The Highline Development Traffic Impact Study

Size: px
Start display at page:

Download "The Highline Development Traffic Impact Study"

Transcription

1 The Highline Development Traffic Impact Study Columbia Falls, Montana Prepared For: TD&H Engineering 450 Corporate Drive, Suite 101 Kalispell, MT June, South Howie Street Helena, Montana

2 Table of Contents A. Executive Summary...1 B. Project Description...1 C. Existing Conditions...1 Adjacent Roadways...1 Traffic Data...3 Historic Data...3 Level of Service...4 D. Proposed Development...4 E. Trip Generation and Assignment...6 F. Trip Distribution...6 G. Traffic Impacts Outside of the Development...6 H. Impact Summary & Recommendations...8 List of Figures Figure 1 Proposed Development Site...2 Figure 2 Proposed Moonrise Meadows Subdivision...5 Figure 3 Trip Distribution...7 List of Tables Table 1 Historic Traffic Data...3 Table 2 Existing Level of Service Summary...4 Table 3 Trip Generation Rates...6 Table 4 Projected Level of Service Summary

3 A. EXECUTIVE SUMMARY The Highline Development Traffic Impact Study Columbia Falls, Montana The Highline development is a 13.8acre, 208 unit residential apartment complex located east of 3 rd Avenue in Columbia Falls, MT. At full build-out the project will produce up to 1,383 daily trips within the area. As proposed, The Highline development will increase traffic along 3 rd Avenue and 9 th Street but will not create any roadway capacity problems within the area under normal seasonal traffic conditions. Higher peak summer traffic conditions within the area will create some traffic congestion issues at the intersection of Highway 2 and 3 rd Avenue. It would be desirable to create separated southbound left- and right-turn lanes at the intersection of Highway 2 with 3 rd Avenue to improve traffic flow through the intersection under peak summer traffic conditions with Phase 2 of this development. B. PROJECT DESCRIPTION This document studies the possible effects on the surrounding road system from a proposed residential development located east of 3 rd Avenue in Columbia Falls, Montana. The development includes 208 residential apartment units on 13.8 acres of property on the eastern side of Columbia Falls. This document identifies any traffic mitigation efforts that the development may require. C. EXISTING CONDITIONS The proposed development property currently consists of a 13.8-acre parcel of undeveloped land located at the east end of Bills Lane. Bills Lane is accessed from 3 rd Avenue to the west. The topography in this area is mostly flat. See Figure 1 for a location map of the proposed development. Adjacent Roadways US Highway 2 is a five-lane east/west principal arterial highway which extends from Whitefish through Columbia Falls to Hungry Horse. Near 3 rd Street the road has a paved width of 96 feet with 12-foot driving lanes and sidewalks. The posted speed limit through Columbia Falls is 35 MPH and increases to 45 MPH at the city limits between Nucleus Avenue and 3 rd Avenue. Traffic data from MDT indicates the highway carried 14,300 VPD in Bills Lane is a local east/west route with an urban cross-section and a concrete sidewalk on the north side of the road. The lane has a paved width of 28 feet and a total length of 300 feet. Bills Lane provides access to five residential duplexes along the north side of the road. Bills 100

4 Lane is controlled with STOP signs at the intersection with 3 rd Avenue. Figure 1- Proposed Development Site The Highline = Study Intersection 3 rd Avenue East is a local north/south route which extends north from Highway 2. The road provides access to residential areas north of Highway 2. The road has a rural cross-section and a paved width of 26 feet with a posted speed limit of 25 MPH. 3 rd Avenue has an eight-foot paved pedestrian/bike trail that runs along the east side of the road south of 9 th Street and crosses to the west side of the road north of 9 th Street. 3 rd Ave is STOP controlled at the intersection with Highway 2. Traffic data collected by ATS in 2018 indicates the roadway carries 600 VPD. Nucleus Avenue/ Hwy 486 is a north/south route that extends north from Highway 2 in Columbia Falls and provides access to the commercial areas in the downtown area before extending into the Flathead National Forest. The road has a posted speed limit of 25 MPH through Columbia Falls. Nucleus Avenue has an urban three-lane cross-section at the intersections with 9th Street and a paved width of 55 feet. The intersections of Nucleus Avenue with Highway 2 is controlled with an actuated traffic signal. According to MDT Nucleus Avenue carried 7,500 VPD in th Street East is a local east/west route that provides access to the residential areas and a city park north of Highway 2. The road has a paved width of 22 to 26 feet. The intersection with 3 rd Avenue is controlled by STOP signs on 9th Street. The road has a short inclined section as 101

5 it approaches a STOP controlled T-intersection at Nucleus Avenue. Traffic data collected by ATS in 2018 indicates daily traffic volumes of 200 VPD on 9 th Street. Traffic Data Traffic data for this analysis was collected in June 2018 for the intersections near the proposed development site. Intersection traffic data was collected for the AM and PM peak hours at the intersections of Highway 2 with Nucleus Avenue and 3 rd Avenue and at the intersection of Nucleus Avenue with 9 th Street. Additional 48-hour traffic counts were conducted on 3 rd Avenue and 9 th Street. This data was reviewed for seasonal variation patterns in accordance with the data collected from MDT s annual count stations on Highway 2 west of Kalispell (Station A-24) and Highway 2 north of Columbia (Station A-60). These count stations indicated that data collected in June is 119%-149% of the AADT (Average Annual Daily Traffic) volume in this area. For the purposes of this report the seasonal correction factor of 119% was used to assess the average peak-hour traffic conditions for the area intersections. The raw data is included in Appendix A. Generally, traffic analysis is performed using annual average traffic volumes unless significant seasonal variations exist. In this case, traffic volumes in the Flathead Valley can peak at 124% to 210% of the annual average during the month of July. While it may not be necessary to design roadways based on the heaviest use conditions, these conditions should be considered when developing roadway improvement plans. Historic Traffic Data Abelin Traffic Services obtained historic traffic data for area roadways. This data is presented in Table 1. The traffic data history for this area indicates that traffic volumes on the roadways within Columbia Falls have increased at an annual rate of 1.5% over the last ten years. Traffic volumes on Nucleus Avenue have increased at a lower rate than traffic volumes on Highway 2. Table 1 Historic Average Daily Traffic Data Location US Hwy 2 E of Nucleus Ave 12,760 13,220 13,540 10,360 10,920 11,240 11,520 12,660 14,557 14,324 #15-4A-031 US Hwy 2 btwn 1st & 2nd Ave W 12,380 13,990 14,900 13,090 14,190 12,990 13,840 14,490 18,157 17,072 #15-4A-030 Nucleus Ave btwn 8th & 9th #15-4A-032 7,670 7,290 7,270 7,350 6,050 6,300 6,260 6,770 7,220 7,

6 Level of Service Using the data collected for this project, ATS conducted a Level of Service (LOS) analysis at area intersections. This evaluation was conducted in accordance with the procedures outlined in the Transportation Research Board s Highway Capacity Manual (HCM) - Special Report 209 and utilized the Highway Capacity Software (HCS) version 7.5. Intersections are graded from A to F representing the average delay that a vehicle entering an intersection can expect. Typically, a LOS of C or better is considered acceptable for peak-hour conditions. Table 2 shows the existing LOS for the AM and PM peak hours without the traffic from the proposed development. The LOS calculations are included in Appendix C. The table shows that the existing intersections are currently operating within acceptable limits and are operating with minimal delay under average traffic conditions. No intersection modifications are currently needed in this area to improve capacity. No detailed LOS calculations were made for the intersection of 9 th Street and 3 rd Avenue due to the relatively low traffic volumes on these roads. Based on the peak-hour traffic volumes recorded on 9 th Street and 3 rd Avenue, the LOS at this two-way STOP controlled intersection is LOS A. Table 2 Existing Level of Service Summary AM Peak Hour PM Peak Hour Intersection Delay (Sec.) LOS Delay (Sec.) LOS Nucleus Ave. & 9 th St B 13.0 B Nucleus Ave. & Hwy B 12.4 B Hwy 2 & 3 rd Ave B 14.0 B D. PROPOSED DEVELOPMENT The development currently under consideration for this site includes 13.8 acres of land located east of 3 rd Avenue which would be developed into a 208-unit residential apartment complex. The development would include six apartment buildings located at the east of Bills Lane. Access to The Highline residential subdivision will be provided through a connection with Bills Lane to the west. Although the development will be located adjacent to Park Avenue to the east, no connection will be made between The Highline and Park Avenue due to an existing area of wetlands between the properties. The Highline development will include nine acres of open space and a central common with a playground and tennis courts. The project will be constructed in three phases with 1/3 of the units (two building) constructed in each phase. It is anticipated that the first phase of The Highline will be fully constructed Subsequent phases will be constructed based on occupancy and demand. The Highline residential development site plan is shown in Figure

