1 Border Crossing Freight Delay Data Collection and Analysis World Trade Bridge Laredo International Bridge 4 Laredo, Texas The border crossing freight delay data collection and analysis project was conducted to determine the feasibility of establishing a performance measure that can be used to evaluate truck freight movement at international border crossings. The Laredo, Texas, U.S.A. and Nuevo Laredo, Tamaulipas, Mexico, international crossing, and more specifically, the World Trade Bridge (i.e. International Bridge IV) was chosen for this purpose. This performance measure can be used to quantify the existing economic loss incurred at the crossings due to federal inspections, facility operations, and facility congestion. On April 15, 2000, Laredo s fourth international bridge the World Trade Bridge was opened for service. The new bridge offers eight lanes exclusively for commercial traffic (as mandated by the World Trade Bridge Presidential Permit issued to the City of Laredo) and contains queue space for 300 trucks, which helps offset long queue lengths along the freeway system. Further, the World Trade Bridge is equipped with state-of-the-art scanning equipment to facilitate toll collection, x-ray provisions to assist U.S. Customs operations, and necessary amenities to improve the efficiency of truck and cargo movement. Figure 1 illustrates the general location of the international border crossings in Laredo, Texas. Figure 1. International Bridges I, II, and IV in Laredo, Texas 1

2 Data Collection Process The Texas Transportation Institute conducted the border crossing freight delay data collection at the World Trade Bridge on August 15-16, The objective of the data collection process was to obtain enough observations from each segment (sections between toll, inspection, and freeway points) of the border crossing facility to identify the average travel time and to identify and note lessons learned for the applied methodology. Data collection for outbound traffic (i.e. export commercial vehicles exiting the United States) was conducted on Tuesday, August 15 while data collection for inbound traffic (i.e. import commercial vehicles entering the United States) was conducted on Wednesday, August 16. Figure 2 illustrates a simplified diagram of the data collection sites at the World Trade Bridge, which were relatively similar in layout and operation for both directions of traffic flow (i.e. inbound and outbound). The Sites noted in Figure 2 correspond to the locations at which data were collected (explained in more detail subsequently). Figure 2. Simplified Diagram of a Typical Border Crossing System with Data Collection Sites Data Collection Work Authorization Conducting a survey on public facilities requires authorization and cooperation from several agencies, depending on the location of each site in the study area. The degree-of-difficulty, as expected, varies directly proportional with the level of the respective government agency (e.g. federal, state, or local). Surprisingly, dealing with Mexican officials at the border crossing was an easier task than dealing with the United States Customs Service (Department of Justice) in the case of this particular effort. The survey conducted in the southbound direction (i.e. export commercial vehicles exiting the United States) required authorization from the Texas Department of Transportation (TxDOT) at Site 1, City of Laredo Bridge Systems at Site 2, City of Nuevo Laredo Toll Systems at Site 3, and Bridge Facility Administration at Site 4. The survey conducted in the northbound direction (i.e. commercial vehicles entering into the United States) required authorization from the Bridge Facility Administration at Sites 1 and 2, the United States Customs Service at Site 3, and the Texas Department of Transportation at Site 4. The table in Appendix A includes the list of personnel from all of the agencies contacted during this data collection effort. 2

3 In addition to authorization from the various agencies, permission to work at the World Trade Bridge facility needs to be approved by the United States General Services Administration (GSA). The GSA Public Building Service leases, constructs, renovates, and manages office space for Federal agencies, including federal agencies at the World Trade Bridge. No special privileges are obtained through the GSA other than permission to be within the federal facility. Finally, authorization to conduct business in a foreign country, such as Mexico, requires a work permit (Form FM3) available for 30 days through the Mexican Consulate General. This 30-Day visitor form can be secured upon presentation of: A valid passport or a certified copy of the birth certificate, and Letter from the company represented by the interested individual (if traveling alone), stating the specific purpose and length of the trip and guaranteeing that the salaries and all expenses will be paid by the company of the individual and not by anyone in Mexico. Data Collection Details Border crossing statistical data was provided by the City of Laredo/Bridge System and evaluated for an assessment of the variability in travel conditions at the World Trade Bridge. The goal of this analysis process is to obtain statistically useful data with as few data collection days as possible. In order to customize the data collection activities to the World Trade Bridge, the following steps were conducted: Define significant seasonal variations, Define significantly different days of the week, Identify traffic streams that experience significantly different conditions, and Estimate the number of days needed for the data collection survey. As shown in Table 1, no significant seasonal variations occur at the border of Laredo, Texas and Nuevo Laredo, Tamaulipas. However, January and June do indicate some monthly moderation in commercial activity. Table 1. Monthly Traffic Distribution of Commercial for Calendar Year 1999 Month Bridge I Bridge II Columbia Total January 14,445 31,711 15,883 62,039 February 13,014 65,618 20,398 99,030 March 23,158 63,569 23, ,885 April 14,078 62,519 23, ,224 May 13,877 67,635 28, ,843 June 15,191 87,355 25, ,491 July 15,471 71,290 24, ,305 August 15,021 71,055 25, ,816 September 15,150 72,416 26, ,285 October 15,381 73,983 26, ,954 November 15,200 73,222 26, ,166 December 16,415 72,301 28, ,380 Total 186, , ,343 1,295,418 3

4 Source: City of Laredo, Bridge System Because of the weekend reduced hours of operation at the World Trade Bridge, a significant difference in traffic for those days occurs and can be noted in Tables 2 and 3. Border crossings for Saturday average approximately 35 percent that of a regular weekday, while Sunday averages approximately 10 percent. Given the typical average daily traffic for the World Trade Bridge and the high percentage of commercial vehicles, it was anticipated that two days of data collection on a Tuesday and Wednesday would be sufficient for obtaining an adequate number of data samples to represent typical conditions. Table 2. Daily Traffic Distribution of Export Commercial for August 2000 Day Day of Week Bridge I Bridge II Columbia Bridge 4 Total 1 Tuesday ,354 5,345 2 Wednesday ,300 5,329 3 Thursday ,285 5,237 4 Friday ,300 5,387 5 Saturday ,232 1,562 6 Sunday Monday ,850 4,810 8 Tuesday ,199 5,108 9 Wednesday ,023 4,360 5, Thursday ,008 4,283 5, Friday ,057 4,296 5, Saturday ,384 1, Sunday Monday ,798 4, Tuesday ,155 5, Wednesday ,316 5, Thursday ,250 5, Friday ,417 5, Saturday ,371 1, Sunday Monday ,760 4, Tuesday ,010 4,320 5, Wednesday ,029 4,409 5, Thursday ,026 4,341 5, Friday ,109 4,350 5, Saturday ,501 1, Sunday Monday ,024 3,773 4, Tuesday ,022 4,497 5, Wednesday ,045 4,469 5, Thursday ,011 4,292 5,392 Total 2, , , ,158 Source: City of Laredo, Bridge System Table 3. Average Daily Traffic Distribution of Export Commercial for August 2000 Day of Week Week 1 Week 2 Week 3 Week 4 Week 5 Average Sunday Monday - 4,810 4,766 4,760 4,874 4,803 Tuesday 5,345 5,108 5,236 5,415 5,602 5,341 Wednesday 5,329 5,425 5,389 5,519 5,579 5,448 Thursday 5,237 5,418 5,297 5,448 5,392 5,358 Friday 5,387 5,477 5,537 5,573-5,494 Saturday 1,562 1,861 1,819 1,937-1,795 Source: City of Laredo, Bridge System 4

