City of Panama City March 14, Harrison Avenue File No.: P Panama City, FL 32401

Size: px
Start display at page:

Download "City of Panama City March 14, Harrison Avenue File No.: P Panama City, FL 32401"

Transcription

1 P a n a m a C i t y O f f i c e 7500 McElvey Road, Suite A Panama City Beach, FL Tel: (850) Fax: (850) Geotechnical, Environmental & Construction Materials Testing City of Panama City March 14, Harrison Avenue File No.: P Panama City, FL Attention: Subject: Ms. Julie Young Administration Specialist Asbestos Survey of 409 Harrison Avenue (Roof Only) Panama City, Florida Dear Ms. Young: As requested, Southern Earth Sciences, Inc. has completed an asbestos survey for the roof of the Martin Theater located at 409 Harrison Avenue in Panama City, Florida. We understand that the roof is scheduled for renovation. Sections of the roof were defined by the Client as sections A, B, C, D, E, F, and G. This report will provide the results of our investigation. 1.0 INTRODUCTION On February 27, 2017 and March 2, 2017, asbestos surveyors with our firm obtained a total of forty-six (46) bulk samples of suspect asbestos-containing building materials for analysis. Fiftyfour (54) samples were analyzed due to multiple-layered samples. The samples consisted of mastic, roofing felt, sealant, flashing roof coating, insulation, roofing tar, caulk and mortar. The bulk samples were sent to Carolina Environmental, Inc., an analytical laboratory in Cary, NC. Bulk samples were analyzed by Polarized Light Microscopy (PLM), E.P.A. Method 600/R- 93/116. Test results and sample locations are included in the attached Asbestos Analytical Report / Chain of Custody and Figure DEFINITIONS Asbestos Containing Materials (ACM): Building materials used for construction of a structure that are known or are suspect for containing asbestos. Asbestos: Asbestos is the asbestiform varieties of chrysotile, crocidolite, amosite, anthophylite, tremolite, and actinolite. Asbestos Inspection: An evaluation performed by a trained and E.P.A. certified inspector to determine the presence or absence of Asbestos-containing materials. Asbestos inspectors engage in the survey and assessment of ACBM. Category I non-friable ACM: asbestos-containing packings, gaskets, resilient floor covering and asphalt roofing products. MOBILE MONTGOMERY SUMMERDALE DESTIN PANAMA CITY BEACH TALLAHASSEE BATON ROUGE MANDEVILLE NEW ORLEANS

2 409 Harrison Boulevard Page 2 Category II non-friable ACM: any material, excluding Category I ACM, that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Demolition: the removal of load-bearing walls or structural components. Regulated Asbestos Containing Material (RACM): (a) Friable asbestos materials, (b) Category I non-friable ACM that has become friable, (c) Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or, (d) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations regulated by NESHAPS. Renovation: the removal of any other building components other than load-bearing walls or structural components. 3.0 PHYSICAL SURVEY According to the Bay County Property Appraiser s Office, the northern portion of the structure containing roof sections A, B, C, E, F and G was constructed in The southern portion of the structure containing roof section D was constructed in Roof A was a sloped deck with rolled-on roofing over insulation on metal. Parapet walls surrounding roof A were covered with sealant, roofing felt and mastic over brick. The edges and penetrations of roof A were lined with flashing and sealant. Roof B was a flat deck covered with rolled-on roofing over insulation on metal. The edges and penetrations of roof B were lined with flashing and sealant. Standing water was noted on roof B during the time of our survey. Roof C was a flat deck covered with roofing tar over felt and insulation on metal. The edges and penetrations of roof C were lined with sealant and fabric over flashing on felt. Roof C was accessed with a hydraulic bucket lift. Roof D was a pitched metal roof over metal joists. Samples of caulk located around roof D were obtained for laboratory analysis. Roof sections E, F and G were located on top of the metal marquee located at the Harrison Avenue entrance of the Martin Theater. The marquee was anchored into the brick and mortar of the structure and was comprised of a metal deck and raised metal walls. Sealant and flashing lined the edges and penetrations of roof sections E, F and G. Conduits for the neon lights were also coated in sealant. A grey deck coating was applied to top of the deck. Yellow insulation was located under electrical panels on the deck. Caulk was applied around the walls of the marquee. Roof sections E, F and G were accessed with a hydraulic bucket lift.

3 409 Harrison Boulevard Page SUMMARY OF FINDINGS The E.P.A. definition for an asbestos-containing material is a building material that contains more than 1 percent asbestos when analyzed by PLM, and is placed into two categories; friable and non-friable. Friable ACM is a material that can be easily pulverized with hand pressure as opposed to non-friable ACM. Sample numbers and locations found on Figure 1 correspond with locations of samples obtained of roof sections. 4.1 FRIABLE ACM There were no friable asbestos containing materials identified in the buildings during our survey. 4.2 NON-FRIABLE ACM The felt with mastic on the parapet walls of roof A contained Chrysotile asbestos. The felt with mastic was weathered but intact and in fair condition. There is approximately 1,680 square feet of felt with mastic on the parapet walls of roof A. The flashing sealant of roof sections E, F and G contained Chrysotile asbestos. The flashing sealant was intact and in good condition. The area of roof sections E, F and G is approximately 272 square feet. The conduit sealant and deck coating of roof sections E, F and G contained Chrysotile asbestos. The conduit sealant was intact and in good condition. The deck coating was weathered but intact and in good condition. The area of roof sections E, F and G is approximately 272 square feet. The flashing on roof sections E, F and G contained 3% Chrysotile asbestos. The flashing was intact and in good condition. The area of roof sections E, F and G is approximately 272 square feet. 5.0 CONCLUSIONS AND RECOMMENDATIONS In accordance with the National Emission Standards for Hazardous Air Pollutants (NESHAPS), 40 CFR Part 61, Subpart M, Regulated Asbestos Containing Materials (RACM) are required to be removed prior to demolition. The felt with mastic located on the parapet walls of roof A are classified as a Category I nonfriable ACM. The flashing sealant, conduit sealant, flashing and deck coating located on roof sections E, F and G are classified as a Category I non-friable ACM. Although the felt with mastic, flashing sealant, conduit sealant, flashing and deck coating could be left in place during demolition, we recommend that these materials be removed prior to demolition. Removal of

