1 May 4, 2015 Mr. Bruce Hampson Town of Wilton Miller-Driscoll School Building Committee 238 Danbury Road Wilton, Connecticut RE: Focused Soil Investigation Miller-Driscoll School Wilton, CT TRC Project No.: Dear Mr. Hampson: TRC is pleased to present the results of the focused soil investigation completed around two 10,000-gallon heating fuel underground storage tanks (USTs) and their associated piping at the Miller-Driscoll School in Wilton, Connecticut (see Figure 1). The USTs are located near the southwestern (referred to as the Driscoll-UST) and the northwestern (referred to as the Miller-UST) corners of the school (see Figure 2). The primary objective of this investigation was to allow for the evaluation of soil conditions in the above referenced areas of the site where there is anticipated to be earth-work conducted as part of the proposed renovations. Technical Approach To complete the objective noted above, a total of three soil borings were advanced along the western, northern and eastern sides of the Driscoll-UST and two soil borings were advanced along its associated pipe run (see Figure 3). These soil borings were identified as SB-1 through SB-5. Note that a soil boring could not be completed along the southern side of the Driscoll-UST due the steep slope adjacent to the tank and proximity to a buried electrical conduit.

2 Mr. Hampson May 4, 2015 Page 2 of 10 Four soil borings were advanced in along the northern, eastern, western and southern sides of the Miller-UST and three soil borings were advanced along its associated pipe run (See Figure 4). These soil borings were identified as SB-6 through SB-12. One soil sample was collected from each of the 12 soil borings and analyzed for extractable total petroleum hydrocarbons (ETPH) by the approved Connecticut Department of Energy and Environmental Protection (CTDEEP) method. Two of the soil samples (one from each UST location) were also analyzed for volatile organic compounds (VOCs) by EPA Method 8260 and semi-volatile organic compounds (SVOCs) by EPA Method All of the samples were analyzed by Complete Environmental Testing Laboratories (CET) of Stratford, Connecticut in accordance with Connecticut s Reasonable Confidence Protocols (RCPs). Prior to commencing work, TRC marked the proposed boring locations at the site with white paint on the pavement. Call Before You Dig (CBYD) was contacted to mark the locations of buried utilities in the proposed work zones. In addition, a private utility service (ACS Underground Solutions of Georgetown, Connecticut) was contracted by Turner Construction to conduct a detailed on-site mark-out given the presence of several utilities within the work areas. Sampling Methodology A total of 12 soil borings were advanced on April 14, 2015 by Berkshire Environmental Services and Technology, LLC (Berkshire) of Torrington, Connecticut, under the direct supervision of TRC personnel. These borings were advanced utilizing a truck-mounted GeoProbe. Soil cores were collected continuously from the ground surface to depths of eight feet below grade around the USTs and four feet below grade along the piping runs. Soil sample intervals were chosen to correspond to the approximate depths of the USTs and piping. Each four-foot soil core, collected in an acetate Macro-Core liner, was logged with respect to soil characteristics (i.e., grain size, moisture content and any other physical characteristics) and indications of potential impacts (e.g., stains and odors). In addition, each core was field-

3 Mr. Hampson May 4, 2015 Page 3 of 10 screened using a photo-ionization detector (PID) prior to the collection of soil samples for analysis. Soil boring logs are included in Attachment A. Soil samples submitted to the laboratory for VOC analysis were collected in accordance with EPA Method This method outlines the collection of soil samples, without homogenization and with minimal disturbance, and transfer into extraction solvents. The remaining soil was then homogenized and placed in the appropriate laboratory-supplied sample containers and then placed on ice, in a cooler, for delivery to the laboratory. The remaining soils and drill cuttings were returned to their respective boreholes, as none exhibited evidence of contamination. Final borehole locations were documented by measuring from two or more fixed locations and recording those measurements in the project field notebook. The probe tip and Macro-Core sampler were decontaminated between uses to minimize the potential for cross-contamination. The decontamination was completed by washing with an Alconox and tap water mixture, followed by a tap water rinse and a final deionized water rinse. Field Observations Based on the descriptions of the soil cores, the site is underlain primarily by silt, with varying amounts of fine sand and gravel. No petroleum odors, staining or elevated PID readings were observed in any of the cores collected from the soil borings. Quality Assurance/Quality Control Samples Quality Assurance/Quality Control Samples were collected as part of this limited Phase II investigation. In order to determine the effectiveness of the decontamination of the sampling equipment, a field rinsate blank was collected and analyzed for the same analyses as the primary samples submitted on the day of the sampling. The field rinsate blank was collected by pouring laboratory-supplied water over and/or through the sampling equipment used in the collection of the samples. The rinsate water was then collected into the appropriate laboratory-supplied

4 Mr. Hampson May 4, 2015 Page 4 of 10 sample containers. The field rinsate blank associated with the soil sampling program was designated as FB Duplicate sample, two separate samples taken from the same source, were also collected as part of this focused investigation. The procedure for collecting a duplicate sample consists of alternating the collection of the sample between the primary sample container and the duplicate sample container. The duplicate soil sample collected as part of this soil sampling program was labeled as SB-3A(6-8), a duplicate of soil sample SB-3(6-8). Investigation Results Thirteen soil samples (including a duplicate soil sample) were collected and analyzed for ETPH. Three soil samples (including the duplicate) were also analyzed for VOCs and SVOCs. The soil analytical results are summarized in Table 1 and a copy of the laboratory report is provided in Attachment B. As shown in Table 1, VOCs, SVOCs and ETPH were not detected in any of the soil samples collected as part of this investigation. In addition, there were no constituents detected in the field blank collected as part of this investigation, indicating that the field equipment used for the sampling had been adequately decontaminated and had no influence on the soil analytical results. Conclusion The soil borings drilled in the immediate vicinity of the USTs were advanced to eight feet below grade and the soil borings advanced in the vicinity of the associated piping runs were advanced to four feet below grade. In general, soils in the immediate vicinity of the USTs and piping can be characterized as silt, with varying amounts of fine sand and gravel. No field evidence of contamination (i.e. elevated PID readings, odors and/or staining) were observed. In addition, ETPH was not reported above analytical detection limits in any of the soils samples collected at the site. VOCs and SVOCs were not detected in either of the two samples in which they were analyzed. Based on the results of this investigation, there does not appear to have been a release of fuel oil from either of the two USTs and their associated piping runs.