7 Figure 2 Proposed Highline Residential Development 104

8 E. TRIP GENERATION AND ASSIGNMENT ATS performed a trip generation analysis to determine the anticipated future traffic volumes from the proposed developments using the trip generation rates contained in Trip Generation (Institute of Transportation Engineers, Tenth Edition). These rates are the national standard and are based on the most current information available to planners. A vehicle trip is defined as any trip that either begins or ends at the development site. ATS determined that the critical traffic impacts on the intersections and roadways would occur during the weekday morning and evening peak hours. According to the ITE trip generation rates, at full build-out the development would produce 106 AM peak hour trips, 129 PM peak hour trips, and 1,383 daily trips. See Table 3 for detailed trip generation information. Land Use Units Table 3 - Trip Generation Rates AM Peak Hour Trip Ends per Unit Total AM Peak Hour Trip Ends PM Peak Hour Trip Ends per Unit Total PM Peak Hour Trip Ends Weekday Trip Ends per Unit Total Weekday Trip Ends Apartment (ITE # 220) ,383 F. TRIP DISTRIBUTION The traffic distribution and assignment for the proposed development was based upon the existing ADT volumes along the adjacent roadways and the peak-hour turning volumes. Traffic is expected to distribute onto the surrounding road network as shown on Figure 3. G. TRAFFIC IMPACTS OUTSIDE OF THE DEVELOPMENT Using the trip generation and trip distribution numbers, ATS determined the future Level of Service for the area intersections. The anticipated intersection LOS with The Highline is shown in Table 4. The LOS calculations are included in Appendix C of this report. 105

9 Figure 3 Trip Distribution 24% 1% 50% Nucleus Avenue 9 th Street 3 rd Avenue The Highline 25% Table 4 indicates that the construction of The Highline residential subdivision will not cause any roadway capacity problems along Highway 2 or Nucleus Avenue under normal traffic conditions. The development will increase traffic on the local road network by 10% at the intersections on Highway 2, but all intersections will continue to function at LOS C or better at full buildout of the project under average annual traffic conditions. Traffic volumes on 3 rd Avenue will increase to approximately 2,000 VPD, but it is generally expected that local urban roadways can handle over 5,000 VPD. Peak-hour traffic volumes on 9 th Avenue will increase to 500 VPD. Note that the projected LOS at the intersection of Nucleus Avenue and 9 th Street improves slightly with the proposed development due to an increased number of right-turning vehicles driving down the average delay from the low-volume approach. Table 4 Future Level of Service Summary AM Peak Hour PM Peak Hour Intersection Delay (Sec.) LOS Delay (Sec.) LOS Nucleus Ave. & 9 th St B 12.1 B Nucleus Ave. & Hwy B 12.6 B Hwy 2 & 3 rd Ave B 16.2 C 106

10 A peak season analysis was also performed by increasing traffic volumes at the affected intersection by 100 percent to evaluate if any LOS issues will occur under heavy summer traffic loading. This analysis indicated that traffic operations at the intersection of Highway 2 with Nucleus Avenue will be largely unaffected. However, the intersection of Highway 2 and 3 rd Avenue may fall to LOS E under these conditions It would be desirable to create separated southbound left and right-turn lanes at the intersection of Highway 2 with 3 rd Avenue to help improve traffic flow through the intersection under peak summer traffic conditions. This improvement will be necessary to help moderate peak summer demand past Phase 1 of the development. H. IMPACT SUMMARY & RECOMMENDATIONS As proposed, The Highline development will increase traffic along 3 rd Avenue and 9 th Street but will not create any roadway capacity problems within the area under normal seasonal traffic conditions. Higher peak summer traffic conditions within the area will create some traffic congestion issues at the intersection of Highway 2 and 3 rd Avenue. It would be desirable to create separated southbound left- and right-turn lanes at the intersection of Highway 2 with 3 rd Avenue to improve traffic flow through the intersection under peak summer traffic conditions with Phase 2 of this development. 107

11 APPENDIX A Traffic Data 108

12 Abelin Traffic Services 130 S. Howie Street Helena, MT File Name : nucluesam Site Code : Start Date : 6/13/2018 Page No : 1 Groups Printed- Unshifted - Bank 1 NUCLEUS Southbound HWY 2 Westbound NUCLEUS Northbound HWY 2 Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total 07:30 AM :45 AM Total :00 AM :15 AM Grand Total Apprch % Total % Unshifted % Unshifted Bank % Bank

13 Abelin Traffic Services 130 S. Howie Street Helena, MT File Name : nucluespm Site Code : Start Date : 6/11/2018 Page No : 1 Groups Printed- Unshifted - Bank 1 NUCLEUS Southbound HWY 2 Westbound NUCLEUS Northbound HWY 2 Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total 04:30 PM :45 PM Total :00 PM :15 PM Grand Total Apprch % Total % Unshifted % Unshifted Bank % Bank

14 Abelin Traffic Services 130 S. Howie Street Helena, MT File Name : 9th Site Code : Start Date : 6/13/2018 Page No : 1 Groups Printed- Bank 2 NUCLEUS 9TH NUCLEUS 9TH Southbound Westbound Northbound Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total 07:30 AM :45 AM Total :00 AM :15 AM Grand Total Apprch % Total %

15 Abelin Traffic Services 130 S. Howie Street Helena, MT File Name : 9thPM Site Code : Start Date : 6/11/2018 Page No : 1 Groups Printed- Bank 2 NUCLEUS 9TH NUCLEUS 9TH Southbound Westbound Northbound Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total 04:30 PM :45 PM Total :00 PM :15 PM Grand Total Apprch % Total %

16 Abelin Traffic Services 130 S. Howie Street Helena, MT File Name : 3rdAM Site Code : Start Date : 6/13/2018 Page No : 1 Groups Printed- Unshifted - Bank 1 - Bank 2 3RD Southbound HWY2 Westbound 3RD Northbound HWY2 Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total 07:30 AM :45 AM Total :00 AM :15 AM Grand Total Apprch % Total % Unshifted % Unshifted Bank % Bank Bank % Bank

17 Abelin Traffic Services 130 S. Howie Street Helena, MT File Name : 3rdpm Site Code : Start Date : 6/11/2018 Page No : 1 Groups Printed- Unshifted - Bank 1 - Bank 2 3RD Southbound HWY 2 Westbound 3RD Northbound HWY 2 Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total 04:30 PM :45 PM Total :00 PM :15 PM Grand Total Apprch % Total % Unshifted % Unshifted Bank % Bank Bank % Bank

18 Basic Volume Report: 3RD CFALLS Station ID : 3RD CFALLS Info Line 1 : ATS Info Line 2 : Unicorn #4 GPS Lat/Lon : DB File : 3RD CFALLS.DB Last Connected Device Type : Version Number : Serial Number : Number of Lanes : Posted Speed Limit : Unic-L mph Lane #1 Configuration # Dir. Information Volume Mode Volume Sensors Divide By 2 Comment 1. NB Normal Axle Yes Lane #1 Basic Volume Data From: 15:00-06/11/2018 To: 08:59-06/13/2018 Date DW Total Month Total : Percent : ADT : M T W % 0% 1% 0% 0% 1% 3% 4% 7% 3% 3% 3% 5% 4% 3% 10% 12% 11% 10% 9% 5% 3% 3% 2% DW Totals : # Days : ADT : Percent : Sun Mon Tue Wed Thu Fri Sat % 31% 62% 8% 0% 0% 0% Weekday (Mon-Fri) : ADT : Weekend (Sat-Sun) : ADT : Total Percent % % 0 Centurion Basic Volume Report Printed: 06/19/18 Page 1 115

19 Basic Volume Report: 9TH CFALLS Station ID : 9TH CFALLS Info Line 1 : ATS Info Line 2 : UNICORN 1 GPS Lat/Lon : DB File : 9TH CFALLS.DB Last Connected Device Type : Version Number : Serial Number : Number of Lanes : Posted Speed Limit : Unic-L mph Lane #1 Configuration # Dir. Information Volume Mode Volume Sensors Divide By 2 Comment 1. E/W Normal Axle Yes Lane #1 Basic Volume Data From: 16:00-06/11/2018 To: 08:59-06/13/2018 Date DW Total Month Total : Percent : ADT : M T W % 0% 0% 1% 1% 2% 2% 4% 7% 4% 5% 3% 4% 2% 3% 5% 11% 14% 10% 7% 8% 4% 2% 1% DW Totals : # Days : ADT : Percent : Sun Mon Tue Wed Thu Fri Sat % 24% 66% 10% 0% 0% 0% Weekday (Mon-Fri) : ADT : Weekend (Sat-Sun) : ADT : Total Percent % % 0 Centurion Basic Volume Report Printed: 06/19/18 Page 1 116

