1 Clyde Avenue Ottawa ON K2C 3G4 Tel: (613) Fax: (613) February 14, 2014 File: Attention: Patricia McCann-MacMillan Planning and Infrastructure Portfolio Planning & Growth Mgmt Department City of Ottawa 110 Laurier Ave W Ottawa ON K1P 1J1 Dear Ms. MacMillan, Reference: Addendum#2 - Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011 The following letter is submitted as an addendum to the Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, submitted by Stantec Consulting on September 26, This letter constitutes part of a site plan application for the site lands located to the south of Cope Drive and north of the Walmart. BACKGROUND The subject area is approximately 0.66 ha and current site plan includes one vehicle service station building and associated garages. Figure 1 below indicates the location of the subject area. The land is currently zoned as General Mixed-Use Subzone 1 (GM1). The previously submitted servicing report assumes lumped calculations for all water, sanitary and stormwater calculations based on the total area of the future development site. For the purposes of the site plan application, detailed water demands, sanitary flows and stormwater flows for the proposed development are presented in comparison to the previously calculated demands and results.
2 February 14, 2014 Patricia McCann-MacMillan Page 2 of 11 Reference: Addendum#2 - Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011 SITE Figure 1: Site Location Map WATER SUPPLY SERVICING The proposed development will be serviced by a 150 mm diameter watermain connection to the existing 300 mm diameter watermain within Cope Drive. Water demand calculations and hydraulic modeling were completed as part of the Serviceability Study and were based on available site plans for the subject area at the time of analysis (see attached excerpts). Table 1 below summarizes the previous assumptions used in the hydraulic modeling and the current estimated values based on the most recent site plan changes. Refer to calculations in Appendix A for the detailed breakdown of building areas and water demand calculations. Fire flow demands were determined based on FUS calculations for building Z, however previously completed modeling applied the maximum fire flow demand for building A (existing Walmart) to all fire flow nodes (see Appendix A for detailed calculations).
3 February 14, 2014 Patricia McCann-MacMillan Page 3 of 11 Reference: Addendum#2 - Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011 Table 1: Comparison of servicing study and current parameters for water demand calculations 2011 Serviceability Proposed Site Study Assumed Value Number of buildings 1 1 Total building area (m 2 ) Fire Flow (L/min) 13,000 ( L/s) 9,000 (150 L/s) Hydraulic modeling completed with H2O Map software as part of the Serviceability Study was for the entire commercial development; including areas to the north and south of Cope Drive. The model layout for the entire site is included in Appendix A. H2O Map model node 26 is located within the subject site area on the south side of Cope Road. Table 2 summarizes the average day, maximum day with fire flow, and peak hour model results from the previous Serviceability Study modelling, as well as the previously assumed flow demand and the currently estimated flows. Excerpts from the 2011 serviceability study are included in Appendix B. Table 2: Comparison of servicing study water pressures and demands to current water demand calculations for building Z (node 26) Pressure psi (kpa) 2011 Serviceability Study H2O Map Results Serviceability Study Value Demand Flow (L/s) Proposed Site Fire Flow demand Average Day 98.3 (677.5) Max day + FF 58.6 (390) Peak Hour 78.1 (538.5) Table 2 indicates that the proposed development has a lower total water demand than previously assumed for the overall hydraulic analysis. Additionally, the modeled pressures for all scenarios are well above the minimum requirements. However, the proposed service connection has been reduced to a 150 mm diameter watermain from the previously assumed 300 mm diameter watermain. Therefore, while sufficient pressures should still be available for the average day and peak hour scenarios, the maximum day + fire flow scenario was re-run with the reduced watermain diameter and revised water demands. Results of the updated maximum day + fire flow scenario are presented in Table 3 below. The updated Max Day + FF results indicate that minimum pressures are maintained for the proposed commercial site and reduced service size.
4 February 14, 2014 Patricia McCann-MacMillan Page 4 of 11 Reference: Addendum#2 - Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011 Table 3: Model results for revised Max Day + FF (150 L/s) scenario ID Static Demand (L/s) Fire- Flow Demand (L/s) Pressure (psi) Pressure (kpa) STORM DRAINAGE Storm sewer service to the site will be provided via connection to the existing 750 mm diameter storm sewer in Cope Drive. It is assumed that the future development area will be serviced by the existing 750mm diameter stub at existing storm manhole STM 104 Storm drainage from the subject area was included in the initial calculations for the Serviceability Study and was included in the design of both the interim and ultimate stormwater ponds. Drainage area FUT1 in the Serviceability Study Drawing SD-1 (see Appendix B) represents the drainage area and runoff coefficient initially assigned to the subject site. Based on the current commercial site plan, approximately 55% of the site remains as future development area with an assumed runoff coefficient of Table 4 below summarizes the initial serviceability study values and the current calculated values for the area and runoff coefficient for the site and area draining directly to the interim SWM pond. Note that the current runoff coefficient value was calculated from the estimated imperviousness based on paved/hard and grassed surface area. Table 4: Comparison of servicing study and current parameters for stormwater calculations 2011 Serviceability Proposed Site Study Assumed Value Drainage Area (ha) Runoff Coefficient AxC
5 February 14, 2014 Patricia McCann-MacMillan Page 5 of 11 Reference: Addendum#2 - Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011 Table 4 indicates that the AxC value for the proposed commercial site is reduced from what was assumed in the Serviceability Study, indicating that for any given rainfall intensity the stormwater runoff generated within the drainage area will be reduced. The 2011 Servicing Study and interim pond design calculations assume no on-site storage for area FUT1, and all detention of runoff is provided in the SWM facility. However, roof storage and sag storage within the parking area (as indicated in drawing SD-1) will provide additional storage volume for runoff generated within the site area. Modified rational method calculations were completed for the site to estimate the 100-year runoff from the site and size ICDs. A summary of the 100-year release rates from the proposed development site and the future development site are included in Table 5 below. As shown in Table 5 below, the proposed 100-year peak release rate from the site and the uncontrolled 100-year runoff from the future development area are less than the 2011 servicing study assumed peak release rate of 331 L/s from the subject site and future development area. A schedule of proposed ICDs is included on Drawings SSP-1 and SD-1 Table 5: Summary of 100-year release rates from proposed development and future development area (FTR1) Area ID Runoff Coefficient 100-year Release Rate (L/s) Proposed ICD Available Ponding Volume (m 3 ) Required Ponding Volume (m 3 ) FTR UNC UNC ST 102A mm orifice ST 103B mm orifice ST 103A RF x roof drain Total proposed Target The 100-year release rates from the site were input into a fixed boundary condition hydraulic model using PCSWMM modelling software to assess the impact of the pond on the site HGLs. PCSWMM modelling from the 2011 SWM report indicated the peak HGL at existing storm manhole EX 102 to be m. This HGL was used as the boundary condition for the site hydraulic analysis. Table 6 below summarizes the HGL results for the subject site and indicates that greater than 0.30m clearance is provided from the proposed ground surface in all locations. Note that the proposed building is slab on grade and, therefore, has no basements. Input and output files from the PCSWMM model are included in Appendix D and electronic model files are included on the enclosed CD.
