0.00 B9 TRANSIT GRANT CAP IMP (NON- VEHICLE) 0.00 BB TRANSIT VEHICLE PURCHASE CAP IMP (NON- VEHICLE) 0.00 B9 TRANSIT VEHICLE PURCHASE

Size: px
Start display at page:

Download "0.00 B9 TRANSIT GRANT CAP IMP (NON- VEHICLE) 0.00 BB TRANSIT VEHICLE PURCHASE CAP IMP (NON- VEHICLE) 0.00 B9 TRANSIT VEHICLE PURCHASE"

Transcription

1

2 842 BB TRF A 2019 ROCHESTER SECT 5307: ROCHESTER RR OPERATING 0.00 B9 TRANSIT FTA 11,450, ,000, ,450,000 ASSISTANCE OPERATIONS 843 BB TRF B 2019 ROCHESTER SECT 5307: CITY OF ROCHESTER; ST MARY'S STATION - CONSTRUCTION 0.00 B9 TRANSIT GRANT FTA 250, , , BB TRF C 2019 ROCHESTER SECT 5339: CITY OF ROCHESTER; SIX (6) STD. 40 FT. BUSES 845 BB TRF D 2019 ROCHESTER SECT 5307: CITY OF ROCHESTER; REMOTE HUB LOCATION, DESIGN STUDY AND PRELIMINARY ENGINEERING 846 BB TRF E 2019 ROCHESTER SECT 5307: CITY OF ROCHESTER; TWO (2) 40 FT. EXPANSION BUSES 0.00 BB TRANSIT VEHICLE 0.00 B9 TRANSIT GRANT 0.00 B9 TRANSIT VEHICLE FTA 2,900, ,680, ,220,000 FTA 150, , ,000 FTA 968, , , BB TRF F 2019 ROCHESTER ROCHESTER; EXPANSION OF BUS GARAGE 0.00 TR TRANSIT GRANT 848 BB TRF G 2019 ROCHESTER ROCHESTER: 4 BUS SHELTERS 0.00 TR TRANSIT GRANT LF 6,125, ,125,000 LF 40, , BB TRF H 2019 ROCHESTER ROCHESTER: DOWNTOWN BUS STOP IMPROVEMENTS 850 BB TRF I 2019 ROCHESTER ROCHESTER: FARE KIOSKS AT OTHER LOCATIONS AND TECH UPDATES 851 BB TRF J 2019 ROCHESTER ROCHESTER: ITS ENHANCEMENTS TO GPS BASED AVL BUS TRACKING 852 BB TRF K 2019 ROCHESTER SECT 5307: CITY OF ROCHESTER; FIVE (5) 60' BRT EXPANSION BUSES 853 BB TRF L 2019 ROCHESTER SECT 5307: CITY OF ROCHESTER; AND INSTALL ELECTRICAL CHARGING STATION 854 BB TRF M 2019 ROCHESTER SECT 5307: CITY OF ROCHESTER; TWO (2) <30' PARATRANSIT BUSES 855 BB TRF N 2019 ROCHESTER SECT 5307: CITY OF ROCHESTER; TWO (2) <30' BUSES FOR REGULAR ROUTE 856 BB TRF LA CRESCENT SECT 5307: CITY OF LA CRESCENT TRANSIT OPERATING ASSISTANCE 0.00 TR TRANSIT GRANT 0.00 TR TRANSIT GRANT 0.00 TR TRANSIT GRANT 0.00 B9 TRANSIT VEHICLE 0.00 B9 EV CHARGING SYSTEM 0.00 B9 TRANSIT VEHICLE 0.00 B9 TRANSIT VEHICLE 0.00 B9 TRANSIT VEHICLE LF 50, ,000 LF 100, ,000 LF 50, ,000 FTA 6,500, ,200, ,300,000 FTA 1,000, , ,000 FTA 330, , ,000 FTA 330, , ,000 FTA 375, , , RR MNDOT DME RR, INSTALL GATES AT MNTH 42, EYOTA, OLMSTED 0.00 SR RR X-ING IMP. RRS 250, , , Page 69

3 858 RR MNDOT UP RR, INSTALL GATES AT MSAS 102, NORTH ST, OWATONNA, STEELE 0.00 SR RR X-ING IMP. RRS 250, , , CSAH FILLMORE 860 CSAH FILLMORE 861 CSAH AC 2019 OLMSTED CSAH 1, CONCRETE, FROM MOWER LINE (CSAH 11) TO CSAH 39 CSAH 12, REPLACE BRIDGE 449 WITH NEW BRIDGE 23K57, 2 MI W OF JCT CSAH 14, WEST OF PRESTON **AC** CSAH 9, FROM CSAH 22 TO CR 119 SOUTH, RECONSTRUCTION AND CONCRETE MILL &. REPLACE BR #92150, REPLACE RAILROAD CROSSING USDOT NO F (AC PAYBACK 1 OF 1) 9.92 RS CONCRETE 0.00 BR BRIDGE STBGP 2,600,000 2,080, ,000 BROS 460, , , RC NEW PAVEMENT STBGP 354, , CSAH OLMSTED COLLEGE VIEW ROAD (CSAH 9) FROM 19TH AVE SE TO EAST CIRCLE DRIVE (CSAH 22) - CONCRETE PAVEMENT (TIED WITH S.P ) 1.08 RC NEW PAVEMENT STBGP 5,524,200 2,350, ,173, CSAH RICE CSAH 46, AT TH 19/ FLYING J, 0.00 SH NEW PAVEMENT HSIP 654, , ,480 INTERSECTION REALIGNMENT 864 CSAH AC 2019 RICE **AC** CSAH 19, MILL, RECLAMATION, BITUMINOUS SURFACING, SHOULDER PAVING AND RUMBLE STRIPS (AC PAYBACK 1 OF 1) 0.00 SH BITUMINOUS RECLAMATION HSIP 419, , CSAH AC 2019 WABASHA **AC** CSAH 3 FROM TH 60 TO TH 63, BITUMINOUS RECLAMATION, BITUMINOUS PAVING, BITUMINOUS SHOULDER PAVING, EDGELINE STRIPING AND RUMBLE STRIPS (ASSOCIATED WITH SAP ) (AC PAYBACK, 1 OF 1) 0.00 SH BITUMINOUS RECLAMATION HSIP 270, , CSAH WABASHA 867 LOCAL WABASHA 868 CSAH 4, 11, 18 AND WABASHA 869 PED/BIKE WABASHA **AC** REALIGNMENT OF CSAH 59 AND CSAH 10 INTERSECTION AT TH 61 (AC PROJECT, PAYBACK IN 2020) WIDE 2' SHOULDER PAVING, RUMBLE STRIPS AND SAFETY EDGE ON HORIZONTAL CURVES - TIED WITH SP **AC** WABASHA CSAH 4, 11, 18 AND 84, SHOULDER PAVING, RUMBLE STRIPS, SAFETY EDGE (AC PROJECT, PAYBACK IN 2020) - TIED WITH SP LIGHTING IMPROVEMENTS, SIDEWALK EXTENSION AND BUS TURNOUT - PLAINVIEW WABASHA SIDEWALK IMPROVEMENT PROJECT - ELGIN 870 PED/BIKE WABASHA 871 CSAH AC 2019 WINONA **AC** CSAH 25, FROM US 14 TO 7 MI NORTH, CONCRETE (AC PAYBACK, 1 OF 1) 0.00 SH NEW PAVEMENT HSIP 80, , , SH SHOULDER REPAIR HSIP 1,000, , , SH SHOULDER REPAIR HSIP 57, , , EN SIDEWALKS STBGTAP 585, , , EN SIDEWALKS STBGTAP 272, , , RS CONCRETE STBGP 980, , Page 70

4 872 LOCAL FARIBAULT 30TH ST NW, CONCRETE 0.50 RS CONCRETE STBGP 1,502,000 1,058, ,440 PAVEMENT/CONCRETE SIDEWALK FROM CARDINAL AVENUE TO INDUSTRIAL DRIVE IN FARIBAULT PAVEMENT REHAB 873 LOCAL AC 2019 RED WING **AC** US 61, CR 53, SPRING CREEK AVE, SOUTH AND NORTH SERVICE DRIVES, INTERSECTION REALIGNMENT WITH FRONTAGE ROAD CONSTRUCTION (AC PAYBACK, 1 OF 1) 0.96 MC NEW PAVEMENT STBGP 737, , PED/BIKE ROCHESTER ROCHESTER LINK - CHESTER WOODS TRAIL 0.00 EN NEW TRAIL STBGTAP 1,967, , ,376, CSAH WINONA **SPPF** IN THE CITY OF WINONA ON RIVERVIEW DRIVE FROM JUST EAST OF PELZER AVENUE OVERPASS TO W 2ND STREET, RECONSTRUCTION 876 PED/BIKE AC 2019 LA CRESCENT **AC** WAGON WHEEL TRAIL - PHASE 2 CONSTRUCT TRAIL ALONG SHORE ACRES DRIVE AND OLD MONTE CARLO ROAD CONNECTING WAGON WHEEL TRAIL TO BOAT LANDING PARKING LOT AT THE NORTH SIDE OF THE WEST CHANNEL BRIDGE (AC PAYBACK 1 OF 1) 2.10 RC NEW PAVEMENT NHFP 3,500,000 2,800, , EN NEW TRAIL STBGTAP 215, , MN MnDOT **TED** MN 56 - AT 1.29 MI S OF E JCT TH 14 - CONSTRUCT A NB RIGHT TURN LANE AND SB BYPASS LANE 878 MN MnDOT MN 57, OVER N BR MID FK ZUMBRO RIVER REPLACE BRIDGE 6862 WITH NEW BRIDGE 20015, OVER MILLIKEN CREEK REPLACE BRIDGE 6861 WITH NEW BRIDGE AND OVER MID FORK ZUMBRO RIVER REPLACE BRIDGE 6867 WITH NEW BRIDGE MN MnDOT MN 30 FROM TH 74 TO RUSHFORD WEST CITY LIMITS, BITUMINOUS 0.00 AM COOP CONST 0.02 BR BRIDGE RS BITUMINOUS SF 135, , STBGP 5,500,000 4,400, ,100, STBGP 5,400,000 4,320, ,080, I MnDOT **SPPF**OAKLAND WOODS REST AREA, RECONSTRUCTION AND EXPANSION 881 I MnDOT **17NEW**CHAP3**SPP** HAYWARD REST AREA, RECONSTRUCTION AND EXPANSION 882 US MnDOT **ITS** US 52 TMS PHASE III - ITS FROM ELK RUN TO MN 60 W INTERCHANGE 883 MN MnDOT MN 58, AT THE MN 58 AND CSAH 21 INTERSECTION, REVISE TRAFFIC SIGNAL - LOCAL PARTNERSHIP PROGRAM RB SAFETY REST AREA NHFP BF 2,800,000 2,520, , RB SAFETY REST AREA NHFP BF 2,790, , ,000 1,990, SC TRAFFIC MANAGEMENT SYSTEM 0.00 AM TRAFFIC SIGNAL REVISION NHPP 750, , , SF 146, ,299-75,588 Page 71

