1 Blue, Karen From: Sent: To: Subject: Attachments: Categories: Hynum, Tammie Wednesday, May 31, 17 6:21 PM Sadler, Bill; Cusher, Annette; Rich, Jay FW: Monitoring Well Installation Report, Entergy White Bluff, Class 3N Landfill Permit No S3N-R3 Rec d Digitally TM-T Hynum pdf AFIN: Red Category PMT#: 0199-S3N-R3 By bluek at 8:52 am, Jun 05, Original Message----- DOC ID#: From: Dana Derrington [dld@ftn-assoc.com] Sent: Wednesday, May 31, 17 05:02 PM Central Standard Time TO: BS>FILE <KMB To: Hynum, Tammie Subject: Monitoring Well Installation Report, Entergy White Bluff, Class 3N Landfill Permit No S3N- R3 S W M D Hello Tammie, Please find the attached monitoring well installation report for the Entergy White Bluff, Class 3N Landfill. Feel free to call if you have any questions regarding this submittal. Regards, Dana Dana Derrington, PE *, PG * FTN Associates, Ltd. 3 Innwood Circle, Ste.2 Little Rock, AR Office: (1) Cell: (1) * Missouri and Arkansas 1

2 TENICAL MEMORANDUM DATE: May 31, 17 TO: FROM: Tammie J. Hynum Office of Land Resources, Arkansas Department of Environmental Quality Dana L. Derrington, PE, PG FTN Associates, Ltd. SUBJECT: Monitoring Well Installation Report, Entergy White Bluff, Class 3N Landfill, Permit No S3N-R3, AFIN: FTN No. R On behalf of Entergy Services, Inc. (Entergy), FTN Associates, Ltd. (FTN) is providing this technical memorandum for the Entergy White Bluff Class 3N Landfill in Redfield, Arkansas. The memorandum presents a summary of field activities associated with the installation and decommissioning of monitoring wells and piezometers as required by Arkansas Pollution Control and Ecology Commission (APCEC) Regulation No. 22, 22.13(f). 1.0 BACKGROUND Entergy submitted two work plans to the Arkansas Department of Environmental Quality (ADEQ) for the proposed installation of seven monitoring wells and decommissioning of two piezometers located at the landfill, in accordance with APCEC 22.13(f). The proposed scope of work in each work plan and associated ADEQ approvals are summarized below. To meet APCEC Regulation No. 22 requirements for the future groundwater monitoring program at the landfill, Entergy proposed the installation of four additional monitoring wells and the decommissioning of two temporary piezometers in a work plan dated January, 17 (ADEQ document identification number [DIN] 937). The work plan described the proposed installation of two shallow wells, MW-8S and MW-9S, screened in the saturated sediments of Stratum I, and two deep wells, MW-12D and MW-13D, screened in the saturated Stratum III soils. The proposed locations of these wells and the decommissioning of temporary piezometers FTN PZ-4 and FTN PZ-6 were based on prior communication between ADEQ, Entergy, and FTN.

3 Tammie J. Hynum May 31, 17 Page 2 Entergy submitted a second work plan dated January, 17, for the proposed installation of three additional Stratum III wells: MW-D, MW-14D, and MW-15D (DIN 938). These wells were being installed to augment the landfill's monitoring program under Title Code of Federal Regulations (CFR) Part 257, 257. through A conditional approval for the two work plans was granted on February 2, 17, in a letter from ADEQ (DIN 967). In the letter, ADEQ requested a shallow well be installed near proposed well MW-12D in lieu of the proposed shallow well MW-9S if Stratum I sediments were found to be saturated during the installation of proposed well MW-12D. ADEQ also requested that the location and possibly the depth of MW-13D be modified. All other proposed work described in the work plans (DINs 937 and 938) was approved. Entergy submitted a revised work plan on February 9, 17 (DIN 5), to address ADEQ s comments in the conditional approval letter (DIN 967). The revised work plan included the installation of a shallow well (MW-12S) near proposed Stratum III well MW-12D (instead of MW-9S near MW-9D) if Stratum I sediments were found to be saturated during installation of MW-12D. The revised work plan also relocated proposed MW-13D nearer to temporary piezometer FTN PZ-4. ADEQ approved the revised work plan (DIN 5) in a letter to Entergy dated February 16, 17 (DIN 718). 2.0 DRILLING AND WELL INSTALLATION Field activities associated with well installations were conducted February 8 through 25, 17. Walker-Hill Environmental, Inc. (WHE), an Arkansas-licensed driller, performed the drilling and well construction tasks, with an FTN geologist on-site to document the work. Soils for each well boring were described and classified according to the Unified Soil Classification System by the on-site geologist. Each Stratum I and Stratum III well boring was advanced using sonic drilling techniques and a 4x6-inch core and case system. Soils were continuously sampled using a -foot, 4-inch-diameter core barrel fitted with a sand catcher to maximize sample recovery. A -foot, 6-inch-diameter override casing was advanced over the core barrel prior to core retrieval. Where applicable, a temporary -inch-diameter casing was advanced 1 to 5 feet into the Stratum II clays during the drilling of Stratum III wells. This outer casing was left in place during deep well borehole advancement and during well construction activities to prevent or minimize downward migration of Stratum I groundwater. The large outer casing was not used during the drilling or construction of MW-13D because Stratum I soils are absent at that location.

