1 Coastal Geomorphology Study Appendix C November TIDAL CHANNEL FORMATION AT THIRD BERTH PROJECT This section of the report assesses the potential for tidal channel formation at the planned Third Berth Project. The assessment is based primarily on the experience and information that has been developed from the historical studies and field studies described previously. 8.1 PROJECT DESCRIPTION Figure C8-1 shows the general layout of the proposed Deltaport Third Berth Project. The main components relevant to the geotechnical investigations consist of (1) a wharf to accommodate the third berth, (2) a container storage yard constructed of dredge fill, (3) a tug basin and boat launch, and (3) an extension to the ship channel. The wharf is 427 m long and may consist of either a pile and deck structure or a caisson structure. The berth will be dredged to a depth of 16 m CD with the top of the deck at +8.0 m CD. Approximately 20 ha of new land will be constructed to provide the container storage yard. The land will be created through dredging and landfill operations. Revetment works along the north side of the fill will consist of rock riprap. The existing tug moorage area on the northeast corner of Deltaport will be re-located to the north corner of the Third berth. The tug moorage area will consist of a floating dock, walkway and dredged basin. The tug moorage area will be dredged to a depth of 6.5 m CD. Estimates of dredge cut and fill volumes are preliminary at this time and indicate 1.6 million m 3 of material will have to be excavated for the ship channel and an additional 2.0 million m 3 is required for constructing the Third berth and terminal area. It is estimated that up to 2.3 million m 3 of the total dredged volume will be unsuitable for site fill. Details of the dredge spoil disposal plan are not available at this time. 8.2 POTENTIAL FOR CHANNEL FORMATION Figure C8-2 shows two profiles through the proposed excavations for the Deltaport Third Berth Project. The main excavation involves deepening the approach channel to the wharf extension. This excavation occurs in deep water where the existing ground level is -12 m CD. Based

2

3

4 Coastal Geomorphology Study Appendix C November 2004 on our understanding of past tidal channel formation on Roberts Bank, there should be no potential for headcutting to occur from this excavation. Furthermore, due to the large depths, the peak velocities generated by tidal currents in this area are very low-typically less than 0.2 m/s. Simulation of current patterns with the hydraulic model showed velocities will remain well below the threshold for significant sediment transport in this region after the Third Berth Project is implemented (Appendix B). Therefore, the risk of any significant new channel formation occurring from this excavation appears negligible. Preliminary plans show the tug basin extending into the existing crest protection. In this area the crest protection is at ground level and does not project above the tidal flats. Some modification to the structure is anticipated, although details of this feature are not finalized at this time. Excavation of the tug basin could involve cutting into portions of the tidal flats that are above LLW. Therefore, there is some theoretical potential for headcutting to be initiated in this area, particularly if the crest protection was eliminated. However, given the very limited extent of the excavation and its orientation with respect to the existing drainage patterns, the potential for headcutting is expected to be minor. Furthermore, this effect should be eliminated if the crest protection structure is modified to tie-in with the tug basin.

5 Coastal Geomorphology Study Appendix C November CONCLUSIONS There are two main factors that have triggered drainage channel development from previous port developments at Roberts Bank: 1. dredging into the tidal flats above the low tide line lowered the base level for water draining off the tidal flats and initiated shoreward headcutting; 2. expansion of eelgrass beds and resulting changes to flow resistance and water storage on the tidal flats affected runoff patterns and promoted channelization. The crest protection structure was constructed in 1981 to limit headcutting processes by artificially maintaining the original base level. The structure appears to have effectively limited the growth of at least two channels. However, the large channel near the centre of the intercauseway area has by-passed the structure by flowing along the inside of it. As a result, this channel is continuing to expand in both the seaward and landward directions. It is expected that the trunk channel will expand shoreward before eventually stabilizing. A small channel that developed near the Tsawwassen Ferry terminal was also observed to have by-passed a riprap control structure. This illustrates the difficulty of mitigating channel development using relatively localized structures that are not be tied-in to inerodible boundaries. The planned Deltaport Third Berth Project is not expected to initiate any new tidal channels on Roberts Bank. The preliminary plans indicate all of the excavation will take place in deep water, well below the low tide line. As a result, there will not be any base lowering or triggering of head-cutting. Furthermore, the main structures associated with the Deltaport Third Berth Project will not affect tidal current patterns or waves sufficiently to initiate scour or erosion.

6 Coastal Geomorphology Study Appendix C November REFERENCES Barrie, J.V., Recent geological evolution and human impact: Fraser Delta, Canada. In, Pye, K. and Allen, J.R.L (eds.). Coastal and Estuarine Environments: sedimentology, geomorphology and geoarchaeology. Geological Society of London, Special Publications, 175, Barrie, J.V. and Currie, R.G., Human impact on the sedimentary regime of the Fraser River Delta, Canada. Journal of Coastal Research, 16, Beak Hinton & Associates Ltd, National Harbours Board (Port of Vancouver), Environmental Impact Assessment of Roberts Bank Port Expansion, Vol. 2, Main Report. Report prepared for Beak Hinton Consultants Ltd., 201 pp. Christian, H.A., Mosher, D.C., Barrie, J.V., Hunter, J.A. and Luternauer, J.L., Seabed slope instability on the Fraser River delta. In, Geology and Natural Hazards of the Fraser River Delta, British Columbia, (ed.) J.J. Clague, J.L. Luternauer, and D.C. Mosher. Geologic Survey of Canada, Bulletin 525, pp Clague, J.J., Geologic setting of the Fraser River delta. In, Geology and Natural Hazards of the Fraser River Delta, British Columbia, (ed.) J.J. Clague, J.L. Luternauer, and D.C. Mosher. Geologic Survey of Canada, Bulletin 525, pp Duggan, D. and Luternauer, J.L., Development-induced tidal flat erosion, Fraser River Delta, British Columbia. In, Current Research, Part A, Geological Survey of Canada, Paper 85-1A, Engelund, F. and E. Hansen, A Monograph on Sediment Transport in Alluvial Streams, Teknisk Forlag, Copenhagen, Denmark. Fonesca, M.S., Zieman, J.C., and Thayer, G.W., Influence of the seagrass, Zostera marina L., on Current Flow. Estuarine, Coastal and Shelf Science, 15, Geo Sea Consulting Ltd., Sediment transport and its environmental implications in the Lower Fraser River and Fraser Delta. Report prepared for Environment Canada, Environmental Conservation Branch, DOE FRAP , 41 pp. Hawley, P.M., Erosional Stability of a Dredged Borrow Pit on Southern Roberts Bank, Fraser River Delta, British Columbia. B.A.Sc. Thesis, Department of Geological Engineering, University of British Columbia, 65 pp. Hay and Company, Erosion at Roberts Bank Geophysical Evaluation. Report to Vancouver Port Corporation, 23 pp.

