Date: April 3, 2018 Revised May 15, Project #: Re: Burlington Mall Retail Collection Transportation Evaluation
|
|
- Clarissa May
- 5 years ago
- Views:
Transcription
1 To: Chuck Schneider Burlington S&S, LLC 225 West Washington Street Indianapolis, IN From: Patrick Dunford, P.E. Senior Project Manager Date: April 3, 2018 Revised May 15, 2018 Project #: Re: Burlington Mall Retail Collection Transportation Evaluation Burlington S&S, LLC (the Proponent) is proposing to reposition portions of the Burlington Mall (the Project) located on in Burlington, Massachusetts (the Site ). Specifically, the Proponent is seeking to redevelop the former Sears Auto Center ( TBA ) building to include a mixture of restaurant and retail uses. This work also will involve minor Site revisions to accommodate new outdoor dining areas and improvements to the Site layout, parking, and access. The building space recently occupied by the Sears anchor store at the northern end of the Burlington Mall also is planned to be redeveloped to include a similar mixture of retail and restaurant space. The following memorandum summarizes the potential changes in traffic generation associated with the Project and evaluates potential Project impacts. Existing Conditions In total, the Burlington Mall currently contains 1,591,024 square feet (sf) of total physical building area, including the currently vacant Sears TBA outparcel building. This building area includes leasable space for a variety of tenants, as well as common space, mechanical rooms, and other non-leasable area used for the general operation of the mall. The parking needs for the mall are currently accommodated by approximately 5,573 on-site parking spaces. Burlington Mall Site Access Access to the mall currently is provided by multiple driveways on the abutting roads. A full-access signalized driveway is located at the approximate midpoint of the property s frontage. A right-turn, enter-only driveway is located immediately south of the signal, and a driveway restricted to entering/exiting right-turns only is located roughly 850 north of the signal (and 400 feet to the south of Burlington Mall Road). Two separate signalized driveways are provided on Burlington Mall Road. The first is located approximately 800 feet to the east of Middlesex Turnpike. The mall driveway is slightly offset from Meadow Road on the opposite side of the roadway, with both approaches operating under the same signal controller. Approximately 750 feet further to the east, Burlington Mall Road is intersected by the mall driveway from the south and Lexington Street from the north. Sears TBA Access The currently vacant Sears TBA building is located at the northwest corner of the overall Burlington Mall property. This parcel also is located at the southwest corner of Burlington Mall Road s signalized intersection with the mall driveway opposite Meadow Road. Extending to the south from Burlington Mall Road, the mall driveway features two lanes in each direction separated by an approximately eight-foot wide landscaped median. Access to the former Sears TBA parcel currently is provided by a full-access unsignalized driveway intersecting the median-divided mall driveway approximately 195 feet to the south of Burlington Mall Road. Access to this parcel also is provided via two driveways on the mall east/west circulation aisle extending from to the median-divided mall driveway noted above. The first driveway is located just west of the above-mentioned drive aisle, and a second driveway is located 135 feet to the west of that. \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
2 Ref: May 15, 2018 Page 2 Proposed Project The proposed Project will involve the redevelopment of the vacant Sears TBA building, and the reoccupancy of recently-vacated building space previously occupied by the Sears anchor store. The following sections summarize the proposed Project components. Sears TBA The currently vacant Sears TBA building contains 28,460 sf of former auto-service/retail space, with an additional 19,756 sf of below-grade storage space. In total, the building contains a combined 48,216 sf of leasable building area. The development proposal involves the existing TBA building being redeveloped as approximately 35,000 sf of total outparcel building space to be occupied by retail/restaurant uses. Current plans call for approximately nine retail tenant spaces and five restaurants, generally to be positioned at the corners of the building. Of the 35,000 sf of total building area, these restaurants will occupy 11,337 sf of building area and will include 316 seats with an additional 157 patio seats. The remainder of the building will be used for approximately 21,831 sf of leasable retail space, with additional space to be used for storage, mechanical space, etc. Sears anchor store repositioning The repositioning of the former first-floor Sears anchor store space will consist of retenanting that space to include a mixture of retail and restaurant space. This work will involve improvements to the exterior of the building and sidewalk areas, which also will allow for outdoor patio restaurant seating. Following this work, there will be roughly 39,011 sf of restaurant space provided including 1,107 seats (and an additional 335 outdoor patio restaurant seats). The remainder of the former Sears space will be occupied by multiple retail tenants with a total gross leasable area (GLA) of 74,774 sf. A 5,365-sf section of the northeasterly end of the Sears building will be demolished to allow for this and other landscape amenity space. The upper story space including the Primark tenant space will remain unchanged. With the former Sears space being replaced by multiple smaller stores and restaurants occupying the former Sears space, there now will be newly-created common space serving these individual tenants similar to that which exists throughout the rest of the mall. Accordingly, there now will be multiple tenants within the former Sears footprint, but with a reduced total leasable area due to the introduction of this common space. In total, the mall currently has 1,328,821 sf of gross leasable area (GLA). This includes the former 48,216 sf of TBA building area, approximately 4,000 sf of sales carts currently located within the main hallways of the mall, and multiple retail and restaurant tenants (including associated stockrooms and supporting leasable space). Table 1 provides an overall summary in the proposed changes to the mall categorized by the newly created uses and associated changes to the existing Burlington Mall. \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
3 Ref: May 15, 2018 Page 3 Table 1 Development Program Retail Proposed New Restaurant Automotive Building Area Seats Existing total Mall leasable space (GLA): 1,328,821 sf - Sears TBA -48,216 sf Existing Mall Retail/restaurant space (GLA): 1,280,605 sf Sears TBA redevelopment Existing TBA demolition -28,460 sf Existing TBA storage demolition -19,756 sf Proposed TBA retail 21,831 sf Proposed TBA restaurant 11,337 sf 316 (+157 patio) Sears TBA subtotal +21,831 sf +11,337 sf 316 (+157 patio) -48,216 sf Sears repositioning 1 st floor/sears to be modified -147,540 sf Proposed new/remaining retail 74,774 sf Change in GLA: Retail conversion to common area -22,988 sf Retail conversion to misc. -4,292 sf Building demolition -5,365 sf Existing compactor removal -1,110 sf Retail conversion to restaurant -39,011 sf 39,011 sf 1,107 (+335 patio) Change in GLA subtotal -72,766 sf +39,011 sf 1,107 (+335 patio) Net change -50,935 sf +50,348 sf 1,423 seats (+492 patio) -48,216 sf Total Retail (inc. existing restaurants) 1,229,670 sf +50,348 sf 1,423 seats (+492 patio) 0 sf Total Retail & existing/new restaurants 1,280,018 sf Total Building Area (GSF) a Existing Burlington Mall (GSF) Proposed Burlington Mall (GSF) 1,591,024 sf 1,571,333 sf Net change: -19,691 sf GSF = Gross Square Footage. GLA = Gross Leasable Area. a Total building area includes gross leasable tenant space and additional non-leasable area (offices, common areas, mechanical rooms, etc.) \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
4 Ref: May 15, 2018 Page 4 As shown in Table 1, the Project will result in an overall 19,691 sf reduction in the total building area at the Burlington Mall. Furthermore, the 1,328,821 sf of total mall leasable area will decrease to 1,280,019 sf GLA with the Project; a reduction of approximately 48,802 sf. The following sections discuss how traffic generation was estimated for the Project considering this reduction, as well as the new uses proposed within the Site. Trip Generation Potential traffic increases associated with the Project were estimated using standard Institute of Transportation Engineers (ITE) data 1, considering the difference between the existing and proposed Burlington Mall building area and uses. The following sections discuss the three different methodologies considered for this analysis to estimate the potential changes in Project trip generation. Method 1 ITE Shopping Center With the overall reduction in building area it reasonably could be assumed that there will be a corresponding reduction in trip generation. However, to provide for a conservative analysis, trip generation was evaluated also considering the unique nature of the former Sears TBA use. While the Project will revitalize and renovate a significant portion of the mall, the Burlington Mall still will remain as a standard regional shopping center, though one with an increased amount of restaurant space. Therefore, the trip generation for the proposed conditions was compared to the current Burlington Mall using ITE Shopping Center data consistent with industry practices. The definition for this ITE land use code notes that shopping centers can include retail, restaurant, and other uses, as well as outparcel developments similar to that present at the Burlington Mall. ITE also notes that trip generation should be estimated based on the gross leasable area of the mall, and not including common areas, mechanical rooms, etc. For this analysis, trip generation for the former Sears TBA use was calculated separately using ITE data independent from the remaining overall Burlington Mall Shopping Center space. The resulting change in trip generation for the overall Burlington Mall using this methodology is shown in Table 2. 1 Trip Generation Manual (10 th edition), Institute of Transportation Engineers, Washington DC, \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