5 Data Collection Procedures The data collection sites selected for the World Trade Bridge were chosen because of the particular actions that occur at each site. Segments defined by these data collection stations were used to determine the commercial vehicle travel times and specific location of freight delay. As illustrated in Figure 2, the four data collection sites were located at: An advance station located upstream of the commercial vehicle queue, The export station (booth before the international crossing), The import station (booth before detailed inspection), and An exit station to the roadway system. Data collection was conducted by recording commercial vehicle license plate figures as vehicles crossed a fixed point within the data collection sites. Four survey teams, each consisting of two surveyors, were placed at one of the four data collection sites to record commercial vehicle license plate data. Data collection for the two directions of travel was conducted on separate days to maximize the number of stations (i.e. four stations for outbound traffic and four stations for inbound traffic) at the World Trade Bridge. Appendix B contains diagrams of the World Trade Bridge facilities on both sides of the border, including station locations and major points of inspection (1,2). The assignment of two-member survey teams to each station allowed for an efficient and accurate data collection survey. With one member continuously reading out commercial vehicle license plates using a pair of binoculars, the other member would enter the data into the data collection device (described in the following section). The collection of four characters when reading the license plates has been used by most agencies, and experience has indicated that the first four are easier to read than the last four (3). However, it was discovered during the initial hours of the data collection effort that many commercial transportation carriers were assigned license plates for an entire fleet, thus having similar numbers and requiring that the survey team record the entire license plate number. After completion of day one data collection activities, the license plate data stored in the data collection devices were downloaded onto the field laptop computer and saved on the hard disk. Once all data collection devices were successfully downloaded, they were set to recharge and prepared for day two of the data collection study. Upon completion of day two data collection activities, the data collection devices were once again downloaded to the field laptop computer and saved on the hard disk. Data collection for both study days was scheduled between the hours of 8:00 AM and 5:00 PM. Hours of operation for the World Trade Bridge are 8:00 AM to 12:00 AM during weekdays and 8:00 AM to 4:00 PM during the weekend. After review of the hourly traffic volume and delay data collected during the license plate survey, vehicle volumes exceed 300 vehicles per hour (vph) between the hours of 12:00 PM and 8:00 PM. Future surveys at this location should consider this time period as the optimal range for license plate data collection. Data Collection Sample Size Sample sizes are typically not a large concern with the video or portable data collection device license plate matching techniques, because data collection includes a large number of vehicles. However, minimum sample sizes should be verified with variability values from field data. Early research found that sample sizes from 25 to 100 license matches were necessary for a given roadway segment and time period (3). 5

6 Data Collection Equipment The Philips Nino 300 Personal Companion (shown in Figures 3 & 4) was chosen as the data collection tool for this project because of its simplistic ability to be programmed using the Microsoft Windows Visual CE software (e.g. questionnaires, surveys, etc), its ability to record and store data, and its physical attributes. The survey data is stored in the Nino 300 and can be downloaded in the field on a daily basis using a portable laptop computer. Once the data that is stored in the Nino 300 is downloaded and saved to the hard disk, the Nino 300 is set to recharge and made available for data collection the following day. Visual CE is the fastest and easiest way to create forms-based applications for Windows CE devices. Using Visual CE, users may design survey forms on a desktop Personal Computer, then download these survey forms onto multiple CE devices, such as the Nino 300. Visual CE forms applications allow the user to utilize the CE device to collect, display, and modify data. The data can be transferred between Visual CE applications and ODBC-enabled applications (e.g. Microsoft Access) on the desktop Personal Computer. Figure 3. Philips Nino 300 Personal Companion used for Collecting License Plate Data 6

7 Figure 4. Data Collection Equipment used for Border Crossing Freight Delay Study Automatic-Traffic-Recorders (ATR) were also used to record the 24-hour traffic volumes entering and exiting the World Trade Bridge. The traffic recorders selected for this project were the ITC A.C.E. (Automatic Counting Equipment) pneumatic tube counters. The traffic recorders were set along Loop 20, approximately 500 feet from the entrance/exit to the World Trade Bridge. Commercial vehicle traffic within the World Trade Bridge, however, provides for a challenging task when recording traffic volume data because of the variation in multiple-axle vehicles. Commercial vehicles entering and exiting this facility consist of a variation of 2-axle vehicles to 6-axle vehicles. After review of the traffic statistics provided by the City of Laredo Bridge System and traffic data recorded at the World Trade Bridge, a vehicle axle factor of four was used to correct the traffic data. The Average Daily Traffic data recorded during the data collection period is shown in Appendix C. 7

8 Data Collection Summary Table 4 shows the number of commercial vehicle license plates recorded for each of the four stations in each of the two days. Table 5 shows the average daily traffic volume as recorded by the City of Laredo Bridge System (southbound direction) and the United States Customs Service (northbound direction). The average daily traffic volumes shown in Appendix C (collected via ATR equipment) are slightly higher than the actual traffic volumes recorded by the City of Laredo/Bridge System and the U.S. Customs Service, but they are a good indicator of the frequency and peak periods as they occur at the World Trade Bridge. Total traffic volumes and peak periods were verified in the FHWA research project , NAFTA Impacts on Operation (1). Table 4. Data Collection Summary for Commercial Vehicle License Plate Survey Station August 15, 2000 (Southbound) August 16, 2000 (Northbound) Total Table 5. Average Daily Traffic at the World Trade Bridge Direction August 15, 2000 August 16, 2000 Southbound 4,155 4,316 Northbound 3,965 3,874 Total 8,120 8,190 Although a large number of commercial vehicles were recorded at all four stations along the study site (between 16% and 20% of the total average daily commercial traffic), only a small percentage of these vehicles were actually recorded by the survey team at all four stations. These issues are discussed in a later section of the report. 8

9 Freight Delay Analysis It has been determined in previous studies that the best measure for the freight transportation system at international roadway border crossings is travel delay per truck trip through the first inspection point in the import country. Delay is measured relative to the travel time at low volume conditions, which will allow the processing time of the inspection to be accommodated outside of the measure. To determine this measure, average freight delay can be calculated in two ways: Taking the total daily freight delay and dividing it by the 24-hour truck volume using the crossing will calculate the average daily freight delay. Taking the total freight delay during the peak period and dividing it by the peak period truck volume will calculate the average peak period freight delay. Data Preparation License plate data collected at the World Trade Bridge was downloaded from the field laptop computer and stored on a PC computer for processing. The license plate data was saved on a Microsoft Excel spreadsheet for filtering (cleanup) and then placed in a Microsoft Access database for analysis. Several tasks were performed during verification of the license plate data in a Microsoft Excel spreadsheet. The first task performed was to verify the proper placement of data in the appropriate fields (columns) to be used in the database. It is possible that the linking process within the data collection device may become altered should the data collection program need modifying, as it occurred during this data collection study. The second task performed was to verify that all entries in the data spreadsheet were completely filled and contained the correct data format. This was a critical step in assuring the accuracy of the database queries. Database Queries To determine the average travel times through all segments along the World Trade Bridge facility, several queries were executed on the license plate data once it was placed in a Microsoft Access database. As indicated earlier, the recommended performance measure is delay per truck trip through the initial point of inspection in the import country (station 3) and the delay is to be measured relative to the travel time at low-volume conditions. With these conditions, the following queries were executed: The total number of vehicles successfully recorded at all data collection stations, Segment Average Travel Times at Low-Volume Conditions (see Table 5), Segment Average Travel Times at Normal Conditions (see Table 6), and Average Travel Times between Data Collection Stations 1 and 3 (see Table 7). Hourly Average Travel Times between Data Collection Stations (see Tables 8 through 13) The number of commercial vehicles recorded at all four stations throughout the data collection period in the southbound direction was 175 while the number of commercial vehicles in the northbound direction was 138. However, due to the large number of samples obtained from the data collection survey, all available segment travel times obtained from the data were used to calculate the average segment travel times, not to be calculated exclusively from vehicles recorded at all four stations. 9