5 884 US AC MnDOT **CHAP 152**AC**PoDI**BP08** RED 0.00 BR BRIDGE NHPP 13,100,000 13,100, WING, US 63 FR US 61 TO 1067 N OF 825TH ST IN WI & US 61 FR 2460 E OF MN 58 TO 450 E OF MN 58, GRADING, BIT & CONC PVMT, BR NO , & 25035, BOX CULV C (AC PAYBACK 2 OF 2) 885 US OV MnDOT **CHAP 152** CONTRACT ADMINISTRATION (CONSULTANT BOND ELIGIBLE) - RED WING BRIDGE 9040 AND BRIDGE F.Y BR BRIDGE BF 2,500, ,500, MN MnDOT MN 16 FROM I 90 TO TRACY ROAD IN SPRING VALLEY, BITUMINOUS MILL AND AND REPLACE BRIDGE 6045 WITH NEW BRIDGE 50X04, BRIDGE 6046 WITH NEW BRIDGE 50X05 AND BRIDGE 6047 WITH NEW BRIDGE 50X06) RS MILL AND STBGP 7,500,000 6,000, ,500, US MnDOT US 218, AT PERSHING AVE IN LYLE, BYPASS LANE AND RIGHT TURN LANE 0.20 SC TURN LANES SF 300, , US MnDOT **SPP** US 52 FROM 0.1 MI N OF RS MILL AND NHPP 8,400,000 6,720, ,680, FILLMORE CSAH 5 TO 0.2 MI S I90, BITUMINOUS MILL AND, ADA IMPROVEMENTS AND REPLACE BRIDGE 6124 WITH NEW BRIDGE 55X25, 8182 WITH NEW BRIDGE 55X23 AND 8183 WITH NEW BRIDGE 55X US AC 2019 MnDOT **AC**SPP**US 52 NB AND SB FROM RS MILL AND NHPP 1,641,097 1,641, MI S OF I 90 TO US 63, BITUMINOUS (AC PAYBACK 1 OF 1) 890 US SAC 2019 MnDOT **AC** US 52 FROM I-90 TO US 63 IN 0.00 SH TRAFFIC BARRIER HSIP 645, , SOUTH ROCHESTER, CABLE MEDIAN BARRIER - HSIP PORTION OF SP (AC PAYBACK 1 OF 1) 891 US MnDOT **SEC164**US 63, FROM NORTH LIMITS OF STEWARTVILLE TO SOUTH LIMITS OF ROCHESTER JUST SOUTH OF TH 52, CABLE MEDIAN BARRIER 7.26 SH TRAFFIC BARRIER HSIP 800, , MN MnDOT MN 19, CSAH 46 REALIGNMENT TO MN AM COOP CONST SF 362, , COOPERATIVE S PROGRAM TIED WITH SP MN MnDOT MN 60, CITY OF FARIBAULT, URBAN RECONSTRUCTION, GRADING, BITUMINOUS SURFACING, BITUMINOUS MILL AND, ADA IMPROVEMENTS, SIGNAL SYSTEMS AND LIGHTING, JCT OF MN 21 TO CENTRAL AVENUE 1.08 AM BITUMINOUS SF 6,377, ,377, I MnDOT HEATH CREEK REST AREA, RECONSTRUCTION 895 MN MnDOT MN 60 FROM US 63 TO US 61, BITUMINOUS MILL AND AND LIGHTING 0.00 RB SAFETY REST AREA NHPP 2,000,000 1,800, , RS MILL AND STBGP 9,400,000 7,520, ,880, Page 72

6 896 US MnDOT **SPP**US 61, NB LANES FROM MN 42 TO END OF 4 LANE SECTION JUST NORTH OF WABASHA (1.7 MI NW MN 60) AND NB & SB LANES FROM 1.7 MI NW MN 60 TO 1 MI N OF LAKE CITY LIMITS, EXCLUDING W. ELM ST. TO CENTRAL POINT RD. IN LAKE CITY, BITUMINOUS MILL AND AND ADA IMPROVEMENTS RS MILL AND NHPP 12,105,000 9,680, ,420,000-5, US S 2019 MnDOT HSIP PORTION OF SP FOR WABASHA R-CUTS 898 US MnDOT US 61, CSAH 59 RECONSTRUCTION AND REALIGNMENT WITH US 61 IN WABASHA - COOPERATIVE S PROGRAM TIED WITH SP MN MnDOT MN 74, OVER STREAM, REPLACE BRIDGE 8355 WITH NEW BRIDGE 79X MN MnDOT MN 74, REALIGNMENT OF MN 74 AND CSAH 26 INTERSECTION NEAR WEAVER - COOPERATIVE PROGRAM US MnDOT **SPP** US 61 NB AND SB FROM 0.4 MI N I 90 TO CSAH 15 (HOMER), BITUMINOUS MILL AND (INCLUDES 3.1 MI OF FRONTAGE RD.) 902 US P 2019 MnDOT **SPP** US 61 NB AND SB FROM 0.4 MI N I 90 TO CSAH 15 (HOMER), BITUMINOUS MILL AND (INCLUDES 3.1 MI OF FRONTAGE RD.) 903 US MnDOT INTERSECTION OF TH 61 AND HUFF ST IN THE CITY OF WINONA; TRAFFIC SIGNAL AND ADA FACILITIES 0.00 SH MILL AND 0.00 AM COOP CONST 0.00 BR BRIDGE 0.00 AM COOP CONST RS MILL AND RS MILL AND 0.00 AM TRAFFIC SIGNAL INSTALL HSIP 2,500,000 2,250, , SF 60, , STBGP 300, , , SF 314, , NHPP 9,612,000 7,689, ,922, STBGP 1,188, , , SF 533, , , MN MnDOT MN 74 FORCE ACCOUNT - MATERIALS AND EQUIPMENT RENTAL, OVER BEAVER CREEK, REPLACE OLD BRIDGE WITH NEW BRIDGE I MnDOT **SPP*I 90 WB FROM 0.18 MI W OF CSAH 12 TO 1.25 MI W OF MN/WI STATE LINE, I 90 EB FROM 0.31 MI W OF CSAH 12 TO 0.75 MI E OF CSAH 12, AND US 61 NB AND SB FROM JUNCTION OF I 90 TO 0.04 MI S OF CR 101, BITUMINOUS MILL AND AND GRADING (INCLUDES MILL AND ON RIVERVIEW DRIVE) 0.00 RX BARC SF 350, , RS MILL AND NHPP 3,648,000 3,298, , Page 73