5 Ref: May 15, 2018 Page 5 Table 2 Method 1 Trip Generation Summary Shopping Center Proposed Retail/ New Restaurant a Existing Retail a Former Sears TBA b = Existing Total Retail/ TBA a Change 1,280,018 sf c 1,280,605 sf c 48,216 sf c 1,328,821 sf c Weekday Daily Enter 17,018 17, , Exit 17,018 17, , Total 34,036 34,046 1,144 35,190-1,154 Weekday Evening Enter 1,721 1, , Exit 1,864 1, , Total 3,585 3, , Saturday Daily Enter 21,649 21, , Exit 21,649 21, , Total 43,298 43,310 1,144 44,454-1,156 Saturday Midday Enter 2,412 2, , Exit 2,227 2, , Total 4,639 4, , a Source: Trip Generation Manual 10 th Edition, Institute of Transportation Engineers (ITE), Washington D.C. (2017). Land Use Code 820 b (Shopping Center). Estimates based on 1,280,018 sf of proposed retail/existing restaurant GLA, and 50,348 sf of new restaurant use. Source: Ibid. Land Use Code 942 (Automobile Care Center). Trip generation data not available for Saturday midday peak hour. Trip generation during this time period is assumed to be equal to that during the weekday evening peak hour. The proposed Project involves a 48,802 sf reduction in tenant leasable area. With that reduction in GLA there should be a corresponding reduction in trip generation. As shown in Table 2, the total traffic generated by the Site should be reduced by 129 trips during both the weekday evening and Saturday midday peak hours. This procedure follows industry standards for estimating shopping center traffic generation, and is the most reasonable means of estimating trip generation as it also considers the former TBA use as a separate entity. While the Project involves the introduction of new restaurant space, it will not change the overall function of the Burlington Mall as a regional shopping center. The proposed new mixture of casual and finer dining establishments can be found at any shopping mall, and are consistent with the current and former use of the Site. In addition to the \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
6 Ref: May 15, 2018 Page 6 food court area, the mall already includes multiple restaurants, and until recently also included a Pizzeria Uno and Rainforest Café. The new restaurant space proposed as part of this Project will represent only four-percent of the total GLA in the Burlington Mall, so the overall dynamic of the mall will not be changing significantly. Method 2 ITE Shopping Center Retail and Restaurant (Building Area) Components VHB also evaluated trip generation using an alternate procedure focusing on the increase in restaurant building space. While the Burlington Mall still clearly meets the ITE definition of a Shopping Center under proposed conditions, the increased amount of restaurant space was considered separately for this exercise. The existing restaurant space within the mall will remain unchanged, but the additional restaurant space proposed was estimated as an overall new entity. Specifically, for the proposed condition the changes in retail and restaurant building space were considered separately, with the resulting difference being compared to the existing Burlington Mall. A detailed description of each step in this process is provided as follows. Method 2 Retail As shown earlier in Table 1, the amount of leasable retail space within the Site (not including the former TBA use) will be reduced by 50,935 sf. With that reduction, there will be a corresponding reduction in retail trips, but that area will be replaced by new restaurant space generating traffic as discussed in the following section. Method 2 Restaurants Exact tenants for each of the new multiple restaurant tenant spaces are currently not known. However, based on information provided by mall ownership, approximately 75-percent of the new restaurant space is being marketed towards casual restaurant uses, with the remaining 25-percent of the leasable area devoted to more formal, finer dining establishments. To account for this mixture of restaurant styles, trip generation estimates for the new restaurant components were based on ITE data for a standard High-Turnover (Sit-Down) Restaurant. ITE also recently added a new Fast Casual Restaurant land use code which has a definition similar to the style of restaurants proposed. However, that ITE database is very limited, with only three studies available for Saturday midday peak hour conditions. Accordingly, trip generation for 75-percent of the planned restaurant space was based on the ITE High-Turnover (Sit- Down) Restaurant land use code. The remaining 25-percent of the leasable restaurant space is expected to be more formal in nature, similar to the ITE Quality Restaurant land-use description. Trip Sharing Use of the ITE Shopping Center land use code is the most appropriate means of estimating mall traffic as it accounts for the internal trip sharing that is inherent to any regional shopping center. The ITE data shows that external trip generation rates decrease as a mall s size increases. This is due to the increased internal trip sharing that occurs between the multiple businesses within a given site. In this instance, the new restaurant space will simply be another attraction to mall shoppers and will not function as an entirely new, independent entity. The restaurants obviously will attract new visitors to the Site, but a substantial portion of the restaurant patrons already will be visiting the Site as shoppers. These trips will occur as walking trips within the mall, or between the mall and redeveloped Sears TBA building, but will not show up as additional vehicle trips at the Site driveways or on the adjacent streets. \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
7 Ref: May 15, 2018 Page 7 If the new restaurant space is to be considered separately, it is important that this internal trip sharing be quantified. ITE 2 has an established methodology for estimating trip generation for scenarios where two or more distinct land uses exist on a site. The ITE database includes trip sharing data between multiple land uses including retail and restaurant for peak-hour conditions. The percent of retail customers that may visit a restaurant after shopping is summarized, as well as diners than may shop before leaving the site. For instance, the ITE database indicates that half of restaurant patrons may shop after dining as part of their same trip before leaving the site. Similar interactions also will occur involving shoppers dining before or after shopping as part of their primary purpose for being on Site. The results of the trip generation estimates based on the proposed retail and restaurant components being considered separately (Method 2) are summarized in Table 3. 2 Trip Generation Handbook 3 rd edition, Institute of Transportation Engineers, Washington DC, \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
8 Ref: May 15, 2018 Page 8 Table 3 Method 2 Trip Generation Summary Proposed Shopping Center by Component (using restaurant building area) Retail Space Proposed New Restaurant Space Total - shared trips b Casual c + Quality d = Total Restaurant - shared trips b Total External Trips Size 1,229,670 sf a 37,761 sf 12,587 sf 50,348 sf 1,280,018 sf Weekday Evening Enter 1, ,794 Exit 1, ,810 Total 3, ,604 Saturday Midday Enter 2, ,434 Exit 2, ,222 Total 4, ,656 a Source: Trip Generation Manual 10 th Edition, Institute of Transportation Engineers (ITE), Washington D.C. (2017). Land Use Code 820 b c d (Shopping Center). Source: Trip Generation Handbook 3 rd Edition, Institute of Transportation Engineers (ITE), Washington D.C. (2017). Internal trip-sharing estimated based on methodology summarized in Chapter 6. Saturday midday peak hour trip sharing percentages assumed to equal those for weekday evening peak hour (Saturday data unavailable). Source: Trip Generation Manual 10 th Edition, ITE, Washington D.C. (2017). Land Use Code 932 (High-Turnover (Sit-Down) Restaurant). Approximately 75% of total new leasable restaurant area assumed to be non-formal, high-turnover/fast-casual oriented. Ibid. Land Use Code 931 (Quality Restaurant). Approximately 25% of total new leasable restaurant area assumed to be fine dining/quality restaurant in nature. The peak-hour trip generation estimates shown in Table 3 represent the total trip generation for the Site s retail components (including existing restaurant space that will remain unchanged), and the additional newly proposed restaurant uses. Table 4 compares the resulting new external Site trips to the existing Burlington Mall. \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