20 APPENDIX B Traffic Model 117

21 Colombia Falls Existing Traffic Seasaonal Correction Factor 0.84 The Highline Peak AM Hour Nucleus 3rd LOS: B th Bills LOS: B Hwy LOS: B 10.3 Peak PM Hour Nucleus 3rd LOS: B th Bills LOS: B Hwy LOS: B

22 Columbia Falls Site Generated Traffic The Highline AM Model Nucleus 3rd Ave East 15 ## # 0 ### 4 1 ## 16 0 # # 9th 0 ## 1 # # 4 0 # # IN 21 # 4 68 # Bill's OUT # ## # # ### 5 43 ## 48 # # 48 Hwy 2 ### 43 PM Model Nucleus 3rd Ave East 8 ## # 1 ### 15 0 ## 9 0 # # 9th 1 ## 0 # # 16 0 # # IN # # Bill's OUT # ## # # ### 5 23 ## 25 # # 47 Hwy 2 ###

23 Colombia Falls Total Projected Traffic The Highline Projected AM Hour Nucleus 3rd LOS: B th Bills LOS:B Hwy Projected PM Hour Nucleus LOS: B rd LOS: B th Bills LOS: B Hwy LOS: C

24 APPENDIX C LOS Calculations 121

25 HCS7 Signalized Intersection Results Summary General Information Intersection Information Agency ATS Duration, h 0.25 Analyst RLA Analysis Date Jun 15, 2018 Area Type Other Jurisdiction MDT Time Period AM Projected Peak PHF 1.00 Urban Street Nucleus Analysis Year 2018 Analysis Period 1> 7:00 Intersection Hwy 2 File Name Nucleus and Hwy2 AM_with.xus Project Description The Highline Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h Signal Information Cycle, s 90.0 Reference Phase 2 Offset, s 0 Reference Point End Uncoordinated No Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Green Yellow Red Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase Case Number Phase Duration, s Change Period, ( Y+R c ), s Max Allow Headway ( MAH ), s Queue Clearance Time ( g s ), s Green Extension Time ( g e ), s Phase Call Probability Max Out Probability Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement Adjusted Flow Rate ( v ), veh/h Adjusted Saturation Flow Rate ( s ), veh/h/ln Queue Service Time ( g s ), s Cycle Queue Clearance Time ( g c ), s Green Ratio ( g/c ) Capacity ( c ), veh/h Volume-to-Capacity Ratio ( X ) Back of Queue ( Q ), ft/ln ( 50 th percentile) Back of Queue ( Q ), veh/ln ( 50 th percentile) Queue Storage Ratio ( RQ ) ( 50 th percentile) Uniform Delay ( d 1 ), s/veh Incremental Delay ( d 2 ), s/veh Initial Queue Delay ( d 3 ), s/veh Control Delay ( d ), s/veh Level of Service (LOS) A A A A D D Approach Delay, s/veh / LOS 3.1 A 6.2 A D Intersection Delay, s/veh / LOS 11.7 B Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 0.63 A 1.86 B 2.15 B 2.31 B Bicycle LOS Score / LOS 0.86 A 0.87 A F Copyright 2018 University of Florida, All Rights Reserved. HCS Streets Version 7.5 Generated: 6/28/ :33:40 PM

26 HCS7 Signalized Intersection Results Summary General Information Intersection Information Agency ATS Duration, h 0.25 Analyst RLA Analysis Date Jun 15, 2018 Area Type Other Jurisdiction MDT Time Period PM Projected Peak PHF 1.00 Urban Street Nucleus Analysis Year 2018 Analysis Period 1> 7:00 Intersection Hwy 2 File Name Nucleus and Hwy2 PM.xus Project Description The Highline Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h Signal Information Cycle, s 90.0 Reference Phase 2 Offset, s 0 Reference Point End Uncoordinated No Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Green Yellow Red Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase Case Number Phase Duration, s Change Period, ( Y+R c ), s Max Allow Headway ( MAH ), s Queue Clearance Time ( g s ), s Green Extension Time ( g e ), s Phase Call Probability Max Out Probability Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement Adjusted Flow Rate ( v ), veh/h Adjusted Saturation Flow Rate ( s ), veh/h/ln Queue Service Time ( g s ), s Cycle Queue Clearance Time ( g c ), s Green Ratio ( g/c ) Capacity ( c ), veh/h Volume-to-Capacity Ratio ( X ) Back of Queue ( Q ), ft/ln ( 50 th percentile) Back of Queue ( Q ), veh/ln ( 50 th percentile) Queue Storage Ratio ( RQ ) ( 50 th percentile) Uniform Delay ( d 1 ), s/veh Incremental Delay ( d 2 ), s/veh Initial Queue Delay ( d 3 ), s/veh Control Delay ( d ), s/veh Level of Service (LOS) A A A A D D Approach Delay, s/veh / LOS 3.8 A 7.6 A D Intersection Delay, s/veh / LOS 12.4 B Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 0.64 A 1.87 B 2.15 B 2.31 B Bicycle LOS Score / LOS 1.08 A 0.99 A F Copyright 2018 University of Florida, All Rights Reserved. HCS Streets Version 7.5 Generated: 6/28/ :34:52 PM

27 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst RLA Intersection Nucleus & Ninth Agency/Co. Abelin Traffic Services Jurisdiction Columbia Falls Date Performed 6/27/2018 East/West Street Ninth St. Analysis Year 2018 North/South Street Nucleus Ave. Time Analyzed AM Peak Hour Peak Hour Factor 1.00 Intersection Orientation North-South Analysis Time Period (hrs) 0.25 Project Description Lanes Highline Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority U U Number of Lanes Configuration LR TR L T Volume (veh/h) Percent Heavy Vehicles (%) Proportion Time Blocked Percent Grade (%) 6 Right Turn Channelized Median Type Storage Critical and Follow-up Headways Undivided Base Critical Headway (sec) Critical Headway (sec) Base Follow-Up Headway (sec) Follow-Up Headway (sec) Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) 10 3 Capacity, c (veh/h) v/c Ratio % Queue Length, Q₉₅ (veh) Control Delay (s/veh) Level of Service (LOS) B A Approach Delay (s/veh) Approach LOS B Copyright 2018 University of Florida. All Rights Reserved. HCS TWSC Version 7.5 Generated: 6/28/2018 2:09:53 PM NucleusAM.xtw 124

28 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst RLA Intersection Nucleus & Ninth Agency/Co. Abelin Traffic Services Jurisdiction Columbia Falls Date Performed 6/28/2018 East/West Street Ninth St. Analysis Year 2018 North/South Street Nucleus Ave. Time Analyzed PM Peak Hour Peak Hour Factor 1.00 Intersection Orientation North-South Analysis Time Period (hrs) 0.25 Project Description Lanes Highline Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority U U Number of Lanes Configuration LR TR L T Volume (veh/h) Percent Heavy Vehicles (%) Proportion Time Blocked Percent Grade (%) 6 Right Turn Channelized Median Type Storage Critical and Follow-up Headways Undivided Base Critical Headway (sec) Critical Headway (sec) Base Follow-Up Headway (sec) Follow-Up Headway (sec) Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) 6 3 Capacity, c (veh/h) v/c Ratio % Queue Length, Q₉₅ (veh) Control Delay (s/veh) Level of Service (LOS) B A Approach Delay (s/veh) Approach LOS B Copyright 2018 University of Florida. All Rights Reserved. HCS TWSC Version 7.5 Generated: 6/28/2018 2:11:12 PM NucleusPM.xtw 125

29 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst RLA Intersection Hwy 2 & 3rd st E. Agency/Co. Abelin Traffic Services Jurisdiction Columbia Falls Date Performed 6/27/2018 East/West Street Hwy 2 Analysis Year 2018 North/South Street 3rd St. E. Time Analyzed AM Peak Hour Peak Hour Factor 1.00 Intersection Orientation East-West Analysis Time Period (hrs) 0.25 Project Description Lanes Highline Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U U Number of Lanes Configuration L T T TR LR Volume (veh/h) Percent Heavy Vehicles (%) Proportion Time Blocked Percent Grade (%) 0 Right Turn Channelized Median Type Storage Critical and Follow-up Headways Undivided Base Critical Headway (sec) Critical Headway (sec) Base Follow-Up Headway (sec) Follow-Up Headway (sec) Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) Capacity, c (veh/h) v/c Ratio % Queue Length, Q₉₅ (veh) Control Delay (s/veh) Level of Service (LOS) A B Approach Delay (s/veh) Approach LOS B Copyright 2018 University of Florida. All Rights Reserved. HCS TWSC Version 7.5 Generated: 6/28/2018 2:07:30 PM 3rdAM.xtw 126

