1 11805 W. Hampton Avenue Milwaukee, WI Project: Prayer Center of Brookfield Location: NW ¼ & SW ¼ of Section 15, T7N, R20E in the City of Brookfield, Wisconsin Prepared For: Islamic Society of Milwaukee 4707 S. 13th Street Milwaukee, WI Project Number: Date: Last Revision: January 9, 2012 STORM WATER MANAGEMENT PLAN

2 TABLE OF CONTENTS CITY OF BROOKFIELD STORM WATER MANAGEMENT PLANAPPLICATION INTRODUCTION DESIGN CRITERIA CITY OF BROOKFIELD WISCONSIN DEPARTMENT OF NATURAL RESOURCES MILWAUKEE METROPOLITAN SEWERAGE DISTRICT HYDROLOGIC CALCULATIONS... 6 Table 1: Design Rainfall Values... 6 Table 2: Soil types present onsite EXISTING CONDITIONS... 6 Table 3: Hydrologic Analysis of Existing Conditions PROPOSED CONDITIONS... 7 Table 4: Hydrologic and Hydraulic Characteristics of Proposed Conditions EROSION CONTROL STORM WATER QUALITY CONTROL MAINTENANCE PROGRAM SUMMARY OF RESULTS... 8 Table 5: Storm Water Discharge Rates for Existing and Proposed Conditions CONCLUSION... 9 APPENDICES Appendix 1 Appendix 2 Appendix 3 Appendix 4 Appendix 5 Appendix 6 Appendix 7 Appendix 8 Appendix 9 Location Map Soil Units Map Existing Conditions Drainage Map Existing Hydraflow Output Proposed Conditions Drainage Map Proposed Hydraflow Output WinSLAMM Input/Output Site Demolition Plan Proposed Grading and Erosion Control Plan Utility and Pavement Plan Site Construction Details Storm Sewer Design Spreadsheet MMSD Chapter 13 Checklist Storm Water Management Practice Agreement Proof of Funds

3 CITY OF BROOKFIELD STORM WATER MANAGEMENT PLAN APPLICATION Item 1 Project Name Project Owner Project Address Total Site Acreage Impervious surface area (s.f.) Greenspace surface area (s.f.) Total Proposed Area of Disturbance (s.f.) ISM West AKA Masjid Al'Noon Islamic Foundation of Greater Milwaukee W. Pheasant Drive 4.25 Acres Existing Proposed 37,939 71, , , ,600 SF (4.05 Ac) Item 2 Owner Engineer Developer Preparer Name Address Phone/Fax Numbers Islamic Foundation 4707 S. 13th Street, Milwaukee One Source Consulting 3065 N. 124th Street, Brookfield / Islamic Foundation 4707 S. 13th Street, Milwaukee One Source Consulting 3065 N. 124th Street, Brookfield / Item 3 Description of Development: Site redevelopment that includes an SF prayer center and its associated parking lot to replace the existing building and drive/parking. A bioretention pond has been designed and will be constructed to accommodate the entire site's impervious runoff for water quantity and quality. Item 4 Illegal Connection (Not applicable to new development on vacant sites) Verification by a licensed plumber that no illegal connections exist between storm and sanitary sewers. Determination is dependent upon review of existing plumbing plans. A visual inspection of the storm sewer must be conducted during dry weather, and of the sanitary sewer during wet weather. Complete attached form. Completed review of plumbing plan? yes no Visual inspection of storm sewer? yes X no Visual inspection of sanitary sewer? yes X no Do illegal connections exist? yes X no If yes, what is the plan of correction? All existing structures will be razed prior to start of construction and service laterals abandoned. Revised: swmp application.xls

4 Item 5 Illicit Discharges (Not applicable to new development on vacant sites.) Any discharge from the site which is not comprised entirely of stormwater, unless permitted by the State of Wisconsin, is an illicit discharge. This could include, but is not limited to: spills, dumping and disposal of any substance, storm water runoff from outdoor storage of materials. Based on a site visit, the preparer of this document must certify: Do illicit discharges exist on site? yes X no If yes, what is the plan of correction? Item 6 What watershed is this site tributary to? (see attached map): Butler Ditch Deer Creek Dousman Ditch Lower Menomonee River Poplar Creek South Branch of Underwood Creek X Underwood Creek Upper Fox River Item 7 Stormwater Discharge Rates: Peak flow rates must be calculated for the 2, 10 and 100-year design storms for the existing and proposed conditions for the entire site of ownership. Calculations must be provided and a summary given below. Note that watersheds within the MMSD service area follow MMSD Chapter 13 Surface Water and Storm Water rules. Conditions 2 year design storm 10 year design storm 100 year design storm Existing Proposed Proposed After Controls Item 8 Stormwater Quality Calculations: Per Section of the Municipal Code, the preparer certifies by checking below, that SLAMM (Source Loading and Management Model) or other approved calculations have been prepared for this site and the proposed Best Management Practices have been designed to meet the requirements, specifically to remove, on an average annual basis, a goal of 40% of the total suspended solids load based on no controls (for the proposed area of redevelopment). Water Quality Calculations have been prepared and the proposed site meets Section X Yes No If yes, attach a copy of the calculations with the application. Item 9 Soil Types: Provide a description of soil types according to soil borings. Also indicate depth of groundwater if encountered during soil boring (groundwater level will be required if a detention pond is proposed). Ashkum silty clay loam, Houghton muck, Mequon silt loam, and Ozaukee silt loam Groundwater: USDA - Web Soil Survey swmp application.xls

5 Item 10 Stormwater Best Management Practices (post construction) Proposed Structural Practices Proposed Non-Structural Practices (include maintenance of structural practices) 1) Bioretention Basin: Check Bi Annually 1) Parking Lot Sweeping: Bi-annually (April and October) 2) Litter & Debris Pick-up: Routine and as needed. a) Inspect orifice for blockage. b) Inspect outlet pipe for debris. c) Mow Overflow Spillway routinely. 2) Inlets: Inspect Bi-annually a) Clean sump and outlet pipe as necessary. Item 11 Stormwater Management Maintenance Agreement The maintenance or non-structural best management as proposed above are to be conducted by the owner or owner's representative. These items are to be included in the owner's annual maintenance budget and will be carried through as proposed in item 10. Name of Owner or Representative Responsible for Maintenance: Owner's Signature and Date: Phone number of Person Responsible for Maintenance: Othmann Otto (414) Item 12 Stamp, Date and Signature of Preparer City of Brookfield State of Wisconsin Licensed Professional Engineer Recommended Approval Project Engineer Date City of Brookfield Approval City Engineer Date swmp application.xls

