ROADWAY ID: PROJECT LENGTH:.000 LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 FUND THAN THAN ALL CODE YEARS

Size: px
Start display at page:

Download "ROADWAY ID: PROJECT LENGTH:.000 LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 FUND THAN THAN ALL CODE YEARS"

Transcription

1 PAGE 1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 ITEM NUMBER: PROJECT DESCRIPTION:ITS EQUIPMENT REPLACEMENT CONSULTANT / GRANT *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:ITS COMMUNICATION SYSTEM EX DESC:PREVIOUSLY ON DIH 0 5, ,000 PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY FDOT ACNP 2,138, ,138,708 TOTAL ,138,708 5, ,143,708 TOTAL PROJECT: 2,138,708 5, ,143,708 ITEM NUMBER: PROJECT DESCRIPTION:SR-848/ STIRLING RD FROM E OF UNIVERSITY DR. TO EAST OF SR-7/US-441 *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:RESURFACING EX DESC:ATMS AND SAFETY IMPROVEMENTS 52-02: NPV=1,512, : NPV=17,962,288; LIGHTING 56-01: INSTALL LIGHT FIXTURES ON EXISTING 10 FPL POLES 52-04: CHECK FROM SURETY TO COVER DAMAGE TO PIPE. ROADWAY ID: PROJECT LENGTH: 3.132MI LANES EXIST/IMPROVED/ADDED: 6/ 6/ 0 DDR 486, ,003 DIH 69, ,355 DS 287, ,017 PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT DIH 0 5, ,000 DS 9, ,260 ACSA 457, ,429 DDR 590, ,734 DS 83, ,174 HSP 737, ,247 LF 34, ,091 SA 3,444,288 90, ,534,679 DDR 11, ,450 TOTAL ,210,048 95, ,305,439 TOTAL PROJECT: 6,210,048 95, ,305,439

2 PAGE 2 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 ITEM NUMBER: PROJECT DESCRIPTION:NW 19TH STREET FROM SR-7 TO SR-845/POWERLINE ROAD *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:BIKE LANE/SIDEWALK EX DESC:2015 MPO PRIORITY #5 B/C RATIO = 40 / SHSP = #2 & #3 ROADWAY ID: PROJECT LENGTH: 3.000MI LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 SA 12, ,805 SU 659,087 4, ,260 SA 0 454, ,000 HSP 0 189, ,980 SA 0 3,585, ,585,657 SA 0 10, ,000 TOTAL ,892 4,243, ,915,702 TOTAL PROJECT: 671,892 4,243, ,915,702 ITEM NUMBER: PROJECT DESCRIPTION:SR-820/HOLLYWOOD BLVD/PINES BLVD FR SR-93/I-75 TO SR-5/US-1/YOUNG CIR *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:PTO STUDIES EX DESC:2016 MPO PRIORITY #7 DESIGN FOR & 3 PORTION OF PHASE 32 FUNDING IS FOR REPURPOSING FOR THE CONSTRUCTION PR OJECT ON ROADWAY ID: PROJECT LENGTH: MI LANES EXIST/IMPROVED/ADDED: 4/ 4/ 0 PHASE: P D & E / RESPONSIBLE AGENCY: MANAGED BY FDOT SU 163,738 4, ,893 ACSU 0 800, ,000 DIH DS 325, ,448 REPE 334,344 1, ,306 SA 14, ,874 SU 1,025, ,025,571 DS 0 35, ,000 TOTAL ,864, , ,705,438 TOTAL PROJECT: 1,864, , ,705,438

3 PAGE 3 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 ITEM NUMBER: PROJECT DESCRIPTION:I-75/SR-93 AT GRIFFIN RD. *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:INTERCHANGE IMPROVEMENT EX DESC:WEST SIDE OF I-75 AT GRIFFIN ROAD ROADWAY ID: PROJECT LENGTH: 2.100MI LANES EXIST/IMPROVED/ADDED: 8/ 8/ 0 DIH TOTAL TOTAL PROJECT: ITEM NUMBER: PROJECT DESCRIPTION:SR-A1A EMERGENCY STABILIZATION *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:EMERGENCY OPERATIONS EX DESC:EMERGENCY DECLARATION APPROVED BY SECRETARY PRASAD ON 11/23/12. ROADWAY ID: PROJECT LENGTH: 7.308MI LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 PHASE: MISCELLANEOUS / RESPONSIBLE AGENCY: MANAGED BY FDOT D 0 5, ,000 TOTAL , ,000 TOTAL PROJECT: 0 5, ,000 ITEM NUMBER: PROJECT DESCRIPTION:JOHNSON STREET FROM EAST OF N 31ST AVENUE TO N 8TH AVENUE *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:BIKE LANE/SIDEWALK EX DESC:2015 MPO PRIORITY #7 31ST COURT TO US-1 WIDENING FOR BIKE LANES; US-1 TO 8TH AVE STRIPING FOR SHARROWS ONLY. LFA W/ CITY OF HOLLYWOOD (2 CHECKS REC'D TOTALING $319,453) ROADWAY ID: PROJECT LENGTH: 3.030MI LANES EXIST/IMPROVED/ADDED: 2/ 2/ 0 EB 93,123 5, ,606 LF 157, , ,235 SA 81, ,130 SU 248, ,056 PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT LF 0 2,017,855 1,693,968 1,671,504 1,158,344 1,193, ,735,607 SA , ,000 CM ,590, ,590,375 SA ,758, ,758,135 LF 0 57, ,218 SA 0 15, ,000 TOTAL ,119 2,199,981 1,693,968 1,671,504 13,306,854 1,193, ,646,362 TOTAL PROJECT: 580,119 2,199,981 1,693,968 1,671,504 13,306,854 1,193, ,646,362

4 PAGE 4 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 ITEM NUMBER: PROJECT DESCRIPTION:BROWARD MOBILITY PROJECT - POMPANO BEACH BIKE LANES *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:BIKE LANE/SIDEWALK EX DESC:2015 MPO PRIORITY #7 WIDEN EXISTING SHARED USE PATH ON THE N.B. SIDE OF NE 5TH AV FR. 10ST TO COPANS RD. & ADD BIKE LANE ON BOTH SIDES OF 10TH ST. FROM SR-811/DIXIE HWY TO NE 5TH AVE & WIDEN EXISTING SHARED USE PATH ON W.B. SIDE O F 10 ST. FROM NE 5TH AVE TO SR-5/US-1 ROADWAY ID: PROJECT LENGTH: 2.793MI LANES EXIST/IMPROVED/ADDED: 2/ 0/ 0 EB 23, ,166 SU 302,928 1, ,427 SU 0 65, ,000 SA , ,278 SU 0 0 1,573, ,573,053 ACSU 0 10, ,000 TOTAL ,094 76,499 1,733, ,135,924 TOTAL PROJECT: 326,094 76,499 1,733, ,135,924 ITEM NUMBER: PROJECT DESCRIPTION:NE BROWARD MOBILITY PROJECT-POMPANO BCH/ DEERFIELD BCH *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:BIKE PATH/TRAIL EX DESC:2015 MPO PRIORITY #7 ; PED-BIKE IMPROVEMENTS ON NE 48TH ST(SR-845 TO SR-5), SW 3RD AVE (SR-869 TO SR-810), NE 11TH AVE (SR814 TO NE 10TH ST.), SE 2ND AVE (SR-869 TO SR-810) / B/C RATIO = 40 / SHSP = #2 & #3 ROADWAY ID: PROJECT LENGTH: 6.167MI LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 HSP 0 42, ,042 SU 925,662 12, ,766 SU 0 15,000 60, ,000 HSP , ,378 SA 0 0 3,960, ,960,827 SU , ,458 ACSU 0 10, ,000 TOTAL ,662 79,146 5,252, ,257,471 TOTAL PROJECT: 925,662 79,146 5,252, ,257,471

