.38

56 STAMSON 5.0 NORMAL REPORT Date: :49:44 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u62rev.te Time Period: Day/Night 16/8 hours Description: Unit 6 POW2 Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 4.50 / 4.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : 0.00 deg deg Receiver source distance : / m Receiver height : 4.50 / 4.50 m

57 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Portobello N (night) -- ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (night) -- ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 46.49

58 STAMSON 5.0 NORMAL REPORT Date: :11:01 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: u892.te Time Period: Day/Night 16/8 hours Description: Unit 8 & 9 POW3 Road data, segment # 1: Portobello N (day/night) -- Data for Segment # 1: Portobello N (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 7.50 / 7.50 m Road data, segment # 2: Portobello S (day/night) -- Data for Segment # 2: Portobello S (day/night) Angle1 Angle2 : deg deg Receiver source distance : / m Receiver height : 7.50 / 7.50 m

59 Results segment # 1: Portobello N (day) ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Portobello N (night) -- ROAD ( ) = dba Segment Leq : dba Results segment # 2: Portobello S (night) -- ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 48.21

60 Detailed Noise Study Habitat for Humanity 2129 Nantes Street APPENDIX B Proposed Grading Plan (110215!GR) Novatech Engineering Consultants Ltd.

61

3443 INNES ROAD NOISE IMPACT ASSESSMENT REPORT

3443 INNES ROAD NOISE IMPACT ASSESSMENT REPORT 3443 INNES ROAD NOISE IMPACT ASSESSMENT REPORT Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Kanata, Ontario K2M 1P6 December 2017 Novatech File No. 117077 Ref No.: R-2017-192 December 19,

More information

115 ECHO DRIVE CITY OF OTTAWA DETAILED NOISE STUDY

115 ECHO DRIVE CITY OF OTTAWA DETAILED NOISE STUDY Dix B 115 ECHO DRIVE CITY OF OTTAWA DETAILED NOISE STUDY Prepared for: UNIFORM URBAN DEVELOPMENTS Suite 300, 117 Centrepointe Drive Ottawa, Ontario K2G 5X3 Prepared by: NOVATECH Suite 200, 240 Michael

More information

Roadway Traffic Noise Feasibility Assessment. 315 Chapel Street. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. 315 Chapel Street. Ottawa, Ontario Roadway Traffic Noise Feasibility Assessment 315 Chapel Street Ottawa, Ontario REPORT: GWE17-002 - Traffic Noise Prepared For: Leanne Moussa Allsaints 10 Blackburn Avenue K1N 6P8 Ottawa, Ontario Prepared

More information

Transportation Noise Assessment Prince of Wales Residential Development Ottawa, Ontario

Transportation Noise Assessment Prince of Wales Residential Development Ottawa, Ontario Transportation Noise Assessment 1003 Prince of Wales Residential Development Ottawa, Ontario REPORT: GWE13-031 - Traffic Noise Prepared For: Kent Bugatsch Inc. 63 Pamilla Street Ottawa, Ontario K1S 3K7

More information

Transportation Noise Assessment. 590 Rideau Street. Ottawa, Ontario

Transportation Noise Assessment. 590 Rideau Street. Ottawa, Ontario Transportation Noise Assessment 590 Rideau Street Ottawa, Ontario REPORT: GWE16-019 Transportation Noise Prepared For: Kevin Yemm Richcraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa,

More information

Transportation Noise Assessment. 560 Rideau Street. Ottawa, Ontario

Transportation Noise Assessment. 560 Rideau Street. Ottawa, Ontario Transportation Noise Assessment 560 Rideau Street Ottawa, Ontario REPORT: GWE13-034 Transportation Noise Prepared For: Kevin Yemm Richcraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa,

More information

Traffic Noise Impact Study. 383 Slater Street / 400 Albert Street. Ottawa, Ontario

Traffic Noise Impact Study. 383 Slater Street / 400 Albert Street. Ottawa, Ontario 383 Slater Street / 400 Albert Street Ottawa, Ontario REPORT: GWE16-104 - Prepared For: Anand Aggarwal 2507701 Ontario Inc. Manor Park Management 231 Brittany Drive, Suite D Ottawa, Ontario K1K 0R8 Prepared

More information

patersongroup Environmental Noise Control Study Proposed Multi-Storey Building 1088 Maritime Way - Ottawa Prepared For

patersongroup Environmental Noise Control Study Proposed Multi-Storey Building 1088 Maritime Way - Ottawa Prepared For Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services Environmental Noise Control Study Proposed

More information

Roadway Traffic Noise Assessment. 407 Nelson Street Ottawa, Ontario

Roadway Traffic Noise Assessment. 407 Nelson Street Ottawa, Ontario 407 Nelson Street Ottawa, Ontario REPORT: GWE17-042 Traffic Noise Prepared For: Tony Kazarian AK Global Management Inc. 680 Eagleson Road Ottawa, Ontario K2M 2G9 Canada Prepared By: Omar Daher, B.Eng.,