30 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst RLA Intersection Hwy 2 & 3rd st E. Agency/Co. Abelin Traffic Services Jurisdiction Columbia Falls Date Performed 6/27/2018 East/West Street Hwy 2 Analysis Year 2018 North/South Street 3rd St. E. Time Analyzed PM Peak Hour Peak Hour Factor 1.00 Intersection Orientation East-West Analysis Time Period (hrs) 0.25 Project Description Lanes West Bank Flats Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U U Number of Lanes Configuration L T T TR LR Volume (veh/h) Percent Heavy Vehicles (%) Proportion Time Blocked Percent Grade (%) 0 Right Turn Channelized Median Type Storage Critical and Follow-up Headways Undivided Base Critical Headway (sec) Critical Headway (sec) Base Follow-Up Headway (sec) Follow-Up Headway (sec) Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) Capacity, c (veh/h) v/c Ratio % Queue Length, Q₉₅ (veh) Control Delay (s/veh) Level of Service (LOS) A B Approach Delay (s/veh) Approach LOS B Copyright 2018 University of Florida. All Rights Reserved. HCS TWSC Version 7.5 Generated: 6/28/2018 2:08:43 PM 3rdPM.xtw 127

31 HCS7 Signalized Intersection Results Summary General Information Intersection Information Agency ATS Duration, h 0.25 Analyst RLA Analysis Date Jun 15, 2018 Area Type Other Jurisdiction MDT Time Period AM Projected Peak PHF 1.00 Urban Street Nucleus Analysis Year 2018 Analysis Period 1> 7:00 Intersection Hwy 2 File Name Nucleus and Hwy2 AM_with.xus Project Description The Highline Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h Signal Information Cycle, s 90.0 Reference Phase 2 Offset, s 0 Reference Point End Uncoordinated No Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Green Yellow Red Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase Case Number Phase Duration, s Change Period, ( Y+R c ), s Max Allow Headway ( MAH ), s Queue Clearance Time ( g s ), s Green Extension Time ( g e ), s Phase Call Probability Max Out Probability Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement Adjusted Flow Rate ( v ), veh/h Adjusted Saturation Flow Rate ( s ), veh/h/ln Queue Service Time ( g s ), s Cycle Queue Clearance Time ( g c ), s Green Ratio ( g/c ) Capacity ( c ), veh/h Volume-to-Capacity Ratio ( X ) Back of Queue ( Q ), ft/ln ( 50 th percentile) Back of Queue ( Q ), veh/ln ( 50 th percentile) Queue Storage Ratio ( RQ ) ( 50 th percentile) Uniform Delay ( d 1 ), s/veh Incremental Delay ( d 2 ), s/veh Initial Queue Delay ( d 3 ), s/veh Control Delay ( d ), s/veh Level of Service (LOS) A A A A D D Approach Delay, s/veh / LOS 3.1 A 6.2 A D Intersection Delay, s/veh / LOS 11.7 B Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 0.63 A 1.86 B 2.15 B 2.31 B Bicycle LOS Score / LOS 0.86 A 0.87 A F Copyright 2018 University of Florida, All Rights Reserved. HCS Streets Version 7.5 Generated: 6/28/ :33:40 PM

32 HCS7 Signalized Intersection Results Summary General Information Intersection Information Agency ATS Duration, h 0.25 Analyst RLA Analysis Date Jun 15, 2018 Area Type Other Jurisdiction MDT Time Period PM Projected Peak PHF 1.00 Urban Street Nucleus Analysis Year 2018 Analysis Period 1> 7:00 Intersection Hwy 2 File Name Nucleus and Hwy2 PM_with.xus Project Description The Highline Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h Signal Information Cycle, s 90.0 Reference Phase 2 Offset, s 0 Reference Point End Uncoordinated No Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Green Yellow Red Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase Case Number Phase Duration, s Change Period, ( Y+R c ), s Max Allow Headway ( MAH ), s Queue Clearance Time ( g s ), s Green Extension Time ( g e ), s Phase Call Probability Max Out Probability Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement Adjusted Flow Rate ( v ), veh/h Adjusted Saturation Flow Rate ( s ), veh/h/ln Queue Service Time ( g s ), s Cycle Queue Clearance Time ( g c ), s Green Ratio ( g/c ) Capacity ( c ), veh/h Volume-to-Capacity Ratio ( X ) Back of Queue ( Q ), ft/ln ( 50 th percentile) Back of Queue ( Q ), veh/ln ( 50 th percentile) Queue Storage Ratio ( RQ ) ( 50 th percentile) Uniform Delay ( d 1 ), s/veh Incremental Delay ( d 2 ), s/veh Initial Queue Delay ( d 3 ), s/veh Control Delay ( d ), s/veh Level of Service (LOS) A A A A D D Approach Delay, s/veh / LOS 4.4 A 7.7 A D Intersection Delay, s/veh / LOS 12.6 B Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 0.64 A 1.87 B 2.15 B 2.31 B Bicycle LOS Score / LOS 1.11 A 1.02 A F Copyright 2018 University of Florida, All Rights Reserved. HCS Streets Version 7.5 Generated: 6/28/ :35:24 PM

33 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst RLA Intersection Nucleus & Ninth Agency/Co. Abelin Traffic Services Jurisdiction Columbia Falls Date Performed 6/27/2018 East/West Street Ninth St. Analysis Year 2018 North/South Street Nucleus Ave. Time Analyzed AM Projected Peak Hour Peak Hour Factor 1.00 Intersection Orientation North-South Analysis Time Period (hrs) 0.25 Project Description Lanes Highline Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority U U Number of Lanes Configuration LR TR L T Volume (veh/h) Percent Heavy Vehicles (%) Proportion Time Blocked Percent Grade (%) 6 Right Turn Channelized Median Type Storage Critical and Follow-up Headways Undivided Base Critical Headway (sec) Critical Headway (sec) Base Follow-Up Headway (sec) Follow-Up Headway (sec) Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) 27 7 Capacity, c (veh/h) v/c Ratio % Queue Length, Q₉₅ (veh) Control Delay (s/veh) Level of Service (LOS) B A Approach Delay (s/veh) Approach LOS B Copyright 2018 University of Florida. All Rights Reserved. HCS TWSC Version 7.5 Generated: 6/28/2018 2:10:41 PM NucleusAMwith.xtw 130

34 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst RLA Intersection Nucleus & Ninth Agency/Co. Abelin Traffic Services Jurisdiction Columbia Falls Date Performed 6/28/2018 East/West Street Ninth St. Analysis Year 2018 North/South Street Nucleus Ave. Time Analyzed PM Projected Peak Hour Peak Hour Factor 1.00 Intersection Orientation North-South Analysis Time Period (hrs) 0.25 Project Description Lanes Highline Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority U U Number of Lanes Configuration LR TR L T Volume (veh/h) Percent Heavy Vehicles (%) Proportion Time Blocked Percent Grade (%) 6 Right Turn Channelized Median Type Storage Critical and Follow-up Headways Undivided Base Critical Headway (sec) Critical Headway (sec) Base Follow-Up Headway (sec) Follow-Up Headway (sec) Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) Capacity, c (veh/h) v/c Ratio % Queue Length, Q₉₅ (veh) Control Delay (s/veh) Level of Service (LOS) B A Approach Delay (s/veh) Approach LOS B Copyright 2018 University of Florida. All Rights Reserved. HCS TWSC Version 7.5 Generated: 6/28/2018 2:11:38 PM NucleusPMwith.xtw 131

35 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst RLA Intersection Hwy 2 & 3rd st E. Agency/Co. Abelin Traffic Services Jurisdiction Columbia Falls Date Performed 6/27/2018 East/West Street Hwy 2 Analysis Year 2018 North/South Street 3rd St. E. Time Analyzed AM Projected Peak Hour Peak Hour Factor 1.00 Intersection Orientation East-West Analysis Time Period (hrs) 0.25 Project Description Lanes Highline Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U U Number of Lanes Configuration L T T TR LR Volume (veh/h) Percent Heavy Vehicles (%) Proportion Time Blocked Percent Grade (%) 0 Right Turn Channelized Median Type Storage Critical and Follow-up Headways Undivided Base Critical Headway (sec) Critical Headway (sec) Base Follow-Up Headway (sec) Follow-Up Headway (sec) Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) Capacity, c (veh/h) v/c Ratio % Queue Length, Q₉₅ (veh) Control Delay (s/veh) Level of Service (LOS) A B Approach Delay (s/veh) Approach LOS B Copyright 2018 University of Florida. All Rights Reserved. HCS TWSC Version 7.5 Generated: 6/28/2018 2:08:06 PM 3rdAMwith.xtw 132