4 Tammie J. Hynum May 31, 17 Page 3 Well construction procedures adhered to methods described in the Handbook of Suggested Practices for the Design and Installation of Ground-Water Monitoring Wells (US Environmental Protection Agency [EPA] 1991) and those required by the Arkansas Water Well Construction Commission (AWWCC). Each Stratum I well was constructed using 2-inch-diameter, flush-threaded, solid Schedule PVC riser and a -foot, 0.0-inch slotted, flush-threaded well screen and end cap. A filter pack consisting of - to -silica sand was placed in the well annulus to a minimum depth of 3 feet above the top of well screen, followed by a minimum of 3 feet of bentonite pellet seal and well-mixed bentonite-cement grout. The new Stratum I wells were secured at the surface with a 4-inch-square locking protective aluminum casings, concrete pads, and four concrete-filled pipe bollards. The Stratum III wells were similarly constructed except that 4-inch-diameter riser, well screen, and end cap were used and protected by an 8-inch-square locking protective aluminum/steel casing. The well identifications were clearly identified on the outside casings of each new well. Boring log and well construction details are included in Attachment PIZOMENTER ABANDONMENT Piezometer abandonment for FTN PZ-4 and FTN PZ-6 were performed by WHE with an FTN geologist on-site to document the work. Abandonment activities adhered to procedures recommended by EPA (1991) and those required by AWWCC. The temporary fence posts and protective netting around each piezometer were removed prior to abandonment activities. The 1-inch-diameter PVC casing, well screen, and end caps were removed by overdrilling using sonic drilling techniques and a 4-inch-diameter core barrel. The boreholes were backfilled using slow-release bentonite pellet plugs from the total drilled depth to the ground surface. Specifically, FTN PZ-4 was backfilled from a total depth of 45 ft below ground surface (bgs), and FTN PZ-6 was backfilled from ft bgs. The pellets were added slowly and periodically tamped to prevent bridging. Potable water was added following pellet installation to hydrate the pellets in place. 4.0 SURVEY Each new monitoring well was surveyed by Harmon Surveying, Inc., an Arkansas-registered professional surveyor. A site map depicting the surveyed locations of the new wells and the certified April, 17, survey report are included as Attachment 2. The survey report includes the horizontal and vertical coordinates based on Entergy s site-referenced coordinate system. The report also provides horizontal coordinates in the Arkansas State Plane Coordinate System, North American Datum of 1983 (NAD 83). The site-referenced vertical coordinates are equivalent to the North American Vertical Datum of 1988 (NAVD 88). The surveyed elevation data and general well construction details for each new well are provided in Table 1.

5 Tammie J. Hynum May 31, 17 Page 4 Table 1. Monitoring well construction details. Top of Casing (TOC) Elevation (ft NAVD 88) Ground Surface Elevation (ft NAVD 88) Total Depth (ft below TOC) Screened Interval (ft NAVD 88) Well ID Stratum I MW-8S MW-12S Stratum III MW-D MW-12D MW-13D MW-14D MW-15D WELL DEVELOPMENT The new wells were developed by circulating potable water into the well to break down the well bore skin along the screened interval. Immediately following this procedure, the wells were purged to remove the added water. This method was used because conventional methods of well development, such as surging and overpumping, are ineffective due to the low-yielding capacity and high-fines content of the target zone sediments. FTN developed the wells February 15, 17, through March 2, 17. Well development records are included as Attachment 3. If you have any questions regarding this technical memorandum, or require any additional information, please do not hesitate to contact me at (1) or Paul Crawford, PE, PG, at (1) DLD/hlf Attachments CC: Mr. Tracy Johnson; Entergy Services, Inc. (with attachments) Mr. Trip Gentry; Entergy Services, Inc. (with attachments) Mr. Stan Chivers, Entergy Services, Inc. (with attachments) R:\WP_FILES\ \CORRESPONDENCE\L-T HYNUM WELL INSTALLATION REPORT\TM-T HYNUM DOCX

6

7 ATTAMENT 1 Well Construction Details and Boring Logs

8 0 CL ML ML/CL /ML PROJECT: LOCATION: Entergy White Bluff Landfill DRILLING CONTRACTOR: Walker-Hill Environmental, Inc. DRILLING METHOD: TOTAL WELL DEPTH: DEPTH TO WATER: (4/3/17) FTN Project # R Sonic with 4x6 core and case 23.0 ft below TOC 6.48 ft below TOC LOGGED BY: SAMPLING METHOD: DATE STARTED: DATE COMPLETED: AJP/DLD Continuous with ft 4 in diameter core barrel 2/9/17 2/13/17 Depth (feet) USCS Graphic Log Monitoring Well Installations DRILLING EQUIPMENT: Geoprobe 81LS Description SILTY CLAY, yellowish orange to light brown, with rounded gravel (~ 1 in), soft to medium stiff, moist. FAT CLAY, tan with red iron oxide staining, with rounded gravel (~ 2 in), very stiff. SILTY SAND, very fine-grained, tan, soft to medium stiff, dry to ft, with increased silt content, tan with orange mottles, very 19 ft, with few clay lenses. SILT, greenish gray, with some thin clay lenses, medium stiff to soft, moist. SILT and CLAY, laminated, light gray to olive gray, stiff, dry. FAT CLAY, greenish gray, laminated with light gray silt, stiff, dry. BORING ID: MW-8S WELL ID: MW-8S NORTHING: EASTING: GROUND ELEVATION: TOC ELEVATION: ft ft % REC Well Construction 0 Above ground completion includes 2x2 ft concrete pad, four pipe bollards, and locking outer aluminum casing ft of 2 in Sch. PVC including 2.8 ft of stickup (vented below cap) Cement/bentonite grout from 0 to 4 ft bgs Bentonite seal from 4 to 7 ft. bgs Silica size / filter pack from 7 to.2 ft bgs ft of 2 in dia. 0.0 in slot, Sch PVC 0.18 ft 2 in dia. Sch PVC end cap Drilling terminated at ft bgs NOTES: Horizontal and vertical data are based on the Harmon Surveying report dated March 26, 17 (AR State Plane NAD83 South and NAVD88). 1