5 Mr. Hampson May 4, 2015 Page 5 of 10 Should you have any question with regard to this correspondence, please contact via at mmahoney@trcsolutions.com or (860) Sincerely, TRC Marya Mahoney, LEP Project Manager/Geologist cc: K Birk Miller-Driscoll School Building Committee J. Baumgart Shipman and Goodwin A. Davis Shipman and Goodwin S. Tragellas Turner Construction Table 1 Soil Sample Analytical Results Figure 1 Site Location Map Figure 2 Site Layout Plan Figure 3 Driscoll School UST Soil Boring Locations Figure 4 Miller School UST Soil Boring Locations Attachments A Soil Boring Logs Attachement B Laboratory Analytical Results

6 Table 1 Soil Sample Analytical Results Focused Soil Investigation Miller-Driscoll School, Wilton Connecticut TRC Project No Boring No. SB-1(6-8) SB-2(6-8) SB-3(6-8) SB-3A(6-8) SB-4(6-8) SB-5(2-4) SB-6(2-4) CT RSRs Sample Interval (ftbg): Sample Date: 4/14/2015 4/14/2015 4/14/2015 4/14/2015 4/14/2015 4/14/2015 4/14/2015 Notes: Driscoll UST Driscoll UST Driscoll UST Dupl. of SB-3(6-8) Driscoll UST Driscoll Piping Miller Piping RES DEC GA PMC Volatile Organic Compounds - ug/kg Method 8260 NA NA ND ND NA NA NA Semi-Volatile Organic Compounds - ug/kg Method 8270 NA NA ND ND NA NA NA Extractable Total Petroleum Hydrocarbons - mg/kg CTDEEP-Approved Method ND ND ND ND ND ND ND Boring No. SB-7(2-4) SB-8(2-4) SB-9(6-8) SB-10(6-8) SB-11(6-8) SB-12(6-8) FB CT RSRs Sample Interval (ftbg): N/A Sample Date: 4/14/2015 4/14/2015 4/14/2015 4/14/2015 4/14/2015 4/14/2015 4/14/2015 Notes: Miller Piping Miller Piping Miller UST Miller UST Miller UST Miller UST Field Blank RES DEC GA PMC Volatile Organic Compounds - ug/kg Method 8260 NA NA NA NA NA ND ND Semi-Volatile Organic Compounds - ug/kg Method 8270 NA NA NA NA NA ND ND Extractable Total Petroleum Hydrocarbons - mg/kg CTDEEP-Approved Method ND ND ND ND ND ND ND NOTES: ftbg - feet below grade CT RSRs - State of Connecticut Remediation Standard Regulations (CT RSRs) per RCSA 22a-133k-1 through 22a-133k-3, adopted January 1, 1996 and revised on June 27, ND - Not detected above laboratory detection limits (all checked to be in compliance with established RSR criteria) NA - Not Analyzed

7 CONNECTICUT N Wilton SITE LOCATION Approximate Scale FT 0 Approximate Scale 1: MILE BASE CREATED WITH TOPO USGS TOPOGRAPHIC MAPS 21 Griffin Road North Windsor, CT Phone: MILLER-DRISCOLL SCHOOL 217 WOLFPIT ROAD & 336 BELDEN HILL RD. WILTON, CONNECTICUT FIGURE 1 SITE LOCATION MAP DATE: 05/2015 PROJECT NO

8 WOLFPIT ROAD CONN ROUTE 106 B-106 B-108 See Figure 4 Miller School Heating Oil UST SOURCE: MAP TITLED "PROPERTY & TOPOGRAPHIC SURVEY, PREPARED FOR TOWN OF WILTON, BELDIN HILL ROAD & WOLFPIT ROAD, WILTON, CONNECTICUT", DATED: , SCALE: 1"-40' BY CCA, LLC. See Figure 3 Driscoll School Heating Oil UST 21 Griffin Road North Windsor, CT (860) MILLER - DRISCOLL SCHOOL 217 WOLFPIT ROAD, WILTON, CONNECTICUT FIGURE 2 SITE LAYOUT PLAN Date: 05/01/15 Project No

9 SB-5 SB-3 SB-4 SB-2 SB-1 SB-1 LEGEND SOURCE: MAP TITLED "PROPERTY & TOPOGRAPHIC SURVEY, PREPARED FOR TOWN OF WILTON, BELDIN HILL ROAD & WOLFPIT ROAD, WILTON, CONNECTICUT", DATED: , SCALE: 1"-40' BY CCA, LLC. 21 Griffin Road North Windsor, CT (860) Date: MILLER - DRISCOLL SCHOOL 217 WOLFPIT ROAD, WILTON, CONNECTICUT FIGURE 3 DRISCOLL SCHOOL UST SOIL BORING LOCATIONS 05/01/15 Project No

10 SB-11 SB-10 SB-12 SB-9 SB-8 SB-6 SB-7 SB-1 LEGEND SOURCE: MAP TITLED "PROPERTY & TOPOGRAPHIC SURVEY, PREPARED FOR TOWN OF WILTON, BELDIN HILL ROAD & WOLFPIT ROAD, WILTON, CONNECTICUT", DATED: , SCALE: 1"-40' BY CCA, LLC. 21 Griffin Road North Windsor, CT (860) Date: MILLER - DRISCOLL SCHOOL 217 WOLFPIT ROAD, WILTON, CONNECTICUT FIGURE 4 MILLER SCHOOL UST SOIL BORING LOCATIONS 05/01/15 Project No

11 ATTACHMENT A SOIL BORING LOGS

12 BORING NUMBER: SB-1 Page 1 of 1 PROJECT INFORMATION Project Name: Miller-Driscoll School Limited Phase II Project Location: Miller-Driscoll School, Wilton Connecticut Project Number: Client: Town of Wilton TRC Eng./Geol: Chris Lindahl Checked By: Chris Lindahl DRILLING INFORMATION Drilling Contractor: Berkshire Driller(s): Bill Douglas Drilling Method: Geoprobe Equipment/Model: Geoprobe 5410 truck mounted Sampler: 48-inch Macrocore BORING INFORMATION Boring Depth (ft): 8 Hole Diameter (in): 2" Date Started: 4/14/15 Date Completed: 4/14/15 Coordinate System: North: Not Surveyed East: Not Surveyed Vertical Datum: Ground Elevation: Not Surveyed Well Elevation (Top of Casing) Not Surveyed GROUND WATER OBSERVATIONS MEASUREMENT At Time of Drilling At End of Drilling After Drilling DATE DEPTH (ft.bgs.) REFERENCE STABILIZATION DEPTH (FT.) SAMPLE NUMBER SAMPLE TYPE PENETRATION (FT.) RECOVERY (FT.) LITHOLOGY MATERIAL DESCRIPTION VOC SCREENING RESULTS (ppm) 0'- 0.5' Topsoil '- 2' Light brown/gray SILT, trace fine sand, moist, no odors, no stains. MAC '- 4' 4'- 5' Light brown/gray SILT, trace fine sand, moist, no odors, no stains. 5 5'- 6' Gray SILT/CLAY, trace fine gravel, moist, no odors, no stains. SOIL BORING/WELL COMPLETION WITH NOTES - TRC-STD US.GDT - 5/4/15 H:\HAZMAT\GINT\PROJECTS\MILLER-DRISCOLL SCHOOL.GPJ 10 Notes: MAC '- 8' Collect sample SB-1(6-8) for ETPH. Bottom of borehole at 8.0 feet.

