1 6.11 Naas River Management Unit Site 41 Issue: Bed and bank erosion Location: E N Waterway: Naas River Management Unit: Naas River Facing downstream from Bobeyan Rd bridge Facing upstream from Bobeyan Rd bridge Erosion along both banks is present at this location of the Naas River. It has been assessed as having a high connectivity for fine sediments due to fine grained sediments eroded from channel banks input directly into channel flow Risk Rating: Extreme Management Option: Install rock beaching to manage bank erosion. Fencing and vegetation to be undertaken in consultation with the landholder. 131
2 Site 42 Issue: Gully delivering fine sediment to river Location: E N Waterway: Naas River and gullies Management Unit: Naas River Large areas of fine sediment deposition Naas River tributary gully, facing upstream Naas River, facing downstream Rock gabion headwalls on Naas Road Sand deposition and bank erosion Bank erosion along the Naas River This Naas River is undergoing active incision and reworking of sediments stored in the stream bed, resulting in the mobilisation of a large amount of sand material. Fine sediments are also being reworked from the channel banks. Incoming tributaries are also delivering significant volumes of sediment to the Naas River. The Naas River and incoming tributaries have been assessed as having a high connectivity for fine sediment transfers through to the Murrumbidgee River. 132
3 Risk Rating: Extreme Management Option: Undertake sediment extraction in gully to reduce sediment delivery. Construct pile fields to manage migration of main waterway. Fencing and revegetation of site in consultation with landholder. 133
4 Site 43 Issue: Fine sediment in banks Location: E N Waterway: Lower Naas River Management Unit: Naas River Active bank erosion evident Further bank erosion downstream Bank erosion is occurring along the length of the Naas River contributing a relatively high amount of fine sediments downstream. These bank erosion problems are represented at this site, but they extend over kilometres. A high connectivity for fine sediment transfers from eroding banks to the Murrumbidgee River has been assessed. Fine grained sediments eroded from the channel banks are input directly into channel flow, and once in the water column are likely to conveyed efficiently to the Murrumbidgee River contributing to water quality issues Risk Rating: Extreme Management Option: Construct rock beaching to manage bank erosion. Fencing and revegetation recommended in consultation with the landholder(s). 134
5 Site 44 Issue: Coarse sediment movement Location: E N Waterway: Naas tributary Management Unit: Naas River Downstream of the crossing Farm crossing, facing upstream The tributaries of the Naas River are transporting large volumes of sand as bedload. At this location the channel bed has aggraded behind crossing. This site has been assessed as having a high connectivity for fine sediments Risk Rating: Very High Management Option: Undertake managed extraction of local sediment. Fencing and revegetation of site in consultation with landholder. 135
6 Site 45 Issue: Eroding sand bank Location: E N Waterway: Upper Naas River Management Unit: Naas River Naas River, facing downstream Widespread bank erosion along Naas River At this site the Naas has experiencing bed incision, bank erosion and channel widening. The right eroded bank is 8 m high and extends over a distance of 800 m. A mixture of sand and fine silt/clay sediments are being eroded from the channel banks. Assessed as having high connectivity for fine sediments, fine grained sediments eroded from bank input directly into channel flow Risk Rating: Extreme Management Option: Install rock beaching to manage bank erosion and channel widening. Fencing and revegetation recommended in consultation with the landholder. 136
7 6.12 Numeralla River Management Unit Site 46 Issue: bed erosion Location: E N Waterway: Numeralla River gully Management Unit: Numeralla River Looking upstream at erosion head Looking downstream over gully This site consists of gully erosion on a tributary which is not clearly connected to the Numeralla River. The secondary erosion head appears to be deepening. IT would appear stock exclusion coupled with revegetation may stabilise the erosion head Risk Rating: Low Management Option: No structural works recommended at this site. Fencing and revegetation recommended in consultation with the landholder. 137
8 Site 47 Issue: Bed and Bank erosion Location: E N Waterway: Carlaminda Road gully Management Unit: Numeralla River Erosion downstream of road Bank erosion upstream of road This gully is connected directly to the Numeralla River. The gully has minor bed deepening occurring and moderately active bank erosion. It appears likely the current active erosion has worsened during high flow events in The site can be stabilised with localised rock beaching, battering, fencing and revegetation Risk Rating: Moderate Management Option: Undertake localised bank stabilisation with toe rock beaching and battering. Couple with fencing and revegetation to stabilise the gully. 138
