1 MONITORING REPORT NO FOR PERIOD O. 3 ESIVERE AND VIRTSU U II W WIND POWER JOINT IMPLEMENTATION PROJECT UNFCCC NO. EE PREPARED BY: OÜ NELJA ENERGIA Regati pst 1, Tallinn, Estonia Tel: piret.loomets@4energia.ee Version 3 1 November,

2 1. GENERAL INFORMATION Project name: Project location: Project owner: Carbon credit purchaser: Project description: Operation during monitoring period: Esivere and Virtsu II Wind Power Developments Hanila municipality, Estonia Roheline Ring Tuulepargid OÜ Estonia pst 1/3, Tallinn, Estonia Republic of Austria (represented by KPC) The project involves an 8 MW wind farm at Esivere (consisting of 4 Enercon E kw wind turbines) and a 6.9 MWwind farm at Virtsu (consisting of 3 Enercon E70 E kw wind turbines). GHG emission reduction is achieved via displacement of carbon intensive electricity produced from fossil fuel sources in the Estonian grid. Crediting period for emission reductions: October December 31, 2012 During the whole monitoring period in question (2009) both Esivere and Virtsu II wind farms operated without major technical interruptions. 2. MONITORING METHODOLOGY Description: Grid connection and measuring meters: Monitoring is based on the procedures defined in the document Esivere and Virtsu II Wind Power Developments Project Design Document. Econ Analysis. March and in Monitoring Plan of Esivere and Virtsu II Wind Power JI Project. May The amount of net electricity supply to the grid from the JI project is defined as the key activity to monitor. The wind farms have different grid connection points to the national power grid operated by transmission company OÜ Põhivõrk (Main Grid). Esivere wind farm is connected to Rõuste 110 kv substation, Virtsu II is connected to Virtsu 110 kv substation and has a separate measuring meter in order to separate the power generation from Virtsu III wind farm which will be connected to the same substation and also have a separate measuring meter. Measuring meters of both wind farms, installed at the 110/20 kv substations belong to the Main Grid. Calibration of the measuring meters is processed according to Estonian legislation and standards. Both measuring meters are connected to the Main Grid and are monitored remotely. The contractual party of purchase of power generated by Esivere wind farm is AS Eesti Energia and the contractual party of purchase of power generated by the Virtsu II wind farm is Latvenergo 2

3 Kaubandus OÜ (Latvenergo trading subsidiary in Estonia). The measuring meters of both wind farms have not been changed and have functioned properly during the monitoring period and can therefore be used as a basis for the calculation of achieved emission reductions. 3. ACHIEVED EMISSION REDUCTIONS In accordance with the PDD the formula for calculation of achieved emission reductions is the following: ERy (tco2e) = EGy () x EFy (tco2/) Emission reductions have been calculated in accordance with the Monitoring Protocol as set out in the Monitoring Plan as following Project constants Emission factor EFy, tco2/ 1,0451 Actual data Net power generation EGy,, Esivere 14772,56 Net power generation EGy,, VirtsuII 12941,62 Annual Emission reduction, tco2, Esivere Annual Emission reduction, tco2, VirtsuII Total emission reduction, tco2e, Esivere & VirtsuII Thus Esivere & Virtsu II Wind Power JI Project generated tco2e of emission reductions during the monitoring period of year

4 1. ANNEXES 1 Annual production report of Esivere wind farm Annual production report of Virtsu II wind farm Annex 3. Replies to Forward Action Requests 4 Monthly production reports of Esivere wind farm Monthly production reports of Virtsu II wind farm 2009 Kalle Kiigske Member of the board 4

5 Annex 1. Annual production report of Esivere wind farm, 2009 Actual power production ()* Active power consumption ()* Net power production () January 1464,91 1, ,13 February 817,06 1,84 815,22 March 943,07 2,32 940,75 April 903,98 2,2 901,78 May 1286,6 0, ,89 June 1197,34 0, ,42 July 836,637 1,87 834,767 August 991,95 1,46 990,49 September 1793,89 0, ,37 October 1588,47 1, ,4 November 1663,45 0, ,32 December 1301,08 1, ,02 Total ,44 15, ,56 * Data according to OÜ Põhivõrk (Main Grid) powermeter. Annex 2. Annual production report of Virtsu II wind farm, 2009 Actual power production ()* Active power consumption ()* Net power production () January 1201,93 1, ,66 February 811,47 1,46 810,01 March 857,8 1,82 855,98 April 846,85 1, May 1193,36 0, ,69 June 1017,39 0, ,6 July 729,13 1,65 727,48 August 847,97 1,11 846,86 September 1415,69 0, ,28 October 1368,19 0, ,35 November 1534,69 0, ,6 December 1130,04 0, ,11 Total ,51 12, ,62 * Data according to OÜ Põhivõrk (Main Grid) powermeter. 5

6 Annex 3. Replies to Forward Action Requests Forward Action Request #1: The readings of the power meters of Virtsu II and Esivere Wind Farm shall be taken also at the end of each monitoring period. The last reading was taken on , which is almost exactly the end of the monitoring period. The power meter data until is presented in the Annex 4 and 5. Forward Action Request #2: The use permit for Esivere WF Transformer station shall be presented to the audit team (see CR#1 Second round of clarification). The use permits for Esivere wind farm transformer station were issued Forward Action Request #3: The developer should ensure that Virtsu III wind farm, which will have an own connection on 35 kv level and separate measuring system in order to separate the power generation from both wind parks the existing Virtsu II and the planned Virtsu III. The Virtsu3 and Virtsu2 are connected at the 20 kv level, not 35 kv level. The Virtsu2 and Esivere wind parks have their own separate measuring meters since the construction of wind parks. However, they share the same connection point to the Main Grid. Therefore, in order for the verifiers to check the production from the Main Grid readings, they will need to use the proportions of electricity produced by the separate meters and multiply these with the Main Grid readings. The proportions can be taken on a monthly basis. 6

7 Annex 4. Monthly production reports of Esivere wind farm 2009 Rouste TUULEPARK kuu raport Tehtud 02 FEB :08 Periood on 01 JAN 2009 / 31 JAN 2009 Kellaaeg ,79 26,03 22,76 2, ,32 0,22 0,1 15,47 11,43 4,04 0,7 0, ,24 0,14 0,1 10,38 8,08 2,3 0,41 0, ,06 0, ,04 10,76 13,28 0,27 0, ,27 0,24 0,03 28,83 19,89 8,94 0,6 0, ,21 115,66 53,55 0,42 0, ,24 23,14 8,1 0,26 0, ,76 60,54 12,22 0,7 0, ,08 85,57 49,51 1,54 0, ,81 39,89 7,92 1, ,75 115,87 33,88 5, ,73 121,38 62,35 8, ,25 42,36 40,89 3, ,11 41,42 36,69 3, ,68 15,44 3,24 1, ,14 34,05 16,09 2, ,07 0, ,67 8,49 13,18 1, ,89 4,52 3,37 2, ,69 9,98 6,71 0, ,73 37,35 6,38 2, ,02 0, ,35 3,49 6,86 2, ,83 8,98 7,85 1, ,58 9,88 14,7 1,51 0, ,57 57,66 41,91 0,31 0, ,23 6,62 10,61 0,19 0, ,37 0,34 0,03 1,46 0,67 0,79 0, ,06 0,01 0,05 1,9 1,37 0,53 0, ,09 0,04 0,05 2,88 2,11 0,77 0, ,28 0,25 0,03 2,31 1,34 0,97 0, ,49 14,52 5,97 0,14 0, ,06 21,57 8,49 0,06 0,06 Summa 1,78 1,39 0, ,91 960,06 504,85 49,68 0,87 Max MW 0,04 0,04 0, ,99 Max aeg : : : : :

8 Rouste TUULEPARK kuu raport Tehtud 02 MAR :17 Periood on 01 FEB 2009 / 28 FEB 2009 Kellaaeg ,38 0,38 0 3,59 0,78 2,81 0,67 0, ,19 0,04 0,15 5,09 4,65 0,44 0,59 0, ,77 36,67 10,1 0,12 0, ,22 0,21 0,01 10,26 1,69 8,57 0,62 0, ,02 0 0,02 9,57 6,15 3,42 0,18 0, ,67 14,38 5,29 0,09 0, ,28 8,09 11,19 0,22 0, ,96 82,2 19,76 0,19 0, ,01 0, ,26 17,07 12,19 0,13 0, ,47 7,53 0,07 0, ,71 20,48 14,23 0,05 0, ,97 22,71 12,26 0,05 0, ,04 0, ,9 7,14 3,76 0,19 0, ,71 15,74 5,97 0,05 0, ,12 0,1 0,02 4,82 2,32 2,5 0,71 0, ,27 5,38 2,89 0,27 0, , ,04 0,05 0, ,1 13,31 8,79 0,1 0, ,19 0,16 0,03 4,51 3,82 0,69 0,67 0, ,9 19,98 8,92 0,11 0, ,02 21,98 22,04 0,12 0, ,46 80,2 17,26 0,28 0, ,18 12,08 12,1 0,13 0, ,36 0,16 0,2 18,87 14,31 4,56 0,63 0, ,23 0, ,35 4,07 19,28 0,52 0, ,78 26,93 4,85 0,11 0, ,08 0, ,21 13,79 5,42 0,36 0, ,81 55,93 33,88 0,21 0,32 Summa 1,84 1,41 0,43 817,06 547,32 269,74 7,49 2,71 Max MW 0,04 0,04 0,04 7,26 7,26 6,75 Max aeg : : : : :

9 Rouste TUULEPARK kuu raport Tehtud 01 APR :57 Periood on 01 MAR 2009 / 31 MAR 2009 Kellaaeg ,1 0,06 0,04 13,32 4,9 8,42 0,37 0, ,22 0 0,22 17,86 15,88 1,98 0,4 0, ,69 22,04 28,65 0,15 0, ,51 4,91 4,6 0,27 0, ,83 27,4 6,43 0,08 0, ,59 18,38 11,21 0,04 0, ,03 10,66 8,37 0,1 0, ,61 19,93 6,68 0,04 0, ,35 2,88 3,47 0,43 0, ,1 0,1 0 21,35 13,47 7,88 0,27 0, ,2 0,18 0,02 10,48 1,88 8,6 0,57 0, ,43 0,33 0,1 5,18 3,26 1,92 0,8 0, ,18 0, ,53 6,53 5 0,55 0, ,61 12,49 5,12 0,09 0, ,27 0,27 0 6,08 0,79 5,29 0,6 0, ,24 0,04 0,2 37,63 31,76 5,87 0,53 0, ,64 27,97 45,67 0,22 0, ,12 14,82 10,3 0,08 0, ,62 18,19 5,43 0,15 0, ,04 0 0,04 50,91 40,13 10,78 0,23 0, ,52 70,57 43,95 0,22 0, ,13 0,12 0,01 12,62 5,29 7,33 0,33 0, ,15 0,09 0,06 8,81 5,38 3,43 0,34 0, ,52 23,12 8,4 0,07 0, ,7 14,68 14,02 0,12 0, ,12 0,1 0,02 14,39 9,27 5,12 0,4 0, ,01 0 0,01 36,94 30,45 6,49 0,17 0, ,05 0, ,24 6,09 14,15 0,25 0, ,01 0 0,01 13,27 11,81 1,46 0,21 0, ,06 0 0,06 71,08 62,98 8,1 0,31 0, ,01 0 0,01 101,04 52,05 48,99 0,23 0,23 Summa 2,32 1,52 0,8 943,07 589,96 353,11 8,62 2,61 Max MW 0,04 0,04 0,04 7,89 7,89 7,77 Max aeg : : : : :