10 Average Daily Traffic counts at the World Trade Bridge indicate low-volume conditions to occur in the early hours of the facility s hours of operation. Table 6 shows the segment average travel times at lowvolume conditions in both directions of travel, specifically between the hours of 8:00 AM and 10:00 AM. Commercial vehicles using the World Trade Bridge at this low-volume period will not likely experience excessive delay and should be an indicator of the normal processing and inspection times expected at the World Trade Bridge. Segment travel times for normal operating conditions are shown in Table 7 including both directions of travel and the number of commercial vehicles surveyed along that segment of the study area. With station 3 being the initial inspection point in the import country, the average travel times for segments 1 and 2 will be used in calculating the delay per truck trip performance measure. Tables 14 and 15 show the average travel times for the section composed of segments 1 and 2 during low-volume and daily traffic conditions, which will be used as additional information to verify the conclusions obtained from using the information shown in Tables 6 and 7. Table 6. Segment Average Travel Times at Low-Volume Conditions (8:00 10:00 AM) Segment Average Travel Time (Minutes) Southbound Northbound Table 7. Segment Average Travel Times at Daily Traffic Conditions Segment Average Travel Time (Minutes) Southbound Northbound Average travel time for northbound segment 3 is below the low-volume average travel time 10

11 Table 8. Average Hourly Delay for Segment 1 in the Southbound Direction Time Average Travel Time (Minutes / Vehicle) 8:00 9:00 AM :00 10:00 AM :00 11:00 AM :00 12:00 PM :00 1:00 PM ND ND 1:00 2:00 PM ND ND 2:00 3:00 PM :00 4:00 PM :00 5:00 PM :00 6:00 PM ND ND 6:00 7:00 PM ND ND 7:00 8:00 PM ND ND 8:00 9:00 PM ND ND ND indicates No Data available for the specific hourly time period Table 9. Average Hourly Delay for Segment 2 in the Southbound Direction Time Average Travel Time (Minutes / Vehicle) 8:00 9:00 AM :00 10:00 AM :00 11:00 AM :00 12:00 PM :00 1:00 PM ND ND 1:00 2:00 PM ND ND 2:00 3:00 PM :00 4:00 PM :00 5:00 PM :00 6:00 PM ND ND 6:00 7:00 PM ND ND 7:00 8:00 PM ND ND 8:00 9:00 PM ND ND ND indicates No Data available for the specific hourly time period 11

12 Table 10. Average Hourly Delay for Segment 1 in the Northbound Direction Time Average Travel Time (Minutes / Vehicle) 8:00 9:00 AM ND ND 9:00 10:00 AM :00 11:00 AM :00 12:00 PM :00 1:00 PM :00 2:00 PM ND ND 2:00 3:00 PM ND ND 3:00 4:00 PM ND ND 4:00 5:00 PM ND ND 5:00 6:00 PM ND ND 6:00 7:00 PM ND ND 7:00 8:00 PM ND ND 8:00 9:00 PM ND ND ND indicates No Data available for the specific hourly time period Table 11. Average Hourly Delay for Segment 2 in the Northbound Direction Time Average Travel Time (Minutes / Vehicle) 8:00 9:00 AM ND ND 9:00 10:00 AM :00 11:00 AM :00 12:00 PM :00 1:00 PM :00 2:00 PM ND ND 2:00 3:00 PM ND ND 3:00 4:00 PM ND ND 4:00 5:00 PM ND ND 5:00 6:00 PM ND ND 6:00 7:00 PM ND ND 7:00 8:00 PM ND ND 8:00 9:00 PM ND ND ND indicates No Data available for the specific hourly time period 12

13 Table 12. Average Hourly Delay for Segment 3 in the Southbound Direction Time Average Travel Time (Minutes / Vehicle) 8:00 9:00 AM :00 10:00 AM :00 11:00 AM :00 12:00 PM :00 1:00 PM ND ND 1:00 2:00 PM ND ND 2:00 3:00 PM :00 4:00 PM :00 5:00 PM ND ND 5:00 6:00 PM ND ND 6:00 7:00 PM ND ND 7:00 8:00 PM ND ND 8:00 9:00 PM ND ND ND indicates No Data available for the specific hourly time period Table 13. Average Hourly Delay for Segment 3 in the Northbound Direction Time Average Travel Time (Minutes / Vehicle) 8:00 9:00 AM ND ND 9:00 10:00 AM :00 11:00 AM :00 12:00 PM :00 1:00 PM :00 2:00 PM :00 3:00 PM ND ND 3:00 4:00 PM ND ND 4:00 5:00 PM ND ND 5:00 6:00 PM ND ND 6:00 7:00 PM ND ND 7:00 8:00 PM ND ND 8:00 9:00 PM ND ND ND indicates No Data available for the specific hourly time period 13

14 Table 14. Average Travel Time between Data Collection Stations 1 and 3 (Low-Volume) Segment 1-2 Average Travel Time (Minutes) Southbound Northbound Table 15. Average Travel Time between Data Collection Stations 1 and 3 (8A to 5P Conditions) Segment 1-2 Average Travel Time (Minutes) Southbound Northbound As shown in Table 14, the average processing and travel time for vehicles utilizing the World Trade Bridge was approximately 5 minutes in the southbound direction and approximately 36 minutes in the northbound direction. Observation of U.S. Customs operations at the World Trade Bridge indicate that not all primary inspection booths are being utilized, thus creating greater processing time and delay in the northbound direction. Tables 14 and 15 illustrate that the average travel time for southbound vehicles operating during all traffic conditions is not considerably larger than for vehicles operating during low-volume conditions. The northbound travel time was one-third higher, but this is much less than the several hours of travel time previously reported for Laredo. This may be expected because of the additional capacity and newer inspection technologies utilized at this state-of-the-art international border crossing. Table 16. Average Travel Time between Data Collection Stations 1 and 4 (8A to 5P Conditions) Segment 1-4 Average Travel Time (Minutes) Southbound Northbound Table 17. Average Travel Time between Data Collection Stations 2 and 4 (8A to 5P Conditions) Segment 2-4 Average Travel Time (Minutes) Southbound Northbound The average travel time and number of data samples collected between other data collection stations are shown in Tables 16 and 17, such as between stations 1 and 4 (see Table 16) and between stations 2 and 4 (see Table 17). 14