7 Coastal Geomorphology Study Appendix C November 2004 Hemmera Envirotech Inc., History of Development at Roberts Bank An Overview (Draft). Report prepared for Vancouver Port Authority, 1900 Granville Square, 200 Granville Street, Vancouver, BC., 19 pp. Howard, A.D., Drainage analysis in geologic interpretation: a summation. American Association of Petroleum Geologists Bulletin, 51, Hutchinson, I., R. Patterson and R. Mathewes, Plant Macrofossil, pollen, Diatom and Foraminiferal Biofacies of the Fraser Delta. In, Geology and Natural Hazards of the Fraser River Delta, British Columbia, ed. J.J. Clague, Geological Survey of Canada, Bulletin 525, pp Johnson, J. W., Characteristics and Behaviour of Pacific Coast Tidal Inlets. Journal of the Waterways, Harbors and Coastal Engineering Division, ASCE. Vol 99, No. WW3, Kellerhals, P. and Murray, J.W., Tidal flats at Boundary Bay, Fraser River Delta, British Columbia. Bulletin of Canadian Petroleum Geology, 17(1), Koch, E.W., Beyond Light: Physical, Geological, and Geochemical Parameters as Possible Submersed Aquatic Vegetation Habitat Requirements. Estuaries, 24(1), Luternauer, J.L., Fraser Delta Sedimentation, Vancouver, British Columbia. In, Report of Activities Part A, Geological Survey of Canada, Paper 76-1A, Luternauer, J.L., and Murray, J.W., Sedimentation on the western delta-front of the Fraser River, British Columbia. Canadian Journal of Earth Sciences, 10, Luternauer, J.L., Mosher, D.C., Clague, J.J. and Atkins, R.J., Sedimentary environments of the Fraser River delta. In Geology and Natural Hazards of the Fraser River Delta, British Columbia, (ed.) J.J. Clague, J.L. Luternauer, and D.C. Mosher. Geologic Survey of Canada, Bulletin 525, pp Luternauer, J.L., Duggan, D. and Hendry, M Development-induced tidal flat erosion, Fraser River Delta, British Columbia. In, Current Research, Part A, Geological Survey of Canada, Paper 84-1A, Mason, C., Regime Equations and Tidal Inlets. Journal of the Waterways, Harbors and Coastal Engineering Division, American Society of Civil Engineers, Vol. 99, WW3, pg Mathews, W.H, Fyles, J.G. and Nasmith, H.W., Postglacial crustal movements in southwestern British Columbia and adjacent Washington State. Canadian Journal of Earth Sciences, 7,

8 Coastal Geomorphology Study Appendix C November 2004 Mathews, W.H., and Shepard, F.P, Sedimentation of the Fraser River Delta, British Columbia. Bulletin of the American Association of Petroleum Geologists, 46(8), McLaren, P. and Bowles, D., The effects of sediment transport on grain size distributions. Journal of Sedimentary Petrology, 55, NHC, Review of Fraser River Sediment Budget. Report to Dredge Management Advisory Committee, Fraser River Estuary Management Program, by Northwest Hydraulic Consultants Ltd. NHC, Sediment Budget of Lower Fraser River. Report to Dredge Management Advisory Committee, Fraser River Estuary Management Program, by Northwest Hydraulic Consultants Ltd. O Brien, M.P., Estuary Tidal Prisms Related to Entrance Areas. Civil Engineering, American Society of Civil Engineers. Vol. 1, No. 8, Precision ID, Cynthia Durance, Precision Identification, 3622 West 3 rd Vancouver B.C., V6R 1L9, precid@shaw.ca Avenue, Reinich, H.-E. and Singh, I.B., Depositional sedimentary environments : with reference to terrigenous clastics. Springer-Verlag, New York, 434 pp. Stevens, M. and C. Nordin, First Step Away from Lacey s Regime Equations. Journal of Hydraulic Engineering, American Society of Civil Engineers, Vol. 116, No. 11, pg Strahler, A.N Quantitative Analysis of Watershed Geomorphology. American Geophysical Union Transactions, Vol. 38, pg Tarbotton, M., Luternauer, J.L. and Mattila, M., Tidal flat response to development and mitigation work at Roberts Bank, Fraser River Delta, British Columbia. In, Proceedings of the 1993 Canadian Coastal Conference, May 4-7,1993, Vancouver, British Columbia. Published by the Canadian Coastal Science and Engineering Association, and Simon Fraser University, Triton Consultants Ltd., A Review of the Recent Physical and Biological Development of the Southern Roberts Bank Seagrass System, Report prepared for Roberts Bank Environmental Review Committee, June USACE, Coastal Inlet Stability Analysis Using Escoffier Method, Coastal Engineering Technical Note CETN IV-11, Waterways Experimental Station, US Army Corps of En gineers, Coastal and Hydraulics Laboratory, Vicksburg, Mississippi, 7 pp. van Rijn, L Sediment Transport by Currents and Waves. Delft Hydraulics Report H 461, June Delft Hydraulics.

Annual transport rates at two locations on the fore-slope.