10 Rouste TUULEPARK kuu raport Tehtud 04 MAY :44 Periood on 01 APR 2009 / 30 APR 2009 Kellaaeg , , ,42 76,42 0,19 0, , , ,99 21,99 0,15 0, , , ,62 25,62 0,09 0, ,96 0 9,96 0,25 0 0,25 10,21 10,21 0,63 0, , ,65 0,11 0 0,11 17,76 17,76 0,38 0, , , ,47 63,47 0,2 0, ,47 0 8,47 0,12 0 0,12 8,59 8,59 0,59 0, , , ,16 30,16 0,21 0, , , ,97 118,97 0,32 0, ,96 0 5,96 0,19 0 0,19 6,15 6,15 0,56 0, ,99 0 4,99 0,04 0 0,04 5,03 5,03 0,55 0, , ,28 0,06 0 0,06 11,34 11,34 0,55 0, , ,76 0,14 0 0,14 10,9 10,9 0,46 0, ,29 0 7,29 0,06 0 0,06 7,35 7,35 0,48 0, , , ,16 21,16 0,34 0, , ,21 0,02 0 0,02 14,23 14,23 0,34 0, , ,12 0,26 0 0,26 19,38 19,38 0,56 0, , , ,32 68,32 0,19 0, ,9 0 17, ,9 17,9 0,24 0, , , ,24 56,24 0,14 0, , ,99 0,19 0 0,19 12,18 12,18 0,52 0, ,17 0 3,17 0,21 0 0,21 3,38 3,38 0,66 0, , ,23 0,2 0 0,2 10,43 10,43 0,55 0, , ,45 0,13 0 0,13 15,58 15,58 0,35 0, , ,88 0,05 0 0,05 24,93 24,93 0,33 0, , , ,78 75,78 0,15 0, , ,68 0,06 0 0,06 48,74 48,74 0,21 0, , ,42 0,02 0 0,02 42,44 42,44 0,23 0, , ,29 0,09 0 0,09 17,38 17,38 0,36 0, , , ,95 41,95 0,1 0,1 Summa 901,78 901,78 2,2 2,2 903,98 903,98 10,63 2,39 PV ku 903,47 903,47 PV st 1,69 1,69 10

11 Rouste TUULEPARK kuu raport Tehtud 01 JUN :43 Periood on 01 MAY 2009 / 31 MAY 2009 d tunniti Kellaaeg , ,95 0,01 0 0,01 29,96 29,96 0,18 0, ,96 0 4,96 0,07 0 0,07 5,03 5,03 0,51 0, , ,94 0,16 0 0,16 20,1 20,1 0,34 0, , , ,21 32,21 0,15 0, , , ,19 84,19 0,23 0, ,8 0 88, ,8 88,8 0,26 0, , ,09 0,03 0 0,03 17,12 17,12 0,36 0, , , ,31 27,31 0,21 0, , , ,23 126,23 0,18 0, ,7 0 44, ,7 44,7 0,08 0, , ,37 0,08 0 0,08 21,45 21,45 0,3 0, , , ,71 66,71 0,13 0, ,18 0, , , ,12 72,12 0,17 0, , , ,07 21,07 0,09 0, ,83 0 8,83 0,17 0 0, ,47 0, , ,26 0,07 0 0,07 11,33 11,33 0,39 0, , ,57 0,11 0 0,11 12,68 12,68 0,46 0, , ,11 0,06 0 0,06 13,17 13,17 0,21 0, , ,44 0,13 0 0,13 11,57 11,57 0,34 0, ,78 0 4,78 0,12 0 0,12 4,9 4,9 0,66 0, , , ,61 21,61 0,18 0, , , ,45 82,45 0,18 0, ,4 0 82, ,4 82,4 0,2 0, ,3 0 31, ,3 31,3 0,35 0, , , ,22 24,22 0,21 0, ,5 0 89, ,5 89,5 0,23 0, , , ,55 58,55 0,12 0, , , ,39 43,39 0,13 0, ,9 0 39,9 0,01 0 0,01 39,91 39,91 0,23 0, , ,93 0,04 0 0,04 19,97 19,97 0,22 0,04 Summa 1285, ,89 1,06 1, , ,95 7,95 3,74 PV ku 1286,6 1286,6 PV st 0,71 0,71 11

12 Rouste TUULEPARK kuu raport Tehtud 01 JUL :29 Periood on 01 JUN 2009 / 30 JUN 2009 Kellaaeg ,51 0 5,51 0,15 0 0,15 5,66 5,66 0,62 0, , , ,32 40,32 0,1 0, , , ,11 51,11 0,13 0, , , ,66 103,66 0,18 0, ,1 0 23,1 0,01 0 0,01 23,11 23,11 0,32 0, , ,04 0,1 0 0,1 12,14 12,14 0,33 0, , , ,04 21,04 0,16 0, , ,52 0,01 0 0,01 14,53 14,53 0,35 0, , ,99 0,25 0 0,25 12,24 12,24 0,61 0, ,1 0 21,1 0,09 0 0,09 21,19 21,19 0,41 0, , ,47 0,09 0 0,09 16,56 16,56 0,36 0, , ,58 0,01 0 0,01 32,59 32,59 0,14 0, , ,87 0,01 0 0,01 38,88 38,88 0,22 0, , ,1 0,02 0 0,02 128,12 128,12 0,22 0, , , ,52 128,52 0,19 0, , ,69 0,01 0 0,01 35,7 35,7 0,16 0, , , ,43 95,43 0,21 0, , ,19 0,02 0 0,02 48,21 48,21 0,26 0, , , ,57 46,57 0,11 0, , ,42 0,02 0 0,02 42,44 42,44 0,23 0, ,74 0 7,74 0,12 0 0,12 7,86 7,86 0,48 0, ,61 0 9,61 0,11 0 0,11 9,72 9,72 0,45 0, , , ,44 32,44 0,14 0, ,1 0 54, ,1 54,1 0,19 0, , , ,36 56,36 0,13 0, ,3 0 54, ,3 54,3 0,14 0, , ,91 0,01 0 0,01 25,92 25,92 0,23 0, , , ,22 16,22 0,13 0, ,19 0 3,19 0,24 0 0,24 3,43 3,43 0, , ,32 0,03 0 0,03 19,35 19,35 0,43 0,01 Summa 1196, ,42 1,3 1,3 1197, ,72 8,45 3,4 PV ku 1197, ,34 PV st 0,92 0,92 12

13 Rouste TUULEPARK kuu Periood 01-JUL JUL-09 valin e Kellaaeg ,8 0 3,8 0,34 0 0,34 4,14 4,14 0, , ,78 0,02 0 0,02 11,8 11,8 0,41 0, , ,46 0,05 0 0,05 16,51 16,51 0,3 0, , ,17 0,01 0 0,01 17,18 17,18 0,09 0, , , ,65 23,65 0,16 0, ,94 0 1,94 0,18 0 0,18 2,12 2,12 0, , , ,15 25,15 0,11 0, , ,12 0,07 0 0,07 21,19 21,19 0,27 0, , , ,18 111,18 0,15 0, , ,69 0,02 0 0,02 70,71 70,71 0,31 0, ,54 0 3,54 0,09 0 0,09 3,63 3,63 0, , ,59 0,16 0 0,16 13,75 13,75 0,33 0, ,14 0 3,14 0,18 0 0,18 3,32 3,32 0, ,29 0 8,29 0,3 0 0,3 8,59 8,59 0,5 0, ,6 0 19,6 0,15 0 0,15 19,75 19,75 0,29 0, , ,62 0,2 0 0,2 11,82 11,82 0,6 0, , , ,61 30,61 0,21 0, ,47 0 2,47 0,32 0 0,32 2,79 2,79 0, , ,77 0,02 0 0,02 50,79 50,79 0,2 0, , , ,08 73,08 0,27 0, , , ,25 91,25 0,28 0, , , ,88 39,88 0,26 0, ,84 0 8,84 0,05 0 0,05 8,89 8,89 0,31 0, , , ,47 35,47 0,11 0, , ,55 0,03 0 0,03 21,58 21,58 0,27 0, , ,99 0,01 0 0, ,18 0, , ,56 0,05 0 0,05 18,61 18,61 0,38 0, ,2 0 12, ,2 12,2 0,13 0, , , ,56 22,56 0,22 0, ,1 0 0,1 7,1 7,1 0,46 0, , , ,82 35,82 0,16 0,05 Summa 834, ,767 2,35 0 2,35 837, ,117 10,1507 1,7123 PV-ku 836, ,637 PV-st 1,87 1,87 Aktii v välin e 13

14 Rouste TUULEPARK kuu raport Tehtud 01 SEP :31 Periood on 01 AUG 2009 / 31 AUG 2009 Kellaaeg , ,11 0,01 0 0,01 25,12 25,12 0,11 0, ,5 0 6,5 0,02 0 0,02 6,52 6,52 0,46 0, , , ,82 15,82 0,03 0, ,79 0 9,79 0,01 0 0,01 9,8 9,8 0,28 0, , ,78 0,06 0 0,06 16,84 16,84 0,26 0, ,4 0 13,4 0,14 0 0,14 13,54 13,54 0,5 0, , ,54 0,12 0 0,12 11,66 11,66 0,4 0, ,76 0 4,76 0,01 0 0,01 4,77 4,77 0,4 0, ,37 0 0,37 0,45 0 0,45 0,82 0,82 0, ,3 0 8,3 0,14 0 0,14 8,44 8,44 0,15 0, , ,45 0,02 0 0,02 28,47 28,47 0,2 0, , , ,49 64,49 0,17 0, ,8 0 7,8 0,22 0 0,22 8,02 8,02 0,41 0, , ,18 0,26 0 0,26 47,44 47,44 0,56 0, , , ,17 57,17 0,12 0, , , ,4 134,4 0,15 0, , ,69 0,11 0 0,11 50,8 50,8 0,1 0, , ,19 0,02 0 0,02 29,21 29,21 0,22 0, , , ,14 57,14 0,22 0, , ,14 0,16 0 0,16 11,3 11,3 0,53 0, , ,89 0,02 0 0,02 14,91 14,91 0,2 0, , , ,95 36,95 0,13 0, , ,31 0,02 0 0,02 28,33 28,33 0,16 0, , ,65 0,01 0 0,01 19,66 19,66 0,14 0, , , ,23 10,23 0,15 0, ,9 0 35, ,9 35,9 0,13 0, , , ,46 53,46 0,16 0, , ,21 0,01 0 0,01 19,22 19,22 0,22 0, , ,69 0,02 0 0,02 31,71 31,71 0,23 0, , ,77 0,03 0 0,03 31,8 31,8 0,15 0, , , ,41 108,41 0,27 0,19 Summa 990,49 990,49 1,86 1,86 992,35 992,35 7,92 2,6 PV ku 991,95 991,95 PV st 1,46 1,46 14