9 0 FILL ML CL ML /ML ML PROJECT: LOCATION: Entergy White Bluff Landfill DRILLING CONTRACTOR: Walker-Hill Environmental, Inc. DRILLING METHOD: TOTAL WELL DEPTH: DEPTH TO WATER: (4/3/17) FTN Project # R Sonic with 4x6 core and case 49.8 ft below TOC ft below TOC LOGGED BY: SAMPLING METHOD: DATE STARTED: DATE COMPLETED: AJP Continuous with ft 4 in diameter core barrel 2/21/17 2/22/17 Depth (feet) USCS Graphic Log Monitoring Well Installations DRILLING EQUIPMENT: Geoprobe 81LS Description FILL, consisting of nepheline syenite gravel. SILT, brownish tan, rootlets, soft, moist. LEAN CLAY, light brown with rootlets and rounded gravel (~ 1 in), medium stiff, moist. FAT CLAY, gray with reddish-brown mottles, very stiff, moist. SILT, light gray to tan with orange mottles, laminated with clayey silt and sandy silt, very stiff, dry to moist. FAT SANDY CLAY, light gray to olive gray, sand is very fine-grained, very stiff, 12.5 to 13.5 ft, with organic 13.5 ft, with dark brown sandy lenses and greenish gray silt lenses, very stiff, moist. SILTY SAND, very fine-grained, light to dark brown, with iron oxide staining, few thin clay lenses, loose to medium dense, moist. FAT CLAY and SANDY SILT, olive gray fat clay laminated with greenish grey sandy silt. Clay layers are very stiff, silty sand layers are medium dense. SILTY SAND, very fine-grained, with some clay, dark brown with dark brown organic matter, medium stiff, moist. FAT CLAY, olive gray transitioning to greenish gray with depth some sandy lenses, with dark brown organic matter/old roots, very dense, moist. SILTY SAND, very fine-grained, tan to brown with some iron oxide staining, dense, 35 ft, olive gray to light gray, with small amounts of organic 39 ft, with some clay laminations. SILT, with very fine-grained sand, light grey, decreasing sand with depth, soft to stiff, moist. BORING ID: MW-12S WELL ID: MW-12S NORTHING: EASTING: GROUND ELEVATION: TOC ELEVATION: ft ft % REC Well Construction 0 Above ground completion includes 2x2 ft concrete pad, four pipe bollards, and locking outer aluminum casing ft of 2 in Sch. PVC including 2.8 ft of stickup (vented below cap) Concrete cement from 0 to 2.5 ft bgs Cement/bentonite grout from 2.5 to 27 ft bgs Bentonite seal from 27 to 34 ft bgs Silica size / filter pack from 34 to 47 ft bgs ft of 2 in dia. 0.0 in slot, Sch PVC 0.18 ft 2 in dia. Sch PVC end cap Drilling terminated at 47 ft bgs Soils descriptions are based on the soil log for MW-12D, located 12 ft from MW-12S. Soils were continuously sampled and logged at MW-12D using a 4-in core barrel. Samples from MW-12S were visually observed to verify that MW-12S was advanced in similar soils logged for MW-12D NOTES: Horizontal and vertical data are based on the Harmon Surveying report dated March 26, 17 (AR State Plane NAD83 South and NAVD88). 1

10 0 FILL ML ML PROJECT: LOCATION: Entergy White Bluff Landfill DRILLING CONTRACTOR: Walker-Hill Environmental, Inc. DRILLING METHOD: TOTAL WELL DEPTH: DEPTH TO WATER: (4/3/17) FTN Project # R Sonic with 4x6 core and case * 84.4 ft below TOC ft below TOC LOGGED BY: SAMPLING METHOD: DATE STARTED: DATE COMPLETED: AJP Continuous with ft 4 in diameter core barrel 2/22/17 2/23/17 Depth (feet) USCS Graphic Log Monitoring Well Installations DRILLING EQUIPMENT: Geoprobe 81LS Description FILL, consisting of nepheline syenite gravel. SANDY CLAYEY SILT, orangish gray, less clay with depth, medium dense, dry to moist. SILTY SAND, yellowish orange transitioning to tan with depth, orange mottles, medium dense to loose, moist. SANDY CLAYEY SILT, light gray sandy silt with olive gray lenses of clay that increase with depth, medium stiff, ft, dark olive clay lenses interbedded with silt, very stiff, moist. FAT CLAY, olive gray, with laminations of silt and very fine-grained sand, sand content decreases with depth, hard to very stiff, dry to somewhat moist. BORING ID: MW-D WELL ID: MW-D NORTHING: EASTING: GROUND ELEVATION: TOC ELEVATION: ft ft % REC 0 0 Well Construction 0 Above ground completion includes 3x3 ft concrete pad, four pipe bollards, and locking outer steel casing ft of 4 in Sch. PVC including 3.0 ft of stickup (vented below cap) Concrete cement from 0 to 4 ft bgs Cement/bentonite grout from 4 to 25 ft 35 to ft, sand content increases with depth, hard to very stiff, dry to somewhat moist. ft, color changes from olive gray to dark 48 ft, color changes to dark olive gray. 0 Bentonite seal from 25 to 68 ft 57 to ft. transitions to FAT SANDY CLAY, hard to very stiff, dry to somewhat moist. CLAYEY SAND to SILTY SAND, light gray to olive gray, dense, moist. 0 SC/ CL 69 ft, very dark gray. LEAN SANDY CLAY, gray to olive gray, fine-grained, varved, moist. CLAYEY SAND to SILTY SAND, very dark gray to olive gray, laminated clayey sand and silty sand, fine-grained, dense to medium dense, to 81 ft, clay lenses thicken with depth. FAT CLAY, olive gray clay with thin lenses of light gray fine-grained sand and silt, hard to very stiff, moist to somewhat dry Silica size / filter pack from 68 to 81.4 ft bgs ft of 4 in dia. 0.0 in slot, Sch PVC 0.1 ft 4 in dia. Sch PVC end cap Drilling terminated at ft bgs NOTES: Horizontal and vertical data are based on the Harmon Surveying report dated March 26, 17 (AR State Plane NAD83 South and NAVD88). * in temporary outer casing was drilled to 25 ft bgs 1