5 PAGE 5 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 ITEM NUMBER: PROJECT DESCRIPTION:BROWARD MOBILITY HOLLYWOOD *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:BIKE LANE/SIDEWALK EX DESC:2015 MPO PRIORITY #7 S 14 AVE FROM ATLANTIC SHORES TO HOLLYWOOD BLVD POLK ST FROM N 17 AVE TO N 14 AVE N 14TH AVE. FROM HOLLYWOOD BLVD. TO JOHNSON ST. N 14TH AVE. FROM JOHNSON ST. TO SHERIDAN STREET ROADWAY ID: PROJECT LENGTH: 3.295MI LANES EXIST/IMPROVED/ADDED: 2/ 2/ 0 SA 191, ,950 SU 782,754 5, ,763 SA 0 0 1,597, ,597,094 SU 0 0 2,023, ,023,472 ACSU 0 30, ,000 TOTAL ,704 35,009 3,620, ,630,279 TOTAL PROJECT: 974,704 35,009 3,620, ,630,279 ITEM NUMBER: PROJECT DESCRIPTION:SR-5/US-1 FROM SR-834/SAMPLE ROAD TO BR/PB COUNTY LINE *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:BIKE LANE/SIDEWALK EX DESC:2015 MPO PRIORITY #7 GOES WITH ROADWAY ID: PROJECT LENGTH: 3.536MI LANES EXIST/IMPROVED/ADDED: 6/ 6/ 0 DDR 321, ,001 DS 21, ,184 SU 38,339 11, ,000 DDR 0 0 9,979, ,979,355 SA , ,836 SU 0 0 5, ,280 ACSU 0 10, ,000 TOTAL ,524 21,661 10,253, ,655,656 TOTAL PROJECT: 380,524 21,661 10,253, ,655,656 ITEM NUMBER: PROJECT DESCRIPTION:BROWARD MOBILITY PROJECT - POMPANO BEACH SIDEWALKS *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:SIDEWALK EX DESC:2015 MPO PRIORITY #7 ADD S/W IN THE E.B. AND W.B. SIDE OF SE 2 ST FROM SE 11 AVE TO SR-5/US-1 & ADD S/W IN THE E.B. SIDE OF NE 4 ST FROM NE 11 AVE TO SR-5/US-1 ROADWAY ID: PROJECT LENGTH: 2.800MI LANES EXIST/IMPROVED/ADDED: 1/ 1/ 0 SA 23, ,213 SU 342,643 10, ,985

6 PAGE 6 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 SA , ,800 SU , ,391 ACSU 0 10, ,000 TOTAL ,856 20, , ,058,389 TOTAL PROJECT: 365,856 20, , ,058,389 ITEM NUMBER: PROJECT DESCRIPTION:I-75 EXPRESS TOLL OPERATIONS BROWARD COUNTY *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:TOLL COLLECTION PHASE: OPERATIONS / RESPONSIBLE AGENCY: MANAGED BY FDOT TOBG 0 1,551,000 1,587,000 1,628,000 1,672,000 1,747, ,185,000 TOTAL ,551,000 1,587,000 1,628,000 1,672,000 1,747, ,185,000 TOTAL PROJECT: 0 1,551,000 1,587,000 1,628,000 1,672,000 1,747, ,185,000 ITEM NUMBER: PROJECT DESCRIPTION:SR-A1A FROM CLEVELAND STREET TO SHERIDAN STREET *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:BIKE LANE/SIDEWALK EX DESC:THIS PROJECT IS FOR PERMIT TRACKING CITY OF HOLLYWOOD (CRA) IMPROVEMENTS, INCLUDING LANDSCAPING & TRAFFIC CALMING, INCLUDES TRANSPORTATION DESIGN FOR LIVABLE COMMUNITY (TDLC) ROADWAY ID: PROJECT LENGTH:.825MI LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 DIH 0 2, ,000 TOTAL , ,000 TOTAL PROJECT: 0 2, ,000 ITEM NUMBER: PROJECT DESCRIPTION:SR-5/US-1 FROM SR-820/HOLLYWOOD BLV TO SR-822/SHERIDAN STREET *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:BIKE LANE/SIDEWALK EX DESC:COMPLETE STREETS IMPROVEMENTS: BIKE LANES, PEDESTRIAN IMPROV MEDIAN ISLANDS & LANDSCAPING. TRANSPORTATION DESIGN FO R LIVABLE COMMUNITY (TDLC) DESIGNATION AND CONTEXT SENSITIVE SOLUTIONS (CCS) WILL APPLY PROJECT FOR PERMIT TRACKING ONLY ROADWAY ID: PROJECT LENGTH: 1.433MI LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 DIH 0 2, ,000 TOTAL , ,000 TOTAL PROJECT: 0 2, ,000

7 PAGE 7 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 ITEM NUMBER: PROJECT DESCRIPTION:SR-5/US-1 FR SR-816/OAKLAND PARK BLVD TO SR-870/COMMERCIAL BLVD *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:RESURFACING ROADWAY ID: PROJECT LENGTH: 1.540MI LANES EXIST/IMPROVED/ADDED: 3/ 3/ 0 DDR 407, ,215 DIH 33,125 1, ,530 DS 398, ,334 DDR 0 541, ,327 DIH 0 20, ,540 DS 0 41, ,719 SA 0 1,802, ,802,861 DS 0 10, ,000 TOTAL ,674 2,417, ,256,526 TOTAL PROJECT: 838,674 2,417, ,256,526 ITEM NUMBER: PROJECT DESCRIPTION:SR-834/SAMPLE RD. FROM ROCK ISLAND RD TO SR-5/US-1 *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:MISCELLANEOUS CONSTRUCTION EX DESC:BUS SIGNALS/QUEUE JUMPER ROADWAY ID: PROJECT LENGTH: 7.806MI LANES EXIST/IMPROVED/ADDED: 4/ 4/ 0 DDR 158, ,726 DIH 4,774 5, ,999 DS 423, ,756 DS 0 65, ,000 DDR 0 754, ,432 DIH 0 10, ,270 DS 0 137, ,368 HSP 0 856, ,720 SA 0 100, ,000 TOTAL ,256 1,929, ,516,271 TOTAL PROJECT: 587,256 1,929, ,516,271 ITEM NUMBER: PROJECT DESCRIPTION:LOXAHATCHEE RD. FROM ARTHUR MARSHALL LOXAHATCHEE REFUGE TO SR-7/US-441 *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:WIDEN/RESURFACE EXIST LANES EX DESC:2015 MPO PRIORITY #6 MPO BIKE/PED PROGRAM PROJECT 5202=LF WITH THE CITY OF PARKLAND 5203=LF WITH BROWARD COUNTY ROADWAY ID: PROJECT LENGTH: 6.150MI LANES EXIST/IMPROVED/ADDED: 2/ 2/ 0 SA 14,149 35, ,000