More information

Transportation Noise Assessment. 370 Queen Elizabeth Drive. Ottawa, Ontario

Transportation Noise Assessment. 370 Queen Elizabeth Drive. Ottawa, Ontario Transportation Noise Assessment 370 Queen Elizabeth Drive Ottawa, Ontario REPORT: GWE14-121 - Traffic Noise REV 1 Prepared For: 2253664 Ontario Inc. Roberto Campagna 24 George Street West Ottawa, Ontario

More information

Noise Feasibility Study Proposed Residential Development (Infill) 747 Liverpool Road Pickering, Ontario

Noise Feasibility Study Proposed Residential Development (Infill) 747 Liverpool Road Pickering, Ontario Noise Feasibility Study Proposed Residential Development (Infill) 747 Liverpool Road Pickering, Ontario Prepared for: Madison Liverpool Limited 369 Rimrock Road Toronto, Ontario, M3J 3G2 Prepared by Victor

More information

Environmental Noise Assessment. St-Charles Market. Ottawa, Ontario

Environmental Noise Assessment. St-Charles Market. Ottawa, Ontario Environmental Noise Assessment St-Charles Market Ottawa, Ontario REPORT: GWE15-120 - Noise Prepared For: Jenna Maw LineBox Studio Inc. 126 York Street, Suite 502 Ottawa, Ontario K1N 5T2 Prepared By: Michael

More information

Feasibility Noise Assessment. Westgate Shopping Centre Redevelopment. Ottawa, Ontario

Feasibility Noise Assessment. Westgate Shopping Centre Redevelopment. Ottawa, Ontario Feasibility Noise Assessment Westgate Shopping Centre Redevelopment Ottawa, Ontario REPORT: GWE15-067 - Feasibility Noise Prepared For: Stuart Craig 2300 Yonge Street, Suite 500 Toronto, Ontario M4P 1E4

More information

REP Taggart 1140 Wellington Noise Control Study Page 1 of 18

REP Taggart 1140 Wellington Noise Control Study Page 1 of 18 REP Taggart 1140 Wellington Noise Control Study Page 1 of 18 2013-10-15 Simon Taggart Project Coordinator The Taggart Group 3187 Albion Road South Ottawa, Ontario K1V 8Y3 T: 613.526.2400 ext 320 C: 613.857.0353

More information

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario Conservancy Subdivision Ottawa, Ontario REPORT: GWE17 151 Traffic Noise Prepared For: Andrew Finnson Barrhaven Conservancy East Inc. Ottawa, Ontario Prepared By: Joshua Foster, P.Eng., Principal Omar Daher,

More information

Transportation Noise Feasibility Assessment & 3930 Riverside Drive Ottawa, Ontario

Transportation Noise Feasibility Assessment & 3930 Riverside Drive Ottawa, Ontario Transportation Noise Feasibility Assessment 3960 & 3930 Riverside Drive Ottawa, Ontario REPORT: GWE18 039 Transportation Noise Prepared For: Alex Turner 225 Metcalfe Street, Suite 708 Ottawa, Ontario K2P

More information

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario Conservancy Subdivision Ottawa, Ontario REPORT: GWE17 151 Traffic Noise Prepared For: Andrew Finnson Barrhaven Conservancy East Inc. Ottawa, Ontario Prepared By: Joshua Foster, P.Eng., Principal Omar Daher,

More information

patersongroup Environmental Noise Control Study Proposed Multi-Storey Building 1136 Martime Way - Ottawa Prepared For

patersongroup Environmental Noise Control Study Proposed Multi-Storey Building 1136 Martime Way - Ottawa Prepared For Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services Environmental Noise Control Study Proposed

More information

Transportation Noise Assessment. 121 Parkdale Avenue. Ottawa, Ontario

Transportation Noise Assessment. 121 Parkdale Avenue. Ottawa, Ontario Transportation Noise Assessment 121 Parkdale Avenue Ottawa, Ontario REPORT: GWE 14-010 - Traffic Noise Prepared For: Michel Gagnon 98 Rue Lois Gatineau, Québec J8Y 3R7 Prepared By: Thomas Couper, B.A.Sc.,

More information

NOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO

NOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO Smart Property Advisors Ltd. 802-500 Laurier Avenue West Ottawa, ON NOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO Prepared by: SMART PROPERTY ADVISORS LTD. 802 500

More information

Transportation Noise Assessment. 809 Richmond Road. Ottawa, Ontario

Transportation Noise Assessment. 809 Richmond Road. Ottawa, Ontario Transportation Noise Assessment 809 Richmond Road Ottawa, Ontario REPORT: GWE16-024 - Transportation Noise Prepared For: Walter Boyce OCEF Corp 200-368 Slater Street Ottawa, Ontario K1R 5C1 Prepared By:

More information

Transportation Noise Assessment. Salvation Army Multi Purpose Building 102 Bill Leathem Drive. Ottawa, Ontario

Transportation Noise Assessment. Salvation Army Multi Purpose Building 102 Bill Leathem Drive. Ottawa, Ontario Transportation Noise Assessment Salvation Army Multi Purpose Building 102 Bill Leathem Drive Ottawa, Ontario REPORT: GWE15-009 - Transportation Noise Prepared For: Michaela Jones The Salvation Army 2 Overlea

More information

Environmental Noise & Vibration Assessment

Environmental Noise & Vibration Assessment Environmental Noise & Vibration Assessment City Park Redevelopment Phase 2 Ottawa, Ontario REPORT: GWE15-068 Noise & Vibration Phase 2 November 13, 2018 PREPARED FOR Stuart Craig RioTrin Prop (Gloucester

More information

Transportation Noise & Vibration Feasibility Assessment. 383 Albert Street & 340 Queen Street Ottawa, Ontario

Transportation Noise & Vibration Feasibility Assessment. 383 Albert Street & 340 Queen Street Ottawa, Ontario 383 Albert Street & 340 Queen Street Ottawa, Ontario REPORT: GWE18-111 Noise & Vibration Prepared For: Neil Malhotra Claridge Homes 2001-210 Gladstone Avenue Ottawa, ON K2P 0Y6 Prepared By: Michael Lafortune,

More information

Appendix C STAMSON Noise Model Output File for Tunnel Alternative (Alternative 3)

Appendix C STAMSON Noise Model Output File for Tunnel Alternative (Alternative 3) Appendix C STAMSON Noise Model Output File for Tunnel Alternative (Alternative 3) Detroit River International Crossing Study STAMSON 5.0 NORMAL REPORT Date: 21-02-2007 01:14:41 MINISTRY OF ENVIRONMENT

More information

Transportation Noise Assessment. Salvation Army Multi-Purpose Building 102 Bill Leathem Drive. Ottawa, Ontario

Transportation Noise Assessment. Salvation Army Multi-Purpose Building 102 Bill Leathem Drive. Ottawa, Ontario Transportation Noise Assessment Salvation Army Multi-Purpose Building 102 Bill Leathem Drive Ottawa, Ontario REPORT: GWE15-009 - Transportation Noise R3 Prepared For: Michaela Jones The Salvation Army

More information

Transportation Noise Assessment. Salvation Army Multi Purpose Building 102 Bill Leathem Drive. Ottawa, Ontario

Transportation Noise Assessment. Salvation Army Multi Purpose Building 102 Bill Leathem Drive. Ottawa, Ontario Transportation Noise Assessment Salvation Army Multi Purpose Building 102 Bill Leathem Drive Ottawa, Ontario REPORT: GWE15-009 - Transportation Noise R2 Prepared For: Michaela Jones The Salvation Army

More information

Environmental Noise and Vibration Assessments Place D Orleans Drive. Ottawa, Ontario

Environmental Noise and Vibration Assessments Place D Orleans Drive. Ottawa, Ontario s 1220-1226 Place D Orleans Drive Ottawa, Ontario REPORT: GWE17-154 Noise & Vibration Prepared For: Choice Properties REIT 22 St. Clair Avenue East, Suite 500 Toronto, ON M4T 2S5 c/o Pamela Whyte Parsons

More information

DETAILED NOISE CONTROL STUDY PROPOSED TOWNHOUSE AND APARTMENT BUILDINGS BRONTE ROAD DEVELOPMENT TOWN OF OAKVILLE

DETAILED NOISE CONTROL STUDY PROPOSED TOWNHOUSE AND APARTMENT BUILDINGS BRONTE ROAD DEVELOPMENT TOWN OF OAKVILLE SS WILSON ASSOCIATES Consulting Engineers REPORT NO. WA10-93 REVISION 3 DETAILED NOISE CONTROL STUDY PROPOSED TOWNHOUSE AND APARTMENT BUILDINGS BRONTE ROAD DEVELOPMENT TOWN OF OAKVILLE SUBMITTED TO: BALLANTRY

More information

J. E. COULTER ASSOCIATES LIMITED -ii- APPENDIX B: GUIDELINES

J. E. COULTER ASSOCIATES LIMITED -ii- APPENDIX B: GUIDELINES J. E. COULTER ASSOCIATES LIMITED -ii- APPENDIX B: GUIDELINES NPC-115 NPC-115 Construction Equipment 1. Scope This Publication sets sound emission standards for various items of new construction

More information

1 INTRODUCTION 4 2 NOISE DESCRIPTORS 5 3 NOISE SENSITIVE POINTS OF RECEPTION 5 4 PROPOSED LAND USE 7 5 GUIDELINES AND CRITERIA 8