15 Determining the Delay per Truck Trip As described earlier in the report, the average freight delay can be presented in two ways: Taking the total daily freight delay and dividing it by the 24-hour truck volume using the crossing will calculate the average daily freight delay. Taking the total freight delay during the peak period and dividing it by the peak period truck volume will calculate the average peak period freight delay. The traffic volume data required for determining the daily peak period was not available prior to the start of this study, so the analysis only includes calculation of the total daily freight delay in both directions of travel. The average daily delay for all vehicles using the World Trade Bridge in a 24-Hour period is 0.9 minutes in the southbound direction and 11.4 minutes in the northbound direction. The total daily delay for the southbound direction is 60 vehicle-hours and 738 vehicle-hours for the northbound direction. Table 18 is a summary of the delay values for the World Trade Bridge in Laredo, Texas. Table 18. Total Daily Freight Delay for the World Trade Bridge in Laredo, Texas Segment 1-2 Average Daily Delay (Minutes) Total Daily Delay (Vehicle-Hours) Southbound 4, Northbound 3, Conclusions The license plate data collection method used in this study to obtain the travel time data required for establishing a performance measure at international border crossing was proven successful. This method has previously been used in obtaining other similar travel time data for various other projects. Simple modification to the data collection device surveys and database queries simplified the procedure. As experienced through this data collection project, several issues should be taken into consideration when pursuing this type of a data collection study. Explained below are a few of these issues: Prior to conducting any data collection project, all jurisdictional and cooperating agencies should be made explicitly aware of all the details associated with the data collection project (e.g. dates, times, procedures to be followed during the data collection period, etc.). Failure to do so may result in confusion and possible delay of the study. Prior to data collection activities, an explanation and understanding of the procedures to be followed and logistics should be made clear to all members of the study team (i.e. number of license plate characters to be recorded, commercial vehicles with trailers only to be recorded, etc.). Prior to data collection activities, a general idea of traffic peak periods and conditions should be understood to optimize collection of appropriate traffic data. Reduction, filtration, and analysis of all traffic data require the largest portion of the budgeted time frame for accomplishing an accepted accuracy level. 15

16 Providing appropriate information to all jurisdictional agencies and obtaining proper authorization for conducting the data collection study is time consuming and should be adequately accounted. Proper identification for all survey members and written documentation of authorization from all jurisdictional agencies should be carried at all times by all members of the study team, especially when conducting business in a foreign country. The procedures developed to conduct this type of a data collection study are highly recommended because of the simplistic level of accomplishing the goals set for this project. 16

17 REFERENCES 1. Conversation with Jose Weissmann, University of Texas at San Antonio. Products from Research Project , NAFTA Impacts on Operations. May Design Plans of Bridge IV in Laredo, Texas. From Texas Department of Transportation, Laredo District Transportation Planning and Design, JoAnn Garcia, August Turner, S.M., W.L. Eisele, R.J. Benz, and D.J. Holdener. Travel Time Data Collection Handbook.Report. No. FHWA-PL Federal Highway Administration, Texas Transportation Institute, March

18 Agency Contacts APPENDIX A

19 Contact Title Agency Phone No. Fax No. Garcia, Rafael Bridge Director Laredo Bridge System (956) (956) Rivera, Berta L. Superintendent of Operations Laredo Bridge System (956) (956) Garza, Eugenio Port Director U.S. Customs (956) (956) Sanchez, Noel Acting Port Director to Passenger Process U.S. Customs (956) (956) Gonzalez, J.L. Chief Inspector U.S. Customs (956) (956) Cabrera, Joe Inspector U.S. Customs (956) (956) Vargas, Gabriel Assistant Property Manager General Services Administration (956) (956) Rodriguez, Carlos Area Engineer Texas Department of Transportation (956) (956) Sandoval Zepeda, Arturo Administrator CABIN (87) (87) Reyes Briseno, Raul Administrator - Nuevo Laredo Bridge 3 City of Nuevo Laredo - Toll Systems (87) (87) Mexican Consulate (Laredo, TX) (956) Mexican Consulate (San Antonio, TX) (210)

20 Data Collection Survey Stations APPENDIX B

21

22

23 Average Daily Traffic Counts for the World Trade Bridge APPENDIX C

24 Texas Transportation Institute Average Daily Traffic Automatic Traffic Recorder Counts Project No. : Station No. : 100 Counter No. : ITC 2845 Location: Bridge 4 Entrance City/State: Laredo, TX Date: August 2000 Day of Week: Tuesday - Wednesday per Hour Time of Day Site: Entrance to the World Trade Bridge in Laredo, Texas (Southbound) Time Peak 15 August August 2000 Time Peak 15 August August Hour Volume 4,561 4,469

25 Texas Transportation Institute Average Daily Traffic Automatic Traffic Recorder Counts Project No. : Station No. : 200 Counter No. : Location: Bridge 4 Exit City/State: Laredo, TX Date: August 2000 Day of Week: Tuesday - Wednesday per Hour Time of Day Site: Exit to the World Trade Bridge in Laredo, Texas (Northbound) Time Peak 15 August August 2000 Time Peak 15 August August Hour Volume 3,963 3,904

Appendix BAL Baltimore, Maryland 2003 Annual Report on Freeway Mobility and Reliability

Appendix BAL Baltimore, Maryland 2003 Annual Report on Freeway Mobility and Reliability (http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix BAL Baltimore, Maryland 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement to:

More information

Trip and Parking Generation Study of Orem Fitness Center-Abstract

Trip and Parking Generation Study of Orem Fitness Center-Abstract Trip and Parking Generation Study of Orem Fitness Center-Abstract The Brigham Young University Institute of Transportation Engineers student chapter (BYU ITE) completed a trip and parking generation study

More information

Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945

Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945 Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945 Introduction The Brigham Young University Institute of Transportation Engineers student chapter (BYU ITE) completed

More information

Traffic Impact Study

Traffic Impact Study Traffic Impact Study Statham DRI One University Parkway Prepared for: Barrow County Prepared by: October 2012 Table of Contents Executive Summary i Section 1. Introduction 1 Project Description 1 Methodology

More information

STATISTICAL ANALYSIS OF LAW ENFORCEMENT SURVEILLANCE IMPACT ON SAMPLE CONSTRUCTION ZONES IN MISSISSIPPI (Part 1: DESCRIPTIVE)

STATISTICAL ANALYSIS OF LAW ENFORCEMENT SURVEILLANCE IMPACT ON SAMPLE CONSTRUCTION ZONES IN MISSISSIPPI (Part 1: DESCRIPTIVE) STATISTICAL ANALYSIS OF LAW ENFORCEMENT SURVEILLANCE IMPACT ON SAMPLE CONSTRUCTION ZONES IN MISSISSIPPI (Part 1: DESCRIPTIVE) Tulio Sulbaran, Ph.D 1, David Marchman 2 Abstract It is estimated that every

More information

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone: JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH 45243 Email: jackpflum1@gmail.com Telephone: 513.919.7814 MEMORANDUM REPORT Traffic Impact Analysis Proposed Soccer