8 PAGE 8 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 SU 99,611 2,500, ,599,611 LF ,527, ,527,499 SA ,157, ,157,598 SU ,951, ,951,676 ACSU 0 10, ,000 TOTAL ,760 2,545, ,636, ,296,384 TOTAL PROJECT: 113,760 2,545, ,636, ,296,384 ITEM NUMBER: PROJECT SR-834/SAMPLE RD FR S OF NB EXIT RAMP TO N OF NB ENT. RAMP *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:INTERCHANGE JUSTIFICA/MODIFICA EX DESC:INTERCHANGE MODIFICATION: REALIGN, WIDEN & RELOCATE GORE OF NB EXIT RAMP, COMBINE THE EB TO NB AND WB TO NB ENTRANC E RAMP INTO A PHYSICALLY SEPARATED ROADWAY. ROADWAY ID: PROJECT LENGTH: 3.378MI LANES EXIST/IMPROVED/ADDED: 4/ 4/ 0 DDR 1,270, ,270,000 DIH 3,022 46, ,000 DS 440, ,942 PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT DDR 0 0 1,108, , ,934,255 DIH , ,000 DS 0 336, ,000 ACNP , , ,000 ACNP ,222, ,222,258 DS 0 20, ,000 TOTAL ,713, ,978 1,236,184 1,396,071 14,222, ,971,455 TOTAL PROJECT: 1,713, ,978 1,236,184 1,396,071 14,222, ,971,455 ITEM NUMBER: PROJECT DESCRIPTION:NW 136TH SR-84, SIS FACILITY IMPROVEMENTS *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:ADD TURN LANE(S) EX DESC:ADD WB SR-84 TO NB 136TH AVE RIGHT TURN LANE, ADD SB NW 136TH AVE RIGHT TURN LANE AND ADD NEW WB SR-84 NW 136TH AVE RIGHT TURN LANE, MEDIAN PVT MARKING MODS ON NW 136TH AVEUNDER I-595. LFA AGREEMENT W/CITY OF SUNRISE ROADWAY ID: PROJECT LENGTH:.509MI LANES EXIST/IMPROVED/ADDED: 3/ 3/ 1 DC 2, ,027 DIH 14,932 1, ,399 GMR 1,067, ,067,964 SIWR 0 1,200, ,200,000 DIH , ,307 LF , ,000 SIWR 0 0 4,535, ,535,390

9 PAGE 9 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 GMR 0 20, ,000 TOTAL ,084,923 1,221,467 5,363, ,670,087 TOTAL PROJECT: 1,084,923 1,221,467 5,363, ,670,087 ITEM NUMBER: PROJECT DESCRIPTION:SR-869/SW 10 ST FROM SR-845/POWERLINE RD TO WEST OF MILITARY TRL *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:PD&E/EMO STUDY EX DESC:2016 MPO PRIORITY #10 ROADWAY ID: PROJECT LENGTH: 1.400MI LANES EXIST/IMPROVED/ADDED: 3/ 3/ 0 PHASE: P D & E / RESPONSIBLE AGENCY: MANAGED BY FDOT DDR 245, ,995 DI 0 4,010, ,010,000 DIH 16,001 13, ,000 DS 174, ,000 DI 0 1,560,000 2,875, ,435,000 DIH 0 50, ,000 PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT DI ,401, ,401,847 DIH , ,000 ACNP , ,000 DDR 0 20, ,000 PHASE: DESIGN BUILD / RESPONSIBLE AGENCY: MANAGED BY FDOT ACNP ,159, ,159,568 DI ,341, ,341,954 SIWR , ,180 TOTAL ,996 5,653,999 14,366, ,958, ,415,544 TOTAL PROJECT: 435,996 5,653,999 14,366, ,958, ,415,544 ITEM NUMBER: PROJECT DESCRIPTION:RIVERLAND ROAD FROM SR-7/US-441 TO BROWARD BOULEVARD *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:BIKE LANE/SIDEWALK EX DESC:BROWARD MPO REGIONAL COMPLETE STREET INITIATIVE PROJECT ADMINISTERED BY FDOT FY2016 "TIGER" GRANT RECEIPANT = BROWA RD MPO FEDERAL FUNDS "TGR" TO BE OBLIGATED BY 09/30/2019 AND EXPENDED BY 09/30/2024. GOES WITH /2/3/4 LFA W / CITY OF FT. LAUDERDALE & BROWARD COUNTY ROADWAY ID: PROJECT LENGTH: 3.644MI LANES EXIST/IMPROVED/ADDED: 2/ 2/ 0 LF 0 370, ,374 TGR , ,420 LF 0 20, ,000 LF 0 10, ,000 PHASE: DESIGN BUILD / RESPONSIBLE AGENCY: MANAGED BY FDOT LF ,214, ,214,949

10 PAGE 10 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 TGR ,317, ,317,793 TOTAL ,374 76,420 4,532, ,009,536 TOTAL PROJECT: 0 400,374 76,420 4,532, ,009,536 TOTAL DIST: 04 19,212,501 23,749,992 45,856,338 29,865,090 29,201,112 2,940, ,958, ,784,671 TOTAL 19,212,501 23,749,992 45,856,338 29,865,090 29,201,112 2,940, ,958, ,784,671

11 PAGE 11 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 TURNPIKE ITEM NUMBER: PROJECT DESCRIPTION:THERMOPLASTIC FOR SUNRISE BLVD INTERCHANGE MODIFICATION *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:SIGNING/PAVEMENT MARKINGS ROADWAY ID: PROJECT LENGTH:.214MI LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 PKYI 0 21, , ,467 TOTAL , , ,467 TOTAL PROJECT: 0 21, , ,467 ITEM NUMBER: PROJECT DESCRIPTION:WIDEN TPK- ATLANTIC BLVD(SR814) TO WILES RD (MP66-70)(6TO10LANES) W/EL *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:ADD LANES & RECONSTRUCT ROADWAY ID: PROJECT LENGTH: 5.076MI LANES EXIST/IMPROVED/ADDED: 5/ 5/ 2 PKYI 21,785,059 5, ,791,010 PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT PKYI 2,791,713 5,602, ,394,700 PKYI 0 0 2,000, ,000,000 PKYI 49, ,392, , , ,853,161 PKYI 0 10, ,000 PKYR 0 250, ,000 TOTAL ,626,620 5,868, ,392, , , ,298,871 TOTAL PROJECT: 24,626,620 5,868, ,392, , , ,298,871 ITEM NUMBER: PROJECT DESCRIPTION:RESURFACE TPK (SR91) NB ONLY, FROM MP *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:RESURFACING ROADWAY ID: PROJECT LENGTH: 1.103MI LANES EXIST/IMPROVED/ADDED: 3/ 3/ 0 PKYI 0 2, ,000 TOTAL , ,000 TOTAL PROJECT: 0 2, ,000 ITEM NUMBER: PROJECT DESCRIPTION:SUNRISE RAMP/CANAL MAINTENANCE BROWARD COUNTY (SAWGRASS MP 1) *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:PERIODIC MAINTENANCE ROADWAY ID: PROJECT LENGTH: 1.500MI LANES EXIST/IMPROVED/ADDED: 6/ 0/ 0 PKYI 130, ,085 PKYR 497, ,831