15 Esivere TP kuu raport Tehtud 01 OCT :20 Periood on 01 SEP 2009 / 30 SEP 2009 Kellaaeg , ,28 0,01 0 0,01 113,29 113,29 0,27 0, , ,63 0,01 0 0,01 121,64 121,64 0,4 0, , ,13 0,12 0 0,12 23,25 23,25 0,1 0, , ,27 0,01 0 0,01 123,28 123,28 0,4 0, , , ,05 34,05 0,11 0, ,9 0 8,9 0,09 0 0,09 8,99 8,99 0,24 0, , ,94 0,01 0 0,01 29,95 29,95 0,14 0, , , ,45 131,45 0,27 0, , , ,95 135,95 0,27 0, , ,63 0,11 0 0,11 13,74 13,74 0,48 0, , ,66 0,04 0 0,04 22,7 22,7 0,26 0, ,91 0 5,91 0,1 0 0,1 6,01 6,01 0,42 0, , , ,61 19,61 0,26 0, , , ,87 35,87 0,13 0, ,1 0 10,1 0,13 0 0,13 10,23 10,23 0,44 0, , ,73 0,03 0 0,03 25,76 25,76 0,32 0, , , ,68 77,68 0,24 0, , , ,39 50,39 0,18 0, ,8 0 24, ,8 24,8 0,13 0, , , ,29 45,29 0,14 0, ,5 0 63, ,5 63,5 0,2 0, , , ,59 81,59 0,23 0, , , ,18 127,18 0,34 0, , , ,29 70,29 0,18 0, , , ,34 46,34 0,14 0, , , ,97 38,97 0,14 0, , , ,63 77,63 0,22 0, , , ,27 80,27 0,22 0, , ,62 0,07 0 0,07 72,69 72,69 0,38 0, , ,71 0,02 0 0,02 81,73 81,73 0,28 0,18 Summa 1793, ,37 0,75 0, , ,12 7,53 3,9 PV ku 1793, ,89 PV st 0,52 0,52 15

16 Esivere TP kuu raport Tehtud 02 NOV :15 Periood on 01 OCT 2009 / 31 OCT 2009 Kellaaeg ,55 10,92 11,63 0,12 0, ,67 11,04 11,63 0,13 0, ,1 10,39 14,71 0,01 0, ,11 10,4 14,71 0,2 0, ,66 64,51 21,15 0,01 0, ,67 64,52 21,15 0,27 0, ,58 107,89 47,69 0,01 0, ,59 107,9 47,69 0,47 0, ,8 121,62 43, ,8 121,62 43,18 0,39 0, ,73 49,57 24,16 0,02 0, ,75 49,59 24,16 0,3 0, ,19 96,11 38,08 0,01 0 0,01 134,2 96,11 38,09 0,32 0, ,69 3,86 32,83 0,15 0, ,84 4,01 32,83 0,47 0, ,97 31,35 12, ,97 31,35 12,62 0,17 0, ,55 3,49 5,06 0,19 0,19 0 8,74 3,68 5,06 0,5 0, ,3 24,14 4,16 0,04 0 0,04 28,34 24,14 4,2 0,23 0, ,51 40,19 22, ,51 40,19 22,32 0,26 0, ,06 12,01 11,05 0,18 0, ,24 12,19 11,05 0,11 0, ,52 106,25 41,27 0,01 0, ,53 106,26 41,27 0,48 0, ,83 16,66 51, ,83 16,66 51,17 0,29 0, ,87 15,84 6, ,87 15,84 6,03 0,09 0, ,68 16,23 3, ,68 16,23 3,45 0,24 0, ,55 10,67 5,88 0,03 0, ,58 10,7 5,88 0,2 0, ,32 80,63 24, ,32 80,63 24,69 0,23 0, ,36 44,24 15, ,36 44,24 15,12 0,19 0, ,9 31,68 4, ,9 31,68 4,22 0,24 0, ,93 14,71 8, ,93 14,71 8,22 0,08 0, ,69 4,25 1,44 0,01 0,01 0 5,7 4,26 1,44 0,42 0, ,54 4,62 2, ,54 4,62 2,92 0,3 0, ,24 28,92 10, ,24 28,92 10,32 0,14 0, ,34 35,85 12, ,34 35,85 12,49 0,14 0, ,5 11,35 7,15 0,02 0, ,52 11,37 7,15 0,33 0, ,89 43,47 23, ,89 43,47 23,42 0,27 0, ,53 20,48 10, ,53 20,48 10,05 0,09 0, ,34 4,06 3,28 0,08 0,08 0 7,42 4,14 3,28 0,45 0, ,68 0,68 1 0,47 0,34 0,13 2,15 1,02 1,13 0,76 0 Summa 1587,4 1066,64 520,76 1,36 1,18 0, , , ,94 8,76 3,35 PV ku 1588, ,56 520,91 PV st 1,07 0,92 0,15 16

17 Esivere TP kuu raport Tehtud 01 DEC :35 Periood on 01 NOV 2009 / 30 NOV 2009 Kellaaeg ,06 10,73 6,33 0,09 0, ,15 10,82 6,33 0,32 0, ,29 33,05 19, ,29 33,05 19,24 0,18 0, ,83 46,54 34, ,83 46,54 34,29 0,33 0, ,56 32,47 15, ,56 32,47 15,09 0,16 0, ,83 45,08 20, ,83 45,08 20,75 0,26 0, ,14 8,92 10, ,14 8,92 10,22 0,12 0, ,48 20,27 14, ,48 20,27 14,21 0,12 0, ,58 6,63 2, ,58 6,63 2,95 0,28 0, ,32 37,22 11, ,32 37,22 11,1 0,17 0, ,41 5,29 10, ,41 5,29 10,12 0,23 0, ,48 10,65 3, ,48 10,65 3,83 0,26 0, ,24 25,94 15, ,24 25,94 15,3 0,14 0, ,41 9,29 10, ,41 9,29 10,12 0,15 0, ,54 21,63 6, ,54 21,63 6,91 0,11 0, ,27 44,15 24,12 0,01 0 0,01 68,28 44,15 24,13 0,29 0, ,1 15,49 8, ,1 15,49 8,61 0,08 0, ,31 29,8 7, ,31 29,8 7,51 0,15 0, ,23 89,8 26, ,23 89,8 26,43 0,23 0, ,96 4,38 17,58 0,06 0, ,02 4,44 17,58 0,4 0, ,93 39,59 16, ,93 39,59 16,34 0,15 0, ,11 87,23 23, ,11 87,23 23,88 0,24 0, ,39 36,71 27, ,39 36,71 27,68 0,25 0, ,7 88,66 42, ,7 88,66 42,04 0,31 0, ,06 24,44 40, ,06 24,44 40,62 0,22 0, ,66 33,5 12, ,66 33,5 12,16 0,16 0, ,32 60,44 52, ,32 60,44 52,88 0,24 0, ,79 83,92 58, ,79 83,92 58,87 0,27 0, ,15 49,27 10, ,15 49,27 10,88 0,2 0, ,19 10,82 23, ,19 10,82 23,37 0,24 0, ,98 65,65 12, ,98 65,65 12,33 0,33 0,26 Summa 1663, ,56 585,76 0,16 0,15 0, ,48 PV ku 1663, ,69 585,76 PV st 0,13 0, , ,77 6,59 3,38 17

18 EsivereTP raport Tehtud 04 JAN :50 Periood on 01 DEC 2009 / 31 DEC 2009 Kellaaeg PV st, PV st,, PV st,, PV ku, valja, R+, R PV st, paeva, PV st, oo, ,65 0,17 0, ,56 0,12 0, ,21 0,06 0, ,47 0,02 0, ,44 0,04 0, ,55 0,07 0, ,95 0,06 0, ,56 0,05 0, ,04 0,04 0 3,52 0,01 0,7 0, ,02 0,01 0,01 2,02 0 0,77 0,01 0, ,94 0,01 0, ,32 0,27 0,05 3,14 0,01 0,75 0 0, ,06 0,02 0,04 6,64 0,01 0,55 0 0, ,15 0,26 0, ,27 0,14 0, ,73 0,28 0, ,79 0,31 0, ,49 0,09 0, ,27 0,22 0, ,01 0,15 0, ,13 0, ,46 0,08 0,4 0, ,83 0,2 0, ,89 0,36 0, ,01 0, ,76 0,13 0,18 0, ,33 0,47 0, ,78 0,12 0, ,86 0,13 0, ,55 0,26 0, ,05 0, ,32 0,07 0,31 0, ,67 0,07 0, ,43 0,16 0,27 1,27 0 0,79 0,16 0,27 Summa 1,06 0,69 0, ,08 3,97 8,79 0,4 0,66 PV st Max, MW 0, Max aeg 21:00 18

19 Monthly production reports of Virtsu II wind farm VIRTSU TUULEPARK kuu raport Tehtud 02 FEB :10 Periood on 01 JAN 2009 / 31 JAN 2009 Kellaaeg ,6 22,48 18,12 0,72 0, ,17 0,1 0,07 14,73 10,6 4,13 1, ,2 0,1 0,1 7,05 5,53 1,52 1, ,03 0, ,29 6,75 9,54 1, ,22 0,2 0,02 21,71 13,8 7,91 1, ,06 91,79 46,27 0,58 0, ,09 5,91 0, ,36 51,3 10,06 0, ,18 70,04 40,14 0,59 0, ,82 35,26 7,56 0, ,06 99,01 25,05 0,44 0, ,68 98,55 48,13 0,57 0, ,79 43,32 34,47 0, ,27 34,35 27,92 0,62 0, ,77 17,1 2,67 0, ,76 25,22 12,54 0, ,03 0, ,73 4,46 10,27 1, ,36 3,81 2,55 1, ,97 15,49 6,48 0, ,95 41,61 9,34 0, ,01 0, ,04 2,97 8,07 1, ,89 8,57 7,32 0, ,97 9,06 9,91 0, ,17 36,33 29,84 0,61 0, ,62 5,07 7,55 0, ,33 0,31 0,02 0,74 0,27 0,47 2, ,03 0 0,03 1,56 1,13 0,43 1, ,04 0,02 0,02 2,7 1,84 0,86 1, ,21 0,2 0,01 1,83 0,83 1 1, ,18 11,18 4 0, ,09 14,28 4,81 0,63 0 Summa 1,27 1 0, ,93 797,09 404,84 31,28 0,12 Max MW 0,04 0,04 0,03 6,92 6,92 6,91 Max aeg : : : : :