7 906 I P 2019 MnDOT **SPP* I 90 WB FROM 0.18 MI W OF CSAH 12 TO 1.25 MI W OF MN/WI STATE LINE, I 90 EB FROM 0.31 MI W OF CSAH 12 TO 0.75 MI E OF CSAH 12, AND US 61 NB AND SB FROM JUNCTION OF I 90 TO 0.04 MI S OF CR 101, BITUMINOUS MILL AND AND GRADING (INCLUDES MILL AND ON RIVERVIEW DRIVE) 4.55 RS MILL AND STBGP 152, , , I S 2019 MnDOT **SEC164** HIGH TENSION CABLE BARRIER (HSIP PORTION OF ) 908 I MnDOT **SPP** I-90 BRIDGE REPAIR, FROM MN 74 (ST. CHARLES) TO CSAH 7 (NODINE): CONCRETE SURFACE, BITUMINOUS SURFACING, JOINTS, RAILS, & APPROACHES ON BRS , 85818, 85823, 85824, 85829, 85830, 85841, 85842, 85843, 85844, 85845, RS TRAFFIC BARRIER HSIP 550, , BI BRIDGE REPAIR NHPP 5,200,000 4,680, , MN MnDOT **IDIQ**SEP14** ADDITIONAL TASK ORDERS FOR F.Y DISTRICTWIDE VARIOUS LOCATIONS, BITUMINOUS PAVEMENT CRACK SEAL - MINIMUM AMOUNT $300,000; MAXIMUM AMOUNT $700,000; EXPIRATION DATE 6/30/ PM BITUMINOUS SEAL COAT STBGP 400, , , MN MnDOT **IDIQ**SEP14** ADDITIONAL TASK ORDERS FOR F.Y DISTRICTWIDE VARIOUS LOCATIONS, BITUMINOUS PAVEMENT SEAL COAT - MINIMUM AMOUNT $5,550,000; MAXIMUM AMOUNT $10,000,000; EXPIRATION DATE 6/30/ MN MnDOT **IDIQ** DISTRICTWIDE, VARIOUS LOCATIONS, EPOXY BRIDGE DECK CRACK SEAL - MINIMUM AMOUNT $500,000; MAXIMUM AMOUNT $1,200,000; EXPIRATION DATE 10/1/ PM BITUMINOUS SEAL COAT STBGP 2,347,000 1,877, , BI BRIDGE REPAIR STBGP 500, , , MN MnDOT **IDIQ**SEP14** ADDITIONAL TASK ORDERS FOR F.Y DISTRICTWIDE LIGHTING LUMINAIRE - MINIMUM AMOUNT $500,000; MAXIMUM AMOUNT $1,500,000; EXPIRATION DATE 6/30/ MN MnDOT **IDIQ** DISTRICTWIDE VARIOUS LOCATIONS, CONCRETE PAVEMENT REHAB - MINIMUM AMOUNT $800,000; MAXIMUM AMOUNT $3,800,000; EXPIRATION DATE 6/30/ MN CA MnDOT DISTRICTWIDE SETASIDES - EXTERNAL PROJECT DELIVERY MN CA-19A 2019 MnDOT **17NEW** DISTRICTWIDE SETASIDES - PROJECT DELIVERY SC LIGHTINGS STBGP 82,348 65, , PM BITUMINOUS SEAL COAT STBGP 800, , , SF 3,850, ,850, SF 2,300, ,300, Page 74

8 916 MN MA MnDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS S MA MISC. SF 431, , MN PD MnDOT DISTRICTWIDE SETASIDE - INTERNAL PROJECT DELIVERY SF 317, , MN RW MnDOT DISTRICTWIDE SETASIDES - R/W RW RIGHT OF WAY SF 2,250, ,250, MN SA MnDOT DISTRICTWIDE SETASIDES - SUPPLEMENTAL S AND COST OVERRUNS SA SUPP. AGREE & COST OVERRUNS SF 3,000, ,000, LOCAL SHL LOCAL HSIP SETASIDE - LOCAL SH SAFETY HSIP 322, , , MN SN MnDOT DISTRICTWIDE SETASIDES - SIGNING RX BARC SF 170, , MN ST MnDOT DISTRICTWIDE SETASIDES - STRIPING RX BARC SF 650, , Total 176,777,773 98,627,760 1,233,000 11,357,400 35,821,928 4,490,000 26,480,685 Page 75

9 923 BB TRF A 2020 ROCHESTER SECT 5307: ROCHESTER RR OPERATING ASSISTANCE 0.00 B9 TRANSIT OPERATIONS FTA 13,000, ,000, ,000, BB TRF B 2020 ROCHESTER CITY OF ROCHESTER; TWO (2) BUS SHELTERS 0.00 TR TRANSIT GRANT LF 24, , BB TRF C 2020 ROCHESTER CITY OF ROCHESTER; PARK & RIDE RAMP 0.00 TR TRANSIT GRANT LF 20,000, ,000, BB TRF LA CRESCENT SECT 5307: CITY OF LA CRESCENT TRANSIT OPERATING ASSISTANCE 0.00 B9 TRANSIT OPERATIONS FTA 375, , , BB TRS T 2020 ROCHESTER CITY OF ROCHESTER; ONE (1) 40 FT. EXPANSION BUS; FIVE (5) 60' BRT EXPANSION BUSES 928 BB TRS TA 2020 ROCHESTER CITY OF ROCHESTER; FIVE (5) STD. 40 FT. BUSES 0.00 TR TRANSIT VEHICLE 0.00 TR TRANSIT VEHICLE STBGP 5,686,000 1,374, ,311,200 STBGP 2,450,000 1,960, , RR MNDOT UP RR, INSTALL GATES AT CSAH 48, MARGARETHA AVE, ALBERT LEA, FREEBORN 930 RR MNDOT UP RR, INSTALL GATES AT MSAS 129, HAMMER RD, ALBERT LEA, FREEBORN 931 RR MNDOT UP RR, INSTALL GATES AT CSAH 5, CENTRAL AVE S, GLENVILLE, FREEBORN 932 RR MNDOT CP RR, INSTALL GATES AT CSAH 5, GRANT ST, LAKE CITY, GOODHUE 933 RR MNDOT UP RR, INSTALL GATES AT CSAH 78, HESTER ST, DUNDAS, RICE 934 RR MNDOT UP RR, INSTALL GATES AT MSAS 103, 14TH ST NE, FARIBAULT, RICE 935 RR MNDOT DME RR, INSTALL GATES AT CSAH 25, LEWISTON, WINONA 936 RR MNDOT CP RR, INSTALL GATES AT MSAS 103, 5TH ST, WINONA, WINONA 937 RR MNDOT CP RR, INSTALL GATES AT MSAS 112, MANKATO ST, WINONA, WINONA 938 CSAH FREEBORN 939 CSAH FREEBORN CSAH 46, 2' PAVED SHOULDERS, RUMBLE STRIPS & SAFETY WEDGE CSAH 22, MARSHALL STREET TO HAMMER ROAD, GRADE AND SURFACE, BITUMINOUS PAVEMENT, STORM SEWER, TRAFFIC SIGNAL INSTALLATION, LIGHTING AND PED/BIKE IMPROVEMENTS (ASSOCIATED WITH CITY OF ALBERT LEA SP ) 0.00 SH PAVE SHOULDER HSIP 192, , , RC NEW PAVEMENT STBGP 7,500,000 5,785, ,715, LOCAL GOODHUE 941 MUN GOODHUE WIDE INTERSECTION LIGHTING INSTALLATION 3RD ST N OVER THE CANNON RIVER, 0.5 MI N OF JCT TH 19, REHAB BR # L SH LIGHTINGS HSIP 88,000 79, , BI BRIDGE REPAIR BROS 1,297,534 1,038, ,507 Page 76

10 942 LOCAL OLMSTED CONSTRUCTION MEMBERS PARKWAY EXTENSION AND PUBLIC STREET - ASSOCIATED SP RS NEW PAVEMENT STBGP 3,200,000 2,515, , CSAH RICE CSAH 48, 3/4 INTERSECTION 0.00 SH NEW PAVEMENT HSIP 310, , , CSAH AC 2020 WABASHA 945 LOCAL WABASHA 946 CSAH 4, AC 2020 WABASHA 11, 18 AND CSAH WABASHA **AC** REALIGNMENT OF CSAH 59 AND CSAH 10 INTERSECTION AT TH 61 (AC PAYBACK 1 OF 1) 0.00 SH NEW PAVEMENT HSIP 720, , WIDE 6" EDGELINE STRIPING 0.00 SH STRIPING HSIP 404, , ,400 **AC** WABASHA CSAH 4, 11, 18 AND 84, 2- SHOULDER PAVING, RUMBLE STRIPS, SAFETY EDGE IN CURVES (AC PAYBACK 1 OF 1) - TIED WITH SP **AC**CSAH 4: 2' SHOULDER PAVING, 6" EDGELINE STRIPING, RUMBLE STRIPS, SAFETY EDGE BITUMINOUS RECLAMATION AND BITUMINOUS PAVEMENT - ASSOCIATED WITH SP (AC PROJECT, PAYBACK IN 2022) 0.00 SH PAVE SHOULDER HSIP 513, , SH PAVE SHOULDER STBGP 846, , , CSAH S 2020 WABASHA **AC**CSAH 4: 2' SHOULDER PAVING, 6" EDGELINE STRIPING, RUMBLE STRIPS, SAFETY EDGE BITUMINOUS RECLAMATION AND BITUMINOUS PAVEMENT - ASSOCIATED WITH SP (AC PROJECT, PAYBACK IN 2022) - HSIP PORTION OF PROJECT 949 CSAH WINONA CSAH 30 OVER BEAVER CREEK, 0.4 MI W OF JCT TH74, REPLACE BR # BR BRIDGE 950 CSAH WINONA CSAH 37 OVER S FK WHITEWATER RIVER, 0.00 BR BRIDGE 1.6 MI S OF JCT CR108, REPLACE BR # SH PAVE SHOULDER HSIP 223, , , ,333 BROS 832, , ,000 BROS 871, , , PED/BIKE RED WING OLD WEST MAIN STREET PEDESTRIAN EN BRIDGE STBGTAP 1,811, , ,032 BICYCLE BRIDGE PEDESTRIAN 952 PED/BIKE LAKE CITY HOK-SI-LA PARK RECREATION TRAIL 0.00 EN NEW TRAIL STBGTAP 535, , , MN MnDOT ROUNDABOUT AT MN 57 AND MN SC ROUNDABOUT STBGP 2,350,000 1,880, , INTERSECTION - WANAMINGO 954 MN S 2020 MnDOT ROUNDABOUT AT MN 57 AND MN SH ROUNDABOUT HSIP 1,050, , , INTERSECTION - WANAMINGO - HSIP PORTION OF US OV MnDOT **CHAP 152** CONTRACT 0.26 BR BRIDGE BF 1,100, ,100,000 - ADMINISTRATION (CONSULTANT BOND ELIGIBLE) - RED WING BRIDGE 9040 AND BRIDGE F.Y MN MnDOT MN 56 FROM LEROY E. CITY LINE TO MAPLE ST. (TAOPI), BITUMINOUS MILL AND 8.40 RS MILL AND STBGP 4,100,000 3,280, , MN MnDOT MN 105 FROM IA STATE LINE TO BRIDGE 5971, BITUMINOUS MILL AND RS MILL AND STBGP 4,400,000 3,520, , Page 77