36 HCS7 Two-Way Stop-Control Report General Information Site Information Analyst RLA Intersection Hwy 2 & 3rd st E. Agency/Co. Abelin Traffic Services Jurisdiction Columbia Falls Date Performed 6/27/2018 East/West Street Hwy 2 Analysis Year 2018 North/South Street 3rd St. E. Time Analyzed PM Projected Peak Hour Peak Hour Factor 1.00 Intersection Orientation East-West Analysis Time Period (hrs) 0.25 Project Description Lanes West Bank Flats Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U U Number of Lanes Configuration L T T TR LR Volume (veh/h) Percent Heavy Vehicles (%) Proportion Time Blocked Percent Grade (%) 0 Right Turn Channelized Median Type Storage Critical and Follow-up Headways Undivided Base Critical Headway (sec) Critical Headway (sec) Base Follow-Up Headway (sec) Follow-Up Headway (sec) Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) Capacity, c (veh/h) v/c Ratio % Queue Length, Q₉₅ (veh) Control Delay (s/veh) Level of Service (LOS) A C Approach Delay (s/veh) Approach LOS C Copyright 2018 University of Florida. All Rights Reserved. HCS TWSC Version 7.5 Generated: 6/28/2018 2:09:27 PM 3rdPMwith.xtw 133

37 134

38 135

39 136

40 137

41 138

42 139

43 140

44 141

45 142

46 143

47 144

48 145

49 146

50 147

51 148

52 149

53 150

54 151

55 152

56 153

57 154

58 155

59 156

60 157

61 158

62 159

63 160

64 161

65 162

66 163

67 164

68 165

69 166

70 167

71 168

72 169

73 170

74 171

75 172

76 173

77 174

78 175

79 176

80 177

81 178

82 179

83 180

84 181

85 182

86 183

87 184

88 185

89 186

90 187

91 188

92 189

93 190

94 191

95 192

96 193

97 194

98 195

99 196

100 197

101 198

102 199

103 200

104 201

105 202

106 203

107 204

108 205

109 206

110 207

111 208

112 209

113 210

114 211

115 212

116 213

117 214

118 215

119 216

120 217

121 218

122 219

123 220

124 221

125 222

126 223

127 224

128 225

129 226

130 227

131 228

132 229

133 230

134 231

135 232

136 233

137 234

138 235

139 236

140 237

141 238

142 239

143 240

144 241

145 242

146 243

147 244

148 245

149 246

150 247

151 248

152 249

153 250

154 251

155 252

156 253

157 254

158 255

159 256

160 257

161 258

162 259

163 260

164 261

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 Executive Summary Page 2.0 Introduction 2.1 DEVELOPMENT

More information

TRAFFIC IMPACT STUDY MANUFACTURING COMPANY

TRAFFIC IMPACT STUDY MANUFACTURING COMPANY TRAFFIC IMPACT STUDY For MANUFACTURING COMPANY Prepared For: Airway Heights, WA Prepared By: SUNBURST ENGINEERING, P. S. 4310 S. Ball Dr. Veradale, WA 99037 April, 2013 TRAFFIC IMP ACT STUDY Manufacturing

More information

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone: JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH 45243 Email: jackpflum1@gmail.com Telephone: 513.919.7814 MEMORANDUM REPORT Traffic Impact Analysis Proposed Soccer

More information

LIC SR INTERCHANGE OPERATIONS STUDY

LIC SR INTERCHANGE OPERATIONS STUDY LIC SR 16 18.20 - INTERCHANGE OPERATIONS STUDY Project Summary Location SR 16 & W. Church St. Interchange Newark, Ohio Licking County PID 99478 Study Sponsor ODOT District 5 Proposed Work Add Left Turn

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY TERRE HAUTE CONVENTION CENTER WABASH AVENUE & 9 TH STREET TERRE HAUTE, INDIANA PREPARED FOR 8365 Keystone Crossing, Suite 201 Indianapolis, IN 46240 Phone: (317) 202-0864 Fax: (317)

More information

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For TRAFFIC IMPACT STUDY For Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) February 2015 Revised: August 2015 April 2016 July 2016 September 2016 Prepared for: KB Home

More information

Airline Road: is a two lane residential roadway adjacent to the west side of the proposed school site with a speed limit of 30 mph.

Airline Road: is a two lane residential roadway adjacent to the west side of the proposed school site with a speed limit of 30 mph. HIGHLAND PARK ISD TRAFFIC IMPACT STUDY REPORT FOR PROPOSED HPISD ELEMENTARY SCHOOL SITE ON NORTHWEST HIGHWAY BETWEEN AIRLINE ROAD AND DURHAM IN THE CITY OF DALLAS, TEXAS PURPOSE OF STUDY The purpose of

More information

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management Transportation Impact Analysis Market Street PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for TerraPointe Services, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc.

More information

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections:

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections: MEMORANDUM DATE: JULY 6, 2012 TO: FROM: RE: CC: MELANIE KNIGHT BRAD BYVELDS/ JENNIFER LUONG 1050 SOMERSET STREET PRELIMINARY TRAFFIC ANALYSIS OUR FILE NO. 111152 NEIL MALHOTRA The purpose of this memo

More information

Per your request and authorization, we have prepared this traffic evaluation for the above referenced project.

Per your request and authorization, we have prepared this traffic evaluation for the above referenced project. Memorandum To: From: Re: Marc Stout, P.E. City Engineer, City of Roseville Chris Gregerson, P.E., T.E. Matt Weir, P.E., T.E., PTOE Douglas Boulevard Coffee Kiosk Traffic Evaluation Roseville, California

More information

Appendix C Traffic Study

Appendix C Traffic Study Final Environmental Impact Statement Appendix C Traffic Study Schofield Generating Station Project, Hawaii October 2015 C-1 Final Environmental Impact Statement This page intentionally left blank. Schofield

More information

Traffic Impact Study

Traffic Impact Study Traffic Impact Study Statham DRI One University Parkway Prepared for: Barrow County Prepared by: October 2012 Table of Contents Executive Summary i Section 1. Introduction 1 Project Description 1 Methodology

More information

Brandywine Road Speed Study FINAL REPORT

Brandywine Road Speed Study FINAL REPORT Brandywine Road Speed Study FINAL REPORT City of Albuquerque Brandywine Road Speed Study Final Report Albuquerque, New Mexico City of Albuquerque May, 2016 Brandywine Road Speed Study Final Report City

More information

TRANSPORTATION IMPACT STUDY WHEELER STREET CLOSURE

TRANSPORTATION IMPACT STUDY WHEELER STREET CLOSURE TRANSPORTATION IMPACT STUDY WHEELER STREET CLOSURE Village of Greene, Chenango County, New York Prepared for: VILLAGE OF GREENE 49 Genesee Street Greene, NY 13778 Prepared by: LARSON DESIGN GROUP 1000

More information

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Subject: Revised Castle Hills BASIS Charter School Traffic Impact Analysis Review City of Castle Hills,

More information

Critchfield Rd / SR-129

Critchfield Rd / SR-129 NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2

More information

Signalized Intersections

Signalized Intersections Signalized Intersections Kelly Pitera October 23, 2009 Topics to be Covered Introduction/Definitions D/D/1 Queueing Phasing and Timing Plan Level of Service (LOS) Signal Optimization Conflicting Operational

More information

APPENDIX. Sutter Street Bicycle Lanes Stockton, CA January 2010

APPENDIX. Sutter Street Bicycle Lanes Stockton, CA January 2010 APPENDIX reet Bicycle Lanes Stockton, CA January 2010 1. Traffic count locations 2. Turning movement counts o AM PEAK - El Dorado Street at Ingram Street o PM PEAK - El Dorado Street at Ingram Street o

More information

CVS Derwood. Local Area Transportation Review

CVS Derwood. Local Area Transportation Review CVS Derwood Montgomery County, Maryland May 27, 2016 Local Area Transportation Review Prepared for: JC Bar Properties, Inc. Steve Fleming, PE 415 Fallowfield Road, Suite 301 Camp Hill, Pennsylvania 17011

More information

DOLLAR GENERAL PROJECT FOCUSED TRAFFIC ANALYSIS (REVISED) May 20, 2015

DOLLAR GENERAL PROJECT FOCUSED TRAFFIC ANALYSIS (REVISED) May 20, 2015 DOLLAR GENERAL PROJECT FOCUSED TRAFFIC ANALYSIS (REVISED) May 20, 2015 May 20, 2015 Mr. Dan Biswas, VP of Development CJS DEVELOPMENT II, LLC 5111 North Scottsdale Road, Suite 200 Scottsdale, CA 85250

More information

SUBJECT: SUMMARY OF FINDINGS. October 29, Mr. Carter Redish Carter Group Architects, Inc S. El Camino Real, Suite F San Clemente, CA 92672

SUBJECT: SUMMARY OF FINDINGS. October 29, Mr. Carter Redish Carter Group Architects, Inc S. El Camino Real, Suite F San Clemente, CA 92672 October 29, 2018 Mr. Carter Redish Carter Group Architects, Inc. 1810 S. El Camino Real, Suite F San Clemente, CA 92672 SUBJECT: CANYON STEEL FOCUSED TRAFFIC IMPACT ANALYSIS Dear Mr. Carter Redish: Urban

More information

MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015

MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015 MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015 TABLE OF CONTENTS... 3 Proposed Development... 3 Methodology... 3 Phase 1 Development...