1 INTRODUCTION 4 2 NOISE DESCRIPTORS 5 3 NOISE SENSITIVE POINTS OF RECEPTION 5 4 PROPOSED LAND USE 7 5 GUIDELINES AND CRITERIA 8 Durham Live Tourist Destination Page 2 of 24 29 May 2014 1 INTRODUCTION 4 2 NOISE DESCRIPTORS 5 3 NOISE SENSITIVE POINTS OF RECEPTION 5 4 PROPOSED LAND USE 7 5 GUIDELINES AND CRITERIA 8 5.1 ROAD & RAIL

More information

Yorkdale Development Master Plan Environmental Noise and Vibration Feasibility Study Toronto, ON

Yorkdale Development Master Plan Environmental Noise and Vibration Feasibility Study Toronto, ON ASSESSMENT REPORT - Project: 16419 Yorkdale Development Master Plan Environmental Noise and Vibration Feasibility Study Toronto, ON Prepared for: Oxford Properties Group Royal Bank Plaza North Tower 200

More information

Noise Maps, Report & Statistics, Dublin City Council Noise Mapping Project Roads and Traffic Department

Noise Maps, Report & Statistics, Dublin City Council Noise Mapping Project Roads and Traffic Department Noise Maps, Report & Statistics, Dublin City Council Noise Mapping Project Roads and Traffic Department Produced by Traffic Noise & Air Quality Unit November 2007 Contact: brian.mcmanus@dublincity.ie Ph;

More information

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections:

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections: MEMORANDUM DATE: JULY 6, 2012 TO: FROM: RE: CC: MELANIE KNIGHT BRAD BYVELDS/ JENNIFER LUONG 1050 SOMERSET STREET PRELIMINARY TRAFFIC ANALYSIS OUR FILE NO. 111152 NEIL MALHOTRA The purpose of this memo

More information

GIS-BASED VISUALISATION OF TRAFFIC NOISE

GIS-BASED VISUALISATION OF TRAFFIC NOISE Proceedings of the 9 th International Conference on Environmental Science and Technology Rhodes island, Greece, 1 3 September 2005 GIS-BASED VISUALISATION OF TRAFFIC NOISE A. KONSTANTINIDIS 1, K. EVANGELIDIS

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT

ENVIRONMENTAL NOISE IMPACT ASSESSMENT REPORT REFERENCE: SA 4968 rev 1 ENVIRONMENTAL NOISE IMPACT ASSESSMENT British Standard 8233: 2014. CLIENT: MJ Gleeson SITE: Berengrave Nursery, 61 Berengrave Road, Rainham, Kent, ME 7NL SURVEY DATES: Noise

More information

1600 Prairie Drive , FAX

1600 Prairie Drive , FAX Hennepin County Transportation Department Transportation Department 612-596-0300, Phone 1600 Prairie Drive 612-321-3410, FAX Medina, MN 55340-5421 www.hennepin.us December 30, 2015 Subject: Bottineau Boulevard

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED Appeal by Fast Signs of the Decision of the Chief Building Official for One Variance Respecting a Proposed First Party Wall Sign 10-21 Four Seasons Place Date: January 18,

More information

Directive on the Assessment and Management of Environmental Noise

Directive on the Assessment and Management of Environmental Noise Directive on the Assessment and Management of Environmental Noise This Directive has been ratified by the European Parliament and is awaiting publication in the Official Journal.( around 23/5/02) The Directive

More information

FOR SALE. Chapel Lane, West Ella, East Yorkshire, HU10 7SE RESIDENTIAL CONVERSION AND NEW BUILD OPPORTUNITY

FOR SALE. Chapel Lane, West Ella, East Yorkshire, HU10 7SE RESIDENTIAL CONVERSION AND NEW BUILD OPPORTUNITY Chapel Lane, West Ella, East Yorkshire, HU10 7SE FOR SALE RESIDENTIAL CONVERSION AND NEW BUILD OPPORTUNITY Conversion, extension and adaptation of former chapel to form a detached three bedroom dwelling

More information

SHADOW STUDY REPORT REGARDING

SHADOW STUDY REPORT REGARDING SHADOW STUDY REPORT REGARDING an APPLICATION TO REDEVELOP Three 6 Storey Condominiums Regional Road 25 (Ontario Street) and Britannia Road Milton, Ontario KNYMH FILE # 17030 Prepared by: Krista Lilley

More information

Engineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year )

Engineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year ) Engineer's Report for the Main Street Business Area Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year 2008-09) Prepared under the provisions of the Benefit Assessment Act of 1982

More information

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone: JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH 45243 Email: jackpflum1@gmail.com Telephone: 513.919.7814 MEMORANDUM REPORT Traffic Impact Analysis Proposed Soccer