Annual transport rates at two locations on the fore-slope. Sediment Transport by Currents Fore-slope Sediment transport rates and sediment concentrations were computed from the hydrodynamic model runs as well as from direct measurements of current velocities at

More information

3.0 ROBERTS BANK TIDAL FLAT MORPHOLOGY

3.0 ROBERTS BANK TIDAL FLAT MORPHOLOGY Vancouver Port Authority Northwest Hydraulic Consultants Ltd. /Triton Consultants Ltd. Roberts Bank Container Expansion File: 33863 Coastal Geomorphology Study - 19 - November 2004 3.0 ROBERTS BANK TIDAL

More information

ROBERTS BANK CONTAINER EXPANSION COASTAL GEOMORPHOLOGY STUDY. Appendix B

ROBERTS BANK CONTAINER EXPANSION COASTAL GEOMORPHOLOGY STUDY. Appendix B ROBERTS BANK CONTAINER EXPANSION COASTAL GEOMORPHOLOGY STUDY Appendix B Prepared for: Vancouver Port Authority Prepared by: northwest hydraulic consultants 30 Gostick Place North Vancouver, B. C. V7M 3G2

More information

6.0 SEDIMENT TRANSPORT

6.0 SEDIMENT TRANSPORT Coastal Geomorphology Study - 74 - November 2004 6.0 SEDIMENT TRANSPORT 6.1 SEDIMENT CHARACTERISTICS 6.1.1 Bed Sediment Properties The size distribution of sediments on Roberts Bank was determined using

More information

Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation

Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation Patterns Project Memo H345670 To: Capt. David Kyle From:

More information

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Project Memo H345670 To: Capt. David Kyle From: O. Sayao/L. Absalonsen December

More information

ENGINEERING APPROACHES TO SHORELINE PLACEMENT FROM COAST TO COAST

ENGINEERING APPROACHES TO SHORELINE PLACEMENT FROM COAST TO COAST ENGINEERING APPROACHES TO SHORELINE PLACEMENT FROM COAST TO COAST 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 83 36 118 110 135 120 112 92 56 62 102 130 Comparing

More information

CHAPTER 28. PHYSIOGRAPHY Cook Inlet Drainages

CHAPTER 28. PHYSIOGRAPHY Cook Inlet Drainages PEBBLE PROJECT ENVIRONMENTAL BASELINE DOCUMENT 2004 through 2008 CHAPTER 28. PHYSIOGRAPHY Cook Inlet Drainages PREPARED BY: Knight Piésold Ltd. PHYSIOGRAPHY COOK INLET DRAINAGES TABLE OF CONTENTS TABLE

More information

3. MARINE HABITAT RESTORATION

3. MARINE HABITAT RESTORATION Feasibility Study for Restoration of Titlow Lagoon Fish Passage South Puget Sound Salmon Enhancement Group 3. MARINE HABITAT RESTORATION Marine habitat restoration at Titlow Park could include restoration

More information

SAVANNAH HARBOR EXPANSION BANK EROSION STUDY UPDATE

SAVANNAH HARBOR EXPANSION BANK EROSION STUDY UPDATE CESAS-EN-GS SAVANNAH HARBOR EXPANSION BANK EROSION STUDY UPDATE GEOTECHNICAL AND HTRW BRANCH SOILS SECTION CITY FRONT, BIGHT SECTION, FORT PULASKI & NORTH TYBEE ISLAND GEORGIA 23 June 2011 CESAW-TS-EG

More information

Appendix A: References

Appendix A: References Appendix A: References Ackers, P., and W. R. White. (1973). "Sediment transport: new approach and analysis," Journal of the Hydraulics Division, American Society of Engineers, Vol 99, No HY11, pp 2041-2060.

More information

Prediction of changes in tidal system and deltas at Nakdong estuary due to construction of Busan new port

Prediction of changes in tidal system and deltas at Nakdong estuary due to construction of Busan new port Prediction of changes in tidal system and deltas at Nakdong estuary due to construction of Busan new port H. Gm1 & G.-Y. park2 l Department of Civil & Environmental Engineering, Kookmin University, Korea

More information

Coastal Processes and Shoreline Erosion on the Oregon Coast, Cascade Head to Cape Kiwanda

Coastal Processes and Shoreline Erosion on the Oregon Coast, Cascade Head to Cape Kiwanda State of Oregon Department of Geology and Mineral Industries Vicki S. McConnell, State Geologist Open File Report OFR O-04-11 Coastal Processes and Shoreline Erosion on the Oregon Coast, Cascade Head to

More information

Stabilization Study. Prepared For: The Town of Bethlehem. Henry Hudson Park Shoreline Stabilization Study. June 2011

Stabilization Study. Prepared For: The Town of Bethlehem. Henry Hudson Park Shoreline Stabilization Study. June 2011 Henry Hudson Park Shoreline Stabilization Study Prepared For: The Town of Bethlehem 1 Company Introduction - OCC Ocean and Coastal Consultants (OCC) is a 50 person engineering consulting firm that specializes

More information

SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA

SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA Prepared by: Louisiana Coastal Protection and Restoration Authority Engineering Division March 2016 The geology of Louisiana s coastal zone is intimately

More information

Surface Processes Focus on Mass Wasting (Chapter 10)

Surface Processes Focus on Mass Wasting (Chapter 10) Surface Processes Focus on Mass Wasting (Chapter 10) 1. What is the distinction between weathering, mass wasting, and erosion? 2. What is the controlling force in mass wasting? What force provides resistance?