9 Ref: May 15, 2018 Page 9 Table 4 Method 2 Trip Generation Comparison Proposed vs. Existing Total Proposed External Trips a Total Existing External Trips b Difference Weekday Evening Enter 1,794 1, Exit 1,810 1, Total 3,604 3, Saturday Midday Enter 2,434 2, Exit 2,222 2, Total 4,656 4, a Source: Table 3. b Source: Table 2. As shown in Table 4, even considering the new restaurant uses separately from the retail space, there still will be a reduction in external trips appearing at the Site driveways. Specifically, the Project should result in a decrease of 110 and 112 trips during the respective weekday evening and Saturday midday peak hours. However, the Project is expected to increase the interaction between the restaurants and other retail space within the Site in the form of internal pedestrian activity. As with existing conditions, not all of the external traffic generated by the Project will be new to the area roadways. For example, a portion of the external vehicle-trips generated by the retail and restaurant uses likely will be drawn from traffic already travelling past the Site, which is attracted to the new uses as the motorists are passing through the area. The primary origin and destination for these trips is elsewhere and the primary trip will be resumed following the visit to the site. Pass-by rates also are provided by ITE in the Trip Generation Manual. Traffic count and survey data from nationwide retail locations have been collected by ITE for the purposes of pass-by trip calculation. Based on the ITE data, approximately 34- and 26-percent of peak-hour retail traffic on a respective weekday and Saturday is in the form of pass-by trips. Likewise, while Saturday information is not available, ITE indicates that a high-turnover restaurant will have a pass-by rate of approximately 43-percent during the weekday evening peak hour. Method 3 ITE Shopping Center Retail and Restaurant (Seats) Components The final trip generation methodology considered is the same as Method 2, with the exception that the proposed number of new seats was used to estimate restaurant trip generation instead of the associated building area. The resulting trip generation estimates are summarized in Table 5. \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
10 Ref: May 15, 2018 Page 10 Table 5 Method 3 Trip Generation Summary Proposed Shopping Center by Component (using restaurant seats) Retail Space - shared Total trips b Proposed New Restaurant Seats (1,423 seats patio = 1,915 seats total) 75% Casual c + 25% Quality d = Total Restaurant - shared trips b Total External Trips Size 1,229,670 sf a 1,436 seats 479 seats 1,915 seats 1,280,018 sf Weekday Evening Enter 1, ,831 Exit 1, ,847 Total 3, ,678 Saturday Midday Enter 2, ,502 Exit 2, ,253 Total 4, ,755 a Source: Trip Generation Manual 10 th Edition, Institute of Transportation Engineers (ITE), Washington D.C. (2017). Land Use Code 820 b c d (Shopping Center). Source: Trip Generation Handbook 3 rd Edition, Institute of Transportation Engineers (ITE), Washington D.C. (2017). Internal trip-sharing estimated based on methodology summarized in Chapter 6. Saturday midday peak hour trip sharing percentages assumed to equal those for weekday evening peak hour (Saturday data unavailable). Source: Trip Generation Manual 10 th Edition, ITE, Washington D.C. (2017). Land Use Code 932 (High-Turnover (Sit-Down) Restaurant). Approximately 75% of total new leasable restaurant area assumed to be non-formal, high-turnover/fast-casual oriented. Ibid. Land Use Code 931 (Quality Restaurant). Approximately 25% of total new leasable restaurant area assumed to be fine dining/quality restaurant in nature. The peak-hour trip generation estimates shown in Table 5 represent the total trip generation for the Site retail components, and the newly proposed restaurant uses (based on seating). Table 6 compares the resulting new external Site trips to the existing Burlington Mall using this methodology. \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
11 Ref: May 15, 2018 Page 11 Table 6 Method 3 Trip Generation Comparison Proposed vs. Existing Total Proposed External Trips a Total Existing External Trips b Difference Weekday Evening Enter 1,831 1, Exit 1,847 1, Total 3,678 3, Saturday Midday Enter 2,502 2, Exit 2,253 2, Total 4,755 4, a Source: Table 5. b Source: Table 2. Table 6 presents the potential changes in Site traffic as estimated considering the total amount of proposed retail space and the number of new restaurant seats. Between the reoccupancy of the former TBA building and vacant Sears space, there will be 1,423 new restaurant seats, and an additional 492 patio seats. As these seats generally would only be in use in warm conditions, the trip generation is conservative in that over 25-percent of the seats incorporated into the analysis would only be in use for part of the year (and not during peak winter holiday shopping conditions). Even with these conservative assumptions, there still would be an overall reduction in trip generation during the weekday evening and Saturday midday peak hours. Based on this methodology, the Project would result in a decrease of 36 and 13 trips during the respective weekday evening and Saturday midday peak hours. Traffic Count / ITE Trip Generation Comparison VHB previously had conducted traffic counts of the Burlington Mall site driveways in November These counts were conducted as part of the Draft Environmental Impact Report prepared for the nearby New England Executive Park development project. The count sheets are provided for reference in the appendix to this document. A summary of the observed volumes at each driveway are summarized in Table 7. \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
12 Ref: May 15, 2018 Page 12 Table 7 Mall Counts / ITE Trip Generation Comparison Weekday Evening Peak Hour Saturday Midday Peak Hour Driveway Enter Exit Total Enter Exit Total Percent at right-in driveway ,147 1,147 22% signalized mall driveway ,235 29% right-in/right-out driveway % Burlington Mall Road/ Sears driveway % Burlington Mall Road/ mall driveway ,290 31% Total trip generation November 2013 a 1,107 1,106 2,213 2,499 1,993 4, % a Existing Condition ITE-based trip generation b : 3,714 4,768 3, counts percentage of ITE estimates: 60% 94% 60% Source: Based on counts from 2013 New England Executive Park Draft Environmental Impact Report November 2013 traffic data collection. b Source: Table 2. As shown in Table 7, the previously observed weekday evening peak hour driveway volumes at the Burlington Mall were only 60-percent of the levels estimated using ITE data. However, during the Saturday midday peak hour the driveway volumes were approximately 94-percent of the level expected based on the ITE data. Regardless, for consistency, this current study s procedure of estimating trip generation using ITE data for both existing and proposed conditions is appropriate as the same methodology and database is used for both scenarios. With the overall mall trip generation not expected to increase, the trip distribution patterns shown in Table 7 should remain relatively unchanged. The traffic counts indicated that the westerly Burlington Mall Road driveway (opposite Meadow Road) is used by roughly 13-percent of the total Site entering/exiting traffic. Likewise, the Middlesex Turnpike right-in/right-out driveway is used by approximately 6-percent of the overall Site traffic. In conjunction with the 2013 data collection, capacity analyses also were conducted at the Burlington Mall Road/Meadow Road/Sears driveway intersection. The analysis results (provided for reference in the Appendix to this document) indicated that this location was projected to operate at an overall level-of-service (LOS) D during both the weekday evening and Saturday midday peak hours under the 2018 Build condition from that study. This indicates acceptable delays and overall operating conditions could be expected for that condition. The analysis also indicated that all of the entering and exiting movements to and from the mall were expected to operate at the same acceptable LOS D. VHB also recently conducted turning movement counts for this intersection during the midday peak period on Saturday, March 10, The counts are provided for reference in the appendix to this document, and are generally consistent \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