6 February 14, 2014 Patricia McCann-MacMillan Page 6 of 11 Reference: Addendum#2 - Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011 Table 6: Summary of site HGLs and proposed ground clearance Structure Proposed Ground (m) Max. HGL (m) Clearance Ground- HGL (m) EXSTM STM STM STM STUB The storm sewer design sheet from the Serviceability Study (See Appendix B) indicates that the downstream box sewer is at 48% capacity before discharging at the interim pond headwall (pipe section from STM 101 to Headwall) and therefore sufficient capacity should exist within the downstream sewer to accommodate the reduced flow from the subject site. Storm sewer design sheets for the proposed development are included in Appendix C. Therefore, the reduced runoff generation and the provision of additional on-site storage indicate that sufficient capacity is available within the existing storm sewers and interim SWM facility.
7 February 14, 2014 Patricia McCann-MacMillan Page 7 of 11 Reference: Addendum#2 - Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011 SANITARY FLOW A 250mm diameter sanitary sewer connection to the existing 300 mm diameter sanitary sewer in Cope Drive is proposed to service the subject site. Sanitary sewer design calculations in Appendix B of the 2011 Serviceability Study indicate that the sanitary flows from the subject area (sanitary drainage area EXTR6) were previously calculated for a lumped area of 0.67ha (see attached design sheet excerpt). In these calculations, the commercial flow unit rate of 50,000 L/ha/day is applied to the entire site area as there was no available site plan at the time. The sanitary flow calculations were revised to reflect the proposed site plan, with the daily demand rate applied over the building area only. The result is that the revised sanitary flows are lower than those previously estimated in the 2011 Serviceability Study and used to size the receiving sewer in Cope Drive. Table 7 below provides a breakdown of the sanitary flow assumptions from the Serviceability Study and the current site plan. Table 7: Comparison of servicing study and proposed sanitary flow calculations Unit flow rate Peaking Factor 2011 Servicing Study Proposed Site Area (ha) Flow (L/s) Area (ha) Flow (L/s) Proposed 50, Commercial (L/ha/day) Future 50, Development (L/ha/day) Infiltration 0.28 (L/s/ha) Total The sanitary flows will be sent to the Hazeldean Pump Station, which is currently approved for 1225 L/s. The site has been included in the Pump Station drainage areas and represents only 0.03% of the total Pump Station flow. The capacity of Hazeldean Pump Station will be sufficient for the sanitary flows from the subject area. Furthermore, the Servicing Study sanitary sewer design sheet indicates that the 300mm diameter storm sewer in Cope Drive between sanitary manholes SAN4 and SAN3 is at 81% capacity with the Serviceability Study assumptions for sanitary flows. Therefore, the downstream sewer infrastructure on the site has capacity for up to 0.79 L/s of sanitary flows from the subject site. The sanitary sewer design sheet used to size the proposed sanitary sewers within the subject site is included in Appendix C.
8 February 14, 2014 Patricia McCann-MacMillan Page 8 of 11 Reference: Addendum#2 - Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011 EROSION CONTROL Erosion and sediment controls must be in place during construction. The following recommendations to the contractor will be included in contract documents. 1. Limit the extent of exposed soils at any given time. 2. Revegetate exposed areas and slopes as soon as possible. 3. Install terrafix siltsack (or equivalent) in all proposed catch basins and catch basin manholes and on all existing catch basins that will receive run-off from the site. 4. Where possible silt fences are to be installed along the same elevation contour. 5. No refueling or cleaning of equipment is permitted near any existing waterway. 6. The contractor shall periodically, or when requested by the contract administrator, clean out accumulated sediments as required. 7. A visual inspection shall be done daily on sediment control measures and cleaned of any accumulated silt as required. The deposits will be disposed off-site as per the requirements of the contract. 8. Sediment control barriers may only be removed temporarily with approval of contract administrator to accommodate construction operations. All affected barriers must be reinstated at night when construction is completed. No removal will occur if there is a significant rainfall event anticipated (>10mm) unless a new device has been installed to protect the existing storm and sanitary sewer systems. 9. The contractor shall immediately report to the engineer any accidental discharges of sediment material into the watercourse. Appropriate response measures, including any repairs to existing control measures or the implementation of additional control measures, shall be carried out by the contractor without delay. 10. Contractor shall remove sediment control measures when, in the opinion of the contract administrator, the measure(s) is no longer required. No control measures shall be permanently removed without prior written authorization from the contract administrator. 11. Establish material stockpiles away from watercourses, so that barriers and filters may be installed. The contractor will, at every rainfall, complete inspections and guarantee proper performance. The inspection is to include: 1. Verification that water is not flowing under silt barriers. 2. Clean and change filter cloth to catch at catch basins. See Drawing DS-1 for further erosion control details.
9 February 14, 2014 Patricia McCann-MacMillan Page 9 of 11 Reference: Addendum#2 - Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011 UTILITIES Both Hydro Ottawa and Enbridge Gas have plants surrounding the proposed development and the plants have enough capacity to service the proposed site without any major upgrades. APPROVALS An Ontario Ministry of Environment (MOE) Environmental Compliance Approval (formerly Certificates of Approval (CofA)) under the Ontario Water Resources Act was issued for the existing stormwater management facility, and storm and sanitary sewers. The subject site was included in the tributary area of the approved storm and sanitary sewers and the interim SWM facility. Since the proposed development is a private site and includes only a connection to the existing approved sewers, no MOE ECA is required. CONCLUSIONS Water Servicing The proposed commercial development is located in an area of the City s water distribution system that has sufficient capacity to provide both the required commercial and emergency fire flows. Based on the modeling results and the boundary conditions determined, fire flow demands in excess of 9,000 L/min will be available within the watermain network proposed for the development. The minimum pressure observed under peak demand conditions is within the acceptable pressure range of 40 psi (275kPa) to 100 psi (689kPa). No additional measures are required to address minimum pressure conditions. The maximum observed pressure is within the allowable pressure range, however all services within the subdivision will require Pressure Reducing Valves to meet Ontario Building Code requirements. Stormwater Servicing The proposed storm sewers will connect to the existing 750 mm diameter storm sewer stub at STM 104 and ultimately discharges to the interim SWM pond 8, which is designed for enhanced water quality treatment (80% TSS removal) and quantity control up to the 100-year event. The minor system is designed according to a 5 year level of service. Hydraulic analysis of the proposed storm sewers indicates that minimum HGL clearances are provided during the 100-year event. Sanitary Servicing The proposed sanitary sewers will outlet to the existing 250 mm dia. within the commercial centre access road on the south side of Cope Drive. Sanitary sewers are sized to convey flows at a maximum of 80% of the total capacity. Proposed sanitary flow rates are less than were estimated in the serviceability study and used for sizing the existing sewers, therefore sufficient capacity should exist in the downstream sewers to support the proposed development.