4 409 Harrison Boulevard Page 4 these materials will allow the building materials to be recycled and/or disposed in a C&D landfill as non-acm waste. NESHAPS requires a 10-working day notification to the Florida Department of Environmental Protection (FDEP) Division of Air Management prior to the start date of an asbestos abatement project, prior to renovations that would disturb asbestos containing materials and prior to demolition. 6.0 GENERAL COMMENTS This asbestos survey has been performed to identify asbestos containing materials in the existing building and is not intended as abatement specifications and drawings. Comments and observations given above reflect an opinion as to the various materials and conditions visually observed during the inspections and should not be construed as a representation or warranty expressed or implied, as to scope, thoroughness or accuracy of the inspection. A conscious effort is made to identify all suspect materials. There is a possibility that conditions or materials may exist which could not be identified during our survey due to physical inaccessibility and the use of nondestructive sampling methods. Materials that typically do not contain asbestos have not been sampled. These materials include but are not limited to rubber, fiberglass, etc. Conclusions and recommendations given in this report are based upon our interpretation of current regulatory standards. Changes in regulatory standards may require changes in our conclusions and recommendations. We appreciate the opportunity to be of service to you on this project. Should you have any questions or require additional information, please contact our office. Sincerely, SOUTHERN EARTH SCIENCES, INC. Caleb Sims Asbestos Surveyor Mark E. Wilson, P.E. Asbestos Consultant No. AX 85 State of Florida

5

6 March 7, 2017 Southern Earth Sciences, Inc McElvey Road, Suite A Panama City Beach, FL CLIENT PROJECT: 409 Harrison Avenue; P CEI LAB CODE: A Dear Customer: Enclosed are asbestos analysis results for PLM Bulk samples received at our laboratory on March 3, The samples were analyzed for asbestos using polarizing light microscopy (PLM) per the EPA 600 Method. Sample results containing >1% asbestos are considered asbestos-containing materials (ACMs) per EPA regulatory requirements. The detection limit for the EPA 600 Method is <1% asbestos by weight as determined by visual estimation. Thank you for your business and we look forward to continuing good relations. If you have any questions, please feel free to call our office at Kind Regards, Tianbao Bai, Ph.D., CIH oratory Director 730 SE Maynard Road Cary, NC

7 AMENDED ASBESTOS ANALYTICAL REPORT By: Polarized Light Microscopy Prepared for Southern Earth Sciences, Inc. CLIENT PROJECT: 409 Harrison Avenue; P CEI LAB CODE: A TEST METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 REPORT DATE: 03/06/17 TOTAL SAMPLES ANALYZED: 46 # SAMPLES >1% ASBESTOS: 9 TEL:

8 AMENDED Asbestos Report Summary By: POLARIZING LIGHT MICROSCOPY PROJECT: 409 Harrison Avenue; P CEI LAB CODE: A METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 Client ID Layer ID Color Sample Description A-1 A-2 A-3 A-4 ASBESTOS % Layer 1 A Roof Core Sample Layer 2 A Brown Roof Core Sample- Insulation A Sealant Layer 1 A Roof Core Sample Layer 2 A Brown Roof Core Sample- Insulation A Flashing A-5 A Felt W/ Mastic Chrysotile A-6 A-7 A-8 A-9 A-10 A-11 B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 C-1 C-2 C-3 C-4 C-5 A Sealant A Flashing Layer 1 A Roof Core Sample Layer 2 A Brown Roof Core Sample- Insulation A Flashing A Sealant A Flashing Layer 1 A Roof Core Sample Layer 2 A Brown Roof Core Sample- Insulation Layer 1 A Roof Core Sample Layer 2 A Brown Roof Core Sample- Insulation Layer 1 A Roof Core Sample Layer 2 A Brown Roof Core Sample- Insulation A Joint Sealant A Joint Sealant A Joint Sealant A Flashing A Flashing A Flashing A Roofing A Roofing A Flashing A Sealant W/ Fabric A Flashing Page 1 of 2

9 AMENDED Asbestos Report Summary By: POLARIZING LIGHT MICROSCOPY PROJECT: 409 Harrison Avenue; P CEI LAB CODE: A METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 Client ID Layer ID Color Sample Description ASBESTOS % C-6 C-7 C-8 C-9 C-10 D-1 D-2 D-3 A Felt W/ Mastic A Felt W/ Mastic A Sealant W/fabric Layer 1 A Roof Core Sample Layer 2 A Brown Roof Core Sample- Insulation Layer 1 A Roof Core Sample Layer 2 A Brown Roof Core Sample- Insulation A White Roofing Caulk A White Roofing Caulk A White Roofing Caulk EFG-1 A ,Silver Flashing Sealant Chrysotile EFG-2 A ,Silver Flashing Sealant Chrysotile EFG-3 A ,Silver Conduit Sealant Chrysotile EFG-4 A ,Silver Conduit Sealant Chrysotile EFG-5 EFG-6 A Gray Mortar A Gray Mortar EFG-7 A Gray Flashing Chrysotile 3% EFG-8 A Gray Flashing Chrysotile 3% EFG-9 A Gray Deck Coating Chrysotile EFG-10 A Gray Deck Coating Chrysotile EFG-11 EFG-12 EFG-13 A White Caulk A White Caulk A Yellow Yellow Insulation Page 2 of 2

10 AMENDED ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Southern Earth Sciences, Inc McElvey Road, Suite A Panama City Beach, FL Project: 409 Harrison Avenue; P ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID A-1 Layer 1 A Layer 2 A A-2 A A-3 Layer 1 A Layer 2 A A-4 A A-5 A Description Roof Core Sample Roof Core Sample- Insulation Sealant Roof Core Sample Roof Core Sample- Insulation Flashing Felt W/ Mastic Attributes Brown Brown NON-ASBESTOS COMPONENTS Non % 1 Gravel Perlite ASBESTOS % 90% 40% % Gravel Perlite Metal Foil Chrysotile Page 1 of 9

11 AMENDED ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Southern Earth Sciences, Inc McElvey Road, Suite A Panama City Beach, FL Project: 409 Harrison Avenue; P ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % A-6 A Sealant 1 8 A-7 A Flashing 20% 70% Metal Foil A-8 Layer 1 A Roof Core Sample 4 40% 1 Gravel Layer 2 A Roof Core Sample- Insulation Brown 8 Perlite A-9 A Flashing 1 80% A-10 A Sealant 9 A-11 A Flashing 1 8 Page 2 of 9

12 AMENDED ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Southern Earth Sciences, Inc McElvey Road, Suite A Panama City Beach, FL Project: 409 Harrison Avenue; P ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % B-1 Layer 1 A Roof Core Sample 4 40% 1 Gravel Layer 2 A Roof Core Sample- Insulation Brown 8 Perlite B-2 Layer 1 A Roof Core Sample 4 40% 1 Gravel Layer 2 A Roof Core Sample- Insulation Brown 8 Perlite B-3 Layer 1 A Roof Core Sample 4 40% 1 Gravel Layer 2 A Roof Core Sample- Insulation Brown 8 Perlite B-4 A Joint Sealant 8 Page 3 of 9