More information

COUNCIL POLICY MANUAL

COUNCIL POLICY MANUAL COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs

More information

APPENDIXD. Traffic Noise Technical Report

APPENDIXD. Traffic Noise Technical Report APPENDIXD Traffic Noise Technical Report Environmental Assessment - Lincoln County, SD 85 th Street: Sundowner Avenue to Louise Avenue November 2017 F I N A L R E P O R T TRAFFIC NOISE TECHNICAL REPORT

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) BUILDING AND SAFETY DIVISION TELEPHONE (949) 724-6300 BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) Payment: When a plan is required by the Administrative Authority to be submitted, a plan check

More information

Uncertainties in Acoustics

Uncertainties in Acoustics Uncertainties in Acoustics Norm Broner Broner Consulting Pty Ltd, Melbourne, Australia ABSTRACT In acoustics, we are often required to demonstrate compliance with a given criterion. The criteria may be

More information

APPENDIX IV MODELLING

APPENDIX IV MODELLING APPENDIX IV MODELLING Kingston Transportation Master Plan Final Report, July 2004 Appendix IV: Modelling i TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 OBJECTIVE... 1 3.0 URBAN TRANSPORTATION MODELLING

More information

Jordan Harrison, Planner III, San Francisco Recreation and Park Department

Jordan Harrison, Planner III, San Francisco Recreation and Park Department Date November 18, 2015 To: Through: From: Subject: Recreation and Park Commission Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division Jordan Harrison, Planner III,

More information

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Subject: Revised Castle Hills BASIS Charter School Traffic Impact Analysis Review City of Castle Hills,

More information

Section 14F Purpose of the Wairakei Residential Zone

Section 14F Purpose of the Wairakei Residential Zone Section 14F 14F Purpose of the Wairakei Residential Zone The purpose of the Wairakei Residential Zone is to provide for an intensified urban character within Papamoa East. The zone recognises Wairakei

More information

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy Page 1 CITY OF AIRDRIE Snow and Ice Control Effective Date: Approved By: Approved On: March 17, 2015 City Council March 16, 2015 Revision Date: Resolution #: ------ PURPOSE: The City of Airdrie is responsible

More information

SHADOW IMPACT STUDY REPORT

SHADOW IMPACT STUDY REPORT SHADOW IMPACT STUDY REPORT 175 Zoo Park Road Town of Wasaga Beach Date: September 2017 Prepared for: Simcoe County Housing Corporation Prepared by: MacNaughton Hermsen Britton Clarkson Planning Limited

More information

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management Transportation Impact Analysis Market Street PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for TerraPointe Services, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc.

More information

MAY 5, Noise Barrier Presentation SE Quadrant Noyes Street and Lincoln Street NOISE BARRIER ABUTTER MEETING. Tech Environmental, Inc.

MAY 5, Noise Barrier Presentation SE Quadrant Noyes Street and Lincoln Street NOISE BARRIER ABUTTER MEETING. Tech Environmental, Inc. MAY 5, 2011 Noise Barrier Presentation SE Quadrant Noyes Street and Lincoln Street Jacobs Engineering Group Group Inc. Inc. 1 Introductions Agenda Overview of Interchange Project Overview of noise barrier

More information

Noise from Oil & Gas Facilities Acoustics 101 and Best Practices for Noise Control. Rob Stevens, HGC Engineering

Noise from Oil & Gas Facilities Acoustics 101 and Best Practices for Noise Control. Rob Stevens, HGC Engineering Noise from Oil & Gas Facilities Acoustics 101 and Best Practices for Noise Control Rob Stevens, HGC Engineering Noise From Oil & Gas Facilities Acoustics 101 and Best Practices for Noise Control Rob Stevens

More information

CITY OF CAMBRIDGE Growth & Intensification Study Secondary Plan Stakeholder Session June 26th, 2017

CITY OF CAMBRIDGE Growth & Intensification Study Secondary Plan Stakeholder Session June 26th, 2017 CITY OF CAMBRIDGE Growth & Intensification Study Secondary Plan Stakeholder Session June 26th, 2017 Dillon Consulting Limited Watson & Associates Economists Curtis Planning Inc. Tim Welch Consulting Inc.

More information

Villages at Riverdale Thornton, CO

Villages at Riverdale Thornton, CO FINAL UTILITY REPORT Villages at Riverdale Thornton, CO October 14, 216 Revised: March 29, 217 JN: 1539 Prepared for: PCS Group, Inc. 11 16 th Street #3 B-18 Denver, CO 8265 P: 33.531.495 Prepared by:

More information

MINISTRY OF TRANSPORTATION HIGHWAY 404 EXTENSION FINAL NOISE STUDY. Assignment Number: 2013-E-0017 #3

MINISTRY OF TRANSPORTATION HIGHWAY 404 EXTENSION FINAL NOISE STUDY. Assignment Number: 2013-E-0017 #3 MINISTRY OF TRANSPORTATION HIGHWAY 404 EXTENSION FINAL NOISE STUDY Assignment Number: 2013-E-0017 #3 Submitted to: The Ministry of Transportation 1201 Wilson Avenue Downsview, Ontario M3M 1J8 Submitted

More information

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By: HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI Project No.