10 February 14, 2014 Patricia McCann-MacMillan Page 10 of 11 Reference: Addendum#2 - Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011 Erosion and sediment control Erosion and sediment controls must be in place during construction. The contractor will, at every rainfall event, complete inspections and guarantee proper performance of all control measures. Approvals Ontario Ministry of Environment (MOE) Environmental Compliance Approval (formerly Certificates of Approval (CofA)) under the Ontario Water Resources Act will not be required for the proposed storm and sanitary sewers. An MOE permit to take water (PTTW) may be required for excavation pumping during site works. The need for a PTTW should be assessed by a geotechnical engineer prior to commencing site works.
11 February 14, 2014 Patricia McCann-MacMillan Page 11 of 11 Reference: Addendum#2 - Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011 Respectfully, STANTEC CONSULTING LTD. Amanda Lynch, EIT. Water Resources EIT Tel: (613) Fax: (613) amanda.lynch@stantec.com Peter Moroz, P.Eng. Managing Principal Tel: (613) Fax: (613) peter.moroz@stantec.com Attachment: Appendix A: Water Demand Calculations Appendix B: Serviceability Study and SWM Report Excerpts o Excerpts from Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Serviceability Study, September 26, 2011 o Excerpts from Proposed Commercial Development, Terry Fox Drive at Fernbank Road, City of Ottawa, Stormwater Management Report, September 26, 2011 Appendix C: Storm and Sanitary Sewer Design Sheets. Appendix D: SWM Calculations and PCSWMM Input/Output Files Engineering drawings - SP-1 - GP-1 - SD-1 - SAN-1 - EC/DS-1 CD c/w PDF copies of: - September 26, 2011 reports and drawings - Addendum #2 letter and appendices - Proposed Development Engineering drawings
12
13 Appendix A: Water Demand Calculations
14
15 FUS Fire Flow Calculations Stantec Project #: Project Name: Kanata Fernbank - Jiffy Lube Fire Flow Calculation #: 1 Date: February 10, 2014 Building Type/Description/Name: Bldg Z Data input by: A.Lynch Calculations Based on 1999 Publication "Water Supply for Public Fire Protection" by Fire Underwriters' Survey (FUS) Notes: The proposed building is a 18 storey high rise - THIS IS A PRELIMINARY SHEET ONLY, FOR BOUNDARY CONDITIONS REQUESTS. A MORE DETAILLED CALCULATION SHOULD BE DONE AFTER THE BCs AND AVAILABLE FLOW AT 20 psi IS PROVIDED. Table A: Fire Underwriters Survey Determination of Required Fire Flow - Long Method Step Task Term Options 1 Multiplier Associated with Option Choose: Value Used Coefficient related Choose Frame Used Wood Frame 1.5 to type of for Construction of Ordinary construction 1 construction (C) Unit Non-combustible construction 0.8 Ordinary construction 1 m Fire resistive construction (< 2 hrs) 0.7 Fire resistive construction (> 2 hrs) 0.6 Choose Type of Housing (if TH, 2 Single Family 1 Enter Number of Type of Housing Townhouse - indicate # of units 6 Other (Comm, Ind, etc.) 1 Units Units Per TH Block) Other (Comm, Ind, etc.) # of Storeys Number of Floors/ Storeys in the Unit (do not include basement): 1 1 Storeys Enter Ground Floor Area of One Unit Obtain Required Fire Flow without Reductions Apply Factors Affecting Burning Choose Combustibility of Building Contents Measurement Units Occupancy content hazard reduction or surcharge Choose Reduction Sprinkler Due to Presence of reduction Sprinklers Choose Separation Distance Between Units Obtain Required Fire Flow, Duration & Volume Exposure Distance Between Units Framing Material Floor Space Area Enter Ground Floor Area (A) of One Unit Only : Square Feet (ft 2 ) Square Metres (m 2 ) 1 Hectares (ha) Non-combustible Limited combustible Combustible 0 Free burning 0.15 Rapid burning 0.25 Complete Automatic Sprinkler Protection -0.3 None 0 North Side 45.1m or greater 0 East Side 45.1m or greater 0 South Side 10.1 to 20.0m 0.15 West Side 45.1m or greater 0 Note: The most current FUS document should be referenced before design to ensure that the above figures are consistent with the intent of the Guideline Legend Drop down menu - choose option, or enter value. No Information, No input required. 223 Square Metres (m2) Required Fire Flow( without reductions or increases per FUS) (F = 220 * C * A) Round to nearest 1000L/min Reductions/Increases Due to Factors Affecting Burning 223 Combustible 0 Unit Area in Square Meters (m 2 ) 0 N/A Total Required Fire Flow, rounded to nearest 1000 L/min, with max/min limits applied: None Total Required Fire Flow (above) in L/s: Required Duration of Fire Flow (hrs) Required Volume of Fire Flow (m 3 ) Total Fire Flow (L/min) 8,000 N/A 8, m 1, , Date: 2/11/2014 Stantec Consulting Ltd. Bldg Z W:\active\ _kanata_smartCentres\design\analysis\Water\Jiffy Lube\STANTEC_FUS_FIREFLOW_CALCULATOR.xlsx
16 Kanata SmartCentres Site Development - Domestic Water Demand Estimates - Based on Petroffe Site Plan SA-002 (Project#07040) Building Z area revised from original 2011 servicing study Existing Buildings Building ID Area (m 2 ) Demand at Node Daily Rate of Avg Day Demand 2 Max Day Demand 3 Peak Hour Demand 3 Demand 1 (L/min) (L/s) (L/min) (L/s) (L/min) (L/s) BLDG A BLDG B BLDG D BLDG E Total Site : Proposed Buildings Building ID Area (m 2 ) Demand at Node Daily Rate of Avg Day Demand 2 Max Day Demand 3 Peak Hour Demand 3 Demand 1 (L/min) (L/s) (L/min) (L/s) (L/min) (L/s) Future BLDG Z Avg Day Demand 2 Building ID Area Demand Daily Rate of Max Day Demand 3 Peak Hour Demand 3 (m 2 ) at Node Demand 1 (L/min) (L/s) (L/min) (L/s) (L/min) (L/s) Future Development BLDG X L/m 2 /day is used to calculate water demand for retail and office space. This flow rate is at the high end of the range used for shopping centres in the For the purpose of this study it is predicted that commercial facilities will be operated 12 hours per day. RMOC water demand criteria used to estimate peak demand rates are as follows: maximum day demand rate = 1.5 x average day demand rate maximum hour demand rate = 1.8 x maximum day demand rate H2OMap Model Input Node Avg Day Demand Max Day Demand Peak Hour Demand ID From Node To Node Length (m) Diameter Roughnes (mm) s W:\active\ _kanata_smartCentres\design\analysis\Water\Jiffy Lube\Water-Demand-Commercial xls, Demands 2/18/2014