13 AMENDED ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Southern Earth Sciences, Inc McElvey Road, Suite A Panama City Beach, FL Project: 409 Harrison Avenue; P ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % B-5 A Joint Sealant 8 B-6 A Joint Sealant 8 B-7 A Flashing 8 B-8 A Flashing 8 B-9 A Flashing 8 C-1 A Roofing 2% 98% C-2 A Roofing 2% 98% Page 4 of 9

14 AMENDED ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Southern Earth Sciences, Inc McElvey Road, Suite A Panama City Beach, FL Project: 409 Harrison Avenue; P ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % C-3 A Flashing 1 7 Metal Foil C-4 A Sealant W/ Fabric 2 7 C-5 A Flashing 1 7 Metal Foil C-6 A Felt W/ Mastic 3 6 C-7 A Felt W/ Mastic 3 6 C-8 A Sealant W/fabric 3 6 C-9 Layer 1 A Roof Core Sample 4 40% 1 Gravel Page 5 of 9

15 AMENDED ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Southern Earth Sciences, Inc McElvey Road, Suite A Panama City Beach, FL Project: 409 Harrison Avenue; P ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % Layer 2 A Roof Core Sample- Insulation Brown 8 Perlite C-10 Layer 1 A Roof Core Sample 4 40% 1 Gravel Layer 2 A Roof Core Sample- Insulation Brown 8 Perlite D-1 A Roofing Caulk White <1% 100% Caulk D-2 A Roofing Caulk White <1% 100% Caulk D-3 A Roofing Caulk White <1% 100% Caulk EFG-1 A Flashing Sealant,Silver 2% 83% Paint Chrysotile Page 6 of 9

16 AMENDED ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Southern Earth Sciences, Inc McElvey Road, Suite A Panama City Beach, FL Project: 409 Harrison Avenue; P ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % EFG-2 A Flashing Sealant,Silver 2% 88% Chrysotile EFG-3 A Conduit Sealant,Silver 2% 88% Paint Chrysotile EFG-4 A Conduit Sealant,Silver 2% 88% Paint Chrysotile EFG-5 A Mortar Gray <1% 100% Silicates EFG-6 A Mortar Gray <1% 100% Silicates EFG-7 A Flashing Gray 2% 9 3% Chrysotile EFG-8 A Flashing Gray 2% 9 3% Chrysotile Page 7 of 9

17 AMENDED ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Southern Earth Sciences, Inc McElvey Road, Suite A Panama City Beach, FL Project: 409 Harrison Avenue; P ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % EFG-9 A Deck Coating Gray 2% 93% Chrysotile EFG-10 A Deck Coating Gray 2% 93% Chrysotile EFG-11 A Caulk White <1% 100% Caulk EFG-12 A Caulk White <1% 100% Caulk EFG-13 A Yellow Insulation Yellow 2% 88% Metal Foil Foam Page 8 of 9

18 LEGEND: Non-Anth = Non-Asbestiform Anthophyllite Non-Trem = Non-Asbestiform Tremolite Calc Carb = Calcium Carbonate METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 REPORTING LIMIT: <1% by visual estimation REGULATORY LIMIT: >1% by weight Due to the limitations of the EPA 600 method, nonfriable organically bound materials (NOBs) such as vinyl floor tiles can be difficult to analyze via polarized light microscopy (PLM). EPA recommends that all NOBs analyzed by PLM, and found not to contain asbestos, be further analyzed by Transmission Electron Microscopy (TEM). Please note that PLM analysis of dust and soil samples for asbestos is not covered under NVLAP accreditation. Estimated measurement of uncertainty is available on request. This report relates only to the samples tested or analyzed and may not be reproduced, except in full, without written approval by CEI s, Inc. CEI s makes no warranty representation regarding the accuracy of client submitted information in preparing and presenting analytical results. Interpretation of the analytical results is the sole responsibility of the client. Samples were received in acceptable condition unless otherwise noted. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. Government. ANALYST: Saithya Painkal APPROVED BY: Tianbao Bai, Ph.D., CIH oratory Director Page 9 of 9

19

20

21

22

730 SE Maynard Road Cary, NC

730 SE Maynard Road Cary, NC January 31, 2019 P.O. Box 9053 Missoula, MT 59807 CLIENT PROJECT: U of M - McGill Hall, Rm 001A, 001, 015, 19-024 LAB CODE: T190368 Dear Customer: Enclosed are asbestos analysis results for TEM dust wipe

More information

REPORT. Limited Asbestos Survey Plaza Latina Stage Two Norcross, Georgia Gwinnett County. Project Number: Report Date: January 18, 2017

REPORT. Limited Asbestos Survey Plaza Latina Stage Two Norcross, Georgia Gwinnett County. Project Number: Report Date: January 18, 2017 REPORT Limited Asbestos Survey Plaza Latina Stage Two Norcross, Georgia Gwinnett County Project Number: 06.69.0 Report Date: January 8, 07 UNITED CONSULTING 65 Holcomb Bridge Road Norcross, GA 3007 (770)

More information

ASBESTOS SURVEY RESULTS 1975 JEFFERSONVILLE ROAD MACON, GEORGIA GEC JOB # PREPARED FOR

ASBESTOS SURVEY RESULTS 1975 JEFFERSONVILLE ROAD MACON, GEORGIA GEC JOB # PREPARED FOR ASBESTOS SURVEY RESULTS 1975 JEFFERSONVILLE ROAD MACON, GEORGIA GEC JOB # 160190.240 PREPARED FOR MR. DAVID FORTSON, DIRECTOR MACON BIBB ENGINEERING DEPARTMENT 780 THIRD STREET MACON, GEORGIA 31201 PREPARED

More information

Asbestos & Lead (Pb) Report Limited Pre-Demolition/Renovation Survey & Evaluation

Asbestos & Lead (Pb) Report Limited Pre-Demolition/Renovation Survey & Evaluation 1208 Main Street, Redwood City, CA 94063 P: (650) 569-4020 F: (650) 569-4023 E: info@protech-cal.com & Lead (Pb) Report Limited Pre-Demolition/Renovation Survey & Evaluation Date: Revised February 1, 2016

More information

Pinchin Ltd. Asbestos Laboratory Certificate of Analysis

Pinchin Ltd. Asbestos Laboratory Certificate of Analysis M. Adams / B. Ficko Date Received: March 24, 2017 Lab Reference No.: b167122 Date Analyzed: March 25, 2017 Analyst(s): C. Luong / T. Ly # Samples submitted: 9 # Phases analyzed: 18 Method of Analysis:

More information

Aloha High School Drop Ceiling Replacment - Summer # of 2x2 (ft.) Load -SF. Area Sq. Ft. # of 1x1 (ft.) # of 1x2 (ft.) HVAC Net Ducts?