More information

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 Appendix C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 CONTENTS List of Figures-... 3 List of Tables... 4 Introduction... 1 Application of the Lubbock Travel Demand

More information

3. If a forecast is too high when compared to an actual outcome, will that forecast error be positive or negative?

3. If a forecast is too high when compared to an actual outcome, will that forecast error be positive or negative? 1. Does a moving average forecast become more or less responsive to changes in a data series when more data points are included in the average? 2. Does an exponential smoothing forecast become more or

More information

Accessing and Using Indiana Traffic Data

Accessing and Using Indiana Traffic Data Accessing and Using Indiana Traffic Data Purdue Road School March 6, 2013 Presented by: Gregory Katter, PE Asset Planning Indiana Traffic Data 1. Overview of Traffic Data Collection Program 2. Accessing

More information

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Prepared by: Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite

More information

South Western Region Travel Time Monitoring Program Congestion Management Process Spring 2008 Report

South Western Region Travel Time Monitoring Program Congestion Management Process Spring 2008 Report South Western Region Travel Monitoring Program Congestion Management Process Spring 2008 Report Prepared by: South Western Regional Planning Agency 888 Washington Boulevard Stamford, CT 06901 Telephone:

More information

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement 2019 Settlement Calendar for ASX Cash Market Products ASX Settlement Settlement Calendar for ASX Cash Market Products 1 ASX Settlement Pty Limited (ASX Settlement) operates a trade date plus two Business

More information

U.S. - Canadian Border Traffic Prediction

U.S. - Canadian Border Traffic Prediction Western Washington University Western CEDAR WWU Honors Program Senior Projects WWU Graduate and Undergraduate Scholarship 12-14-2017 U.S. - Canadian Border Traffic Prediction Colin Middleton Western Washington

More information

Published by ASX Settlement Pty Limited A.B.N Settlement Calendar for ASX Cash Market Products

Published by ASX Settlement Pty Limited A.B.N Settlement Calendar for ASX Cash Market Products Published by Pty Limited A.B.N. 49 008 504 532 2012 Calendar for Cash Market Products Calendar for Cash Market Products¹ Pty Limited ( ) operates a trade date plus three Business (T+3) settlement discipline

More information

GUIDELINES FOR FILMING IN TOMBALL, TEXAS

GUIDELINES FOR FILMING IN TOMBALL, TEXAS GUIDELINES FOR FILMING IN TOMBALL, TEXAS I. PURPOSE The following guidelines are intended to protect the personal and property rights of our Tomball, Texas residents and businesses. The City Manager reserves

More information

Montmorency County Traffic Crash Data & Year Trends. Reporting Criteria

Montmorency County Traffic Crash Data & Year Trends. Reporting Criteria June 2018 Revised 8/3/2018 2017 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data

More information

4.4 The Calendar program

4.4 The Calendar program 4.4. THE CALENDAR PROGRAM 109 4.4 The Calendar program To illustrate the power of functions, in this section we will develop a useful program that allows the user to input a date or a month or a year.

More information

Montmorency County Traffic Crash Data & Year Trends. Reporting Criteria

Montmorency County Traffic Crash Data & Year Trends. Reporting Criteria June 2017 Revised 10/3/17 2016 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data

More information

HALFF 16196? TRAFFIC MANAGEMENT PLAN. Richardson ISD Aikin Elementary School Dallas, Texas North Bowser Road Richardson, Texas 75081

HALFF 16196? TRAFFIC MANAGEMENT PLAN. Richardson ISD Aikin Elementary School Dallas, Texas North Bowser Road Richardson, Texas 75081 30280 16196? TRAFFIC MANAGEMENT PLAN Exhibit 572B Aikin Elementary School Planned Development District No. 572 Approved City Plan Commission October20, 2016 July 12, 2016 Prepared for HALFF AVO 31586 PHO1

More information

City of Hermosa Beach Beach Access and Parking Study. Submitted by. 600 Wilshire Blvd., Suite 1050 Los Angeles, CA

City of Hermosa Beach Beach Access and Parking Study. Submitted by. 600 Wilshire Blvd., Suite 1050 Los Angeles, CA City of Hermosa Beach Beach Access and Parking Study Submitted by 600 Wilshire Blvd., Suite 1050 Los Angeles, CA 90017 213.261.3050 January 2015 TABLE OF CONTENTS Introduction to the Beach Access and Parking

More information

Focused Traffic Analysis for the One Lincoln Park Project

Focused Traffic Analysis for the One Lincoln Park Project September 15, 2015 Mr. Bill Johnson Coldwell Banker 511 Sir Francis Drake Boulevard Greenbrae, CA 94904 Focused Traffic Analysis for the One Lincoln Park Project Dear Mr. Johnson; As requested, W-Trans

More information

Chapter 1 0+7= 1+6= 2+5= 3+4= 4+3= 5+2= 6+1= 7+0= How would you write five plus two equals seven?

Chapter 1 0+7= 1+6= 2+5= 3+4= 4+3= 5+2= 6+1= 7+0= How would you write five plus two equals seven? Chapter 1 0+7= 1+6= 2+5= 3+4= 4+3= 5+2= 6+1= 7+0= If 3 cats plus 4 cats is 7 cats, what does 4 olives plus 3 olives equal? olives How would you write five plus two equals seven? Chapter 2 Tom has 4 apples

More information

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES TAKING THE MYSTERY OUT OF USACE S ER 1110-1-1807 DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65

More information

The Sunland Park flyover ramp is set to close the week of March 19 until early summer

The Sunland Park flyover ramp is set to close the week of March 19 until early summer March 2, 2018 The Sunland Park flyover ramp is set to close the week of March 19 until early summer GO 10 is targeting the week of March 19 to close the Sunland Park Drive flyover entrance ramp to I 10

More information

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Subject: Revised Castle Hills BASIS Charter School Traffic Impact Analysis Review City of Castle Hills,

More information

A Demand Forecasting Methodology for Land-Based Ports of Entry

A Demand Forecasting Methodology for Land-Based Ports of Entry A Demand Forecasting Methodology for Land-Based Ports of Entry Dr. J.M. Kosior P. Eng., Senior Transportation Planner Systems Planning Branch, Manitoba Infrastructure and Transportation D. E. Lettner,

More information

Appendix C Traffic Study

Appendix C Traffic Study Final Environmental Impact Statement Appendix C Traffic Study Schofield Generating Station Project, Hawaii October 2015 C-1 Final Environmental Impact Statement This page intentionally left blank. Schofield

More information

MEMORANDUM. Trip Generation Analysis

MEMORANDUM. Trip Generation Analysis MEMORANDUM To: RMC Architects From: Matthew Palmer, PE Subject: Trip Generation, Parking Analysis & Level of Service Project: Port of Everett, GTC #13-053 Date: August 25, 2014 The trip generation and

More information

QUANTIFICATION OF THE NATURAL VARIATION IN TRAFFIC FLOW ON SELECTED NATIONAL ROADS IN SOUTH AFRICA

QUANTIFICATION OF THE NATURAL VARIATION IN TRAFFIC FLOW ON SELECTED NATIONAL ROADS IN SOUTH AFRICA QUANTIFICATION OF THE NATURAL VARIATION IN TRAFFIC FLOW ON SELECTED NATIONAL ROADS IN SOUTH AFRICA F DE JONGH and M BRUWER* AECOM, Waterside Place, Tygerwaterfront, Carl Cronje Drive, Cape Town, South