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review

More information

Traffic Impact Study

Traffic Impact Study Traffic Impact Study Statham DRI One University Parkway Prepared for: Barrow County Prepared by: October 2012 Table of Contents Executive Summary i Section 1. Introduction 1 Project Description 1 Methodology

More information

COULD THE GUNSHOT BE HEARD?

COULD THE GUNSHOT BE HEARD? COULD THE GUNSHOT BE HEARD? October 9, 2003 Paul D. Schomer Schomer & Associates Champaign, IL 61821 INTRODUCTION Statement of Problem On the evening of November 21, 1991, a NJ State Trooper gave chase

More information

MEMORANDUM. Date: May 8, Planning & Development Committee. From: Ilidia Sa Melo, Deputy City Clerk. Re: Items Further to the Agenda May 8, 2018

MEMORANDUM. Date: May 8, Planning & Development Committee. From: Ilidia Sa Melo, Deputy City Clerk. Re: Items Further to the Agenda May 8, 2018 MEMORANDUM Date: May 8, 2018 To: Planning & Development Committee From: Ilidia Sa Melo, Deputy City Clerk Re: Items Further to the Agenda May 8, 2018 Notes: Item 1, re: Boulevard Appeal Committee Minutes

More information

October 16, Dear Mr. Hawkins:

October 16, Dear Mr. Hawkins: IBI GROUP 101 410 Albert Street Waterloo ON N2L 3V3 Canada tel 519 585 2255 fax 519 585 2269 October 16, 2017 Mr. Trevor Hawkins Manager of Applications and Implementation Integrated Planning and Public

More information

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN March 27, 2007 Oxford Heights Overview and Historical Conditions Oxford Heights is a medium sized community located on the southern side of Elizabeth

More information

D14. Volcanic Viewshafts and Height Sensitive Areas Overlay

D14. Volcanic Viewshafts and Height Sensitive Areas Overlay D14. Volcanic Viewshafts and Height Sensitive Areas Overlay D14.1. Overlay description The purpose of the Volcanic Viewshafts and Height Sensitive Areas Overlay is to appropriately protect significant

More information

Re: Draft OPA 320 Recommended Amendments to Various Neighbourhood Policies Statutory Public Meeting to be held on Monday 16 November 2015

Re: Draft OPA 320 Recommended Amendments to Various Neighbourhood Policies Statutory Public Meeting to be held on Monday 16 November 2015 PG8.5.5 ANALOGICA George S. Belza Partner 9 Madeline Road Toronto, Ontario Canada M2N 2S7 T: 416 223 9584 F: 416 223 5665 E: belana@axxent.ca E-Mailed to: pgmc@toronto.ca Wednesday 04 November 2015 Planning

More information

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance Endo Engineering Traffic Engineering Air Quality Studies Noise Assessments July 13, 2015 Mr. Ed Freeman Pinnacle View, LLC P.O. Box 1754 Lake Oswego, OR 97035-0579 Subject: Desert Palisades Specific Plan

More information

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 Executive Summary Page 2.0 Introduction 2.1 DEVELOPMENT

More information

Speed Limit Review. Montague Road, West End. Prepared for Brisbane City Council CEB06842 CEB06842

Speed Limit Review. Montague Road, West End. Prepared for Brisbane City Council CEB06842 CEB06842 Speed Limit Review Montague Road, West End CEB06842 CEB06842 Prepared for Brisbane City Council 2 November 2016 Speed Limit Review Montague Road, West End Document Information Prepared for Brisbane City

More information

Chapter 11. Noise Impacts of Transportation Systems. Transportation Decision-making Principles of Project Evaluation and Programming

Chapter 11. Noise Impacts of Transportation Systems. Transportation Decision-making Principles of Project Evaluation and Programming Transportation Decision-making Principles of Project Evaluation and Programming Chapter 11 Noise Impacts of Transportation Systems Kumares Sinha and Samuel Labi 1 2 Real Experiences of Transportation Noise

More information

MEMORANDUM. Trip Generation Analysis

MEMORANDUM. Trip Generation Analysis MEMORANDUM To: RMC Architects From: Matthew Palmer, PE Subject: Trip Generation, Parking Analysis & Level of Service Project: Port of Everett, GTC #13-053 Date: August 25, 2014 The trip generation and