Aloha High School Drop Ceiling Replacment - Summer # of 2x2 (ft.) Load -SF. Area Sq. Ft. # of 1x1 (ft.) # of 1x2 (ft.) HVAC Net Ducts? Aloha High School Drop Ceiling Replacment - Summer 07 Room # Area Sq. Ft. # of x (ft.) Additional Grid New x 4 (ft.) Existing x 4 (ft.) nonrecessed ceilinglight Load -SF # of x (ft.) # of x (ft.) HVAC

More information

HAZARDOUS MATERIALS SURVEY

HAZARDOUS MATERIALS SURVEY HAZARDOUS MATERIALS SURVEY 1057-1059 Dayton Avenue Saint Paul, Minnesota Prepared For: Ramsey County Tax Forfeited Lands May 1, 2014 Hazardous Materials Survey Peer #24048.00 1057-1059 Dayton Avenue, Saint

More information

REPORT OF FINDINGS ASBESTOS AND LEAD BASED PAINT ASSESSMENT

REPORT OF FINDINGS ASBESTOS AND LEAD BASED PAINT ASSESSMENT REPORT OF FINDINGS Reno Office 815 Maestro Drive Reno, Nevada 89511 Ph: 775.829.2245 Fax: 775.829.2213 Las Vegas Office 6280 South Valley View Boulevard Suite 604 Las Vegas, Nevada 89118 Ph: 702.260.4961

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

Certificate of Analysis

Certificate of Analysis Certificate of Alysis Certificate Number 17-95099-1 Client Earth Science Partnership 33 Cardiff Road Taffs Well Cardiff CF15 7RB 03-Apr-17 Our Reference Client Reference Order No Contract Title Description

More information

Lincoln County Board of Commissioner s Agenda Item Cover Sheet

Lincoln County Board of Commissioner s Agenda Item Cover Sheet Lincoln County Board of Commissioner s Agenda Item Cover Sheet Board Meeting Date: Agenda Item Type: Consent Agenda: Public Hearing: Regular Agenda: Presentation Time (est): Submitting Person: Phone Number/Ext:

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 22262-1 First edition 2012-07-01 Air quality Bulk materials Part 1: Sampling and qualitative determination of asbestos in commercial bulk materials Qualité de l air Matériaux

More information

Nellis Air Force Base Asbestos and Lead Based Paint Inspection Report

Nellis Air Force Base Asbestos and Lead Based Paint Inspection Report Nellis Air Force Base Asbestos and Lead Based Paint Inspection Report Building Number: 434 Inspection Date: 2/12/2014 Nellis Work Order: 23211 Macrotec Job Number: 14534 Introduction: Macrotec Consulting,

More information

HERRON Enterprises USA, Inc.

HERRON Enterprises USA, Inc. Phone (303) 763 9639 HERRON Enterprises USA, Inc. Fax (303) 763 9686 E-Mail Lennie.Herron@comcast.net Hazardous Materials*Mold*Asbestos*Lead Paint www.herron-enterprises.com Environmental Services*Industrial

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 4 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District ED FIELDING Commissioner, District ANNE SCOTT Commissioner, District 3 SARAH HEARD Commissioner,

More information

CONSTRUCTION MATERIALS

CONSTRUCTION MATERIALS CONSTRUCTION MATERIALS T E C H N O L O G I E S LABORATORY TEST REPORT Report for: 6 Cherry Ave Penticton, BC VA L7 Canada Product(s): Deksmart Ultra 68mil Decking Membrane Manufacturer: O Sullivan Films,

More information

Naturally Occurring Asbestos:

Naturally Occurring Asbestos: RJ LeeGroup, Inc. Naturally Occurring Asbestos: A Recurring Public Policy Challenge R. J. Lee, B. R. Strohmeier, K. L. Bunker, and D. R. Van Orden RJ Lee Group, Inc. 350 Hochberg Road Monroeville, PA 15146

More information

Quarries National Joint Advisory Committee (QNJAC) Occupational Health. Information Sheet 10. April Management of Asbestos on Site

Quarries National Joint Advisory Committee (QNJAC) Occupational Health. Information Sheet 10. April Management of Asbestos on Site Occupational Health Quarries National Joint Advisory Committee (QNJAC) Occupational Health Information Sheet 10 April 2013 Management of Asbestos on Site This information sheet has been developed by the

More information

Level 3 Award in Asbestos Surveying

Level 3 Award in Asbestos Surveying Level 3 Award in Asbestos Surveying January 2016 Guided Learning Hours 24 Total Qualification Time 40 Ofqual Qualification Number 601/8289/1 Description The Control of Asbestos Regulations impose duties

More information

GEOSYNTEC CONSULTANTS

GEOSYNTEC CONSULTANTS GEOSYNTEC CONSULTANTS 2100 Main Street, Suite 150 Huntington Beach, CA 92648 USA Tel (714) 969-0800 Fax (714) 969-0820 15 February 2006 Ms. Tamara Zeier, P.E. Project Manager Project Navigator, Ltd. One

More information

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS Introduction... 1 Scope of Services... 1 Project Location and Description... 1 Geologic Setting... 1 Regional Geology... 1 Site

More information

Asbestos Bulk Analysis

Asbestos Bulk Analysis Asbestos Bulk Analysis January 2014 18 Guided Learning Hours 3 Prior Learning Hours Description The Control of Asbestos Regulations impose duties on every organisation who analyses samples for the identification

More information

Level 3 Award in Asbestos Bulk Analysis

Level 3 Award in Asbestos Bulk Analysis Level 3 Award in Asbestos Bulk Analysis January 2016 Guided Learning Hours 23 Total Qualification Time 81 Ofqual Qualification Number 601/8288/X Description The Control of Asbestos Regulations impose duties

More information

KSA Environmental Laboratory Inc.