11 0 FILL ML CL ML /ML PROJECT: LOCATION: Entergy White Bluff Landfill DRILLING CONTRACTOR: Walker-Hill Environmental, Inc. DRILLING METHOD: TOTAL WELL DEPTH: DEPTH TO WATER: (4/3/17) FTN Project # R Sonic with 4x6 core and case * ft below TOC ft below TOC LOGGED BY: SAMPLING METHOD: DATE STARTED: DATE COMPLETED: AJP/DLD Continuous with ft 4 in diameter core barrel 2/12/17 2/21/17 Depth (feet) USCS Graphic Log Monitoring Well Installations DRILLING EQUIPMENT: Geoprobe 81LS Description FILL, consisting of nepheline syenite gravel. SILT, brownish tan, rootlets, soft, moist. LEAN CLAY, light brown with rootlets and rounded gravel (~ 1 in), medium stiff, moist. FAT CLAY, gray with reddish-brown mottles, very stiff, moist. SILT, light gray to tan with orange mottles, laminated with clayey silt and sandy silt, very stiff, dry to moist. FAT SANDY CLAY, light gray to olive gray, sand is very fine-grained, very stiff, 12.5 to 13.5 ft, with organic 13.5 ft, with dark brown sandy lenses and greenish gray silt lenses, very stiff, moist. SILTY SAND, very fine-grained, light to dark brown, with iron oxide staining, few thin clay lenses, loose to medium dense, moist. FAT CLAY and SANDY SILT, olive gray fat clay laminated with greenish grey sandy silt. Clay layers are very stiff, silty sand layers are medium dense. SILTY SAND, very fine-grained, with some clay, dark brown with dark brown organic matter, medium stiff, moist. FAT CLAY, olive gray transitioning to greenish gray with depth some sandy lenses, with dark brown organic matter/old roots, very dense, moist. SILTY SAND, very fine-grained, tan to brown with some iron oxide staining, dense, 35 ft, olive gray to light gray, with small amounts of organic 39 ft, with some clay laminations. BORING ID: MW-12D WELL ID: MW-12D NORTHING: EASTING: GROUND ELEVATION: TOC ELEVATION: ft ft % REC Well Construction 0 Above ground completion includes 3x3 ft concrete pad, four pipe bollards, and locking outer aluminum casing. 3.2 ft of 4 in Sch. PVC including 2.8 ft of stickup (vented below cap) Concrete cement from 0 to 2.7 ft bgs Cement/benontite grout from 2.7 to ft bgs ML /ML SILT, with very fine-grained sand, light grey, decreasing sand with depth, soft to stiff, 48 to ft. increasing clay content, medium stiff, moist. FAT CLAY and SILT, olive gray fat clay with laminations of light gray sandy silt, medium stiff, moist. FAT CLAY, olive gray with light gray silt lenses that decrease with depth, very stiff to hard, dry to somewhat moist. 0 to.5 ft, blocky texture, organic matter. ft, silt lenses thicken but become sparse, very stiff to hard, dry to somewhat moist. 0 Bentonite seal from to 97 ft ft, homogeneous texture with no silt lenses SC /CL SC/ NOTES: CLAYEY SAND, fine-grained, dark grey to olive gray, poorly graded, moist. FAT CLAY to LEAN CLAY, olive gray with light gray silt lenses that thicken and decrease in frequency with depth, very stiff to hard, dry to somewhat moist. CLAYEY SAND to SILTY SAND, fine-grained, very dark gray to olive gray, decreasing clay with depth, medium dense, moist to wet. SILTY SAND, light gray and poorly graded, very loose, moist to wet. FAT CLAY, olive gray with light gray silt lenses that decrease with depth, very stiff to hard, dry to somewhat moist Silica size / filter pack from 97 0 to 111ft bgs ft of 4 in dia. 0.0 in. slot, Sch PVC ft 4 in dia. Sch PVC end cap Drilling terminated at 1 ft bgs 1 Horizontal and vertical data are based on the Harmon Surveying report dated March 26, 17 (AR State Plane NAD83 South and NAVD88). * in temporary outer casing was drilled to 54 ft bgs

12 0 FILL PROJECT: LOCATION: Entergy White Bluff Landfill DRILLING CONTRACTOR: Walker-Hill Environmental, Inc. DRILLING METHOD: TOTAL WELL DEPTH: DEPTH TO WATER: (4/3/17) FTN Project # R Sonic with 4x6 core and case 46.9 ft below TOC 8.36 ft below TOC LOGGED BY: SAMPLING METHOD: DATE STARTED: DATE COMPLETED: AJP Continuous with ft 4 in diameter core barrel 2/23/17 2/24/17 Depth (feet) USCS Graphic Log Monitoring Well Installations DRILLING EQUIPMENT: Geoprobe 81LS Description FILL, consisting of nepheline syenite gravel. FAT CLAY, oxidized orange, laminated with light gray clayey fine-grained sandy silt, silt content increases with depth, rootlets, soft, very 2.7 ft, SANDY CLAY, yellowish orange with lenses of fine-grained sandy silt that are light gray with bright orange mottling, very soft, 15 ft, with fine-grained sand, tan with bright orange limonite stained silts and fine-grained sand, some subrounded to rounded fine-grained gravel to 17 ft, medium stiff, 17 ft, color changes to very dark 22ft, dark olive gray with very little sand or silt, very hard, dry. BORING ID: MW-13D WELL ID: MW-13D NORTHING: EASTING: GROUND ELEVATION: TOC ELEVATION: 1.7 ft 5.46 ft % REC 0 0 Well Construction 0 Above ground completion includes 3x3 ft concrete pad, four pipe bollards, and locking outer aluminum casing ft of 4 in Sch PVC including 3.8 ft of stickup (vented below cap) Cement/benonite grout from 0 to 11 ft bgs Bentonite seal from 11 to 29.5 ft bgs SC SC/ CLAYEY SAND, dark olive gray with lenses of dark gray-green sand and light gray sand, dense, moist. SILTY SAND, fine-grained, olive gray with thin layers of clayey sand, loose to medium dense. CLAYEY SAND to SILTY SAND, dark olive gray with lenses of dark gray-green sand and light gray sand, with organic matter and dark gray-green clay layers that increasing with depth, dense, moist. FAT CLAY with sand, olive gray with lenses of light grey fine-grained sand and silt, clay thickness increases with depth, very stiff, moist. 0 0 Silica size / filter pack from 29.5 to 43.5 ft bgs ft of 4 in dia. 0.0 in slot, Sch PVC 0.1 ft 4 in dia. Sch PVC end cap Drilling terminated at ft bgs NOTES: Horizontal and vertical data are based on the Harmon Surveying report dated March 26, 17 (AR State Plane NAD83 South and NAVD88). 1