More information

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Prepared by: Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite

More information

PLAZA MEXICO RESIDENCES

PLAZA MEXICO RESIDENCES PLAZA MEXICO RESIDENCES TRAFFIC STUDY PREPARED FOR: 3000 E. IMPERIAL, LLC. 6940 Beach Boulevard, D-501 Buena Park, California 90621 PREPARED BY: OCTOBER 5, 2017 translutions the transportatio n solutions

More information

Appendix I: Traffic Study

Appendix I: Traffic Study City of Fontana Sierra Lakes Commerce Center Draft EIR Appendix I: Traffic Study FirstCarbon Solutions H:\Client (PN JN)\0144\01440050\EIR\1 ADEIR\01440050 Sec99 99 Appendix Dividers.doc THIS PAGE INTENTIONALLY

More information

MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output

MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output Rev. April 29, 2005 MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output Table of

More information

2014 Data Collection Project ITE Western District

2014 Data Collection Project ITE Western District 2014 Data Collection Project ITE Western District Project Completed By: Oregon State University OSU ITE Student Chapter 101 Kearney Hall Corvallis, OR 97331 Student Coordinator: Sarah McCrea (OSU ITE Student

More information

KAISER SOUTH NORTHERN VIRGINIA HUB TRAFFIC IMPACT STUDY PRINCE WILLIAM COUNTY, VIRGINIA TABLE OF CONTENTS. Section 2 BACKGROUND INFORMATION 12

KAISER SOUTH NORTHERN VIRGINIA HUB TRAFFIC IMPACT STUDY PRINCE WILLIAM COUNTY, VIRGINIA TABLE OF CONTENTS. Section 2 BACKGROUND INFORMATION 12 KAISER SOUTH NORTHERN VIRGINIA HUB TRAFFIC IMPACT STUDY PRINCE WILLIAM COUNTY, VIRGINIA TABLE OF CONTENTS Page EXECUTIVE SUMMARY 1 Purpose of Report and Study Objectives... 1 Site Location and Study Area...

More information

FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005

FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005 FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005 Prepared For: EDAW, Inc. 1420 Kettner Boulevard, Suite 620

More information

US 169/I-70 North Loop Planning & Environmental Linkages Study

US 169/I-70 North Loop Planning & Environmental Linkages Study US 169/I-70 North Loop Planning & Environmental Linkages Study VISSIM Calibration Document Draft April 13, 2018 Page i Table of Contents 1. Overview... 1 2. Data Types... 2 3. Model Parameter Adjustments...

More information

CE351 Transportation Systems: Planning and Design

CE351 Transportation Systems: Planning and Design CE351 Transportation Systems: Planning and Design TOPIC: Level of Service (LOS) at Traffic Signals 1 Course Outline Introduction to Transportation Highway Users and their Performance Geometric Design Pavement

More information

Focused Traffic Analysis for the One Lincoln Park Project

Focused Traffic Analysis for the One Lincoln Park Project September 15, 2015 Mr. Bill Johnson Coldwell Banker 511 Sir Francis Drake Boulevard Greenbrae, CA 94904 Focused Traffic Analysis for the One Lincoln Park Project Dear Mr. Johnson; As requested, W-Trans

More information

Travel Demand Management Plan

Travel Demand Management Plan Travel Demand Management Plan Tryg s & Apartment Building 8 West Lake Street Minneapolis, MN AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mr. Johnny Carlson Trammell Crow Chicago Development, Inc. 5 South

More information

Table of Contents Introduction... 4 Study Area... 5

Table of Contents Introduction... 4 Study Area... 5 Table of Contents Introduction... 4 Study Area... 5 Streets and s... 5 Traffic Volumes... 8 Recent and Anticipated Development... 10 Crash Analysis... 10 Projected Traffic Volumes... 11 Trip Generation...

More information

Traffic Impact Analysis. for the STARBUCKS STORE. Located at 9900 BALBOA BOULEVARD. Submitted to CITY OF LOS ANGELES. January 2017.

Traffic Impact Analysis. for the STARBUCKS STORE. Located at 9900 BALBOA BOULEVARD. Submitted to CITY OF LOS ANGELES. January 2017. Traffic Impact Analysis for the STARBUCKS STORE Located at 9900 BALBOA BOULEVARD Submitted to CITY OF LOS ANGELES January 2017 Submitted By January 5, 2017 Ken A. Aitchison, P.E. Transportation Engineering

More information

Approved Corrections and Changes for the Highway Capacity Manual 2000

Approved Corrections and Changes for the Highway Capacity Manual 2000 Approved Corrections and Changes for the Highway Capacity Manual 2000 Updated 7/8/2005 Previous update 2/27/2004 TRB Committee AHB40, Highway Capacity and Quality of Service Unless stated otherwise, corrections

More information

VHD Daily Totals. Population 14.5% change. VMT Daily Totals Suffolk 24-hour VMT. 49.3% change. 14.4% change VMT

VHD Daily Totals. Population 14.5% change. VMT Daily Totals Suffolk 24-hour VMT. 49.3% change. 14.4% change VMT 6.9 Suffolk 6-54 VMT Population and Travel Characteristics Population 14.5% change 2014 1,529,202 VHD Daily Totals 2014 251,060 49.3% change 2040 1,788,175 2040 374,850 VMT Daily Totals 2014 39,731,990

More information

TRAFFIC IMPACT STUDY FOR SOUTH BAY SALT POND RESTORATION PROJECT PHASE 2

TRAFFIC IMPACT STUDY FOR SOUTH BAY SALT POND RESTORATION PROJECT PHASE 2 APPENDIX G TRAFFIC IMPACT STUDY FOR SOUTH BAY SALT POND RESTORATION PROJECT PHASE 2 South Bay Salt Pond Restoration Project Phase II May 2015 Draft Environmental Impact Statement/Report Traffic Impact

More information

CHAPTER 3. CAPACITY OF SIGNALIZED INTERSECTIONS

CHAPTER 3. CAPACITY OF SIGNALIZED INTERSECTIONS CHAPTER 3. CAPACITY OF SIGNALIZED INTERSECTIONS 1. Overview In this chapter we explore the models on which the HCM capacity analysis method for signalized intersections are based. While the method has

More information

ALTA VISTA COMMERCIAL/ RESIDENTIAL PROJECT

ALTA VISTA COMMERCIAL/ RESIDENTIAL PROJECT ALTA VISTA COMMERCIAL/ RESIDENTIAL PROJECT TRAFFIC IMPACT ANALYSIS Prepared For: Paul Conzelman SC Development 2151 Michelson Drive, Suite 140 Irvine, CA 92612 Prepared By: 2030 Main Street, Suite 1200

More information

6711 LEE HIGHWAY TRAFFIC IMPACT STUDY ARLINGTON, VIRGINIA

6711 LEE HIGHWAY TRAFFIC IMPACT STUDY ARLINGTON, VIRGINIA 6711 TRAFFIC IMPACT STUDY ARLINGTON, VIRGINIA Prepared for: NVR, Inc. Prepared by: Wells + Associates, Inc. Michael J. Workosky, PTP, TOPS, TSOS John J. Andrus William L. Zeid, PE 703.917.6620 May 4, 2017

More information

TRAFFIC STUDY FOR THE GAFFEY POOL PROJECT LOS ANGELES, CALIFORNIA CITY OF LOS ANGELES, BUREAU OF ENGINEERING OCTOBER 2013 PREPARED FOR PREPARED BY