13 Ref: May 15, 2018 Page 13 with the previously conducted 2013 traffic counts at this location. Accordingly, with no increase in Site trip generation or notable changes in trip distribution, these same LOS D operating conditions can be expected in conjunction with the Project. Further, this location is part of a recently-installed adaptive signal system along the and Burlington Mall Road. Under this system, each signal operates in a coordinated manner, and also responds to actual traffic conditions on a cycle-by-cycle basis without strictly relying on more rigid pre-established timing plans. This system will be able to readily handle any potential minor changes in arrival/departure patterns to maintain the acceptable LOS D conditions noted earlier. Conclusion VHB has evaluated the potential changes in traffic generation resulting from the repositioning of the Burlington Mall. This assessment considered multiple different methods for estimating potential changes in trip generation. These involved considering the overall reduction in building area resulting from the Project, as well as the somewhat unique former Sears TBA use and the additional restaurant uses being introduced to the Site. Following these industry-accepted methodologies, the Project will result in a reduction in the volume of peak-hour traffic visiting the Site under weekday and Saturday conditions. This conclusion is the same whether the mall is considered as a single overall entity including restaurants (which is the standard industry practice), or if the restaurants are considered separately based on either building area or seating. While the Project will reduce the peak-hour trip generation it is possible that other times of day could see minor increases or changes in patterns resulting from the new restaurants uses. These would most likely occur during the midday lunchtime period, or later into the evening after retail activity already has peaked. A graph depicting the likely hourly distribution of a fast-casual restaurant compared to standard retail uses is provided in the appendix to this document (Figure 1). These minor changes in traffic patterns should be readily accommodated by the primary signalized Site access driveways. The signals at these locations are part of a recently-installed adaptive signal system along the and Burlington Mall Road corridors. With this system, each of the signals operates in a coordinated manner, and now also responds to actual traffic conditions on a cycle-by-cycle basis without strictly relying on more rigid pre-established timing plans. This system will be able to readily handle the minor changes noted above through its ongoing adaptive changes to timings throughout the day. With this infrastructure in place, and the critical peak-hour Project trip generation being reduced, additional off-site analysis or improvements are not necessary. As part of the Project the proponent will be making changes to the mall access drive extending from Burlington Mall Road to the east of the former Sears TBA building. These improvements will involve eliminating the median on this roadway and providing only a single entering lane from Burlington Mall Road into the Site. The existing exclusive leftand right lanes for exiting traffic will remain unchanged so that the overall signal operation will not be affected. A new crosswalk also will be provided across this access aisle immediately south of the Sears TBA curb cut. Improved signage and striping will be provided at the internal four-way, Stop-controlled intersection between Sears and the former Sears TBA building. The existing curbline on the westerly side of this aisle will be shifted to the east by approximately 18-feet, which will provide a more-pedestrian-friendly environment. As noted earlier, the Sears TBA parcel currently \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
14 Ref: May 15, 2018 Page 14 has two curb cuts on the east/west circulation aisle extending from to the corner of the Sears building. These will be consolidated into a single driveway to be located approximately 120 feet to the west of the four-way Stop intersection noted above. Eliminating the easterly driveway, which is in close proximity to this intersection, will help minimize conflicts at that location. Likewise, the westerly driveway for this parcel currently is slightly offset from another internal mall circulation aisle extending to the south to the main mall parking area. Eliminating that curb cut also should help to improve conditions at that location by eliminating conflicting traffic associated with the Sears TBA redevelopment. \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
15 ATTACHMENTS Trip Generation o Method 1 o Method 2 o Method 3 Internal Trip Sharing Burlington Mall Traffic Counts Hourly Trip Generation Variation 2013 Capacity Analysis Results \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx 101 Walnut Street PO Box 9151 Watertown, MA P
16 Ref: May 15, 2018 Page 16 Trip Generation \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
17 Ref: May 15, 2018 Page 17 o Trip Generation Method 1 \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
18 Proposed: proposed mall GLA retail 1,229,671 proposed mall GLA restaurant 50,348 4% new restaurants represent this percent increase in total Burlington Mall leasable area total mall GLA 1,280,019 Existing: existing mall GLA 1,280,605 existing TBA 48,216 Total existing mall GLA + TBA 1,328,821-48,802 Considering Burlington Mall as a single overall shopping center; existing restaurants to remain unchanged. Proposed Existing Difference Retail/Restaurant Retail Auto Total LUC SIZE 1,280,019 1,280,605 48,216 1,328,821 Weekday Daily Enter 17,018 17, , Exit 17,018 17, , Total 34,035 34,046 1,144 35,189-1,154 Weekday Morning Peak Hour Enter Exit Total Weekday Evening Peak Hour Enter 1,721 1, , Exit 1,864 1, , Total 3,585 3, , Saturday Daily Enter 21,649 21, , Exit 21,649 21, , Total 43,298 43,311 1,144 44,454-1,156 Saturday Midday Peak Hour Enter 2,412 2, , Exit 2,227 2, , Total 4,639 4, , Trip generation estimate based on ITE LUC. \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation Method 1 - mall 5/15/2018
19 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Shopping Center LANDUSE CODE: 820 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% AM PEAK OF GENERATOR ,320 54% 46% PM PEAK OF GENERATOR ,320 50% 50% AM PEAK (ADJACENT ST) ,510 62% 38% PM PEAK (ADJACENT ST) ,200 48% 52% DAILY 48,321 24,160 24,160 34,035 17,018 17,018 AM PEAK (ADJACENT ST) 1, PM PEAK (ADJACENT ST) 4,877 2,341 2,536 3,585 1,721 1,864 SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% PEAK OF GENERATOR ,510 52% 48% DAILY 59,034 29,517 29,517 43,298 21,649 21,649 PEAK OF GENERATOR 5,760 2,995 2,765 4,639 2,412 2,227 SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% PEAK OF GENERATOR ,268 49% 51% DAILY 27,008 13,504 13,504 N/A N/A N/A PEAK OF GENERATOR 3,571 1,750 1,821 N/A N/A N/A \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation 820_Pr_Method_1 5/15/2018
20 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Shopping Center LANDUSE CODE: 820 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% AM PEAK OF GENERATOR ,320 54% 46% PM PEAK OF GENERATOR ,320 50% 50% AM PEAK (ADJACENT ST) ,510 62% 38% PM PEAK (ADJACENT ST) ,200 48% 52% DAILY 48,343 24,171 24,171 34,046 17,023 17,023 AM PEAK (ADJACENT ST) 1, PM PEAK (ADJACENT ST) 4,879 2,342 2,537 3,586 1,721 1,865 SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% PEAK OF GENERATOR ,510 52% 48% DAILY 59,062 29,531 29,531 43,311 21,655 21,655 PEAK OF GENERATOR 5,763 2,997 2,766 4,640 2,413 2,227 SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% PEAK OF GENERATOR ,268 49% 51% DAILY 27,021 13,510 13,510 N/A N/A N/A PEAK OF GENERATOR 3,573 1,751 1,822 N/A N/A N/A \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation 820_Ex_Method_1 5/15/2018
21 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Automobile Care Center LANDUSE CODE: 942 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY AM PEAK OF GENERATOR % 44% PM PEAK OF GENERATOR % 51% AM PEAK (ADJACENT ST) % 34% PM PEAK (ADJACENT ST) % 52% DAILY N/A N/A N/A N/A N/A N/A AM PEAK OF GENERATOR PM PEAK OF GENERATOR AM PEAK (ADJACENT ST) N/A N/A N/A PM PEAK (ADJACENT ST) SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY % 50% PEAK OF GENERATOR DAILY 1, N/A N/A N/A PEAK OF GENERATOR N/A N/A N/A N/A N/A N/A SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY % 50% PEAK OF GENERATOR DAILY N/A N/A N/A PEAK OF GENERATOR N/A N/A N/A N/A N/A N/A \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation Automobile_Service_Center_942 5/15/2018
22 Ref: May 15, 2018 Page 18 o Trip Generation Method 2 \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
23 Proposed: proposed mall GLA retail 1,229,671 proposed mall GLA restaurant 50,348 total mall GLA 1,280,019 Existing: existing mall GLA 1,280,605 existing TBA 48,216 Total existing mall GLA + TBA 1,328,821 Proposed Existing Difference Proposed Retail Proposed New Restaurant Existing Retail - shared trips Total External Trips Total new: 50,348 Restaurant - shared trips Total External Trips Total External Trips Retail Auto Total LUC Total Total SIZE 1,229,671 37,761 12,587 50,348 1,280,019 1,280,605 48,216 1,328,821 Weekday Evening Peak Hour Enter 1, , ,794 1, , Exit 1, , ,811 1, , Total 3, , ,605 3, , Saturday Midday Peak Hour Enter 2, , ,435 2, , Exit 2, , ,222 2, , Total 4, , ,657 4, , \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation Method 2 5/15/2018
24 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Shopping Center LANDUSE CODE: 820 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% AM PEAK OF GENERATOR ,320 54% 46% PM PEAK OF GENERATOR ,320 50% 50% AM PEAK (ADJACENT ST) ,510 62% 38% PM PEAK (ADJACENT ST) ,200 48% 52% DAILY 46,420 23,210 23,210 33,119 16,559 16,559 AM PEAK (ADJACENT ST) 1, PM PEAK (ADJACENT ST) 4,685 2,249 2,436 3,480 1,670 1,809 SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% PEAK OF GENERATOR ,510 52% 48% DAILY 56,712 28,356 28,356 42,234 21,117 21,117 PEAK OF GENERATOR 5,534 2,877 2,656 4,494 2,337 2,157 SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% PEAK OF GENERATOR ,268 49% 51% DAILY 25,946 12,973 12,973 N/A N/A N/A PEAK OF GENERATOR 3,431 1,681 1,750 N/A N/A N/A \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation 820_Pr_Method_2 5/15/2018