13 BORING NUMBER: SB-2 Page 1 of 1 PROJECT INFORMATION Project Name: Miller-Driscoll School Limited Phase II Project Location: Miller-Driscoll School, Wilton Connecticut Project Number: Client: Town of Wilton TRC Eng./Geol: Chris Lindahl Checked By: Chris Lindahl DRILLING INFORMATION Drilling Contractor: Berkshire Driller(s): Bill Douglas Drilling Method: Geoprobe Equipment/Model: Geoprobe 5410 truck mounted Sampler: 48-inch Macrocore BORING INFORMATION Boring Depth (ft): 8 Hole Diameter (in): 2" Date Started: 4/14/15 Date Completed: 4/14/15 Coordinate System: North: Not Surveyed East: Not Surveyed Vertical Datum: Ground Elevation: Not Surveyed Well Elevation (Top of Casing) Not Surveyed GROUND WATER OBSERVATIONS MEASUREMENT At Time of Drilling At End of Drilling After Drilling DATE DEPTH (ft.bgs.) REFERENCE STABILIZATION DEPTH (FT.) SAMPLE NUMBER SAMPLE TYPE PENETRATION (FT.) RECOVERY (FT.) LITHOLOGY MATERIAL DESCRIPTION VOC SCREENING RESULTS (ppm) 0'- 0.5' Asphalt '- 1' Brown fine to medium SAND, little silt, dry, no odors, no stains. 1'- 2' Gray SILT and fine SAND, some fine gravel, dry, no odors, no stains. MAC '- 4' 4'- 5.5' Gray SILT and fine SAND, some fine gravel, dry, no odors, no stains. 5 SOIL BORING/WELL COMPLETION WITH NOTES - TRC-STD US.GDT - 5/4/15 H:\HAZMAT\GINT\PROJECTS\MILLER-DRISCOLL SCHOOL.GPJ 10 Notes: MAC '- 8' Collect sample SB-2(6-8) for ETPH. Bottom of borehole at 8.0 feet.

14 BORING NUMBER: SB-3 Page 1 of 1 PROJECT INFORMATION Project Name: Miller-Driscoll School Limited Phase II Project Location: Miller-Driscoll School, Wilton Connecticut Project Number: Client: Town of Wilton TRC Eng./Geol: Chris Lindahl Checked By: Chris Lindahl DRILLING INFORMATION Drilling Contractor: Berkshire Driller(s): Bill Douglas Drilling Method: Geoprobe Equipment/Model: Geoprobe 5410 truck mounted Sampler: 48-inch Macrocore BORING INFORMATION Boring Depth (ft): 8 Hole Diameter (in): 2" Date Started: 4/14/15 Date Completed: 4/14/15 Coordinate System: North: Not Surveyed East: Not Surveyed Vertical Datum: Ground Elevation: Not Surveyed Well Elevation (Top of Casing) Not Surveyed GROUND WATER OBSERVATIONS MEASUREMENT At Time of Drilling At End of Drilling After Drilling DATE DEPTH (ft.bgs.) REFERENCE STABILIZATION DEPTH (FT.) SAMPLE NUMBER SAMPLE TYPE PENETRATION (FT.) RECOVERY (FT.) LITHOLOGY MATERIAL DESCRIPTION VOC SCREENING RESULTS (ppm) 0'- 1.5' Asphalt and sub-base material '- 3' Gray/brown SILT, little fine sand, little fine gravel, moist, no odors, no stains. MAC '- 4' 4'- 4.5' Cave-in '- 7' Gray CLAY/SILT, trace fine sand, moist, no odors, no stains. SOIL BORING/WELL COMPLETION WITH NOTES - TRC-STD US.GDT - 5/4/15 H:\HAZMAT\GINT\PROJECTS\MILLER-DRISCOLL SCHOOL.GPJ 10 Notes: MAC '- 8' Bottom of borehole at 8.0 feet. Collect sample SB-3(6-8) for VOCs, SVOCs and ETPH. Collect duplicate sample SB-3A for the same analysis.

15 BORING NUMBER: SB-4 Page 1 of 1 PROJECT INFORMATION Project Name: Miller-Driscoll School Limited Phase II Project Location: Miller-Driscoll School, Wilton Connecticut Project Number: Client: Town of Wilton TRC Eng./Geol: Chris Lindahl Checked By: Chris Lindahl DRILLING INFORMATION Drilling Contractor: Berkshire Driller(s): Bill Douglas Drilling Method: Geoprobe Equipment/Model: Geoprobe 5410 truck mounted Sampler: 48-inch Macrocore BORING INFORMATION Boring Depth (ft): 8 Hole Diameter (in): 2" Date Started: 4/14/15 Date Completed: 4/14/15 Coordinate System: North: Not Surveyed East: Not Surveyed Vertical Datum: Ground Elevation: Not Surveyed Well Elevation (Top of Casing) Not Surveyed GROUND WATER OBSERVATIONS MEASUREMENT At Time of Drilling At End of Drilling After Drilling DATE DEPTH (ft.bgs.) REFERENCE STABILIZATION DEPTH (FT.) SAMPLE NUMBER SAMPLE TYPE PENETRATION (FT.) RECOVERY (FT.) LITHOLOGY MATERIAL DESCRIPTION VOC SCREENING RESULTS (ppm) 0'- 1' Asphalt and sub-base material '- 1.5' Gray SILT/CLAY, moist, no odors, no stains. 1.5'- 4' MAC '- 6' Gray CLAY/SILT, wet, no odors, no stains. 5 SOIL BORING/WELL COMPLETION WITH NOTES - TRC-STD US.GDT - 5/4/15 H:\HAZMAT\GINT\PROJECTS\MILLER-DRISCOLL SCHOOL.GPJ 10 Notes: MAC '- 8' Collect sample SB-4(6-8) for ETPH. Bottom of borehole at 8.0 feet.

16 BORING NUMBER: SB-5 Page 1 of 1 PROJECT INFORMATION Project Name: Miller-Driscoll School Limited Phase II Project Location: Miller-Driscoll School, Wilton Connecticut Project Number: Client: Town of Wilton TRC Eng./Geol: Chris Lindahl Checked By: Chris Lindahl DRILLING INFORMATION Drilling Contractor: Berkshire Driller(s): Bill Douglas Drilling Method: Geoprobe Equipment/Model: Geoprobe 5410 truck mounted Sampler: 48-inch Macrocore BORING INFORMATION Boring Depth (ft): 4 Hole Diameter (in): 2" Date Started: 4/14/15 Date Completed: 4/14/15 Coordinate System: North: Not Surveyed East: Not Surveyed Vertical Datum: Ground Elevation: Not Surveyed Well Elevation (Top of Casing) Not Surveyed GROUND WATER OBSERVATIONS MEASUREMENT At Time of Drilling At End of Drilling After Drilling DATE DEPTH (ft.bgs.) REFERENCE STABILIZATION DEPTH (FT.) SAMPLE NUMBER SAMPLE TYPE PENETRATION (FT.) RECOVERY (FT.) LITHOLOGY MATERIAL DESCRIPTION VOC SCREENING RESULTS (ppm) 0'- 0.5' Asphalt '- 1' Light brown SILT/CLAY, moist, no odors, no stains. 1'- 2' Greenish gray SILT/CLAY, moist, no odors, no stains. MAC Bottom of borehole at 4.0 feet. 5 SOIL BORING/WELL COMPLETION WITH NOTES - TRC-STD US.GDT - 5/4/15 H:\HAZMAT\GINT\PROJECTS\MILLER-DRISCOLL SCHOOL.GPJ 10 Notes: Collect sample SB-5(2-4) for ETPH.