13 0 FILL ML PROJECT: LOCATION: Entergy White Bluff Landfill DRILLING CONTRACTOR: Walker-Hill Environmental, Inc. DRILLING METHOD: TOTAL WELL DEPTH: DEPTH TO WATER: (4/3/17) FTN Project # R Sonic with 4x6 core and case * 92.2 ft below TOC.55 ft below TOC LOGGED BY: SAMPLING METHOD: DATE STARTED: DATE COMPLETED: AJP/DLD Continuous with ft 4 in diameter core barrel 2/8/17 2/13/17 Depth (feet) USCS Graphic Log Monitoring Well Installations DRILLING EQUIPMENT: Geoprobe 81LS Description FILL, consisting of nepheline syenite gravel. SILTY SAND, very fine-grained, brownish tan, with clay lenses, ft, with orange iron oxide stains. 0 SILT, with very fine grained sand, tan with orange oxide stains, very moist to wet. FAT CLAY, dark gray, medium stiff to soft, moist, some silt in the upper ft, with thin laminations of gray silt, very stiff, moist. 0 BORING ID: MW-14D WELL ID: MW-14D NORTHING: EASTING: GROUND ELEVATION: TOC ELEVATION: ft 3.22 ft % REC Well Construction 0 Above ground completion includes 3x3 ft concrete pad, four pipe bollards, and locking outer aluminum casing ft of 4 in Sch PVC including 2.9 ft of stickup (vented below cap) Concrete cement from 0 to 1.2 ft 32 ft, very few to no silt laminations, very stiff, moist. 0 Cement/bentonite grout from 1.2 to 22 ft ft, homogeneous texture. 0 Bentonite seal from 22 to 76 ft bgs ft, with very fine-grained ft, SANDY FAT CLAY, sand content increases with depth. SP- SILTY SAND, very fine-grained, dark gray to dark olive gray, dense, very ft, silt content decreases with depth. POORLY GRADED SAND with SILT, fine-grained, dark gray, medium dense, very moist. FAT CLAY, dark gray, with some thin laminations of gray silt, very stiff, moist Silica size / filter pack from 76 to ft bgs ft of 4 in dia. 0.0 in. slot, Sch PVC 0.1 ft 4 in dia. Sch PVC end cap Drilling terminated at 95 ft bgs NOTES: Horizontal and vertical data are based on the Harmon Surveying report dated March 26, 17 (AR State Plane NAD83 South and NAVD88). * in temporary outer casing was drilled to 22 ft bgs 1

14 0 FILL CL ML PROJECT: LOCATION: Entergy White Bluff Landfill DRILLING CONTRACTOR: Walker-Hill Environmental, Inc. DRILLING METHOD: TOTAL WELL DEPTH: DEPTH TO WATER: (4/3/17) FTN Project # R Sonic with 4x6 core and case * 93.3 ft below TOC 74. ft below TOC LOGGED BY: SAMPLING METHOD: DATE STARTED: DATE COMPLETED: AJP/DLD Continuous with ft 4 in diameter core barrel 2//17 2/13/17 Depth (feet) USCS Graphic Log Monitoring Well Installations DRILLING EQUIPMENT: Geoprobe 81LS Description FILL, consisting of nepheline syenite gravel. LEAN CLAY, tan, highly and thinly laminated with light tan silt and very fine-grained sand, hard, dry. SILTY SAND, very fine-grained, tan with orange mottles, some clay laminations in the upper first foot, soft, dry. SILT with fine-grained sand, light gray, highly laminated with clay with lenses of sandy silt (~ 6 in), stiff to soft, moist. BORING ID: MW-15D WELL ID: MW-15D NORTHING: EASTING: GROUND ELEVATION: TOC ELEVATION: ft ft % REC 46 0 Well Construction 0 Above ground completion includes 3x3 ft concrete pad, four pipe bollards, and locking outer aluminum casing ft of 4 in Sch PVC including 2.7 ft stickup (vented below cap) Concrete cement from 0 to 2.8 ft bgs Cement/bentonite grout from 2.8 to 45 ft bgs FAT CLAY, olive gray, thinly laminated with light gray very fine-grained sand and silt, very stiff, dry. to 45 ft, decreasing 45 to ft, increased laminations of light gray very fine-grained sand and silt, very stiff, ft, no laminations. 0 Bentonite seal from 45 to 75 ft bgs 69 ft, FAT SANDY CLAY, olive gray, very stiff, dry. /SC CL/ SC SILTY SAND to CLAYEY SAND, fine-grained, dark gray to olive gray, very dense, moist. LEAN SANDY CLAY to FAT SANDY CLAY, olive gray, very stiff, dry, CLAYEY SAND, fine-grained, olive gray, very dense, moist. FAT CLAY, highly laminated with light gray fine-grained sand and silt, very stiff, dry Silica size / filter pack from 75 to ft bgs ft of 4 in dia. 0.0 in slot, Sch PVC 0.1 ft 4 in dia. Sch PVC end cap Drilling terminated at 95 ft bgs NOTES: Horizontal and vertical data are based on the Harmon Surveying report dated March 26, 17 (AR State Plane NAD83 South and NAVD88). * in temporary outer casing was drilled to 35 ft bgs 1

15 ATTAMENT 2 Certified Survey Report and Well Location Map

16 April, 17 FTN Assoc. LTD. Attn: Dana L. Derrington, PE, PG 3 Innwood Circle, Suite 2 Little Rock, Arkansas Subject: Coordinates for New Monitoring Wells at Entergy White Bluff, Redfield, AR. Mrs. Dana Derrington: Harmon Surveying, Inc. was contracted to determine the coordinates for the Monitoring Wells at the Entergy White Bluff plant in Redfield, AR, and my determination of the coordinates are as follows: Northing Easting Plant Northing Plant Easting Top Casing Top Conc. Ground Elev. Desc MW15D MW13D MWD MW8S MW 14D MW12D MW12S These coordinates are shown as Arkansas State Plane NAD83, South Coordinates, NAVD 88, and Plant Coordinates, based on site monuments, and were surveyed using Trimble R8 GNSS and top of casing elevations were established by level loops. If you have any question or comments, please do not hesitate to call. Sincerely, Justin Dodd Harmon, AR. P.L.S # G I N G E R K E R R Y L A N E C O N W A Y, A R P H O N E : ( ) F A X : ( )