More information

Monroe County: Key West and Lower Keys

Monroe County: Key West and Lower Keys FDOT PROJECT UPDATES June 15-21, 2015 Monroe County: Key West and Lower Keys Monroe County projects website: www.fdotmonroe.com Opt Out: If you no longer wish to receive these weekly notifications, please

More information

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan Town of Barnstable Department of Public Work Snow and Ice Control Operations Plan I. Mission: The mission of the Department of Public Works is to remove accumulations of snow and ice from town, county

More information

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road STAFF REPORT ACTION REQUIRED Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road Date: October 28, 2008 To: From: Toronto and East York Community Council Director, Transportation

More information

DAILY QUESTIONS 28 TH JUNE 18 REASONING - CALENDAR

DAILY QUESTIONS 28 TH JUNE 18 REASONING - CALENDAR DAILY QUESTIONS 28 TH JUNE 18 REASONING - CALENDAR LEAP AND NON-LEAP YEAR *A non-leap year has 365 days whereas a leap year has 366 days. (as February has 29 days). *Every year which is divisible by 4

More information

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For TRAFFIC IMPACT STUDY For Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) February 2015 Revised: August 2015 April 2016 July 2016 September 2016 Prepared for: KB Home

More information

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS 2018 WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS Introduction Woodruff Road is the main road to and through the commercial area in Greenville, South Carolina. Businesses along the corridor have

More information

CONGESTION REPORT 1 st Quarter 2016

CONGESTION REPORT 1 st Quarter 2016 CONGESTION REPORT 1 st Quarter 2016 A quarterly update of the National Capital Region s traffic congestion, travel time reliability, top-10 bottlenecks and featured spotlight April 20, 2016 ABOUT TPB Transportation

More information

2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT

2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT 2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT Settlement Calendar for ASX Cash Market Products 1 ASX Settlement Pty Limited (ASX Settlement) operates a trade date plus two Business

More information

COUNCIL POLICY MANUAL

COUNCIL POLICY MANUAL COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs

More information

Estimation of Average Daily Traffic (ADT) Using Short - Duration Volume Counts

Estimation of Average Daily Traffic (ADT) Using Short - Duration Volume Counts Estimation of Average Daily Traffic (ADT) Using Short - Duration Volume Counts M.D.D.V. Meegahapola 1, R.D.S.M. Ranamuka 1 and I.M.S. Sathyaprasad 1 1 Department of Civil Engineering Faculty of Engineering

More information

Morgantown, West Virginia. Adaptive Control Evaluation, Deployment, & Management. Andrew P. Nichols, PhD, PE

Morgantown, West Virginia. Adaptive Control Evaluation, Deployment, & Management. Andrew P. Nichols, PhD, PE Morgantown, West Virginia Adaptive Control Evaluation, Deployment, & Management Andrew P. Nichols, PhD, PE Program Director of ITS Nick J. Rahall II, Appalachian Transportation Inst. Marshall University

More information

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 Executive Summary Page 2.0 Introduction 2.1 DEVELOPMENT

More information

Economics 390 Economic Forecasting

Economics 390 Economic Forecasting Economics 390 Economic Forecasting Prerequisite: Econ 410 or equivalent Course information is on website Office Hours Tuesdays & Thursdays 2:30 3:30 or by appointment Textbooks Forecasting for Economics

More information

Advance signals that can be used to foresee demand response days PJM SODRTF - March 9, 2018

Advance signals that can be used to foresee demand response days PJM SODRTF - March 9, 2018 Advance signals that can be used to foresee demand response days PJM SODRTF - March 9, 2018 1 OVERVIEW BGE s load response programs are split between two programs Peak Rewards and Smart Energy Rewards

More information

Project Appraisal Guidelines

Project Appraisal Guidelines Project Appraisal Guidelines Unit 16.2 Expansion Factors for Short Period Traffic Counts August 2012 Project Appraisal Guidelines Unit 16.2 Expansion Factors for Short Period Traffic Counts Version Date

More information

Weather Company Energy and Power Products

Weather Company Energy and Power Products Service Weather Company Energy and Power Products This Service (SD) describes the Cloud Service IBM provides to Client. Client means the company and its authorized users and recipients of the Cloud Service.

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

Preliminary Material Data Sheet

Preliminary Material Data Sheet Level 1/Level 2 Certificate Foundation Level June 2015 Use of Mathematics 43503F/PM Core unit Preliminary Material Data Sheet To be opened and issued to candidates between Monday 27 April 2015 and Monday

More information

Septem ber 28, 2016 EL PASO, Texas

Septem ber 28, 2016 EL PASO, Texas September 28, 2016 EL PASO, Texas Crews from Paso del Norte Trackworks will finalize underground utility work and begin laying rail on a portion of Kansas Street thru Downtown El Paso in the coming weeks,

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

CVS Derwood. Local Area Transportation Review

CVS Derwood. Local Area Transportation Review CVS Derwood Montgomery County, Maryland May 27, 2016 Local Area Transportation Review Prepared for: JC Bar Properties, Inc. Steve Fleming, PE 415 Fallowfield Road, Suite 301 Camp Hill, Pennsylvania 17011

More information

MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output

MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output Rev. April 29, 2005 MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output Table of

More information

Kenneth Shelton, Assistant Superintendent, Business Services Los Angeles County Office of Education 9300 Imperial Highway Downey, CA 90242

Kenneth Shelton, Assistant Superintendent, Business Services Los Angeles County Office of Education 9300 Imperial Highway Downey, CA 90242 April 17, 2009 Kenneth Shelton, Assistant Superintendent, Business Services Los Angeles County Office of Education 9300 Imperial Highway Downey, CA 90242 Dear Assistant Superintendent Shelton: The purpose

More information

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes Fairview Ave. and Main St. Improvements and Local Streets Plan Appendices Ada County Highway District Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes January 3, 207 Appendices

More information

INTRODUCTION PURPOSE DATA COLLECTION

INTRODUCTION PURPOSE DATA COLLECTION DETERMINATION OF VEHICLE OCCUPANCY ON THE KATY AND NORTHWEST FREEWAY MAIN LANES AND FRONTAGE ROADS Mark Ojah and Mark Burris Houston Value Pricing Project, March 2004 INTRODUCTION In the late 1990s, an

More information

VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS

VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS Christopher D. McDonald, PE, PTOE Regional Operations Director, Southwest Region NRITS and ITS Arizona Annual Conference October

More information

Appendix I: Traffic Study

Appendix I: Traffic Study City of Fontana Sierra Lakes Commerce Center Draft EIR Appendix I: Traffic Study FirstCarbon Solutions H:\Client (PN JN)\0144\01440050\EIR\1 ADEIR\01440050 Sec99 99 Appendix Dividers.doc THIS PAGE INTENTIONALLY

More information

Using GIS Online for tracking development of roadway construction plans. Tom Cox Viraj Perera

Using GIS Online for tracking development of roadway construction plans. Tom Cox Viraj Perera Using GIS Online for tracking development of roadway construction plans Tom Cox Viraj Perera 9 Districts District 6 Located in the Capital City Springfield, IL LAND OF LINCOLN Home to: Abraham Lincoln

More information

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management Transportation Impact Analysis Market Street PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for TerraPointe Services, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc.