KSA Environmental Laboratory Inc. September 07, 2007 KSA Environmental Laboratory Inc. Amerigrow Recycling Attn: Orlando D. Pagan 10320 West Atlantic Ave Delray Beach, FL 33446 RE: Mulch Metals KSA Workorder: Q006081 Dear Orlando D. Pagan,

More information

EXHIBIT H LOT 317 GRADING AND SITE PLAN

EXHIBIT H LOT 317 GRADING AND SITE PLAN EXHIBIT H LOT 317 GRADING AND SITE PLAN EXHIBIT I LOT 317 ELEVATIONS ridge height 4915'-6" GENERAL & KEYED NOTES ridge height 4905'-9" 3 7 4 A5.1 1 5 ridge height 4910'-6" 2 ridge height 4906'-3" 1 Provide

More information

Non-licensed Work with Asbestos Training

Non-licensed Work with Asbestos Training TRAINING SYLLABUS NON-LICENSED WORK WITH ASBESTOS Non-licensed Work with Asbestos Training This unit has eleven learning outcomes. 1. Recognise why asbestos is dangerous a) Identify the properties of asbestos

More information

ATTACHMENT A WEAVER BOTTOMS SEDIMENT BASIN MAINTENANCE PROJECT PROJECT REPORT SUMMARY (APRIL 7, 2014)

ATTACHMENT A WEAVER BOTTOMS SEDIMENT BASIN MAINTENANCE PROJECT PROJECT REPORT SUMMARY (APRIL 7, 2014) ATTACHMENT A WEAVER BOTTOMS SEDIMENT BASIN MAINTENANCE PROJECT PROJECT REPORT SUMMARY (APRIL 7, 2014) PRE-PROJECT DREDGE MATERIAL SEDIMENT CORE AND BASELINE CONTAMINANT ANALYSIS PREPARED BY BRAUN INTERTEC

More information

Analytical Report

Analytical Report Analytical Report 386228 for Natural Soap Formulas Project Manager: Wanda Baligad Formula 206 Natural Soap Formulas 20-AUG-10 3231 NW 7th Avenue, Boca Raton, FL 33431 Ph:(561) 447-7373 Fax:(561) 447-6136

More information

Appendix I-1: Archaeological Records Search

Appendix I-1: Archaeological Records Search Appendix I-1: Archaeological Records Search South Central Coastal Information Center California State University, Fullerton Department of Anthropology MH-426 800 North State College Boulevard Fullerton,

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

NVLAP TEM PROFICIENCY Individual Laboratory Report LAB ERROR POINT SUMMARY

NVLAP TEM PROFICIENCY Individual Laboratory Report LAB ERROR POINT SUMMARY NVLAP TEM PROFICIENCY 2014-2 Individual Laboratory Report LAB ERROR POINT SUMMARY Error Points Part A: Calculation of Mean and Standard Deviation: 0.00 Part B: Assignment of Ranks and Evaluation for Outliers

More information

County of San Diego, Planning & Development Services

County of San Diego, Planning & Development Services County of San Diego, Planning & Development Services E N V I R O N M E N T A L R E V I E W U P D A T E A P P L I C A T I O N F O R A P P L I C A T I O N S C O V E R E D B Y A P R E V I O U S L Y C O M

More information

September 21, 2004 GeoInsight Project

September 21, 2004 GeoInsight Project GeoInsight, Inc. GeoInsight, Inc. GeoInsight, Inc. 75 Gilcreast Road, Suite 210 319 Littleton Road, Suite 105 Corporate Ten Center Londonderry, NH 03053-3566 Westford, MA 01886 1781 Highland Avenue, Suite

More information

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report Pursuant to: 40 CFR 257.60 40 CFR 257.61 40 CFR 257.62 40 CFR 257.63 40 CFR 257.64 Submitted to: Consumers Energy Company

More information

A visual inspection, and collection of 12 asbestos PCM samples and 12 air-o-cell samples were utilized to perform this assessment

A visual inspection, and collection of 12 asbestos PCM samples and 12 air-o-cell samples were utilized to perform this assessment January 19, 2017 Ms. Alix Zapolski Zapolski Real Estate, LLC. 501 Washington Street Durham, NC 27701 Re: Limited Indoor Air Quality Assessment Asbestos & Microbial 137 E. Franklin Street, Chapel Hill,

More information

A visual inspection, and collection of 10 asbestos PCM samples and 12 air-o-cell samples were utilized to perform this assessment

A visual inspection, and collection of 10 asbestos PCM samples and 12 air-o-cell samples were utilized to perform this assessment December 9, 2016 Ms. Alix Zapolski Zapolski Real Estate, LLC. 501 Washington Street Durham, NC 27701 Re: Limited Indoor Air Quality Assessment Asbestos & Microbial 137 E. Franklin Street, Chapel Hill,

More information

APPENDIX 1. Geotechnical Information and Analysis. Pacific Aggregates Inc. and Pacific Clay Products July 13, 2011 RP112 Reclamation Plan

APPENDIX 1. Geotechnical Information and Analysis. Pacific Aggregates Inc. and Pacific Clay Products July 13, 2011 RP112 Reclamation Plan Pacific Aggregates Inc. and Pacific Clay Products July 13, 2011 RP112 Reclamation Plan APPENDIX 1 Geotechnical Information and Analysis PA02_RP112-RecPlan-Resub_FNL.docx SESPE Consulting, Inc. June 27,

More information

AIR MONITORING REPORT

AIR MONITORING REPORT AIR MONITORING REPORT 1500 Hallway Frost Lake Magnet 1505 East Hoyt Avenue St. Paul, MN 55103 December 21, 2005 Nova Client No.: STPAU006/Project No: H05-1309 AIR MONITORING REPORT 1500 Hallway Frost Lake

More information

ASBESTOS AWARENESS. Presented by: Angus McLellan. C.M.I.O.S.H

ASBESTOS AWARENESS. Presented by: Angus McLellan. C.M.I.O.S.H ASBESTOS AWARENESS Presented by: Angus McLellan. C.M.I.O.S.H ASBESTOS TALK. Talk contents: Properties of asbestos Health risks from asbestos Types, uses & locations of asbestos containing materials within

More information

P402 - Surveying and Sampling Strategies for Asbestos in Buildings

P402 - Surveying and Sampling Strategies for Asbestos in Buildings Proficiency Module Syllabus P402 - Surveying and Sampling Strategies for Asbestos in Buildings Aim To provide candidates with background and practical knowledge in the surveying of buildings for asbestos

More information

In room E 28 slightly elevated concentrations of Stachybotrys were found.