17 BORING NUMBER: SB-6 Page 1 of 1 PROJECT INFORMATION Project Name: Miller-Driscoll School Limited Phase II Project Location: Miller-Driscoll School, Wilton Connecticut Project Number: Client: Town of Wilton TRC Eng./Geol: Chris Lindahl Checked By: Chris Lindahl DRILLING INFORMATION Drilling Contractor: Berkshire Driller(s): Bill Douglas Drilling Method: Geoprobe Equipment/Model: Geoprobe 5410 truck mounted Sampler: 48-inch Macrocore BORING INFORMATION Boring Depth (ft): 4 Hole Diameter (in): 2" Date Started: 4/14/15 Date Completed: 4/14/15 Coordinate System: North: Not Surveyed East: Not Surveyed Vertical Datum: Ground Elevation: Not Surveyed Well Elevation (Top of Casing) Not Surveyed GROUND WATER OBSERVATIONS MEASUREMENT At Time of Drilling At End of Drilling After Drilling DATE DEPTH (ft.bgs.) REFERENCE STABILIZATION DEPTH (FT.) SAMPLE NUMBER SAMPLE TYPE PENETRATION (FT.) RECOVERY (FT.) LITHOLOGY MATERIAL DESCRIPTION VOC SCREENING RESULTS (ppm) 0'- 2.5' Light brown SILT and fine SAND, little fine gravel, moist, no odors, no stains MAC '- 4' Bottom of borehole at 4.0 feet. 5 SOIL BORING/WELL COMPLETION WITH NOTES - TRC-STD US.GDT - 5/4/15 H:\HAZMAT\GINT\PROJECTS\MILLER-DRISCOLL SCHOOL.GPJ 10 Notes: Collect sample SB-6(2-4) for ETPH.

18 BORING NUMBER: SB-7 Page 1 of 1 PROJECT INFORMATION Project Name: Miller-Driscoll School Limited Phase II Project Location: Miller-Driscoll School, Wilton Connecticut Project Number: Client: Town of Wilton TRC Eng./Geol: Chris Lindahl Checked By: Chris Lindahl DRILLING INFORMATION Drilling Contractor: Berkshire Driller(s): Bill Douglas Drilling Method: Geoprobe Equipment/Model: Geoprobe 5410 truck mounted Sampler: 48-inch Macrocore BORING INFORMATION Boring Depth (ft): 4 Hole Diameter (in): 2" Date Started: 4/14/15 Date Completed: 4/14/15 Coordinate System: North: Not Surveyed East: Not Surveyed Vertical Datum: Ground Elevation: Not Surveyed Well Elevation (Top of Casing) Not Surveyed GROUND WATER OBSERVATIONS MEASUREMENT At Time of Drilling At End of Drilling After Drilling DATE DEPTH (ft.bgs.) REFERENCE STABILIZATION DEPTH (FT.) SAMPLE NUMBER SAMPLE TYPE PENETRATION (FT.) RECOVERY (FT.) LITHOLOGY MATERIAL DESCRIPTION VOC SCREENING RESULTS (ppm) 0'- 0.5' Topsoil '- 2.1' Light brown SILT and fine SAND, trace fine gravel, moist, no odors, no stains. MAC '- 4' Bottom of borehole at 4.0 feet. 5 SOIL BORING/WELL COMPLETION WITH NOTES - TRC-STD US.GDT - 5/4/15 H:\HAZMAT\GINT\PROJECTS\MILLER-DRISCOLL SCHOOL.GPJ 10 Notes: Collect sample SB-7(2-4) for ETPH.

19 BORING NUMBER: SB-8 Page 1 of 1 PROJECT INFORMATION Project Name: Miller-Driscoll School Limited Phase II Project Location: Miller-Driscoll School, Wilton Connecticut Project Number: Client: Town of Wilton TRC Eng./Geol: Chris Lindahl Checked By: Chris Lindahl DRILLING INFORMATION Drilling Contractor: Berkshire Driller(s): Bill Douglas Drilling Method: Geoprobe Equipment/Model: Geoprobe 5410 truck mounted Sampler: 48-inch Macrocore BORING INFORMATION Boring Depth (ft): 4 Hole Diameter (in): 2" Date Started: 4/14/15 Date Completed: 4/14/15 Coordinate System: North: Not Surveyed East: Not Surveyed Vertical Datum: Ground Elevation: Not Surveyed Well Elevation (Top of Casing) Not Surveyed GROUND WATER OBSERVATIONS MEASUREMENT At Time of Drilling At End of Drilling After Drilling DATE DEPTH (ft.bgs.) REFERENCE STABILIZATION DEPTH (FT.) SAMPLE NUMBER SAMPLE TYPE PENETRATION (FT.) RECOVERY (FT.) LITHOLOGY MATERIAL DESCRIPTION VOC SCREENING RESULTS (ppm) 0'- 1' Topsoil '- 4' Light brown SILT/CLAY, little f-gravel, trace f-sand, moist, no odors, no stains. MAC Bottom of borehole at 4.0 feet. 5 SOIL BORING/WELL COMPLETION WITH NOTES - TRC-STD US.GDT - 5/4/15 H:\HAZMAT\GINT\PROJECTS\MILLER-DRISCOLL SCHOOL.GPJ 10 Notes: Collect sample SB-8(2-4) for ETPH.

20 BORING NUMBER: SB-9 Page 1 of 1 PROJECT INFORMATION Project Name: Miller-Driscoll School Limited Phase II Project Location: Miller-Driscoll School, Wilton Connecticut Project Number: Client: Town of Wilton TRC Eng./Geol: Chris Lindahl Checked By: Chris Lindahl DRILLING INFORMATION Drilling Contractor: Berkshire Driller(s): Bill Douglas Drilling Method: Geoprobe Equipment/Model: Geoprobe 5410 truck mounted Sampler: 48-inch Macrocore BORING INFORMATION Boring Depth (ft): 8 Hole Diameter (in): 2" Date Started: 4/14/15 Date Completed: 4/14/15 Coordinate System: North: Not Surveyed East: Not Surveyed Vertical Datum: Ground Elevation: Not Surveyed Well Elevation (Top of Casing) Not Surveyed GROUND WATER OBSERVATIONS MEASUREMENT At Time of Drilling At End of Drilling After Drilling DATE DEPTH (ft.bgs.) REFERENCE STABILIZATION DEPTH (FT.) SAMPLE NUMBER SAMPLE TYPE PENETRATION (FT.) RECOVERY (FT.) LITHOLOGY MATERIAL DESCRIPTION VOC SCREENING RESULTS (ppm) 0'- 0.5' Topsoil '- 3.5' Light brown SILT, some fine to medium sand, trace fine gravel, moist, no odors, no stains. MAC '- 4' 4'- 8' Light brown SILT/CLAY, little fine sand, moist, no odors, no stains. 5 SOIL BORING/WELL COMPLETION WITH NOTES - TRC-STD US.GDT - 5/4/15 H:\HAZMAT\GINT\PROJECTS\MILLER-DRISCOLL SCHOOL.GPJ 10 Notes: MAC Collect sample SB-9(6-8) for ETPH. Bottom of borehole at 8.0 feet.