17

18 ATTAMENT 3 Well Development Records

19 Prepared By: Location: Project #: AJP / JAC / EFN Entergy White Bluff Landfill FTN Well Development Log Initial Depth Initial Volume in Initial Volume Purge to H 2 O Well Turbidity Final Turbidity Added Volume* Well ID Date Developed By Time (ft) (gallons) (NTU) (NTU) (gallons) (gallons) MW 8S 2/15/17 EFN / JAC 8:00 12: > 1, > 195 MW 12S 2/27/17 AJP / JAC 9: 12: > 1, > 197 MW D 2/27/17 AJP / JAC 12:36 16: > 6 MW 12D 2/28/17 AJP / JAC 13:09 14: > 1, MW 12D 3/2/17 AJP / JAC 9: 11: > 1, > 111 MW 13D 2/28/17 AJP / JAC 8: 12: > 1, > 72 MW 14D 2/15/17 EFN / JAC 13: 14: > MW 15D 2/16/17 EFN / JAC 14:00 15: > 1, > 81 *Volumes purged are approximate. EFN / JAC Equipment: AJP / JAC Equipment: Pump: Hurricane 12V Pump: Tornado 12V on 2/27 2/28; Hurricane 12V on 3/2 Water level meter: Keck 0 ft Water level meter: Geotech 0 ft SN 2616 Turbidity meter: HF Scientific Micro TPW (177) Turbidity meter: HA P SN

Log of Monitoring Well D58B

Log of Monitoring Well D58B Project: Motiva - Monitoring Well and Soil Boring Data Project Location: Delaware City Refinery Project Number: 20240412.W1000 Log of Monitoring Well D58B Sheet 1 of 7 Date(s) Drilled Drilling Method Drill

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG GEOLOGIC LOG DATE STARTED: DATE COMPLETED: 08-Sep-09 08-Sep-09 LOGGER: Quin Kinnebrew WEATHER: Clear & Warm PAGE 1 OF 2 WELL NO. GMW-66 COMPANY NAME:

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter ATTACHMENT 2 Page 1 of 1 B1 0 1 2 FILL, Dry; brownish red; clayey silt and gravel; ~30% gravel size fragments of dark grey microcrystalline (aphanetic), extrusive, igneous, rock 3 B1-4a 1100 B1-4b-duplicate

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

DRILL HOLE # BH-BGC13-FN-01

DRILL HOLE # BH-BGC13-FN-01 DILL HOLE # BH-BGC3-FN-0 Drill Method: Mud otary/coring Depth To ock (m): N/A Page of 7 eviewed by: AJB 0 GAVEL (GW) Fine to coarse, sandy, well graded, dense, max particle size = 30 mm, angular to subrounded,

More information

APPENDIX B BORING LOGS AND WELL CONSTRUCTION LOGS. KN\4040\SI\P153\153 SI Report\06/04/01(9 :44 AM)

APPENDIX B BORING LOGS AND WELL CONSTRUCTION LOGS. KN\4040\SI\P153\153 SI Report\06/04/01(9 :44 AM) APPENDIX B BORING LOGS AND WELL CONSTRUCTION LOGS KN\4040\SI\P153\153 SI Report\06/04/01(9 :44 AM) KN\4040\SI\P153\153 SI Report\06/04/01(9 :44 AM) BORING LOGS L R HTRW DRILLING LOG District: Mobile USAGE

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

WELL NUMBER 14-BW03 PAGE 1 OF 5

WELL NUMBER 14-BW03 PAGE 1 OF 5 WELL 14-BW03 PAGE 1 OF 5 IENT PROJECT DATE STARTED 4/30/14 COMPLETED 5/1/14 GROUND ELEVATION 1157.89 ft HOLE SIZE 9 5/8 inches DRILLING CONTRACTOR Cascade Drilling NORTHING 670592.2 EASTING 1937845.8 DRILLING

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

UNIT DESCRIPTIONS: Artificial Fill, Undocumented (Afu): Locally derived sandy silt and silty sand, locally with clay and varying amounts of gravel and man-made debris. Abundant concrete rubble, in places

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES TAKING THE MYSTERY OUT OF USACE S ER 1110-1-1807 DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road LEGEND ra R aku Ru BUSINESS ZONE NORTH OF Powells Road oad AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE 3 mm TEST PIT AS121 SCPT12 TP18 BH13 TP15 2 AS125 AS126 TP14 BH12 AGRESEARCH CPT13 TP17 INNOVATION

More information

Soil Sampling Results Former Truck Maintenance Garage

Soil Sampling Results Former Truck Maintenance Garage Soil Sampling Results Former Truck Maintenance Garage Maine Yankee Decommissioning Project Corrective Measures Study May 2004 Prepared for: Maine Yankee 321 Old Ferry Road, Bailey Point Wiscasset, ME 04578

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

PARQUE COLON AGUADILLA (LAND PROPERTY OF MUNICIPIO AGUADA) LOT PROPERTY OF SUNC. ESTEVEZ BW-1 BW-5 BW-2 DB1 BW-3 DB2 BW-4 DB3 GWS-1

PARQUE COLON AGUADILLA (LAND PROPERTY OF MUNICIPIO AGUADA) LOT PROPERTY OF SUNC. ESTEVEZ BW-1 BW-5 BW-2 DB1 BW-3 DB2 BW-4 DB3 GWS-1 N 64650 N 64600 N 64550 N 64500 N 64450 N 64400 N 64350 N 64300 N 64250 N 64200 N 64150 N 64100 N 64050 N 64000 N 63950 N 63900 N 63850 N 63800 N 63750 N 63700 N 63650 N 63600 N 63550 N 63500 N 63450 N

More information

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014 CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a

More information

TP-1 N61E 0 DARK BROWN SANDY SILT (ML) stiff, wet with roots (Disturbed Surficial Soil) DEPTH (FEET) 5 REDDISH BROWN SANDSTONE intensely fractured, weak to friable, deeply weathered, tight (Franciscan

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

APPENDIX B: BORING LOGS

APPENDIX B: BORING LOGS New Orleans Levee Systems Independent Levee Hurricane Katrina Investigation Team July, 6 APPENDIX B: BORING S As part of the field investigation 9 borings were performed at the sites of interest, as listed

More information

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed

More information

Appendix 1 MONITORING BORE LOGS

Appendix 1 MONITORING BORE LOGS Appendix 1 MONITORING BORE LOGS Level 2, Mallon St, Bowen Hills, Queensland GCQ-MB1 GDA94 Z6 ~62m AHD 8 Aug 212 467 me, 688923 mn Lithologic Description GCQ-MB1 Bore Description TOPSOIL: silty sand, dark