More information

Year 6. Geography. Revision

Year 6. Geography. Revision Year 6 Geography Revision November 2017 Rivers and World knowledge How the water cycle works and the meaning of the terms evaporation, condensation, precipitation, transpiration, surface run-off, groundwater

More information

SHORELINE AND BEACH PROCESSES: PART 2. Implications for Coastal Engineering

SHORELINE AND BEACH PROCESSES: PART 2. Implications for Coastal Engineering SHORELINE AND BEACH PROCESSES: PART 2 Implications for Coastal Engineering Objectives of the lecture: Part 2 Show examples of coastal engineering Discuss the practical difficulties of ocean engineering

More information

River Restoration and Rehabilitation. Pierre Y. Julien

River Restoration and Rehabilitation. Pierre Y. Julien River Restoration and Rehabilitation Pierre Y. Julien Department of Civil and Environmental Engineering Colorado State University Fort Collins, Colorado River Mechanics and Sediment Transport Lima Peru

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

CHAPTER 126 ^^^C^SR, SEDIMENTATION STUDIES ON THE NIGER RIVER DELTA

CHAPTER 126 ^^^C^SR, SEDIMENTATION STUDIES ON THE NIGER RIVER DELTA CHAPTER 126 SEDIMENTATION STUDIES ON THE NIGER RIVER DELTA Ramiro Mayor-Mora, D. Eng. (1) Preben Mortensen, M.Sc. (2) Jorgen Fredsoe, M.Sc. (2) 1. Introduction An area of the Niger River Delta was studied

More information

GROUND RESPONSE ANALYSIS FOR SEISMIC DESIGN IN FRASER RIVER DELTA, BRITISH COLUMBIA

GROUND RESPONSE ANALYSIS FOR SEISMIC DESIGN IN FRASER RIVER DELTA, BRITISH COLUMBIA 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 2104 GROUND RESPONSE ANALYSIS FOR SEISMIC DESIGN IN FRASER RIVER DELTA, BRITISH COLUMBIA Uthaya M. UTHAYAKUMAR

More information

GY 402: Sedimentary Petrology

GY 402: Sedimentary Petrology UNIVERSITY OF SOUTH ALABAMA GY 402: Sedimentary Petrology Lecture 13: Immature Siliciclastic Sedimentary Environments Alluvial Fans, Braided Streams Instructor: Dr. Douglas W. Haywick Last Time Immature

More information

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.)

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.) Run 027 RNZ Full Bridge Simulation Run Plots Final Report Be-Software August 2016 Prepared for Royal Haskoning DHV on behalf of Refining New Zealand Limited 27 Run 028 (Note: error in UKC at start of exercise

More information

National Center for Earth-surface Dynamics: Renesse 2003: Non-cohesive Sediment Transport

National Center for Earth-surface Dynamics: Renesse 2003: Non-cohesive Sediment Transport Introduction to Morphodynamics For the original references on the work of Exner see Graf, W., 1971, Hydraulics of Sediment Transport, McGraw Hill, New York, 513 p. Sediment Properties Dietrich, E. W.,

More information

EVALUATION TECHNIQUES FOR THE PROTECTIVE BENEFITS OF DUNE SYSTEMS TO COASTAL HAZARDS

EVALUATION TECHNIQUES FOR THE PROTECTIVE BENEFITS OF DUNE SYSTEMS TO COASTAL HAZARDS EVALUATION TECHNIQUES FOR THE PROTECTIVE BENEFITS OF DUNE SYSTEMS TO COASTAL HAZARDS 5 th Coastal Hazards Symposium Key West 2015 Matthew Janssen Thomas Herrington Jon Miller 1 Abstract Quantify and predict

More information

APPENDIX B HYDROLOGY

APPENDIX B HYDROLOGY APPENDIX B HYDROLOGY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROBABLE MAXIMUM PRECIPITATION (PMP)... 1 3.0 DESIGN FLOW CALCULATION... 1 4.0 DIVERSION CHANNEL SIZING... 2 5.0 REFERENCES... 4 LIST OF

More information

Process-based Long Term Morphological Modelling the present state-of-the-art and the way ahead. Dirk-Jan Walstra

Process-based Long Term Morphological Modelling the present state-of-the-art and the way ahead. Dirk-Jan Walstra Process-based Long Term Morphological Modelling the present state-of-the-art and the way ahead Dirk-Jan Walstra Deltares Delft Hydraulics Delft University of Technology Les littoraux à l heure du changement

More information

Each basin is surrounded & defined by a drainage divide (high point from which water flows away) Channel initiation

Each basin is surrounded & defined by a drainage divide (high point from which water flows away) Channel initiation DRAINAGE BASINS A drainage basin or watershed is defined from a downstream point, working upstream, to include all of the hillslope & channel areas which drain to that point Each basin is surrounded &

More information

ANALYSIS OF SEISMIC PROFILES AND SIDE-SCAN SONAR RECORDS FROM LOWER NEW YORK HARBOR, A PROGRESS REPORT. Roger D. Flood Vicki Lynn Ferrini

ANALYSIS OF SEISMIC PROFILES AND SIDE-SCAN SONAR RECORDS FROM LOWER NEW YORK HARBOR, A PROGRESS REPORT. Roger D. Flood Vicki Lynn Ferrini 45 ANALYSIS OF SISMIC PROFILS AND SID-SCAN SONAR RCORDS FROM LOWR NW YORK HARBOR, A PROGRSS RPORT Roger D. Flood Vicki Lynn Ferrini Marine Sciences Research Center State University of New York, Stony Brook,

More information

Influence of the Major Drainages to the Mississippi River and Implications for System Level Management

Influence of the Major Drainages to the Mississippi River and Implications for System Level Management Influence of the Major Drainages to the Mississippi River and Implications for System Level Management Brian M. Vosburg Geologist Louisiana Coastal Protection and Restoration Authority brian.vosburg@la.gov

More information

ENVIRONMENTAL GEOSCIENCE UNIFORM SYLLABUS

ENVIRONMENTAL GEOSCIENCE UNIFORM SYLLABUS ENVIRONMENTAL GEOSCIENCE UNIFORM SYLLABUS The Association of Professional Engineers and Geoscientists of the Province of British Columbia Note: 1. This Syllabus May Be Subject To Change 2. These Courses

More information

Modeling the Transport and Fate of Sediments Released from Dredging Projects in the Coastal Waters of British Columbia, Canada

Modeling the Transport and Fate of Sediments Released from Dredging Projects in the Coastal Waters of British Columbia, Canada WEDA Dredging Summit & Expo 18 Modeling the Transport and Fate of Sediments Released from Dredging Projects in the Coastal Waters of British Columbia, Canada David B. Fissel, Yuehua (Andy) Lin and Todd