6 Prayer Center of Brookfield 01/09/ INTRODUCTION One Source Consulting has been contracted to provide site civil engineering related services for a proposed prayer center in Brookfield. The prayer center site is located within part of the SW ¼ of Section 15, T7N, R20E in the City of Brookfield, Wisconsin. This development is north of W. North Avenue and between N. Calhoun Road and Pilgrim Road. A location map for the development is location in Appendix 1. The development s study area is approximately 4.25 acres. It will comprise of a new building and sidewalks, landscaping and parking lot. This area is tributary to the Underwood Creek basin. An area of wetlands is present north of the site that was delineated by Wetland and Waterway Consulting, LLC on October 20, DESIGN CRITERIA 2.1 City of Brookfield City of Brookfield Engineering Division Public Infrastructure and Development Handbook Section I. Design Standards and Material Specifications C. Storm Sewer and Stormwater Management Systems MMSD requirements do not apply but are more restrictive and are being followed for this design report. 2.2 Wisconsin Department of Natural Resources WDNR Technical Standards (NR 151 and NR 216) Water Quality: Best management practices shall be designed, installed and maintained to control total suspended solids carried in runoff from the post-construction site as follows: For redevelopment, by design, reduce to the maximum extent practicable, the total suspended solids load by 40%, based on an average annual rainfall, as compared to no runoff management controls. Post Construction Wetland Protective Buffers The recommended protective buffer for the cattail swamp (highly susceptible wetland complex) located north of the proposed improvements is 50 feet. No storm water collected from impervious areas will be discharged within the WDNR recommended wetland protective buffers prior to treatment designed in accordance with the WDNR Best Management Practices technical standards. Additionally, any untreated impervious areas will have not less than 50 of vegetated buffer adjacent to the wetlands. 2.3 Milwaukee Metropolitan Sewerage District Chapter 13 Surface Water and Storm Water Rules Technical Guidance Water Quantity: Limit site development outflows to a release rate of 0.5 cfs/acre for the one percent probability event (100-year recurrence interval). Limit site development outflows to a release rate of 0.15 cfs/acre for the fifty percent probability event (2-year recurrence interval). Development is defined as construction of any parking lot, building, road or storage area, regardless of whether it is paved or unpaved or whether it is original development or redevelopment. The definition is not intended to apply to agricultural, maintenance, grading or landscaping activities, although other state or local regulations may govern these types of activities. The intent of the Rules is to require appropriate management practices for all developments and redevelopments that result in new impervious surface exceeding one-half acre or more. S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

7 Prayer Center of Brookfield 01/09/ HYDROLOGIC CALCULATIONS Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 has been used to analyze storm water characteristics for the prayer center development. Hydraflow uses the accepted TR-55 methodology for determining peak discharge runoff rates. Curve numbers for the existing ground cover were selected for a C soil type using the standard values specified in TR-55. Storm water modeling was conducted using the 2-year, 10-year and 100-year storm events with an SCS Type II rainfall distribution, as defined in the Milwaukee Rainfall Distribution Tech Report 40 as shown in Table 1. Table 1: Design Rainfall Values Storm Recurrence Interval 2-year 10-year 100-year 24-hour Rainfall Volume 2.57 inches 3.62 inches 5.88 inches A controlling drainage flow path was developed for the drainage area and used to determine a time of concentration in accordance with TR-55 methodology. The developable portion of the site contains four (4) soil types. Soil map units and descriptions are listed within Table 2 below. A soil location map using soils data obtained from USDA Natural Resources Conservation Service Web portal can be found in Appendix 2. Table 2: Soil types present onsite Map Symbol Map Unit Name HSG AsA Ashkum silty clay loam, 0-3% slopes B/D HtA Houghton muck, 0-2% slopes A/D MtA Mequon silt loam, 1-3% slopes C OuB2 Ozaukee silt loam, 2-6% slopes C Infiltration characteristics for the proposed site were determined using WinSLAMM (Version 9.4) Source Loading and Management Model (SLAMM) as developed by Robert Pitt and John Voorhees. Proposed peak discharge rates used within the SLAMM analysis were determined using Hydraflow. 4.0 EXISTING CONDITIONS The existing site consists of one drainage area discharging the site that was delineated to coincide with the proposed drainage area for comparison purposes. The land cover, drainage area, and flow path are shown in Appendix 3. The site drainage area was determined using 1-foot topographic mapping generated from topographic field survey data developed for the site. The existing site consists of a metal building, paved areas and adjacent lands. Detailed calculations are also included in Appendix 3. The following table presents the results of the hydrological analysis for the existing conditions: S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

8 Prayer Center of Brookfield 01/09/12 Table 3: Hydrologic Analysis of Existing Conditions Area Runoff Time of Peak Flow Rate (cfs) (acres) Curve Conc. Number 2-year 10-year 100-year Existing Area Composite Runoff Curve Number Calculation: [(0.38 x 98) + (1.59 x 74)] / 1.97 = PROPOSED CONDITIONS The proposed project includes the construction of the building and its supporting parking lots, sidewalks and landscaped areas. Appendix 4 shows the proposed land cover and drainage patterns used for the analysis of proposed conditions. The hydrologic analysis of proposed conditions was performed using the same methodology as used for existing conditions. Detailed calculations for the proposed watershed are also located in Appendix 4. The proposed site has been delineated into one primary drainage area that reflects the 1.97 acre watershed which generates storm water runoff that will enter the north bio-retention basin. This area includes the sidewalks and parking lot. There is also a 0.30 acre area that drains offsite undetained. This area includes the building and path/patio area as well as landscaping. This area has not been considered in the hydrology analysis because the impervious area is less than ½ acre and primarily rooftop and the remaining falls under MMSD s grading or landscaping activity category. The bio-retention pond will be constructed to reduce the peak discharge from the site and provide water quality benefits. Appendix 4 shows the location and calculations for the basin. The bio-retention pond will be constructed in accordance with the Wisconsin DNR Technical Standard 1004 Bio-retention for Infiltration and will discharge by means of an underdrain. The outlet control structure will have a 6 underdrain coming to it and discharging through a 4 orifice at The structure will discharge through a 12 outflow pipe at The following table summarizes the results of the analysis of proposed conditions for the site: Table 4: Hydrologic and Hydraulic Characteristics of Proposed Conditions Area Runoff Time of Peak Flow Rate (cfs) (acres) Curve Conc. Number 2-year 10-year 100-year Proposed Area Composite Runoff Curve Number Calculation: [(1.40 x 98) + (0.57 x 74)] / 1.97 = 91 S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

9 Prayer Center of Brookfield 01/09/12 N Bio Basin Features 2-year 10-year 100-year Peak Inflow (cfs) Peak Outflow (cfs) *The controlling elements are summarized below: #1 = (3) 12 Inflow Pipes, INV = #2 = 4 Diameter Orifice, INV = #3 = 12 Outflow Pipe, INV = EROSION CONTROL Construction sediment control will be provided through the use of the permanent retention basin and permanent outlet structures as well as perimeter silt fence and BMPs for grading practices. The Grading and Erosion Control Plan and details designed for this project are located in Appendix STORM WATER QUALITY CONTROL The proposed site will utilize the bio-retention basin to achieve post-construction storm water quality control in accordance with the State of Wisconsin requirements for suspended solids removal. The requirement is 40% removal of the Total Suspended Solids (TSS) based on no controls. SLAMM was used to calculate the water quality impacts as a result of this project. Detailed computations are provided in Appendix 5. In the post-developed conditions, the pond was modeled to comply with the water quality standard as follows: Water Quality Modeling Results With No Controls (lbs) Controls % Reduction N Bio Pond % The undetained area was included in the SLAMM analysis. The impervious area was modeled as Building 1, Sidewalks/Walks 1 and the pervious area was modeled as Small Landscaped Area 1. The Undetained Landscaped Areas A and B are modeled as one under Large Landscaped Area MAINTENANCE PROGRAM Erosion control matting shall be installed on the 4:1 side slopes of the retention basin and seeded. Upon establishment of permanent vegetation, the facility shall be mowed on a regular basis and kept free of debris. The entire facility including the outlet control structures shall be inspected a minimum of four times annually and after significant storm events. 9.0 SUMMARY OF RESULTS After gathering the necessary information and using the above models, One Source Consulting has analyzed the effect of the proposed improvements. The following table compares the proposed watershed discharge rates with the existing: Table 5: Storm Water Discharge Rates for Existing and Proposed Conditions 2-year (cfs) 10-year (cfs) 100-year (cfs) Existing Area Allowable (MMSD) 0.30 N/A 0.99 S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