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

OVERVIEW OF ER DRILLING IN EARTH EMBANKMENT DAMS AND

OVERVIEW OF ER DRILLING IN EARTH EMBANKMENT DAMS AND OVERVIEW OF ER 1110-1-1807 DRILLING IN EARTH EMBANKMENT DAMS AND 255 255 255 237 237 237 0 0 0 217 217 217 LEVEES 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 110 135 120 Requirements and Processes

More information

Feet. SAND; clayey, fine grained; shells are common; rounded quartz grains. SHELLS; muddy; almost no sand, shells and fragments common

Feet. SAND; clayey, fine grained; shells are common; rounded quartz grains. SHELLS; muddy; almost no sand, shells and fragments common SAND; clayey, fine grained; shells are common; rounded quartz grains SHELLS; muddy; almost no sand, shells and fragments common SAND; back to medium to fine; has a mottled appearance and looks burrowed;

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

Technical Memorandum. Soil Borings

Technical Memorandum. Soil Borings Technical Memorandum To: Project File and Appendix F to Sediment Remedial Investigation Report From: Sara L. Leow, PE Subject: Geotechnical Investigation and Results Summary Date: February 213 Project:

More information

GEOLOGY Local Geology Local geologic mapping shows the site underlain by Goble Volcanics consisting of basalt and andesite, with basalt breccia, volcanic conglomerate, and interbedded siltstone and pyroclastics

More information

May 4, Mr. Bruce Hampson Town of Wilton Miller-Driscoll School Building Committee 238 Danbury Road Wilton, Connecticut 06897

May 4, Mr. Bruce Hampson Town of Wilton Miller-Driscoll School Building Committee 238 Danbury Road Wilton, Connecticut 06897 May 4, 2015 Mr. Bruce Hampson Town of Wilton Miller-Driscoll School Building Committee 238 Danbury Road Wilton, Connecticut 06897 RE: Focused Soil Investigation Miller-Driscoll School Wilton, CT TRC Project

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS Presented by: W. Morgan NeSmith, P.E. Berkel & Company Contractors Inc. 770.941.5100 mnesmith@berkelapg.com SC Engineering Conference

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

APPENDIX C SUBSURFACE EXPLORATIONS

APPENDIX C SUBSURFACE EXPLORATIONS APPENDIX C SUBSURFACE EXPLORATIONS 51-1-52-021 APPENDIX C SUBSURFACE EXPLORATIONS TABLE OF CONTENTS Page C.1. C.2. C.3. C.4. C.5. C.6. GENERAL...C-1 DRILLING PROCEDURES...C-1 SAMPLING PROCEDURES...C-2

More information

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1 88 E. Marshall Street, Suite 0 Tulsa, OK 76 98 8 9 Phone 98 8 798 FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR

More information

Feet. Cape May Core #51 Start depth: 240 ft Stop depth: 245 ft Recovery (ft): 5.1 ft Date: 3/21/94 Described by: JVB, KGM, CL. 5.

Feet. Cape May Core #51 Start depth: 240 ft Stop depth: 245 ft Recovery (ft): 5.1 ft Date: 3/21/94 Described by: JVB, KGM, CL. 5. SAND; medium to fine sand with abundant silt, homogenous slightly mottled appearance; mica on outside, mostly quartz; few darks; peat layer.9 - ft; cnv - same as above; the last few cores are all the same;

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia. REPORT OF PRELIMINARY SUBSURFACE EXPLORATION VCU Basketball Practice Facility 100/18 West Marshall Street City of Richmond, Virginia For Mr. Carl F. Purdin, AIA Assistant Director of Design Services VCU

More information

Clay Robinson, PhD, CPSS, PG copyright 2009

Clay Robinson, PhD, CPSS, PG   copyright 2009 Engineering: What's soil got to do with it? Clay Robinson, PhD, CPSS, PG crobinson@wtamu.edu, http://www.wtamu.edu/~crobinson, copyright 2009 Merriam-Webster Online Dictionary soil, noun 1 : firm land

More information

SEISMIC IMPACT ZONES DEMONSTRATION

SEISMIC IMPACT ZONES DEMONSTRATION SEISMIC IMPACT ZONES DEMONSTRATION CFR 257.63 Bottom Ash Complex Rockport Plant Town of Rockport, Spencer County, Indiana January, 2018 Prepared for: INDIANA MICHIGAN POWER COMPANY Rockport Plant Town

More information

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates Drilled Shaft Foundations in Limestone Dan Brown, P.E., Ph.D. Dan Brown and Associates Foundation Engineering How we teach our students Fundamental understanding of soil and rock behavior (good!) Focus

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

Preliminary soil survey of the NATL Old Field Plots

Preliminary soil survey of the NATL Old Field Plots Preliminary soil survey of the NATL Old Field Plots The preliminary soil survey consisted of completing auger borings at 25 m intervals and included auger borings at total of 46 points. The borings were

More information

Table 5-1 Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ.

Table 5-1 Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ. Table 5- Sampling Program Summary for Milltown Ford Avenue Redevelopment Area, NJ. Transformer Pads (9 pads: PAD 9) Evaluate if PCBs presently exist in soils adjacent to, and/or beneath the transformer

More information

DEPARTMENT OF THE ARMY BADGER ARMY AMMUNITION PLANT S7273 BLUFF ROAD MERRIMAC, WISCONSIN June 6, 2018

DEPARTMENT OF THE ARMY BADGER ARMY AMMUNITION PLANT S7273 BLUFF ROAD MERRIMAC, WISCONSIN June 6, 2018 DEPARTMENT OF THE ARMY BADGER ARMY AMMUNITION PLANT S7273 BLUFF ROAD MERRIMAC, WISCONSIN 53561 June 6, 2018 SUBJECT: Gruber s Grove Bay Sediment Sampling Work Plan Addendum Mr. Bill Fitzpatrick, P.E.,

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

Cabarrus County, NC Construction and Demolition Debris Landfill Phase 1L Expansion Project Bidder's List CDM Project No.