More information

z, B1-\T11v10J.\J{TrrE1{ & 1-\~Boc1i~TE33111c. Efl.VIRONMENTAL ENGINEERS AND CONSULTANTS

z, B1-\T11v10J.\J{TrrE1{ & 1-\~Boc1i~TE33111c. Efl.VIRONMENTAL ENGINEERS AND CONSULTANTS vv, z, B1-\T11v10J.\J{TrrE1{ & 1-\~Boc1i~TE33111c. Efl.VIRONMENTAL ENGINEERS AND CONSULTANTS P.O. BOX 680369 FRANKLIN, TN 37068-0369 1113 MURFREESBORO RD., SUITE 310 FRANKLIN, TN 37064 615-595-0025 FAX

More information

1 Summary Monetary Component Public Purpose Land Provision Introduction Document Structure...

1 Summary Monetary Component Public Purpose Land Provision Introduction Document Structure... 1 Summary... 1 1.1 Monetary Component... 1 1.2 Public Purpose Land Provision... 1 2 Introduction... 5 2.1 Document Structure... 5 2.2 Planning & Environment Act 1987... 5 2.3 Strategic Planning & Justification...

More information

Date: June 19, 2013 Meeting Date: July 5, Consideration of the City of Vancouver s Regional Context Statement

Date: June 19, 2013 Meeting Date: July 5, Consideration of the City of Vancouver s Regional Context Statement Section E 1.5 To: From: Regional Planning and Agriculture Committee Lee-Ann Garnett, Senior Regional Planner Planning, Policy and Environment Department Date: June 19, 2013 Meeting Date: July 5, 2013 Subject:

More information

Answer - SAQ 1. The intensity, I, is given by: Back

Answer - SAQ 1. The intensity, I, is given by: Back Answer - SAQ 1 The intensity, I, is given by: Noise Control. Edited by Shahram Taherzadeh. 2014 The Open University. Published 2014 by John Wiley & Sons Ltd. 142 Answer - SAQ 2 It shows that the human

More information

Zoning Ordinance. Requirements Used Districts R1 R2 R2.6 R3 R4 R5 B1 B2 B3 B4 M1 M2 RH Density Low Low Med Med High High Gen Local CBD Local LT Hvy Ag

Zoning Ordinance. Requirements Used Districts R1 R2 R2.6 R3 R4 R5 B1 B2 B3 B4 M1 M2 RH Density Low Low Med Med High High Gen Local CBD Local LT Hvy Ag The ordinance shall be known as the Zoning Ordinance of Wetumpka, Alabama, and the map herein referred to as the Zoning Map of Wetumpka, Alabama. The map and all explanatory matter thereon are hereby adopted

More information

City of Camrose Winter Road Maintenance Policy

City of Camrose Winter Road Maintenance Policy City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.

More information

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For TRAFFIC IMPACT STUDY For Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) February 2015 Revised: August 2015 April 2016 July 2016 September 2016 Prepared for: KB Home

More information

Appendix G Noise Modeling Files

Appendix G Noise Modeling Files Appendix G Noise Modeling Files County of Butte Rio d Oro Specific Plan Noise Study July 2014 Rio d Oro Specific Plan Noise Study Prepared for: JKB Development 2370 West Monte Vista Ave. Turlock, CA 95381

More information

August 10, 2007 File:

August 10, 2007 File: August 10, 2007 File: 15-85-72 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, AB T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL AREA)

More information

VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS

VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS Christopher D. McDonald, PE, PTOE Regional Operations Director, Southwest Region NRITS and ITS Arizona Annual Conference October

More information

570 Hazeldean Road, Ottawa, ON Transportation Brief Mattamy Homes. Prepared By: Stantec Consulting Ltd. Project Number:

570 Hazeldean Road, Ottawa, ON Transportation Brief Mattamy Homes. Prepared By: Stantec Consulting Ltd. Project Number: 570 Hazeldean Road, Ottawa, ON Transportation Brief Mattamy Homes Prepared By: Stantec Consulting Ltd. Project Number: 163600871 March 2013 570 HAZELDEAN ROAD, OTTAWA, ON TRANSPORTATION BRIEF MARCH 2013

More information

PUP R-4 R-3 R-4 R-3 R-4 B-1 B-3 B-1 B-1 B-1 R-3 C-1 R-3 R-3 A-1 M-2C SUBJECT PROPERTY B-3 R-5 B-3C B-3C B-3C B-3C B-2.