More information

Aquatic Transfer Facility (ATF) San Pablo Bay (SPB) Proposed Region of ATF. Proposed Seabed Pipeline

Aquatic Transfer Facility (ATF) San Pablo Bay (SPB) Proposed Region of ATF. Proposed Seabed Pipeline Aquatic Transfer Facility (ATF) San Pablo Bay (SPB) Proposed Region of ATF Proposed Seabed Pipeline Technical Studies An Overview Scope: Provide background and new scientific information and analysis for

More information

Regional Sediment Management

Regional Sediment Management Regional Sediment Management Linda S. Lillycrop Program Manager Coastal Engineer US Army Engineer Research and Development Center Coastal and Hydraulics Laboratory Q AVG Coastal Resilience: The Environmental,

More information

Aim and objectives Components of vulnerability National Coastal Vulnerability Assessment 2

Aim and objectives Components of vulnerability National Coastal Vulnerability Assessment 2 ASSESSING THE UTILITY OF GEOMORPHIC SENSITIVITY MAPPING ON THE ILLAWARRA COAST Pamela Abuodha, Christina Baker, Chris Sharples, Darren Skene and Colin Woodroffe Geoquest Research Centre, University of

More information

B.C. s Offshore Oil and Gas: a Guide to the Geology and Resources.

B.C. s Offshore Oil and Gas: a Guide to the Geology and Resources. B.C. s Offshore Oil and Gas: a Guide to the Geology and Resources. Introduction Beneath the offshore regions of British Columbia are four moderately large, geologically young sedimentary basins (Figure

More information

Programmatic Approaches to Assessing and Mitigating Risk to Pipelines from Natural Forces

Programmatic Approaches to Assessing and Mitigating Risk to Pipelines from Natural Forces Programmatic Approaches to Assessing and Mitigating Risk to Pipelines from Natural Forces 23 rd International Petroleum Environmental Conference New Orleans, Louisiana November 8-10, 2016 Introduction

More information

mountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output

mountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output mountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output strong interaction between streams & hillslopes Sediment Budgets for Mountain Rivers Little

More information

COASTAL QUATERNARY GEOLOGY MAPPING FOR NSW: EXAMPLES AND APPLICATIONS

COASTAL QUATERNARY GEOLOGY MAPPING FOR NSW: EXAMPLES AND APPLICATIONS COASTAL QUATERNARY GEOLOGY MAPPING FOR NSW: EXAMPLES AND APPLICATIONS A Troedson Geological Survey of New South Wales Abstract Detailed geological mapping of the coastal plains of regional NSW was undertaken

More information

MISSISSIPPI COASTAL IMPROVEMENTS

MISSISSIPPI COASTAL IMPROVEMENTS MISSISSIPPI COASTAL IMPROVEMENTS PROGRAM (MsCIP) Comprehensive Barrier 237 27 200 237 27 200 Island 237 Restoration 27 200 Plan 80 9 27 252 74.59 255 255 255 0 0 0 63 63 63 3 32 22 239 65 53 0 35 20 2

More information

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review Appendix I Dredged Volume Estimates Draft Contractor Document: Subject to Continuing Agency Review Interoffice Correspondence Date: April 6, 2007 To: L. Bossi (WHI) Copy: S. Thompson (WHI), B. Fidler (NNJ)

More information

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin? How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin? Bruce Rhoads Department of Geography University of Illinois at Urbana-Champaign

More information

Quantification of Bed-Load Transport on the Upper Mississippi River Using Multibeam Survey Data and Traditional Methods

Quantification of Bed-Load Transport on the Upper Mississippi River Using Multibeam Survey Data and Traditional Methods Quantification of Bed-Load Transport on the Upper Mississippi River Using Multibeam Survey Data and Traditional Methods by David D. Abraham and Thad Pratt PURPOSE: This Coastal and Hydraulics Engineering

More information

Management of Spartina anglica in the Fraser River estuary, British Columbia

Management of Spartina anglica in the Fraser River estuary, British Columbia Management of Spartina anglica in the Fraser River estuary, British Columbia Gary Williams GL Williams & Associates Ltd. White Rock & Surrey Naturalists Society May 12 th, 2005 White Rock, BC Presentation

More information

The Systems Approach. Alun Williams, ABPmer

The Systems Approach. Alun Williams, ABPmer The Systems Approach Alun Williams, ABPmer Overview What is A Systems Approach? Behavioural / Qualitative Modelling? System Definition / Mapping (Behavioural Statements Objective) What is a Systems Approach?

More information

HYDRAULIC STRUCTURES, EQUIPMENT AND WATER DATA ACQUISITION SYSTEMS - Vol. I - Hydraulics of Two-Phase Flow: Water and Sediment - G R Basson

HYDRAULIC STRUCTURES, EQUIPMENT AND WATER DATA ACQUISITION SYSTEMS - Vol. I - Hydraulics of Two-Phase Flow: Water and Sediment - G R Basson HYDRAULICS OF TWO-PHASE FLOWS: WATER AND SEDIMENT G R Basson Dept. of Civil Engineering, University of Stellenbosch, South Africa. Keywords: sediment, sediment transport, turbulence, river regime, stream

More information

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation) Stream Restoration and Environmental River Mechanics Pierre Y. Julien Malaysia 2004 Objectives Brief overview of environmental river mechanics and stream restoration: 1. Typical problems in environmental

More information

Evaluation of Sediment Transport Function using Different Fall Velocity Equations

Evaluation of Sediment Transport Function using Different Fall Velocity Equations GRD Journals Global Research and Development Journal for Engineering Recent Advances in Civil Engineering for Global Sustainability March 2016 e-issn: 2455-5703 Evaluation of Sediment Transport Function

More information

June 2018 Sediments and Dredging at GBR Ports

June 2018 Sediments and Dredging at GBR Ports June 2018 Sediments and Dredging at GBR Ports Reef 2050 Long Term Sustainability Plan The Great Barrier Reef is over 2000 km long and covers an area of approximately 350,000 square kilometres. It is a