More information

GASB 34. Basic Financial Statements M D & A

GASB 34. Basic Financial Statements M D & A GASB 34 Basic Financial Statements M D & A In June 1999, the Governmental Accounting Standards Board issued Statement No. 34 (GASB 34) which fundamentally changed the financial reporting model for state

More information

The Dayton Power and Light Company Load Profiling Methodology Revised 7/1/2017

The Dayton Power and Light Company Load Profiling Methodology Revised 7/1/2017 The Dayton Power and Light Company Load Profiling Methodology Revised 7/1/2017 Overview of Methodology Dayton Power and Light (DP&L) load profiles will be used to estimate hourly loads for customers without

More information

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov February 9, 2018 I-10 East at Redd closes for 24 hours this Sunday, Feb 11

More information

Drehid MBT Facility- Waste Licence EIS

Drehid MBT Facility- Waste Licence EIS 11 TRAFFIC 11.1 INTRODUCTION This Chapter assesses the potential impact that both the construction and operational phases of the proposed Mechanical Biological Treatment (MBT) Facility will have on the

More information

REPORT ON INVESTMENTS

REPORT ON INVESTMENTS REPORT ON INVESTMENTS D.T2.3.3 Investments for technical equipment for the implementation of Web-GIS platform in Mantova 1 Local support group designing Mantova Web-GIS platform. Picture by Maria Giulia

More information

Solar Powered Illuminated RPMs

Solar Powered Illuminated RPMs Report Title Report Date: 2000 Solar Powered Illuminated RPMs Principle Investigator Name Meyer, Eric Affiliation Meyer ITS Address 2617 W 27th Terrace Lawrence, KS 66047 Vendor Name and Address Interplex

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-03/4150-1 4. Title and Subtitle ANALYSIS OF TXDOT THICKNESS MEASUREMENT PROCEDURES FOR THERMOPLASTIC PAVEMENT MARKINGS Technical Report Documentation Page 2. Government Accession

More information

2129 NORTH MAIN STREET HOTE PROJECT ULI SHARED PARKING STUDY City of Santa Ana, California

2129 NORTH MAIN STREET HOTE PROJECT ULI SHARED PARKING STUDY City of Santa Ana, California 2129 NORTH MAIN STREET HOTE PROJECT ULI SHARED PARKING STUDY City of Santa Ana, California Prepared for: NET DEVELOPMENT COMPANY 3130 Airway Avenue Costa Mesa, CA 92626 Prepared by: RK ENGINEERING GROUP,

More information

Mountain View Community Shuttle Monthly Operations Report

Mountain View Community Shuttle Monthly Operations Report Mountain View Community Shuttle Monthly Operations Report December 6, 2018 Contents Passengers per Day, Table...- 3 - Passengers per Day, Chart...- 3 - Ridership Year-To-Date...- 4 - Average Daily Ridership

More information

Annual Collision Report

Annual Collision Report 2016 Annual Collision Report Contents The Annual Collision Report is a summary of statistics associated with traffic collisions that occurred in the City of Winnipeg. This information is provided by Manitoba

More information

AM02 - Texas A&M University. Purchase Order

AM02 - Texas A&M University. Purchase Order Page 1 of 8 AM02 - Texas A&M University Purchase Order P.O. Date: 8/23/2016 Purchase Order Number AM02-17-P029331 SHOW THIS NUMBER ON ALL PACKAGES, INVOICES AND SHIPPING PAPERS. V E N D O R Vendor Number:

More information

CAWa Central Asian Water. Training Course Geographical Information Systems in Hydrology

CAWa Central Asian Water. Training Course Geographical Information Systems in Hydrology CAWa Central Asian Water Training Course Geographical Information Systems in Hydrology 1 Place & Time Place to hold the workshop: Helmholtz Centre Potsdam GFZ German Research Center for Geosciences, Germany

More information

Speed Limit Review. Montague Road, West End. Prepared for Brisbane City Council CEB06842 CEB06842

Speed Limit Review. Montague Road, West End. Prepared for Brisbane City Council CEB06842 CEB06842 Speed Limit Review Montague Road, West End CEB06842 CEB06842 Prepared for Brisbane City Council 2 November 2016 Speed Limit Review Montague Road, West End Document Information Prepared for Brisbane City

More information

Examining travel time variability using AVI data

Examining travel time variability using AVI data CAITR 2004 Examining travel time variability using AVI data by Ruimin li ruimin.li@eng.monash.edu.au 8-10 December 2004 INSTITUTE OF TRANSPORT STUDIES The Australian Key Centre in Transport Management

More information

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections:

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections: MEMORANDUM DATE: JULY 6, 2012 TO: FROM: RE: CC: MELANIE KNIGHT BRAD BYVELDS/ JENNIFER LUONG 1050 SOMERSET STREET PRELIMINARY TRAFFIC ANALYSIS OUR FILE NO. 111152 NEIL MALHOTRA The purpose of this memo

More information

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance Endo Engineering Traffic Engineering Air Quality Studies Noise Assessments July 13, 2015 Mr. Ed Freeman Pinnacle View, LLC P.O. Box 1754 Lake Oswego, OR 97035-0579 Subject: Desert Palisades Specific Plan

More information

FIELD MANUAL FOR CONFIGURING TRAFFIC-RESPONSIVE CONTROL ON TxDOT CLOSED-LOOP SYSTEMS

FIELD MANUAL FOR CONFIGURING TRAFFIC-RESPONSIVE CONTROL ON TxDOT CLOSED-LOOP SYSTEMS FIELD MANUAL FOR CONFIGURING TRAFFIC-RESPONSIVE CONTROL ON TxDOT CLOSED-LOOP SYSTEMS by Geza Pesti, Ph.D., P.E. Associate Research Engineer Texas Transportation Institute Nadeem Chaudhary, Ph.D., P.E.

More information

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),

More information

Internal Audit Report

Internal Audit Report Internal Audit Report Right of Way Mapping TxDOT Internal Audit Division Objective To determine the efficiency and effectiveness of district mapping procedures. Opinion Based on the audit scope areas reviewed,

More information

General Information Regarding The Combat Methamphetamine Epidemic Act of 2005 [Title VII of Public Law ]

General Information Regarding The Combat Methamphetamine Epidemic Act of 2005 [Title VII of Public Law ] General Information Regarding The Combat Methamphetamine Epidemic Act of 2005 [Title VII of Public Law 109-177] Drug Enforcement Administration May 2006 The Combat Methamphetamine Epidemic Act of 2005

More information

URISA Exemplary Systems In Government (ESIG) Award Application

URISA Exemplary Systems In Government (ESIG) Award Application URISA Exemplary Systems In Government (ESIG) Award Application The Urban and Regional Information Systems Association (URISA) Exemplary Systems In Government (ESIG) Awards recognize exceptional achievements