21 BORING NUMBER: SB-10 Page 1 of 1 PROJECT INFORMATION Project Name: Miller-Driscoll School Limited Phase II Project Location: Miller-Driscoll School, Wilton Connecticut Project Number: Client: Town of Wilton TRC Eng./Geol: Chris Lindahl Checked By: Chris Lindahl DRILLING INFORMATION Drilling Contractor: Berkshire Driller(s): Bill Douglas Drilling Method: Geoprobe Equipment/Model: Geoprobe 5410 truck mounted Sampler: 48-inch Macrocore BORING INFORMATION Boring Depth (ft): 8 Hole Diameter (in): 2" Date Started: 4/14/15 Date Completed: 4/14/15 Coordinate System: North: Not Surveyed East: Not Surveyed Vertical Datum: Ground Elevation: Not Surveyed Well Elevation (Top of Casing) Not Surveyed GROUND WATER OBSERVATIONS MEASUREMENT At Time of Drilling At End of Drilling After Drilling DATE DEPTH (ft.bgs.) REFERENCE STABILIZATION DEPTH (FT.) SAMPLE NUMBER SAMPLE TYPE PENETRATION (FT.) RECOVERY (FT.) LITHOLOGY MATERIAL DESCRIPTION VOC SCREENING RESULTS (ppm) 0'- 0.5' Topsoil '- 3.5' Light brown SILT and fine SAND, little fine gravel, moist, no odors, no stains. MAC '- 4' 4'- 6' Light brown SILT and fine SAND, little fine gravel, moist, no odors, no stains. 5 SOIL BORING/WELL COMPLETION WITH NOTES - TRC-STD US.GDT - 5/4/15 H:\HAZMAT\GINT\PROJECTS\MILLER-DRISCOLL SCHOOL.GPJ 10 Notes: MAC Collect sample SB-10(6-8) for ETPH. 6'- 8' Light brown SILT/CLAY, trace fine sand, moist, no odors, no stains. Bottom of borehole at 8.0 feet.

22 BORING NUMBER: SB-11 Page 1 of 1 PROJECT INFORMATION Project Name: Miller-Driscoll School Limited Phase II Project Location: Miller-Driscoll School, Wilton Connecticut Project Number: Client: Town of Wilton TRC Eng./Geol: Chris Lindahl Checked By: Chris Lindahl DRILLING INFORMATION Drilling Contractor: Berkshire Driller(s): Bill Douglas Drilling Method: Geoprobe Equipment/Model: Geoprobe 5410 truck mounted Sampler: 48-inch Macrocore BORING INFORMATION Boring Depth (ft): 8 Hole Diameter (in): 2" Date Started: 4/14/15 Date Completed: 4/14/15 Coordinate System: North: Not Surveyed East: Not Surveyed Vertical Datum: Ground Elevation: Not Surveyed Well Elevation (Top of Casing) Not Surveyed GROUND WATER OBSERVATIONS MEASUREMENT At Time of Drilling At End of Drilling After Drilling DATE DEPTH (ft.bgs.) REFERENCE STABILIZATION DEPTH (FT.) SAMPLE NUMBER SAMPLE TYPE PENETRATION (FT.) RECOVERY (FT.) LITHOLOGY MATERIAL DESCRIPTION VOC SCREENING RESULTS (ppm) 0'- 0.5' Topsoil '- 3.5' Light brown SILT, some fine sand, little fine gravel, moist, no odors, no stains. MAC '- 4' 4'- 8' Light brown SILT, some fine sand, little fine gravel, moist, no odors, no stains. 5 SOIL BORING/WELL COMPLETION WITH NOTES - TRC-STD US.GDT - 5/4/15 H:\HAZMAT\GINT\PROJECTS\MILLER-DRISCOLL SCHOOL.GPJ 10 Notes: MAC Collect sample SB-11(6-8) for ETPH. Bottom of borehole at 8.0 feet.

23 BORING NUMBER: SB-12 Page 1 of 1 PROJECT INFORMATION Project Name: Miller-Driscoll School Limited Phase II Project Location: Miller-Driscoll School, Wilton Connecticut Project Number: Client: Town of Wilton TRC Eng./Geol: Chris Lindahl Checked By: Chris Lindahl DRILLING INFORMATION Drilling Contractor: Berkshire Driller(s): Bill Douglas Drilling Method: Geoprobe Equipment/Model: Geoprobe 5410 truck mounted Sampler: 48-inch Macrocore BORING INFORMATION Boring Depth (ft): 8 Hole Diameter (in): 2" Date Started: 4/14/15 Date Completed: 4/14/15 Coordinate System: North: Not Surveyed East: Not Surveyed Vertical Datum: Ground Elevation: Not Surveyed Well Elevation (Top of Casing) Not Surveyed GROUND WATER OBSERVATIONS MEASUREMENT At Time of Drilling At End of Drilling After Drilling DATE DEPTH (ft.bgs.) REFERENCE STABILIZATION DEPTH (FT.) SAMPLE NUMBER SAMPLE TYPE PENETRATION (FT.) RECOVERY (FT.) LITHOLOGY MATERIAL DESCRIPTION VOC SCREENING RESULTS (ppm) 0'- 1' Topsoil '- 2' Medium brown SILT and fine SAND, some fine gravel, moist, no odors, no stains. MAC '- 4' Light brown SILT, little fine sand, trace fine gravel, moist, no odors, no stains. 4'- 8' Light brown SILT/CLAY, little fine gravel, moist, no odors, no stains. 5 SOIL BORING/WELL COMPLETION WITH NOTES - TRC-STD US.GDT - 5/4/15 H:\HAZMAT\GINT\PROJECTS\MILLER-DRISCOLL SCHOOL.GPJ 10 Notes: MAC Collect sample SB-12(6-8) for VOCs, SVOCs and ETPH. Bottom of borehole at 8.0 feet.

24 ATTACHMENT B LABORATORY ANALYTICAL REPORT

25 Page 1 of 62

26 Page 2 of 62

27 Page 3 of 62

28 Page 4 of 62

29 Page 5 of 62

30 Page 6 of 62

31 Page 7 of 62

32 Page 8 of 62

33 Page 9 of 62

34 Page 10 of 62

35 Page 11 of 62

36 Page 12 of 62

37 Page 13 of 62

38 Page 14 of 62

39 Page 15 of 62

40 Page 16 of 62

41 Page 17 of 62

42 Page 18 of 62

43 Page 19 of 62

44 Page 20 of 62

45 Page 21 of 62

46 Page 22 of 62

47 Page 23 of 62

48 Page 24 of 62

49 Page 25 of 62

50 Page 26 of 62

51 Page 27 of 62

52 Page 28 of 62

53 Page 29 of 62

54 Page 30 of 62

55 Page 31 of 62

56 Page 32 of 62

57 Page 33 of 62

58 Page 34 of 62

59 Page 35 of 62

60 Page 36 of 62

61 Page 37 of 62

62 Page 38 of 62

63 Page 39 of 62

64 Page 40 of 62

65 Page 41 of 62

66 Page 42 of 62

67 Page 43 of 62

68 Page 44 of 62

69 Page 45 of 62

70 Page 46 of 62

71 Page 47 of 62

72 Page 48 of 62

73 Page 49 of 62

74 Page 50 of 62

75 Page 1 of 3 Page 51 of 62

76 Page 52 of 62 3

77 Page 53 of 62 3

78 Page 54 of 62

79 Page 55 of 62

80 Page 56 of 62

81 Page 57 of 62

82 Page 58 of 62

83 Page 59 of 62

84 Page 60 of 62

85 Page 61 of 62

86 Page 62 of 62

Soil Sampling Results Former Truck Maintenance Garage

Soil Sampling Results Former Truck Maintenance Garage Soil Sampling Results Former Truck Maintenance Garage Maine Yankee Decommissioning Project Corrective Measures Study May 2004 Prepared for: Maine Yankee 321 Old Ferry Road, Bailey Point Wiscasset, ME 04578