20 VIRTSU TUULEPARK kuu raport Tehtud 02 MAR :20 Periood on 01 FEB 2009 / 28 FEB 2009 Kellaaeg ,34 0,34 0 2,35 0,61 1,74 2, ,19 0,05 0,14 2,48 2,25 0,23 1, ,05 34,67 6,38 0, ,1 0,1 0 8,78 1,53 7,25 1, ,2 7,88 3,32 0, ,75 22,75 5 0, ,41 10,57 11,84 0, ,32 86,63 37,69 0,63 0, ,01 0, ,29 13,22 12,07 0, ,26 10,26 6 0, ,68 15,52 8,16 0, ,15 21,26 12,89 0,47 0, ,03 0,03 0 7,12 4,12 3 1, ,31 11,52 4,79 0, ,08 0,07 0,01 3,84 1,96 1,88 1, ,24 3,56 1,68 1, ,35 18,52 4,83 0, ,76 8,51 7,25 0, ,17 0,16 0,01 3,58 3,06 0,52 1, ,79 14,83 6,96 0, ,42 29,23 14,19 0, ,18 87,35 17,83 0,64 0, ,03 7,31 13,72 1, ,31 0,13 0,18 19,86 14,83 5,03 1, ,16 0, ,29 2,55 20,74 1, ,64 17,76 4,88 0,68 0, ,07 0, ,18 17,4 6,78 1, ,16 72,59 42,57 0,53 0,02 Summa 1,46 1,12 0,34 811,47 542,25 269,22 29,17 0,07 Max MW 0,04 0,04 0,04 6,86 6,86 6,71 Max aeg : : : : :

21 VIRTSU TUULEPARK kuu raport Tehtud 01 APR :00 Periood on 01 MAR 2009 / 31 MAR 2009 Kellaaeg ,06 0,03 0,03 16,75 6,04 10,71 1, ,15 0 0,15 34,94 30,63 4,31 1, ,65 41,35 0,73 0, ,01 0, ,19 7,06 4,13 0, ,99 17,12 4,87 0, ,05 18,29 7,76 0, ,09 8,02 8,07 0, ,15 13,41 5,74 0, ,44 1,8 2,64 1, ,07 0, ,69 9,58 5,11 1, ,15 0,14 0,01 7,32 1,81 5,51 1, ,36 0,26 0,1 4,82 3,31 1,51 1, ,15 0,14 0,01 9,7 5,66 4,04 1, ,91 14,49 4,42 0, ,23 0,22 0,01 8,11 1,71 6,4 1, ,22 0,05 0,17 20,69 17,13 3,56 1, ,84 21,36 40,48 0,68 0, ,3 19,6 7,7 0, ,06 20,44 4,62 0, ,03 0 0,03 41,07 31,97 9,1 0, ,39 85,78 33,61 0,6 0, ,1 0,09 0,01 14,41 8 6,41 1, ,08 0,04 0,04 6,54 4,08 2,46 1, ,94 20,82 7,12 1,31 0, ,84 20,96 15,88 0,99 0, ,13 0,11 0,02 14,36 9,67 4,69 1, ,11 27,21 3,9 1,22 0, ,02 0, ,02 4,73 9,29 1, ,59 10,32 1,27 1, ,06 0 0,06 45,01 38,66 6,35 1,37 0, ,48 38,81 47,67 0,52 0 Summa 1,82 1,18 0,64 857,8 537,12 320,68 34,73 0,23 Max MW 0,04 0,04 0,03 6,92 6,9 6,92 Max aeg : : : : :

22 VIRTSU TUULEPARK kuu raport Tehtud 04 MAY :46 Periood on 01 APR 2009 / 30 APR 2009 Kellaaeg , ,92 0,01 0 0,01 78,93 78,93 0,71 0, , , ,54 18,54 0, , , ,69 18,69 0, ,81 0 6,81 0,19 0 0, , , ,88 0,07 0 0,07 10,95 10,95 1, , , ,04 54,04 0, ,06 0 8,06 0,11 0 0,11 8,17 8,17 1, , ,31 0,01 0 0,01 20,32 20,32 0,78 0, , , ,88 77,88 0,64 0, ,59 0 3,59 0,13 0 0,13 3,72 3,72 1, ,91 0 2,91 0,02 0 0,02 2,93 2,93 1, ,91 0 6,91 0,09 0 0, , ,26 0 9,26 0,13 0 0,13 9,39 9,39 1, ,43 0 7,43 0,05 0 0,05 7,48 7,48 1, , ,15 0,01 0 0,01 18,16 18,16 1, , ,55 0,01 0 0,01 13,56 13,56 1, , ,16 0,21 0 0,21 16,37 16,37 1, , , ,83 125,83 0,57 0, , , , ,17 99,17 0,58 0, , ,54 0,13 0 0,13 11,67 11,67 1, ,73 0 1,73 0,19 0 0,19 1,92 1,92 1, , ,49 0,19 0 0,19 13,68 13,68 1, , ,73 0,07 0 0,07 11,8 11,8 1, ,74 0 6,74 0,11 0 0,11 6,85 6,85 1, , , ,62 57,62 0,5 0, , ,25 0,04 0 0,04 50,29 50,29 0,85 0, , , ,74 24,74 0, , ,51 0,08 0 0,08 15,59 15,59 1, , , ,56 23,56 0,54 0 Summa ,85 1,85 846,85 846,85 32,94 0,09 PV ku 846,38 846,38 PV st 1,38 1,38 22

23 VIRTSU TUULEPARK kuu raport Tehtud 01 JUN :45 Periood on 01 MAY 2009 / 31 MAY 2009 Kellaaeg , ,78 0,01 0 0,01 25,79 25,79 0, ,21 0 3,21 0,05 0 0,05 3,26 3,26 1, , ,53 0,11 0 0,11 15,64 15,64 1, , ,19 0,02 0 0,02 25,21 25,21 1,03 0, , , ,69 74,69 0,68 0, , , ,01 58,01 0,72 0, , ,43 0,03 0 0,03 16,46 16,46 1, , ,19 0,01 0 0,01 26,2 26,2 0,75 0, , , ,79 120,79 0,75 0, , , ,01 47,01 0, , ,78 0,1 0 0,1 19,88 19,88 1, , , ,79 74,79 0, ,9 0 83, ,9 83,9 0,51 0, , , ,33 54,33 0,6 0, , , ,66 15,66 0, ,53 0 9,53 0,09 0 0,09 9,62 9,62 1, ,59 0 8,59 0,07 0 0,07 8,66 8,66 1, ,13 0 0,13 6,13 6,13 1, , ,19 0,06 0 0,06 14,25 14,25 0, ,11 0 7,11 0,09 0 0,09 7,2 7,2 1, ,97 0 4,97 0,09 0 0,09 5,06 5,06 1, , , ,83 18,83 1, , , ,26 95,26 0,67 0, , , ,24 75,24 0,58 0, , , ,58 31,58 0, , ,13 0,01 0 0,01 16,14 16,14 1, , , ,57 85,57 0,65 0, , , ,93 43,93 0,56 0, , , ,98 40,98 0, , ,24 0,01 0 0,01 51,25 51,25 0, , ,25 0,07 0 0,07 22,32 22,32 0,83 0 Summa 1192, ,69 0,95 0, , ,64 28,37 0,15 PV ku 1193, ,36 PV st 0,67 0,67 23

24 VIRTSU TUULEPARK kuu raport Tehtud 01 JUL :31 Periood on 01 JUN 2009 / 30 JUN 2009 Kellaaeg ,33 0 7,33 0,15 0 0,15 7,48 7,48 1, , , ,01 28,01 0, ,7 0 38, ,7 38,7 0,49 0, , , ,67 97,67 0,75 0, , , ,05 22,05 1, , ,61 0,08 0 0,08 12,69 12,69 1, , , ,39 15,39 0, , ,11 0,01 0 0,01 12,12 12,12 1, , ,71 0,13 0 0,13 11,84 11,84 1, , ,35 0,08 0 0,08 14,43 14,43 1, , ,24 0,06 0 0,06 10,3 10,3 1, , ,69 0,01 0 0,01 26,7 26,7 0, , ,34 0,01 0 0,01 46,35 46,35 0, , ,59 0,02 0 0,02 111,61 111,61 0,76 0, , , ,35 108,35 0,7 0, , ,49 0,02 0 0,02 33,51 33,51 0, , , ,08 86,08 0,61 0, , ,14 0,03 0 0,03 26,17 26,17 0, , , ,14 46,14 0,56 0, ,3 0 32,3 0,06 0 0,06 32,36 32,36 0, ,63 0 4,63 0,1 0 0,1 4,73 4,73 1, , ,83 0,15 0 0,15 10,98 10,98 1, ,4 0 26, ,4 26,4 0, ,5 0 41, ,5 41,5 0, , , ,68 39,68 0, , ,63 0,01 0 0,01 42,64 42,64 0, , , ,86 19,86 0,82 0, , , ,83 22,83 0, ,5 0 2,5 0,19 0 0,19 2,69 2,69 2, , ,45 0,05 0 0,05 18,5 18,5 1,24 0 Summa 1016,6 1016,6 1,16 1, , ,76 27,99 0,1 PV ku 1017, ,39 PV st 0,79 0,79 24

25 VIRTSU TUULEPARK kuu raport Tehtud 03 AUG :50 Periood on 01 JUL 2009 / 31 JUL 2009 Kellaaeg ,02 0 3,02 0,33 0 0,33 3,35 3,35 1, , ,15 0,05 0 0,05 15,2 15,2 1, , ,26 0,05 0 0,05 15,31 15,31 1, , , , ,82 26,82 0, ,34 0 1,34 0,16 0 0,16 1,5 1,5 2, , , ,12 29,12 0, , ,68 0,07 0 0,07 17,75 17,75 1, , , ,26 127,26 0,73 0, , ,77 0,01 0 0,01 67,78 67,78 1,08 0, ,99 0 3,99 0,05 0 0,05 4,04 4,04 1, ,15 0 9,15 0,09 0 0,09 9,24 9,24 1, ,03 0 3,03 0,24 0 0,24 3,27 3,27 1, ,73 0 7,73 0,24 0 0,24 7,97 7,97 1, ,73 0 6,73 0,11 0 0,11 6,84 6,84 0, ,36 0 7,36 0,19 0 0,19 7,55 7,55 1, , , ,98 16,98 0, ,36 0 1,36 0,26 0 0,26 1,62 1,62 1, , ,49 0,02 0 0,02 32,51 32,51 0, , , ,76 54,76 0,69 0, , , ,48 84,48 0,62 0, , ,75 0,01 0 0,01 32,76 32,76 0, ,79 0 7,79 0,04 0 0,04 7,83 7,83 1, , ,82 0,01 0 0,01 37,83 37,83 0, , ,82 0,05 0 0,05 19,87 19,87 0, , ,29 0,01 0 0,01 16,3 16,3 0, , ,03 0,04 0 0,04 10,07 10,07 1, , , ,12 10,12 0, , ,85 0,01 0 0,01 10,86 10,86 1, ,66 0 4,66 0,07 0 0,07 4,73 4,73 1, , , ,87 26,87 0,64 0 Summa 727,48 727,48 2,11 2,11 729,59 729,59 34,84 0,12 PV ku 729,13 729,13 PV st 1,65 1,65 25