17 _JIFFY Prepared By: Date: 2/18/2014 4:06:04 PM
18
19 Appendix B: Serviceability Study and SWM Report Excerpts
20
21 Subcatchments NAME X Y DESCRIPTION TAG RAINGAGE OUTLET AREA WIDTH SLOPE IMPERV NIMPERV 110B Storm CB110A BLDG_B Storm RfB BLDG_E Storm RfE PND Storm POND UNC Storm MH UNC Storm OUT E Storm CB111F STM Storm CB A Storm CB110D UNC Storm MH Storm CB105A A Storm CB105A B Storm CB106A C Storm CB111B Storm CB110C B Storm CB111C A Storm CB111A Storm CB111D C Storm CB110B BLDG_D Storm RfD D Storm CB111G F Storm CB111E FUT Storm xstub Storm CB107A UNC Storm OUT FUT Storm POND A Storm CB109B Storm CB109A B Storm CB108C A Storm CB108B Storm CB108A BLDG_A Storm RfA STM Storm CB /26/2011 Page 43 Subcatchments ResultsSummary.xls C:\Temp\812\submission \ _POST_INT_100yr12hrSCS\ResultsSummary.xls
22 LOCATION Kanata Smart Centres STORM SEWER DESIGN PARAMETERS DESIGN SHEET I = a / (t+b) c (As per City of Ottawa Guidelines, 2004) Commercial Site, Terry Fox & Cope Dr. DATE: July 18, 2011 (City of Ottawa) 1:5 yr 1:10 yr REVISION: REV5 a = MANNING'S n = DESIGNED BY: npc FILE NUMBER: b = MINIMUM COVER: 2.00 m CHECKED BY: c = TIME OF ENTRY 15 min DRAINAGE AREA Accum 100 Year Accum PIPE SELECTION FROM TO AREA C ACCUM. A x C ACCUM. T of C I Q ACT Roof Roof Roof 100 Yr Q TOTAL LENGTH PIPE SLOPE Q CAP Q ACT VEL. VEL. TIME OF M.H. M.H. AREA AxC (CIA/360) Area Area Flow Roof Flow SIZE (FULL) Q CAP (FULL) (ACT) FLOW (ha) (-) (ha) (ha) (ha) (min) (mm/h) (L/s) (ha) (ha) (L/s) (L/s) (L/s) (m) (mm) % (L/s) (-) (m/s) (m/s) (min) 111,111A,111B,111C,111D,111E,111F, BLDG D, BLD STM111 STM ,110A,110B,110C,BLDG B STM110 STM STM107 STM , 109A STM109 STM ,108A,108B,BLDG A STM108 STM STM106 STM ,105A,105B STM105 STM FUT-1 STUB1 STM STM103 STM STM102 STM STM104 STM STM101 HEADWALL Total Area 4.59 ha Check Sewer Area from Site 4.59 ha x900 BOX 1800x900 BOX Page 1 of 1 STM_ _rev8.xls, 5 yr Design (obverts)
23 Fernbank at Terry Fox SANITARY SEWER DESIGN PARAMETERS DESIGN SHEET CITY CRITERIA & DENSITIES Average Daily Flow / Person: 350 L/p/day Commercial: 0.60 L/s/ha Minimum Velocity: 0.60 m/s Industrial: 0.35 L/s/ha Revision Date: July 18, 2011 n = Institutional: 0.58 L/s/ha Date: March 8, 2010 Max Peaking Factor: 4.0 Infiltration: 0.28 L/s/ha Designed by: MJS Min. Peaking Factor: 2.0 Checked By: npc Peaking Factor Industrial: 2.0 Low 3.4 pers/unit Peaking Factor Comm. / Inst.: 1.5 Medium 2.7 pers/unit High 1.8 pers/unit File Number: residential 20 Units/ha ID Area From To Extraneous COMMERCIAL INDUSTRIAL INSTITUTIONAL C+I+I INFILTRATION PIPE MH MH Area Accum. Area Accum. Area Accum. Peak Total Accum. Infilt. Total Distance Diameter Slope Capacity Velocity Parking Area Area Area Area Flow Area Area Flow Flow (Full) (Full) (Actual) (ha) (ha) (ha) (ha) (ha) (ha) (ha) (l/s) (ha) (ha) (L/s) (L/s) (m) (mm) (%) (l/s) (m/s) (m/s) BLDG D BLDG D BLDG E BLDG E EXTR BLDG B BLDG B EXTR EXTR BLDG A BLDG A EXTR EXTR EXTR 6 STUB EXTR EXTR 8 STUB **EXTR 9 + FUT RES / INST COPE DRIVE (EXTR 10) COPE DRIVE (EXTR 11) 2 1 (EX STUB) * Refer to Fernbank Community Design Plan Mater Servicing Study Sept 2008 Table D-3 ** Added residential and institutional peak and infiltration flows of to total flow TOTALS CHECK Date: 9/26/2011 Stantec Consulting Ltd. Sanitary Design xls
24
25
26
27 Appendix C: Proposed Development Storm and Sanitary Sewer Design Sheets
28
29 SANITARY SEWER SUBDIVISION: DESIGN PARAMETERS KANATA SOUTH COMMERCIAL DESIGN SHEET DEVELOPMENT (City of Ottawa) MAX PEAK FACTOR (RES.)= 4.0 AVG. DAILY FLOW / PERSON 350 l/p/day MINIMUM VELOCITY 0.60 DATE: 2/18/2014 MIN PEAK FACTOR (RES.)= 2.0 COMMERCIAL 50,000 l/ha/day MAXIMUM VELOCITY 3.00 REVISION: 1 PEAKING FACTOR (INDUSTRIAL): 2.4 INDUSTRIAL (HEAVY) 55,000 l/ha/day MANNINGS n DESIGNED BY: MJS FILE NUMBER: PEAKING FACTOR (COMM., INST.): 1.5 INDUSTRIAL (LIGHT) 35,000 l/ha/day BEDDING CLASS B CHECKED BY: PM PERSONS / SINGLE UNIT 3.4 INSTITUTIONAL 50,000 l/ha/day MINIMUM COVER 2.50 PERSONS / TOWNHOME 2.7 INFILTRATION 0.28 l/s/ha PERSONS / APARTMENT 2.3 LOCATION RESIDENTIAL AREA AND POPULATION COMMERCIAL GREEN / UNUSED C+I+I INFILTRATION TOTAL PIPE AREA ID FROM TO AREA UNITS POP. CUMULATIVE PEAK PEAK AREA ACCU. AREA ACCU. PEAK TOTAL ACCU. INFILT. FLOW LENGTH DIA MATERIAL CLASS SLOPE CAP. CAP. V VEL. VEL. NUMBER M.H. M.H. SINGLE TOWN APT. AREA POP. FACT. FLOW AREA AREA FLOW AREA AREA FLOW (FULL) PEAK FLOW (FULL) (ACT.) (ha) (ha) (l/s) (ha) (ha) (ha) (ha) (l/s) (ha) (ha) (l/s) (l/s) (m) (mm) (%) (l/s) (%) (m/s) (m/s) BLDG Z SAN STUB PVC DR % PARKING 2 Existing PVC SDR % of SAN xlsx
30 Kanata Smart Centres STORM SEWER DESIGN PARAMETERS Commercial Site, Terry Fox & Cope Dr. DESIGN SHEET I = a / (t+b) c (As per City of Ottawa Guidelines, 2004) LOCATION DATE: February 14, 2014 (City of Ottawa) 1:5 yr 1:10 yr REVISION: a = MANNING'S n = DESIGNED BY: aml FILE NUMBER: b = MINIMUM COVER: 2.00 m CHECKED BY: c = TIME OF ENTRY 15 min DRAINAGE AREA Accum 100 Year Accum PIPE SELECTION FROM TO AREA C ACCUM. A x C ACCUM. T of C I Q ACT Roof Roof Roof 100 Yr Q TOTAL LENGTH PIPE SLOPE Q CAP Q ACT VEL. VEL. TIME OF M.H. M.H. AREA AxC (CIA/360) Area Area Flow Roof Flow SIZE (FULL) Q CAP (FULL) (ACT) FLOW (ha) (-) (ha) (ha) (ha) (min) (mm/h) (L/s) (ha) (ha) (L/s) (L/s) (L/s) (m) (mm) % (L/s) (-) (m/s) (m/s) (min) RF103, ST 103A, ST103B STM103 STM ST102A STM102 TEE FTR1 STUB EX STM EX103, UNC2 EX STM103 EX STM Page 1 of 1 STM_ xls, 5 yr Design (obverts)