25 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Shopping Center LANDUSE CODE: 820 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% AM PEAK OF GENERATOR ,320 54% 46% PM PEAK OF GENERATOR ,320 50% 50% AM PEAK (ADJACENT ST) ,510 62% 38% PM PEAK (ADJACENT ST) ,200 48% 52% DAILY 48,343 24,171 24,171 34,046 17,023 17,023 AM PEAK (ADJACENT ST) 1, PM PEAK (ADJACENT ST) 4,879 2,342 2,537 3,586 1,721 1,865 SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% PEAK OF GENERATOR ,510 52% 48% DAILY 59,062 29,531 29,531 43,311 21,655 21,655 PEAK OF GENERATOR 5,763 2,997 2,766 4,640 2,413 2,227 SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% PEAK OF GENERATOR ,268 49% 51% DAILY 27,021 13,510 13,510 N/A N/A N/A PEAK OF GENERATOR 3,573 1,751 1,822 N/A N/A N/A \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation 820_Ex_Method_2 5/15/2018
26 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Quality Restaurant LANDUSE CODE: 931 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY % 50% AM PEAK OF GENERATOR % 20% PM PEAK OF GENERATOR % 39% AM PEAK (ADJACENT ST) % 20% PM PEAK (ADJACENT ST) % 33% DAILY 1, N/A N/A N/A AM PEAK OF GENERATOR N/A N/A N/A PM PEAK OF GENERATOR N/A N/A N/A AM PEAK (ADJACENT ST) N/A N/A N/A PM PEAK (ADJACENT ST) N/A N/A N/A SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY % 50% PEAK OF GENERATOR % 41% DAILY 1, N/A N/A N/A PEAK OF GENERATOR N/A N/A N/A SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY PEAK OF GENERATOR DAILY N/A N/A N/A PEAK OF GENERATOR N/A N/A N/A \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation Quality_Restaurant_931 5/15/2018
27 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: High-Turnover (Sit-Down) Restaurant LANDUSE CODE: 932 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY % 50% AM PEAK OF GENERATOR % 43% PM PEAK OF GENERATOR % 48% AM PEAK (ADJACENT ST) % 45% PM PEAK (ADJACENT ST) % 38% DAILY 4,236 2,118 2,118 N/A N/A N/A AM PEAK OF GENERATOR N/A N/A N/A PM PEAK OF GENERATOR N/A N/A N/A AM PEAK (ADJACENT ST) N/A N/A N/A PM PEAK (ADJACENT ST) N/A N/A N/A SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY % 50% PEAK OF GENERATOR % 49% DAILY 4,622 2,311 2,311 N/A N/A N/A PEAK OF GENERATOR N/A N/A N/A SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY % 50% PEAK OF GENERATOR % 45% DAILY 5,386 2,693 2,693 N/A N/A N/A PEAK OF GENERATOR N/A N/A N/A \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation High_Turnover_932 5/15/2018
28 Ref: May 15, 2018 Page 19 o Trip Generation Method 3 \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
29 Proposed: proposed mall GLA retail 1,229,671 proposed mall GLA restaurant N/A (seats) total mall GLA 1,229,671 Existing: existing mall GLA 1,280,605 existing TBA 48,216 Total existing mall GLA + TBA 1,328,821 Proposed Existing Difference Proposed Retail Proposed New Restaurant Existing Retail - shared trips Total External Trips Total new: 1,915 Restaurant - shared trips Total External Trips Total External Trips Retail Auto Total LUC Total Total SIZE 1,229,671 1, ,915 1,280,605 48,216 1,328,821 Weekday Evening Peak Hour Enter 1, , ,831 1, , Exit 1, , ,848 1, , Total 3, , ,679 3, , Saturday Midday Peak Hour Enter 2, , ,502 2, , Exit 2, , ,253 2, , Total 4, , ,755 4, , \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation_seats Method 3 5/15/2018
30 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Shopping Center LANDUSE CODE: 820 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% AM PEAK OF GENERATOR ,320 54% 46% PM PEAK OF GENERATOR ,320 50% 50% AM PEAK (ADJACENT ST) ,510 62% 38% PM PEAK (ADJACENT ST) ,200 48% 52% DAILY 46,420 23,210 23,210 33,119 16,559 16,559 AM PEAK (ADJACENT ST) 1, PM PEAK (ADJACENT ST) 4,685 2,249 2,436 3,480 1,670 1,809 SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% PEAK OF GENERATOR ,510 52% 48% DAILY 56,712 28,356 28,356 42,234 21,117 21,117 PEAK OF GENERATOR 5,534 2,877 2,656 4,494 2,337 2,157 SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% PEAK OF GENERATOR ,268 49% 51% DAILY 25,946 12,973 12,973 N/A N/A N/A PEAK OF GENERATOR 3,431 1,681 1,750 N/A N/A N/A \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation_seats 820_Pr_Method_2 5/15/2018
31 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Shopping Center LANDUSE CODE: 820 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: FLOOR AREA (KSF): JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% AM PEAK OF GENERATOR ,320 54% 46% PM PEAK OF GENERATOR ,320 50% 50% AM PEAK (ADJACENT ST) ,510 62% 38% PM PEAK (ADJACENT ST) ,200 48% 52% DAILY 48,343 24,171 24,171 34,046 17,023 17,023 AM PEAK (ADJACENT ST) 1, PM PEAK (ADJACENT ST) 4,879 2,342 2,537 3,586 1,721 1,865 SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% PEAK OF GENERATOR ,510 52% 48% DAILY 59,062 29,531 29,531 43,311 21,655 21,655 PEAK OF GENERATOR 5,763 2,997 2,766 4,640 2,413 2,227 SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY ,510 50% 50% PEAK OF GENERATOR ,268 49% 51% DAILY 27,021 13,510 13,510 N/A N/A N/A PEAK OF GENERATOR 3,573 1,751 1,822 N/A N/A N/A \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation_seats 820_Ex_Method_2 5/15/2018
32 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: Quality Restaurant LANDUSE CODE: 931 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: Seats: 479 JOB NUMBER: WEEKDAY nal RATES: Total Trip Ends Independent Variable Range DAILY % 50% AM PEAK OF GENERATOR % 31% PM PEAK OF GENERATOR % 41% AM PEAK (ADJACENT ST) PM PEAK (ADJACENT ST) % 33% DAILY 1, , AM PEAK OF GENERATOR N/A N/A N/A PM PEAK OF GENERATOR N/A N/A N/A AM PEAK (ADJACENT ST) 8 #VALUE! #VALUE! N/A N/A N/A PM PEAK (ADJACENT ST) N/A N/A N/A SATURDAY nal RATES: Total Trip Ends Independent Variable Range DAILY % 50% PEAK OF GENERATOR % 41% DAILY 1, , PEAK OF GENERATOR N/A N/A N/A SUNDAY nal RATES: Total Trip Ends Independent Variable Range DAILY PEAK OF GENERATOR DAILY PEAK OF GENERATOR \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation_seats Quality_Restaurant_931 5/15/2018
33 ITE TRIP GENERATION WORKSHEET (10th Edition, Updated 2017) LANDUSE: High-Turnover (Sit-Down) Restaurant LANDUSE CODE: 932 Independent Variable --- SETTING/LOCATION: General Urban/Suburban JOB NAME: Seats: 1436 JOB NUMBER: WEEKDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY % 50% AM PEAK OF GENERATOR % 40% PM PEAK OF GENERATOR % 48% AM PEAK (ADJACENT ST) % 48% PM PEAK (ADJACENT ST) % 43% DAILY 6,276 3,138 3,138 N/A N/A N/A AM PEAK OF GENERATOR N/A N/A N/A PM PEAK OF GENERATOR 1, N/A N/A N/A AM PEAK (ADJACENT ST) N/A N/A N/A PM PEAK (ADJACENT ST) N/A N/A N/A SATURDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY % 50% PEAK OF GENERATOR % 47% DAILY 8,043 4,022 4,022 N/A N/A N/A PEAK OF GENERATOR N/A N/A N/A SUNDAY Directional RATES: Total Trip Ends Independent Variable Range Distribution DAILY % 50% PEAK OF GENERATOR % 45% DAILY 5,558 2,779 2,779 N/A N/A N/A PEAK OF GENERATOR N/A N/A N/A \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation_seats High_Turnover_932 5/15/2018
34 Ref: May 15, 2018 Page 20 Internal Trip Sharing \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
35
36
37 SHARED TRIPS RETAIL - RESTAURANT WEEKDAY EVENING SATURDAY MIDDAY RETAIL % # BALANCED # % RESTAURANT RETAIL % # BALANCED # % RESTAURANT EXIT -> 29% 1, % -> ENTER EXIT -> 29% 2, % -> ENTER ENTER <- 50% 1, % <- EXIT ENTER <- 50% 2, % <- EXIT TOTAL SHARED TRIPS - WEEKDAY EVENING TOTAL SHARED TRIPS - SATURDAY MIDDAY ENTER EXIT TOTAL ENTER EXIT TOTAL Retail Retail Restaurant Restaurant \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation Method 2 - Shared Trips 5/15/2018
38 SHARED TRIPS RETAIL - RESTAURANT WEEKDAY EVENING SATURDAY MIDDAY RETAIL % # BALANCED # % RESTAURANT RETAIL % # BALANCED # % RESTAURANT EXIT -> 29% 1, % -> ENTER EXIT -> 29% 2, % -> ENTER ENTER <- 50% 1, % <- EXIT ENTER <- 50% 2, % <- EXIT TOTAL SHARED TRIPS - WEEKDAY EVENING TOTAL SHARED TRIPS - SATURDAY MIDDAY ENTER EXIT TOTAL ENTER EXIT TOTAL Retail Retail Restaurant Restaurant \\MAWALD\ld\ Simon Burlington\ssheets\Traffic\Trip Generation_seats Medhod 3 - Shared Trips 5/15/2018
39 Ref: May 15, 2018 Page 21 Burlington Mall Traffic Counts \\MAWALD\ld\ Simon Burlington\docs\memos\Traffic evaluation - revised.docx
40 81 Burlington Mall Driveway November 2013 volumes from New England Executive Park DEIR (June 2014)
41 November 2013 volumes from New England Executive Park DEIR (June 2014)
42 143 Burlington Mall Driveway November 2013 volumes from New England Executive Park DEIR (June 2014)
43 November 2013 volumes from New England Executive Park DEIR (June 2014)
44 # = March 10, 2018 Turning movement counts November 2013 volumes from New England Executive Park DEIR (June 2014)
45 Client: Engineer: Site Code: Date: PDI Job Number: City, State: VHB V. Kalikiri Sat 11/23 thru Tues 11/26/ Burlington, MA
NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents
Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Prepared by: Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite
More informationMEMORANDUM. Trip Generation Analysis
MEMORANDUM To: RMC Architects From: Matthew Palmer, PE Subject: Trip Generation, Parking Analysis & Level of Service Project: Port of Everett, GTC #13-053 Date: August 25, 2014 The trip generation and
More informationMarket Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management
Transportation Impact Analysis Market Street PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for TerraPointe Services, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc.