More information

Mountain View Community Shuttle Monthly Operations Report

Mountain View Community Shuttle Monthly Operations Report Mountain View Community Shuttle Monthly Operations Report October 9, 2018 Contents Passengers per Day, Table...- 3 - Passengers per Day, Chart...- 3 - Ridership Year-To-Date...- 4 - Average Daily Ridership

More information

Town of Taos Request for Proposal Historic Preservation GIS Geodatabase Project April 2007

Town of Taos Request for Proposal Historic Preservation GIS Geodatabase Project April 2007 Town of Taos Request for Proposal Historic Preservation GIS Geodatabase Project April 2007 1. Background The Town of Taos is requesting proposals from qualified firms or a team of firms who can develop

More information

2011 South Western Region Travel Time Monitoring Program Congestion Management Process. Executive Summary

2011 South Western Region Travel Time Monitoring Program Congestion Management Process. Executive Summary 2011 South Western Region Travel Monitoring Program Executive Summary Prepared by: South Western Regional Planning Agency 888 Washington Blvd, 3rd Floor Stamford, CT 06901 Telephone: 203.6.5190 Facsimile:

More information

Rapid Intervention Program (RIP) to Improve Operational Management and Efficiencies in Irrigation Districts in Iraq

Rapid Intervention Program (RIP) to Improve Operational Management and Efficiencies in Irrigation Districts in Iraq Rapid Intervention Program (RIP) to Improve Operational Management and Efficiencies in Irrigation Districts in Iraq USCID Water Management Conference Phoenix, Arizona April 17, 2013 Gabriele Bonaiti Extension

More information

Encapsulating Urban Traffic Rhythms into Road Networks

Encapsulating Urban Traffic Rhythms into Road Networks Encapsulating Urban Traffic Rhythms into Road Networks Junjie Wang +, Dong Wei +, Kun He, Hang Gong, Pu Wang * School of Traffic and Transportation Engineering, Central South University, Changsha, Hunan,

More information

TopGolf Inc: Demand Forecasting

TopGolf Inc: Demand Forecasting Senior Design Final Report TopGolf Inc: Demand Forecasting Prepared by: Kaitlyn Farmer, Janie Flowers, Zach Taher May 8th, 2014 Table of Contents Management Summary... 1 Background and Description of Project...

More information

SAMPLE AUDIT FORMAT. Pre Audit Notification Letter Draft. Dear Registrant:

SAMPLE AUDIT FORMAT. Pre Audit Notification Letter Draft. Dear Registrant: Pre Audit Notification Letter Draft Dear Registrant: The Pennsylvania Department of Transportation (PennDOT) is a member of the Federally Mandated International Registration Plan (IRP). As part of this

More information

City of Camrose Winter Road Maintenance Policy

City of Camrose Winter Road Maintenance Policy City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.

More information

Exploring Nature With Children A Guided Journal Cursive Edition by Lynn Seddon

Exploring Nature With Children A Guided Journal Cursive Edition by Lynn Seddon Exploring Nature With Children A Guided Journal Cursive Edition by Lynn Seddon Table of Contents Cursive Edition Getting started: notes for parents on how to use this journal 6 Autumn 8 September Seeds

More information

Sensory Map. of the North Carolina Museum of Natural Sciences

Sensory Map. of the North Carolina Museum of Natural Sciences Sensory Map of the North Carolina Museum of Natural Sciences Introduction Welcome to the North Carolina Museum of Natural Sciences. You can use this sensory map to identify sensory-friendly spaces within

More information

AASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response

AASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response AASHTO Committee on Maintenance 2018 Annual Meeting July 25, 2018 Hurricane Irma- Preparation and Response Rudy Powell Director, Office of Maintenance Satellite Aerial Image (September 10, 2017) Hurricane

More information

Trip Generation Characteristics of Super Convenience Market Gasoline Pump Stores

Trip Generation Characteristics of Super Convenience Market Gasoline Pump Stores Trip Generation Characteristics of Super Convenience Market Gasoline Pump Stores This article presents the findings of a study that investigated trip generation characteristics of a particular chain of

More information

Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles

Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles Traffic Study August 31, 2015 AECOM 515 South Flower Street, 4 th Floor Los Angeles, CA 90071 Job Number: 60323255

More information

JOB DESCRI PTI ON. GIS Administrator

JOB DESCRI PTI ON. GIS Administrator JOB DESCRI PTI ON JOB GRADE: GS-0 Cla ss Code : Office - 8 8 0 DEPARTMENT: 2 0 - FLSA: EXEMPT JOB NO: 6-0 9-2 7 SALARY: To Be De t e rm in e d Job description statements are intended to describe the general

More information

Chapter 3. Regression-Based Models for Developing Commercial Demand Characteristics Investigation

Chapter 3. Regression-Based Models for Developing Commercial Demand Characteristics Investigation Chapter Regression-Based Models for Developing Commercial Demand Characteristics Investigation. Introduction Commercial area is another important area in terms of consume high electric energy in Japan.

More information

ORIENT TRANSPORT COMPANY

ORIENT TRANSPORT COMPANY ORIENT TRANSPORT COMPANY (ESTABLISHED:1950) P R O FII L E:: ORIENT TRANSPORT COMPANY 14/2 OLD CHINA BAZAAR STREET, ROOM NO: 178,179,190,191 & 110. KOLKATA 700001. PHONE: (33) 22424690,22100389 FAX: (33)

More information

The spatial network Streets and public spaces are the where people move, interact and transact

The spatial network Streets and public spaces are the where people move, interact and transact The spatial network Streets and public spaces are the where people move, interact and transact The spatial network Cities are big spatial networks that create more of these opportunities Five key discoveries

More information

WEATHER SYSTEMS IMPACTING THE CAYMAN ISLANDS Prepared by the staff of the Cayman Islands National Weather Service

WEATHER SYSTEMS IMPACTING THE CAYMAN ISLANDS Prepared by the staff of the Cayman Islands National Weather Service WEATHER SYSTEMS IMPACTING THE CAYMAN ISLANDS 2008 Prepared by the staff of the Cayman Islands National Weather Service TROPICAL STORM DOLLY Formed 194 miles west of Grand Cayman July 19 th. The tropical

More information

Sheridan Expressway-Hunts Point Planning Study

Sheridan Expressway-Hunts Point Planning Study Sheridan Expressway-Hunts Point Planning Study Final Summary Report Summary of Hunts Point Markets Driver Surveys March 2012 Prepared for: NYC Department of Transportation Prepared by: STV Incorporated

More information

Evaluating Physical, Chemical, and Biological Impacts from the Savannah Harbor Expansion Project Cooperative Agreement Number W912HZ

Evaluating Physical, Chemical, and Biological Impacts from the Savannah Harbor Expansion Project Cooperative Agreement Number W912HZ Evaluating Physical, Chemical, and Biological Impacts from the Savannah Harbor Expansion Project Cooperative Agreement Number W912HZ-13-2-0013 Annual Report FY 2018 Submitted by Sergio Bernardes and Marguerite

More information

Municipal Act, 2001 Loi de 2001 sur les municipalités

Municipal Act, 2001 Loi de 2001 sur les municipalités Municipal Act, 2001 Loi de 2001 sur les municipalités ONTARIO REGULATION 239/02 MINIMUM MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS Consolidation Period: From January 25, 2013 to the e-laws currency date.

More information