More information

Relatively little hard substrate occurs naturally in the

Relatively little hard substrate occurs naturally in the CHAPTER FIVE Rock Habitats Relatively little hard substrate occurs naturally in the estuary, owing mainly to the vast quantities of fine sediment that have been deposited by the rivers. Rock habitat is

More information

Island 32 Erosion. prepared for Ministry of Environment, Lands and Parks A Street Surrey, British Columbia, V3R 7P8. and

Island 32 Erosion. prepared for Ministry of Environment, Lands and Parks A Street Surrey, British Columbia, V3R 7P8. and Island 32 Erosion prepared for Ministry of Environment, Lands and Parks 10334 152A Street Surrey, British Columbia, V3R 7P8 and District of Chilliwack 8550 Young Road Chilliwack, British Columbia, V2P

More information

A SEDIMENT BUDGET ANALYSIS AND MANAGEMENT STRATEGY FOR FORT PIERCE INLET, FL

A SEDIMENT BUDGET ANALYSIS AND MANAGEMENT STRATEGY FOR FORT PIERCE INLET, FL A SEDIMENT BUDGET ANALYSIS AND MANAGEMENT STRATEGY FOR FORT PIERCE INLET, FL By Elba Rodriguez and Robert G. Dean Department of Civil and Coastal Engineering University of Florida Gainesville, FL 32611,

More information

Unchain the River and Allow it to Build a Delta

Unchain the River and Allow it to Build a Delta Unchain the River and Allow it to Build a Delta Harley S. Winer Atkins Harley.Winer@atkinsglobal.com Mississippi River Drainage Basin Basin Facts Drains 41% of continental U.S. Includes 31 states & 2 Canadian

More information

Upper Mississippi River Basin Environmental Management Program Workshop

Upper Mississippi River Basin Environmental Management Program Workshop Presentation to the Upper Mississippi River Basin Environmental Management Program Workshop by Michael Rodgers River Engineer US Army Corps of Engineers, St. Louis District August 17, 2007 Engineering

More information

Environmental impact assessment study of the new offshore dumping sites for Šventoji port in Lithuania

Environmental impact assessment study of the new offshore dumping sites for Šventoji port in Lithuania Environmental impact assessment study of the new offshore dumping sites for Šventoji port in Lithuania Introduction Summary In 2003 Lithuanian Ministry of Transport initiated the preparation of feasibility

More information

Geomorphology Of The Chilliwack River Watershed Landform Mapping At North Cascades National Park Service Complex, Washington By National Park Service

Geomorphology Of The Chilliwack River Watershed Landform Mapping At North Cascades National Park Service Complex, Washington By National Park Service Geomorphology Of The Chilliwack River Watershed Landform Mapping At North Cascades National Park Service Complex, Washington By National Park Service READ ONLINE Snowshed contributions to the Nooksack

More information

4.9 GEOLOGY AND SOILS

4.9 GEOLOGY AND SOILS 4.9 GEOLOGY AND SOILS 4.9.1 EXISTING CONDITIONS TOPOGRAPHY AND RELIEF Zone 40 is located in the central portion of Sacramento County. The topography of the county is represented by three physiographic

More information

Deltaport Third Berth Sediment Sampling Program

Deltaport Third Berth Sediment Sampling Program Deltaport Third Berth Sediment Sampling Program Delta, BC Prepared for: VANCOUVER PORT AUTHORITY 1900-200 Granville Street Vancouver, BC V6C 2P9 Prepared by: HEMMERA ENVIROCHEM INC. 350 1190 Hornby Street

More information

Bank Erosion and Morphology of the Kaskaskia River

Bank Erosion and Morphology of the Kaskaskia River Bank Erosion and Morphology of the Kaskaskia River US Army Corps Of Engineers St. Louis District Fayette County Soil and Water Conservation District Team Partners : Carlyle Lake Ecosystem Partnership Vicinity

More information

Redwood City Harbor, California, Navigation Improvement Feasibility Study. Appendix D. Geotechnical Engineering. DRAFT April 2015

Redwood City Harbor, California, Navigation Improvement Feasibility Study. Appendix D. Geotechnical Engineering. DRAFT April 2015 1 Redwood City Harbor, California, Navigation Improvement Feasibility Study Appendix D Geotechnical Engineering DRAFT April 2015 2 Contents 1 Purposes of Report... 3 2 Background... 3 3 References and

More information

Long-term estuary processes and morphological change

Long-term estuary processes and morphological change Long-term estuary processes and morphological change Professor Ken Pye with contributions from Dr. Simon Blott and Dr. Daphne van der Wal Department of Geology Available top-down methods relying on data

More information

Assessment of the Hood River Delta Hood River, Oregon

Assessment of the Hood River Delta Hood River, Oregon Assessment of the Hood River Delta Hood River, Oregon Pacific Northwest Waterways Association Annual Meeting October 13, 2010 Michael McElwee, Executive Director Port of Hood River Overview U.S. Army Corps

More information

Inter State Large Navigable Rivers of the United States

Inter State Large Navigable Rivers of the United States Inter State Large Navigable Rivers of the United States REVIEW OF NORTH AMERICAN BASINS: GREAT LAKES AND MISSISSIPPI RIVER HELEN A. BROHL, EXECUTIVE DIRECTOR US COMMITTEE ON THE MARINE TRANSPORTATION SYSTEM

More information

Delta Flood Protection Strategy Update. May 16, 2016

Delta Flood Protection Strategy Update. May 16, 2016 Delta Flood Protection Strategy Update May 16, 2016 Presentation Overview 1. Background 2. Understanding the Dike Reaches/Issues 3. Future Dike Improvements 4. Next Steps Boundary Bay Village March 10,