10 Prayer Center of Brookfield 01/09/12 Proposed Area Reduction 87% 87% 90% 10.0 CONCLUSION The analysis of the project and the proposed storm water basin indicates that the requirements of the City of Brookfield and Milwaukee Metropolitan Sewerage District have been met. S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

11 Prayer Center of Brookfield 01/09/12 Appendix 1 Location Map S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

12 Prayer Center of Brookfield Development W. Pheasant Drive Brookfield, WI Located north of W. North Avenue and between N. Calhoun Road and Pilgrim Road and also part of the Northeast ¼ of the Southwest ¼ and the Southeast ¼ of the Northwest ¼ of Section 15, Town 7 North, Range 20 East, in the City of Brookfield, County of Waukesha, State of Wisconsin.

13 Prayer Center of Brookfield 01/09/12 Appendix 2 Soils Unit Map S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

14 Hydrologic Soil Group Milwaukee and Waukesha Counties, Wisconsin 43 4' 5'' 43 3' 52'' ' 14'' 88 7' 14'' OuB MtA T7N R20E Map Scale: 1:1,890 if printed on A size (8.5" x 11") sheet. Meters Feet Pheasant Dr AsA HtA Dousman Ditch MtA ' 1'' ' 1'' 43 4' 5'' 43 3' 52'' Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/3/2011 Page 1 of 4

15 Hydrologic Soil Group Milwaukee and Waukesha Counties, Wisconsin MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Units Soil Ratings A A/D B B/D C C/D D Not rated or not available Political Features Cities MAP INFORMATION Map Scale: 1:1,890 if printed on A size (8.5" 11") sheet. The soil surveys that comprise your AOI were mapped at 1:15,840. Please rely on the bar scale on each map sheet for accurate map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: UTM Zone 16N NAD83 This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Milwaukee and Waukesha Counties, Wisconsin Survey Area Data: Version 6, Aug 14, 2010 Date(s) aerial images were photographed: 6/16/2005 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Water Features Transportation PLSS Township and Range PLSS Section Oceans Streams and Canals Rails Interstate Highways US Routes Major Roads Local Roads Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/3/2011 Page 2 of 4

16 Hydrologic Soil Group Milwaukee and Waukesha Counties, Wisconsin Hydrologic Soil Group Hydrologic Soil Group Summary by Map Unit Milwaukee and Waukesha Counties, Wisconsin Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AsA Ashkum silty clay loam, 0 to 3 percent slopes HtA MtA Houghton muck, 0 to 2 percent slopes Mequon silt loam, 1 to 3 percent slopes OuB2 Ozaukee silt loam, 2 to 6 percent slopes, eroded B/D % A/D % C % C % Totals for Area of Interest % Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/3/2011 Page 3 of 4

17 Hydrologic Soil Group Milwaukee and Waukesha Counties, Wisconsin Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Lower Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/3/2011 Page 4 of 4

18 Prayer Center of Brookfield 01/09/12 Appendix 3 Existing Conditions Drainage Map Existing Hydraflow Output S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

19

20 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v Legend Hyd. Origin Description 1 SCS Runoff Existing Area Project: Existing.gpw Monday, Mar 19, 2012

21 Hydrograph Return Period Recap Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 2 1 SCS Runoff Existing Area Proj. file: Existing.gpw Monday, Mar 19, 2012

22 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 3 1 SCS Runoff , Existing Area Existing.gpw Return Period: 2 Year Monday, Mar 19, 2012

23 Hydrograph Report 4 Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Monday, Mar 19, 2012 Hyd. No. 1 Existing Area Hydrograph type = SCS Runoff Peak discharge = cfs Storm frequency = 2 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 6,405 cuft Drainage area = ac Curve number = 79* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = min Total precip. = 2.57 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.380 x 98) + (1.590 x 74)] / Existing Area Q (cfs) Hyd. No Year Q (cfs) Time (min) Hyd No. 1

24 TR55 Tc Worksheet 5 Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Hyd. No. 1 Existing Area Description A B C Totals Sheet Flow Manning's n-value = Flow length (ft) = Two-year 24-hr precip. (in) = Land slope (%) = Travel Time (min) = = Shallow Concentrated Flow Flow length (ft) = Watercourse slope (%) = Surface description = Paved Paved Paved Average velocity (ft/s) = Travel Time (min) = = 0.00 Channel Flow X sectional flow area (sqft) = Wetted perimeter (ft) = Channel slope (%) = Manning's n-value = Velocity (ft/s) = Flow length (ft) ({0}) Travel Time (min) = = 0.00 Total Travel Time, Tc min

25 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 6 1 SCS Runoff , Existing Area Existing.gpw Return Period: 10 Year Monday, Mar 19, 2012

26 Hydrograph Report 7 Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Monday, Mar 19, 2012 Hyd. No. 1 Existing Area Hydrograph type = SCS Runoff Peak discharge = cfs Storm frequency = 10 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 12,017 cuft Drainage area = ac Curve number = 79* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.380 x 98) + (1.590 x 74)] / Existing Area Q (cfs) Hyd. No Year Q (cfs) Time (min) Hyd No. 1

27 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 8 1 SCS Runoff , Existing Area Existing.gpw Return Period: 100 Year Monday, Mar 19, 2012

28 Hydrograph Report 9 Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Monday, Mar 19, 2012 Hyd. No. 1 Existing Area Hydrograph type = SCS Runoff Peak discharge = cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 25,868 cuft Drainage area = ac Curve number = 79* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = min Total precip. = 5.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.380 x 98) + (1.590 x 74)] / Existing Area Q (cfs) Hyd. No Year Q (cfs) Time (min) Hyd No. 1

29 Prayer Center of Brookfield 01/09/12 Appendix 4 Proposed Conditions Drainage Map Proposed Hydraflow Output S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

30

31 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v Legend Hyd. Origin Description 1 SCS Runoff Proposed Area 2 Reservoir N Bio Pond Project: Proposed.gpw Monday, Mar 19, 2012

32 Hydrograph Return Period Recap Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 2 1 SCS Runoff Proposed Area 2 Reservoir N Bio Pond Proj. file: Proposed.gpw Monday, Mar 19, 2012

33 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 3 1 SCS Runoff , Proposed Area 2 Reservoir , ,260 N Bio Pond Proposed.gpw Return Period: 2 Year Monday, Mar 19, 2012

34 Hydrograph Report 4 Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Monday, Mar 19, 2012 Hyd. No. 1 Proposed Area Hydrograph type = SCS Runoff Peak discharge = cfs Storm frequency = 2 yrs Time to peak = hrs Time interval = 2 min Hyd. volume = 11,224 cuft Drainage area = ac Curve number = 91* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 3.40 min Total precip. = 2.57 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.400 x 98) + (0.570 x 74)] / Proposed Area Q (cfs) Hyd. No Year Q (cfs) Hyd No. 1 Time (hrs)