12 PAGE 12 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 TURNPIKE PKYI 30, ,000 PKYI 157,315 1, ,415 PKYR 762, ,130 PKYI 0 250, ,000 TOTAL ,577, , ,829,461 TOTAL PROJECT: 1,577, , ,829,461 ITEM NUMBER: PROJECT DESCRIPTION:SAWGRASS CANAL REVETMENT - WALL 6 (MP 16) *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:DRAINAGE IMPROVEMENTS ROADWAY ID: PROJECT LENGTH:.600MI LANES EXIST/IMPROVED/ADDED: 3/ 0/ 0 PKYI 0 1, ,500 PKYI 4,413, ,413,453 TOTAL ,413,453 1, ,414,953 ITEM NUMBER: PROJECT DESCRIPTION:SAWGRASS CANAL REVETMENT PHASE 4 *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:DRAINAGE IMPROVEMENTS ROADWAY ID: PROJECT LENGTH: 1.571MI LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 PKYI 0 1, ,500 TOTAL , ,500 TOTAL PROJECT: 4,413,453 3, ,416,453 ITEM NUMBER: PROJECT DESCRIPTION:THERMOPLASTIC FOR SAMPLE RD RAMP RESURFACING/INTERSECTION IMPROVEMENT *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:SIGNING/PAVEMENT MARKINGS PKYI 0 69, ,034 TOTAL , ,034 TOTAL PROJECT: 0 69, ,034

13 PAGE 13 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 TURNPIKE ITEM NUMBER: PROJECT DESCRIPTION:HEFT / TPK SPUR (SR91) INTERCHANGE MODIFICATION (MP47) *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:INTERCHANGE IMPROVEMENT ROADWAY ID: PROJECT LENGTH: 1.606MI LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 PHASE: P D & E / RESPONSIBLE AGENCY: MANAGED BY FDOT PKYI 0 1, ,000, ,001,500 TOTAL , ,000, ,001,500 TOTAL PROJECT: 0 1, ,000, ,001,500 TOTAL DIST: 04 30,618,066 6,217, ,599,092 3,000, , , ,845,786 TOTAL TURNPIKE 30,618,066 6,217, ,599,092 3,000, , , ,845,786

14 PAGE 14 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 MAINTENANCE ITEM NUMBER: PROJECT DESCRIPTION:SR-870/COMMERCIAL BLVD FR SR-817/UNIVERSITY DR TO PROSPECT RD *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:LANDSCAPING EX DESC:2017 HIGHWAY BEAUTIFICATION COUNCEL GRANT (HBCG) CITY OF TAMARAC ROADWAY ID: PROJECT LENGTH: 5.007MI LANES EXIST/IMPROVED/ADDED: 3/ 3/ 0 PHASE: BRDG/RDWY/CONTRACT MAINT / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE D 0 100, ,000 LF 0 180, ,848 TOTAL , ,848 TOTAL PROJECT: 0 280, ,848 ITEM NUMBER: PROJECT DESCRIPTION:SR-816/OAKLAND PARK BLVD FR E OF 21 AVE TO W OF SR-9/I-95 *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:LANDSCAPING EX DESC:2017 HIGHWAY BEAUTIFICATION COUNCEL GRANT (HBCG) CITY OF OAKLAND PARK ROADWAY ID: PROJECT LENGTH:.570MI LANES EXIST/IMPROVED/ADDED: 3/ 3/ 0 PHASE: BRDG/RDWY/CONTRACT MAINT / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE D 0 100, ,000 LF 0 180, ,246 TOTAL , ,246 TOTAL PROJECT: 0 280, ,246 ITEM NUMBER: PROJECT DESCRIPTION:SR-817/UNIVERSITY DR FR SR-91/FL TURNPIKE TO SR-824/PEMBROKE RD *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:LANDSCAPING EX DESC:2017 HIGHWAY BEAUTIFICATION COUNCEL GRANT (HBCG) CITY OF MIRAMAR ROADWAY ID: PROJECT LENGTH: 1.423MI LANES EXIST/IMPROVED/ADDED: 3/ 3/ 0 PHASE: BRDG/RDWY/CONTRACT MAINT / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE D 0 100, ,000 LF 0 40, ,000 TOTAL , ,000 TOTAL PROJECT: 0 140, ,000 TOTAL DIST: , ,094 TOTAL MAINTENANCE 0 701, ,094

15 PAGE 15 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 RAIL ITEM NUMBER: PROJECT DESCRIPTION:SFRC R/R BRIDGE OVER S FORK NEW RIVER REPLACE EXISTING BRIDGE BR#86992 *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:RAIL PRESERVATION PROJECT EX DESC:SOUTH FLORIDA RAIL CORRIDOR EXECUTIVE BOARD APPROVED FUNDING THIS PROJECT IN 2012 FROM S/W BOX RAIL FUNDS, 7/07 CON ST DEFERRED TO FY2013 LIMITS FROM: SX # TO: SX # **SEE WP45 FOR ADDITIONAL PROJECT COMMENTS** PHASE: P D & E / RESPONSIBLE AGENCY: MANAGED BY FDOT BRP 114, ,322 DDR 9, ,029 DIH 136,826 3, ,104 DPTO 971, ,738 DDR 523, ,314 DEM 140, ,906 DIH 144, ,720 DPTO 1,516, ,516,518 DS 250, ,594 PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT DIH 0 1, ,030 DPTO 759, ,186 DS 875, ,529 GMR 300, ,000 BNBR 4,942, ,942,328 DDR 9,390, ,390,441 DIH 116,106 2, ,133 DPTO 2,879, ,879,506 DS 12,087,084 2, ,089,568 DDR 50, ,420 DEM 914, ,871 DEMW 4, ,449 DS 4, ,734 PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY FDOT DS 889, ,000 TOTAL ,021,292 9, ,030,440 TOTAL PROJECT: 37,021,292 9, ,030,440 TOTAL DIST: 04 37,021,292 9, ,030,440 TOTAL RAIL 37,021,292 9, ,030,440

16 PAGE 16 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 TRANSIT ITEM NUMBER: PROJECT DESCRIPTION:BROWARD COUNTY SECTION 5307 FORMULA FUNDS *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:CAPITAL FOR FIXED ROUTE EX DESC:FEDERAL CAPITAL ASSISTANCE FY06=22,669,509 FTA/62M LF EXECUTED GRANT 5/13/08 FL90X628 FY07=23,304,192 FTA/64M LF EC ECUTED GRANT 8/11/08 FL90X660 FY08=13,910,000 FTA/64M LF FY10=24,155,304 FTA GRANT EXECUTED 7/20/10 FL90X PHASE: OPERATIONS / RESPONSIBLE AGENCY: MANAGED BY BROWARD COUNTY FTA 74,596, ,596,005 LF 195,428, ,428,000 PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY BROWARD COUNTY FTA 129,280, ,000,000 25,000,000 25,000,000 25,000,000 25,000, ,280,970 LF 206,000, ,000,000 TOTAL ,304, ,000,000 25,000,000 25,000,000 25,000,000 25,000, ,304,975 TOTAL PROJECT: 605,304, ,000,000 25,000,000 25,000,000 25,000,000 25,000, ,304,975 ITEM NUMBER: PROJECT DESCRIPTION:BROWARD COUNTY DOWNTOWN-BEACH TRANSIT SHUTTLE SECTION 5307 *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:TRANSIT IMPROVEMENT EX DESC:FEDERAL 2003/ /08 TRANSPORTATION IMPROVEMENT PROGRAM PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY BROWARD COUNTY FTA 0 1,875, ,875,000 TOTAL ,875, ,875,000 TOTAL PROJECT: 0 1,875, ,875,000 ITEM NUMBER: PROJECT DESCRIPTION:SR-842/BROWARD BLVD FRM PINE ISLAND RD TO US1 SECTION 5309 /BCT *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:PURCHASE VEHICLES/EQUIPMENT EX DESC:LIVEABILITY GRANT; 2015 MPO PRIORITY #4 SECTION BROWARD CO. TRANSIT PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY BROWARD COUNTY FTA 0 8,034, ,034,017 TOTAL ,034, ,034,017 TOTAL PROJECT: 0 8,034, ,034,017