PUP R-4 R-3 R-4 R-3 R-4 B-1 B-3 B-1 B-1 B-1 R-3 C-1 R-3 R-3 A-1 M-2C SUBJECT PROPERTY B-3 R-5 B-3C B-3C B-3C B-3C B-2. 0 0 0 0 0 00 0 EARLY AVE 00 0 0 0 0 0 R- 0 0 0 C- 0 0 0 0 0 0 R- 0 B- 00 0 0 0 0 0 0 CARTER AVE EAST SIDE LN 0 0 0 JACKSON AVE 00 0 0 A- Parcels or Portions thereof identified on this sheet are within

More information

D14. Volcanic Viewshafts and Height Sensitive Areas Overlay

D14. Volcanic Viewshafts and Height Sensitive Areas Overlay D14. Volcanic Viewshafts and Height Sensitive Areas Overlay D14.1. Overlay description The purpose of the Volcanic Viewshafts and Height Sensitive Areas Overlay is to appropriately protect significant

More information

930 Old Northern Rd & 4 Post Office Rd, Glenorie

930 Old Northern Rd & 4 Post Office Rd, Glenorie Proposed Mixed Use Development 930 Old Northern & 4, Glenorie TRAFFIC AND PARKING ASSESSMENT REPORT 13 December 2016 Ref 16264 Suite 6, 20 Young Street, Neutral Bay NSW 2089 - PO Box 1868, Neutral Bay

More information

POLICY MANUAL. Hamlets/Residential named hamlets within the County of Grande Prairie whose roads are hard surfaced.

POLICY MANUAL. Hamlets/Residential named hamlets within the County of Grande Prairie whose roads are hard surfaced. POLICY MANUAL Legal References: Policy department: Public Works Department Cross References: N7 Adoption Date: January 19, 2005 Revision Date: June 20, 2005 Motion# 06/662/2005 October 20, 2014 Motion#

More information

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse

More information

Fundamentals of Sound

Fundamentals of Sound Sound is an important consideration in the selection of mechanical equipment. The purpose of this article is to present a procedure for evaluating the sound levels created by evaporative cooling equipment

More information

Committee Meeting November 6, 2018

Committee Meeting November 6, 2018 Committee Meeting November 6, 2018 Agenda Where we are in the process Land Use Plan Transportation Element Housing & Neighborhoods Elements Next Steps Schedule November 6: Plan Elements December: Plan

More information

SNOW CONTROL OPERATIONS

SNOW CONTROL OPERATIONS SNOW CONTROL OPERATIONS PUBLIC WORKS TEAM STREET MAINTENANCE DIVISION SNOW CONTROL OPERATIONS Standard Operating Procedures for Snow Removal Operations. 1. Plowing operations will be initiated when snow

More information

2267 N o r t h 1500 W C l i n t o n U T 84015

2267 N o r t h 1500 W C l i n t o n U T 84015 P l a n n i n g C o m m i s s i o n M e m b e r s C h a i r J a c o b B r i g g s V i c e C h a i r G a r y T y l e r T o n y T h o m p s o n J o l e n e C r e s s a l l A n d y H a l e D e r e c k B a

More information

Special edition paper

Special edition paper Study on Conventional Railway Line in High Spaces Satoshi Ishikawa* Ryo Shiraga* Kenichi Yaginuma* Toru Masuda* In this study, we carried out noise measurement in different environments including high

More information

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 Appendix C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 CONTENTS List of Figures-... 3 List of Tables... 4 Introduction... 1 Application of the Lubbock Travel Demand

More information

ZONING DISTRICT REGULATIONS. Table 4-2 Permitted Uses by Zoning Districts Use Types AG RR R-1 R-2 R-3 MH LC CC DC GC LI GI P Addl Reg

ZONING DISTRICT REGULATIONS. Table 4-2 Permitted Uses by Zoning Districts Use Types AG RR R-1 R-2 R-3 MH LC CC DC GC LI GI P Addl Reg ZONING DITRICT REGULATION Table 4-2 Permitted Uses by Zoning Districts Agricultural Uses Horticulture P P P P P P P P P 39.06.002a Crop Production P P P 39.06.002a Type I Animal Production Type II Animal

More information

GIS in Community & Regional Planning

GIS in Community & Regional Planning GIS in Community & Regional Planning The The role role of of GIS GIS in in Re-writing the the Zoning Bylaw for for the the City City of of Vernon LandInfo Technologies Presentation Overview The GIS Initiative

More information

Date: March 31, 2014 PATE; fyril 2.3,2 >H

Date: March 31, 2014 PATE; fyril 2.3,2 >H aj BRAMPTON fifs Rower City XH-l-f r.t "»* City Council The Corporation of the City of Brampton SRAMPTON CITY COUNCIL Date: March 31, 2014 PATE; fyril 2.3,2 >H File: POO GR VisWhtoJed ^t'th-meeh'^a Subject:

More information

AERCOUSTICS ENGINEERING LIMITED

AERCOUSTICS ENGINEERING LIMITED AERCOUSTICS ENGINEERING LIMITED ST. MARYS FLAMBOROUGH QUARRY Noise Impact Study Project#: 06199 Prepared By: Ryan Bessey, B.A.Sc, P.Eng Mohan Barman M.A.Sc., P.Eng. Marc Bracken M.A.Sc., P.Eng. Bob Rimrott,

More information