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

Appendix B RFI Sampling Program Summary (appears on CD only)

Appendix B RFI Sampling Program Summary (appears on CD only) Appendix B 2013 RFI Sampling Program Summary (appears on CD only) APPENDI B 2013 SOIL INVESTIGATION SUMMARY 1. Background By letter dated February 26, 2013, the New York State Department of Environmental

More information

DEPARTMENT OF THE ARMY BADGER ARMY AMMUNITION PLANT S7273 BLUFF ROAD MERRIMAC, WISCONSIN June 6, 2018

DEPARTMENT OF THE ARMY BADGER ARMY AMMUNITION PLANT S7273 BLUFF ROAD MERRIMAC, WISCONSIN June 6, 2018 DEPARTMENT OF THE ARMY BADGER ARMY AMMUNITION PLANT S7273 BLUFF ROAD MERRIMAC, WISCONSIN 53561 June 6, 2018 SUBJECT: Gruber s Grove Bay Sediment Sampling Work Plan Addendum Mr. Bill Fitzpatrick, P.E.,

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed

More information

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG GEOLOGIC LOG DATE STARTED: DATE COMPLETED: 08-Sep-09 08-Sep-09 LOGGER: Quin Kinnebrew WEATHER: Clear & Warm PAGE 1 OF 2 WELL NO. GMW-66 COMPANY NAME:

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

10 May Rod Walls - Director Facilities New Construction, Sustainability Hays CISD IH 35 Kyle, Texas 78640

10 May Rod Walls - Director Facilities New Construction, Sustainability Hays CISD IH 35 Kyle, Texas 78640 10 May 2017 Rod Walls - Director Facilities New Construction, Sustainability Hays CISD 21003 IH 35 Kyle, Texas 78640 Re: Hays CISD Proposed ES15 Site, Buda Phase II Soil Sampling Dear Rod: Concern has

More information

TECHNICAL MEMORANDUM June 16, 2011

TECHNICAL MEMORANDUM June 16, 2011 TECHNICAL MEMORANDUM June 16, 2011 Tier 1 Remedial Investigation Results and Tier 2 Sampling Plan Former Salinas Manufactured Gas Plant To: Mr. Henry Chui, Department of Toxics Substances Control From:

More information

Table 5-1 Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ.

Table 5-1 Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ. Table 5- Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ. Transformer Pads (9 pads: PAD 9) Evaluate if PCBs presently exist in soils adjacent to, and/or beneath the transformer

More information

GEOSYNTEC CONSULTANTS

GEOSYNTEC CONSULTANTS GEOSYNTEC CONSULTANTS 2100 Main Street, Suite 150 Huntington Beach, CA 92648 USA Tel (714) 969-0800 Fax (714) 969-0820 15 February 2006 Ms. Tamara Zeier, P.E. Project Manager Project Navigator, Ltd. One

More information

MIP System Field Test Results for High Level TPH-GRO

MIP System Field Test Results for High Level TPH-GRO MIP System Field Test Results for High Level TPH-GRO Salina, KS Summer 2011 Tom Christy and Blake Slater run MIP logs at local site in Salina, KS where gasoline contaminates the soil and groundwater. Release

More information

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL

More information

ATTACHMENT A WEAVER BOTTOMS SEDIMENT BASIN MAINTENANCE PROJECT PROJECT REPORT SUMMARY (APRIL 7, 2014)

ATTACHMENT A WEAVER BOTTOMS SEDIMENT BASIN MAINTENANCE PROJECT PROJECT REPORT SUMMARY (APRIL 7, 2014) ATTACHMENT A WEAVER BOTTOMS SEDIMENT BASIN MAINTENANCE PROJECT PROJECT REPORT SUMMARY (APRIL 7, 2014) PRE-PROJECT DREDGE MATERIAL SEDIMENT CORE AND BASELINE CONTAMINANT ANALYSIS PREPARED BY BRAUN INTERTEC

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

GZA GeoEnvironmental, Inc.

GZA GeoEnvironmental, Inc. GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Soil Vapor Survey: A Gasoline Plume Beneath A Residence And The Implications For Additional Corrective Action Or Case Closure

Soil Vapor Survey: A Gasoline Plume Beneath A Residence And The Implications For Additional Corrective Action Or Case Closure Soil Vapor Survey: A Gasoline Plume Beneath A Residence And The Implications For Additional Corrective Action Or Case Closure William R Chapman Senior Geologist VA DEQ NRO Remediation Program 22nd National

More information

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines. 611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

Quarterly Groundwater Monitoring Report Third Quarter 2018

Quarterly Groundwater Monitoring Report Third Quarter 2018 Quarterly Groundwater Monitoring Report Third Quarter 2018 Piper s Wine & Spirit Barn 4127 Hanover Pike Manchester, Maryland 21102 MDE Case No. 18-0496CL Facility I.D. No. 17166 AEC Project No. 14-059

More information

Maine DEP DRO. MY05TP220A(0-0.5) MY05TP222A(0-0.5) FD MY05TP223A(0-0.5) FD MY05TP220A (EB) EB-Equipment Rinsate Blank FD- Field Duplicate Samples

Maine DEP DRO. MY05TP220A(0-0.5) MY05TP222A(0-0.5) FD MY05TP223A(0-0.5) FD MY05TP220A (EB) EB-Equipment Rinsate Blank FD- Field Duplicate Samples Mr. John Rendall Maine Yankee 321 Old Ferry Road Wiscasset, Maine 04578 RE: Project No.: Maine Yankee Soil/sediment Samples Lab Name: Katahdin Analytical Services, Westbrook, Maine Site Name: Maine Yankee

More information

WELL NUMBER 14-BW03 PAGE 1 OF 5

WELL NUMBER 14-BW03 PAGE 1 OF 5 WELL 14-BW03 PAGE 1 OF 5 IENT PROJECT DATE STARTED 4/30/14 COMPLETED 5/1/14 GROUND ELEVATION 1157.89 ft HOLE SIZE 9 5/8 inches DRILLING CONTRACTOR Cascade Drilling NORTHING 670592.2 EASTING 1937845.8 DRILLING

More information

PARQUE COLON AGUADILLA (LAND PROPERTY OF MUNICIPIO AGUADA) LOT PROPERTY OF SUNC. ESTEVEZ BW-1 BW-5 BW-2 DB1 BW-3 DB2 BW-4 DB3 GWS-1