17 PAGE 17 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 TRANSIT ITEM NUMBER: PROJECT DESCRIPTION:BROWARD COUNTY TRANSIT INFRASTRUCTURE IMPROVEMENTS SEC *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:TRANSIT IMPROVEMENT EX DESC:FTA EARMARKS FY 2010-SECTION 5309 PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY BROWARD COUNTY FTA 0 500, ,000 TOTAL , ,000 TOTAL PROJECT: 0 500, ,000 ITEM NUMBER: PROJECT DESCRIPTION:BROWARD COUNTY TRANSIT SECTION 5339 BUS AND BUS FACILITIES *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:CAPITAL FOR FIXED ROUTE EX DESC:DEVELOP AN ASSET MGMT SYSTEM TO TRACK CONDITION OF AGENCY'S FLEET, FACILITIES, & EQUIPMENT /STATE OF GOOD REPAIR DR AFT GRANT #FL PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY BROWARD COUNTY FTA 0 16,879,720 2,833,000 2,833,000 2,833,000 2,833, ,211,720 TOTAL ,879,720 2,833,000 2,833,000 2,833,000 2,833, ,211,720 TOTAL PROJECT: 0 16,879,720 2,833,000 2,833,000 2,833,000 2,833, ,211,720 ITEM NUMBER: PROJECT DESCRIPTION:BROWARD COUNTY SECTION 5309 BUS LIVABILITY *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:CAPITAL FOR FIXED ROUTE EX DESC:SECTION 5309 BUS LIVABILITY BROWARD COUNTY TRANSIT (NON-BUDGETED) PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY BROWARD COUNTY FTA 0 401, ,440 TOTAL , ,440 TOTAL PROJECT: 0 401, ,440

18 PAGE 18 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 TRANSIT ITEM NUMBER: PROJECT DESCRIPTION:BROWARD COUNTY TRANSIT SEC STATE OF GOOD REPAIR *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:CAPITAL FOR FIXED ROUTE EX DESC:FTA FORMULA CAPITAL FUNDING FOR CAPITAL PROJECTS SECTION 5337 REPLACED 5307 PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY BROWARD COUNTY FTA 0 1,042, , , , , ,782,000 TOTAL ,042, , , , , ,782,000 TOTAL PROJECT: 0 1,042, , , , , ,782,000 TOTAL DIST: ,304, ,732,177 28,018,000 28,018,000 28,018,000 28,018, ,109,152 TOTAL TRANSIT 605,304, ,732,177 28,018,000 28,018,000 28,018,000 28,018, ,109,152

19 PAGE 19 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 FLA. RAIL ENT. ITEM NUMBER: PROJECT DESCRIPTION:SFRC R/R BRIDGE OVER S FORK NEW RIVER REPLACE EXISTING BRIDGE BR#86992 *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:RAIL PRESERVATION PROJECT EX DESC:SOUTH FLORIDA RAIL CORRIDOR EXECUTIVE BOARD APPROVED FUNDING THIS PROJECT IN 2012 FROM S/W BOX RAIL FUNDS, 7/07 CON ST DEFERRED TO FY2013 LIMITS FROM: SX # TO: SX # **SEE WP45 FOR ADDITIONAL PROJECT COMMENTS** DS 2,356, ,356,459 DPTO 0 4, ,179 TOTAL ,356,459 4, ,360,638 TOTAL PROJECT: 2,356,459 4, ,360,638 ITEM NUMBER: PROJECT DESCRIPTION:SFRTA CAPITAL SECTION 5339 BUS AND BUS FACILITIES *NON-SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:RAIL REVENUE/OPERATIONA IMPR EX DESC:FTA FORMULA CAPITAL FUNDING FOR CAPITAL PROJECTS SFTRA- SOUTH FLORIDA REGIONAL TRANSPORTATION AUTHORITY PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY SOUTH FL REG TRANSPORT AUTH FTA 0 1,844, , , , , ,689,880 TOTAL ,844, , , , , ,689,880 TOTAL PROJECT: 0 1,844, , , , , ,689,880 TOTAL DIST: 04 2,356,459 1,849, , , , , ,050,518 TOTAL FLA. RAIL ENT. 2,356,459 1,849, , , , , ,050,518 GRAND TOTAL 694,513, ,258, ,934,665 61,344,325 57,950,347 31,420, ,099,973 1,683,521,661

FUND THAN THAN ALL CODE YEARS

FUND THAN THAN ALL CODE YEARS PAGE 1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/20/2012 HIGHWAYS ITEM NUMBER:230724 1 PROJECT DESCRIPTION:ANDREWS AVE EXT FROM POMPANO PARK PLACE TO S. OF ATLANTIC BLVD *NON-SIS* DISTRICT:04 COUNTY:BROWARD

More information

FUND THAN THAN ALL CODE YEARS

FUND THAN THAN ALL CODE YEARS PAGE 1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 HIGHWAYS ITEM NUMBER:434452 1 PROJECT DESCRIPTION:SR 11 (MOODY BLVD) RAIL CROSSING # 271908-S REHABILITATION *NON-SIS* DISTRICT:05 COUNTY:FLAGLER

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS DT2511563 2511563 FROM PORT OF MIAMI PORT OF MIAMI TUNNEL TO SR 836/I-395 0.5 NEW ROAD CONSTRUCTION $2,514,664 $790,186 - DESIGN/BUILD LF 2,766 2,849 2,935 3,023 3,113 DESIGN/BUILD GMR 22,152 22,990 24,338

More information

MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS

MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS Freeway DT2495811 SR 826/SR 836 2495811 FROM N OF SW 8 ST And from NW 87 to 57 Avenues 4.8 TO S OF NW 25 ST & FM NW 87 TO 57 AVE' INTERCHANGE - ADD LANES $851,335 $804,835 - - DESIGN/BUILD LF 46,500 0

More information

Hillcrest Residential Development Hollywood, Florida

Hillcrest Residential Development Hollywood, Florida August 19, 2015 Hillcrest Residential Development Hollywood, Florida Drainage Report For City of Hollywood Prepared by: Kimley-Horn and Associates, Inc. 445 24 th Street, Suite 200 Vero Beach, FL 32960

More information

VILLAGE OF WELLINGTON

VILLAGE OF WELLINGTON VILLAGE OF $83,270 Median Income 25.8% Traditionally Underserved 5.93% Growth from 2010 95.1% HS/GED 44.5% Bachelors 20,301 Households 67% Labor Force Lake Okeechobee Wellington Palm Beach County Commuter

More information

FY 2018 Ten Year Capital Plan Review Project List

FY 2018 Ten Year Capital Plan Review Project List FY 2018 Ten Year Capital Plan Review Project List Program Category FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 Highway Roadway/Safety 100,950,000 128,431,766 125,896,635 91,153,571

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review

More information

MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM

MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM 2018-2021 April, 2017 FISCAL YEARS 2018-2021 MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM FOR THE GRAND FORKS - EAST GRAND FORKS METROPOLITAN

More information

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management Transportation Impact Analysis Market Street PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for TerraPointe Services, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc.