9 Site 48 Issue: Sediment transport Location: E N Waterway: Numeralla River (township and Management Unit: Numeralla upstream) Numeralla River, facing upstream Numeralla River, facing downstream Coarse sand and gravel/cobbles (up to 10cm in diameter) are present at this location. Sandbars lack vegetation however the banks appear well stabilised with moderate vegetation present. There have been no reports of channel widening with the recent flood events. Additionally, there are no indications of there being significant inputs of fine sediments. This site is assessed as having a high connectivity for transport of fine sediments Risk Rating: Moderate Management Option: Stabilisation of in stream sediment via construction of pile fields and establishment of in-stream revegetation. Also fencing and revegetation of the riparian zone. 139
10 Site 49 Issue: Sediment transport Location: E N Waterway: Numeralla River Rose Valley district Management Unit: Numeralla Numeralla River facing downstream View across Numeralla River Facing upstream from Rosebrook Rd crossing Facing downstream from Rosebrook Rd crossing Channel bed and banks appear stable and well vegetated. This site has been assessed as having high connectivity for fine sediments due to direct transfer of fine sediments along Numeralla River with high connectivity to Murrumbidgee Risk Rating: Moderate Management Option: No structural works recommended. Fencing and revegetation of site recommended in consultation with the landholder. 140
11 Site 50 Issue: Gully and bank erosion, sediment transport Location: E N Waterway: Rose Valley Creek Management Unit: Numeralla Upper reach of Rose Valley Creek, facing upstream Upper reach of Rose Valley Creek, facing downstream Gully erosion, mid reach Lower reach of Rose Creek Facing upstream of Numeralla River at Rose Valley Rd crossing Facing downstream of Numeralla River at Rose Valley Rd crossing Active incision and widening of creek reworking fine alluvial sediments is occurring along the Rose Valley. Rose Creek is assessed as having a medium connectivity for fine sediments. Whilst some fine sediment may be transferred through to the Numeralla River, there is a natural potential for these sediments to be deposited across a large alluvial fan prior to flows entering Numeralla. 141
12 Risk Rating: Moderate to Very High Management Option: Stabilise alluvial fan using pile fields, construct rock beaching to manage bank erosion. Fencing and revegetation of site in consultation with landholder. 142
13 6.13 Paddys River Management Unit Site 51 Issue: Bank erosion and sedimentation Location: E N Waterway: Tidbinbilla Creek Management Unit: Paddys River Sedimentation downstream of the bridge Channel braiding Major widening and sedimentation Major bank erosion This site is located on Tidbinbilla Creek at Tidbinbilla Station. Downstream of Gilmore Road major channel development has occurred following recent floods with the channel now two to three times wider than the original channel. The channel has chosen a short course abandoning major outside bends with significant erosion and sedimentation. The channel is braided in a number of locations. If left unmanaged, the creek will continue to change course in subsequent major flow events, with significant sediment movement downstream likely. To manage the site, pile fields coupled with fencing and revegetation could be utilised to maintain a preferred channel alignment Risk Rating: Extreme Management Option: Install pile fields to manage migration of creek alignment. Undertake sediment removal to assist in definition of waterway alignment. Fencing and revegetation to be undertaken in consultation with the landholder. 143
14 Site 52 Issue: Bed and bank erosion Location: E N Waterway: Punchbowl Creek Management Unit: Paddys River Existing creek crossing Localised sediment build-up Bank erosion downstream of crossing Bank erosion along right-hand bank This valley comprises a series of valley storages which are partially incised by channels. Sediment delivery to Murrumbidgee is broken up by these series of valley storages. This site is assessed as having medium connectivity for fine sediments. There is a high probability that eroded fine sediments are being deposited and stored along the valley of Punchbowl Creek Risk Rating: Moderate Management Option: Establish in-stream vegetation to trap sediment. Complete fencing and riparian revegetation of site in consultation with landholder. 144
15 Site 53 Issue: Coarse sediment Location: E N Waterway: Paddys River Management Unit: Paddys River Downstream of crossing Upstream of crossing Upstream of bridge crossing over Punchbowl Creek, banks are generally stable. Recent floods have resulted in deposition of sand at the channel margins (benches/floodplain). This site is assessed as having medium connectivity for fine sediments; there is a high probability that eroded fine sediments are being deposited and stored along valley of Punchbowl Creek Risk Rating: Moderate Management Option: No structural works recommended. Fencing and revegetation of site recommended in consultation with the landholder 145
16 6.14 Rock Flat Creek Management Unit Site 54 Issue: Bed and bank erosion Location: E N Waterway: Upper Rock Flat Creek Management Unit: Rock Flat Creek Facing downstream of gully Facing upstream of gully Grassed stable channel along Rock Flat Creek. This creek has been assessed as having a low connectivity for fine sediments due to long travel distance to Murrumbidgee water extraction point with opportunities for storage along channel margins and across floodplain storages Risk Rating: Low Management Option: No structural works recommended. Fencing and revegetation of site recommended in consultation with the landholder. 146
17 Site 55 Issue: Sediment transport Location: E N Waterway: Lower Rock Flat Creek Management Unit: Rock Flat Creek Facing downstream from Cottage Hill Rd Large gravel material visible on creek bed This site along Rock Flat Creek features several gravel and cobble bars. Active bank erosion is occurring along the left-hand bank is also evident, with the banks exhibiting a silty/sandy material composition. The creek is open to cattle access. The creek has been assessed as having medium connectivity for fine sediments. There is a high potential for deposition and storage of sediments along valley at channel margins and across the floodplain Risk Rating: High Management Option: Localised rock beaching to be installed to manage bank erosion. Fencing and revegetation of site recommended in consultation with the landholder. 147
18 6.15 Strike A Light Creek Management Unit Site 56 Issue: Sediment transport Location: E N Waterway: Strike A Light Creek Management Unit: Strike A Light Creek Strike A Light River, facing downstream from the Jerangle Rd crossing Strike A Light River, facing upstream from the Jerangle Rd crossing This site along Strike A Light River is moderately stable given the high vegetation presence. It has been assessed as having medium connectivity for fine sediments, as it is a considerable distance from Murrumbidgee. There are no indications of significant fine sediment transport in this section of the river Risk Rating: Low Management Option: No structural works recommended. Fencing and revegetation of site recommended in consultation with the landholder. 148
19 Site 57 Issue: Bank erosion Location: E N Waterway: Wangrah Creek Management Unit: Strike A Light Creek Upper reach of Wangrah Creek, facing upstream Existing rock chute beside Jerangle Rd Upper reach of Wangrah Creek, facing downstream Upper reach of Wangrah Creek facing upstream Four metre high banks and fine sediment bars are present at this site. This eroding creek has been assessed as having a high connectivity for transfer of fine sediments. There remains little potential for sediment storage within the channel between here and the Murrumbidgee River Risk Rating: High Management Option: Install Rock beaching to manage bank erosion. Fencing and revegetation of site in consultation with landholder. 149
Sea Elephant River Geomorphology and Vegetation
Sea Elephant River Geomorphology and Vegetation Prepared by Alexandra Spink Report for NRM Cradle Coast March 2010 Cover photograph A laterally-unconfined meandering swamp channel on the Sea Elephant River.
More informationStep 5: Channel Bed and Planform Changes
Step 5: Channel Bed and Planform Changes When disturbed, streams go through a series of adjustments to regain equilibrium with the flow and sediment supply of their watersheds. These adjustments often
More informationAquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.
Aggradation raising of the streambed by deposition that occurs when the energy of the water flowing through a stream reach is insufficient to transport sediment conveyed from upstream. Alluvium a general
More informationNATURE OF RIVERS B-1. Channel Function... ALLUVIAL FEATURES. ... to successfully carry sediment and water from the watershed. ...dissipate energy.
1 2 Function... Sevier River... to successfully carry sediment and water from the watershed....dissipate energy. 3 ALLUVIAL FEATURES 4 CHANNEL DIMENSION The purpose of a stream is to carry water and sediment
More informationAPPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013
APPENDIX E GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2 Introduction Keystone Restoration Ecology (KRE) conducted geomorphological monitoring in
More informationStream Geomorphology. Leslie A. Morrissey UVM July 25, 2012
Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation
More informationStrategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS
Strategies for managing sediment in dams Iwona Conlan Consultant to IKMP, MRCS 1 Sediment trapping by dams Active storage capacity Dead storage coarse material (bed load) Fine materials (suspension) Francis
More informationProject Proposal. Lyme Brook. Newcastle-under-Lyme. 3 rd July 2015
Project Proposal Lyme Brook Newcastle-under-Lyme 3 rd July 2015 Contents Page 1.0 Introduction... 1.0 2.0 Background and rationale... 2.0 3.0 Proposed measures... 5 4.0 Summary of Recommendations... 10
More informationGEOL 1121 Earth Processes and Environments
GEOL 1121 Earth Processes and Environments Wondwosen Seyoum Department of Geology University of Georgia e-mail: seyoum@uga.edu G/G Bldg., Rm. No. 122 Seyoum, 2015 Chapter 6 Streams and Flooding Seyoum,
More informationErosion Surface Water. moving, transporting, and depositing sediment.
+ Erosion Surface Water moving, transporting, and depositing sediment. + Surface Water 2 Water from rainfall can hit Earth s surface and do a number of things: Slowly soak into the ground: Infiltration
More informationInstream Erosion Control General
Instream Erosion Control General EROSION CONTROL TECHNIQUES Revegetation Temperate Climates Short-Term Non Vegetation Wet Tropics Long-Term Weed Control [1] Semi-Arid Zones Permanent [1] Weed control attributes
More informationES 105 Surface Processes I. Hydrologic cycle A. Distribution % in oceans 2. >3% surface water a. +99% surface water in glaciers b.
ES 105 Surface Processes I. Hydrologic cycle A. Distribution 1. +97% in oceans 2. >3% surface water a. +99% surface water in glaciers b. >1/3% liquid, fresh water in streams and lakes~1/10,000 of water
More informationWhat is weathering and how does it change Earth s surface? Answer the question using
7 th Grade Lesson What is weathering and how does it change Earth s surface? Answer the question using the sentence frame. You have 4 minutes. Weathering is. This changes the Earth s surface because. 1
More informationRiparian Assessment. Steps in the right direction... Drainage Basin/Watershed: Start by Thinking Big. Riparian Assessment vs.
Riparian Assessment vs. Monitoring Riparian Assessment What is a healthy stream? Determine stream/riparian health Determine change or trend, especially in response to mgmt Classification = designation
More informationGriswold Creek August 22, 2013
Creek August 22, 2013 1 Lake Erie Protection Fund Creek Study ver Evaluate the overall condition of Creek Determine stable channel dimensions & appropriate restoration techniques Starting Stat gpoint for
More informationIn-channel coarse sediment trap Best Management Practice
In-channel coarse sediment trap Best Management Practice By Henry R. Hudson July 2002 Environmental Management Associates Ltd., Christchurch Complexity Environmental Value Cost Low Moderate High Low Moderate
More informationWhy Geomorphology for Fish Passage
Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the
More informationDam Removal Analysis Guidelines for Sediment
A review of: Dam Removal Analysis Guidelines for Sediment Joe Rathbun (Retired) rathbunj@sbcglobal.net Some Potential Sediment Issues Reservoir restoration Downstream water quality Downstream deposition
More informationSummary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,
Appendix N SUMMARY OF HYDRAULIC AND SEDIMENT-TRANSPORT ANALYSIS OF RESIDUAL SEDIMENT: ALTERNATIVES FOR THE SAN CLEMENTE DAM REMOVAL/RETROFIT PROJECT, CALIFORNIA the San Clemente Dam Removal/Retrofit Project,
More informationHAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD, PROJECT CONSTRUCTED IN 1 DAY, MARCH 10, 2009 BY
More informationDolores River Watershed Study
CHAPTER 4: RIVER AND FLOODPLAIN ISSUES The Dolores River falls into a category of streams in Colorado that share some unique characteristics. Like some other mountain streams in the state, it has a steep
More informationStream Classification
Stream Classification Why Classify Streams? Communication Tool Describe Existing Conditions & Trends Describe Restoration Goals Research Tool Morphologic Stream Classification Systems Schumm (1977) Alluvial
More informationGully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion
Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES Gully erosion A complex of processes whereby the removal of soil is characterised by incised channels in the landscape. NSW Soil Conservation Service,
More informationFluvial Driven Alluvial Fans
Fluvial Driven Alluvial Fans Restoration Project Evaluations - Examples from the Russian and Napa River Watersheds Mia Docto Masters Thesis UC Berkeley 1. Basic Fan Description 2. Fluvial Driven Fan Characteristics
More informationSEARCHING FOR SEDIMENT SOURCES IN SPRING CREEK
SEARCHING FOR SEDIMENT SOURCES IN SPRING CREEK Christopher Frederick, Department of Earth Sciences, University of South Alabama, Mobile, AL 36688. E-mail: cjf702@jaguar1.usouthal.edu. Sediment deposition
More informationAPPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011
APPENDIX A REACH DECRIPTIONS Basin 615, South Fork of Quantico Creek - Project Reach Descriptions Reach Name: 615-A Coordinates (NAD 83, Virginia State Plane North): 11796510.57, 6893938.95 to 11801555.79,
More information1 INTRODUCTION AND MAJOR FINDINGS... 1
Memorandum To: Lindsey Clark, Stillwater Valley Watershed Council Coordinator From: Chad Raisland, Pioneer Technical Services, Inc. and Karin Boyd, Applied Geomorphology, Inc. CC: Tanya Lester, Stillwater
More informationTechnical Memorandum No Sediment Model
Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.9 Sediment Model Task: Development of Sediment Model To: PRWFPA Staff Working Group Prepared by: Gregory Morris and Elsie Parrilla
More information33. Eroding downstream left bank, new bridge, Attlebridge (TG ).
33. Eroding downstream left bank, new bridge, Attlebridge (TG 12831675). 58 34. Eroding upstream right bank at Attlebridge Hall (TG 13871557), ford and cattle crossing. 35. Eroding upstream left bank at
More informationSCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS
DESIGN METHODS B: SEDIMENT TRANSPORT PROCESSES FOR STREAM RESTORATION DESIGN PETER KLINGEMAN OREGON STATE UNIVERSITY CIVIL ENGINEERING DEPT., CORVALLIS 2 ND ANNUAL NORTHWEST STREAM RESTORATION DESIGN SYMPOSIUM
More informationPEACOCK D H LIMITED MAKARIKA STREAM MEAN BED LEVEL TRENDS; 1958 TO 2017.
PEACOCK D H LIMITED GST Reg No 97918708 email: dave2mar@gmail.com Mob: 021 02465899 1.0 Introduction: MAKARIKA STREAM MEAN BED LEVEL TRENDS; 1958 TO 2017. This is one of a series of reports on river bed
More informationAppendix III-A Descriptions of Channel Habitat Types
Appendix III-A Descriptions of Channel Habitat Types Table of Contents Channel Habitat Typing Background... 3 Small Estuarine Channel (ES)... 7 Large Estuarine Channel (EL)... 9 Low Gradient Large Floodplain
More informationGEOL 652. Poudre River Fieldtrip
GEOL 652. Poudre River Fieldtrip One of the more difficult variables to measure and/or estimate when studying flow in natural channels is that of roughness. Roughness, usually approximated with Manning
More informationDETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6.
DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6. The Eklutna River was divided into study reaches (figure 1) prior to this site visit. Prominent geologic or
More informationGeomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River
Geomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River Scott McBain and Bill Trush McBain & Trush, Inc. Clavey River and Cherry Creek vicinity
More informationStreams. Stream Water Flow
CHAPTER 14 OUTLINE Streams: Transport to the Oceans Does not contain complete lecture notes. To be used to help organize lecture notes and home/test studies. Streams Streams are the major geological agents
More information27. Running Water I (p ; )
27. Running Water I (p. 424-436; 440-444) Hydrosphere How much of the Earth s surface is covered by water? Earth's water is collectively called the and is stored in a number of so-called as follows: 1.
More informationWorking with Natural Stream Systems
Working with Natural Stream Systems Graydon Dutcher Delaware County Soil & Water Conservation District Stream Corridor Management Program Tropical Storm Sandy October 29,2012 What is a Watershed?
More informationAn environmentally sensitive erosion control technique in the Mekong River Delta: 10 years on
7 th Australian Stream Management Conference - Full Paper An environmentally sensitive erosion control technique in the Mekong River Delta: 10 years on John Tilleard 1, Tony Ladson 2 1 Moroka Pty Ltd,
More informationAnabranch management on a regulated reach of the Murray River
Anabranch management on a regulated reach of the Murray River Julian Martin 1 and Dean Judd 2 1 Earth Tech Pty Ltd, PO Box 165, Wangaratta, Victoria, 3676. Web: www.earthtech.com.au, Email: julian.martin@earthtech.com.au
More informationNatural hazards in Glenorchy Summary Report May 2010
Natural hazards in Glenorchy Summary Report May 2010 Contents Glenorchy s hazardscape Environment setting Flood hazard Earthquakes and seismic hazards Hazards Mass movement Summary Glossary Introduction
More informationEROSION, DEPOSITION AND SEDIMENTARY ROCKS. Reading: Earth Science Tarbuck and Lutgens Chapter 5: pages Chapter 3: pages 52-54, 61-69
EROSION, DEPOSITION AND SEDIMENTARY ROCKS Reading: Earth Science Tarbuck and Lutgens Chapter 5: pages 124-133 Chapter 3: pages 52-54, 61-69 Base Level Resistant bed Resistant bed creates a local base level
More informationUpper Mississippi River Basin Environmental Management Program Workshop
Presentation to the Upper Mississippi River Basin Environmental Management Program Workshop by Michael Rodgers River Engineer US Army Corps of Engineers, St. Louis District August 17, 2007 Engineering
More informationBowen Collinsville Enterprise Don River Sand and Flooding Briefing Report Prepared and presented by John Finlay April 9 th 2013
Bowen Collinsville Enterprise Don River Sand and Flooding Briefing Report Prepared and presented by John Finlay April 9 th 2013 1 Bowen Collinsville Enterprise Briefing Report on Don River 1. The Don River
More informationSummary. Streams and Drainage Systems
Streams and Drainage Systems Summary Streams are part of the hydrologic cycle and the chief means by which water returns from the land to the sea. They help shape the Earth s surface and transport sediment
More informationGENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO
GENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO Prepared For Trout Unlimited 300 North Main Street, Hailey, Idaho, 83333 Prepared By P. O. Box 8578, 140 E. Broadway, Suite 23,
More informationGeo 302D: Age of Dinosaurs. LAB 2: Sedimentary rocks and processes
Geo 302D: Age of Dinosaurs LAB 2: Sedimentary rocks and processes Last week we covered the basic types of rocks and the rock cycle. This lab concentrates on sedimentary rocks. Sedimentary rocks have special
More informationPage 1. Name:
Name: 1) Which event is the best example of erosion? dissolving of rock particles on a limestone gravestone by acid rain breaking apart of shale as a result of water freezing in a crack rolling of a pebble
More informationThe Effect of Weather, Erosion, and Deposition in Texas Ecoregions
The Effect of Weather, Erosion, and Deposition in Texas Ecoregions 7.8B: I can analyze the effects of weathering, erosion, and deposition on the environment in ecoregions of Texas Weathering The breakdown
More informationFinal Exam. Running Water Erosion and Deposition. Willamette Discharge. Running Water
Final Exam Running Water Erosion and Deposition Earth Science Chapter 5 Pages 120-135 Scheduled for 8 AM, March 21, 2006 Bring A scantron form A calculator Your 3 x 5 paper card of formulas Review questions
More informationAnalysis of coarse sediment connectivity in semiarid river channels
Sediment Transfer tlirongh the Fluviai System (Proceedings of a symposium held in Moscow, August 2004). IAHS Publ. 288, 2004 269 Analysis of coarse sediment connectivity in semiarid river channels J. M.
More informationEarth Science Chapter 9. Day 6 - Finish Capillary Action Lab - Quiz over Notes - Review Worksheets over Sections 9.2 and 9.3
Earth Science Chapter 9 Day 1 Day 2 Day 3 Read Section 9.1 Surface Water Chapter 9 Term Sheet Notes over Section 9.1 Surface Water Section 9.1 Review Worksheets Quiz over Section 9.1 Notes Virtual Lab
More informationOverview of fluvial and geotechnical processes for TMDL assessment
Overview of fluvial and geotechnical processes for TMDL assessment Christian F Lenhart, Assistant Prof, MSU Research Assoc., U of M Biosystems Engineering Fluvial processes in a glaciated landscape Martin
More informationFish Passage at Road Crossings
Fish Passage at Road Crossings 1 Crossing Design Workshop Outline 1:00 to 2:00 Intro, Design Overview, Channel Width 2:00 to 2:15 Break 2:15 to 3:15 No-Slope, Stream Simulation Design 3:15 to 3:30 Break
More informationPhysical modeling to guide river restoration projects: An Overview
Physical modeling to guide river restoration projects: An Overview Scott Dusterhoff¹, Leonard Sklar², William Dietrich³, Frank Ligon¹, Yantao Cui¹, and Peter Downs¹ ¹Stillwater Sciences, 2855 Telegraph
More informationSECTION G SEDIMENT BUDGET
SECTION G SEDIMENT BUDGET INTRODUCTION A sediment budget has been constructed for the for the time period 1952-2000. The purpose of the sediment budget is to determine the relative importance of different
More information4. The map below shows a meandering stream. Points A, B, C, and D represent locations along the stream bottom.
1. Sediment is deposited as a river enters a lake because the A) velocity of the river decreases B) force of gravity decreases C) volume of water increases D) slope of the river increases 2. Which diagram
More informationWatershed Assessment of River Stability and Sediment Supply: Advancing the Science of Watershed Analysis
Watershed Assessment of River Stability and Sediment Supply: Advancing the Science of Watershed Analysis 2009 MWEA Annual Conference Rob Myllyoja, CET rmyllyoja@hrc-engr.com Watershed Assessment of River
More informationDecember 11, 2006 File:
December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)
More informationHYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE
PUBLIC WORKS CANADA HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE KILOMETRE 207.9, LIARD HIGKWAY December 1978 I I f I I I I # Bolter Parish Trimble Ltd. ONLIULTINO Public Works, Canada, 9925-109 Street,
More information[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.
Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of
More information11/12/2014. Running Water. Introduction. Water on Earth. The Hydrologic Cycle. Fluid Flow
Introduction Mercury, Venus, Earth and Mars share a similar history, but Earth is the only terrestrial planet with abundant water! Mercury is too small and hot Venus has a runaway green house effect so
More informationAvoiding Geohazards in the Mid-Atlantic Highlands by Using Natural Stream Principles
Avoiding Geohazards in the Mid-Atlantic Highlands by Using Natural Stream Principles J. Steven Kite, WVU Neal Carte, WVDOT Will Harman, Michael Baker Corp. Donald D. Gray, WVU Photo: W. Gillespie North
More informationDynamics and Evolution of Tributary Alluvial Fans in the Grand Canyon below Glen Canyon Dam Alex Morelan
Dynamics and Evolution of Tributary Alluvial Fans in the Grand Canyon below Glen Canyon Dam Alex Morelan Abstract/ Introduction: Tributary alluvial fans along the Grand Canyon are key to both natural and
More informationPHYSICAL GEOGRAPHY. By Brett Lucas
PHYSICAL GEOGRAPHY By Brett Lucas FLUVIAL PROCESSES Fluvial Processes The Impact of Fluvial Processes on the Landscape Streams and Stream Systems Stream Channels Structural Relationships The Shaping and
More informationFLUVIAL LANDFORMS. Floodplains
FLUVIAL LANDFORMS Floodplains fairly flat & continuous surface occupying much of a valley bottom normally underlain by unconsolidated sediments subject to periodic flooding (usually once every year or
More informationPolyMet NorthMet Project
RS 26 Draft-01 December 8, 2005 RS26 Partridge River Level 1 Rosgen Geomorphic Survey Rosgen Classification Partridge River from Headwaters to Colby Lake Prepared for PolyMet NorthMet Project December
More informationNATURAL RIVER. Karima Attia Nile Research Institute
NATURAL RIVER CHARACTERISTICS Karima Attia Nile Research Institute NATURAL RIVER DEFINITION NATURAL RIVER DEFINITION Is natural stream of water that flows in channels with ih more or less defined banks.
More informationThe last three sections of the main body of this report consist of:
Threatened and Endangered Species Geological Hazards Floodplains Cultural Resources Hazardous Materials A Cost Analysis section that provides comparative conceptual-level costs follows the Environmental
More informationCarmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018
Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 EXISTING CONDITION The proposed Carmel River Bank Stabilization at Rancho San Carlos Road Project
More informationProject (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2
MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report
More informationMATHEMATICAL MODELING OF FLUVIAL SEDIMENT DELIVERY, NEKA RIVER, IRAN. S.E. Kermani H. Golmaee M.Z. Ahmadi
JOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology On the World Wide Web at http://www.hydroweb.com VOLUME 16 2008 MATHEMATICAL MODELING
More informationADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN
ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN Conor Shea - Hydrologist U.S. Fish and Wildlife Service Conservation Partnerships Program Arcata, CA Learning Objectives Examine
More informationBank Erosion and Morphology of the Kaskaskia River
Bank Erosion and Morphology of the Kaskaskia River US Army Corps Of Engineers St. Louis District Fayette County Soil and Water Conservation District Team Partners : Carlyle Lake Ecosystem Partnership Vicinity
More informationRivers T. Perron
1 Rivers T. Perron 12.001 After our discussions of large-scale topography, how we represent topography in maps, and how topography interacts with geologic structures, you should be frothing at the mouth
More informationSTABILITY ASSESSSMENT: O Connell River
STABILITY ASSESSSMENT: O Connell River May 2014 Document history Revision: Revision no. 02 Author/s Misko Ivezich Checked Ross Hardie Dom Blackham Approved Steve Skull Distribution: Revision no. 01 Issue
More informationBlack Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget
Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration
More informationRiver Response. Sediment Water Wood. Confinement. Bank material. Channel morphology. Valley slope. Riparian vegetation.
River Response River Response Sediment Water Wood Confinement Valley slope Channel morphology Bank material Flow obstructions Riparian vegetation climate catchment vegetation hydrological regime channel
More informationCase Study 2: Twenty-mile Creek Rock Fords
Case Study : Twenty-mile Creek Rock Fords Location Crossing Description Washington. Okanagan National Forest. Methow Valley Ranger District. Chewuch river basin, East Chewuch Road. The Twenty-mile Creek
More informationThe Effects of Hydraulic Structures on Streams Prone to Bank Erosion in an Intense Flood Event: A Case Study from Eastern Hokkaido
Symposium Proceedings of the INTERPRAENENT 2018 in the Pacific Rim The Effects of Hydraulic Structures on Streams Prone to Bank Erosion in an Intense Flood Event: A Case Study from Eastern Hokkaido Daisuke
More informationThe origin of Rivers Erosion:
The origin of Rivers Erosion: is the action of surface processes (such as water flow or wind) that removes soil, rock, or dissolved material from one location on the Earth's crust, and then transport it
More informationGeomorphology Geology 450/750 Spring Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26
Geomorphology Geology 450/750 Spring 2004 Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26 This exercise is intended to give you experience using field data you collected
More informationDay 3 Weathering and Erosion.notebook. October 02, Section 7.2. Erosion and Deposition. Objectives
Objectives Describe the relationship of gravity to all agents of erosion. Contrast the features left from different types of erosion. Analyze the impact of living and nonliving things on the processes
More informationEFFECTS OF RIPARIAN RETENTION (IN WATERSHEDS) ON ALLUVIAL FANS
EFFECTS OF RIPARIAN RETENTION (IN WATERSHEDS) ON ALLUVIAL FANS TIM GILES GEOMORPHOLOGIST FLNRO EFFECTS OF RIPARIAN RETENTION (IN WATERSHEDS) ON ALLUVIAL FANS Description of alluvial fans Three case studies
More informationA floodplain is the flat land immediately surrounding a stream channel and innundated at 5mes of high flow.
A floodplain is the flat land immediately surrounding a stream channel and innundated at 5mes of high flow. Aggrada5on occurs when deposi5on is greater than erosion. Aggrada&on of the Rivière des Ha! Ha!
More informationRock & Aggregate Drop Inlet Protection
Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils
More informationLAB-SCALE INVESTIGATION ONBAR FORMATION COORDINATES IN RIVER BASED ON FLOW AND SEDIMENT
LAB-SCALE INVESTIGATION ONBAR FORMATION COORDINATES IN RIVER BASED ON FLOW AND SEDIMENT Mat Salleh M. Z., Ariffin J., Mohd-Noor M. F. and Yusof N. A. U. Faculty of Civil Engineering, University Technology
More informationmountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output
mountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output strong interaction between streams & hillslopes Sediment Budgets for Mountain Rivers Little
More informationLectures Hydrology & Fluvial Geomorphology. Gauley River Images. Ancients' (= Biblical) Model of Water (Hydrologic) Cycle
Lectures 11-13 13 Hydrology & Fluvial Geomorphology Gauley River Images http://www.youtube.com/watch?v=eulmuyegtz4&feature=related Ancients' (= Biblical) Model of Water (Hydrologic) Cycle Stream Water
More informationRapid Geomorphic Assessments: RGA s
Establishing Current Reference Conditions Rates and concentrations of suspended-sediment transport vary over time and space due to factors such as precipitation characteristics and discharge, geology,
More informationChannel Pattern. Channel Pattern, Meanders, and Confluences. Description of Channel Pattern. Bridge (2003)
Channel Pattern Channel Pattern, Meanders, and Confluences Outline Description of channel pattern Alternate bars Channel pattern continua and evolution Controls of channel pattern Description of Channel
More informationLimitation to qualitative stability indicators. the real world is a continuum, not a dichotomy ~ 100 % 30 % ~ 100 % ~ 40 %
Stream Stability Assessment & BEHI Surveys Joe Rathbun MDEQ Water Resources Division rathbunj@michigan.gov 517--373 517 373--8868 Stability Stream can transport its water and sediment inputs without changing
More informationFluvial Geomorphology Assessment of Northern Connecticut River Tributaries
Fluvial Geomorphology Assessment of Northern Connecticut River Tributaries Final Report Upper Ammonoosuc River in Stark, NH Prepared for Connecticut River Joint Commissions Charlestown, New Hampshire Prepared
More informationFour Mile Run Levee Corridor Stream Restoration
Four Mile Run Levee Corridor Stream Restoration 30% Design Summary U.S. Army Corps of Engineers, Baltimore District Presentation Outline Four Mile Run 1.) Historic Perspective 2.) Existing Conditions 3.)
More informationCountermeasure Calculations and Design
Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,
More informationMISSION CREEK WATERSHED (2002 Report Year 4)
Stream Channel Monitoring Program for the MISSION CREEK WATERSHED (2002 Report Year 4) (Penticton Forest District) Prepared for RIVERSIDE FOREST PRODUCTS LTD. Prepared by DOBSON ENGINEERING LTD. #4, 1960
More informationRiver Meandering and Braiding. Pierre Y. Julien. Department of Civil and Environmental Engineering Colorado State University Fort Collins, Colorado
River Meandering and Braiding Pierre Y. Julien Department of Civil and Environmental Engineering Colorado State University Fort Collins, Colorado River Mechanics and Sediment Transport Lima Peru January
More informationALDERON IRON ORE CORP. ENVIRONMENTAL IMPACT STATEMENT KAMI IRON ORE MINE AND RAIL INFRASTRUCTURE, LABRADOR. Appendix P
ALDERON IRON ORE CORP. ENVIRONMENTAL IMPACT STATEMENT KAMI IRON ORE MINE AND RAIL INFRASTRUCTURE, LABRADOR Appendix P Additional Monitoring Station Details of Stream Gauging Stations S1, S2, S3, S4, and
More informationThe River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant
The River Restoration Centre therrc.co.uk Understanding Fluvial Processes: supporting River Restoration Dr Jenny Mant Jenny@therrc.co.uk Understanding your catchment Hydrology Energy associated with the
More informationGLG362/GLG598 Geomorphology K. Whipple October, 2009 I. Characteristics of Alluvial Channels
I. Characteristics of Alluvial Channels Self-formed morphology set by entrainment, transport, and deposition They move unconsolidated sedimentary materials present in the valley fill flood plain/bank flow
More information