PARQUE COLON AGUADILLA (LAND PROPERTY OF MUNICIPIO AGUADA) LOT PROPERTY OF SUNC. ESTEVEZ BW-1 BW-5 BW-2 DB1 BW-3 DB2 BW-4 DB3 GWS-1 N 64650 N 64600 N 64550 N 64500 N 64450 N 64400 N 64350 N 64300 N 64250 N 64200 N 64150 N 64100 N 64050 N 64000 N 63950 N 63900 N 63850 N 63800 N 63750 N 63700 N 63650 N 63600 N 63550 N 63500 N 63450 N

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

KESTREL. April 26, Mr. Stephen Evans Maine Yankee 321 Old Ferry Road Wiscasset, Maine 04578

KESTREL. April 26, Mr. Stephen Evans Maine Yankee 321 Old Ferry Road Wiscasset, Maine 04578 KESTREL ENVIRONMENTAL TECHNOLOGIES, INC. Mr. Stephen Evans Maine Yankee 321 Old Ferry Road Wiscasset, Maine 04578 RE: Project No.: Maine Yankee Soil Samples Lab Name: Katahdin Analytical Services, Westbrook,

More information

Antelope Hills Directionally Drilled Water Well. Theresa Jehn-Dellaport Jehn Water Consultants, Inc.

Antelope Hills Directionally Drilled Water Well. Theresa Jehn-Dellaport Jehn Water Consultants, Inc. Antelope Hills Directionally Drilled Water Well Theresa Jehn-Dellaport Directional Well Applications Deep Bedrock Aquifers Proven Oil field technology Initial Analysis indicates up to 4 times the production

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

February 9, 2018 GeoInsight Project

February 9, 2018 GeoInsight Project February 9, 2018 GeoInsight Project 7877-001 William Murphy, Director Town of Sudbury Board of Health 275 Old Lancaster Road Sudbury, MA 01776 Re: Focused Subsurface Investigation Melone Property North

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

APPENDIX B: BORING LOGS

APPENDIX B: BORING LOGS New Orleans Levee Systems Independent Levee Hurricane Katrina Investigation Team July, 6 APPENDIX B: BORING S As part of the field investigation 9 borings were performed at the sites of interest, as listed

More information

ONONDAGA LAKE PRE-DESIGN INVESTIGATION: PHASE III WORK PLAN - ADDENDUM 2 Syracuse, New York

ONONDAGA LAKE PRE-DESIGN INVESTIGATION: PHASE III WORK PLAN - ADDENDUM 2 Syracuse, New York ONONDAGA LAKE PRE-DESIGN INVESTIGATION: PHASE III WORK PLAN - Syracuse, New York Prepared For: 5000 Brittonfield Parkway Suite 700 East Syracuse, NY 13057 Prepared By: Parsons 290 Elwood Davis Road, Suite

More information

71912 From: Dana Derrington Sent: Wednesday, May 31, :02 PM Central Standard Time TO:

71912 From: Dana Derrington Sent: Wednesday, May 31, :02 PM Central Standard Time TO: Blue, Karen From: Sent: To: Subject: Attachments: Categories: Hynum, Tammie Wednesday, May 31, 17 6:21 PM Sadler, Bill; Cusher, Annette; Rich, Jay FW: Monitoring Well Installation Report, Entergy White

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

APPENDIX B SUBSURFACE EXPLORATIONS

APPENDIX B SUBSURFACE EXPLORATIONS APPENDIX B SUBSURFACE EXPLORATIONS 51-1-10079-028 APPENDIX B SUBSURFACE EXPLORATIONS TABLE OF CONTENTS Page B.1. B.2. B.3. B.4. B.5. B.6. B.7. GENERAL...B-1 HEALTH AND SAFETY PLAN...B-1 DRILLING PROCEDURES...B-1

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

RE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H

RE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H November 2, 2017 Rick Spicer Regulatory & Environmental Superintendent Operations BHP Billiton Petroleum, LLC Fayetteville Petroleum Unit 1686 Letona Rd Searcy, AR 72143 RE: AFIN: 23-00000 ADEQ Reference

More information

PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF:

PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Paulsboro Marine Terminal Sediment and Benthic Sampling and Characterization Plan Addendum No. 1 SUBMISSION DEADLINE: May 27, 2009 at 11:00 A.M. FAIR

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

AN ARCHAEOLOGICAL SURVEY FOR THE EASTHAM STATE PRISON FARM UNIT PROJECT IN HOUSTON COUNTY TEXAS

AN ARCHAEOLOGICAL SURVEY FOR THE EASTHAM STATE PRISON FARM UNIT PROJECT IN HOUSTON COUNTY TEXAS AN ARCHAEOLOGICAL SURVEY FOR THE EASTHAM STATE PRISON FARM UNIT PROJECT IN HOUSTON COUNTY TEXAS Antiquities Permit 5693 By William E. Moore and Edward P. Baxter Brazos Valley Research Associates Contract

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

WELL AND BORING REPORT

WELL AND BORING REPORT 45 0'N 45 0'N South North South North 1905 0 1 Distance in Miles 1: 24,000 (1"=2,000') NAD 1983 UTM Zone 15N Unified maps show subdued modern topo features where corresponding maps of the same year were

More information

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review Appendix I Dredged Volume Estimates Draft Contractor Document: Subject to Continuing Agency Review Interoffice Correspondence Date: April 6, 2007 To: L. Bossi (WHI) Copy: S. Thompson (WHI), B. Fidler (NNJ)

More information

Log of Monitoring Well D58B

Log of Monitoring Well D58B Project: Motiva - Monitoring Well and Soil Boring Data Project Location: Delaware City Refinery Project Number: 20240412.W1000 Log of Monitoring Well D58B Sheet 1 of 7 Date(s) Drilled Drilling Method Drill

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road LEGEND ra R aku Ru BUSINESS ZONE NORTH OF Powells Road oad AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE 3 mm TEST PIT AS121 SCPT12 TP18 BH13 TP15 2 AS125 AS126 TP14 BH12 AGRESEARCH CPT13 TP17 INNOVATION

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC Prepared For: Akisqnuk First Nation Windermere, BC Box 688 Fernie, BC V0B 1M0 250 423 4829 August

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Guideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS

Guideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS Guideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS 1. Introduction The requirement to prepare and submit a Final Well Report is specified by subsection 201(1) of the Newfoundland

More information

H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE)

H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE) DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE) Parsons P:\Honeywell -SYR\444576 2008 Capping\09

More information

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units June 26, 2007: Low Impact Development 1 Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 24, 2012 How & Where does infiltration work? Summary of

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report Pursuant to: 40 CFR 257.60 40 CFR 257.61 40 CFR 257.62 40 CFR 257.63 40 CFR 257.64 Submitted to: Consumers Energy Company

More information

Cabarrus County, NC Construction and Demolition Debris Landfill Phase 1L Expansion Project Bidder's List CDM Project No.