More information

TABLE 2 FDOT ADOPTED WORK PROGRAM - VOLUSIA COUNTY PROJECTS FOR FISCAL YEARS 2014/ /19

TABLE 2 FDOT ADOPTED WORK PROGRAM - VOLUSIA COUNTY PROJECTS FOR FISCAL YEARS 2014/ /19 1 240836-1 SR 40 FROM SR 15 US 17 TO SR 11 ADD LANES & RECONSTRUCT ENVIRO CONSULTANT 461918 0 0 0 0 2 240837-1 SR 40 FROM W OF SR 11 TO W OF CONE ROAD ADD LANES & RECONSTRUCT PE IN-HOUSE 4363 0 0 0 0 3

More information

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington METRO CIP

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington METRO CIP METRO METRO METRO 2019 2028 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit

More information

TOWN OF JUPITER. Overview Map. Commuter Mode of Choice QUICK FACTS. 46 Median Age. 61,388 Residents. 19.6% Traditionally Underserved

TOWN OF JUPITER. Overview Map. Commuter Mode of Choice QUICK FACTS. 46 Median Age. 61,388 Residents. 19.6% Traditionally Underserved TOWN OF $76,687 Median Income 19.6% Traditionally Underserved 7.17% Growth from 2010 92.9% H/GED 43.7% Bachelors 24,915 Households 63.3% Labor Force Jupiter Palm Beach County Commuter Mode of Choice 46

More information

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Information for File # 2013-00531-MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Applicant: City of St. Louis Park Corps Contact: Melissa Jenny Address: U.S. Army Corps of Engineers Attn:

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 14-31 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF TREASURE ISLAND APPROVING THE EXECUTION OF A WORK AUTHORIZATION WITH MICHAEL BAKER JR., INC ENGINEERING TO COMPLETE ENGINEERING AND

More information

City of Brainerd, Minnesota Snowplowing Policy

City of Brainerd, Minnesota Snowplowing Policy City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control

More information

Study Overview. the nassau hub study. The Nassau Hub

Study Overview. the nassau hub study. The Nassau Hub Livable Communities through Sustainable Transportation the nassau hub study AlternativeS analysis / environmental impact statement The Nassau Hub Study Overview Nassau County has initiated the preparation

More information

COUNTY COMMISSION DISTRICT 3

COUNTY COMMISSION DISTRICT 3 COUNTY COMMISSION DISTRICT 44 Mdian Ag $7,241 Houshold Incom 41% Traditionally Undrsrvd 609% Growth from 2010 777% HS/GED 192% Bachlors District 806% Labor Forc Commutr Mod of Choic 71, 218 Housholds Lak

More information

FY Transportation Improvement Program

FY Transportation Improvement Program FY 2009-2013 Transportation Improvement Program Adopted July 10, 2008 Amended 9/11/2008; 4/09/09; 7/29/09 Space Coast Transportation Planning Organization Transportation Improvement Program - FY 2008/09

More information

A Study of Red Light Cameras in Kansas City, MO

A Study of Red Light Cameras in Kansas City, MO A Study of Red Light s in Kansas City, MO Prepared by the Special Operations Division Executive Summary This paper will analyze the crash data for the 29 red light cameras located in 17 intersections in

More information

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7H BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: PARKS FY 2012 CAPITAL IMPROVEMENT PLAN (CIP) AGENDA ITEM DATES: MEETING DATE: 4/26/2011 COMPLETED

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program FISCAL YEARS 2017/2018-2021/2022 Draft: May 10, 2017 The preparation of this document has been financed in part through a grant from the U.S. Department of Transportation

More information

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov February 9, 2018 I-10 East at Redd closes for 24 hours this Sunday, Feb 11

More information

FY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission

FY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission FY 2010 Continuing i Planning Program Product Report Local Transportation and Traffic Data Travel Time and Delay Data for Belpre and Marietta, Ohio Wood-Washington-Wirt Interstate Planning Commission CONTINUING

More information

FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT

FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT Incident Number: 2018-6664 Incident Name: Southbound I-75 Closed Occurred: 10/26/2018 01:26 ET Reported to SWO: 10/26/2018

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Fiscal Years 2011/12-2015/16 1022 Prudential Drive Jacksonville, Florida 32207 T 904.306.7500 F 904.306.7501 www.northfloridatpo.com Table of Contents Section I - Executive

More information

FOR LEASE ±1,800 SF OUTPARCEL NEW CONSTRUCTION, SINGLE TENANT

FOR LEASE ±1,800 SF OUTPARCEL NEW CONSTRUCTION, SINGLE TENANT FOR LEASE ±1,800 SF OUTPARCEL NEW CONSTRUCTION, SINGLE TENANT DEERFIELD BEACH FL 33441 ROXANNE REGISTER Vice President of Leasing & Sales RoxanneRegister@dkatz.com (561) 869-4346 HIGHLIGHTS Retail only

More information

Randall W. Parkinson, Ph.D., P.G. Institute of Water and Environment Florida International University

Randall W. Parkinson, Ph.D., P.G. Institute of Water and Environment Florida International University An Update on Adaptation Action Activities Undertaken Since Completion of the City of Satellite Beach (FL) Vulnerability Assessment to Rising Seas (2010) Randall W. Parkinson, Ph.D., P.G. Institute of Water

More information

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016 Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

Com munity Advisor y C ommitte e Meeting

Com munity Advisor y C ommitte e Meeting Community Advisor y Committee Meeting J u n e 1 5, 2 0 1 7 Project Scope 14 miles of enhanced service from Downtown Portland to Cleveland Park & Ride 41 Stations with 82 Platforms 1/3 mile approximate

More information

Policy Title: Snow Removal & Ice Control Policy #: PW

Policy Title: Snow Removal & Ice Control Policy #: PW Village of Fruitvale Corporate Policy Manual Policy Title: Snow Removal & Ice Control Policy #: PW-2012-01 Section: PUBLIC WORKS Initially Approved: 2012 06 04 Last Reviewed: 2013 05 06 Council Approval:

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet September 2015 RECOMMENDED ALTERNATIVES Environmental Impact Statement (EIS) Project Divided into 3 Segments Segment 1:

More information

STREET LIGHTING AUSTIN ENERGY ILLUMINATION DEPARTMENT

STREET LIGHTING AUSTIN ENERGY ILLUMINATION DEPARTMENT STREET LIGHTING AUSTIN ENERGY ILLUMINATION DEPARTMENT http://www.austinenergy.com/ Physical Address: 4411 Meinardus Drive Austin, Texas 78744 Hours of Operation: Monday Friday 6am to 3pm Key Contact: Joyce

More information

The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference.

The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference. Main Street @ Coconut Creek DRI QUESTION 9 MAPS The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference. Map

More information

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation #1 Northing 640586.689 / Easting 669419.281 / Elevation 1443.178 Center of bronze cap with UA seal. Located in sidewalk approx. 10 W of curb on Garland Ave. Approx. 24.5 SE of traffic signal post. UA #1

More information

2014 Data Collection Project ITE Western District

2014 Data Collection Project ITE Western District 2014 Data Collection Project ITE Western District Project Completed By: Oregon State University OSU ITE Student Chapter 101 Kearney Hall Corvallis, OR 97331 Student Coordinator: Sarah McCrea (OSU ITE Student

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Planning for a Mega Project in a Metropolitan Area TxDOT Short Course October 13, 2015 RECOMMENDED ALTERNATIVES Environmental Impact Statement (EIS) Project

More information

Engineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year )

Engineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year ) Engineer's Report for the Main Street Business Area Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year 2008-09) Prepared under the provisions of the Benefit Assessment Act of 1982

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program FISCAL YEARS 2013/14-2017/18 Approved June 26, 2013 Amended September 25, 2013 Amended December 11, 2013 Amended June 25, 2014 Prepared by the Lake~Sumter Metropolitan

More information

Prepared for: San Diego Association Of Governments 401 B Street, Suite 800 San Diego, California 92101

Prepared for: San Diego Association Of Governments 401 B Street, Suite 800 San Diego, California 92101 Activity-Based Travel Model Validation for 2012 Using Series 13 Data: Coordinated Travel Regional Activity Based Modeling Platform (CT-RAMP) for San Diego County Prepared for: San Diego Association Of

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

Wesley Chapel Area Roadway Needs Study Build-Out Analysis (Beardsley Dr/Oldwoods Ave Need Study) Project Progress Meeting 1

Wesley Chapel Area Roadway Needs Study Build-Out Analysis (Beardsley Dr/Oldwoods Ave Need Study) Project Progress Meeting 1 Build-Out Analysis (Beardsley Dr/Oldwoods Ave Need Study) Project Progress Meeting 1 9:30 AM Pasco County Development Services Conference Room 1. Welcome/Introductions 2. Project Overview Purpose Major

More information

APPENDIX (R) Committed Developments Documentation

APPENDIX (R) Committed Developments Documentation APPENDIX 21-10 (R) Committed Developments Documentation Revised October 2008 Committed Developments Trip Generation Beacon Countyline DRI Development Location Land Use Approved Built Remaining PM Peak

More information

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas.