11 958 US MnDOT US 63, OVER I 90, REPLACE BRIDGES BR BRIDGE NHPP 15,400,000 12,320, ,080, AND SB BR 9889 AND INTERCHANGE IMPROVEMENTS 959 I MnDOT SPP** I 90 EB OVER US 52, BRIDGE BI BRIDGE REPAIR NHPP 2,625,000 2,362, , AND WB OVER US 52, BRIDGE 55809, REHAB BRIDGES 960 US MnDOT **ITS** US 14 FROM I-35 TO CSAH 80, TMS 6.20 SC TRAFFIC STBGP 500, , , MANAGEMENT SYSTEM 961 I MnDOT STRAIGHT RIVER REST AREA, 0.00 RB SAFETY REST AREA NHPP 2,000,000 1,800, , RECONSTRUCTION 962 MN MnDOT MN 42 FROM 0.35 MI N OF MN 247 TO US 61, BITUMINOUS MILL AND RS MILL AND STBGP 4,900,000 3,920, , US MnDOT US 61, IN LAKE CITY FROM WEST ELM STREET TO CENTRAL POINT ROAD, RECONSTRUCTION 964 MN MnDOT MN 74, OVER STREAMS, REHAB BRIDGES 8593 AND 8595 AND REPLACE BRIDGES 5835, 5836, 8592 AND I MnDOT **17NEW**CHAP3**SPP** I 90, EB OVER TWP 231, REPLACE BRIDGES AND MN MnDOT DISTRICTWIDE VARIOUS LOCATIONS, BITUMINOUS PAVEMENT SEAL COAT 967 MN MnDOT CULVERT LININGS - VARIOUS LOCATIONS DISTRICTWIDE 968 MN AM MnDOT DISTRICTWIDE SETASIDE - LOCAL PARTNERSHIP PROGRAM (LPP) MN CA MnDOT DISTRICTWIDE SETASIDES - EXTERNAL PROJECT DELIVERY MN CA-20A 2020 MnDOT **17NEW** DISTRICTWIDE SETASIDES - PROJECT DELIVERY MN LT MnDOT DISTRICTWIDE SETASIDES - LIGHTING MN MA MnDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS S MN PD MnDOT DISTRICTWIDE SETASIDE - INTERNAL PROJECT DELIVERY MN PM MnDOT DISTRICTWIDE SETASIDES - ROUT AND SEAL RC RECONST. NHPP 9,900,000 6,960, ,740,000-1,200, BR BRIDGE REPAIR STBGP 1,350,000 1,080, , BR BRIDGE 0.00 MA MISC PM BITUMINOUS ROUT & SEAL 975 MN RW MnDOT DISTRICTWIDE SETASIDES - R/W RW RIGHT OF WAY 976 MN SA MnDOT DISTRICTWIDE SETASIDES - SUPPLEMENTAL 0.00 SA SUPP. AGREE & S AND COST OVERRUNS COST OVERRUNS BF SF 5,000, ,100,000 1,900, PM BITUMINOUS SEAL COAT STBGP 1,800,000 1,440, , DR CULVERT REHAB SF 750, , AM COOP CONST SF 960, , SF 2,500, ,500, SF 3,000, ,000, SC LIGHTINGS SF 50, , SF 200, , SF 800, , STBGP 400, , , SF 3,150, ,150, SF 3,000, ,000, MN SC MnDOT DISTRICTWIDE SETASIDES - SAFETY PROJECTS SC MISC. STBGP 1,900,000 1,520, , LOCAL SHL LOCAL HSIP SETASIDE - LOCAL SH SAFETY HSIP 80,444 72, , MN SN MnDOT DISTRICTWIDE SETASIDES - SIGNING RX BARC SF 220, , MN ST MnDOT DISTRICTWIDE SETASIDES - STRIPING RX BARC SF 700, , Total 137,224,824 61,320, ,000 2,055,000 28,157,500 3,000,000 42,691,997 Page 78

12 981 BB TRF A 2021 ROCHESTER SECT 5307: ROCHESTER RR OPERATING 0.00 B9 TRANSIT FTA 13,700, ,000, ,700,000 ASSISTANCE OPERATIONS 982 BB TRF B 2021 ROCHESTER SECT 5339: ROCHESTER ; (2) DAR BUSES 0.00 BB TRANSIT VEHICLE FTA 645, , , BB TRF C 2021 ROCHESTER SECT 5339: ROCHESTER ; ONE (1) ST. 40 FT EXPANSION BUS 984 BB TRF D 2021 ROCHESTER SECT 5307: ROCHESTER; TRANSIT DEVELOPMENT PLAN 985 BB TRF E 2021 ROCHESTER ROCHESTER: TWO (2) BUS SHELTERS 986 BB TRF LA CRESCENT SECT 5307: CITY OF LA CRESENT TRANSIT OPERATING ASSISTANCE 987 BB TRS T 2021 ROCHESTER CITY OF ROCHESTER; FIVE (5) STD. 40 FT. BUSES 0.00 BB TRANSIT VEHICLE 0.00 B9 TRANSIT OPERATIONS 0.00 TR TRANSIT GRANT 0.00 B9 TRANSIT OPERATIONS 0.00 TR TRANSIT VEHICLE FTA 490, , ,000 FTA 250, , ,000 LF 20, ,000 FTA 375, , ,000 STBGP 2,675,000 2,140, , CSAH FILLMORE 989 CSAH HOUSTON CSAH 21, FROM CSAH 12 TO TH 16, CONCRETE CSAH 6, FROM WINONA LINE TO TOWN HALL ROAD, BITUMINOUS RECLAMATION/BITUMINOUS PAVEMENT 5.37 RS CONCRETE 6.66 RD BITUMINOUS RECLAMATION STBGP 2,700,000 1,950, ,000 STBGP 2,331,000 1,680, , CSAH RICE CSAH 6, EDGELINES PLUS 2' SHOULDER PLUS RUMBLES PLUS EDGE 991 CR WABASHA TH 61/CR77 INTERSECTION IMPROVEMENTS 992 CSAH WABASHA CSAH 8, 6" EDGELINES, RUMBLE STRIPS AND SHOULDER PAVING 993 CSAH WABASHA CSAH 4/CSAH 27/TH 42, INTERSECTION GEOMETRICS 0.00 SH EDGELINE RUMBLE STRIPS 0.00 SH PAVEMENT MARKINGS 0.00 SH EDGELINE RUMBLE STRIPS 0.00 SH PROFILE CHANGE AND REPAVE HSIP 524, , ,444 HSIP 388, , ,889 HSIP 700, , ,000 HSIP 500, , , MUN FARIBAULT MUN 138, REPLACE BRIDGE OVER DIVISION STREET - FARIBAULT 995 LOCAL OWATONNA BRIDGE STREET, FROM 24TH AVE TO I 35 SB RAMP, RECONSTRUCTION 996 LOCAL RED WING **AC**OLD WEST MAIN ST (150' N OF TH 61 TO BUCHANAN STREET) & JACKSON ST (OLD WEST MAIN ST TO CP RAIL CROSSING), GRADE & SURFACE, BITUMINOUS PAVEMENT, STORM SEWER, SIGNING, STRIPING, LIGHTING, LANDSCAPING AND PED/BIKE IMPROVEMENTS (AC PROJECT, PAYBACK IN 2022) 997 PED/BIKE ROCHESTER TRAIL ALONG BROADWAY AND TH 14 FROM 14TH STREET TO CROSSROADS DR. SW 998 MSAS ROCHESTER MSAS 106, 16TH AVE SW TO 11TH AVE SW, 106 RECONSTRUCTION OF 2ND ST SW 999 PED/BIKE LA CRESCENT LA CRESCENT WAGON WHEEL TRAIL PHASE BI BRIDGE BROS 2,200,000 1,760, , RC NEW PAVEMENT STBGP 2,940,000 1,249, ,691, RC NEW PAVEMENT STBGP 1,770, , , ,119, EN NEW TRAIL STBGTAP 528, , , RC NEW PAVEMENT STBGP 3,570,000 2,370, ,200, EN NEW TRAIL STBGTAP 2,250,000 1,000, ,250,000 Page 79