26 VIRTSU TUULEPARK kuu raport Tehtud 01 SEP :35 Periood on 01 AUG 2009 / 31 AUG 2009 Kellaaeg ,1 0 20, ,1 20,1 0, ,77 0 5,77 0,02 0 0,02 5,79 5,79 1, , , ,39 16,39 0, ,51 0 7,51 0,01 0 0,01 7,52 7,52 1, , ,43 0,03 0 0,03 17,46 17,46 0, , ,25 0,11 0 0,11 12,36 12,36 1, , ,77 0,1 0 0,1 14,87 14,87 1, ,93 0 3, ,93 3,93 1, ,68 0 0,68 0,37 0 0,37 1,05 1,05 1, ,41 0 6,41 0,13 0 0,13 6,54 6,54 1, , ,06 0,02 0 0,02 36,08 36,08 0, , , ,41 46,41 0,67 0, ,04 0 5,04 0,16 0 0,16 5,2 5,2 1, ,32 0 8,32 0,19 0 0,19 8,51 8,51 0,86 0, , , ,19 41,19 0, , , ,79 99,79 0,65 0, , , ,32 59,32 0,57 0, , , ,56 27,56 0, , , ,88 64,88 0, , ,93 0,13 0 0,13 17,06 17,06 1, , ,29 0,01 0 0,01 13,3 13,3 1, , , ,38 42,38 0, , ,41 0,01 0 0,01 16,42 16,42 0, , , ,95 15,95 0, ,92 0 8, ,92 8,92 1, , , ,24 39,24 0, , , ,35 35,35 0, , , ,29 20,29 0, , ,47 0,08 0 0,08 34,55 34,55 0, , , ,21 24,21 0, , , ,61 85,61 0,67 0,02 Summa 846,86 846,86 1,37 1,37 848,23 848,23 29,3 0,12 PV ku 847,97 847,97 PV st 1,11 1,11 26

27 VIRTSU TUULEPARK kuu raport Tehtud 01 OCT :31 Periood on 01 SEP 2009 / 30 SEP 2009 Kellaaeg , , ,46 79,46 0,63 0, , , ,83 109,83 0,75 0, , , ,48 33,48 0,62 0, , , ,94 95,94 0,7 0, , , ,54 27,54 0,56 0, ,95 0 5,95 0,08 0 0,08 6,03 6,03 1, , , ,61 23,61 0, , , ,41 110,41 0,72 0, , , ,11 120,11 0,73 0, , ,29 0,12 0 0,12 17,41 17,41 1, , ,02 0,03 0 0,03 24,05 24,05 0, ,21 0 3,21 0,1 0 0,1 3,31 3,31 1, , ,98 0,01 0 0,01 13,99 13,99 1, , , ,05 28,05 0, ,63 0 8,63 0,13 0 0,13 8,76 8,76 1, ,4 0 19,4 0,06 0 0,06 19,46 19,46 1, , , ,18 71,18 0,67 0, , , ,69 31,69 0, , ,24 0,01 0 0,01 18,25 18,25 0, , , ,53 32,53 0, , , ,66 51,66 0, , , ,58 71,58 0,59 0, , , ,91 85,91 0,68 0, , , ,96 51,96 0, , , ,65 26,65 0,48 0, ,4 0 27, ,4 27,4 0, , , ,24 57,24 0, , , ,09 59,09 0,57 0, , ,82 0,06 0 0,06 53,88 53,88 0,97 0, , ,42 0,02 0 0,02 55,44 55,44 0,82 0,01 Summa 1415, ,28 0,62 0, ,9 1415,9 23,76 0,25 PV ku 1415, ,69 PV st 0,41 0,41 27

28 VIRTSU TUULEPARK kuu raport Tehtud 02 NOV :27 Periood on 01 OCT 2009 / 31 OCT 2009 Kellaaeg ,66 9,98 12,68 0,07 0, ,73 10,05 12,68 1, ,76 10,1 11,66 0,01 0, ,77 10,11 11,66 0, ,58 59,05 18, ,58 59,05 18,53 0,63 0, ,43 99,23 48, ,43 99,23 48,2 0,7 0, ,82 96,53 34, ,82 96,53 34,29 0,59 0, ,9 27,78 13,12 0,02 0, ,92 27,8 13,12 0, ,06 83,59 41, ,06 83,59 41,47 0,61 0, ,19 1,93 18,26 0,18 0, ,37 2,11 18,26 1, ,74 38,99 7, ,74 38,99 7,75 0,68 0, ,35 3,86 3,49 0,13 0,13 0 7,48 3,99 3,49 1, ,73 17,17 3,56 0,05 0 0,05 20,78 17,17 3,61 0, ,55 31,67 16, ,55 31,67 16,88 0,53 0, , , , ,69 0,44 0, ,52 94,86 31, ,52 94,86 31,66 0,72 0, ,17 9,3 39, ,17 9,3 39,87 0,93 0, ,95 13,38 5, ,95 13,38 5,57 0, ,05 16,61 2, ,05 16,61 2,44 0, ,43 7,86 5,57 0,04 0, ,47 7,9 5,57 0, ,31 70,92 21, ,31 70,92 21,39 0,51 0, ,47 43,04 15, ,47 43,04 15,43 0, ,8 24,67 3, ,8 24,67 3,13 0, ,09 11,43 5, ,09 11,43 5,66 0, ,51 3,27 1, ,51 3,27 1,24 1, ,66 3,66 2 0,01 0,01 0 5,67 3,67 2 1, ,93 26,24 7, ,93 26,24 7,69 0,44 0, ,35 27,08 9, ,35 27,08 9,27 0, ,23 12,81 8, ,23 12,81 8,42 1, ,1 50,06 30, ,1 50,06 30,04 0,55 0, ,97 13,83 8, ,97 13,83 8,14 0, ,15 4,4 2,75 0,06 0,06 0 7,21 4,46 2,75 1, ,2 0,49 0,71 0,41 0,28 0,13 1,61 0,77 0,84 1,95 0 Summa 1367,35 927,79 439,56 0,98 0,8 0, ,33 928,59 439,74 26,64 0,33 PV ku 1368,19 928,46 439,73 PV st 0,84 0,67 0,17 28

29 VIRTSU TUULEPARK kuu raport Tehtud 01 DEC :48 Periood on 01 NOV 2009 / 30 NOV 2009 Kellaaeg ,25 11,12 6,13 0,06 0, ,31 11,18 6,13 1, ,43 53,4 21, ,43 53,4 21,03 0,61 0, ,96 49,44 35, ,96 49,44 35,52 0,61 0, ,71 32,18 15, ,71 32,18 15,53 0,43 0, ,54 46,48 15, ,54 46,48 15,06 0,55 0, ,04 3,76 6, ,04 3,76 6,28 1, ,48 21,22 17, ,48 21,22 17,26 0, ,31 4,95 2, ,31 4,95 2,36 1, ,44 30,54 6, ,44 30,54 6,9 0, ,71 4,78 8, ,71 4,78 8, ,4 7 3, ,4 7 3,4 1, ,92 15,02 9, ,92 15,02 9,9 0,45 0, ,12 6,62 6, ,12 6,62 6,5 0, ,95 26,24 6, ,95 26,24 6,71 0, ,35 70,17 38, ,35 70,17 38,18 0,69 0, ,61 17,27 10, ,61 17,27 10,34 0, ,57 30,91 6, ,57 30,91 6,66 0, ,68 62,25 16, ,68 62,25 16,43 0,56 0, ,32 2,5 22,82 0,04 0, ,36 2,54 22,82 1, ,1 41,26 17, ,1 41,26 17,84 0, ,79 62,72 23, ,79 62,72 23,07 0,64 0, ,6 37,26 22, ,6 37,26 22,34 0,76 0, ,25 63,09 33, ,25 63,09 33,16 0,62 0, , , , ,54 0,72 0, ,2 29,23 10, ,2 29,23 10,97 0,71 0, ,69 53,67 49, ,69 53,67 49,02 0, ,36 65,64 48, ,36 65,64 48,72 0,61 0, ,38 39,18 11, ,38 39,18 11,2 0, ,05 12,67 16, ,05 12,67 16,38 0, ,85 85,21 13, ,85 85,21 13,64 0,7 0,03 Summa 1534,6 1003,78 530,82 0,1 0, ,7 PV ku 1534, ,87 530,82 PV st 0,09 0, , ,82 22,08 0,28 29

30 VirtsuTP raport Tehtud 04 JAN :00 Periood on 01 DEC 2009 / 31 DEC 2009 Kellaaeg PV st, PV st,, PV st,, PV ku, valja, R+, R PV st, paeva, PV st, oo, ,95 0,02 0, ,38 0,01 0, ,86 0 1, ,96 0 1, ,17 0 0, ,07 0 0, ,49 0 0, ,37 0 0, ,04 0,04 0 2,59 0 1,96 0, ,03 0 0,03 1,81 0 2,06 0 0, ,87 0 1, ,3 0,25 0,05 1,65 0 2,02 0 0, ,05 0,01 0,04 4,25 0 1,68 0 0, ,5 0,02 0, ,06 0 0, ,39 0,02 0, ,96 0,02 0, ,48 0 0, ,35 0,01 0, ,71 0 0, ,12 0, ,82 0,01 1,17 0, ,02 0,01 0, ,52 0,03 0, ,2 0,01 0, ,12 0,03 0, ,71 0,01 0, ,37 0 1, ,59 0,02 0, ,08 0, ,44 0 1,2 0, ,13 0 0, ,31 0,11 0,2 1,25 0 2,03 0,11 0,2 Summa 0,93 0,61 0, ,04 0,22 28,73 0,35 0,58 PV st Max, MW 0, Max aeg 21:00 30

MONITORING REPORT NO. 5

MONITORING REPORT NO. 5 MONITORING REPORT NO. 5 FOR PERIOD 01.01-31.12.2009 PAKRI WIND FARM JOINT IMPLEMENTATION PROJECT UNFCCC NO. EE1000067 PREPARED BY: OÜ NELJA ENERGIA Regati pst 1, 11911 Tallinn, Estonia Tel: +372 6 396

More information

MONITORING REPORT NO. 1

MONITORING REPORT NO. 1 MONITORING REPORT NO. 1 FOR PERIOD 12.03.2007-31.12.2007 VIRU NIGULA WIND FARM JOINT IMPLEMENTATION PROJECT PREPARED BY: OÜ NELJA ENERGIA Regati pst 1, 11911 Tallinn, Estonia Tel: +372 6 396 610 E-mail:

More information

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and 2001-2002 Rainfall For Selected Arizona Cities Phoenix Tucson Flagstaff Avg. 2001-2002 Avg. 2001-2002 Avg. 2001-2002 October 0.7 0.0

More information

GAMINGRE 8/1/ of 7

GAMINGRE 8/1/ of 7 FYE 09/30/92 JULY 92 0.00 254,550.00 0.00 0 0 0 0 0 0 0 0 0 254,550.00 0.00 0.00 0.00 0.00 254,550.00 AUG 10,616,710.31 5,299.95 845,656.83 84,565.68 61,084.86 23,480.82 339,734.73 135,893.89 67,946.95

More information

Jackson County 2013 Weather Data

Jackson County 2013 Weather Data Jackson County 2013 Weather Data 61 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data

More information

Changing Hydrology under a Changing Climate for a Coastal Plain Watershed

Changing Hydrology under a Changing Climate for a Coastal Plain Watershed Changing Hydrology under a Changing Climate for a Coastal Plain Watershed David Bosch USDA-ARS, Tifton, GA Jeff Arnold ARS Temple, TX and Peter Allen Baylor University, TX SEWRU Objectives 1. Project changes

More information

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement 2019 Settlement Calendar for ASX Cash Market Products ASX Settlement Settlement Calendar for ASX Cash Market Products 1 ASX Settlement Pty Limited (ASX Settlement) operates a trade date plus two Business

More information

2018 Annual Review of Availability Assessment Hours

2018 Annual Review of Availability Assessment Hours 2018 Annual Review of Availability Assessment Hours Amber Motley Manager, Short Term Forecasting Clyde Loutan Principal, Renewable Energy Integration Karl Meeusen Senior Advisor, Infrastructure & Regulatory

More information

Variability and trends in daily minimum and maximum temperatures and in diurnal temperature range in Lithuania, Latvia and Estonia

Variability and trends in daily minimum and maximum temperatures and in diurnal temperature range in Lithuania, Latvia and Estonia Variability and trends in daily minimum and maximum temperatures and in diurnal temperature range in Lithuania, Latvia and Estonia Jaak Jaagus Dept. of Geography, University of Tartu Agrita Briede Dept.