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas. NOTICE OF PUBLIC HEARING CITY PLANNING COMMISSION CITY OF OVERLAND PARK, KANSAS Notice is hereby given that the City Planning Commission of Overland Park, Kansas, will hold a public hearing Monday, July

More information

Monroe County: Key West and Lower Keys

Monroe County: Key West and Lower Keys FDOT PROJECT UPDATES June 15-21, 2015 Monroe County: Key West and Lower Keys Monroe County projects website: www.fdotmonroe.com Opt Out: If you no longer wish to receive these weekly notifications, please

More information

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 Appendix C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 CONTENTS List of Figures-... 3 List of Tables... 4 Introduction... 1 Application of the Lubbock Travel Demand

More information

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Prepared by: Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite

More information

CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors]

CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors] CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors] Travel Time and Delay Analysis for Belpre (OH) and Marietta (OH) Fiscal Year 2009 Report WOOD WASHINGTON

More information

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone: JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH 45243 Email: jackpflum1@gmail.com Telephone: 513.919.7814 MEMORANDUM REPORT Traffic Impact Analysis Proposed Soccer

More information

Arlington County, Virginia

Arlington County, Virginia Arlington County, Virginia METRO METRO 2015 2024 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed

More information

WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING

WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING 1. Snow Removal Procedures Steven Lang 2. 2020 Budget Streets & Highways Tom Dankert

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF APRIL 2, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF APRIL 2, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF APRIL 2, 2018 AGENDA ITEM NO. 47 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final June 2018 bid opening for $58,352,185, the tentative

More information

West Tennessee Construction June 14-21, 2017

West Tennessee Construction June 14-21, 2017 FOR IMMEDIATE RELEASE Wednesday, June 14, 2017 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction June 14-21, 2017 BENTON COUNTY, I-40 Truck Climbing Lane Wednesday, June 7 through

More information

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2016 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET FUND

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2016 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET FUND 2017 SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2016 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET FUND 001... 3 IV. GENERAL FUND 001 DESCRIPTIONS... 4 V. DEBT SERVICE FUND...

More information

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS 2018 WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS Introduction Woodruff Road is the main road to and through the commercial area in Greenville, South Carolina. Businesses along the corridor have

More information

0.00 B9 TRANSIT GRANT CAP IMP (NON- VEHICLE) 0.00 BB TRANSIT VEHICLE PURCHASE CAP IMP (NON- VEHICLE) 0.00 B9 TRANSIT VEHICLE PURCHASE

0.00 B9 TRANSIT GRANT CAP IMP (NON- VEHICLE) 0.00 BB TRANSIT VEHICLE PURCHASE CAP IMP (NON- VEHICLE) 0.00 B9 TRANSIT VEHICLE PURCHASE 842 BB TRF-0047-19A 2019 ROCHESTER SECT 5307: ROCHESTER RR OPERATING 0.00 B9 TRANSIT FTA 11,450,000 - - 2,000,000 - - 9,450,000 ASSISTANCE OPERATIONS 843 BB TRF-0047-19B 2019 ROCHESTER SECT 5307: CITY

More information

COUNCIL POLICY MANUAL

COUNCIL POLICY MANUAL COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs

More information

SNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT

SNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT ITASCA COUNTY TRANSPORTATION DEPARTMENT Effective Date: November 1, 1989 Revised: November 18, 2014 Policy Number: Operations 89-4 Distribution: Commissioner's Office Engineer's Office All Garages Number

More information

CITY OF PALM BEACH GARDENS

CITY OF PALM BEACH GARDENS CITY OF $72,805 Mdian Incom 222% Traditionally Undrsrvd 430% Growth from 2010 949% HS/GED 476% Bachlors 23,168 Housholds 587% Labor Forc Lak Okchob Palm Bach Gardns Palm Bach County Commutr Mod of Choic

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF JANUARY 3, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF JANUARY 3, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF JANUARY 3, 2018 AGENDA ITEM NO. 9 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final March 2018 bid opening for $112,025,914, the tentative

More information

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3 Page 1 of 12 Winter Operations Table of Contents WINTER CONTROL Objectives 2 WINTER CONTROL Season 3 SNOW ACCUMULATION Road Plowing 4,5 ICY ROADWAYS Application of Deicers/Abrasives 6 SNOW ACCUMULATION

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/22/2019 4:20:05 AM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

Washington State S. T. I. P to 2021 (Project Funds to Nearest Dollar)

Washington State S. T. I. P to 2021 (Project Funds to Nearest Dollar) ( Funds to Nearest Dollar) Agency: Bellingham Number PIN ID 17 5565(001) BHAM 40 28 0.210 CE Yes Mahogany Ave Cordata Elementary 1,951,200 Cordata Safe Routes to School Program The project includes bike

More information

APPENDIX IV MODELLING

APPENDIX IV MODELLING APPENDIX IV MODELLING Kingston Transportation Master Plan Final Report, July 2004 Appendix IV: Modelling i TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 OBJECTIVE... 1 3.0 URBAN TRANSPORTATION MODELLING

More information

FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT

FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT Incident Number: 2018-7477 Incident Name: Woodville Highway Closed Occurred: 12/6/2018 05:29 ET Reported to SWO: 12/6/2018

More information

Hillsborough County MPO Transit Study. Technical Team August 23, 2007

Hillsborough County MPO Transit Study. Technical Team August 23, 2007 Hillsborough County MPO Transit Study Technical Team August 23, 2007 Meeting Agenda Technology Choices Needs and Opportunities Transit Concepts Comparative Land Use Analysis Measures of Effectiveness System

More information

CITY OF MINOT SNOW REMOVAL PLAN October 2018

CITY OF MINOT SNOW REMOVAL PLAN October 2018 CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study

New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study Overview Prepared for: June 26, 2018 Introduction Overview of Pilot Study New Jersey s Climate New Jersey s Transportation

More information

TRANSPORTATION IMPROVEMENT PROGRAM

TRANSPORTATION IMPROVEMENT PROGRAM TRANSPORTATION IMPROVEMENT PROGRAM Fiscal Years 2015/16 2019/20 DRAFT APRIL 27, 2015 1022 Prudential Drive Jacksonville, FL 32207 T: (904) 306.7500 F: (904) 306.7501 www.northfloridatpo.com Table of Contents

More information

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS 3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS In order to better determine future roadway expansion and connectivity needs, future population growth and land development patterns were analyzed as part of

More information

East Bay BRT. Planning for Bus Rapid Transit

East Bay BRT. Planning for Bus Rapid Transit East Bay BRT Planning for Bus Rapid Transit Regional Vision Draper Prison The Bottleneck is a State-Level issue, Salt Lake County 2050 Population: 1.5M Draper Prison hopefully with some State-Level funding!