In room E 28 slightly elevated concentrations of Stachybotrys were found. July nd, 0 Mr. Marty Foutch Facilities Director Bixby Public Schools 09 N. Armstrong Bixby, OK 700 RE: CC: Bixby High School - % IAQ Liberty OHM File Number -7 Jarred Doubrava Operations Support Manager/District

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G GEOTECHNICAL REPORT INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G City of Cape Coral Procurement Division 1015

More information

2004 Report on Roadside Vegetation Management Equipment & Technology. Project 2156: Section 9

2004 Report on Roadside Vegetation Management Equipment & Technology. Project 2156: Section 9 2004 Report on Roadside Vegetation Management Equipment & Technology Project 2156: Section 9 By Craig Evans Extension Associate Doug Montgomery Extension Associate and Dr. Dennis Martin Extension Turfgrass

More information

ANALYTICAL REPORT. Sampling Parameter: Area 200 cm² Result. (ug/100cm²) RL (ug/sample) Sampling Parameter: Area 300 cm². Result

ANALYTICAL REPORT. Sampling Parameter: Area 200 cm² Result. (ug/100cm²) RL (ug/sample) Sampling Parameter: Area 300 cm². Result Report Date: August 07, 2015 Steve Hudson Terracon Consulting 15080 "A" Circle Omaha, NE 68144 Phone: 402-670-3842 E-mail: steve.hudson@terracon.com Analytical s Sample ID: TB-1 Lab ID: 1521876001 Sampling

More information

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533 State of California Natural Resources Agency Edmund G. Brown Jr., Governor Department of Conservation John G. Parrish, Ph.D., State Geologist California Geological Survey 801 K Street MS 12-31 Sacramento,

More information

Simulation Report (Revised) Rendered To: Showcase Custom Vinyl Windows 1002 Olde Towne Drive Irving, TX 75061

Simulation Report (Revised) Rendered To: Showcase Custom Vinyl Windows 1002 Olde Towne Drive Irving, TX 75061 ETC Laboratories ETC Laboratories Corporate Offices / Laboratories 297 Buell Road Rochester, NY 14624 (585) 328-7668 Fax: (585) 328-7777 Simulation Report (Revised) Rendered To: Showcase Custom Vinyl Windows

More information

Certificate of Analysis

Certificate of Analysis Certificate of Analysis 2139 Certificate Number: 13-92896 Date: 27/11/2013 Client: Stainton Quarry Stainton Quarry Stainton Barnard Castle DL12 8RB Our Reference: 13-92896 Client Reference: Description:

More information

Enclosed is a copy of your laboratory report for test samples received by our laboratory on Thursday, February 25, 2010.

Enclosed is a copy of your laboratory report for test samples received by our laboratory on Thursday, February 25, 2010. Environmental Conservation Laboratories, Inc. 10775 Central Port Drive Orlando FL, 32824 407.826.5314 407.850.6945 Phone: FAX: www.encolabs.com Friday, March 5, 2010 Jones Edmunds & Associates (JO005)

More information

ASBESTOS-CONTAINING MATERIAL FOR SURFACING APPLICATIONS (Adopted December 15, 1994; Amended March 21, 2002.)

ASBESTOS-CONTAINING MATERIAL FOR SURFACING APPLICATIONS (Adopted December 15, 1994; Amended March 21, 2002.) RULE 7050 ASBESTOS-CONTAINING MATERIAL FOR SURFACING APPLICATIONS (Adopted December 15, 1994; Amended March 21, 2002.) 1.0 Purpose The purpose of this rule is to control airborne emissions of asbestos

More information

DEPARTMENT OF PUBLIC WORKS. James R. McCain, Jr. Corporation Secretary/Assistant General Counsel

DEPARTMENT OF PUBLIC WORKS. James R. McCain, Jr. Corporation Secretary/Assistant General Counsel I DEPARTMENT OF PUBLIC WORKS I 4 o41lf June 8, 2015 MEMORANDUM TO: James R. McCain, Jr. Corporation Secretary/Assistant General Counsel THROUGH: C. Ronald Belton, Assistant~ tth MaY.or/ChljJi~~~ ~ Officer

More information

Tom Blackman Project Lead. Mékell Mikell Communications Representative

Tom Blackman Project Lead. Mékell Mikell Communications Representative Sediment Cleanup Middle River Complex, 2016-17 Season 1 Project Photo Tour Updated November 15, 2016 Tom Blackman Project Lead Mékell Mikell Communications Representative 1 Sediment Cleanup - Season 1

More information

IBIDEN Group Green Procurement Guidelines. (Version 6)

IBIDEN Group Green Procurement Guidelines. (Version 6) IBIDEN Group Green Procurement Guidelines (Version 6) October 1, 2017 [Table of Contents] 1. Introduction P3 2. IBIDEN Group s Basic Policy for the Environment P4 3. Objective of the Guideline P5 4. Definitions

More information

NANOTECHNOLOGY: AN INDUSTRIAL HYGIENE PERSPECTIVE. Loren Anderson, CIH, ROH

NANOTECHNOLOGY: AN INDUSTRIAL HYGIENE PERSPECTIVE. Loren Anderson, CIH, ROH NANOTECHNOLOGY: AN INDUSTRIAL HYGIENE PERSPECTIVE Loren Anderson, CIH, ROH Agenda Hazard Identification: (Recognition) Defining Nanotechnology Identification of new nanotechnology in process Communication

More information

Tropical E.S. - BUDGET

Tropical E.S. - BUDGET Tropical E.S. - BUDGET Replace HVAC Chiller and Cooling Tower Description Budget COMMENTS GMP Design $45,90.92 Heard Construction $5,885.00 DDC Engineering Sub-Total Overhead @ 0% Profit @ 5% Contingency

More information

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402 October 26, 2017 Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402 Re: Soo Line Dump Site 2017 Annual Soil Cover Inspection Dear Aimee: The purpose of this letter

More information

ADDENDUM NO. 1 TENDER NO

ADDENDUM NO. 1 TENDER NO Purchasing & Materials Management Michael Pacholok, Acting Director City Hall 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 David Ferguson, Manager Construction Services July 23, 2012

More information

SYNTHETIC ROOFING TILES

SYNTHETIC ROOFING TILES P R O D U C T C A T A L O G U E SYNTHETIC ROOFING TILES www.tuflite.com Bangalore (Head Office) #240/1, Ganesh Krupa, 18th Cross, Sadashivanagar, Bangalore- 560 080, India P: +91 80 4252 5252 F: +91 80

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

PERFORMANCE ANALYSIS OF WELCH PRODUCTS RECYCLED RUBBER SPACER BLOCK

PERFORMANCE ANALYSIS OF WELCH PRODUCTS RECYCLED RUBBER SPACER BLOCK PERFORMANCE ANALYSIS OF WELCH PRODUCTS RECYCLED RUBBER SPACER BLOCK Submitted by Bob W. Bielenberg, M.S.M.E., E.I.T. Research Associate Engineer Ronald K. Faller, Ph.D., P.E. Research Assistant Professor

More information

C1.0 HOP IN FUEL STATION BENCHMARKS PARKING SUMMARY TABLE SITE PAVING: NOTES: SITE LOCATION MAP LEGEND DESCRIPTION PROPOSED EXISTING

C1.0 HOP IN FUEL STATION BENCHMARKS PARKING SUMMARY TABLE SITE PAVING: NOTES: SITE LOCATION MAP LEGEND DESCRIPTION PROPOSED EXISTING LOCATION MAP UNIVERSAL CITY GUADALUPE SITE CITY OF SCHERTZ NOTES: CONVENIENCE STORE 4500 S.F. PARKING SUMMARY TABLE SITE PAVING: CARWASH 1075 S.F. BENCHMARKS EXISTING PROPOSED LEGEND DESCRIPTION REVISIONS:

More information

Memorandum. Air Sampling

Memorandum. Air Sampling Memorandum TO: David Yelton, City of Beverly Hills DATE: December 8, 2015 CC: Heidi Rous, PCR Services FROM: Everest Yan and Audrey Vinant Tang, PCR Services RE: BEVERLY HILLS ARSENIC MONITORING MEMO This

More information

Attached is the report detailing the Adams Spanish Immersion Magnet asbestos abatement project.