More information

VARIATION IN GROUND SHAKING ON THE FRASER RIVER DELTA (GREATER VANCOUVER, CANADA) FROM ANALYSIS OF MODERATE EARTHQUAKES

VARIATION IN GROUND SHAKING ON THE FRASER RIVER DELTA (GREATER VANCOUVER, CANADA) FROM ANALYSIS OF MODERATE EARTHQUAKES 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 1010 VARIATION IN GROUND SHAKING ON THE FRASER RIVER DELTA (GREATER VANCOUVER, CANADA) FROM ANALYSIS

More information

WG-43 REPORT OBJECTIVES

WG-43 REPORT OBJECTIVES HARBORS,SEMINAR NAVIGATION & ENVIRONMENT ENVIRONMENT SEMINAR Minimizing Harbor Working Group 43 John Headland Santiago Alfageme June, 2006 Current Deflecting Wall Hamburg, Germany WG-43 REPORT OBJECTIVES

More information

Port of Kalama, 2013 TEMCO Berth Maintenance Dredging and In-water Flow-Lane Placement Project

Port of Kalama, 2013 TEMCO Berth Maintenance Dredging and In-water Flow-Lane Placement Project 2014 WEDA ENVIRONMENTAL EXCELLENCE AWARDS Category: Navigation Dredging Port of Kalama, 2013 TEMCO Berth Maintenance Dredging and In-water Flow-Lane Placement Project Port of Kalama, Washington 18 April

More information

Morphological Changes of Reach Two of the Nile River

Morphological Changes of Reach Two of the Nile River ICHE 2014, Hamburg - Lehfeldt & Kopmann (eds) - 2014 Bundesanstalt für Wasserbau ISBN 978-3-939230-32-8 Morphological Changes of Reach Two of the Nile River E. Said Egyptian Environmental Affairs Agency,

More information

Linking Channel-Margin Bed Thickness to Hydrodynamics in the Tidally Influenced Fraser River, British Columbia*

Linking Channel-Margin Bed Thickness to Hydrodynamics in the Tidally Influenced Fraser River, British Columbia* Linking Channel-Margin Bed Thickness to Hydrodynamics in the Tidally Influenced Fraser River, British Columbia* Andrew La Croix 1, Shahin Dashtgard 1, and James MacEachern 1 Search and Discovery Article

More information

Winfried Siefert ; Volker Barthel**' and

Winfried Siefert ; Volker Barthel**' and CHAPTER 176 THE GERMAN "MORAN" PROJECT by Winfried Siefert ; Volker Barthel**' and Abstract The project "MORAN" (Morphological Analyses of the North- Sea-Coast) is an extensive program in order to try

More information

.ttlllllll:. Human Impact on the Sedimentary Regime of the Fraser River Delta, Canada. J. Vaughn Barrie and Ralph G. Currie. ~.

.ttlllllll:. Human Impact on the Sedimentary Regime of the Fraser River Delta, Canada. J. Vaughn Barrie and Ralph G. Currie. ~. Journal of Coastal Research 747-755 West Palm Beach, Florida Summer 2000 Human mpact on the Sedimentary Regime of the Fraser River Delta, Canada J. Vaughn Barrie and Ralph G. Currie Geological Survey of

More information

What is a watershed or landscape perspective?

What is a watershed or landscape perspective? What is a watershed or landscape perspective? -remove sediment -add sediment -add wood, riparian manipulation -alter (engineer) channel/floodplain morphology -restore/abandon roads You are here What is

More information

Mark Hawley, Piteau Associates Engineering Ltd. John Cunning, Golder Associates Ltd.

Mark Hawley, Piteau Associates Engineering Ltd. John Cunning, Golder Associates Ltd. Introducing: GUIDELINES FOR MINE WASTE DUMP AND STOCKPILE DESIGN Editors: Mark Hawley, Piteau Associates Engineering Ltd. John Cunning, Golder Associates Ltd. 8 November 2017 Sponsorship 8 November 2017

More information

Surface Water and Stream Development

Surface Water and Stream Development Surface Water and Stream Development Surface Water The moment a raindrop falls to earth it begins its return to the sea. Once water reaches Earth s surface it may evaporate back into the atmosphere, soak

More information

BUDGET. Investigation of natural sand transport on the Belgian continental shelf

BUDGET. Investigation of natural sand transport on the Belgian continental shelf BUDGET Investigation of natural sand transport on the Belgian continental shelf Funded by Federal Office for Scientific, Technical and Cultural Affairs Program: Sustainable Management of the North Sea

More information

Subcommittee on Sedimentation Draft Sediment Analysis Guidelines for Dam Removal

Subcommittee on Sedimentation Draft Sediment Analysis Guidelines for Dam Removal Subcommittee on Sedimentation Draft Sediment Analysis Guidelines for Dam Removal August 4, 2011 Jennifer Bountry, M.S., P.E. Tim Randle, M.S., P.E., D.WRE. Blair Greimann, Ph.D., P.E. Sedimentation and

More information

When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill

When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill 1 When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill Robin McKillop 1, Dan McParland 1 & Cassie Scobie 2 TRIECA conference March 22-23, 2017 1 Palmer Environmental

More information

ΛTKINS. Applications of Regional Sediment Management Concepts in Texas Estuarine Restoration Projects. Riparian Workshop Fort Worth, October 17, 2012

ΛTKINS. Applications of Regional Sediment Management Concepts in Texas Estuarine Restoration Projects. Riparian Workshop Fort Worth, October 17, 2012 Juan C Moya, PhD., PG Coastal Planning and Restoration Applications of Regional Sediment Management Concepts in Texas Estuarine Restoration Projects Riparian Workshop Fort Worth, October 17, 2012 West

More information

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling Attachment B-1 Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling 1 October 2012 Lower Susquehanna River Watershed Assessment Evaluation of AdH Model Simplifications

More information

FOLLOW-UP ON CHANNELIZATION IN SPRING CREEK SUB-WATERSHED

FOLLOW-UP ON CHANNELIZATION IN SPRING CREEK SUB-WATERSHED FOLLOW-UP ON CHANNELIZATION IN SPRING CREEK SUB-WATERSHED Justin R. Beebe, Department of Earth Sciences, University of South Alabama, Mobile, AL 36688. jrb308@jaguar1.usouthal.edu. Spring Creek is a tributary