More informationCVS Derwood. Local Area Transportation Review
CVS Derwood Montgomery County, Maryland May 27, 2016 Local Area Transportation Review Prepared for: JC Bar Properties, Inc. Steve Fleming, PE 415 Fallowfield Road, Suite 301 Camp Hill, Pennsylvania 17011
More informationPLAZA MEXICO RESIDENCES
PLAZA MEXICO RESIDENCES TRAFFIC STUDY PREPARED FOR: 3000 E. IMPERIAL, LLC. 6940 Beach Boulevard, D-501 Buena Park, California 90621 PREPARED BY: OCTOBER 5, 2017 translutions the transportatio n solutions
More informationTrip Generation Characteristics of Super Convenience Market Gasoline Pump Stores
Trip Generation Characteristics of Super Convenience Market Gasoline Pump Stores This article presents the findings of a study that investigated trip generation characteristics of a particular chain of
More informationTraffic Impact Study
Traffic Impact Study Statham DRI One University Parkway Prepared for: Barrow County Prepared by: October 2012 Table of Contents Executive Summary i Section 1. Introduction 1 Project Description 1 Methodology
More informationTrip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945
Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945 Introduction The Brigham Young University Institute of Transportation Engineers student chapter (BYU ITE) completed
More informationWEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project
WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 Executive Summary Page 2.0 Introduction 2.1 DEVELOPMENT
More informationApril 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213
Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Subject: Revised Castle Hills BASIS Charter School Traffic Impact Analysis Review City of Castle Hills,
More informationMADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015
MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015 TABLE OF CONTENTS... 3 Proposed Development... 3 Methodology... 3 Phase 1 Development...
More informationALTA VISTA COMMERCIAL/ RESIDENTIAL PROJECT
ALTA VISTA COMMERCIAL/ RESIDENTIAL PROJECT TRAFFIC IMPACT ANALYSIS Prepared For: Paul Conzelman SC Development 2151 Michelson Drive, Suite 140 Irvine, CA 92612 Prepared By: 2030 Main Street, Suite 1200
More information930 Old Northern Rd & 4 Post Office Rd, Glenorie
Proposed Mixed Use Development 930 Old Northern & 4, Glenorie TRAFFIC AND PARKING ASSESSMENT REPORT 13 December 2016 Ref 16264 Suite 6, 20 Young Street, Neutral Bay NSW 2089 - PO Box 1868, Neutral Bay
More informationTRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For
TRAFFIC IMPACT STUDY For Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) February 2015 Revised: August 2015 April 2016 July 2016 September 2016 Prepared for: KB Home
More informationTravel Demand Management Plan
Travel Demand Management Plan Tryg s & Apartment Building 8 West Lake Street Minneapolis, MN AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mr. Johnny Carlson Trammell Crow Chicago Development, Inc. 5 South
More informationJanuary 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519
January 12, 2018 Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519 Re: Proposed Reserve at Rivertown Mixed-Use Development Updated Trip Generation and Site Driveway
More informationVHD Daily Totals. Population 14.5% change. VMT Daily Totals Suffolk 24-hour VMT. 49.3% change. 14.4% change VMT
6.9 Suffolk 6-54 VMT Population and Travel Characteristics Population 14.5% change 2014 1,529,202 VHD Daily Totals 2014 251,060 49.3% change 2040 1,788,175 2040 374,850 VMT Daily Totals 2014 39,731,990
More informationSHADE/SHADOW REPORT. For the Proposed 8777 Washington Project. Culver City, CA. Prepared for:
SHADE/SHADOW REPORT For the Proposed 8777 Washington Project Culver City, CA Prepared for: VITRUVIAN CULVER CITY LLC (THE APPLICANT) 5822 WEST WASHINGTON BOULEVARD CULVER CITY, CALIFORNIA 90232 Prepared
More informationMEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections:
MEMORANDUM DATE: JULY 6, 2012 TO: FROM: RE: CC: MELANIE KNIGHT BRAD BYVELDS/ JENNIFER LUONG 1050 SOMERSET STREET PRELIMINARY TRAFFIC ANALYSIS OUR FILE NO. 111152 NEIL MALHOTRA The purpose of this memo
More informationJEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:
JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH 45243 Email: jackpflum1@gmail.com Telephone: 513.919.7814 MEMORANDUM REPORT Traffic Impact Analysis Proposed Soccer
More informationEstablishment of Local Trip Generation Rates or Equations for Mixed-Use Developments in Kansas
Report No. K-TRAN: KU-11-7 FINAL REPORT October 2012 Establishment of Local Trip Generation Rates or Equations for Mixed-Use Developments in Kansas Mehrdad Givechi, P.E., PTOE George Sarkodee The University
More informationHALFF 16196? TRAFFIC MANAGEMENT PLAN. Richardson ISD Aikin Elementary School Dallas, Texas North Bowser Road Richardson, Texas 75081
30280 16196? TRAFFIC MANAGEMENT PLAN Exhibit 572B Aikin Elementary School Planned Development District No. 572 Approved City Plan Commission October20, 2016 July 12, 2016 Prepared for HALFF AVO 31586 PHO1
More information6711 LEE HIGHWAY TRAFFIC IMPACT STUDY ARLINGTON, VIRGINIA
6711 TRAFFIC IMPACT STUDY ARLINGTON, VIRGINIA Prepared for: NVR, Inc. Prepared by: Wells + Associates, Inc. Michael J. Workosky, PTP, TOPS, TSOS John J. Andrus William L. Zeid, PE 703.917.6620 May 4, 2017
More information2129 NORTH MAIN STREET HOTE PROJECT ULI SHARED PARKING STUDY City of Santa Ana, California
2129 NORTH MAIN STREET HOTE PROJECT ULI SHARED PARKING STUDY City of Santa Ana, California Prepared for: NET DEVELOPMENT COMPANY 3130 Airway Avenue Costa Mesa, CA 92626 Prepared by: RK ENGINEERING GROUP,
More informationKitsap County 2016 Comprehensive Plan Update. Appendix A: Growth Estimates
Kitsap County 2016 Comprehensive Plan Update Appendix A: Growth Estimates Appendix A 1 April 2016 Kitsap County 2016 Comprehensive Plan Update Appendix A: Growth Estimates Land Capacity Land capacity
More informationCalifornia Urban Infill Trip Generation Study. Jim Daisa, P.E.
California Urban Infill Trip Generation Study Jim Daisa, P.E. What We Did in the Study Develop trip generation rates for land uses in urban areas of California Establish a California urban land use trip
More informationTraffic Impact Analysis. for the STARBUCKS STORE. Located at 9900 BALBOA BOULEVARD. Submitted to CITY OF LOS ANGELES. January 2017.
Traffic Impact Analysis for the STARBUCKS STORE Located at 9900 BALBOA BOULEVARD Submitted to CITY OF LOS ANGELES January 2017 Submitted By January 5, 2017 Ken A. Aitchison, P.E. Transportation Engineering
More informationThe Urbana Free Library Parking and Transportation Study
CHAMPAIGN COUNTY REGIONAL PLANNING COMMISSION The Urbana Free Library Parking and Transportation Study Final Report 7/18/2013 Champaign Urbana Urbanized Area Transportation Study (CUUATS) TABLE OF CONTENTS
More informationWinning Farm of Winchester
Winning Farm of Winchester Planning Board Presentation Winning Farm of Winchester 12.9 acres of undeveloped forest on the former Winning Farm site Located north of Thornberry Road in the northwestern corner
More informationFARM 1065 PORTION 1, ATLANTIS TRAFFIC IMPACT ASSESSMENT
FARM 1065 PORTION 1, ATLANTIS TRAFFIC IMPACT ASSESSMENT February 2018 FIRST ISSUE Prepared by: JG AFRIKA (PTY) LTD Branch: Cape Town PO Box 38561 Postal code: 7430 Telephone: 021 530 1800 Email: wink@
More informationTRAFFIC IMPACT STUDY MANUFACTURING COMPANY
TRAFFIC IMPACT STUDY For MANUFACTURING COMPANY Prepared For: Airway Heights, WA Prepared By: SUNBURST ENGINEERING, P. S. 4310 S. Ball Dr. Veradale, WA 99037 April, 2013 TRAFFIC IMP ACT STUDY Manufacturing
More informationFINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005
FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005 Prepared For: EDAW, Inc. 1420 Kettner Boulevard, Suite 620
More informationTable of Contents Introduction... 4 Study Area... 5
Table of Contents Introduction... 4 Study Area... 5 Streets and s... 5 Traffic Volumes... 8 Recent and Anticipated Development... 10 Crash Analysis... 10 Projected Traffic Volumes... 11 Trip Generation...
More informationKAISER SOUTH NORTHERN VIRGINIA HUB TRAFFIC IMPACT STUDY PRINCE WILLIAM COUNTY, VIRGINIA TABLE OF CONTENTS. Section 2 BACKGROUND INFORMATION 12
KAISER SOUTH NORTHERN VIRGINIA HUB TRAFFIC IMPACT STUDY PRINCE WILLIAM COUNTY, VIRGINIA TABLE OF CONTENTS Page EXECUTIVE SUMMARY 1 Purpose of Report and Study Objectives... 1 Site Location and Study Area...