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System Colorado PUC E-Filings System Attachment A.1 RES Summary Total Acquired Non-Distributed Generation Distributed Generation Retail Distributed Generation Carry Forward Previous Carry Forward Total Carry

More information

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA Document Prepared By: Cauvery Hydro Energy Limited Contact Information Cauvery Hydro Energy Limited 67, Lavina Courts,

More information

Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center

Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data

More information

ENGINE SERIAL NUMBERS

ENGINE SERIAL NUMBERS ENGINE SERIAL NUMBERS The engine number was also the serial number of the car. Engines were numbered when they were completed, and for the most part went into a chassis within a day or so. However, some

More information

DROUGHT IN MAINLAND PORTUGAL

DROUGHT IN MAINLAND PORTUGAL DROUGHT IN MAINLAND Ministério da Ciência, Tecnologia e Ensino Superior Instituto de Meteorologia, I. P. Rua C Aeroporto de Lisboa Tel.: (351) 21 844 7000 e-mail:informacoes@meteo.pt 1749-077 Lisboa Portugal

More information

Interannual variation of MODIS NDVI in Lake Taihu and its relation to climate in submerged macrophyte region

Interannual variation of MODIS NDVI in Lake Taihu and its relation to climate in submerged macrophyte region Yale-NUIST Center on Atmospheric Environment Interannual variation of MODIS NDVI in Lake Taihu and its relation to climate in submerged macrophyte region ZhangZhen 2015.07.10 1 Outline Introduction Data

More information

Published by ASX Settlement Pty Limited A.B.N Settlement Calendar for ASX Cash Market Products

Published by ASX Settlement Pty Limited A.B.N Settlement Calendar for ASX Cash Market Products Published by Pty Limited A.B.N. 49 008 504 532 2012 Calendar for Cash Market Products Calendar for Cash Market Products¹ Pty Limited ( ) operates a trade date plus three Business (T+3) settlement discipline

More information

P7.7 A CLIMATOLOGICAL STUDY OF CLOUD TO GROUND LIGHTNING STRIKES IN THE VICINITY OF KENNEDY SPACE CENTER, FLORIDA

P7.7 A CLIMATOLOGICAL STUDY OF CLOUD TO GROUND LIGHTNING STRIKES IN THE VICINITY OF KENNEDY SPACE CENTER, FLORIDA P7.7 A CLIMATOLOGICAL STUDY OF CLOUD TO GROUND LIGHTNING STRIKES IN THE VICINITY OF KENNEDY SPACE CENTER, FLORIDA K. Lee Burns* Raytheon, Huntsville, Alabama Ryan K. Decker NASA, Marshall Space Flight

More information

2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT

2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT 2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT Settlement Calendar for ASX Cash Market Products 1 ASX Settlement Pty Limited (ASX Settlement) operates a trade date plus two Business

More information

Drought Characterization. Examination of Extreme Precipitation Events

Drought Characterization. Examination of Extreme Precipitation Events Drought Characterization Examination of Extreme Precipitation Events Extreme Precipitation Events During the Drought For the drought years (1999-2005) daily precipitation data was analyzed to find extreme

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System Attachment A.1 RES Summary Colorado PUC E-Filings System Total RECs Acquired Non-Distributed Generation Distributed Generation Retail Distributed Generation Carry Forward Previous Carry Forward Total Carry

More information

Location. Datum. Survey. information. Etrometa. Step Gauge. Description. relative to Herne Bay is -2.72m. The site new level.

Location. Datum. Survey. information. Etrometa. Step Gauge. Description. relative to Herne Bay is -2.72m. The site new level. Tide Gauge Location OS: 616895E 169377N WGS84: Latitude: 51 o 22.919196 N Longitude: 01 o 6.9335907 E Instrument Type Etrometa Step Gauge Benchmarks Benchmark TGBM = 5.524m above Ordnance Datum Newlyn

More information

Calculations Equation of Time. EQUATION OF TIME = apparent solar time - mean solar time

Calculations Equation of Time. EQUATION OF TIME = apparent solar time - mean solar time Calculations Equation of Time APPARENT SOLAR TIME is the time that is shown on sundials. A MEAN SOLAR DAY is a constant 24 hours every day of the year. Apparent solar days are measured from noon one day

More information

Location. Datum. Survey. information. Etrometa. Step Gauge. Description. relative to Herne Bay is -2.72m. The site new level.

Location. Datum. Survey. information. Etrometa. Step Gauge. Description. relative to Herne Bay is -2.72m. The site new level. Tide Gauge Location OS: 616895E 169377N WGS84: Latitude: 51 o 22.919196 N Longitude: 01 o 6.9335907 E Instrument Type Etrometa Step Gauge Benchmarks Benchmark TGBM = 5.524m above Ordnance Datum Newlyn

More information

Scarborough Tide Gauge

Scarborough Tide Gauge Tide Gauge Location OS: 504898E 488622N WGS84: Latitude: 54 16' 56.990"N Longitude: 00 23' 25.0279"W Instrument Valeport 740 (Druck Pressure Transducer) Benchmarks Benchmark Description TGBM = 4.18m above

More information

Memo. I. Executive Summary. II. ALERT Data Source. III. General System-Wide Reporting Summary. Date: January 26, 2009 To: From: Subject:

Memo. I. Executive Summary. II. ALERT Data Source. III. General System-Wide Reporting Summary. Date: January 26, 2009 To: From: Subject: Memo Date: January 26, 2009 To: From: Subject: Kevin Stewart Markus Ritsch 2010 Annual Legacy ALERT Data Analysis Summary Report I. Executive Summary The Urban Drainage and Flood Control District (District)

More information

Mountain View Community Shuttle Monthly Operations Report

Mountain View Community Shuttle Monthly Operations Report Mountain View Community Shuttle Monthly Operations Report December 6, 2018 Contents Passengers per Day, Table...- 3 - Passengers per Day, Chart...- 3 - Ridership Year-To-Date...- 4 - Average Daily Ridership

More information

Determine the trend for time series data

Determine the trend for time series data Extra Online Questions Determine the trend for time series data Covers AS 90641 (Statistics and Modelling 3.1) Scholarship Statistics and Modelling Chapter 1 Essent ial exam notes Time series 1. The value

More information

Life Cycle of Convective Systems over Western Colombia

Life Cycle of Convective Systems over Western Colombia Life Cycle of Convective Systems over Western Colombia Meiry Sakamoto Uiversidade de São Paulo, São Paulo, Brazil Colombia Life Cycle of Convective Systems over Western Colombia Convective System (CS)

More information

DAILY QUESTIONS 28 TH JUNE 18 REASONING - CALENDAR

DAILY QUESTIONS 28 TH JUNE 18 REASONING - CALENDAR DAILY QUESTIONS 28 TH JUNE 18 REASONING - CALENDAR LEAP AND NON-LEAP YEAR *A non-leap year has 365 days whereas a leap year has 366 days. (as February has 29 days). *Every year which is divisible by 4

More information

Drought in Southeast Colorado

Drought in Southeast Colorado Drought in Southeast Colorado Nolan Doesken and Roger Pielke, Sr. Colorado Climate Center Prepared by Tara Green and Odie Bliss http://climate.atmos.colostate.edu 1 Historical Perspective on Drought Tourism

More information

Long-term Water Quality Monitoring in Estero Bay

Long-term Water Quality Monitoring in Estero Bay Long-term Water Quality Monitoring in Estero Bay Keith Kibbey Laboratory Director Lee County Environmental Laboratory Division of Natural Resource Management Estero Bay Monitoring Programs Three significant

More information

Monthly Magnetic Bulletin

Monthly Magnetic Bulletin BRITISH GEOLOGICAL SURVEY Ascension Island Observatory Monthly Magnetic Bulletin December 2008 08/12/AS Crown copyright; Ordnance Survey ASCENSION ISLAND OBSERVATORY MAGNETIC DATA 1. Introduction Ascension

More information

Verification & Certification Report (August 2009) For Power Generation

Verification & Certification Report (August 2009) For Power Generation Verification & Certification Report (August 2009) For Power Generation With Reference To Power Generation Guarantee (Agreement between Gujarat Alkalies & Chemicals Ltd. and Suzlon Energy Ltd.) for 23.75MW

More information

Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC

Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC This threat overview relies on projections of future climate change in the Mekong Basin for the period 2045-2069 compared to a baseline of 1980-2005.

More information

PROGRESS ACCOMPLISHED THIS PERIOD

PROGRESS ACCOMPLISHED THIS PERIOD Semi-Annual Report Period Covered: September 1, 21 through February 28, 217 Prepared By: Richard Radigan Title: Monitoring of a Constructed Oyster Reef in the St. Lucie Estuary Agency: Florida Fish & Wildlife

More information

March 5, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

March 5, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 Tom A. Loski Chief Regulatory Officer March 5, 2010 British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 592-7464

More information

Pre-Calc Chapter 1 Sample Test. D) slope: 3 4

Pre-Calc Chapter 1 Sample Test. D) slope: 3 4 Pre-Calc Chapter 1 Sample Test 1. Use the graphs of f and g to evaluate the function. f( x) gx ( ) (f o g)(-0.5) 1 1 0 4. Plot the points and find the slope of the line passing through the pair of points.

More information

GTR # VLTs GTR/VLT/Day %Δ:

GTR # VLTs GTR/VLT/Day %Δ: MARYLAND CASINOS: MONTHLY REVENUES TOTAL REVENUE, GROSS TERMINAL REVENUE, WIN/UNIT/DAY, TABLE DATA, AND MARKET SHARE CENTER FOR GAMING RESEARCH, DECEMBER 2017 Executive Summary Since its 2010 casino debut,

More information

Distributed Generation. Retail Distributed Generation

Distributed Generation. Retail Distributed Generation Attachment A.1 RES Summary Total RECs Acquired NonDistributed Generation Distributed Generation Retail Distributed Generation Carry Forward to 2017 Previous Carry Forward to 2017 Total Carry Forward to

More information

Multivariate Regression Model Results

Multivariate Regression Model Results Updated: August, 0 Page of Multivariate Regression Model Results 4 5 6 7 8 This exhibit provides the results of the load model forecast discussed in Schedule. Included is the forecast of short term system

More information

SYSTEM BRIEF DAILY SUMMARY

SYSTEM BRIEF DAILY SUMMARY SYSTEM BRIEF DAILY SUMMARY * ANNUAL MaxTemp NEL (MWH) Hr Ending Hr Ending LOAD (PEAK HOURS 7:00 AM TO 10:00 PM MON-SAT) ENERGY (MWH) INCREMENTAL COST DAY DATE Civic TOTAL MAXIMUM @Max MINIMUM @Min FACTOR

More information

EIA411 May 1, A Report to the Office of Energy Emergency Operations Department of Energy Under EIA-411

EIA411 May 1, A Report to the Office of Energy Emergency Operations Department of Energy Under EIA-411 EIA411 May 1, 2006 A Report to the Office of Energy Emergency Operations Department of Energy Under EIA-411 All questions concerning this data should be directed to: Jason Speer Southwest Power Pool 415

More information

Astrological Calendar. for Central Time

Astrological Calendar. for Central Time 2014 for Central Time January 2014 Capricorn Compliments of: Clayten Tylor Esoteric Astrologer (604)331-0251 Jan 15, 2014 Full Moon 10:53:09 PM CST Jan 1, 2014 New Moon 05:15:21 AM CST January 2014 Sun

More information

Wind Resource Data Summary Cotal Area, Guam Data Summary and Transmittal for December 2011

Wind Resource Data Summary Cotal Area, Guam Data Summary and Transmittal for December 2011 Wind Resource Data Summary Cotal Area, Guam Data Summary and Transmittal for December 2011 Prepared for: GHD Inc. 194 Hernan Cortez Avenue 2nd Floor, Ste. 203 Hagatna, Guam 96910 January 2012 DNV Renewables

More information

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training Training Calendar 2014 Public s (ISO LSS PMP BPI ERM IT Sales Training) www.excelledia.com (ISO, LSS, PMP, BPI, ERM, IT, Sales Public s) 1 Schedule Registration JANUARY FEBRUARY 2 days 26 JAN 27 JAN 3

More information

SYSTEM BRIEF DAILY SUMMARY

SYSTEM BRIEF DAILY SUMMARY SYSTEM BRIEF DAILY SUMMARY * ANNUAL MaxTemp NEL (MWH) Hr Ending Hr Ending LOAD (PEAK HOURS 7:00 AM TO 10:00 PM MON-SAT) ENERGY (MWH) INCREMENTAL COST DAY DATE Civic TOTAL MAXIMUM @Max MINIMUM @Min FACTOR

More information

Jackson County 2014 Weather Data

Jackson County 2014 Weather Data Jackson County 2014 Weather Data 62 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data

More information

Suppression of colonies of Reticulitermes spp. using the Sentricon termite colony elimination system: : A case study in Chatsworth, CA

Suppression of colonies of Reticulitermes spp. using the Sentricon termite colony elimination system: : A case study in Chatsworth, CA Suppression of colonies of Reticulitermes spp. using the Sentricon termite colony elimination system: : A case study in Chatsworth, CA Gail M. Getty, MS, Chris Solek, MS, Ron 1 1 Sbragia, Ph.D., Michael

More information

SOLAR POWER FORECASTING BASED ON NUMERICAL WEATHER PREDICTION, SATELLITE DATA, AND POWER MEASUREMENTS

SOLAR POWER FORECASTING BASED ON NUMERICAL WEATHER PREDICTION, SATELLITE DATA, AND POWER MEASUREMENTS BASED ON NUMERICAL WEATHER PREDICTION, SATELLITE DATA, AND POWER MEASUREMENTS Detlev Heinemann, Elke Lorenz Energy Meteorology Group, Institute of Physics, Oldenburg University Workshop on Forecasting,

More information

Champaign-Urbana 2000 Annual Weather Summary

Champaign-Urbana 2000 Annual Weather Summary Champaign-Urbana 2000 Annual Weather Summary ILLINOIS STATE WATER SURVEY 2204 Griffith Dr. Champaign, IL 61820 wxobsrvr@sws.uiuc.edu Maria Peters, Weather Observer January: January started on a mild note,

More information

Statistical Analysis of Temperature and Rainfall Trend in Raipur District of Chhattisgarh

Statistical Analysis of Temperature and Rainfall Trend in Raipur District of Chhattisgarh Current World Environment Vol. 10(1), 305-312 (2015) Statistical Analysis of Temperature and Rainfall Trend in Raipur District of Chhattisgarh R. Khavse*, R. Deshmukh, N. Manikandan, J. L Chaudhary and

More information

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training Training Calendar 2014 Public s (ISO LSS PMP BPI ERM IT Sales Training) (ISO, LSS, PMP, BPI, ERM, IT, Sales Public s) 1 Schedule Registration JANUARY ) FEBRUARY 2 days 26 JAN 27 JAN 3 days 28 JAN 30 JAN

More information

CWV Review London Weather Station Move

CWV Review London Weather Station Move CWV Review London Weather Station Move 6th November 26 Demand Estimation Sub-Committee Background The current composite weather variables (CWVs) for North Thames (NT), Eastern (EA) and South Eastern (SE)

More information

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training Training Calendar 2014 Public s (ISO LSS PMP BPI ERM IT Sales Training) (ISO, LSS, PMP, BPI, ERM, IT, Sales Public s) 1 Schedule Registration JANUARY IMS ) FEBRUARY 2 days 26 JAN 27 JAN 3 days 28 JAN 30

More information

Bryan Butler. National Radio Astronomy Observatory. November 23, 1998

Bryan Butler. National Radio Astronomy Observatory. November 23, 1998 MMA Memo. No. 238 Precipitable Water at KP 1993{1998 Bryan Butler National Radio Astronomy Observatory November 23, 1998 Introduction This memo is essentially a clone of MMA Memo No. 237 (also VLA Scientic

More information

Dates and Prices ICAEW - Manchester In Centre Programme Prices

Dates and Prices ICAEW - Manchester In Centre Programme Prices Dates and Prices ICAEW - Manchester - 2019 In Centre Programme Prices Certificate Level GBP ( ) Intensive Accounting 690 Assurance 615 Law 615 Business, Technology and Finance 615 Mangement Information

More information

Practice Test Chapter 8 Sinusoidal Functions

Practice Test Chapter 8 Sinusoidal Functions FOM 12 Practice Test Chapter 8 Sinusoidal Functions Name: Multiple Choice Identify the choice that best completes the statement or answers the question. Block: _ 1. Convert 120 into radians. A. 2" 3 B.

More information

Computing & Telecommunications Services Monthly Report January CaTS Help Desk. Wright State University (937)

Computing & Telecommunications Services Monthly Report January CaTS Help Desk. Wright State University (937) January 215 Monthly Report Computing & Telecommunications Services Monthly Report January 215 CaTS Help Desk (937) 775-4827 1-888-775-4827 25 Library Annex helpdesk@wright.edu www.wright.edu/cats/ Last

More information

2003 Water Year Wrap-Up and Look Ahead

2003 Water Year Wrap-Up and Look Ahead 2003 Water Year Wrap-Up and Look Ahead Nolan Doesken Colorado Climate Center Prepared by Odie Bliss http://ccc.atmos.colostate.edu Colorado Average Annual Precipitation Map South Platte Average Precipitation

More information

Three main areas of work:

Three main areas of work: Task 2: Climate Information 1 Task 2: Climate Information Three main areas of work: Collect historical and projected weather and climate data Conduct storm surge and wave modeling, sea-level rise (SLR)

More information

TABLE -I RAINFALL RECORDED AT PORT BLAIR (MM) FROM 1949 TO 2009

TABLE -I RAINFALL RECORDED AT PORT BLAIR (MM) FROM 1949 TO 2009 A. RAINFALL TABLE -I RAINFALL RECORDED AT PORT BLAIR (MM) FROM 1949 TO 2009 MONTH/YEAR 1949 1950 1951 1952 1953 1954 1955 1956 1957 1958 JANUARY 0.0 0.8 82.5 0.0 26.9 37.3 71.4 46.2 10.2 28.7 FEBRUARY

More information

Computing & Telecommunications Services

Computing & Telecommunications Services Computing & Telecommunications Services Monthly Report September 214 CaTS Help Desk (937) 775-4827 1-888-775-4827 25 Library Annex helpdesk@wright.edu www.wright.edu/cats/ Table of Contents HEAT Ticket

More information

Effective Gross Revenue 3,335,005 3,130,591 3,320,552 3,338,276 3,467,475 3,606,962 3,509,653 3,981,103 3,984,065 4,147,197 4,300,790

Effective Gross Revenue 3,335,005 3,130,591 3,320,552 3,338,276 3,467,475 3,606,962 3,509,653 3,981,103 3,984,065 4,147,197 4,300,790 Schedule Of Prospective Cash Flow In Inflated Dollars for the Fiscal Year Beginning 1/1/2011 Potential Gross Revenue Base Rental Revenue $3,331,625 $3,318,220 $3,275,648 $3,270,394 $3,368,740 $3,482,312

More information

STATISTICAL FORECASTING and SEASONALITY (M. E. Ippolito; )

STATISTICAL FORECASTING and SEASONALITY (M. E. Ippolito; ) STATISTICAL FORECASTING and SEASONALITY (M. E. Ippolito; 10-6-13) PART I OVERVIEW The following discussion expands upon exponential smoothing and seasonality as presented in Chapter 11, Forecasting, in

More information

In Centre, Online Classroom Live and Online Classroom Programme Prices

In Centre, Online Classroom Live and Online Classroom Programme Prices In Centre, and Online Classroom Programme Prices In Centre Online Classroom Foundation Certificate Bookkeeping Transactions 430 325 300 Bookkeeping Controls 320 245 225 Elements of Costing 320 245 225

More information

Sections 01, 02, & 04 (Bressoud and Ehren) 9 October, 2015

Sections 01, 02, & 04 (Bressoud and Ehren) 9 October, 2015 Math 135, Applied Calculus First Midterm Exam Sections 01, 02, & 04 (Bressoud and Ehren) 9 October, 2015 This exam is worth 100 points. Show your work. Partial credit will be given for partially correct

More information

Average 175, , , , , , ,046 YTD Total 1,098,649 1,509,593 1,868,795 1,418, ,169 1,977,225 2,065,321

Average 175, , , , , , ,046 YTD Total 1,098,649 1,509,593 1,868,795 1,418, ,169 1,977,225 2,065,321 AGRICULTURE 01-Agriculture JUL 2,944-4,465 1,783-146 102 AUG 2,753 6,497 5,321 1,233 1,678 744 1,469 SEP - 4,274 4,183 1,596 - - 238 OCT 2,694 - - 1,032 340-276 NOV 1,979-5,822 637 3,221 1,923 1,532 DEC

More information

Average 175, , , , , , ,940 YTD Total 944,460 1,284,944 1,635,177 1,183, ,954 1,744,134 1,565,640

Average 175, , , , , , ,940 YTD Total 944,460 1,284,944 1,635,177 1,183, ,954 1,744,134 1,565,640 AGRICULTURE 01-Agriculture JUL 2,944-4,465 1,783-146 102 AUG 2,753 6,497 5,321 1,233 1,678 744 1,469 SEP - 4,274 4,183 1,596 - - 238 OCT 2,694 - - 1,032 340-276 NOV 1,979-5,822 637 3,221 1,923 1,532 DEC