More information

U.S. ARMY CORPS OF ENGINEERS

U.S. ARMY CORPS OF ENGINEERS CORPS FACTS Regulating Mississippi River Navigation Pools U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Historical Background Federal improvements in the interest of navigation on the Mississippi River

More information

Material Workshop. Galveston District 2012 Beneficial Use of Dredged. Material Workshop. Custodians of the Coast

Material Workshop. Galveston District 2012 Beneficial Use of Dredged. Material Workshop. Custodians of the Coast Galveston District 2012 Beneficial Use of Dredged Material Workshop Galveston District 2012 Beneficial Use of Dredged Material Workshop US Army Corps of Engineers BUILDING STRONG Welcome Opening Remarks

More information

The Coast: Beaches and Shoreline Processes Trujillo & Thurman, Chapter 10

The Coast: Beaches and Shoreline Processes Trujillo & Thurman, Chapter 10 The Coast: es and Shoreline Processes Trujillo & Thurman, Chapter 10 Oceanography 101 Chapter Objectives Recognize the various landforms characteristic of beaches and coastal regions. Identify seasonal

More information

Red River Levee Panel

Red River Levee Panel Red River Levee Panel Mississippi River Commission Monday, August 9, 2017 Red River Levees in LA & AR NONE along TX & OK Boarder Red River Levee Issues Caddo Levee Cherokee Park Authorization Bossier Levee

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Seagrass Transplantation & Environmental & Marine Consulting Services, Inc. Drew Campbell, Vice President & Lead Scientst.

Seagrass Transplantation & Environmental & Marine Consulting Services, Inc. Drew Campbell, Vice President & Lead Scientst. Indian River Lagoon Symposium Seagrass Transplantation & Project Considerations Environmental & Marine Consulting Services, Inc. Drew Campbell, Vice President & Lead Scientst March 26 th, 2013 Regulatory

More information

Modeling habitat suitability for the European green crab using the ShoreZone mapping system

Modeling habitat suitability for the European green crab using the ShoreZone mapping system Modeling habitat suitability for the European green crab using the ShoreZone mapping system Jodi N. Harney, Ph.D. and John R. Harper, Ph.D. Coastal and Ocean Resources Inc. Mary Morris, R.P. Bio. Archipelago

More information

Assessment of Water and Sediment Patterns within Prado Basin

Assessment of Water and Sediment Patterns within Prado Basin APPENDIX A Assessment of Water and Sediment Patterns within Prado Basin APPENDIX A Submitted To: Orange County Water District 18700 Ward Street Fountain Valley, California 92708 USA Submitted By: Golder

More information

Coastal and Hydraulics Laboratory

Coastal and Hydraulics Laboratory SAM Hydraulic Design Package for Channels Coastal and Hydraulics Laboratory William A. Thomas, Ronald R. Copeland, and Dinah N. McComas September 2002 Approved for public release; distribution is unlimited.

More information

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012 Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation

More information

Working with Natural Stream Systems

Working with Natural Stream Systems Working with Natural Stream Systems Graydon Dutcher Delaware County Soil & Water Conservation District Stream Corridor Management Program Tropical Storm Sandy October 29,2012 What is a Watershed?

More information

Landforms in Canada. Canada is made up of three dis;nct types of landforms: Canadian Shield Highlands Lowlands

Landforms in Canada. Canada is made up of three dis;nct types of landforms: Canadian Shield Highlands Lowlands Canada s Landforms What is a Landform? A landform is any physical feature of the Earth s surface having a characteris;c, recognizable shape, produced by natural causes. Landforms include major features

More information

3.18 GEOLOGY AND SOILS

3.18 GEOLOGY AND SOILS 3.18 GEOLOGY AND SOILS This section discusses geologic resource concerns as they relate to the environment, public safety, and project design both during construction and after completion of the project.

More information

Why is Sebago Lake so deep?

Why is Sebago Lake so deep? Maine Geologic Facts and Localities February, 1999 Why is Sebago Lake so deep? 43 51 13.36 N, 70 33 43.98 W Text by Robert A. Johnston, Department of Agriculture, Conservation & Forestry 1 Introduction

More information

Lower South Fork McKenzie River Floodplain Enhancement Project

Lower South Fork McKenzie River Floodplain Enhancement Project Lower South Fork McKenzie River Floodplain Enhancement Project McKenzie River Ranger District Willamette National Forest Project Location The project is located in the South Fork McKenzie River Watershed,

More information

CHAPTER 55 BARRON RIVER DELTA INVESTIGATION. D.A. Robinson*, A.M.ASCE, D.J. Cook** and J.G. Barff***

CHAPTER 55 BARRON RIVER DELTA INVESTIGATION. D.A. Robinson*, A.M.ASCE, D.J. Cook** and J.G. Barff*** CHAPTER 55 BARRON RIVER DELTA INVESTIGATION D.A. Robinson*, A.M.ASCE, D.J. Cook** and J.G. Barff*** 1.0 INTRODUCTION The Barron River flows to sea through a 50 km 2 alluvial Delta on the narrow coastal

More information

Possibility of Reducing Sedimentation at Lateral Diversion

Possibility of Reducing Sedimentation at Lateral Diversion Available online at www.scholarsresearchlibrary.com Annals of Biological Research, 212, 3 (5):2545-2554 (http://scholarsresearchlibrary.com/archive.html) ISSN 976-1233 CODEN (USA): ABRNBW Possibility of

More information

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report CCR Surface Impoundment Information Name: Operator:

More information

GY 111: Physical Geology

GY 111: Physical Geology UNIVERSITY OF SOUTH ALABAMA GY 111: Physical Geology Lecture 14: Sedimentary Rocks Part 2: Alluvial Fans and Rivers Instructor: Dr. Douglas W. Haywick Last Time 1) Types of Sediment 2) Sedimentary Rock

More information