31
32 Appendix D: SWM Calculations and PCSWMM Input/Output Files
33
34 Roof Drain Design Calculation Sheet Project #PROJECT #, PROJECT DESCRIPTION Roof Drain Design Sheet, Area RF 103 Standard Zurn Model Z Control-Flo Single Notch Roof Drain Drawdown Estimate Rating Curve Volume Estimation Total Total Elevation Discharge Rate Outlet Discharge Storage Elevation Area Volume (cu. m) Water Depth Volume Time Vol Detention (m) (cu.m/s) (cu.m/s) (cu. m) (m) (sq. m) Increment Accumulated (m) (cu.m) (sec) (cu.m) Time (hr) Rooftop Storage Summary From Zurn Drain Catalogue Total Building Area (sq.m) 200 Head (m) L/min L/s Notch Rating Assume Available Roof Area (sq. 80% Roof Imperviousness 0.99 Roof Drain Requirement (sq.m/notch) 232 Number of Roof Notches* 1 Max. Allowable Depth of Roof Ponding (m) 0.15 * As per Ontario Building Code section OBC (2)(c). Max. Allowable Storage (cu.m) 8 Estimated 100 Year Drawdown Time (h) 1.0 * Note: Number of drains can be reduced if multiple-notch drain used. Calculation Results 5yr 100yr Available Qresult (cu.m/s) Depth (m) Volume (cu.m) Draintime (hrs) Date: 2/18/2014 Stantec Consulting Ltd. anl_swm_vb-mrm_ xlsm, RF 103 W:\active\ _kanata_smartCentres\design\analysis\SWM\Jiffy Lube\
35 Stormwater Management Calculations File No: PROJECT # Project: PROJECT DESCRIPTION Date: DATE SWM Approach: Post-development to Pre-development flows Post-Development Site Conditions: Overall Runoff Coefficient for Site and Sub-Catchment Areas Runoff Coefficient Table Sub-catchment Area Runoff Overall Area (ha) Coefficient Runoff Catchment Type ID / Description "A" "C" "A x C" Coefficient Uncontrolled - Tributary FTR1 Hard Soft Subtotal Uncontrolled - Tributary UNC2 Hard Soft Subtotal Uncontrolled - Non-Tributary UNC1 Hard Soft Subtotal Controlled - Tributary ST 102A Hard Soft Subtotal Controlled - Tributary ST 103B Hard Soft Subtotal Controlled - Tributary ST 103A Hard Soft Subtotal Roof RF 103 Hard Soft Subtotal Total Overall Runoff Coefficient= C: 0.64 Total Roof Areas Total Tributary Surface Areas (Controlled and Uncontrolled) Total Tributary Area to Outlet Total Uncontrolled Areas (Non-Tributary) ha ha ha ha Total Site ha Check SUM in columns S to W and Total in Table A Date: 2/18/2014, 12:35 PM Stantec Consulting Ltd. anl_swm_vb-mrm_ xlsm, Area Summary W:\active\ _kanata_smartCentres\design\analysis\SWM\Jiffy Lube\
36 Stormwater Management Calculations Project #PROJECT #, PROJECT DESCRIPTION Modified Rational Method Calculatons for Storage Project #PROJECT #, PROJECT DESCRIPTION Modified Rational Method Calculatons for Storage 5 yr Intensity I = a/(t + b) c a = t (min) I (mm/hr) 100 yr Intensity I = a/(t + b) c a = t (min) I (mm/hr) City of Ottawa b = City of Ottawa b = c = c = YEAR Predevelopment Target Release from Portion of Site 100 YEAR Predevelopment Target Release from Portion of Site Subdrainage Area: Predevelopment Tributary Area to Outlet Subdrainage Area: Predevelopment Tributary Area to Outlet Area (ha): Area (ha): C: 0.20 C: 0.20 Typical Time of Concentration Estimated Time of Concentration after Development tc I (5 yr) Qtarget tc I (100 yr) Q100yr (min) (mm/hr) (L/s) (min) (mm/hr) (L/s) YEAR Modified Rational Method for Entire Site 100 YEAR Modified Rational Method for Entire Site Subdrainage Area: FTR1 Uncontrolled - Tributary Subdrainage Area: FTR1 Uncontrolled - Tributary Area (ha): 0.29 Area (ha): 0.29 C: 0.75 C: 0.94 tc l (5 yr) Qactual Qrelease Qstored Vstored tc l (100 yr) Qactual Qrelease Qstored Vstored (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) Subdrainage Area: UNC2 Uncontrolled - Tributary Subdrainage Area: UNC2 Uncontrolled - Tributary Area (ha): 0.04 Area (ha): 0.04 C: 0.25 C: 0.31 tc l (5 yr) Qactual Qrelease Qstored Vstored tc l (100 yr) Qactual Qrelease Qstored Vstored (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) Subdrainage Area: UNC1 Uncontrolled - Non-Tributary Subdrainage Area: UNC1 Uncontrolled - Non-Tributary Area (ha): 0.08 Area (ha): 0.08 C: 0.25 C: 0.31 tc l (5 yr) Qactual Qrelease Qstored Vstored tc l (100 yr) Qactual Qrelease Qstored Vstored (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) Subdrainage Area: ST 102A Controlled - Tributary Subdrainage Area: ST 102A Controlled - Tributary Area (ha): 0.08 Area (ha): 0.08 C: 0.57 C: 0.71 tc l (5 yr) Qactual Qrelease Qstored Vstored tc l (100 yr) Qactual Qrelease Qstored Vstored (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) Storage: e Above CB Storage: Surface Storage Above CB Orifice Equation:= CdA(2gh)^0.5 Where C = 0.61 Orifice Equation: Q = CdA(2gh)^0.5 Where C = 0.61 Orifice Diameter: mm Orifice Diameter: mm Date: 2/18/2014 Stantec Consulting Ltd. Page 3 of 5 anl_swm_vb-mrm_ xlsm, Modified RM W:\active\ _kanata_smartCentres\design\analysis\SWM\Jiffy Lube\