35 TR55 Tc Worksheet 5 Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Hyd. No. 1 Proposed Area Description A B C Totals Sheet Flow Manning's n-value = Flow length (ft) = Two-year 24-hr precip. (in) = Land slope (%) = Travel Time (min) = = 2.30 Shallow Concentrated Flow Flow length (ft) = Watercourse slope (%) = Surface description = Paved Paved Paved Average velocity (ft/s) = Travel Time (min) = = 0.73 Channel Flow X sectional flow area (sqft) = Wetted perimeter (ft) = Channel slope (%) = Manning's n-value = Velocity (ft/s) = Flow length (ft) ({0}) Travel Time (min) = = 0.35 Total Travel Time, Tc min

36 Hydrograph Report 6 Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Monday, Mar 19, 2012 Hyd. No. 2 N Bio Pond Hydrograph type = Reservoir Peak discharge = cfs Storm frequency = 2 yrs Time to peak = hrs Time interval = 2 min Hyd. volume = 6,539 cuft Inflow hyd. No. = 1 - Proposed Area Max. Elevation = ft Reservoir name = N Bio Pond Max. Storage = 7,260 cuft Storage Indication method used. N Bio Pond Q (cfs) Hyd. No Year Q (cfs) Time (hrs) Hyd No. 2 Hyd No. 1 Total storage used = 7,260 cuft

37 Pond Report 7 Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Monday, Mar 19, 2012 Pond No. 1 - N Bio Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) , ,546 6,545 6, ,546 6,545 13, ,546 6,545 19, ,546 6,545 26, ,958 7,240 33, ,469 8,702 42,123 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = Span (in) = No. Barrels = Invert El. (ft) = Length (ft) = Slope (%) = n/a N-Value = n/a Orifice Coeff. = Multi-Stage = n/a Yes No No Crest Len (ft) = Crest El. (ft) = Weir Coeff. = Weir Type = Broad Multi-Stage = Yes No No No Exfil.(in/hr) = 0 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage (ft) Stage / Discharge Elev (ft) Total Q Discharge (cfs)

38 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 8 1 SCS Runoff , Proposed Area 2 Reservoir , ,205 N Bio Pond Proposed.gpw Return Period: 10 Year Monday, Mar 19, 2012

39 Hydrograph Report 9 Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Monday, Mar 19, 2012 Hyd. No. 1 Proposed Area Hydrograph type = SCS Runoff Peak discharge = cfs Storm frequency = 10 yrs Time to peak = hrs Time interval = 2 min Hyd. volume = 17,799 cuft Drainage area = ac Curve number = 91* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 3.40 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.400 x 98) + (0.570 x 74)] / Proposed Area Q (cfs) Hyd. No Year Q (cfs) Hyd No. 1 Time (hrs)

40 Hydrograph Report 10 Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Monday, Mar 19, 2012 Hyd. No. 2 N Bio Pond Hydrograph type = Reservoir Peak discharge = cfs Storm frequency = 10 yrs Time to peak = hrs Time interval = 2 min Hyd. volume = 13,114 cuft Inflow hyd. No. = 1 - Proposed Area Max. Elevation = ft Reservoir name = N Bio Pond Max. Storage = 11,205 cuft Storage Indication method used. N Bio Pond Q (cfs) Hyd. No Year Q (cfs) Time (hrs) Hyd No. 2 Hyd No. 1 Total storage used = 11,205 cuft

41 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 11 1 SCS Runoff , Proposed Area 2 Reservoir , ,985 N Bio Pond Proposed.gpw Return Period: 100 Year Monday, Mar 19, 2012

42 Hydrograph Report 12 Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Monday, Mar 19, 2012 Hyd. No. 1 Proposed Area Hydrograph type = SCS Runoff Peak discharge = cfs Storm frequency = 100 yrs Time to peak = hrs Time interval = 2 min Hyd. volume = 32,447 cuft Drainage area = ac Curve number = 91* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 3.40 min Total precip. = 5.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.400 x 98) + (0.570 x 74)] / Proposed Area Q (cfs) Hyd. No Year Q (cfs) Hyd No. 1 Time (hrs)

43 Hydrograph Report 13 Hydraflow Hydrographs Extension for AutoCAD Civil 3D 2010 by Autodesk, Inc. v9.24 Monday, Mar 19, 2012 Hyd. No. 2 N Bio Pond Hydrograph type = Reservoir Peak discharge = cfs Storm frequency = 100 yrs Time to peak = hrs Time interval = 2 min Hyd. volume = 27,762 cuft Inflow hyd. No. = 1 - Proposed Area Max. Elevation = ft Reservoir name = N Bio Pond Max. Storage = 20,985 cuft Storage Indication method used. N Bio Pond Q (cfs) Hyd. No Year Q (cfs) Time (hrs) Hyd No. 2 Hyd No. 1 Total storage used = 20,985 cuft

44 Prayer Center of Brookfield 01/09/12 Appendix 5 WinSLAMM Input/Output S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

45 Data file name: S:\Project Admin\C ISM Brookfield\SWM\WinSLAMM\ N Bio Pond.dat SLAMM Version Rain file name: S:\Design Resources\SLAMM\DEC06\WisReg - Milwaukee WI 1969.RAN Particulate Solids Concentration file name: S:\Design Resources\SLAMM\DEC06\WI_AVG01.psc Runoff Coefficient file name: S:\Design Resources\SLAMM\DEC06\WI_SL06 Dec06.rsv Particulate Residue Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_DLV01.prr Residential Street Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_Com Inst Indust Dec06.std Institutional Street Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_Com Inst Indust Dec06.std Commercial Street Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_Com Inst Indust Dec06.std Industrial Street Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_Com Inst Indust Dec06.std Other Urban Street Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_Com Inst Indust Dec06.std Freeway Street Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_Com Inst Indust Dec06.std Apply Street Delivery Files to Adjust the After Event Load Street Dirt Mass Balance: False Pollutant Relative Concentration file name: S:\Design Resources\SLAMM\DEC06\WI_GEO01.ppd Seed for random number generator: -42 Study period starting date: 03/28/69 Study period ending date: 12/06/69 Date: Time: 09:10:01 Fraction of each type of Drainage System serving study area: 1. Grass Swales 0 2. Undeveloped roadside 0 Curb and Gutters, `valleys', or sealed swales in: 3. Poor condition (or very flat) 0 4. Fair condition 1 5. Good condition (or very steep) 0 Site information: Area to N <===== Areas for each Source (acres) =====> Resi- Institu- Commercial Industrial Other dential tional Areas Areas Urban Source Area Areas Areas Areas Roofs Roofs Roofs Roofs Roofs Paved Parking/Storage Paved Parking/Storage Paved Parking/Storage Unpaved Prkng/Storage

46 Unpaved Prkng/Storage Playground Playground Driveways Driveways Driveways Sidewalks/Walks Sidewalks/Walks Street Area Street Area Street Area Large Landscaped Area Large Landscaped Area Undeveloped Area Small Landscaped Area Small Landscaped Area Small Landscaped Area Isolated/Water Body Area Other Pervious Area Other Dir Cnctd Imp Area Other Part Cnctd Imp Area Total Freeway Source Area Area (acres) Pavd Lane & Shldr Area Pavd Lane & Shldr Area Pavd Lane & Shldr Area Pavd Lane & Shldr Area Pavd Lane & Shldr Area Large Turf Areas Undeveloped Areas Other Pervious Areas Other Directly Conctd Imp Other Partially Conctd Imp Total Total of All Source Areas Total of All Source Areas less All Isolated Areas ========= Pre-Development Curve Number Data Area Description Area (ac) CN Existing

47 Total Pre-Development Area (ac): 2.27 Composite Curve Number: 79 Institutional Control Practice: Biofiltration Device Fraction of Runoff From Selected Source Areas Routed to Land Use Biofilters: 1 Source Areas from Land Use that Contribute Runoff to Biofiltration Control Device Paved Parking/Storage 1 Sidewalks/Walks 2 Large Landscaped Area 1 Small Landscaped Area 2 Small Landscaped Area 3 Control Practice 1 : Wet Detention Ponds 1. Area served by detention ponds (acres)= 0 2. Particle Size Distribution file name: 3. Initial stage elevation (ft): 0 4. Peak to Average Flow Ratio: 0 5. Maximum flow allowed into pond (cfs): No maximum value entered 6. Outlet Characteristics: 7. Pond stage and surface area Entry Stage Pond Area Natural Seepage Other Outflow Number (ft) (acres) (in/hr) (cfs) Top Area (square feet) = Bottom Area (square feet) = Depth (ft): 6 4. Depth of Biofilter that is Rock Filled (ft) Fraction of Rock Filled Volume as Voids = Engineered Soil Depth (ft) = Engineered Soil Void Ratio = Infiltration Rate (in/hr) = Infiltration Rate Coefficient of Variation Random Infiltration Rate Generation? No 11. Infiltration Rate Fraction (Side): Infiltration Rate Fraction (Bottom): Biofilter Width (ft) - for Cost Purposes Only: Number of Biofiltration Control Devices = Biofilter Peak to Average Flow Ratio = Percent Solids Reduction Due to Flow Through Engineered Soil = Particle Size Distribution File: S:\Design Resources\SLAMM\DEC06\NURP.CPZ 18. Engineered Soil Media: Compost-Sand 19. Engineered Soil Infiltration Rate: Biofilter Outlet/Discharge Characteristics:

48 Biofilter Outlet/Discharge Option Number 1 Outlet type: Broad Crested Weir 1. Weir crest length (ft): Weir crest width (ft): 4 3. Height of datum to bottom of weir opening: 5 4. Default weir coefficients: Yes Weir Coefficient: 0 Biofilter Outlet/Discharge Option Number 2 Outlet type: Orifice 1. Underdrain outlet diameter (ft): Invert elevation above datum (ft): Number of underdrain outlets: 1 Source Area Control Practice Information Land Use: Institutional Roofs 1 Source area number: 31 The roof is pitched The Source Area is draining to a pervious area (partially connected impervious area) The SCS Hydrologic Soil Type is Silty Paved Parking/Storage 1 Source area number: 36 The Source Area is directly connected or draining to a directly connected area Sidewalks/Walks 1 Source area number: 46 The Source Area is draining to a pervious area (partially connected impervious area) The SCS Hydrologic Soil Type is Silty Sidewalks/Walks 2 Source area number: 47 The Source Area is draining to a pervious area (partially connected impervious area) The SCS Hydrologic Soil Type is Silty Large Landscaped Area 1 Source area number: 51 The SCS Hydrologic Soil Type is Silty Large Landscaped Area 2 Source area number: 52 The SCS Hydrologic Soil Type is Silty Small Landscaped Area 1 Source area number: 54 The SCS Hydrologic Soil Type is Silty Small Landscaped Area 2 Source area number: 55 The SCS Hydrologic Soil Type is Silty Small Landscaped Area 3 Source area number: 56 The SCS Hydrologic Soil Type is Silty Isolated/Water Body Area Source area number: 57 The source area is a water body where all rainfall is considered to be runoff, with no particulate solids loading Drainage System Outfall Pollutants to be Analyzed and Printed: Pollutant Name Pollutant Type Solids Particulate Solids Total

49 N Bio Pond - Output Summary SLAMM for Windows Version (c) Copyright Robert Pitt and John Voorhees 2003 All Rights Reserved Data file name: S:\Project Admin\C ISM Brookfield\SWM\WinSLAMM\ N Bio Pond.dat Data file description: Area to N Rain file name: S:\Design Resources\SLAMM\DEC06\WisReg - Milwaukee WI 1969.RAN Particulate Solids Concentration file name: S:\Design Resources\SLAMM\DEC06\WI_AVG01.psc Runoff Coefficient file name: S:\Design Resources\SLAMM\DEC06\WI_SL06 Dec06.rsv Particulate Residue Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_DLV01.prr Residential Street Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_Com Inst Indust Dec06.std Institutional Street Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_Com Inst Indust Dec06.std Commercial Street Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_Com Inst Indust Dec06.std Industrial Street Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_Com Inst Indust Dec06.std Other Urban Street Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_Com Inst Indust Dec06.std Freeway Street Delivery file name: S:\Design Resources\SLAMM\DEC06\WI_Com Inst Indust Dec06.std Pollutant Relative Concentration file name: S:\Design Resources\SLAMM\DEC06\WI_GEO01.ppd Apply Street Delivery Files to Adjust the After Event Load Street Dirt Mass Balance: False Model Run Start Date: 03/28/69 Model Run End Date: 12/06/69 Date of run: Time of run: 09:09:55 Total Area Modeled (acres): 4.25 Years in Model Run: 0.67 Runoff Percent Particulate Particulate Percent Volume Runoff Solids Solids Particulate (cu ft) Volume Conc. Yield Solids Reduction (mg/l) (lbs) Reduction Source Area Total without Controls: % % Total Before Drainage System: % % Total After Drainage System: % % Total After Outfall Controls: % % Annualized Total After Outfall Controls: Page 1

50 Prayer Center of Brookfield 01/09/12 Appendix 6 Site Demolition Plan Proposed Grading and Erosion Control Plan Utility and Pavement Plan Site Construction Details S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

51

52

53

54

55

56

57 Prayer Center of Brookfield 01/09/12 Appendix 7 Storm Sewer Design Spreadsheet S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

58 DEPARTMENT OF COMMERCE STORM SEWER CALCULATIONS Project Name: PRAYER CENTER OF BROOKFIELD Project Location: CITY OF BROOKFIELD, WI Performed by: JNP Project Number: Date: 1/9/2012 Structure abbreviations are as follows: ES - End Section, MH - Manhole, FI - Field Inlet, TD - Trench Drain, BC - Building Connection, RD - Roof Drain, STB - Stub PIPE LOCATION CONTRIBUTING AREA PIPE FLOW PIPE DATA PIPE CAPACITY INFORMATION DROP ELEVATIONS ROOF PAVED GRASS AREA TOTAL Manning's ACTUAL FLOW FULL THRU UP DOWN RUNOFF FLOW LENGTH DIA. SLOPE n REQD ACTUAL PARTS VEL FLOW STRUCT RIM/(F/L) INVERT INVERT STRUCT STRUCT (SQ FT) (SQ FT) (SQ FT) (GPM) (GPM) (CFS) (FT) (IN) (FT/FT) RCP DROP DROP FULL (FPS) (CFS) (FT) UP UP DOWN COVER TO CROWN (FT) IN#3 IN#2 0 5,746 1, IN#2 ES#1 0 5,746 1, IN#6 IN#5 0 17, IN#5 ES#4 0 24, IN #8 ES#7 0 10,546 3, S:\Project Admin\C ISM Brookfield\ DOC STORM Date Printed: 3/19/2012 Page 1 of 1

59 Prayer Center of Brookfield 01/09/12 Appendix 8 MMSD Chapter 13 Checklist S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

60 Prayer Center of Brookfield 01/09/12 Appendix 9 Storm Water Management Practice Agreement Proof of Funds S:\Project Admin\C World Harvest Church\SWM\Report \ SWMP Report Text.doc

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase. Gates TETRA TECH, INC. By: RH Date: 1/30/2017 Subject: Gates Road Checked By: JB Date: 2/1/2017 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction Stormwater

More information

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) Stormwater Guidelines and Case Studies CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Goals and Challenges for Manual State Stormwater Policy More Widespread

More information

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase. High Street TETRA TECH, INC. By: RH Date: 1/30/2017 Subject: High Street Checked By: JB Date: 2/1/2017 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction

More information

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase. Gates TETRA TECH, INC. By: RH Date: 11/11/2016 Subject: Gates Road Checked By: JB Date: 11/13/2016 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number:

More information

Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collecti

Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collecti Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collection... 2 Treatment... 3 Storage... 3 Disposal... 4 Soils...

More information

DAVID NOEL KELLY CIVIL. David Noel Kelly :24:14-04'00'

DAVID NOEL KELLY CIVIL. David Noel Kelly :24:14-04'00' DAVID NOEL KELLY CIVIL David Noel Kelly 2014.07.22 10:24:14-04'00' TABLE OF CONTENTS Stormwater Management Summary Checklist for Stormwater Report Illicit Discharge Statement Runoff Summary Existing Conditions

More information

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)

More information

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example

More information

Continuing Education Course #101 Drainage Design with WinTR-55

Continuing Education Course #101 Drainage Design with WinTR-55 1 of 5 Continuing Education Course #101 Drainage Design with WinTR-55 1. WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the

More information

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses

More information

EROSION CONTROL NARRATIVE

EROSION CONTROL NARRATIVE EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment

More information

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229 Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

More information

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report September 6, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Soil Map Boulder County Area, Colorado (Planet Blue Grass) Web Soil Survey National Cooperative Soil Survey

Soil Map Boulder County Area, Colorado (Planet Blue Grass) Web Soil Survey National Cooperative Soil Survey 475910 476000 476090 476180 476270 476360 105 16' 21'' W 476450 476540 476630 476720 476810 4453350 4453440 4453260 4453350 4453170 4453260 4453080 4453170 4453080 475820 475910 4452990 476000 476090 476180

More information

WATER MANAGEMENT REPORT FOR PAGE ESTATES

WATER MANAGEMENT REPORT FOR PAGE ESTATES WATER MANAGEMENT REPORT FOR PAGE ESTATES SLB Consulting of SW Florida, LLC PO Box 2826 Bonita Springs, FL. 34133 Phone: 239-948-9566 sandra@slbconsult.com C.O.A. # 25395 September 1, 2014 Sandra L. Bottcher

More information

Hydric Rating by Map Unit Harrison County, Mississippi 30 27' 27'' 30 26' 57''

Hydric Rating by Map Unit Harrison County, Mississippi 30 27' 27'' 30 26' 57'' Hydric Rating by Map Unit Harrison County, Mississippi 30 27' 27'' 30 26' 57'' 3370400 3370500 3370600 3370700 3370800 3370900 3371000 3371100 3371200 89 2' 40'' 89 2' 41'' 303700 303700 303800 303800

More information

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details Project Description File Name... 323 - Att Pond 3 East PIPES ONLY.SPF Project Options Flow Units... Elevation Type... Hydrology Method... EPA SWMM Infiltration Method... Link Routing Method... Enable Overflow

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 603 Park Point Dr. Suite 100 Golden, CO 80401 (303)-801-2900 June 29, 2015 Revised August 14, 2015 CERTIFICATE

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction

More information

PARADIGM ODP FORT COLLINS, CO 80525

PARADIGM ODP FORT COLLINS, CO 80525 DRAINAGE REPORT PARADIGM ODP FORT COLLINS, CO 80525 Prepared For: Paradigm Properties, LLC 2186 Knoll Drive Ventura, CA 93003 Prepared By Coffey Engineering & Surveying 4045 St. Cloud Drive, Suite 180

More information

Appendix 2b. NRCS Soil Survey

Appendix 2b. NRCS Soil Survey Appendix 2b NRCS Soil Survey 118 19' 25'' W Nonirrigated Capability Class Antelope Valley Area, California (Del Sur Solar Site) 118 17' 28'' W 378900 379200 379500 379800 380100 380400 380700 381000 381300

More information

STORMWATER MANAGEMENT REPORT

STORMWATER MANAGEMENT REPORT STORMWATER MANAGEMENT REPORT THE FAIRWAYS AT EDGEWOOD LOTS 5 & 6, BLOCK 1201 TOWNSHIP OF RIVER VALE BERGEN COUNTY, NEW JERSEY PREPARED BY: DAPHNE A. GALVIN PROFESSIONAL ENGINEER LICENSE NO. 24GE03434900

More information

Drainage Analysis. Appendix F

Drainage Analysis. Appendix F Drainage Analysis Appendix F Golden View Drive Elizabeth Street LMORE CREEK Ricky Road Rabbit Creek Road LITTLE RABBIT CREEK East 156th Avenue MOA Project #10-026 Golden View Drive Intersection

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

Hydric Rating by Map Unit Harrison County, Mississippi. Web Soil Survey National Cooperative Soil Survey

Hydric Rating by Map Unit Harrison County, Mississippi. Web Soil Survey National Cooperative Soil Survey 89 9' 7'' W 89 8' 38'' W 30 34' 13'' N 30 33' 57'' N 3383480 3383560 3383640 3383720 3383800 3383880 3383960 293640 293720 293800 293880 293960 294040 294120 294200 294280 294360 3383480 3383560 3383640

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Presented at the 78 th Annual Water Environment Federation Technical Exposition and Conference. Washington, D.C. Oct. 29 Nov. 2, 2005.

Presented at the 78 th Annual Water Environment Federation Technical Exposition and Conference. Washington, D.C. Oct. 29 Nov. 2, 2005. Presented at the 78 th Annual Water Environment Federation Technical Exposition and Conference. Washington, D.C. Oct. 29 Nov. 2, 2005. IMPERVIOUS SURFACES IN URBAN WATERSHEDS Celina Bochis-Micu and Robert

More information

Appendix D. Stormwater Pollution Prevention Plan

Appendix D. Stormwater Pollution Prevention Plan Appendix D Stormwater Pollution Prevention Plan STORMWATER POLLUTION PREVENTION PLAN FOR FOSTER CHURCH INC. BRETHREN GOSPEL HALL FEBRUARY 2011 Prepared by Civil Tec CONSULTING ENGINEERS 67 Brookside Avenue

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

Wright County, MN. Overview. Legend

Wright County, MN. Overview. Legend Wright County, MN Overview 461 ft Legend Roads CSAHCL CTYCL MUNICL PRIVATECL TWPCL Highways Interstate State Hwy US Hwy City/Township Limits c t Subdivisions Parcels Water 2' Contours 842; 844; 846; 848;

More information

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Autodesk Storm and Sanitary Analysis 2014 - Version 8.1.62 (Build 1) ----------------- *** Project Description *** File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Analysis Options Flow

More information

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226 RUN-ON/RUN-OFF CONTROL SYSTEM PLAN RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN St. Johns River Power Park Byproduct Storage Area B Phase I Development Submitted to: St. Johns River Power Park 11201 New Berlin

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

SINCE 1959 SITE NARRATIVE Major Site Plan Application Lot 18 Harbinger Park Powells Point, Currituck County, North Carolina Prepared For: Richard M No

SINCE 1959 SITE NARRATIVE Major Site Plan Application Lot 18 Harbinger Park Powells Point, Currituck County, North Carolina Prepared For: Richard M No SINCE 1959 SITE NARRATIVE Major Site Plan Application Lot 18 Harbinger Park Powells Point, Currituck County, North Carolina Prepared For: Richard M Norris & Brooke R Norris 101 Baker Ave. Kill Devil Hills,

More information

Custom Soil Resource Report for Forrest County, Mississippi

Custom Soil Resource Report for Forrest County, Mississippi United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Web Soil Survey National Cooperative Soil Survey

Web Soil Survey National Cooperative Soil Survey 122 14' 27'' W () 122 13' 37'' W 40 8' 40'' N 564700 564800 564900 565000 565100 565200 565300 565400 565500 565600 565700 565800 40 8' 40'' N 4443400 4443500 4443600 4443700 4443800 4443900 4444000 4443400

More information

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable

More information

FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO

FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO October 14, 2016 Revised: March 30, 2017 JN: 15096 Prepared for: PCS Group, Inc. 1001 16 th Street #3 B-180 Denver, CO 80265 P: 303.561.4905

More information

Hydric Rating by Map Unit Harrison County, Mississippi

Hydric Rating by Map Unit Harrison County, Mississippi 89 6' 12'' W 89 5' 54'' W 30 28' 47'' N 30 28' 26'' N 3373210 3373290 3373370 3373450 3373530 3373610 3373690 3373770 3373850 298080 298160 298240 298320 298400 298480 298560 30 28' 47'' N Soil Map may

More information

Hydric Rating by Map Unit Ocean County, New Jersey (Larsen & N New Prospect Jackson Twp., NJ)

Hydric Rating by Map Unit Ocean County, New Jersey (Larsen & N New Prospect Jackson Twp., NJ) 74 16' 14'' W Hydric Rating by Map Unit Ocean County, New Jersey ( ) 74 15' 50'' W 40 9' 17'' N 40 8' 53'' N 4444460 4444550 4444640 4444730 4444820 4444910 4445000 4445090 4445180 562120 562210 562300

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

Web Soil Survey National Cooperative Soil Survey

Web Soil Survey National Cooperative Soil Survey 121 52' 18'' W Irrigated Capability Class Sutter County, California () 121 51' 49'' W 597600 597700 597800 597900 598000 598100 598200 39 6' 27'' N 39 6' 27'' N 39 5' 57'' N 4328400 4328500 4328600 4328700

More information

Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO

Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO 88th Avenue and Pecos Street Stormwater Drainage Design Report Reeve & Associates, Inc. Solutions You Can Build On for Maverik, Inc. 88th Avenue and Pecos Street Thornton, CO submitted to Reeve & Associates,

More information

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design City of Columbia BMP Manual Detailed Unified Sizing Criteria Example Wet Pond Design April 17, 2013 Wet Pond Example: Unified Sizing Criteria Methodology Base Data Location: Rome, GA Site Drainage Area

More information

Chapter 2: Description of Planning Area

Chapter 2: Description of Planning Area 2020 Facilities Plan Facilities Plan Report Chapter 2: Description of Planning Area 2.1 Introduction This chapter describes Milwaukee Metropolitan Sewerage District s (MMSD) planning area and existing

More information

Hydrology Study Report

Hydrology Study Report Hafeez Consulting www.hafeezconsulting.com Civil/ Structural Engineering, Design & Construction 1451 S. Hacienda St. Anaheim CA 92804 (714) 225-4565 Fax (714)917-2977 engineer@hafeezconsulting.com Hydrology

More information

Suitable Applications Sediment traps should be considered for use:

Suitable Applications Sediment traps should be considered for use: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Stage Discharge Tabulation for Only Orifice Flow

Stage Discharge Tabulation for Only Orifice Flow Stage Discharge Tabulation for Only Orifice Flow DEPTH STAGE DISCHARGE (meters) (feet) (meters) (feet) (m 3 /s) (ft 3 /s) 0 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.7 1.3 2.0 2.6 3.3 3.9 4.6

More information

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax: MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA 23149 Phone: 804-758-3382 Fax: 804-758-0061 LAND DISTURBANCE PERMIT SUBMISSION REQUIREMENTS In order to expedite

More information

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215

More information

Soil Map Polk County, Florida

Soil Map Polk County, Florida Soil Map Polk County, Florida 28 9' 21'' 28 8' 23'' 3113000 3113200 3113400 3113600 3113800 3114000 3114200 3114400 3114600 81 51' 19'' 81 51' 19'' 416000 416000 ± 416200 416200 68 416400 68 416400 7 13

More information

3301 East 120 th Avenue Assited Living & Memory Care

3301 East 120 th Avenue Assited Living & Memory Care UTILITY REPORT FOR 3301 East 120 th Avenue Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 Prepared for: 3301 E. 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario Report No. 12020-SWM August 27, 2012 Revised April 21, 2014 Revised December 9, 2014 Revised April 14, 2015 D. B. G R A Y E N G I N E E R

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Appendix E Guidance for Shallow Flooding Analyses and Mapping Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding

More information

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design Scholars' Mine Masters Theses Student Theses and Dissertations Spring 2010 The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention

More information

Stormwater Management Master Plan

Stormwater Management Master Plan City of New Berlin Stormwater Management Master Plan June 2000 Report Contents Executive Summary... ES Section 1 Introduction...1-1 1.1 Project Background...1-1 1.2 Purpose and Scope...1-6 Section 2 Objectives

More information

Objectives: After completing this assignment, you should be able to:

Objectives: After completing this assignment, you should be able to: Data Analysis Assignment #1 Evaluating the effects of watershed land use on storm runoff Assignment due: 21 February 2013, 5 pm Objectives: After completing this assignment, you should be able to: 1) Calculate

More information

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION DEPARTMENT OF THE ARMY SAN FRANCISCO DISTRICT, U.S. ARMY CORPS OF ENGINEERS 1455 MARKET STREET SAN FRANCISCO, CALIFORNIA 94103-1398 SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS

More information

PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks

PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks Version 2.1 - March 1989 William W. Walker, Jr. Ph.D., Environmental Engineer 1127 Lowell Road, Concord, Massachusetts 01742 508-369-8061 PONDNET.WK1

More information

Custom Soil Resource Report Soil Map

Custom Soil Resource Report Soil Map 121 3' 56'' W Custom Soil Resource Report Soil Map 121 2' 49'' W 45 16' 39'' N 5013800 5014000 5014200 5014400 5014600 5014800 5015000 5015200 5015400 5015600 651800 652000 652200 652400 652600 652800

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars

Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars Introduction Abstract: The use of ArcMap to calculate soil areas for storm water

More information

Web Soil Survey National Cooperative Soil Survey

Web Soil Survey National Cooperative Soil Survey 252500 252600 252700 252800 252900 253000 253100 83 47' 15'' W 83 47' 49'' W Nonirrigated Capability Class Jackson and Owsley Counties, Kentucky (Peggy Wilson Booneville Property - ) 253200 253300 37 25'

More information

Wellsgate Terrace SPECIFICATIONS.

Wellsgate Terrace SPECIFICATIONS. GRADING NOTES: 1. LOT GRADING SHALL BE COMPLETED TO PROVE SUFFICIENT DIRT ON EACH PAD TO ACHIEVE THE CRITICAL PAD GRADES AND SPOT GRADES ON EACH LOT. AFTER ACHIEVING CRITICAL PAD GRADES INDICATED ON THIS

More information

EROSION CONTROL NARRATIVE

EROSION CONTROL NARRATIVE EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment

More information

Chapter 10 - Sacramento Method Examples

Chapter 10 - Sacramento Method Examples Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer

More information

RANCHO de DOS PALMAS DAVIS, California, AC +/-

RANCHO de DOS PALMAS DAVIS, California, AC +/- RANCHO de DOS PALMAS DAVIS, California, 507.28 AC +/- Boundary Transmission Line Pond / Tank Well SCOTT STONE P: (530) 662-4094 sastone57@gmail.com 37874 County Road 28, Woodland, Ca. 95695 The information

More information

5. Using WinSLAMM. Copyright R. Pitt 2003 August 12, 2003

5. Using WinSLAMM. Copyright R. Pitt 2003 August 12, 2003 Copyright R. Pitt 2003 August 12, 2003 5. Using WinSLAMM Introduction...2 Hardware Requirements and Recommendations...3 Description of the Files Associated WinSLAMM...4 WinSLAMM.EXE...4 MPARAXX.EXE...4

More information

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations. CHAPTER 19.07 GEOLOGICALLY HAZARDOUS AREAS 19.07.010 Applicability. Geologically hazardous areas may pose a threat to the health and safety of citizens when incompatible development is sited in areas of

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

Villages at Riverdale Thornton, CO

Villages at Riverdale Thornton, CO FINAL UTILITY REPORT Villages at Riverdale Thornton, CO October 14, 216 Revised: March 29, 217 JN: 1539 Prepared for: PCS Group, Inc. 11 16 th Street #3 B-18 Denver, CO 8265 P: 33.531.495 Prepared by:

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

MS4: MAPPING CHALLENGES. Mike Towle Associate Planner, WestCOG

MS4: MAPPING CHALLENGES. Mike Towle Associate Planner, WestCOG MS4: MAPPING CHALLENGES Mike Towle Associate Planner, WestCOG mtowle@westcog.org Please contact or attribute author before using any images or data from this presentation Overview I. Theory and background

More information

² 2015 Program Year. Farm Tract McLeod County, Minnesota 1:4, NHEL NHEL

² 2015 Program Year. Farm Tract McLeod County, Minnesota 1:4, NHEL NHEL United States Department of Agriculture McLeod County, Minnesota Farm 5125 #* 2 3.65 NHEL Tract 2762 1 33.19 NHEL ² 2015 Program Year Map Created November 06, 2014 Common Land Unit Cropland Non-cropland

More information

Carrick Road $798,000

Carrick Road $798,000 1955-2020 Carrick Road 165.76± acres Fayette/Scott Counties $798,000 Offered Exclusively By: Zach Davis Principal Broker +1.859.576.8195 www.kirkfarms.com zach@kirkfarms.com Measuring an appx. 165+/- acres,

More information

Monitoring Considerations and Costs

Monitoring Considerations and Costs Monitoring Considerations and Costs Stormwater BMP Selection, Design, and Monitoring Florida Stormwater Association September 9, 2016 Harvey H. Harper, Ph.D., P.E. Environmental Research & Design, Inc.

More information

APPENDIX B DRAINAGE REPORT

APPENDIX B DRAINAGE REPORT APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,

More information

Eastlake Assited Living & Memory Care

Eastlake Assited Living & Memory Care UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.

More information

HYDROLOGY REPORT Tentative Tract No. 5978

HYDROLOGY REPORT Tentative Tract No. 5978 ATTACHMENT 5 October 2016 HYDROLOGY REPORT Tentative Tract No. 5978 City of Simi Valley County of Ventura Prepared For: Landsea Holdings Corporation 7525 Irvine Center Drive Suite 200 Irvine, CA 92618

More information

Producing Chandler Walnut Orchard

Producing Chandler Walnut Orchard AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA 96080 530-529-4400 Fax 530-527-5042 Producing Chandler Walnut Orchard West Sacramento Avenue - Chico, CA AG-LAND INVESTMENT BROKERS 275 Sale Lane

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

BROADSTONE VANTAGE POINT APARTMENTS NE corner of S. Parker Road, and E. Cottonwood Drive Parker, Colorado

BROADSTONE VANTAGE POINT APARTMENTS NE corner of S. Parker Road, and E. Cottonwood Drive Parker, Colorado BROADSTONE VANTAGE POINT APARTMENTS NE corner of S. Parker Road, and E. Cottonwood Drive Parker, Colorado PRELIMINARY DRAINAGE REPORT Strategic Land Solutions, Inc. JN: 16-002-15 Report Date/History: July

More information

BUNCOMBE COUNTY NORTH CAROLINA

BUNCOMBE COUNTY NORTH CAROLINA PROJECT SITE ² 0 0. 75 1. 5 LOCATION MAP MARCH 2018 2. 25 3 Mil es AID: PROJECT # 2018-01122 18.05301 Sheet 1 of 7 Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri

More information

Table 1 - Infiltration Rates

Table 1 - Infiltration Rates Stantec Consulting Ltd. 100-300 Hagey Boulevard, Waterloo ON N2L 0A4 November 14, 2017 File: 161413228/10 Attention: Mr. Michael Witmer, BES, MPA, MCIP, RPP City of Guelph 1 Carden Street Guelph ON N1H

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

ENGINEERING HYDROLOGY

ENGINEERING HYDROLOGY ENGINEERING HYDROLOGY Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati VNIT,

More information

Using the Web Soil Survey Resilience and Resistance Score Sheet Soils Report

Using the Web Soil Survey Resilience and Resistance Score Sheet Soils Report Using the Resilience and Resistance Score Sheet Soils Report 1. Go to http://websoilsurvey.nrcs.usda.gov/app/ and click on the Start WSS button. 2. Create an Area of Interest (AOI) using any of the available

More information

Custom Soil Resource Report for Victoria County, Texas

Custom Soil Resource Report for Victoria County, Texas United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Cripps Ranch 76+/- Acres Orchard Development Opportunity Dixon, CA. Presented By:

Cripps Ranch 76+/- Acres Orchard Development Opportunity Dixon, CA. Presented By: Cripps Ranch 76+/- Acres Orchard Development Opportunity Dixon, CA Presented By: Cripps Ranch 76+/- Acres Orchard Development Opportunity Dixon, CA Location: This property is located at 5663 Dally Road

More information

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS By Thomas T. Burke, Jr., PhD, PE Luke J. Sherry, PE, CFM Christopher B. Burke Engineering, Ltd. October 8, 2014 1 SEMINAR OUTLINE Overview of hydrologic

More information

CALIFORNIA AGRICULTURAL PR OPERTIES, IN C. GALE RANCH

CALIFORNIA AGRICULTURAL PR OPERTIES, IN C. GALE RANCH CALIFORNIA AGRICULTURAL PR OPERTIES, IN C. GALE RANCH LOCATION: The Ranch is located 6 Yi miles west of the City of Davis on the northwest corner of County Roads 29A and 92E in Yolo County. SIZE: 368.64

More information