More information

Additional Wind and Stability Observations at S6mastaoageroi in Reyoarfiorour Il

Additional Wind and Stability Observations at S6mastaoageroi in Reyoarfiorour Il ... ~EfJURSTOFA ~ ISLANDS Report Flosi Hrafn Sig urosson Hreinn Hjartarson Torfi Ka ri Antonsson ~rour Aroson Additional Wind and Stability Observations at Smastaoageroi in Reyoarfiorour Il November 1999

More information

Sampling, Storage and Pre-Treatment Techniques

Sampling, Storage and Pre-Treatment Techniques 1. Sampling Protocol Sample needs to be representative of the body of water (or other matrix) from where it originates. Sampling Considerations A. Location B. Frequency (hourly, daily) C. Spatial and temporal

More information

peak half-hourly New South Wales

peak half-hourly New South Wales Forecasting long-term peak half-hourly electricity demand for New South Wales Dr Shu Fan B.S., M.S., Ph.D. Professor Rob J Hyndman B.Sc. (Hons), Ph.D., A.Stat. Business & Economic Forecasting Unit Report

More information

July 2017 LOGISTICAL HARMONY

July 2017 LOGISTICAL HARMONY Li s&staging(wpedestriansidewalkprot.) (4/18/through7/18/2017) July2017 101BelvidereEastFaçadeWorkPipeStaging (4/18/through7/18/2017) 101BelvidereEastFaçadeWork (through8/31/2017) Legend RampaccesstoTMCX

More information

Supplementary Figure 1 Annual number of F0-F5 (grey) and F2-F5 (black) tornado observations over 30 years ( ) for Canada and United States.

Supplementary Figure 1 Annual number of F0-F5 (grey) and F2-F5 (black) tornado observations over 30 years ( ) for Canada and United States. SUPPLEMENTARY FIGURES Supplementary Figure 1 Annual number of F0-F5 (grey) and F2-F5 (black) tornado observations over 30 years (1980-2009) for Canada and United States. Supplementary Figure 2 Differences

More information

Highlights of the 2006 Water Year in Colorado

Highlights of the 2006 Water Year in Colorado Highlights of the 2006 Water Year in Colorado Nolan Doesken, State Climatologist Atmospheric Science Department Colorado State University http://ccc.atmos.colostate.edu Presented to 61 st Annual Meeting

More information

The Climate of Murray County

The Climate of Murray County The Climate of Murray County Murray County is part of the Crosstimbers. This region is a transition between prairies and the mountains of southeastern Oklahoma. Average annual precipitation ranges from

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power

More information

WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY

WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY MONTHLY REPORT October 15, 2007 Black & Veatch Project: 144374 Prepared by: Black & Veatch Corporation 6300 S. Syracuse Way

More information

COUNTRY REPORT. Jakarta. July, th National Directorate of Meteorology and Geophysics of Timor-Leste (DNMG)

COUNTRY REPORT. Jakarta. July, th National Directorate of Meteorology and Geophysics of Timor-Leste (DNMG) The Southeastern Asia-Oceania Flash Flood COUNTRY REPORT Jakarta. July, 10-12 th 2017 National Directorate of Meteorology and Geophysics of Timor-Leste (DNMG) Carla Feritas and Crisostimo Lobato Democratic

More information

Alberto Troccoli, Head of Weather and Energy Research Unit, CSIRO, Australia ICCS 2013 Jamaica, 5 December 2013 (remotely, unfortunately)

Alberto Troccoli, Head of Weather and Energy Research Unit, CSIRO, Australia ICCS 2013 Jamaica, 5 December 2013 (remotely, unfortunately) 013 Alberto Troccoli, Head of Weather and Energy Research Unit, CSIRO, Australia ICCS 013 Jamaica, 5 December 013 (remotely, unfortunately) Historical and projected changes in World primary energy demand

More information

CLIMOGRAPH UNIT: s^io

CLIMOGRAPH UNIT: s^io Narrre: Block: Date: CLIMOGRAPH UNIT: s^io The climate can be defined as the average amount of rainfall, and the average temperature in a region. The climate of a region affects the type of soil that is

More information

Annual Average NYMEX Strip Comparison 7/03/2017

Annual Average NYMEX Strip Comparison 7/03/2017 Annual Average NYMEX Strip Comparison 7/03/2017 To Year to Year Oil Price Deck ($/bbl) change Year change 7/3/2017 6/1/2017 5/1/2017 4/3/2017 3/1/2017 2/1/2017-2.7% 2017 Average -10.4% 47.52 48.84 49.58

More information

SHADOW - Main Result. windpro CUMULTATIEVE EFFECTEN SLAGSCHADUW HERENTALS. EDF Luminus Markiesstraat Brussel

SHADOW - Main Result. windpro CUMULTATIEVE EFFECTEN SLAGSCHADUW HERENTALS. EDF Luminus Markiesstraat Brussel SHADOW - Main Result Assumptions for shadow calculations Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look in WTG table Minimum sun height over

More information

JOURNAL OF INTERNATIONAL ACADEMIC RESEARCH FOR MULTIDISCIPLINARY Impact Factor 1.393, ISSN: , Volume 2, Issue 4, May 2014

JOURNAL OF INTERNATIONAL ACADEMIC RESEARCH FOR MULTIDISCIPLINARY Impact Factor 1.393, ISSN: , Volume 2, Issue 4, May 2014 Impact Factor 1.393, ISSN: 3583, Volume, Issue 4, May 14 A STUDY OF INVERSIONS AND ISOTHERMALS OF AIR POLLUTION DISPERSION DR.V.LAKSHMANARAO DR. K. SAI LAKSHMI P. SATISH Assistant Professor(c), Dept. of

More information

The Climate of Bryan County

The Climate of Bryan County The Climate of Bryan County Bryan County is part of the Crosstimbers throughout most of the county. The extreme eastern portions of Bryan County are part of the Cypress Swamp and Forest. Average annual

More information

The Climate of Marshall County

The Climate of Marshall County The Climate of Marshall County Marshall County is part of the Crosstimbers. This region is a transition region from the Central Great Plains to the more irregular terrain of southeastern Oklahoma. Average

More information

Final Report. COMET Partner's Project. University of Texas at San Antonio

Final Report. COMET Partner's Project. University of Texas at San Antonio Final Report COMET Partner's Project University: Name of University Researcher Preparing Report: University of Texas at San Antonio Dr. Hongjie Xie National Weather Service Office: Name of National Weather

More information

Technical note on seasonal adjustment for M0

Technical note on seasonal adjustment for M0 Technical note on seasonal adjustment for M0 July 1, 2013 Contents 1 M0 2 2 Steps in the seasonal adjustment procedure 3 2.1 Pre-adjustment analysis............................... 3 2.2 Seasonal adjustment.................................

More information

KING EDWARD POINT OBSERVATORY MAGNETIC DATA

KING EDWARD POINT OBSERVATORY MAGNETIC DATA BRITISH GEOLOGICAL SURVEY King Edward d Point Observatory Monthly Magnetic Bulletin October 2018 18/10/KE King Edward Point (UK) Maps British Antarctic Survey KING EDWARD POINT OBSERVATORY MAGNETIC DATA

More information

FOWPI Metocean Workshop Modelling, Design Parameters and Weather Windows

FOWPI Metocean Workshop Modelling, Design Parameters and Weather Windows FOWPI Metocean Workshop Modelling, Design Parameters and Weather Windows Jesper Skourup, Chief Specialist, COWI 1 The Project is funded by The European Union Agenda 1. Metocean Data Requirements 2. Site

More information

The Climate of Pontotoc County

The Climate of Pontotoc County The Climate of Pontotoc County Pontotoc County is part of the Crosstimbers. This region is a transition region from the Central Great Plains to the more irregular terrain of southeast Oklahoma. Average

More information

Stream Discharge and the Water Budget

Stream Discharge and the Water Budget Regents Earth Science Unit 6: Water Cycle & Climate Name: Lab # Stream Discharge and the Water Budget Introduction: The United States Geological Survey (USGS) measures and publishes values for the daily

More information

Payment of Funds

Payment of Funds 30 July 1999 CIRCULAR THE FURTHER EDUCATION FUNDING COUNCIL Payment of Funds 1999-2000 Cheylesmore House Quinton Road Coventry CV1 2WT To Principals of colleges Principals of higher education institutions

More information

Champaign-Urbana 2001 Annual Weather Summary

Champaign-Urbana 2001 Annual Weather Summary Champaign-Urbana 2001 Annual Weather Summary ILLINOIS STATE WATER SURVEY 2204 Griffith Dr. Champaign, IL 61820 wxobsrvr@sws.uiuc.edu Maria Peters, Weather Observer January: After a cold and snowy December,

More information

Table 01A. End of Period End of Period End of Period Period Average Period Average Period Average

Table 01A. End of Period End of Period End of Period Period Average Period Average Period Average SUMMARY EXCHANGE RATE DATA BANK OF ZAMBIA MID-RATES Table 01A Period K/USD K/GBP K/ZAR End of Period End of Period End of Period Period Average Period Average Period Average Monthly January 6.48 6.46 9.82

More information

Variability and trend of the heat balance in the southeast Indian Ocean

Variability and trend of the heat balance in the southeast Indian Ocean Variability and trend of the heat balance in the southeast Indian Ocean Ming Feng, CSIRO Marine & Atmospheric Research Arne Biastoch, Claus Böning, Leibniz-Institut für Meeresforschung Nick Caputi, Department

More information

Public Library Use and Economic Hard Times: Analysis of Recent Data

Public Library Use and Economic Hard Times: Analysis of Recent Data Public Library Use and Economic Hard Times: Analysis of Recent Data A Report Prepared for The American Library Association by The Library Research Center University of Illinois at Urbana Champaign April

More information

The Climate of Payne County

The Climate of Payne County The Climate of Payne County Payne County is part of the Central Great Plains in the west, encompassing some of the best agricultural land in Oklahoma. Payne County is also part of the Crosstimbers in the

More information

Site Description: Tower Site

Site Description: Tower Site Resource Summary for Elizabeth Site Final Report Colorado Anemometer Loan Program Monitoring Period: 7/3/06 /26/07 Report Date: January, 0 Site Description: The site is.6 miles northeast of the town of

More information

PROJECT REPORT (ASL 720) CLOUD CLASSIFICATION

PROJECT REPORT (ASL 720) CLOUD CLASSIFICATION PROJECT REPORT (ASL 720) CLOUD CLASSIFICATION SUBMITTED BY- PRIYANKA GUPTA 2011CH70177 RINI KAPOOR 2011CH70179 INDIVIDUAL CONTRIBUTION- Priyanka Gupta- analysed data of region considered in India (West:80,

More information

Monthly Trading Report Trading Date: Dec Monthly Trading Report December 2017

Monthly Trading Report Trading Date: Dec Monthly Trading Report December 2017 Trading Date: Dec 7 Monthly Trading Report December 7 Trading Date: Dec 7 Figure : December 7 (% change over previous month) % Major Market Indicators 5 4 Figure : Summary of Trading Data USEP () Daily

More information