Attached is the report detailing the Adams Spanish Immersion Magnet asbestos abatement project. CORPORATE HEADQUARTERS Minneapolis, MN OFFICE LOCATIONS Chicago, IL Dallas, TX Denver, CO Duluth, MN Indianapolis, IN Los Angeles, CA Miami, FL Milwaukee, WI New York, NY Salt Lake City, UT San Antonio,

More information

Chapter X: Radiation Safety Audit Program

Chapter X: Radiation Safety Audit Program Chapter X: Radiation Safety Audit Program Policy All laboratories using radioactive material shall be reviewed as required by the Illinois Emergency Management Agency (IEMA), Division of Nuclear Safety

More information

TSCA SECTION 13 IMPORTER CERTIFICATION PROCEDURE

TSCA SECTION 13 IMPORTER CERTIFICATION PROCEDURE TSCA SECTION 13 IMPORTER CERTIFICATION PROCEDURE INTRODUCTION PURPOSE To outline the steps required for the importation of chemical substances (including microorganisms) and provide either positive or

More information

STANDARD OPERATING PROCEDURES

STANDARD OPERATING PROCEDURES STANDARD OPERATING PROCEDURES for Spectrophotometric Measurement Chl a, Chl b, and Bulk Carotenoids using Methanol Solvent Prepared by EcoAnalysts, Inc. 1420 South Blaine Street, Suite 14 Moscow, ID 83843

More information

PA DEP SOUTHWEST REGIONAL OFFICE

PA DEP SOUTHWEST REGIONAL OFFICE PA DEP SOUTHWEST REGIONAL OFFICE MEMO TO FROM Air Quality Permit File: OP-04-00043 / Thomas J. Joseph, P.E. Facilities Engineering Manager Air Quality Program THROUGH Mark R. Gorog, P.E. Environmental

More information

Uniform Sign Plan (USP) Beechtree Planned Unit Development (PUD) 85-USP-001

Uniform Sign Plan (USP) Beechtree Planned Unit Development (PUD) 85-USP-001 Uniform Sign Plan (USP) Beechtree Planned Unit Development (PUD) 85-USP-001 These guidelines are published for informational purposes. They describe the characteristics of signs, not structures on which

More information

This document provides instructions for shipping small samples to ST Equipment & Technology.

This document provides instructions for shipping small samples to ST Equipment & Technology. ST Equipment & Technology Small Sample Shipping Instructions Revised: November 30, 2017 This document provides instructions for shipping small samples to ST Equipment & Technology. Small (5-10 kilogram)

More information

Inside Wall Temperature Measurements of DSTs Using an Infrared Temperature Sensor

Inside Wall Temperature Measurements of DSTs Using an Infrared Temperature Sensor TEST PLAN Inside Wall Temperature Measurements of DSTs Using an Infrared Temperature Sensor Date submitted: December 18, 2015 Prepared by: Aparna Aravelli, Ph.D. Florida International University Collaborators:

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

January 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols:

January 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols: January 16, 2019 Mr. Andrew Nichols Minnesota Pollution Control Agency Voluntary Investigation and Cleanup Program 520 Lafayette Road Saint Paul, Minnesota 55155 Re: Soo Line Dump Site 2018 Annual Soil

More information

DRAFT. PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA. Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835

DRAFT. PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA. Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835 PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835 Prepared by: Northern Geotechnical Engineering, Inc. d.b.a. Terra

More information

SIMULATION TEST REPORT NCTL E0A0

SIMULATION TEST REPORT NCTL E0A0 SIMULATION TEST REPORT NCTL-610-21539-1E0A0 REPORT TO: All Seasons Window & Door System Inc. 1340 Metropolitan Avenue Brooklyn, NY 11237 SIMULATION DATE: 11/20/18 PRODUCT: EU400 Tilt & Turn This report

More information

Fun with Asbestos 1. Table 1: Asbestos Minerals. Mineral Asbestos Variety Mineral Group Comments. monoclinic amphibole. monoclinic amphibole

Fun with Asbestos 1. Table 1: Asbestos Minerals. Mineral Asbestos Variety Mineral Group Comments. monoclinic amphibole. monoclinic amphibole 1 Fun with Asbestos 1 WARNING: DO NOT OPEN BOTTLES CONTAINING ASBESTOS. Asbestos may cause lung damage. Do not breathe fibers. The crocidolite (blue asbestos) is considered most hazardous, but the other

More information

Thermal Imaging Survey. Conducted at Nottingham

Thermal Imaging Survey. Conducted at Nottingham Thermal Imaging Survey Conducted at ----------------- Nottingham [This copy has been edited to remove location details. The original document does not have a "Foxit PDF Editor" header on every page.] 27/01/2010

More information

ENVIRONMENTAL LABORATORY APPROVAL PROGRAM CERTIFICATION MANUAL DATE PAGE 1/11/05. 1 of 20

ENVIRONMENTAL LABORATORY APPROVAL PROGRAM CERTIFICATION MANUAL DATE PAGE 1/11/05. 1 of 20 1 of 20 1. Introduction The Stratified Point-Counting Method has been approved by the New York State Department of Health and promulgated Environmental Laboratory Approval Program (ELAP) as Item in the

More information

Uniform Sign Plan (USP) Lodge at Crossroads and Park at Crossroads 99-USP-007

Uniform Sign Plan (USP) Lodge at Crossroads and Park at Crossroads 99-USP-007 Uniform Sign Plan (USP) Lodge at Crossroads and Park at Crossroads 99-USP-007 These guidelines are published for informational purposes. They describe characteristics of signs, not structures on which

More information

10 May Rod Walls - Director Facilities New Construction, Sustainability Hays CISD IH 35 Kyle, Texas 78640

10 May Rod Walls - Director Facilities New Construction, Sustainability Hays CISD IH 35 Kyle, Texas 78640 10 May 2017 Rod Walls - Director Facilities New Construction, Sustainability Hays CISD 21003 IH 35 Kyle, Texas 78640 Re: Hays CISD Proposed ES15 Site, Buda Phase II Soil Sampling Dear Rod: Concern has