Cabarrus County, NC Construction and Demolition Debris Landfill Phase 1L Expansion Project Bidder's List CDM Project No. Attachment No. 1 Cabarrus County, NC Construction and Demolition Debris Landfill Phase 1L Expansion Project Bidder's List CDM Project No. 1200 Contractor Contact Name Contractor Type? Cabarrus County Solid

More information

Imagine the result Sediment Sampling Plan. 1½-Mile Reach of the Housatonic River. General Electric Company Pittsfield, Massachusetts

Imagine the result Sediment Sampling Plan. 1½-Mile Reach of the Housatonic River. General Electric Company Pittsfield, Massachusetts Imagine the result General Electric Company Pittsfield, Massachusetts 2012 Sediment Sampling Plan 1½-Mile Reach of the Housatonic River March 2012 2012 Sediment Sampling Plan 1½-Mile Reach of the Housatonic

More information

Geotechnical Engineering Subsurface Exploration The Proposed LAPLAWD Phase 2B 12 Main Water Line Durango, Colorado

Geotechnical Engineering Subsurface Exploration The Proposed LAPLAWD Phase 2B 12 Main Water Line Durango, Colorado July, La Plata Archuleta Water District c/o Harris Water Engeerg, P.E. East nd Avenue, Suite Durango, Colorado brett@durangowater.com PN: GE Subject: Geotechnical Engeerg Subsurface Exploration The Proposed

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

Guideline Petroleum Drilling Regulations (CNR 1150/96)

Guideline Petroleum Drilling Regulations (CNR 1150/96) Government of Newfoundland and Labrador Department of Natural Resources Guideline Petroleum Drilling Regulations (CNR 1150/96) Topic: Final Well Report Onshore Petroleum Exploratory Wells Ref: Section

More information

APPENDIX C GEOPHYSICAL REPORT

APPENDIX C GEOPHYSICAL REPORT APPENDIX C GEOPHYSICAL REPORT GEOPHYSICAL ENGINEERING SURVEY REPORT 700 E 241 st Street NOVA PROJECT NUMBER 15-0522 DATED January 27, 2015 PREPARED FOR: LANGAN Long Warf Maritime Center New Haven, CT 06511

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

TIERRA. Florida License No Florida License No

TIERRA. Florida License No Florida License No March 9, 208 TIERRA AECOM 7650 West Courtney Campbell Cswy Tampa, FL 33607 Attn: RE: Mr. Edgar Figueroa, P.E. Geotechnical Engineering Services Report Purchase Order No.: 9532 AECOM Project Number: 6055499

More information

Summary of Indium Soil Vapor Monitoring Points Decommissioning Former Lockheed Martin French Road Facility Utica, NY

Summary of Indium Soil Vapor Monitoring Points Decommissioning Former Lockheed Martin French Road Facility Utica, NY Stantec Consulting Services Inc. 61 Commercial Street, Suite 100, Rochester NY 14614-1009 September 2, 2015 File: 190500800 New York State Department of Environmental Conservation Division of Environmental

More information

SlimPulse FS Original Hole Ft August 12, 2017

SlimPulse FS Original Hole Ft August 12, 2017 Oilfield Services, Central U.S. Land Schlumberger Drilling and Measurements Drilling Group Geo Market Area: South West Texas Basin 7220 W I-H 20 Midland, Texas 79706 Phone : (432) 742-5400 (Main) Fax :(432)

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

YSI INCORPORATED. SCIA Soil Investigation Report. 1700/1725 Brannum Lane, Yellow Springs, Ohio September 2015 PROJECT NUMBER:

YSI INCORPORATED. SCIA Soil Investigation Report. 1700/1725 Brannum Lane, Yellow Springs, Ohio September 2015 PROJECT NUMBER: September 2015 YSI INCORPORATED SCIA Soil Investigation Report 1700/1725 Brannum Lane, Yellow Springs, Ohio 45387 PROJECT NUMBER: 138794 PROJECT CONTACT: Eric Riekert EMAIL: eric.riekert@powereng.com PHONE:

More information

Revisions to Text Based on Completion of Tier III Validation. Section 1. Section 4.2

Revisions to Text Based on Completion of Tier III Validation. Section 1. Section 4.2 Revisions to Text Based on Completion of Tier III Validation Section 1 Section 4.2 Downstream Areas Data Assessment Report Revision 2 1. Introduction ARCADIS U.S., Inc. (ARCADIS) has prepared this Downstream

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 4 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District ED FIELDING Commissioner, District ANNE SCOTT Commissioner, District 3 SARAH HEARD Commissioner,

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

APPENDIX B BORING LOGS AND WELL CONSTRUCTION LOGS. KN\4040\SI\P153\153 SI Report\06/04/01(9 :44 AM)

APPENDIX B BORING LOGS AND WELL CONSTRUCTION LOGS. KN\4040\SI\P153\153 SI Report\06/04/01(9 :44 AM) APPENDIX B BORING LOGS AND WELL CONSTRUCTION LOGS KN\4040\SI\P153\153 SI Report\06/04/01(9 :44 AM) KN\4040\SI\P153\153 SI Report\06/04/01(9 :44 AM) BORING LOGS L R HTRW DRILLING LOG District: Mobile USAGE

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

Method 8270C PAH. FD- Field Duplicate Samples

Method 8270C PAH. FD- Field Duplicate Samples Mr. John Rendall Maine Yankee 321 Old Ferry Road Wiscasset, Maine 04578 RE: Project No.: Maine Yankee Sediment Samples Lab Name: Katahdin Analytical Services, Westbrook, Maine Site Name: Maine Yankee Nuclear

More information

Advanced Geologic Exploration, Inc.

Advanced Geologic Exploration, Inc. Advanced Geologic Exploration, Inc. Scientists of the Earth PO Box 1956, Chester, CA 96020 Voice: (530) 258-4228 Fax (530) 258-4339 www.advancedgeologic.com January 23, 2009 Job No. G-081201 Terri Barber,

More information

GEOPHYSICAL IMAGING TO ENHANCE ANALYSIS, DESIGN AND DRILLING OF LARGE-SCALE GEOTHERMAL SYSTEMS. Abstract

GEOPHYSICAL IMAGING TO ENHANCE ANALYSIS, DESIGN AND DRILLING OF LARGE-SCALE GEOTHERMAL SYSTEMS. Abstract GEOPHYSICAL IMAGING TO ENHANCE ANALYSIS, DESIGN AND DRILLING OF LARGE-SCALE GEOTHERMAL SYSTEMS John A. Mundell, Mundell & Associates, Inc., Indianapolis, Indiana Gabriel Hebert, Mundell & Associates, Inc.,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is based upon the City of El Segundo General Plan and General Plan EIR and addresses the following geologic issues: soil erosion,

More information

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION

More information

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF CONSTRUCTING A SINGLE-SPAN BRIDGE ON RELOCATED SHUMWAY HOOW ROAD OVER THE CSXT RAILROAD. THE STRUCTURE AS ANNED, IS A SINGLE-SPAN STRUCTURE WITH MSE WAS AT THE ABUTMENTS.

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

MAPPING BEDROCK: Verifying Depth to Bedrock in Calumet County using Seismic Refraction

MAPPING BEDROCK: Verifying Depth to Bedrock in Calumet County using Seismic Refraction MAPPING BEDROCK: Verifying Depth to Bedrock in Calumet County using Seismic Refraction Revised December 13, 2011 Dave Hart Wisconsin Geological and Natural History Survey INTRODUCTION Seismic refraction

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary