1 July 13, 2011, corrected Observations of post-monument Fire flows at, Miller Canyon, Coronado National Forest, July 11 th, 2011 Ann Youberg, AZGS Tom Beatty reported 1.05 of rain at his house on July 10 th, followed by significant and damaging flows through his property. The ALERT rain gauge that had been installed on the Reef, east of Carr Peak and just above the Beatty s, recorded 1.64 of rainfall between 13:31:40 and 14:35:40 on July 10 th. A quick assessment of the raw ALERT data indicates that during the highest intensity rainfall 0.72 fell in 10 minutes. The Sue Cannon Rule of Thumb is that 0.25 in 10 minutes is sufficient for post-fire debris-flow initiation. At the request of the Coronado National Forest Ann Youberg, AZGS, visited the Beatty s on July 11 th to assess what kind of flows (floods or debris flows) had impacted the Beatty s property. She was accompanied by Rebeca Franco, Coronado BAER PIO. A.Youberg had previously visited the Beatty s on July 8 th, prior to significant flows. The following are a few comments and photos showing conditions from a visit to the Beatty s on July 8 th, and again after the flows on July 11 th. Yellow arrows indicate the same object between photos, trees or rocks. Blue arrows indicate direction of stream flow. There are several drainages above the Beatty s property. Miller Creek crosses the south end of the property (Figure 1). The next drainage north is informally called Marshall Canyon and a smaller drainage north of that has just been informally named Beatty s Gulch (Figure 1). Miller Canyon had a small debris flow. At first it appeared that the flow in Miller was a flood flow, but then we found a debris-flow snout just upstream of the confluence between Miller and Marshall. Marshall Canyon, on the other hand, definitely produced debris flows. Based on the amount of material there were likely several pulses. Clasts from Marshall Canyon ranged from cobbles to very large boulders. The thickness of the Marshall Canyon debris fan at the channel of Miller Creek is approximately seven feet. There is now a very large debris fan where the apple orchard used to be. Material from the Marshall Canyon debris flows extends down Miller Canyon to approximately the Miller Canyon Trailhead. Beatty s Gulch produced flood flows. The largest material from this drainage was large cobbles to small boulders, but most of the material was composed of sand and gravel. This is the drainage that filled the frog pond. Figure 1. Map of drainages above Beatty s property. The upper watersheds still have plenty of material available for transport. The risk of post-fire floods and debris flows continues. These now-disturbed channels that cross the Beatty s property will shift with subsequent flows. Channels will episodically fill and scour as pulses of sediment move through the system.
2 View from footbridge over Miller Creek near campsites, July 8th. View of the same Miller Creek riparian area, July 11th, from river left. This material came from Marshall Canyon.
3 , July 11th. View upfan of Marshall Canyon debris fan from confluence w/miller Creek New channel of Miller Creek Photos above and below are of Miller Creek riparian area below Marshall Canyon.
4 Miller Creek at the FS boundary, July 8th and 11th. View upstream, July 8th and 11th. View downstream, July 8th and 11th.
5 Marshall Canyon, July 8th and 11th. View upstream of Marshall Canyon, July 8th and 11th. View of Marshall Canyon debris fan, July 11th.
6 View of Marshall Canyon debris fan looking downstream at the confluence of Marshall (left arrow) and Miller Creek (right arrow), July 11 th. Looking upstream in Miller Creek, July 11 th. Small debris flow snout just above confluence with Marshall Canyon. View downstream of Beatty s Gulch, July 8th. View downstream of Beatty s Gulch, July 11th.
7 View of Beatty s pond, July 8 th. View of Beatty s pond, July 11 th. View looking up Marshall Canyon, July 8 th. View looking up Marshall Canyon, July 11 th. Note freshly scoured channels in upper watershed. For more information contact: Ann Youberg Research Geologist Arizona Geological Survey 416 W Congress, Suite 100 Tucson, Arizona ann.youberg@azgs.az.gov (direct) (fax)
DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6.
DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6. The Eklutna River was divided into study reaches (figure 1) prior to this site visit. Prominent geologic or
More informationWhy Geomorphology for Fish Passage
Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the
More informationGateway Trail Project
Gateway Trail Project Debris Flow Hazard Assessment By: Juan de la Fuente April 30, 2010 Background- On April 22, 2010, the Shasta-Trinity National Forest (Mt. Shasta-McCloud Unit) requested a geologic
More informationDan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda. GOAL Predict Channel Characteristics in Space and Time
Broad-Scale Models Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda GOAL Predict Channel Characteristics in Space and Time Assess Potential for Fish Use and Productivity Assess
More informationNorse Peak and American Fire BAER Burned Area Emergency Response (BAER) Norse Peak and American Fires. Geology: Landslides
Burned Area Emergency Response (BAER) Norse Peak and American Fires : Landslides Snoqualmie Ranger District - Mount Baker-Snoqualmie National Forest, Washington Naches Ranger District - Okanogan-Wenatchee
More informationGEOL 652. Poudre River Fieldtrip
GEOL 652. Poudre River Fieldtrip One of the more difficult variables to measure and/or estimate when studying flow in natural channels is that of roughness. Roughness, usually approximated with Manning
More informationCR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District
CR AAO Bridge Dead River Flood & Natural Channel Design Mitch Koetje Water Resources Division UP District Old County Road AAO Bridge Map courtesy of Marquette County Silver Lake Basin McClure Basin
More informationTSEGI WASH 50% DESIGN REPORT
TSEGI WASH 50% DESIGN REPORT 2/28/2014 Daniel Larson, Leticia Delgado, Jessica Carnes I Table of Contents Acknowledgements... IV 1.0 Project Description... 1 1.1 Purpose... 1 Figure 1. Erosion of a Headcut...
More informationGeomorphic Responses of Burned Watersheds in the Modern Fire Regime: Floods, Debris Flows and Long-Term Recovery. Fire Regimes: Tree Ring Data
Geomorphic Responses of Burned Watersheds in the Modern Fire Regime: Floods, Debris Flows and Long-Term Recovery Outline Fire Regimes and Trends Post-fire Hydrologic Changes Post-fire Geomorphic Responses
More informationEFFECTS OF RIPARIAN RETENTION (IN WATERSHEDS) ON ALLUVIAL FANS
EFFECTS OF RIPARIAN RETENTION (IN WATERSHEDS) ON ALLUVIAL FANS TIM GILES GEOMORPHOLOGIST FLNRO EFFECTS OF RIPARIAN RETENTION (IN WATERSHEDS) ON ALLUVIAL FANS Description of alluvial fans Three case studies
More informationSeeley Burn Scar SR-31, Region 4 UDOT Weather Response Summer 2013
Seeley Burn Scar SR-31, Region 4 UDOT Weather Response Summer 2013 Seeley Burn Scar Information June 26 July 18, 2012 48,050 acres burned Lightning caused fire 8 miles of SR-31 impacted Huntington Creek
More informationRecent Debris Flows and Floods in Southern Arizona
Vol. 36, No. 3 FALL 2006 THE STATE AGENCY FOR GEOLOGIC INFORMATION Recent Debris Flows and Floods in Southern Arizona Philip A. Pearthree and Ann Youberg Widespread damage Southeastern Arizona experienced
More informationCASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia
CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia Brushy Fork Dam is a flood control structure built by the Soil Conservation Service southeast of the city of Franklin in Pendleton County, West
More informationPENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:
More informationProject Proposal. Lyme Brook. Newcastle-under-Lyme. 3 rd July 2015
Project Proposal Lyme Brook Newcastle-under-Lyme 3 rd July 2015 Contents Page 1.0 Introduction... 1.0 2.0 Background and rationale... 2.0 3.0 Proposed measures... 5 4.0 Summary of Recommendations... 10
More informationSECTION G SEDIMENT BUDGET
SECTION G SEDIMENT BUDGET INTRODUCTION A sediment budget has been constructed for the for the time period 1952-2000. The purpose of the sediment budget is to determine the relative importance of different
More informationWatershed concepts for community environmental planning
Purpose and Objectives Watershed concepts for community environmental planning Dale Bruns, Wilkes University USDA Rural GIS Consortium May 2007 Provide background on basic concepts in watershed, stream,
More informationSUPPLEMENTAL MATERIAL
SUPPLEMENTAL MATERIAL DESCRIPTIONS OF OTHER STRATIGRAPHIC SECTIONS Cherry Creek In its middle reaches, Cherry Creek meanders between three paired terraces within a narrow bedrock valley. The highest is
More informationThe River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant
The River Restoration Centre therrc.co.uk Understanding Fluvial Processes: supporting River Restoration Dr Jenny Mant Jenny@therrc.co.uk Understanding your catchment Hydrology Energy associated with the
More informationMISSION CREEK WATERSHED (2002 Report Year 4)
Stream Channel Monitoring Program for the MISSION CREEK WATERSHED (2002 Report Year 4) (Penticton Forest District) Prepared for RIVERSIDE FOREST PRODUCTS LTD. Prepared by DOBSON ENGINEERING LTD. #4, 1960
More informationThe effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan
Erosion, Debris Mows and Environment in Mountain Regions (Proceedings of the Chengdu Symposium, July 1992). IAHS Publ. no. 209, 1992. 423 The effectiveness of check dams in controlling upstream channel
More informationDo you think sediment transport is a concern?
STREAM RESTORATION FRAMEWORK AND SEDIMENT TRANSPORT BASICS Pete Klingeman 1 What is Your Restoration Project Like? k? Do you think sediment transport is a concern? East Fork Lewis River, WA Tidal creek,
More informationEagle Creek Post Fire Erosion Hazard Analysis Using the WEPP Model. John Rogers & Lauren McKinney
Eagle Creek Post Fire Erosion Hazard Analysis Using the WEPP Model John Rogers & Lauren McKinney Columbia River Gorge at Risk: Using LiDAR and GIS-based predictive modeling for regional-scale erosion susceptibility
More informationFire effects on tinajas and amphibian habitat at Saguaro National Park
Fire effects on tinajas and amphibian habitat at Saguaro National Park Don Swann, Kara O Brien, and Chuck Perger Saguaro National Park, Tucson, Arizona Thanks to: Mike Sredl (Arizona Game and Fish) Ann
More informationA GEOLOGIC TRIP to the SAN ANDREAS FAULT
A GEOLOGIC TRIP to the SAN ANDREAS FAULT San Andreas Hot Spot Loop Road Hot Spot P Parking San Andreas Fault Interpretive Trail Fault Zone Map: San Andreas Fault Zone During the 25 million years that the
More informationGreat Lakes Tributary Modeling: Canaseraga Creek Watershed
Great Lakes Tributary Modeling: Canaseraga Creek Watershed SWAT Model Authority: Section 516(e) of WRDA 1996 US Army Corps of Engineers Canaseraga Creek Project Location - Encompasses portions of Livingston,
More informationAPPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013
APPENDIX E GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2 Introduction Keystone Restoration Ecology (KRE) conducted geomorphological monitoring in
More informationWorking with Natural Stream Systems
Working with Natural Stream Systems Graydon Dutcher Delaware County Soil & Water Conservation District Stream Corridor Management Program Tropical Storm Sandy October 29,2012 What is a Watershed?
More informationALDERON IRON ORE CORP. ENVIRONMENTAL IMPACT STATEMENT KAMI IRON ORE MINE AND RAIL INFRASTRUCTURE, LABRADOR. Appendix P
ALDERON IRON ORE CORP. ENVIRONMENTAL IMPACT STATEMENT KAMI IRON ORE MINE AND RAIL INFRASTRUCTURE, LABRADOR Appendix P Additional Monitoring Station Details of Stream Gauging Stations S1, S2, S3, S4, and
More informationCarmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018
Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 EXISTING CONDITION The proposed Carmel River Bank Stabilization at Rancho San Carlos Road Project
More informationUSGS scientists with Venezuelan military liaisons.
USGS scientists with Venezuelan military liaisons. In December, 1999, heavy rainfall triggered thousands of debris flows and caused numerous flash floods in a 300- kilometer long area of the north coast
More informationGeomorphic Responses of Burned Watersheds in the Modern Fire Regime: Floods, Debris Flows and Long-Term Recovery. Fire Regimes: Tree Ring Data
Geomorphic Responses of Burned Watersheds in the Modern Fire Regime: Floods, Debris Flows and Long-Term Recovery Outline Fire Regimes and Trends Post-fire Hydrologic Changes Post-fire Geomorphic Responses
More informationJanuary 22, Coronado National Forest 300 West Congress Street Tucson, AZ Jim Upchurch, Forest Supervisor. Dear Mr.
January 22, 2015 Coronado National Forest 300 West Congress Street Tucson, AZ 85701 Attn: Jim Upchurch, Forest Supervisor Dear Mr. Upchurch: In your letter dated January 16, 2015, you requested that Hudbay
More informationCase Study 14. Rocky Creek Vented Box Culvert Ford
Case Study. Rocky Creek Vented Box Culvert Ford Location West Central Arkansas. Ouachita National Forest; Oden Ranger District. Rocky Creek crossing on Forest Road 887 (Muddy Gibbs Road). Crossing Description
More informationTechnical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth
Technical Memorandum To: From: Greg Laird, Courtney Moore Kevin Pilgrim and Travis Stroth 5777 Central Avenue Suite 228 Boulder, CO 80301 www.otak.com Copies: [Electronic submittal] Date: 10/19/2017 Subject:
More informationLower South Fork McKenzie River Floodplain Enhancement Project
Lower South Fork McKenzie River Floodplain Enhancement Project McKenzie River Ranger District Willamette National Forest Project Location The project is located in the South Fork McKenzie River Watershed,
More informationThe Effects of Flooding on Structures. Or What to Expect when the Drought Ends Violently
The Effects of Flooding on Structures Or What to Expect when the Drought Ends Violently Let s Define Flood Increase in discharge compared to normal level Direct runoff of rainfall (we re talking about
More informationWoodstock, Route 26 Stream Relocation Project
MAINE DEPARTMENT OF TRANSPORTATION 2006 POST - CONSTRUCTION MONITORING REPORT: Woodstock, Route 26 Stream Relocation Project Year 1 of 5 Compensation for the Woodstock, Route 26 Highway Reconstruction
More informationWhat discharge (cfs) is required to entrain the D 84 (84 th percentile of sediment size distribution) in Red Canyon Wash?
Gregory Indivero 31 October 2011 What discharge (cfs) is required to entrain the D 84 (84 th percentile of sediment size distribution) in Red Canyon Wash? What discharge was required to deposit observed
More informationFluvial Erosion Impacts on Infrastructure Along Indiana Rivers and Streams
Fluvial Erosion Impacts on Infrastructure Along Indiana Rivers and Streams Siavash Beik, Robert Barr, Brian Meunier 2017 Purdue Road School March 6-9, 2017 In June 2008, flooding damaged or destroyed
More informationOC Public Works El Niño Storm Preparation 2015
OC Public Works El Niño Storm Preparation 2015 December 8, 2015 Overview About OC Public Works Storm Preparation Pre-Storm During Storm Post-Storm Storm Preparation Canyon and Burn Areas County Department
More informationScience of Natural Disasters: RIVERS& FLOODS! 27 April 2016
Science of Natural Disasters: RIVERS& FLOODS! 27 April 2016 Rebecca Clotts Department of Geology, University of St Thomas Flood in St Paul, 2014, Star Tribune 1 2 What is a watershed? 3 4 5 6 7 What is
More informationStop 1: Marmot Dam Stop 1: Marmot Dam
Stop 1: Marmot Dam Stop 1: Marmot Dam Following the removal of Marmot Dam in 2007, the fate of the reservoir sediments has been monitored through a series of surveys and sediment transport measurements.
More informationStream Simulation: A Simple Example
Stream Simulation: A Simple Example North Thompson Creek, CO Paul T. Anderson U.S.D.A. Forest Service Here s How We Started May 2011 2-1 USDA-Forest Service Here s How We Finished Forest Service Aquatic
More informationSession 1 Healthy Streams Stream Hydraulics Natural Channel Design
Session 1 Healthy Streams Stream Hydraulics Natural Channel Design Bill Brant Heart of America Flyfishers Black & Veatch Kansas City, MO February 21, 2014 http://www.bobswebspace.com Audience? What do
More informationFOLLOW-UP ON CHANNELIZATION IN SPRING CREEK SUB-WATERSHED
FOLLOW-UP ON CHANNELIZATION IN SPRING CREEK SUB-WATERSHED Justin R. Beebe, Department of Earth Sciences, University of South Alabama, Mobile, AL 36688. jrb308@jaguar1.usouthal.edu. Spring Creek is a tributary
More informationMINISTRY OF FORESTS, LANDS AND NATURAL RESOURCE OPERATIONS, POST-WILDFIRE RISK ANALYSIS PRELIMINARY REPORT
MINISTRY OF FORESTS, ANDS AND NATURA RESOURCE OPERATIONS, POST-WIDFIRE RISK ANAYSIS PREIMINARY REPORT NOTE: The results given on this form are preliminary in nature and are intended to be a warning of
More informationStream Geomorphology. Leslie A. Morrissey UVM July 25, 2012
Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation
More informationAPPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011
APPENDIX A REACH DECRIPTIONS Basin 615, South Fork of Quantico Creek - Project Reach Descriptions Reach Name: 615-A Coordinates (NAD 83, Virginia State Plane North): 11796510.57, 6893938.95 to 11801555.79,
More informationWays To Identify Background Verses Accelerated Erosion
Ways To Identify Background Verses Accelerated Erosion Establish Background Condition From Old Ground Photos, Aerial Photos, and Maps Compare Rate Over Time At the Same Location, or for Reaches Channel
More information1 INTRODUCTION AND MAJOR FINDINGS... 1
Memorandum To: Lindsey Clark, Stillwater Valley Watershed Council Coordinator From: Chad Raisland, Pioneer Technical Services, Inc. and Karin Boyd, Applied Geomorphology, Inc. CC: Tanya Lester, Stillwater
More informationBorrego Springs Alluvial Fan Active and Inactive Area Mapping, County of San Diego, California. Julianne J. Miller Steve N. Bacon Richard H.
Borrego Springs Alluvial Fan Active and Inactive Area Mapping, County of San Diego, California Julianne J. Miller Steve N. Bacon Richard H. French Outline Where is Borrego Springs, California? History
More informationFluvial Driven Alluvial Fans
Fluvial Driven Alluvial Fans Restoration Project Evaluations - Examples from the Russian and Napa River Watersheds Mia Docto Masters Thesis UC Berkeley 1. Basic Fan Description 2. Fluvial Driven Fan Characteristics
More informationDISCUSSION PURPOSES ONLY C A L I F O R N I A S T A T E L A N D S C O M M I S S I O N
C A L I F O R N I A S T A T E L A N D S C O M M I S S I O N SAN JOAQUIN RIVER REACH 2B OVERVIEW OF THE CALIFORNIA STATE LANDS COMMISSION ADMINISTRATIVE MAPS PRESENTATION Water Boundary Principles Best
More information6.11 Naas River Management Unit
6.11 Naas River Management Unit 6.11.1 Site 41 Issue: Bed and bank erosion Location: E 0685848 N 6058358 Waterway: Naas River Management Unit: Naas River Facing downstream from Bobeyan Rd bridge Facing
More informationWaterbury Dam Disturbance Mike Fitzgerald Devin Rowland
Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland Abstract The Waterbury Dam was completed in October 1938 as a method of flood control in the Winooski Valley. The construction began in April1935
More informationRiparian Assessment. Steps in the right direction... Drainage Basin/Watershed: Start by Thinking Big. Riparian Assessment vs.
Riparian Assessment vs. Monitoring Riparian Assessment What is a healthy stream? Determine stream/riparian health Determine change or trend, especially in response to mgmt Classification = designation
More informationMount St. Helens. Copyright 2010 LessonSnips
Mount St. Helens Washington State is home to the Cascade Mountains, a range of mountains that extends from the Canadian province of British Columbia to northern California. Many of these mountains are
More informationThe Effects of Hydraulic Structures on Streams Prone to Bank Erosion in an Intense Flood Event: A Case Study from Eastern Hokkaido
Symposium Proceedings of the INTERPRAENENT 2018 in the Pacific Rim The Effects of Hydraulic Structures on Streams Prone to Bank Erosion in an Intense Flood Event: A Case Study from Eastern Hokkaido Daisuke
More informationTechnical Memorandum No
Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.10 Task: Evaluation of Four Watershed Conditions - Sediment To: PRWFPA Staff Working Group Prepared by: Gregory Morris and
More informationPage 1. Name:
Name: 1) Which event is the best example of erosion? dissolving of rock particles on a limestone gravestone by acid rain breaking apart of shale as a result of water freezing in a crack rolling of a pebble
More informationRAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION
RAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION Rail Environment Conference November 2016 AGENDA Objective Background Benefits
More informationScientific research and tools to support management and protection of water supplies from the effects of wildfires
Scientific research and tools to support management and protection of water supplies from the effects of wildfires Deborah A., Martin, U.S. Geological Survey Managing for Uncertainty and Climatic Variability:
More informationTemplate for Sediment and Erosion Control Plan General Instructions
Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery
More informationPresident s Day Weekend Storm Community Meeting and Workshop April 17, 2017
President s Day Weekend Storm Community Meeting and Workshop April 17, 2017 Meeting outline 1. Progress update on the City of San Jose s recovery efforts 2. Water district presentation on: Weather situation
More informationTechnical Memorandum No Sediment Model
Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.9 Sediment Model Task: Development of Sediment Model To: PRWFPA Staff Working Group Prepared by: Gregory Morris and Elsie Parrilla
More informationSTUDY PERFORMANCE REPORT
STUDY PERFORMANCE REPORT State: Michigan Project No.: F-80-R-8 Study No.: 230702 Title: Effects of sediment traps on Michigan river channels Period Covered: October 1, 2006 to September 30, 2007 Study
More informationNotes: We all know that Toulmins Spring Branch is a sub-watershed of Three Mile Creek watershed. Some part of it is in Mobile area and rest of it is
1 Notes: This presentation is about some of our findings from a study carried out over the last 3-4 months on stormwater management of Toulmins Spring Branch watershed by NEP. The objective of this study
More informationErosion Surface Water. moving, transporting, and depositing sediment.
+ Erosion Surface Water moving, transporting, and depositing sediment. + Surface Water 2 Water from rainfall can hit Earth s surface and do a number of things: Slowly soak into the ground: Infiltration
More informationChannel Morphology in Carnation Creek: 2009 Survey Results
Research Branch BC Ministry of Forests Channel Morphology in Carnation Creek: submitted to: Dan Hogan BC Ministry of Forests Rm 315 2202 Main Mall Vancouver B.C. V6T 1Z4 prepared by: Stephen Bird White
More informationBank Erosion and Morphology of the Kaskaskia River
Bank Erosion and Morphology of the Kaskaskia River US Army Corps Of Engineers St. Louis District Fayette County Soil and Water Conservation District Team Partners : Carlyle Lake Ecosystem Partnership Vicinity
More informationBlack Gore Creek Sediment Source Monitoring and TMDL Sediment Budget
Black Gore Creek 2012 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: The Eagle River Watershed Council Prepared By: RiverRestoration.org - I. Introduction Interstate 70 is a major highway
More informationThe Lynmouth Flood 1952 Student Assignment
The Lynmouth Flood 1952 Student Assignment Name Group Section Points Score Where is Lynmouth? 7 The Weather 10 Exmoor 8 The East Lyn Valley 11 Human Factors 10 Bridges 14 Changes in Lynmouth 12 Flood defences
More informationNAME DATE TOPOGRAPHIC MAPS. Activity 1: Topographic Map Investigation I: More Than a Road Map
NAME DATE PARTNER(S) TOPOGRAPHIC MAPS Now you have seen how topographic maps can be generated to present the elevation of a terrain. Let s look at some topographic maps and learn how to interpret them.
More informationDiego Burgos. Geology 394. Advisors: Dr. Prestegaard. Phillip Goodling
Sediment Transport into an Urban Tributary Junction Diego Burgos Geology 394 Advisors: Dr. Prestegaard Phillip Goodling 1 Abstract Tributary junctions are an important component of stream morphology and
More information!"#$%&&'()*+#$%(,-./0*)%(!
8:30 Sign in Hoosic River Revival Coalition!"#$%&&'()*+#$%(,-./0*)%(! 12-#30+4/#"5-(60 9:00 Welcome and Introductions 9:15 Goals for Today s Program: A Description of the Planning Process 9:30 First Session:
More informationConceptual Model of Stream Flow Processes for the Russian River Watershed. Chris Farrar
Conceptual Model of Stream Flow Processes for the Russian River Watershed Chris Farrar Several features of creeks affect the interactions between surface and groundwater. This conceptual model uses the
More informationSteven Noble MDEQ - WRD Enbridge Response Unit
EPA situation report, October 19, 2012 Steven Noble MDEQ - WRD Enbridge Response Unit Brief history of the spill Monitoring Monitoring the impacts Follow the oil The Current Situation A Look at the Future
More informationExperimental Study of the Sediment Trap Effect of Steel Grid-Type Sabo Dams
Experimental Study of the Sediment Trap Effect of Steel Grid-Type Sabo Dams Teruyoshi TAKAHARA 1 and Kazuki MATSUMURA 1 1 Graduate school of Agriculture, Kyoto Pref. University (1-5 Shimogamonakaragicyo,
More informationLectures Hydrology & Fluvial Geomorphology. Gauley River Images. Ancients' (= Biblical) Model of Water (Hydrologic) Cycle
Lectures 11-13 13 Hydrology & Fluvial Geomorphology Gauley River Images http://www.youtube.com/watch?v=eulmuyegtz4&feature=related Ancients' (= Biblical) Model of Water (Hydrologic) Cycle Stream Water
More informationProbability and Volume of Potential Postwildfire Debris Flows in the 2010 Fourmile Burn Area, Boulder County, Colorado
Prepared in cooperation with the U.S. Department of Agriculture Forest Service Arapaho and Roosevelt National Forests and Boulder County Probability and Volume of Potential Postwildfire Debris Flows in
More informationSELBY CREEK STREAM HABITAT RESTORATION AND RIPARIAN REVEGETATION PROJECT: GEOMORPHIC ANALYSIS AND REVIEW
SELBY CREEK STREAM HABITAT RESTORATION AND RIPARIAN REVEGETATION PROJECT: GEOMORPHIC ANALYSIS AND REVIEW Submitted to Bioengineering Institute P.O. Box 1554 Laytonville, CA 95454 By Matthew O Connor, PhD,
More informationAugust 2006 El Paso. Policy Factors
August 2006 El Paso Flooding: Technical and Policy Factors John Walton University of Texas at El Paso El Paso, Texas UTEP History Deficiencies in El Paso Arroyo drainage systems were multitudinous and
More informationBlack Gore Creek Total Maximum Daily Load Sediment Source Monitoring 2008 Vail Pass, Colorado. Prepared for: Eagle River Watershed Council
Black Gore Creek Total Maximum Daily Load Sediment Source Monitoring 2008 Vail Pass, Colorado Prepared for: Eagle River Watershed Council Prepared by: RiverRestoration.org I. Introduction This document
More informationGeomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River
Geomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River Scott McBain and Bill Trush McBain & Trush, Inc. Clavey River and Cherry Creek vicinity
More informationInstream Erosion Control General
Instream Erosion Control General EROSION CONTROL TECHNIQUES Revegetation Temperate Climates Short-Term Non Vegetation Wet Tropics Long-Term Weed Control [1] Semi-Arid Zones Permanent [1] Weed control attributes
More informationSwift Creek Sediment Management Action Plan (SCSMAP)
Swift Creek Sediment Management Action Plan (SCSMAP) PHASE 3 PROJECT PLAN PROPOSAL Whatcom County Public Works Department 322 N. Commercial Street, Suite 210 Bellingham, WA 98225 (360) 676-6692 June 2013
More informationCase Study 2: Twenty-mile Creek Rock Fords
Case Study : Twenty-mile Creek Rock Fords Location Crossing Description Washington. Okanagan National Forest. Methow Valley Ranger District. Chewuch river basin, East Chewuch Road. The Twenty-mile Creek
More informationLittle Blackfoot TPA 2009 Sediment and Habitat Assessment QAQC Review March 9, 2010
Little Blackfoot TPA 2009 Sediment and Habitat Assessment QAQC Review March 9, 2010 1.0 PROJECT OVERVIEW Sediment and habitat monitoring in the Little Blackfoot TPA was conducted in July of 2009 as outlined
More informationAppendix E Rosgen Classification
Appendix E Stream Type s Using the morphometric parameters described above, stream reaches are classified into 7 major stream types (Aa+ through G) based on s (1996) criteria. The relevant stream classifications
More informationHAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD, PROJECT CONSTRUCTED IN 1 DAY, MARCH 10, 2009 BY
More informationLandslide Hazards: A Stealth Threat to the Nation
Landslide Hazards: A Stealth Threat to the Nation Sponsored by the Geological Society of America Association of Environmental & Engineering Geologists American Society of Civil Engineers In Cooperation
More informationGEL 109 Midterm W01, Page points total (1 point per minute is a good pace, but it is good to have time to recheck your answers!
GEL 109 Midterm W01, Page 1 50 points total (1 point per minute is a good pace, but it is good to have time to recheck your answers!) 1. Where in a water flow is there usually a zone of laminar flow even
More informationYour web browser (Safari 7) is out of date. For more security, comfort and the best experience on this site: Update your browser Ignore
Your web browser (Safari 7) is out of date. For more security, comfort and the best experience on this site: Update your browser Ignore ALLU VIAL FAN colluvial fan, debris cone For the complete encyclopedic
More informationTom Ballestero University of New Hampshire. 1 May 2013
Tom Ballestero University of New Hampshire 1 May 2013 1 Hydrology 2 Basic Hydrology Low flows most common Flows that fill the stream to the banks and higher are much less common Filling the stream to the
More informationFour Beetles Project Mendocino National Forest
Four Beetles Project Mendocino National Forest Jose Chavez Bakersfield College 06/07/2016-08/02/2016 District Archeologist Curtis Fair & District Hydrologist John Kelley 2016 Acknowledgements: This project
More informationProject (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2
MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report
More informationRocky Mountain Field Institute 2015 Annual Report Waldo Canyon Fire Restoration December 17, 2015
December 17, 2015 815 South 25 th St, Suite 101 Colorado Springs, CO 80904 www.rmfi.org Dedicated to the conservation and stewardship of public lands in the Pikes Peak Region 2 Background In the summer
More informationHabitat Assessment. Peggy Compton UW-Extension Water Action Volunteers Program Coordinator
Habitat Assessment Peggy Compton UW-Extension Water Action Volunteers Program Coordinator Adapted from a presentation by Jean Unmuth, Water Quality Biologist, WI DNR dnr.wi.gov www.uwex.edu erc.cals.wisc.edu
More informationRosgen Classification Unnamed Creek South of Dunka Road
Rosgen Classification Unnamed Creek South of Dunka Road Prepared for Poly Met Mining Inc. September 2013 Rosgen Classification Unnamed Creek South of Dunka Road Prepared for Poly Met Mining Inc. September