More information225 Bush Street Suite 1700 San Francisco, CA phone fax
225 Bush Street Suite 1700 San Francisco, CA 94104 415.896.5900 phone 415.896.0332 fax www.esassoc.com memorandum date July 29, 2009 to from subject Craig Nikitas, San Francisco Planning Department Daniel
More informationFocused Traffic Analysis for the One Lincoln Park Project
September 15, 2015 Mr. Bill Johnson Coldwell Banker 511 Sir Francis Drake Boulevard Greenbrae, CA 94904 Focused Traffic Analysis for the One Lincoln Park Project Dear Mr. Johnson; As requested, W-Trans
More informationParking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road
STAFF REPORT ACTION REQUIRED Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road Date: October 28, 2008 To: From: Toronto and East York Community Council Director, Transportation
More informationFigure 8.2a Variation of suburban character, transit access and pedestrian accessibility by TAZ label in the study area
Figure 8.2a Variation of suburban character, transit access and pedestrian accessibility by TAZ label in the study area Figure 8.2b Variation of suburban character, commercial residential balance and mix
More informationMetro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles
Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles Traffic Study August 31, 2015 AECOM 515 South Flower Street, 4 th Floor Los Angeles, CA 90071 Job Number: 60323255
More informationCOUNCIL POLICY MANUAL
COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs
More information3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS
3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS In order to better determine future roadway expansion and connectivity needs, future population growth and land development patterns were analyzed as part of
More informationFinal City of Colusa STREETS & ROADWAYS MASTER PLAN. October J Street Suite 390 Sacramento, CA 95814
Final City of Colusa STREETS & ROADWAYS MASTER PLAN October 2009 660 J Street Suite 390 Sacramento, CA 95814 TABLE OF CONTENTS I. INTRODUCTION... 1 Report Organization...1 II. ANALYSIS METHODOLOGY... 2
More informationCommittee Meeting November 6, 2018
Committee Meeting November 6, 2018 Agenda Where we are in the process Land Use Plan Transportation Element Housing & Neighborhoods Elements Next Steps Schedule November 6: Plan Elements December: Plan
More informationSHADOW STUDY REPORT REGARDING
SHADOW STUDY REPORT REGARDING an APPLICATION TO REDEVELOP Three 6 Storey Condominiums Regional Road 25 (Ontario Street) and Britannia Road Milton, Ontario KNYMH FILE # 17030 Prepared by: Krista Lilley
More informationTrip and Parking Generation Study of Orem Fitness Center-Abstract
Trip and Parking Generation Study of Orem Fitness Center-Abstract The Brigham Young University Institute of Transportation Engineers student chapter (BYU ITE) completed a trip and parking generation study
More informationWOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS
2018 WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS Introduction Woodruff Road is the main road to and through the commercial area in Greenville, South Carolina. Businesses along the corridor have
More informationDate: August 3, Project #:
To: Mr. Warren Nighan Total Athletics 128 Devon Lane Marston Mills, Massachusetts 02648 From: Randall C. Hart, Director of Transportation Planning & Engineering Kathleen Keen, EIT Date: August 3, 2016
More informationTRAFFIC IMPACT STUDY
TRAFFIC IMPACT STUDY TERRE HAUTE CONVENTION CENTER WABASH AVENUE & 9 TH STREET TERRE HAUTE, INDIANA PREPARED FOR 8365 Keystone Crossing, Suite 201 Indianapolis, IN 46240 Phone: (317) 202-0864 Fax: (317)
More informationNeighborhood Locations and Amenities
University of Maryland School of Architecture, Planning and Preservation Fall, 2014 Neighborhood Locations and Amenities Authors: Cole Greene Jacob Johnson Maha Tariq Under the Supervision of: Dr. Chao
More informationCase Special Exception request for Planned Unit Development (PUD) The Vineyards
Case 1627 Applicant: Developer: Request: Location: Pointe South Land Trust Contact Information: Jimmy Garrett 901-271-3642 N/A Special Exception request for Planned Unit Development (PUD) The Vineyards
More informationSHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. UPDATES
More informationIII. FORECASTED GROWTH
III. FORECASTED GROWTH In order to properly identify potential improvement projects that will be required for the transportation system in Milliken, it is important to first understand the nature and volume
More informationAppendix C Traffic Study
Final Environmental Impact Statement Appendix C Traffic Study Schofield Generating Station Project, Hawaii October 2015 C-1 Final Environmental Impact Statement This page intentionally left blank. Schofield
More informationAppendix J: Transportation and Circulation
Appendix J: Transportation and Circulation J 1: Transportation Analysis Report J 2: Los Angeles Department of Transportation (LADOT) Approval Letter J 3: Construction Traffic Analysis J 1: Transportation
More informationPer your request and authorization, we have prepared this traffic evaluation for the above referenced project.
Memorandum To: From: Re: Marc Stout, P.E. City Engineer, City of Roseville Chris Gregerson, P.E., T.E. Matt Weir, P.E., T.E., PTOE Douglas Boulevard Coffee Kiosk Traffic Evaluation Roseville, California
More informationAppendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014
Appendix C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 CONTENTS List of Figures-... 3 List of Tables... 4 Introduction... 1 Application of the Lubbock Travel Demand
More informationI-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov February 9, 2018 I-10 East at Redd closes for 24 hours this Sunday, Feb 11
More informationRE: Existing and Future Parking Demand Analysis St. Joseph Center Expansion
HAND DELIVERED December 12, 2003 Mr. James S. Bancroft Chair, Board of Directors St. Joseph Center 204 Hampton Drive Venice, California 90291-8633 RE: Existing and Future Parking Demand Analysis St. Joseph
More informationAppendix I: Traffic Study
City of Fontana Sierra Lakes Commerce Center Draft EIR Appendix I: Traffic Study FirstCarbon Solutions H:\Client (PN JN)\0144\01440050\EIR\1 ADEIR\01440050 Sec99 99 Appendix Dividers.doc THIS PAGE INTENTIONALLY
More informationTOWN OF WINCHESTER OFFICE OF THE PLANNING DEPARTMENT. 71 Mount Vernon Street. Winchester, MA 01890
BRIAN SZEKELY TOWN PLANNER Winchester Board of Selectmen 71 Mt. Vernon St. Winchester, MA 01890 TOWN OF WINCHESTER OFFICE OF THE PLANNING DEPARTMENT 71 Mount Vernon Street Winchester, MA 01890 August 11,
More informationTRANSPORTATION AND TRAFFIC ANALYSIS REPORT
Square One Drive Extension Municipal Class Environmental Assessment Environmental Study Report Appendix B Transportation and Traffic Analysis Report TRANSPORTATION AND TRAFFIC ANALYSIS REPORT FINAL DRAFT
More informationI. M. Schoeman North West University, South Africa. Abstract
Urban Transport XX 607 Land use and transportation integration within the greater area of the North West University (Potchefstroom Campus), South Africa: problems, prospects and solutions I. M. Schoeman
More informationDowntown Parking Study
Downtown Parking Study Mount Prospect, Illinois Prepared For: VILLAGE OF MOUNT PROSPECT September 24, 2018 Contents List of Figures and Tables, ii 1. Introduction...1 2. Downtown Parking Surveys..2 3.
More informationPrepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006
DRAFT TRAFFIC IMPACT STUDY FOR PHASED DEVELOPMENT OF TAMU CC Prepared for 3D/International, Inc. 1900 West Loop South, Suite 400 Houston, Texas 77027 November 2006 Interim Review Only Document Incomplete:
More informationMEMORANDUM (DRAFT) DRAFT
117 Commercial St. NE, Suite 310 Salem, OR 97301 503.391.8773 www.dksassociates.com MEMORANDUM (DRAFT) DATE: February 15, 2017 TO: FROM: SUBJECT: Alex Dupey, MIG Scott Mansur, PE, PTOE; Garth Appanaitis,
More informationForecasts for the Reston/Dulles Rail Corridor and Route 28 Corridor 2010 to 2050
George Mason University Center for Regional Analysis Forecasts for the Reston/Dulles Rail Corridor and Route 28 Corridor 21 to 25 Prepared for the Fairfax County Department of Planning and Zoning Lisa
More informationThe Sunland Park flyover ramp is set to close the week of March 19 until early summer
March 2, 2018 The Sunland Park flyover ramp is set to close the week of March 19 until early summer GO 10 is targeting the week of March 19 to close the Sunland Park Drive flyover entrance ramp to I 10
More informationParking areas in all zoning districts shall comply with the following standards:
Part 13, Off-Street Parking and Loading 1300. Applicability. Off-street parking spaces shall be provided in accordance with the specifications in this Part in any district whenever any new use is established
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS B. AESTHETICS SHADE/SHADOW
IV. ENVIRONMENTAL IMPACT ANALYSIS B. AESTHETICS SHADE/SHADOW 1. INTRODUCTION Potential effects of the Proposed Project related to visual character, views and light/glare are addressed in Section IV.A,
More informationCity of Camrose Winter Road Maintenance Policy
City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.