More information

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006 DRAFT TRAFFIC IMPACT STUDY FOR PHASED DEVELOPMENT OF TAMU CC Prepared for 3D/International, Inc. 1900 West Loop South, Suite 400 Houston, Texas 77027 November 2006 Interim Review Only Document Incomplete:

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/24/2019 5:16:03 PM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Quarterly Project Status Report May 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Construction of North Main Street Bridge by TxDOT s bridge contractor, Texas

More information

2012 Hurricane Preparedness Guide

2012 Hurricane Preparedness Guide 2012 Hurricane Preparedness Guide IMPORTANT TELEPHONE NUMBERS: Emergency 911 Hollywood Emergency Operations Center 954.967.4EOC(4362) Hollywood Police Department non-emergency 954.967.HELP (4357) Hollywood

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Quarterly Project Status Report September 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update TxDot s contractor has nearly completed the superstructure false work

More information

COUNCIL POLICY BACKGROUND

COUNCIL POLICY BACKGROUND COUNCIL POLICY Policy Title: Snow and Ice Control Policy Policy Number: TP004 Report Number: TTP2003-39, C2007-44, LPT2011-57 Approved by: City Council Effective Date: Interim policy approved 2009 December

More information

FHWA Peer Exchange Meeting on Transportation Systems Management during Inclement Weather

FHWA Peer Exchange Meeting on Transportation Systems Management during Inclement Weather Travel Demand Modeling & Simulation at GBNRTC Matt Grabau Kimberly Smith Mike Davis Why Model? Travel modeling is a tool for transportation planners and policy makers, to observe impacts of a transportation

More information

Metropolitan Transportation Authority Grants and Subsidies Report Covering Fiscal Year 2010

Metropolitan Transportation Authority Grants and Subsidies Report Covering Fiscal Year 2010 Metropolitan Transportation Authority Grants and Subsidies Report Covering Fiscal Year 2010 Submitted as part of the MTA 2010 Annual Report Pursuant to New York State Public Authorities Law Section 2800(1)(a)(2)(ii)

More information

Red River Levee Panel

Red River Levee Panel Red River Levee Panel Mississippi River Commission Monday, August 9, 2017 Red River Levees in LA & AR NONE along TX & OK Boarder Red River Levee Issues Caddo Levee Cherokee Park Authorization Bossier Levee

More information

CUSTER COUNTY SNOW REMOVAL PROCEDURES

CUSTER COUNTY SNOW REMOVAL PROCEDURES CUSER COUNY SNOW REMOVAL PROCEDURES Prioritization of Plow Routes County-maintained roads are plowed based upon the following prioritization criteria: 1. Arterial Roadways and School Bus routes: Arterial

More information

4. TEMPORARY ROAD CLOSURE MODIFICATION EMOND STREET MODIFICATION APPORTÉE À LA FERMETURE TEMPORAIRE DE LA RUE EMOND

4. TEMPORARY ROAD CLOSURE MODIFICATION EMOND STREET MODIFICATION APPORTÉE À LA FERMETURE TEMPORAIRE DE LA RUE EMOND 98 COMITÉ DES TRANSPORTS 4. TEMPORARY ROAD CLOSURE MODIFICATION EMOND STREET MODIFICATION APPORTÉE À LA FERMETURE TEMPORAIRE DE LA RUE EMOND COMMITTEE RECOMMENDATION That Council approve that the chain

More information

CLEARING THE WAY CAUTION. brampton.ca/snow

CLEARING THE WAY CAUTION. brampton.ca/snow CLEARING THE WAY CAUTION brampton.ca/snow Who clears the roads? Not all roads in Brampton are the responsibility of the City of Brampton. The Region of Peel does winter maintenance on the major roads highlighted

More information

Welcome to the Public Meeting Red Bluff Road from Kirby Boulevard to State Highway 146 Harris County, Texas CSJ No.: December 15, 2016

Welcome to the Public Meeting Red Bluff Road from Kirby Boulevard to State Highway 146 Harris County, Texas CSJ No.: December 15, 2016 Welcome to the Public Meeting Red Bluff Road from Kirby Boulevard to State Highway 146 Harris County, Texas CSJ No.: 0912-72-340 December 15, 2016 No formal presentation will be made. Seabrook Intermediate

More information

CAPTAIN S KEY DEPENDENT DISTRICT PALM BEACH COUNTY REGULAR BOARD MEETING NOVEMBER 14, :00 P.M.

CAPTAIN S KEY DEPENDENT DISTRICT PALM BEACH COUNTY REGULAR BOARD MEETING NOVEMBER 14, :00 P.M. CAPTAIN S KEY DEPENDENT DISTRICT PALM BEACH COUNTY REGULAR BOARD MEETING NOVEMBER 14, 2017 6:00 P.M. Special District Services, Inc. The Oaks Center 2501A Burns Road Palm Beach Gardens, FL 33410 www.captainskeydd.org

More information

INDOT Office of Traffic Safety

INDOT Office of Traffic Safety Intro to GIS Spatial Analysis INDOT Office of Traffic Safety Intro to GIS Spatial Analysis INDOT Office of Traffic Safety Kevin Knoke Section 130 Program Manager Highway Engineer II Registered Professional

More information

City of Camrose Winter Road Maintenance Policy

City of Camrose Winter Road Maintenance Policy City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.

More information

TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES

TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES Pursuant to RSA 231:92 a, the Thornton Board of Selectmen hereby establishes the following policy and procedure for winter

More information

The Highline Development Traffic Impact Study

The Highline Development Traffic Impact Study The Highline Development Traffic Impact Study Columbia Falls, Montana Prepared For: TD&H Engineering 450 Corporate Drive, Suite 101 Kalispell, MT 59901 June, 2018 130 South Howie Street Helena, Montana

More information

GIS ANALYSIS METHODOLOGY

GIS ANALYSIS METHODOLOGY GIS ANALYSIS METHODOLOGY No longer the exclusive domain of cartographers, computer-assisted drawing technicians, mainframes, and workstations, geographic information system (GIS) mapping has migrated to

More information

Project Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County

Project Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County Project Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County TIP No. U-2827 B WBS # 34872.1.1 June 2013 Prepared for North Carolina Department of Transportation Prepared by Project

More information

Town of Windsor. Department of Public Works

Town of Windsor. Department of Public Works Town of Windsor Department of Public Works 860.285.1855 TOWN OF WINDSOR PUBLIC WORKS SNOW REMOVAL PLAN In Windsor, as throughout the New England states, winter can bring a variety of weather conditions

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 Executive Summary Page 2.0 Introduction 2.1 DEVELOPMENT

More information

TRAINING ANNOUNCEMENT. Office of Homeland Security COURSE MGT-310

TRAINING ANNOUNCEMENT. Office of Homeland Security COURSE MGT-310 TRAINING ANNOUNCEMENT Office of Homeland Security COURSE MGT-310 WMD Threat and Risk Assessment September 12-14, 2007 0800-1600 SUNY Maritime College at Fort Schuyler 6 Pennyfield Avenue Baylis Hall, Throggs

More information

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan Town of Barnstable Department of Public Work Snow and Ice Control Operations Plan I. Mission: The mission of the Department of Public Works is to remove accumulations of snow and ice from town, county

More information