TRAFFIC STUDY FOR THE GAFFEY POOL PROJECT LOS ANGELES, CALIFORNIA CITY OF LOS ANGELES, BUREAU OF ENGINEERING OCTOBER 2013 PREPARED FOR PREPARED BY TRAFFIC STUDY FOR THE GAFFEY POOL PROJECT LOS ANGELES, CALIFORNIA OCTOBER 2013 PREPARED FOR CITY OF LOS ANGELES, BUREAU OF ENGINEERING PREPARED BY DRAFT TRAFFIC STUDY FOR THE GAFFEY POOL PROJECT October

More information

Expanding the GSATS Model Area into

Expanding the GSATS Model Area into Appendix A Expanding the GSATS Model Area into North Carolina Jluy, 2011 Table of Contents LONG-RANGE TRANSPORTATION PLAN UPDATE 1. Introduction... 1 1.1 Background... 1 1.2 Existing Northern Extent of

More information

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 Appendix C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 CONTENTS List of Figures-... 3 List of Tables... 4 Introduction... 1 Application of the Lubbock Travel Demand

More information

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes Fairview Ave. and Main St. Improvements and Local Streets Plan Appendices Ada County Highway District Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes January 3, 207 Appendices

More information

A Study of Red Light Cameras in Kansas City, MO

A Study of Red Light Cameras in Kansas City, MO A Study of Red Light s in Kansas City, MO Prepared by the Special Operations Division Executive Summary This paper will analyze the crash data for the 29 red light cameras located in 17 intersections in

More information

1 h. Page 1 of 12 FINAL EXAM FORMULAS. Stopping Sight Distance. (2 ) N st U Where N=sample size s=standard deviation t=z value for confidence level

1 h. Page 1 of 12 FINAL EXAM FORMULAS. Stopping Sight Distance. (2 ) N st U Where N=sample size s=standard deviation t=z value for confidence level Page 1 of 12 FINAL EXAM FORMULAS Stopping Sight Distance 2 2 V V d 1.47Vt 1.075 i f a 2 2 Vi Vf d 1.47Vt 30( f 0.01 G) Where d = distance (ft) V = speed (mph) t = time (sec) a=deceleration rate (ft/sec

More information

1.0 INTRODUCTION AND SUMMARY...

1.0 INTRODUCTION AND SUMMARY... TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY... 1 1.1 Purpose and Study Objective... 1 1.2 Executive Summary... 1 2.0 ROADWAY CONDITIONS... 5 2.1 Granville Parkway (South Intersection)... 8 2.2 Tuscany

More information

ADAPTIVE SIGNAL CONTROL IV

ADAPTIVE SIGNAL CONTROL IV ADAPTIVE SIGNAL CONTROL IV Evaluation of the Adaptive Traffic Control System in Park City, Utah Dr. Peter T. Martin Associate Professor Aleksandar Stevanovic Research Associate Ivana Vladisavljevic Research

More information

APPENDIX IV MODELLING

APPENDIX IV MODELLING APPENDIX IV MODELLING Kingston Transportation Master Plan Final Report, July 2004 Appendix IV: Modelling i TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 OBJECTIVE... 1 3.0 URBAN TRANSPORTATION MODELLING

More information

MEMORANDUM. Trip Generation Analysis

MEMORANDUM. Trip Generation Analysis MEMORANDUM To: RMC Architects From: Matthew Palmer, PE Subject: Trip Generation, Parking Analysis & Level of Service Project: Port of Everett, GTC #13-053 Date: August 25, 2014 The trip generation and

More information

Freeway Work Zone Lane Capacity

Freeway Work Zone Lane Capacity Freeway Work Zone Lane Capacity Thomas Notbohm, P.E. Wisconsin Department of Transportation Thomas.Notbohm@dot.state.wi.us Alex Drakopoulos Department of Civil & Environmental Engineering Marquette University,

More information

Appendix B.1 EMME Model Calibration Memo

Appendix B.1 EMME Model Calibration Memo Appendix B.1 EMME Model Calibration Memo itrans 144 Front Street West, Suite 655 Toronto, ON M5J 2L7 Tel: (416) 847-0005 Fax: (905) 882-1557 www.hdrinc.com www.itransconsulting.com File: 2.0 Memorandum

More information

CHAPTER 3 TRANSPORTATION

CHAPTER 3 TRANSPORTATION CHAPTER 3 TRANSPORTATION This chapter presents information on transportation impacts of Section 2 of the Project that have changed from those identified in the published Westside Subway Extension Final

More information

TRANSPORTATION AND TRAFFIC ANALYSIS REPORT

TRANSPORTATION AND TRAFFIC ANALYSIS REPORT Square One Drive Extension Municipal Class Environmental Assessment Environmental Study Report Appendix B Transportation and Traffic Analysis Report TRANSPORTATION AND TRAFFIC ANALYSIS REPORT FINAL DRAFT

More information

City of Camrose Winter Road Maintenance Policy

City of Camrose Winter Road Maintenance Policy City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.

More information

Freeway Work Zone Lane Capacity

Freeway Work Zone Lane Capacity Report Title Report Date: 2009 Freeway Work Zone Lane Capacity Principle Investigator Vendor Name and Address Name Drakopoulos, Alex «Vendor» Affiliation Marquette University Address 263 Haggerty Hall

More information

Accessing and Using Indiana Traffic Data

Accessing and Using Indiana Traffic Data Accessing and Using Indiana Traffic Data Purdue Road School March 6, 2013 Presented by: Gregory Katter, PE Asset Planning Indiana Traffic Data 1. Overview of Traffic Data Collection Program 2. Accessing

More information

Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles

Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles Traffic Study August 31, 2015 AECOM 515 South Flower Street, 4 th Floor Los Angeles, CA 90071 Job Number: 60323255

More information

Impact of Day-to-Day Variability of Peak Hour Volumes on Signalized Intersection Performance

Impact of Day-to-Day Variability of Peak Hour Volumes on Signalized Intersection Performance Impact of Day-to-Day Variability of Peak Hour Volumes on Signalized Intersection Performance Bruce Hellinga, PhD, PEng Associate Professor (Corresponding Author) Department of Civil and Environmental Engineering,

More information

Greater Toronto Area Cordon Count Summary Analysis of Traffic Trends 1985 to 2011

Greater Toronto Area Cordon Count Summary Analysis of Traffic Trends 1985 to 2011 Greater Toronto Area Cordon Count Summary Analysis of Traffic Trends 1985 to 2011 Prepared by: Data Management Group Department of Civil Engineering University of Toronto Telephone: (416) 978-3916 Table

More information

Bruce Freeman Rail Trail

Bruce Freeman Rail Trail Functional Design Report Bruce Freeman Rail Trail Station Road to Concord Town Line Sudbury, Massachusetts PREPARED FOR Town of Sudbury Planning and Community Development 287 Old Sudbury Road Sudbury,

More information

MEMORANDUM (DRAFT) DRAFT

MEMORANDUM (DRAFT) DRAFT 117 Commercial St. NE, Suite 310 Salem, OR 97301 503.391.8773 www.dksassociates.com MEMORANDUM (DRAFT) DATE: February 15, 2017 TO: FROM: SUBJECT: Alex Dupey, MIG Scott Mansur, PE, PTOE; Garth Appanaitis,

More information

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519 January 12, 2018 Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519 Re: Proposed Reserve at Rivertown Mixed-Use Development Updated Trip Generation and Site Driveway

More information

FY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission

FY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission FY 2010 Continuing i Planning Program Product Report Local Transportation and Traffic Data Travel Time and Delay Data for Belpre and Marietta, Ohio Wood-Washington-Wirt Interstate Planning Commission CONTINUING

More information

Design Priciples of Traffic Signal

Design Priciples of Traffic Signal Design Priciples of Traffic Signal Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew Contents 1 Overview 1 2 Definitions and notations 2 3 Phase design 3 3.1 Two phase signals.................................