More information

BOARD OF COUNTY COMMISSIONERS. December 10, 1991

BOARD OF COUNTY COMMISSIONERS. December 10, 1991 ANATEE COUNTY BOARD OF COUNTY COMMISSIONERS December 10, 1991 Mr. W i l l i a m Hinkley, A d m i n i s t r a t o r S o l i d Waste Section F l o r i d a Department of Environmental Regulation v, ^ Twin

More information

Standard Practice for Calculating Formulation Physical Constants of Paints and Coatings 1

Standard Practice for Calculating Formulation Physical Constants of Paints and Coatings 1 Designation: D 5201 05 Standard Practice for Calculating Formulation Physical Constants of Paints and Coatings 1 This standard is issued under the fixed designation D 5201; the number immediately following

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Asbestos Briefing for Health & Safety Co-ordinators

Asbestos Briefing for Health & Safety Co-ordinators Asbestos Briefing for Health & Safety Co-ordinators What is asbestos? Basically a rock mined from the earth. Asbestos is a term used for a group of fibrous forms of naturally occurring minerals gathered

More information

CEMEX Eliot Quarry. Lake A Evaluation Report. Alameda County, California

CEMEX Eliot Quarry. Lake A Evaluation Report. Alameda County, California May 7, 2015 May 7, 2015 Project No. GT13-16 Prepared for: CEMEX 5180 Golden Foothills, Parkway El Dorado Hills, California 95762 7400 Shoreline Drive, Ste. 6 Stockton, California 95219 Tel: 209-472-1822

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

Cat# LED Linear High Bay 100W

Cat# LED Linear High Bay 100W Cat# 71724 LED Linear High Bay 100W QPL ID # PRNKSMPK OVERALL LAMP PARAMETERS LED DRIVER LIFESPAN & ENVIRONMENT OTHERS Model: Input Voltage Input Current Input Power Power Factor Luminance Luminous Efficiency

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

Report No: NCTL NFRC THERMAL TEST SUMMARY REPORT Expiration Date: 12/14/15

Report No: NCTL NFRC THERMAL TEST SUMMARY REPORT Expiration Date: 12/14/15 MGM INDUSTRIES, INC. Report No: NCTL-110-14571-1 NFRC THERMAL TEST SUMMARY REPORT Expiration Date: 12/14/15 Test Specimen NFRC Code Manufacturer: MGM Industries, Inc. Series/Model: Series 4600 Window Type:

More information

Test Results: Results of the test period on 06/19/16 using the Equivalent CTS Method: Thermal transmittance at test conditions (U s ):

Test Results: Results of the test period on 06/19/16 using the Equivalent CTS Method: Thermal transmittance at test conditions (U s ): NORTH EAST WINDOWS USA, INC. NFRC THERMAL TEST SUMMARY REPORT Report No: NCTL-110-17842-3S Test Specimen NFRC Code Manufacturer: North East Windows USA, Inc. Series/Model: Series CW 300 Window Type: Casement-

More information

Geotechnical Completion Report Knights Stream Park Stage3A Development (Lots 107 to 148)

Geotechnical Completion Report Knights Stream Park Stage3A Development (Lots 107 to 148) Aurecon New Zealand Limited Unit 1, 150 Cavendish Road Casebrook Christchurch 8051 PO Box 1061 Christchurch 8140 New Zealand T F E W +64 3 366 0821 +64 3 379 6955 christchurch@aurecongroup.com aurecongroup.com

More information

FRIENDS OF THE EEL RIVER

FRIENDS OF THE EEL RIVER FRIENDS OF THE EEL RIVER Working for the recovery of our Wild & Scenic River, its fisheries and communities. Frank Blackett, Regional Engineer Office of Energy Projects Division of Dam Safety and Inspections

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

PHIMF Project - Limited Geotechnical Investigation - Feasibility-Level Report RESPONSE TO INITIAL REVIEW LETTER

PHIMF Project - Limited Geotechnical Investigation - Feasibility-Level Report RESPONSE TO INITIAL REVIEW LETTER Connie Christian, P.E. County Sanitation Districts of Los Angeles County 1955 Workman Mill Road Whittier, California 90601 Project No. BAS 04-02E January 29, 2008 Subject: PHIMF Project - Limited Geotechnical

More information

ANALYTICAL REPORT. Attn: Richard Boelter

ANALYTICAL REPORT. Attn: Richard Boelter ANALYTICAL REPORT TestAmerica Laboratories, Inc. 0 Community Drive Suite South Burlington, VT 00 Tel: (0)0-0 TestAmerica Job ID: 00-- Client For: ARCADIS U.S. Inc Massena Facility, Route East Chevrolet

More information

August 14, James Bolton 312 Perry Lane Lovingston, VA

August 14, James Bolton 312 Perry Lane Lovingston, VA August 14, 2017 James Bolton 312 Perry Lane Lovingston, VA 22949 jrbolton035@gmail.com Department of Environmental Quality Office of Wetlands & Stream Protection P.O. Box 1105 Richmond, VA 23218 comment-acp@deq.virginia.gov

More information

REACH: HOW IT AFFECTS PSA TAPES

REACH: HOW IT AFFECTS PSA TAPES REACH: HOW IT AFFECTS PSA TAPES Brian Johnson, Sr. EHS&R Stewardship Specialist, REACH Program Office, 3M, St. Paul, MN Introduction The REACH chemical regulation was enacted in December of 2006 with the

More information

Pinellas County Capital Improvement Program, FY2006 Through FY2011 Project Summary Report

Pinellas County Capital Improvement Program, FY2006 Through FY2011 Project Summary Report Function : General Government Services Activity : Judicial Project No: 923 Title: Courts/Jails Future Expansion Cost Center: 8160500 Department: General Services Primary Fund: 0401 CIE: No Sub-cost Center:

More information

POLICY ISSUE (INFORMATION)

POLICY ISSUE (INFORMATION) POLICY ISSUE (INFORMATION) August 12, 2011 SECY-11-0112 FOR: FROM: SUBJECT: The Commissioners Michael R. Johnson, Director /RA/ Office of New Reactors STAFF ASSESSMENT OF SELECTED SMALL MODULAR REACTOR

More information

September 2, Mr. Abdi Zarrabi NYC School Construction Authority Thomson Avenue Long Island City, NY 11101

September 2, Mr. Abdi Zarrabi NYC School Construction Authority Thomson Avenue Long Island City, NY 11101 36-15A 23 rd Street Long Island City, NY 11106 Tel: 718.383.2626 Fax: 718.383.7780 www.precision-enviro.com September 2, 2015 Mr. Abdi Zarrabi NYC School Construction Authority 30-30 Thomson Avenue Long

More information