13 1000 MN MnDOT MN 57 FROM CSAH 34 TO 11TH STREET IN THE CITY OF KASSON, RECONSTRUCTION 0.76 RC COOP CONST SF 3,750, ,750, US MnDOT **SPP**AC** US 65 NB AND SB FROM NEWTON AVE TO I-35 RAMPS IN ALBERT LEA, MN, BITUMINOUS MILL AND, ADA RAMP, SIDEWALK AND STORM SEWER REPAIRS (AC PROJECT - PAYBACK IN 2022) 1002 US MnDOT **17NEW**CHAP3**SPP**US 52 FROM S JCT OF MN 60 TO 2.2 MI S MN 19 IN GOODHUE. RECONSTRUCT SB LANES, REPLACE BRIDGES 9414, 9483, 9659, 9660, 9662 AND INCLUDES POTENTIAL NEW INTERCHANGE AND BRIDGE AT US 52/TH 57 INTERSECTION IN HADER RS MILL AND MC CONCRETE PAVEMENT NHPP 3,129,000 2,349, , , BF SF 56,572, ,900,000 49,672, MN MnDOT MN 56, REPLACE BOX 8648 OVER STREAM 0.17 BR BOX CULVERT STBGP 1,000, , , US OV MnDOT **CHAP 152** CONTRACT ADMINISTRATION (CONSULTANT BOND ELIGIBLE) - RED WING BRIDGE 9040 AND BRIDGE F.Y MN MnDOT MN 16, FROM 0.16 MILES WEST OF THE HOUSTON WEST CITY LIMITS TO BRIDGE 95111, MILL AND 1006 MN MnDOT MN 76, REHAB BRIDGE 9104, 9105 AND 9106 OVER MONEY CREEK - FORCE ACCOUNT 1007 US MnDOT **SPP** US 218, WEST JUNCTION OVER I 90, REPLACE BRIDGES AND I MnDOT **SPP** I 90, 28TH STREET OVER I 90, REPLACE BRIDGE 9504 WITH NEW BRIDGE US MnDOT **ITS** US 14 FROM CSAH 5 (BYRON) TO WEST CIRCLE DRIVE (ROCHESTER), TMS 1010 US MnDOT **ELLA** US 14, OVER STREAM, REPLACE BRIDGE 6034 WITH NEW BRIDGE 55X26 AND CULVERT WORK 1011 MN MnDOT MN 30, REPLACE BRIDGE 9008 AND BRIDGE 9009, OVER N. BR. ROOT RIVER 1012 MN MnDOT MN 30 FROM 0.28 MILE WEST OF ELLENDALE TO 1 MILE EAST OF CSAH 45 - MILL AND, CULVERT WORK AND STRUCTURAL LINING OF A BOX CULVERT PLUS THE REALIGNMENT OF MN 30 AND E 8TH AVE INTERSECTION AND ADA IMPROVEMENTS 1013 US MnDOT US 14, FROM I 35 TO APPROX. 0.5 MI EAST OF 44TH AVE SE (CSAH 43), HIGH TENSION CABLE BARRIER 0.26 BR BRIDGE 1.72 PM BITUMINOUS BF 150, ,000 - STBGP 658, , , RX BRIDGE REPAIR SF 50, , BR BRIDGE 0.00 BR BRIDGE 6.99 SC TRAFFIC MANAGEMENT SYSTEM 0.00 BR BRIDGE 0.25 BR BRIDGE 5.60 RS MILL AND NHPP 8,500,000 6,800, ,700, NHPP 3,300,000 2,640, , STBGP 670, , , STBGP 640, , , STBGP 5,400,000 4,320, ,080, STBGP 2,700,000 2,160, , SH TRAFFIC BARRIER HSIP 675, , , Page 80

14 1014 MN MnDOT **ELLA** MN 74, REPLACE BRIDGE 5932 OVER SOUTH FK WHITEWATER RIVER WITH NEW BRIDGE ST CHARLES 0.00 BR BRIDGE STBGP 1,800,000 1,440, , MN MnDOT DISTRICTWIDE PREVENTIVE MAINTENANCE - D6 EAST 1016 MN MnDOT DISTRICTWIDE PREVENTIVE MAINTENANCE - D6 WEST 1017 MN MnDOT DISTRICTWIDE PREVENTIVE MAINTENANCE - ROUT AND SEAL 1018 MN MnDOT DISTRICTWIDE BRIDGE DECK CRACK SEALING 1019 MN MnDOT DISTRICTWIDE, VARIOUS LOCATIONS, CONSTRUCT CENTERLINE SINUSOIDAL RUMBLE STRIP 1020 MN AM MnDOT DISTRICTWIDE SETASIDE - LOCAL PARTNERSHIP PROGRAM (LPP) MN AP MnDOT DISTRICTWIDE SETASIDES - ACCESSIBLE PEDESTRIAN INFRASTRUCTURE PM BITUMINOUS SEAL COAT STBGP 1,600,000 1,280, , PM BITUMINOUS SEAL STBGP 2,258,000 1,806, , COAT 0.00 PM BITUMINOUS STBGP 2,258,000 1,806, , ROUT & SEAL 0.00 BI BRIDGE REPAIR SF 385, , SH CENTERLINE RUMBLE STRIPS 0.00 AM COOP CONST 0.00 BT PED RAMPS (ADA IMP) HSIP 450, , , SF 483, , SF 100, , MN CA MnDOT DISTRICTWIDE SETASIDES - EXTERNAL SF 2,200, ,200, PROJECT DELIVERY MN CA-21A 2021 MnDOT **17NEW** DISTRICTWIDE SETASIDES - PROJECT DELIVERY SF 1,000, ,000, MN CL MnDOT DISTRICTWIDE SETASIDES - CULVERTS DR CULVERT SF 950, , MN LT MnDOT DISTRICTWIDE SETASIDES - LIGHTING SC LIGHTINGS SF 81, , MN MA MnDOT DISTRICTWIDE SETASIDES MA MISC. SF 100, , MISCELLANEOUS S MN PD MnDOT DISTRICTWIDE SETASIDE - INTERNAL SF 800, , PROJECT DELIVERY MN PED MnDOT DISTRICTWIDE SETASIDES - BICYCLE INFRASTRUCTURE BT PED RAMPS (ADA IMP) SF 260, , MN RCIP MnDOT DISTRICTWIDE SETASIDES - RCIP AM COOP CONST SF 1,938, ,938, MN RW MnDOT DISTRICTWIDE SETASIDES - R/W RW RIGHT OF WAY SF 2,100, ,100, MN SA MnDOT DISTRICTWIDE SETASIDES - SUPPLEMENTAL S AND COST OVERRUNS SA SUPP. AGREE & COST OVERRUNS SF 3,430, ,430, MN SC MnDOT DISTRICTWIDE SETASIDES - SAFETY 0.00 SC MISC. STBGP 369, , , PROJECTS MN SC MnDOT DISTRICTWIDE SETASIDES - SAFETY PROJECTS SC MISC. STBGP 735, , , MN SG MnDOT DISTRICTWIDE SETASIDES - SIGNAL SC TRAFFIC SIGNAL INSTALL SF 500, , LOCAL SHL LOCAL HSIP SETASIDE - LOCAL SH SAFETY HSIP 220, , , MN SHS MnDOT DISTRICTWIDE SETASIDES - HSIP SH SAFETY HSIP 541, , , MN SN MnDOT DISTRICTWIDE SETASIDES - SIGNING RX SIGNING SF 250, , MN ST MnDOT DISTRICTWIDE SETASIDES - STRIPING RX STRIPING SF 850, , Total 151,409,833 44,458,800 1,171,000 3,163,000 33,451,200 49,822,500 20,514,333 Page 81

15 1039 BB TRF A 2022 ROCHESTER SECT 5307: ROCHESTER RR OPERATING ASSISTANCE 0.00 B9 TRANSIT OPERATIONS FTA 13,700, ,000, ,700, BB TRF B 2022 ROCHESTER CITY OF ROCHESTER; TWO (2) BUS SHELTERS 0.00 TR TRANSIT GRANT LF 20, , BB TRF LA CRESCENT SECT 5307: CITY OF LA CRESENT TRANSIT OPERATING ASSISTANCE 0.00 B9 TRANSIT OPERATIONS FTA 375, , , BB TRS T 2022 ROCHESTER CITY OF ROCHESTER; RR 40-FT. BUS FOR EXPANSION 0.00 TR TRANSIT VEHICLE STBGP 546, , , BB TRS TA 2022 ROCHESTER CITY OF ROCHESTER; FOUR (4) FIXED ROUTE BUSES (CLASS 700) 1044 CR GOODHUE CR 57, REPLACE BR L0546 WITH NEW BRIDGE OVER LITTLE CANNON RIVER 0.00 TR TRANSIT VEHICLE 0.00 BI BRIDGE STBGP 2,184,000 1,747, ,800 BROS 610, , , CSAH MOWER CSAH 46, FROM I 90 TO TH 56, GRADE, SURFACE AND BRIDGE 1046 CSAH OLMSTED CSAH 4 AND CR 104/60TH AVENUE NW REBUILD - FROM JCT CSAH 3 N TO 0.5 MI W OF JCT 50 AVE NW 1047 CSAH SAC 2022 WABASHA **AC**CSAH 4: 2' SHOULDER PAVING, 6" EDGELINE STRIPING, RUMBLE STRIPS AND SAFETY EDGE - ASSOCIATED WITH SP (AC PAYBACK 1 OF 1) - HSIP PORTION OF PROJECT 3.00 RC NEW PAVEMENT STBGP 4,500,000 3,520, , RC NEW PAVEMENT STBGP 4,500,000 2,370, ,130, SH PAVE SHOULDER HSIP STBGP 110, , MSAS MSAS MSAS ALBERT LEA MSAS 135 (EAST MAIN STREET), US HWY 65 TO FREEBORN CSAH 38, MILL AND, INTERSECTION IMPROVEMENT, BIKE/PED TRAIL AUSTIN MSAS 145 (21ST AVENUE NE) FROM 8TH DRIVE NE TO 14TH ST NE, GRADE & SURFACE, CONCRETE PAVEMENT, LIGHTING, LANDSCAPING, PED/BIKE IMPROVEMENTS AC 2022 RED WING **AC**OLD WEST MAIN ST (150' N OF TH 61 TO BUCHANAN ST) & JACKSON ST (OLD WEST MAIN ST TO CP RAIL CROSSING), GRADE & SURFACE, BITUMINOUS PAVEMENT, STORM SEWER, SIGNING, STRIPING, LIGHTING, LANDSCAPING AND PED/BIKE IMPROVEMENTS (AC PAYBACK, 1 OF 1) 1.22 RS MILL AND STBGP 1,800,000 1,080, , RC NEW PAVEMENT STBGP 1,400, , , RC NEW PAVEMENT STBGP 400, , LOCAL WINONA BROADWAY STREET - FROM SIOUX ST TO MANKATO AVE - MILL AND, SIDEWALK AN PEDESTRIAN RAMPS - FOUR TO THREE LANE CONVERSION 0.00 EN MILL AND STBGTAP 1,555, , , PED/BIKE KASSON KASSON SAFE ROUTES TO SCHOOL - FROM MN 57 TO 9TH AVE NE IN CITY OF KASSON 0.00 EN NEW TRAIL STBGTAP 375, , ,000 Page 82

16 1053 MN MnDOT MN 30, RUSHFORD WEST CITY LIMITS TO MN 43, RECONSTRUCT URBAN SECTION 0.50 RS MAJOR CONST. SF LF 4,350, ,010,000-2,340, MN MnDOT **ELLA** MN 250 FROM MI N OF MN 16 (BRIDGE 23027) TO MN 30, BITUMINOUS MILL AND AND HYDRAULIC IMPROVEMENTS 1055 US AC 2022 MnDOT **SPP**AC** US 65 NB AND SB FROM NEWTON AVE TO I-35 RAMPS IN ALBERT LEA, MN, BITUMINOUS MILL AND, ADA RAMP, SIDEWALK AND STORM SEWER REPAIRS (AC PAYBACK 1 OF 1) 1056 I MnDOT **SPP** I 90 EB FROM CSAH 46 (PETRAN) TO 0.4 MI E MN 105, UNBONDED CONCRETE 1057 US MnDOT **SPP** US 61 FROM 1 MI N LAKE CITY LIMITS TO READY MIX ENTRANCE IN RED WING, BITUMINOUS MILL AND 8.49 RS MILL AND 2.67 RS MILL AND 9.27 RC CONCRETE 9.61 RS MILL AND STBGP 3,700,000 2,960, , NHPP 771, , NHPP 14,500,000 13,050, ,450, NHPP 4,538,000 3,630, , US MnDOT US 14, BYRON TO ROCHESTER FROM CSAH 34 TO US 52, HIGH TENSION CABLE BARRIER 1059 US MnDOT **SPP** US 14 EB AND WB FROM CSAH 36/MARION ROAD TO 0.2 MI E CSAH 19, BITUMINOUS MILL AND 7.25 SH TRAFFIC BARRIER HSIP 826, , , RS MILL AND NHPP 3,100,000 2,480, , MN MnDOT **ELLA**MN 21 FROM 1.7 MI N OF I 35 TO MN 99, BITUMINOUS MILL AND 1061 MN MnDOT MN 60 FROM US 52 TO US 63 (ZUMBRO FALLS), BITUMINOUS MILL AND, GRADING, ADA IMPROVEMENTS AND REPLACE BRIDGES 8676, 8841 AND RS MILL AND RS MILL AND SF 3,500, ,500, STBGP 9,900,000 7,920, ,980, US MnDOT **SPP** US 61, SB LANES FROM 0.1 MI N MN 248 TO 1.7 MI NW MN 60, BITUMINOUS MILL AND AND MN 74, FROM WABASHA ROAD 26 TO US 61, BITUMINOUS MILL AND AND ADA IMPROVEMENTS RS MILL AND NHPP 12,000,000 9,600, ,400, MN MnDOT **SPP** MN 43 NB AND SB FROM TH 61/WINONA TO JCT MANKATO AVE/SARNIA ST, RECONSTRUCTION 1064 MN MnDOT DISTRICTWIDE DECK CRACK SEALING AND REPAIRS 1065 MN ADA MnDOT DISTRICTWIDE SETASIDES - ADA IMPROVEMENTS MN AM MnDOT DISTRICTWIDE SETASIDE - LOCAL PARTNERSHIP PROGRAM (LPP) MN CA MnDOT DISTRICTWIDE SETASIDES - EXTERNAL PROJECT DELIVERY MN CA-22A 2022 MnDOT **17NEW** DISTRICTWIDE SETASIDES - PROJECT DELIVERY RC RECONST. SF 9,450, ,450, BI BRIDGE REPAIR SF 700, , SC PED RAMPS (ADA IMP) 0.00 AM COOP CONST SF 50, , SF 2,000, ,000, SF 4,000, ,000, SF 2,500, ,500, Page 83

17 1069 MN LT MnDOT DISTRICTWIDE SETASIDES - LIGHTING SC LIGHTINGS SF 50, , MN MA MnDOT DISTRICTWIDE SETASIDES - MISCELLANEOUS S MA MISC. SF 600, , MN PD MnDOT DISTRICTWIDE SETASIDE - INTERNAL SF 1,000, ,000, PROJECT DELIVERY MN PM MnDOT DISTRICTWIDE SETASIDES - PREVENTIVE MAINTENANCE PM BITUMINOUS SEAL COAT SF 4,100, ,100, MN RCIP MnDOT DISTRICTWIDE SETASIDES - RCIP AM COOP CONST SF 300, , MN RW MnDOT DISTRICTWIDE SETASIDES - R/W RW RIGHT OF WAY SF 2,200, ,200, MN SA MnDOT DISTRICTWIDE SETASIDES - SUPPLEMENTAL S AND COST OVERRUNS SA SUPP. AGREE & COST OVERRUNS SF 4,000, ,000, MN SC MnDOT DISTRICTWIDE SETASIDES - SAFETY PROJECTS SC SAFETY STBGP 750, , , MN SG MnDOT DISTRICTWIDE SETASIDES - SIGNAL SC TRAFFIC SIGNAL INSTALL SF 800, , LOCAL SHL LOCAL HSIP SETASIDE - LOCAL SH SAFETY HSIP 2,333,333 2,100, , MN SHS MnDOT DISTRICTWIDE SETASIDES - HSIP SH SAFETY HSIP 774, , , MN SN MnDOT DISTRICTWIDE SETASIDES - SIGNING RX BARC SF 220, , MN ST MnDOT DISTRICTWIDE SETASIDES - STRIPING RX BARC SF 850, , Total 125,938,209 56,323,400-2,055,000 46,737,600-20,822,209 Page 84

Target FHWA 0.0 TR STBGP STATEW IDE 0.0 TR STBGP 2,100,000 1,680, ,000 2,100, RS STBGP< 5K 7.0 RS STBGP< 5K 0.0 EN STBGTA 5K 200K

Target FHWA 0.0 TR STBGP STATEW IDE 0.0 TR STBGP 2,100,000 1,680, ,000 2,100, RS STBGP< 5K 7.0 RS STBGP< 5K 0.0 EN STBGTA 5K 200K 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 BB TRF 3780 18 2018 L LA CRSCNT 5 SCT 5307: CITY OF LA CRSNT TRANSIT OPRATING ASSISTANC BB TRF 0047 18 2018 L ROCHSTR 6 CITY OF ROCHSTR; DIAL A R OPRATING

More information

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION

More information

Target FHWA Dist C FHWA Total FHWA. STIP Total FHWA EARMARK

Target FHWA Dist C FHWA Total FHWA. STIP Total FHWA EARMARK 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 B C F G H J L M P Q R S W AA AE AF AG AH AI AJ A AL AM AN AO AP AQ AR AS AU AV

More information

MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM

MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM 2018-2021 April, 2017 FISCAL YEARS 2018-2021 MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM FOR THE GRAND FORKS - EAST GRAND FORKS METROPOLITAN

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS DT2511563 2511563 FROM PORT OF MIAMI PORT OF MIAMI TUNNEL TO SR 836/I-395 0.5 NEW ROAD CONSTRUCTION $2,514,664 $790,186 - DESIGN/BUILD LF 2,766 2,849 2,935 3,023 3,113 DESIGN/BUILD GMR 22,152 22,990 24,338

More information

Washington State S. T. I. P to 2021 (Project Funds to Nearest Dollar)

Washington State S. T. I. P to 2021 (Project Funds to Nearest Dollar) ( Funds to Nearest Dollar) Agency: Bellingham Number PIN ID 17 5565(001) BHAM 40 28 0.210 CE Yes Mahogany Ave Cordata Elementary 1,951,200 Cordata Safe Routes to School Program The project includes bike

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF APRIL 2, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF APRIL 2, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF APRIL 2, 2018 AGENDA ITEM NO. 47 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final June 2018 bid opening for $58,352,185, the tentative

More information

FY 2018 Ten Year Capital Plan Review Project List

FY 2018 Ten Year Capital Plan Review Project List FY 2018 Ten Year Capital Plan Review Project List Program Category FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 Highway Roadway/Safety 100,950,000 128,431,766 125,896,635 91,153,571

More information

CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors]

CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors] CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors] Travel Time and Delay Analysis for Belpre (OH) and Marietta (OH) Fiscal Year 2009 Report WOOD WASHINGTON

More information

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation #1 Northing 640586.689 / Easting 669419.281 / Elevation 1443.178 Center of bronze cap with UA seal. Located in sidewalk approx. 10 W of curb on Garland Ave. Approx. 24.5 SE of traffic signal post. UA #1

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF JULY 2, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF JULY 2, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF JULY 2, 2018 AGENDA ITEM NO. 91 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final September 2018 bid opening for $118,698,012, the tentative

More information

FY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission

FY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission FY 2010 Continuing i Planning Program Product Report Local Transportation and Traffic Data Travel Time and Delay Data for Belpre and Marietta, Ohio Wood-Washington-Wirt Interstate Planning Commission CONTINUING

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Quarterly Project Status Report September 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update TxDot s contractor has nearly completed the superstructure false work

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF JANUARY 3, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF JANUARY 3, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF JANUARY 3, 2018 AGENDA ITEM NO. 9 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final March 2018 bid opening for $112,025,914, the tentative

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 10, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 10, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 10, 2018 AGENDA ITEM NO. 116 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final November 2018 bid opening for $233,251,841,

More information

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS 3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS In order to better determine future roadway expansion and connectivity needs, future population growth and land development patterns were analyzed as part of

More information

FUND THAN THAN ALL CODE YEARS

FUND THAN THAN ALL CODE YEARS PAGE 1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/20/2012 HIGHWAYS ITEM NUMBER:230724 1 PROJECT DESCRIPTION:ANDREWS AVE EXT FROM POMPANO PARK PLACE TO S. OF ATLANTIC BLVD *NON-SIS* DISTRICT:04 COUNTY:BROWARD

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

West Tennessee Construction June 14-21, 2017

West Tennessee Construction June 14-21, 2017 FOR IMMEDIATE RELEASE Wednesday, June 14, 2017 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction June 14-21, 2017 BENTON COUNTY, I-40 Truck Climbing Lane Wednesday, June 7 through

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Quarterly Project Status Report May 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Construction of North Main Street Bridge by TxDOT s bridge contractor, Texas

More information

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY Town of Bowden Box 338, 2101 20 th Ave Bowden, Alberta, T0M 0K0 Town of Bowden Province of Alberta Policy Document (2019-01) SNOW REMOVAL POLICY 1 INTRODUCTION The purpose of this policy is to establish

More information

March 3, 2011 Update. Mike Welvaert National Weather Service La Crosse, WI. March 3, 2011

March 3, 2011 Update. Mike Welvaert National Weather Service La Crosse, WI. March 3, 2011 March 3, 2011 Update Mike Welvaert National Weather Service La Crosse, WI March 3, 2011 Discussion Points Flood Setup A Wet Fall and Snowy Winter 2011 Spring Flood Outlooks Precipitation: Sept 3 2010 March

More information

0.143 Hickory Circle

0.143 Hickory Circle Rank Width Leng ROAD NAME Total Feet Miles Cregar Road House 132 to Muni Bound 37.3 20' to 32 0.343 Mill Street McDonald Street to Trail 32.8 20 0.133 Academy Street 32.3 18 0.066 Sunset Drive 32.3 33

More information

2014 Data Collection Project ITE Western District

2014 Data Collection Project ITE Western District 2014 Data Collection Project ITE Western District Project Completed By: Oregon State University OSU ITE Student Chapter 101 Kearney Hall Corvallis, OR 97331 Student Coordinator: Sarah McCrea (OSU ITE Student

More information

TRAFFIC IMPACT STUDY MANUFACTURING COMPANY

TRAFFIC IMPACT STUDY MANUFACTURING COMPANY TRAFFIC IMPACT STUDY For MANUFACTURING COMPANY Prepared For: Airway Heights, WA Prepared By: SUNBURST ENGINEERING, P. S. 4310 S. Ball Dr. Veradale, WA 99037 April, 2013 TRAFFIC IMP ACT STUDY Manufacturing

More information

TRAFFIC FORECAST METHODOLOGY

TRAFFIC FORECAST METHODOLOGY CHAPTER 5 TRAFFIC FORECAST METHODOLOGY Introduction Need for County-Level Traffic Forecasting 2030 HC-TSP Model Methodology Model Calibration Future Traffic Forecasts Hennepin County Transportation Systems

More information

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Information for File # 2013-00531-MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Applicant: City of St. Louis Park Corps Contact: Melissa Jenny Address: U.S. Army Corps of Engineers Attn:

More information

MnDOT Research Update BCOA Performance and UBOL Design

MnDOT Research Update BCOA Performance and UBOL Design MnDOT Research Update BCOA Performance and UBOL Design Tom Burnham, P.E. Senior Road Research Engineer CPAM Annual Concrete Paving Workshop, Brainerd, MN Outline BCOA (Whitetopping) Study Objectives Field

More information

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016 Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION

More information

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00

More information

GIS ANALYSIS METHODOLOGY

GIS ANALYSIS METHODOLOGY GIS ANALYSIS METHODOLOGY No longer the exclusive domain of cartographers, computer-assisted drawing technicians, mainframes, and workstations, geographic information system (GIS) mapping has migrated to

More information

Hurricane Florence Recovery Report 4:00 PM October 31, 2018

Hurricane Florence Recovery Report 4:00 PM October 31, 2018 Hurricane Florence Recovery Report 4:00 PM October 3, 208 SCDOT Operations Mode: Recovery Statewide Summary There are 2 road closures on primary and secondary routes due to damage or flooding throughout

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/22/2019 4:20:05 AM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone: JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH 45243 Email: jackpflum1@gmail.com Telephone: 513.919.7814 MEMORANDUM REPORT Traffic Impact Analysis Proposed Soccer

More information

Hurricane Florence Recovery Report 4:00 PM October 17, 2018

Hurricane Florence Recovery Report 4:00 PM October 17, 2018 Hurricane Florence Recovery Report 4:00 PM October 17, 2018 SCDOT Operations Mode: Recovery Statewide Summary There are 27 road closures on primary and secondary routes due to damage or flooding throughout

More information

Public Open House Meeting Thursday, February 22, Broken Arrow to Tulsa Mass Transit Feasibility Study

Public Open House Meeting Thursday, February 22, Broken Arrow to Tulsa Mass Transit Feasibility Study Public Open House Meeting Thursday, February 22, 2007 Broken Arrow to Tulsa Mass Transit Feasibility Study Meeting Agenda Welcome Where we Are What we ve Learned Corridor Study Map Stations (Commuter Rail

More information

COUNCIL POLICY MANUAL

COUNCIL POLICY MANUAL COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/24/2019 5:16:03 PM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

CITY OF MINOT SNOW REMOVAL PLAN October 2018

CITY OF MINOT SNOW REMOVAL PLAN October 2018 CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

Hurricane Florence Recovery Report 4:00 PM November 15, 2018

Hurricane Florence Recovery Report 4:00 PM November 15, 2018 Hurricane Florence Recovery Report 4:00 PM November 5, 208 SCDOT Operations Mode: Recovery Statewide Summary There are 9 road closures on primary and secondary routes due to damage or flooding throughout

More information

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas.

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas. NOTICE OF PUBLIC HEARING CITY PLANNING COMMISSION CITY OF OVERLAND PARK, KANSAS Notice is hereby given that the City Planning Commission of Overland Park, Kansas, will hold a public hearing Monday, July

More information

Reserve Forecast Details

Reserve Forecast Details 10-26th St South of Maryland Reserve (1552) Opening Balance 158,947 158,947 0 0 0 0 0 0 0 0 1058 - Street Construction 0 (158,947) 0 0 0 0 0 0 0 0 Total 0 (158,947) 0 0 0 0 0 0 0 0 Closing Balance 158,947

More information

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington METRO CIP

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington METRO CIP METRO METRO METRO 2019 2028 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF MARCH 5, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF MARCH 5, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF MARCH 5, 2018 AGENDA ITEM NO. 33 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final May 2018 bid opening for $115,638,524, the tentative

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/13/2019 2:54:03 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/13/2019 2:54:03 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/13/2019 2:54:03 PM 57 56 @ Corvallis - Newport Hwy OR34 HWY372 22 22 Mount Bachelor Ski Area I-5 10 13

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/10/2019 7:20:01 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/10/2019 7:20:01 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/10/2019 7:20:01 PM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

[Leveraging & Improving Neighborhood Connections] Area E Cedar Creek

[Leveraging & Improving Neighborhood Connections] Area E Cedar Creek Community Charrette LINC Dallas [Leveraging & Improving Neighborhood Connections] Area E Cedar Creek 06.02.12 LINC Workshop Area E Area E has the unique distinction of at-grade frontage to the Trinity

More information

FY TRANSPORTATION IMPROVEMENT PROGRAM

FY TRANSPORTATION IMPROVEMENT PROGRAM NEW CASTLE COUNTY I-295 IMPROVEMENTS DESCRIPTION: I-295 Northbound: This project will include additional capacity from I-95 northbound from the SR141 interchange to I-295 northbound. I-295 Improvements,

More information

APPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT

APPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT APPENDIX C: SNOW/ICE REMOVAL RESOURCES FACILITIES MAINTENANCE EQUPMENT (2) Tractors with Front End Loader and Box Blade (1) Unit used to load sand and salt mix (1) Unit used to remove plowed snow in parking

More information

Com munity Advisor y C ommitte e Meeting

Com munity Advisor y C ommitte e Meeting Community Advisor y Committee Meeting J u n e 1 5, 2 0 1 7 Project Scope 14 miles of enhanced service from Downtown Portland to Cleveland Park & Ride 41 Stations with 82 Platforms 1/3 mile approximate

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

CVS Derwood. Local Area Transportation Review

CVS Derwood. Local Area Transportation Review CVS Derwood Montgomery County, Maryland May 27, 2016 Local Area Transportation Review Prepared for: JC Bar Properties, Inc. Steve Fleming, PE 415 Fallowfield Road, Suite 301 Camp Hill, Pennsylvania 17011