Cabarrus County, NC Construction and Demolition Debris Landfill Phase 1L Expansion Project Bidder's List CDM Project No. Attachment No. 1 Cabarrus County, NC Construction and Demolition Debris Landfill Phase 1L Expansion Project Bidder's List CDM Project No. 1200 Contractor Contact Name Contractor Type? Cabarrus County Solid

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

PERIODIC SAFETY FACTOR ASSESSMENT

PERIODIC SAFETY FACTOR ASSESSMENT PERIODIC SAFETY FACTOR ASSESSMENT CFR 257.73(e)(1) Pond 21, Pond 22, Pond 23, and Waste Water Sludge Pond Oklaunion Power Station Vernon, Texas October, 16 Prepared for: Public Service Company of Oklahoma

More information

Antelope Hills Directionally Drilled Water Well. Theresa Jehn-Dellaport Jehn Water Consultants, Inc.

Antelope Hills Directionally Drilled Water Well. Theresa Jehn-Dellaport Jehn Water Consultants, Inc. Antelope Hills Directionally Drilled Water Well Theresa Jehn-Dellaport Directional Well Applications Deep Bedrock Aquifers Proven Oil field technology Initial Analysis indicates up to 4 times the production

More information

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H SYMBOL SOURCE 8 9 1 SOIL DATA NATURAL SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY NO. CONTENT LIMIT LIMIT INDEX (%) (%) (%) (%) Client: County of Berthoud Project: Project No.: Boring B-2 S-1-5' 6.2 8

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-9 Bridge over Wewoka Creek Hughes County, Oklahoma Job Piece No. 27059(04) July 16, 2015 Terracon Project No. 04125055 Prepared for: Holloway, Updike, and Bellen, Inc.

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 4 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District ED FIELDING Commissioner, District ANNE SCOTT Commissioner, District 3 SARAH HEARD Commissioner,

More information

GZA GeoEnvironmental, Inc.

GZA GeoEnvironmental, Inc. GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring

More information

Feet CLAY; silty, greenish gray and clayey fine sand; Color: 5Y 3/1

Feet CLAY; silty, greenish gray and clayey fine sand; Color: 5Y 3/1 -. CLAY; silty, greenish gray and clayey fine sand; Color: Y /. -. SAND; fine-medium, clayey, with sandy clay layers; very abundant broken thin, tiny shells; shell hash at several horizons, heavily burrowed;

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

GEOSYNTEC CONSULTANTS

GEOSYNTEC CONSULTANTS GEOSYNTEC CONSULTANTS 2100 Main Street, Suite 150 Huntington Beach, CA 92648 USA Tel (714) 969-0800 Fax (714) 969-0820 15 February 2006 Ms. Tamara Zeier, P.E. Project Manager Project Navigator, Ltd. One

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

ENTERGY WHITE BLUFF PLANT RECYCLE POND A AND RECYCLE POND B DEMONSTRATION OF COMPLIANCE WITH EPA CCR RULE SITING CRITERIA 257.

ENTERGY WHITE BLUFF PLANT RECYCLE POND A AND RECYCLE POND B DEMONSTRATION OF COMPLIANCE WITH EPA CCR RULE SITING CRITERIA 257. ENTERGY WHITE BLUFF PLANT RECYCLE POND A AND RECYCLE POND B DEMONSTRATION OF COMPLIANCE WITH EPA CCR RULE SITING CRITERIA 257.62, FAULT AREAS Prepared for Entergy Arkansas, Inc. PO Box 551 Little Rock,

More information

Dry Muliwai Sample Location Map

Dry Muliwai Sample Location Map DMM2 DMM1 P:\AthruR\K838-Makua\GIS\Layouts\Dry Muliwai.mxd.mxd - 3/26/3 - JC DMM3 5 Dry Muliwai Sample Location Map Figure 2-4 P:\AthruR\K838-Makua\GIS\Layouts\orth Background Muliwai.mxd.mxd - 3/26/3

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

Groundwater Extraction Well PE-1 Installation Report

Groundwater Extraction Well PE-1 Installation Report Groundwater Extraction Well PE-1 Installation Report PG&E Topock Compressor Station Needles, California Prepared for Pacific Gas and Electric Company April 29, 2005 Prepared by 155 Grand Avenue, Suite

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

HOW. HOW vehicle mounted units portable units also available. HOW, WHEN & WHY to Geophysically Log in S.I.?

HOW. HOW vehicle mounted units portable units also available. HOW, WHEN & WHY to Geophysically Log in S.I.? HOW, WHEN & WHY to Geophysically Log in S.I.? by Kim Beesley HOW HOW vehicle mounted units portable units also available Access to borehole Depth of borehole sump / rat -hole? 1 HOW? - subject to borehole

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

AN ARCHAEOLOGICAL SURVEY FOR THE EASTHAM STATE PRISON FARM UNIT PROJECT IN HOUSTON COUNTY TEXAS

AN ARCHAEOLOGICAL SURVEY FOR THE EASTHAM STATE PRISON FARM UNIT PROJECT IN HOUSTON COUNTY TEXAS AN ARCHAEOLOGICAL SURVEY FOR THE EASTHAM STATE PRISON FARM UNIT PROJECT IN HOUSTON COUNTY TEXAS Antiquities Permit 5693 By William E. Moore and Edward P. Baxter Brazos Valley Research Associates Contract

More information

ENTERGY INDEPENDENCE PLANT EAST AND WEST RECYCLE PONDS DEMONSTRATION OF COMPLIANCE WITH EPA CCR RULE SITING CRITERIA , FAULT AREAS.

ENTERGY INDEPENDENCE PLANT EAST AND WEST RECYCLE PONDS DEMONSTRATION OF COMPLIANCE WITH EPA CCR RULE SITING CRITERIA , FAULT AREAS. ENTERGY INDEPENDENCE PLANT EAST AND WEST RECYCLE PONDS DEMONSTRATION OF COMPLIANCE WITH EPA CCR RULE SITING CRITERIA 257.62, FAULT AREAS Prepared for Entergy Arkansas, Inc. PO Box 551 Little Rock, AR 72203

More information

TECHNICAL MEMORANDUM June 16, 2011

TECHNICAL MEMORANDUM June 16, 2011 TECHNICAL MEMORANDUM June 16, 2011 Tier 1 Remedial Investigation Results and Tier 2 Sampling Plan Former Salinas Manufactured Gas Plant To: Mr. Henry Chui, Department of Toxics Substances Control From:

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Emergency Bridge Package 6 Richland County, South Carolina May 12, 2016 SCDOT Project ID.: P029942, P029943, P029944 Terracon Project No. 73100L (Rev. 1) Prepared for: South Carolina

More information