More information2014 Data Collection Project ITE Western District
2014 Data Collection Project ITE Western District Project Completed By: Oregon State University OSU ITE Student Chapter 101 Kearney Hall Corvallis, OR 97331 Student Coordinator: Sarah McCrea (OSU ITE Student
More information4.A.3 SHADE/SHADOW 1. INTRODUCTION. 2. ENVIRONMENTAL SETTING a. Existing Conditions. (1) Project Vicinity 4.A.3 1
4.A.3 SHADE/SHADOW 1. INTRODUCTION This section describes the potential for the Project to result in shade/shadow impacts. New construction has the potential to block sunlight from land uses that are sensitive
More informationSUBJECT: SUMMARY OF FINDINGS. October 29, Mr. Carter Redish Carter Group Architects, Inc S. El Camino Real, Suite F San Clemente, CA 92672
October 29, 2018 Mr. Carter Redish Carter Group Architects, Inc. 1810 S. El Camino Real, Suite F San Clemente, CA 92672 SUBJECT: CANYON STEEL FOCUSED TRAFFIC IMPACT ANALYSIS Dear Mr. Carter Redish: Urban
More informationGuidelines on Using California Land Use/Transportation Planning Tools
Guidelines on Using California Land Use/Transportation Planning Tools 1. Selecting Ds Analysis Modules Appropriate to a Region In almost all cases, the appropriate Ds Analysis Module to use for analysis
More information15.0 Operations and Maintenance Cost Calculations
15.0 Operations and Maintenance Cost Calculations 15.1 Introduction Operations and Maintenance (O&M) costs were calculated for each of the four alternatives being considered in the analysis. No Build Alternative
More informationRegional Transit Development Plan Strategic Corridors Analysis. Employment Access and Commuting Patterns Analysis. (Draft)
Regional Transit Development Plan Strategic Corridors Analysis Employment Access and Commuting Patterns Analysis (Draft) April 2010 Contents 1.0 INTRODUCTION... 4 1.1 Overview and Data Sources... 4 1.2
More informationRiver North Multi-Modal Transit Analysis
River North Multi-Modal Transit Analysis November 7, 2006 Dan Meyers, AICP URS Corporation 612-373-6446 / dan_meyers@urscorp.com River North Study Area Reasons for initiating the study Downtown areas north
More informationGRB QUICK REFERENCE: Contact Information.
1 GEORGE R. BROWN C O N V E N T I O N C E N T E R WITH A VIBRANT DOWNTOWN, a walkable convention district and one of the largest convention facilities in America, there has never been a better time to
More informationExpanding the GSATS Model Area into
Appendix A Expanding the GSATS Model Area into North Carolina Jluy, 2011 Table of Contents LONG-RANGE TRANSPORTATION PLAN UPDATE 1. Introduction... 1 1.1 Background... 1 1.2 Existing Northern Extent of
More informationJordan Harrison, Planner III, San Francisco Recreation and Park Department
Date November 18, 2015 To: Through: From: Subject: Recreation and Park Commission Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division Jordan Harrison, Planner III,
More informationDOWNTOWN SUB-AREA. Final Parking Study. Prepared for: City of Bellingham. March Prepared by:
Final Parking Study DOWNTOWN SUB-AREA Prepared for: City of Bellingham March 2013 Prepared by: 11730 118 th Avenue NE, Suite 600 Kirkland, WA 98034-7120 Phone: 425-821-3665 Fax: 425-825-8434 www.transpogroup.com
More informationPROJECTS IN PROGRESS. October 2015
PROJECTS IN PROGRESS October 2015 DEVELOPMENT UPDATE Village Location Map O N G O I N G P R O J E C T S I N G L E N V I E W 2 DEVELOPMENT UPDATE Village Location Map G L E N P O I N T E I - 2 9 4 & W I
More informationBUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)
BUILDING AND SAFETY DIVISION TELEPHONE (949) 724-6300 BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) Payment: When a plan is required by the Administrative Authority to be submitted, a plan check
More information570 Hazeldean Road, Ottawa, ON Transportation Brief Mattamy Homes. Prepared By: Stantec Consulting Ltd. Project Number:
570 Hazeldean Road, Ottawa, ON Transportation Brief Mattamy Homes Prepared By: Stantec Consulting Ltd. Project Number: 163600871 March 2013 570 HAZELDEAN ROAD, OTTAWA, ON TRANSPORTATION BRIEF MARCH 2013
More informationNorth Easton Village Parking Study. Final Report
North Easton Village Parking Study Final Report January 2016 Table of Contents Page Executive Summary... 1 Process... 1 Key Findings... 1 Recommendations... 2 1 Introduction... 3 2 Approach... 4 Study
More informationTRAFFIC ALERT FOR WEEK OF February 4 8, 2008
TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during
More informationSHADOW IMPACT STUDY REPORT
SHADOW IMPACT STUDY REPORT 175 Zoo Park Road Town of Wasaga Beach Date: September 2017 Prepared for: Simcoe County Housing Corporation Prepared by: MacNaughton Hermsen Britton Clarkson Planning Limited
More informationCITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY
CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of
More informationProclaiming Certain Lands as Reservation for the Confederated Tribes of the
This document is scheduled to be published in the Federal Register on 11/05/2018 and available online at https://federalregister.gov/d/2018-24174, and on govinfo.gov [4337-15] DEPARTMENT OF THE INTERIOR
More informationAPPENDIX B. CalEEMod Output Files
APPENDIX B CalEEMod Output Files CalEEMod Version: CalEEMod.2011.1.1 Date: 5/7/2013 Leidesdorff Village Mixed-Use Sacramento County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric
More informationAttachment E: CADP Design Shadow Analysis
Attachment E: CADP Design Shadow Analysis June 6, 2016 TO: Don Lewis San Francisco Planning Department 1650 Mission Street, Suite 400 San Francisco, CA 94103 SUBJECT: 2060 Folsom Street 17 th & Folsom
More informationREQUEST FOR EXPRESSION OF INTEREST RETAIL OPPORTUNITIES GEORGE R. BROWN CONVENTION CENTER GREATER HOUSTON PARTNERSHIP BUILDING HOUSTON, TEXAS
RETAIL OPPORTUNITIES GEORGE R. BROWN CONVENTION CENTER AND GREATER HOUSTON PARTNERSHIP BUILDING HOUSTON, TEXAS MARCH 3, 2015 Error! Unknown document property name. Retail Opportunities in the George R.
More informationCity of Hermosa Beach Beach Access and Parking Study. Submitted by. 600 Wilshire Blvd., Suite 1050 Los Angeles, CA
City of Hermosa Beach Beach Access and Parking Study Submitted by 600 Wilshire Blvd., Suite 1050 Los Angeles, CA 90017 213.261.3050 January 2015 TABLE OF CONTENTS Introduction to the Beach Access and Parking
More informationSubject: Desert Palisades Specific Plan - Tram Way Access Sight Distance
Endo Engineering Traffic Engineering Air Quality Studies Noise Assessments July 13, 2015 Mr. Ed Freeman Pinnacle View, LLC P.O. Box 1754 Lake Oswego, OR 97035-0579 Subject: Desert Palisades Specific Plan
More informationAppendix B. Land Use and Traffic Modeling Documentation
Appendix B Land Use and Traffic Modeling Documentation Technical Memorandum Planning Level Traffic for Northridge Sub-Area Study Office of Statewide Planning and Research Modeling & Forecasting Section
More information1.0 INTRODUCTION AND SUMMARY...
TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY... 1 1.1 Purpose and Study Objective... 1 1.2 Executive Summary... 1 2.0 ROADWAY CONDITIONS... 5 2.1 Granville Parkway (South Intersection)... 8 2.2 Tuscany
More informationDOLLAR GENERAL PROJECT FOCUSED TRAFFIC ANALYSIS (REVISED) May 20, 2015
DOLLAR GENERAL PROJECT FOCUSED TRAFFIC ANALYSIS (REVISED) May 20, 2015 May 20, 2015 Mr. Dan Biswas, VP of Development CJS DEVELOPMENT II, LLC 5111 North Scottsdale Road, Suite 200 Scottsdale, CA 85250
More informationCITY OF PAPILLION PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC
PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC-15-0005 I. GENERAL INFORMATION A. APPLICANT: City of Papillion 122 East Third St. Papillion, NE 68046 B. LEGAL DESCRIPTION: See
More informationAPPENDIX IV MODELLING
APPENDIX IV MODELLING Kingston Transportation Master Plan Final Report, July 2004 Appendix IV: Modelling i TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 OBJECTIVE... 1 3.0 URBAN TRANSPORTATION MODELLING
More informationFY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission
FY 2010 Continuing i Planning Program Product Report Local Transportation and Traffic Data Travel Time and Delay Data for Belpre and Marietta, Ohio Wood-Washington-Wirt Interstate Planning Commission CONTINUING
More information