More information

March Grade Crossing Analysis

March Grade Crossing Analysis March 2014 Grade Crossing Analysis T E C H N I C A L M E M O R A N D U M South Florida Freight and Passenger Rail Enhancement Study Phase 1A - Rehabilitate Existing Northwood Connection; FPID: 434948-1

More information

CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors]

CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors] CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors] Travel Time and Delay Analysis for Belpre (OH) and Marietta (OH) Fiscal Year 2009 Report WOOD WASHINGTON

More information

The Sunland Park flyover ramp is set to close the week of March 19 until early summer

The Sunland Park flyover ramp is set to close the week of March 19 until early summer March 2, 2018 The Sunland Park flyover ramp is set to close the week of March 19 until early summer GO 10 is targeting the week of March 19 to close the Sunland Park Drive flyover entrance ramp to I 10

More information

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road STAFF REPORT ACTION REQUIRED Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road Date: October 28, 2008 To: From: Toronto and East York Community Council Director, Transportation

More information

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS 2018 WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS Introduction Woodruff Road is the main road to and through the commercial area in Greenville, South Carolina. Businesses along the corridor have

More information

FARM 1065 PORTION 1, ATLANTIS TRAFFIC IMPACT ASSESSMENT

FARM 1065 PORTION 1, ATLANTIS TRAFFIC IMPACT ASSESSMENT FARM 1065 PORTION 1, ATLANTIS TRAFFIC IMPACT ASSESSMENT February 2018 FIRST ISSUE Prepared by: JG AFRIKA (PTY) LTD Branch: Cape Town PO Box 38561 Postal code: 7430 Telephone: 021 530 1800 Email: wink@

More information

Appendix BAL Baltimore, Maryland 2003 Annual Report on Freeway Mobility and Reliability

Appendix BAL Baltimore, Maryland 2003 Annual Report on Freeway Mobility and Reliability (http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix BAL Baltimore, Maryland 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement to:

More information

S.170 th Street Micro-Simulation Seattle-Tacoma International Airport Port of Seattle/Aviation Planning

S.170 th Street Micro-Simulation Seattle-Tacoma International Airport Port of Seattle/Aviation Planning Seattle-acoma International Airport Port of Seattle/Aviation Planning Port of Seattle PO OF SEAE Aviation Planning Airport Operations January 24, 2013 Summary he Port is planning to relocate the cell phone

More information

Appendix B. Durham Region Travel Demand Model Calibration

Appendix B. Durham Region Travel Demand Model Calibration Appendix B Durham Region Travel Demand Model Calibration AECOM 300 Water Street 905 668 9363 tel Whitby, ON, Canada L1N 9J2 905 668 0221 fax www.aecom.com To Ron Albright, Municipality of Clarington Page

More information

FINAL REPORT. City of Toronto. Contract Project No: B

FINAL REPORT. City of Toronto. Contract Project No: B City of Toronto SAFETY IMPACTS AND REGULATIONS OF ELECTRONIC STATIC ROADSIDE ADVERTISING SIGNS TECHNICAL MEMORANDUM #2B BEFORE/AFTER COLLISION ANALYSIS AT MID-BLOCK LOCATIONS FINAL REPORT 3027 Harvester

More information

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006 DRAFT TRAFFIC IMPACT STUDY FOR PHASED DEVELOPMENT OF TAMU CC Prepared for 3D/International, Inc. 1900 West Loop South, Suite 400 Houston, Texas 77027 November 2006 Interim Review Only Document Incomplete:

More information

III. FORECASTED GROWTH

III. FORECASTED GROWTH III. FORECASTED GROWTH In order to properly identify potential improvement projects that will be required for the transportation system in Milliken, it is important to first understand the nature and volume

More information

2015 Grand Forks East Grand Forks TDM

2015 Grand Forks East Grand Forks TDM GRAND FORKS EAST GRAND FORKS 2015 TRAVEL DEMAND MODEL UPDATE DRAFT REPORT To the Grand Forks East Grand Forks MPO October 2017 Diomo Motuba, PhD & Muhammad Asif Khan (PhD Candidate) Advanced Traffic Analysis

More information

Traffic Signal Timing: Green Time. CVEN 457 & 696 Lecture #18 Gene Hawkins

Traffic Signal Timing: Green Time. CVEN 457 & 696 Lecture #18 Gene Hawkins Traffic Signal Timing: Green Time CVEN 457 & 696 Lecture #18 Gene Hawkins The Problem N 25 134 77 128 643 216 181 517 171 111 154 56 NBLT = 181 vph NBTR = 688* vph SBLT = 216 vph SBTR = 771* vph WB = 321*

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/22/2019 4:20:05 AM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

California Urban Infill Trip Generation Study. Jim Daisa, P.E.

California Urban Infill Trip Generation Study. Jim Daisa, P.E. California Urban Infill Trip Generation Study Jim Daisa, P.E. What We Did in the Study Develop trip generation rates for land uses in urban areas of California Establish a California urban land use trip

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

Trip Generation Calculations

Trip Generation Calculations Trip Generation Calculations A HORIZON AIR ALLEGIANT AI R EMPLOYEES Daily Trip Generation Daily Trip Generation Daily Trip Generation Directional Flights (per day): 20 Directional Flights (per day): 2.8

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. UPDATES

More information

HALFF 16196? TRAFFIC MANAGEMENT PLAN. Richardson ISD Aikin Elementary School Dallas, Texas North Bowser Road Richardson, Texas 75081

HALFF 16196? TRAFFIC MANAGEMENT PLAN. Richardson ISD Aikin Elementary School Dallas, Texas North Bowser Road Richardson, Texas 75081 30280 16196? TRAFFIC MANAGEMENT PLAN Exhibit 572B Aikin Elementary School Planned Development District No. 572 Approved City Plan Commission October20, 2016 July 12, 2016 Prepared for HALFF AVO 31586 PHO1

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/24/2019 5:16:03 PM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

SPEED LIMIT STUDY ELDRON BLVD NE & SE FROM AMERICANA BLVD NE TO BAYSIDE LAKES BLVD. Engineering and Traffic Investigation Conducted by:

SPEED LIMIT STUDY ELDRON BLVD NE & SE FROM AMERICANA BLVD NE TO BAYSIDE LAKES BLVD. Engineering and Traffic Investigation Conducted by: SPEED LIMIT STUDY ELDRON BLVD NE & SE FROM AMERICANA BLVD NE TO BAYSIDE LAKES BLVD Engineering and Traffic Investigation Conducted by: Elia Twigg, P.E. Kwabena Ofosu, Ph.D., P.E. Public Works Department

More information

Mountain View Community Shuttle Monthly Operations Report

Mountain View Community Shuttle Monthly Operations Report Mountain View Community Shuttle Monthly Operations Report October 9, 2018 Contents Passengers per Day, Table...- 3 - Passengers per Day, Chart...- 3 - Ridership Year-To-Date...- 4 - Average Daily Ridership

More information

PROPOSED PROJECT. Section PROJECT DESCRIPTION

PROPOSED PROJECT. Section PROJECT DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 1.1 PROJECT DESCRIPTION This Environmental Assessment describes the proposed improvements

More information

Final City of Colusa STREETS & ROADWAYS MASTER PLAN. October J Street Suite 390 Sacramento, CA 95814

Final City of Colusa STREETS & ROADWAYS MASTER PLAN. October J Street Suite 390 Sacramento, CA 95814 Final City of Colusa STREETS & ROADWAYS MASTER PLAN October 2009 660 J Street Suite 390 Sacramento, CA 95814 TABLE OF CONTENTS I. INTRODUCTION... 1 Report Organization...1 II. ANALYSIS METHODOLOGY... 2

More information

Speed Limit Review. Montague Road, West End. Prepared for Brisbane City Council CEB06842 CEB06842

Speed Limit Review. Montague Road, West End. Prepared for Brisbane City Council CEB06842 CEB06842 Speed Limit Review Montague Road, West End CEB06842 CEB06842 Prepared for Brisbane City Council 2 November 2016 Speed Limit Review Montague Road, West End Document Information Prepared for Brisbane City

More information

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3 Page 1 of 12 Winter Operations Table of Contents WINTER CONTROL Objectives 2 WINTER CONTROL Season 3 SNOW ACCUMULATION Road Plowing 4,5 ICY ROADWAYS Application of Deicers/Abrasives 6 SNOW ACCUMULATION

More information

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS 3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS In order to better determine future roadway expansion and connectivity needs, future population growth and land development patterns were analyzed as part of

More information

2011 South Western Region Travel Time Monitoring Program Congestion Management Process. Executive Summary

2011 South Western Region Travel Time Monitoring Program Congestion Management Process. Executive Summary 2011 South Western Region Travel Monitoring Program Executive Summary Prepared by: South Western Regional Planning Agency 888 Washington Blvd, 3rd Floor Stamford, CT 06901 Telephone: 203.6.5190 Facsimile:

More information

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance Endo Engineering Traffic Engineering Air Quality Studies Noise Assessments July 13, 2015 Mr. Ed Freeman Pinnacle View, LLC P.O. Box 1754 Lake Oswego, OR 97035-0579 Subject: Desert Palisades Specific Plan

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/13/2019 2:54:03 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/13/2019 2:54:03 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/13/2019 2:54:03 PM 57 56 @ Corvallis - Newport Hwy OR34 HWY372 22 22 Mount Bachelor Ski Area I-5 10 13

More information

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov February 9, 2018 I-10 East at Redd closes for 24 hours this Sunday, Feb 11

More information