37 Stormwater Management Calculations Project #PROJECT #, PROJECT DESCRIPTION Project #PROJECT #, PROJECT DESCRIPTION Modified Rational Method Calculatons for Storage Modified Rational Method Calculatons for Storage Invert Elevation 0.00 m Invert Elevation 0.00 m T/G Elevation 0.80 m T/G Elevation 0.80 m Max Ponding Depth 0.15 m Max Ponding Depth 0.14 m Downstream W/L 0.00 m Downstream W/L 0.00 m Stage Head Discharge Vreq Vavail Volume Stage Head Discharge Vreq Vavail Volume (m) (L/s) (cu. m) (cu. m) Check (m) (L/s) (cu. m) (cu. m) Check 5-year Water Level OK 100-year Water Level OK 0.07 Subdrainage Area: ST 103B Controlled - Tributary Subdrainage Area: ST 103B Controlled - Tributary Area (ha): 0.10 Area (ha): 0.10 C: 0.67 C: 0.84 tc l (5 yr) Qactual Qrelease Qstored Vstored tc l (100 yr) Qactual Qrelease Qstored Vstored (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) Storage: e Above CB Storage: Surface Storage Above CB Orifice Equation:= CdA(2gh)^0.5 Where C = 0.61 Orifice Equation: Q = CdA(2gh)^0.5 Where C = 0.61 Orifice Diameter: mm Orifice Diameter: mm Invert Elevation 0.00 m Invert Elevation 0.00 m T/G Elevation 0.80 m T/G Elevation 0.80 m Max Ponding Depth 0.15 m Max Ponding Depth 0.17 m Downstream W/L 0.00 m Downstream W/L 0.00 m Stage Head Discharge Vreq Vavail Volume Stage Head Discharge Vreq Vavail Volume (m) (L/s) (cu. m) (cu. m) Check (m) (L/s) (cu. m) (cu. m) Check 5-year Water Level OK 100-year Water Level OK 6.33 Subdrainage Area: ST 103A Controlled - Tributary Subdrainage Area: ST 103A Controlled - Tributary Area (ha): 0.05 Area (ha): 0.05 C: 0.90 C: 1.00 tc l (5 yr) Qactual Qrelease Qstored Vstored tc l (100 yr) Qactual Qrelease Qstored Vstored (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) Warning, max. volume may not have been reached. Storage: e Above CB Storage: Surface Storage Above CB Orifice Equation:= CdA(2gh)^0.5 Where C = 0.61 Orifice Equation: Q = CdA(2gh)^0.5 Where C = 0.61 Orifice Diameter: N/A mm Orifice Diameter: N/A mm Invert Elevation 0.00 m Invert Elevation 0.00 m T/G Elevation 1.30 m T/G Elevation 1.30 m Max Ponding Depth 0.15 m Max Ponding Depth 0.30 m Downstream W/L 0.00 m Downstream W/L 0.00 m Stage Head Discharge Vreq Vavail Volume Stage Head Discharge Vreq Vavail Volume (m) (L/s) (cu. m) (cu. m) Check (m) (L/s) (cu. m) (cu. m) Check 5-year Water Level OK 100-year Water Level OK 7.00 Subdrainage Area: RF 103 Roof Subdrainage Area: RF 103 Roof Area (ha): 0.02 Maximum Storage Depth: 150 mm Area (ha): 0.02 Maximum Storage Depth: 150 mm C: 0.90 C: 1.00 tc l (5 yr) Qactual Qrelease Qstored Vstored Depth tc l (100 yr) Qactual Qrelease Qstored Vstored Depth (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) (mm) (min) (mm/hr) (L/s) (L/s) (L/s) (m^3) (mm) #VALUE! ### Storage: Roof Storage Storage: Roof Storage Depth Head Discharge Vreq Vavail Discharge Depth Head Discharge Vreq Vavail Discharge (mm) (m) (L/s) (cu. m) (cu. m) Check (mm) (m) (L/s) (cu. m) (cu. m) Check 5-year Water Level year Water Level SUMMARY TO OUTLET SUMMARY TO OUTLET Vrequired Vavailable* Vrequired Vavailable* Tributary Area ha Tributary Area ha Total 5yr Flow to Sewer 71 L/s 0 0 m 3 Ok Total 100yr Flow to Sewer 71 L/s 0 0 m 3 Ok Date: 2/18/2014 Stantec Consulting Ltd. Page 4 of 5 anl_swm_vb-mrm_ xlsm, Modified RM W:\active\ _kanata_smartCentres\design\analysis\SWM\Jiffy Lube\
: WATER SUPPLY SERVICING
APPENDICES LONGFIELDS BLOCK 13 COMMERCIAL PLAZA SERVICING AND STORMWATER MANAGEMENT REPORT Appendix A : Water Supply Servicing November 20, 2017 : WATER SUPPLY SERVICING A.1 DOMESTIC WATER DEMAND ESTIMATE
More informationJp2g Consultants Inc.
Jp2g Consultants Inc. ENGINEERS PLANNERS PROJECT MANAGERS 1150 Morrison Drive, Suite 410 Ottawa, ON K2H 8S9 T 613-828-7800, F 613-828-2600, www.jp2g.com September 20, 2018 City of Ottawa Development Review
More informationHOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:
HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI Project No.
More informationSERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017
SERVICING BRIEF & STORMWATER MANAGEMENT REPORT 2980 Colonial Road Sarsfield (Ottawa), Ontario Report No. 16033 June 15, 2017 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading &
More informationD. B. G R A Y E N G I N E E R I N G I N C.
STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario Report No. 12020-SWM August 27, 2012 Revised April 21, 2014 Revised December 9, 2014 Revised April 14, 2015 D. B. G R A Y E N G I N E E R
More informationSTREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT
STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology
More informationVillages at Riverdale Thornton, CO
FINAL UTILITY REPORT Villages at Riverdale Thornton, CO October 14, 216 Revised: March 29, 217 JN: 1539 Prepared for: PCS Group, Inc. 11 16 th Street #3 B-18 Denver, CO 8265 P: 33.531.495 Prepared by:
More informationTable 1 - Infiltration Rates
Stantec Consulting Ltd. 100-300 Hagey Boulevard, Waterloo ON N2L 0A4 November 14, 2017 File: 161413228/10 Attention: Mr. Michael Witmer, BES, MPA, MCIP, RPP City of Guelph 1 Carden Street Guelph ON N1H
More information3301 East 120 th Avenue Assited Living & Memory Care
UTILITY REPORT FOR 3301 East 120 th Avenue Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 Prepared for: 3301 E. 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite
More informationUTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO
UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215
More informationB805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805
B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff
More informationEROSION CONTROL NARRATIVE
EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment
More informationSTORMWATER DESIGN CALCULATIONS
STORMWATER DESIGN CALCULATIONS REF : C7011-2390 AT 19a-23 MEMORIAL AVENUE BLACKWALL FOR MR KERR Contents 1.0 Detention System Requirements 1.1 Storage-Area calcs. 1.2 Data Files for Pre & Post Developed
More informationCity of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229
Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229
More informationFUNCTIONAL SERVICING REPORT AND SWM REPORT
FUNCTIONAL SERVICING REPORT AND SWM REPORT 104 WHITE CRESCENT CITY OF BARRIE, COUNTY OF SIMCOE December 2018 18058 TABLE OF CONTENTS 1. INTRODUCTION... 4 2. SUPPORTING DOCUMENTS... 4 3. DESIGN POPULATION...
More informationEastlake Assited Living & Memory Care
UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.
More informationStormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)
Stormwater Guidelines and Case Studies CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Goals and Challenges for Manual State Stormwater Policy More Widespread
More informationWoodford County Erosion Prevention Plan and Permit. Application #
Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance
More information1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,
Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER
More informationMaterials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationOrica Australia Pty Ltd Ammonium Nitrate Facility Upgrade
Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies
More informationFOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP
AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment
More informationRock & Aggregate Drop Inlet Protection
Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils
More informationSection 4: Model Development and Application
Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within
More informationStormwater Capacity Analysis for Westover Branch Watershed
Stormwater Capacity Analysis for Westover Branch Watershed Pimmit Run Little Pimmit Run, Mainstem Stohman's Run Gulf Branch Pimmit Run Tributary Little Pimmit Run, W. Branch Little Pimmit Run, E. Branch
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationWELCOME Lake Wabukayne OPEN HOUSE
WELCOME Lake Wabukayne Sediment Removal Project OPEN HOUSE We are here to: Update you, the community, on recent developments and activities at Lake Wabukayne Present the preferred alternative and receive
More informationSite Servicing and Stormwater Management Brief Hampton Inn and Suites, 4401 Fallowfield Road, Ottawa, ON
Site Servicing and Stormwater Management Brief Hampton Inn and Suites, 4401 Fallowfield Road, Ottawa, ON File: 160401378/83 Prepared for: 2441736 Ontario Inc. Prepared by: Stantec Consulting Ltd. October
More informationGuide to the use of the Erosion and Sediment Control Evaluation Tool
Guide to the use of the Erosion and Sediment Control Evaluation Tool December 2017 If you require content in an alternate format please contact us at 905-895-1281 or by email at Accessibility@LSRCA.on.ca
More informationSpecifications Whitcomb Elementary School Demolition January 15, 2016
SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,
More informationSTORMWATER REPORT FRITO LAY SUBDIVISION NO. 3
STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses
More informationSeptember 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report
September 6, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report
More informationARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS
ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example
More informationLOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY
FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED
More informationFINAL UTILITY REPORT Creekside Thornton, CO
FINAL UTILITY REPORT Creekside Thornton, CO March 4, 216 Revised: June 27, 216 JN: 1539 Prepared for: HW Sodbusters, LLC 2733 E. Parleys Way, Suite 3 Salt Lake City, UT 8419 P: 81.485.777 Prepared by:
More informationHydrology Study Report
Hafeez Consulting www.hafeezconsulting.com Civil/ Structural Engineering, Design & Construction 1451 S. Hacienda St. Anaheim CA 92804 (714) 225-4565 Fax (714)917-2977 engineer@hafeezconsulting.com Hydrology
More informationProject Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details
Project Description File Name... 323 - Att Pond 3 East PIPES ONLY.SPF Project Options Flow Units... Elevation Type... Hydrology Method... EPA SWMM Infiltration Method... Link Routing Method... Enable Overflow
More informationSuitable Applications Sediment traps should be considered for use:
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More informationConstruction Exits Rock pads
Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor
More informationCaledon Villas Corporation
Caledon Villas Corporation Functional Servicing Report Caledon Villas Residential Subdivision Town of Caledon Project No. L11-557 April 2014 Caledon Villas Corporation Town of Caledon Caledon Villas Residential
More informationSediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources
Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable
More informationEtobicoke Exfiltration System: Monitoring and Evaluation. Tim Van Seters Ryerson University July 24, 2015
Etobicoke Exfiltration System: Monitoring and Evaluation Tim Van Seters Ryerson University July 24, 2015 Presentation Outline Summary of 1994 1995 Candaras Associates study Summary of 1996-1998 SWAMP Study
More informationCoarse Sediment Traps
Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily
More informationContinuing Education Associated with Maintaining CPESC and CESSWI Certification
Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program
More informationSediment Trap. At multiple locations within the project site where sediment control is needed.
Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control
More informationMIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:
MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA 23149 Phone: 804-758-3382 Fax: 804-758-0061 LAND DISTURBANCE PERMIT SUBMISSION REQUIREMENTS In order to expedite
More informationAPPENDIX A: EROSION & SEDIMENT CONTROL FORMS
APPENDIX A: EROSION & SEDIMENT CONTROL FORMS Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL FORMS Appendix-1 This page intentionally left blank. Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL
More informationBRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT
BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital
More informationD.M. Wills Associates Limited PARTNERS IN ENGINEERING. Stormwater Management Report. City of Peterborough
Stormwater Management Report City of Peterborough P-20-12 Parkway Corridor Class Environmental Assessment Jackson Park Parkhill Road West to Chemong Road D.M. Wills Project No. 12-5061 D.M. Wills Associates
More informationIndependent Environmental Audit Erosion and Sediment Control
Independent Environmental Audit Erosion and Sediment Control Commencement of YOUNG TO BETHUNGRA LOOPING PIPELINE JUNE 2016 suite 1, 39 fitzmaurice st (po box 5464) wagga wagga nsw 2650 australia t (02)
More informationAPPENDIX B DRAINAGE REPORT
APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,
More informationCITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY
CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works
More informationSTORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect
STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)
More informationStage Discharge Tabulation for Only Orifice Flow
Stage Discharge Tabulation for Only Orifice Flow DEPTH STAGE DISCHARGE (meters) (feet) (meters) (feet) (m 3 /s) (ft 3 /s) 0 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.7 1.3 2.0 2.6 3.3 3.9 4.6
More informationContinuing Education Course #101 Drainage Design with WinTR-55
1 of 5 Continuing Education Course #101 Drainage Design with WinTR-55 1. WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the
More informationU-Shaped Sediment Traps
U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally
More informationNORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES
Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management
More informationPressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.
Design Manual Chapter - Stormwater D - Storm Sewer Design D- Storm Sewer Sizing A. Introduction The purpose of this section is to outline the basic hydraulic principles in order to determine the storm
More information[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.
Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of
More informationSTORMWATER MANAGEMENT REPORT
STORMWATER MANAGEMENT REPORT THE FAIRWAYS AT EDGEWOOD LOTS 5 & 6, BLOCK 1201 TOWNSHIP OF RIVER VALE BERGEN COUNTY, NEW JERSEY PREPARED BY: DAPHNE A. GALVIN PROFESSIONAL ENGINEER LICENSE NO. 24GE03434900
More informationFHWA - HIGHWAY HYDROLOGY
The unit peak discharge is computed with Equation 5.6 by interpolating c 0, c, and c Table 5.5 using a type II distribution. The peak discharge is also calculated as follows. from Variable SI Unit U Unit.5444
More informationStatus Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California
Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California Introduction Beginning in 1999, the University of California,
More informationRoadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario
Conservancy Subdivision Ottawa, Ontario REPORT: GWE17 151 Traffic Noise Prepared For: Andrew Finnson Barrhaven Conservancy East Inc. Ottawa, Ontario Prepared By: Joshua Foster, P.Eng., Principal Omar Daher,
More informationSediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.
Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff
More informationChapter 7 Mudflow Analysis
Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain
More informationWATER MANAGEMENT REPORT FOR PAGE ESTATES
WATER MANAGEMENT REPORT FOR PAGE ESTATES SLB Consulting of SW Florida, LLC PO Box 2826 Bonita Springs, FL. 34133 Phone: 239-948-9566 sandra@slbconsult.com C.O.A. # 25395 September 1, 2014 Sandra L. Bottcher
More informationStone Outlet Sediment Trap
3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose
More informationAPPENDIX G APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE
APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE March 18, 2003 This page left blank intentionally. March 18, 2003 G-2 FIGURES Page # Figure G.1 Estimated Runoff from Precipitation Over Different
More informationInstream Sediment Control Systems
Instream Sediment Control Systems INSTREAM PRACTICES Photo 1 Photo 2 Modular sediment The information contained within this series of fact sheets deals only with the design of temporary instream sediment
More informationSPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM DRAFT. MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS. February 11, 2014.
SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS February 11, 2014 Prepared by: J-U-B ENGINEERS, INC. 240 West Center Street, Suite 200 Orem,
More informationCity of Camrose Winter Road Maintenance Policy
City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.
More informationSPRINGVILLE CITY, UTAH
SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS February 11, 2014 Adopted May 20, 2014 Prepared by: J-U-B ENGINEERS, INC. 240 West Center Street,
More informationHISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)
HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:
More informationNOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO
Smart Property Advisors Ltd. 802-500 Laurier Avenue West Ottawa, ON NOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO Prepared by: SMART PROPERTY ADVISORS LTD. 802 500
More informationStormwater Inlet Sediment Traps
Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable
More informationTHE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:
THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL
More informationpatersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive
patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse
More informationDRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design
DRAINAGE REPORT Ministry of Transportation and Infrastructure Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design December 14, 2017 Reviewed by: Amanda Rust, P. Eng. Senior Drainage
More informationROCK EXCAVATION (GRADING) OPSS 206 INDEX
206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6
More informationPRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017
PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 I hereby certify that this
More informationCHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.
CHAPTER 19.07 GEOLOGICALLY HAZARDOUS AREAS 19.07.010 Applicability. Geologically hazardous areas may pose a threat to the health and safety of citizens when incompatible development is sited in areas of
More informationStormwater Outlet Sediment Traps
Stormwater Outlet Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Excavated sediment trap just prior to scheduled clean-out (note energy dissipater at end of pipe) Photo 2 A supplementary straw bale barrier
More informationDrainage Master Plan Update
Water Resources City of White Rock Drainage Master Plan Update Final Report Prepared by: AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax www.aecom.com Project
More informationPreliminary Hydraulic Report
Tarrant County, Texas Preliminary Hydraulic Report Prepared for: Texas Department of Transportation Fort Worth District Prepared by: AECOM Corporation Scott C. Williams, P.E. No. 101334, Date 2009 This
More informationCITY OF PUYALLUP TOSCANOS SINKHOLE EVALUATION
CITY OF PUYALLUP PIERCE COUNTY WASHINGTON TOSCANOS SINKHOLE EVALUATION G&O #15470 OCTOBER 2015 TABLE OF CONTENTS BACKGROUND...1 EXISTING SYSTEM...1 Stormwater Conveyance System...1 Video Inspection...2
More informationSediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological Performance and Suspended Solids
Concrete Sustainability Conference April 14 th 2010, Tempe, AZ Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological l Performance and Suspended Solids Discharge Luis A. Mata,
More informationChapter 10 - Sacramento Method Examples
Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer
More informationSubmitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226
RUN-ON/RUN-OFF CONTROL SYSTEM PLAN RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN St. Johns River Power Park Byproduct Storage Area B Phase I Development Submitted to: St. Johns River Power Park 11201 New Berlin
More informationGully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion
Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES Gully erosion A complex of processes whereby the removal of soil is characterised by incised channels in the landscape. NSW Soil Conservation Service,
More informationRoadway Traffic Noise Feasibility Assessment. 315 Chapel Street. Ottawa, Ontario
Roadway Traffic Noise Feasibility Assessment 315 Chapel Street Ottawa, Ontario REPORT: GWE17-002 - Traffic Noise Prepared For: Leanne Moussa Allsaints 10 Blackburn Avenue K1N 6P8 Ottawa, Ontario Prepared
More informationHABITAT FOR HUMANITY 2129 Nantes Street Detailed Noise Study
HABITAT FOR HUMANITY 2129 Nantes Street Detailed Noise Study HABITAT FOR HUMANITY 2129 Nantes Street DETAILED NOISE STUDY Prepared by: NOVATECH ENGINEERING CONSULTANTS LTD. 240 Michael Cowpland Drive,
More informationChapter 7 Mudflow Analysis
Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain
More informationDrainage Analysis. Appendix F
Drainage Analysis Appendix F Golden View Drive Elizabeth Street LMORE CREEK Ricky Road Rabbit Creek Road LITTLE RABBIT CREEK East 156th Avenue MOA Project #10-026 Golden View Drive Intersection
More informationSevere Storm Response Version # 1-0-1
Severe Storm Response Version # 1-0-1 Weather Warnings Environment Canada issues severe weather warnings, watches and advisories Weather Watch Severe weather may develop. Weather Warning Severe weather
More informationTPDES: Soil, Erosion and Sedimentation Methods
SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common
More informationSewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling.
Using Dynamic Hydraulic Modeling to Understand Sewer Headspace Dynamics A Case Study of Metro Vancouver s Highbury Interceptor Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd. 200-4185A Still Creek Drive
More informationNoise Feasibility Study Proposed Residential Development (Infill) 747 Liverpool Road Pickering, Ontario
Noise Feasibility Study Proposed Residential Development (Infill) 747 Liverpool Road Pickering, Ontario Prepared for: Madison Liverpool Limited 369 Rimrock Road Toronto, Ontario, M3J 3G2 Prepared by Victor
More informationBUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)
BUILDING AND SAFETY DIVISION TELEPHONE (949) 724-6300 BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) Payment: When a plan is required by the Administrative Authority to be submitted, a plan check
More informationENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )
PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS
More informationCASE STUDIES. Introduction
Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts
More information