More information

A CASE STUDY ON EDUCATING ENGINEERING STUDENTS ON THE CHALLENGES OF URBANIZED AT-GRADE INTERSECTIONS

A CASE STUDY ON EDUCATING ENGINEERING STUDENTS ON THE CHALLENGES OF URBANIZED AT-GRADE INTERSECTIONS A CASE STUDY ON EDUCATING ENGINEERING STUDENTS ON THE CHALLENGES OF URBANIZED AT-GRADE INTERSECTIONS Villanova University, Dept. of Civil & Environmental Engineering Villanova, Pennsylvania Presented by:

More information

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Subject: Revised Castle Hills BASIS Charter School Traffic Impact Analysis Review City of Castle Hills,

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF DECEMBER 3, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF DECEMBER 3, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF DECEMBER 3, 2018 AGENDA ITEM NO. 159 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final February 2019 bid opening for $88,659,936, the

More information

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016 Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet September 2015 RECOMMENDED ALTERNATIVES Environmental Impact Statement (EIS) Project Divided into 3 Segments Segment 1:

More information

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov February 9, 2018 I-10 East at Redd closes for 24 hours this Sunday, Feb 11

More information

PCI by Road Section - District 4 (A to Z) PCI for Road Maintenance District 4 (A to Z)

PCI by Road Section - District 4 (A to Z) PCI for Road Maintenance District 4 (A to Z) MULTNOMAH COUNTY 1620 SE 190th Avenue Portland, OR 97233 (503) 988-5050 PCI by Section - District 4 (A to Z) PCI for Maintenance District 4 (A to Z) Number Name Funct. Class Surface Type Begin Location

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Planning for a Mega Project in a Metropolitan Area TxDOT Short Course October 13, 2015 RECOMMENDED ALTERNATIVES Environmental Impact Statement (EIS) Project

More information

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 Executive Summary Page 2.0 Introduction 2.1 DEVELOPMENT

More information

Ellis County-Midlothian to Waxahachie Trail Corridor Research

Ellis County-Midlothian to Waxahachie Trail Corridor Research Ellis County- to Trail Corridor Research The University of Texas at Arlington Program in Landscape Architecture, School of Architecture and The Institute of Urban Studies, The School of Urban and Public

More information

CITY OF MINOT SNOW REMOVAL PLAN November 2017

CITY OF MINOT SNOW REMOVAL PLAN November 2017 CITY OF MINOT SNOW REMOVAL PLAN November 2017 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

Hurricane Michael Operations Report 4:00 PM October 10, 2018

Hurricane Michael Operations Report 4:00 PM October 10, 2018 Hurricane Michael Operations Report 4:00 PM October 10, 2018 SCDOT Operations Mode: Preparation Statewide Summary SCDOT is prepared and ready to respond to the potential effects of Hurricane Michael. Currently,

More information

City of Brainerd, Minnesota Snowplowing Policy

City of Brainerd, Minnesota Snowplowing Policy City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control

More information

I-95/I-85 INTERCHANGE ROADWAY SAFETY ASSESSMENT

I-95/I-85 INTERCHANGE ROADWAY SAFETY ASSESSMENT FINAL REPORT I-95/I-85 INTERCHANGE ROADWAY SAFETY ASSESSMENT Prepared for: Prepared by: 117306012.B MARCH 2013 Final Report March 2013 I-95/I-85 Interchange ROADWAY SAFETY ASSESSMENT Prepared for: Prepared

More information

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN March 27, 2007 Oxford Heights Overview and Historical Conditions Oxford Heights is a medium sized community located on the southern side of Elizabeth

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB

More information

1. Departmental Presentation - Away Goes Trouble Down the Drain - Highway Division. 3. Continued Discussion an Ordinance for Disorderly Residences

1. Departmental Presentation - Away Goes Trouble Down the Drain - Highway Division. 3. Continued Discussion an Ordinance for Disorderly Residences City of Keene New Hampshire MUNICIPAL SERVICES, FACILITIES AND INFRASTRUCTURE COMMITTEE AGENDA Council Chambers B October 11, 2017 6:00 PM Janis O. Manwaring Randy L. Filiault Robert J. O'Connor Stephen

More information

APPENDIX (R) Committed Developments Documentation

APPENDIX (R) Committed Developments Documentation APPENDIX 21-10 (R) Committed Developments Documentation Revised October 2008 Committed Developments Trip Generation Beacon Countyline DRI Development Location Land Use Approved Built Remaining PM Peak

More information

TRANSPORTATION AND TRAFFIC ANALYSIS REPORT

TRANSPORTATION AND TRAFFIC ANALYSIS REPORT Square One Drive Extension Municipal Class Environmental Assessment Environmental Study Report Appendix B Transportation and Traffic Analysis Report TRANSPORTATION AND TRAFFIC ANALYSIS REPORT FINAL DRAFT

More information

Winter Maintenance on Ontario s Highways

Winter Maintenance on Ontario s Highways Ministry of Transportation Winter Maintenance on Ontario s Highways MTO Eastern Region November 18, 2015, Northumberland County Council Outline 1. Winter Maintenance Areas - Eastern Region 2. Winter Maintenance

More information

Monroe County: Key West and Lower Keys

Monroe County: Key West and Lower Keys FDOT PROJECT UPDATES June 15-21, 2015 Monroe County: Key West and Lower Keys Monroe County projects website: www.fdotmonroe.com Opt Out: If you no longer wish to receive these weekly notifications, please

More information

Blue Ridge Relay Course Outline. leg distance

Blue Ridge Relay Course Outline. leg distance Blue Ridge Relay Course Outline leg leg distance segment distance direction road markers 1 Grayson Highlands State Park Visitors Center 3.90 3.90 S Grayson Highlands State Park Office and Gate 2 S Grayson

More information

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots City of Mt. Pleasant Administrative Memo #1-85 Issued: January 1, 1985 SUBJECT: Snow and Ice Control Policy SUMMARY: The intent of this policy is to construct a basic guideline to effectively and efficiently

More information

MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015

MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015 MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015 TABLE OF CONTENTS... 3 Proposed Development... 3 Methodology... 3 Phase 1 Development...

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

Analysis of Hydraulic Impacts on the Schuylkill River

Analysis of Hydraulic Impacts on the Schuylkill River Analysis of Hydraulic Impacts on the Schuylkill River Manayunk Sewer Basin Construction Project and the Venice Island Recreation Center Reconstruction Project Venice Island, Manayunk, Philadelphia, PA

More information

SNOW REMOVAL GUIDE. City Of Orange Township. Public Works Snow Removal Hotline: (973) My Orange Hotline: (973)

SNOW REMOVAL GUIDE. City Of Orange Township. Public Works Snow Removal Hotline: (973) My Orange Hotline: (973) Mayor Dwayne D. Warren, Esq. And The Orange Municipal Council MOVING ORANGE FORWARD City Of Orange Township SNOW REMOVAL GUIDE Public Works Snow Removal Hotline: (973) 266-4030 My Orange Hotline: (973)

More information

LRRB INV 828 Local Road Material Properties and Calibration for MnPAVE

LRRB INV 828 Local Road Material Properties and Calibration for MnPAVE LRRB INV 828 Local Road Material Properties and Calibration for MnPAVE Task 4 Report Calibration Bruce Tanquist, Assistant Pavement Design Engineer Minnesota Department of Transportation May 23, 2008 Introduction

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

Best Practices and Techniques for Clearing Intersection Layouts

Best Practices and Techniques for Clearing Intersection Layouts Research for winter highway maintenance Manual of Best Practices and Techniques for Clearing Intersection Layouts Prepared by: Yan Qi (Southern Illinois University Edwardsville) Dave Bergner (Monte Vista

More information

FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005

FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005 FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005 Prepared For: EDAW, Inc. 1420 Kettner Boulevard, Suite 620

More information

Winter Maintenance on Provincial Highways

Winter Maintenance on Provincial Highways Winter Maintenance on Provincial Highways Thunder Bay District Municipal League Wayne Prystanski, A/Regional Director, Northwestern Region February 27, 2015 Outline 1. AMC s in NW Region 2. Winter Maintenance

More information

WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas)

WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas) WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas) 1.0 PURPOSE: It is the goal and intent of the City of Rochester to provide timely, efficient

More information

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 MISSOURI RIVER FLOOD OF 2011 M I C H A E L J. K E N N E R L Y P. E. D I R E C T O R O F T H E O F F I C E O F D E S I G N I O W A D

More information

DEPARTMENT OF PUBLIC WORKS

DEPARTMENT OF PUBLIC WORKS Village of Hartland DEPARTMENT OF PUBLIC WORKS SNOW AND ICE CONTROL/REMOVAL POLICY PPM-1 ADOPTED BY VILLAGE BOARD 12/28/87 Revised 7/22/13 VILLAGE OF HARTLAND SNOW AND ICE CONTROL/REMOVAL POLICY General

More information

SNOWPLOWING/ICE CONTROL POLICY

SNOWPLOWING/ICE CONTROL POLICY SNOWPLOWING/ICE CONTROL POLICY BACKGROUND: The Town of White Bear, Minnesota, finds that in the best interest of the residents of the Town to assume basic responsibility for the control of snow and ice

More information

Local Calibration Factors for Implementing the Highway Safety Manual in Maine

Local Calibration Factors for Implementing the Highway Safety Manual in Maine Local Calibration Factors for Implementing the Highway Safety Manual in Maine 2017 Northeast Transportation Safety Conference Cromwell, Connecticut October 24-25, 2017 MAINE Darryl Belz, P.E. Maine Department

More information

MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS

MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS Freeway DT2495811 SR 826/SR 836 2495811 FROM N OF SW 8 ST And from NW 87 to 57 Avenues 4.8 TO S OF NW 25 ST & FM NW 87 TO 57 AVE' INTERCHANGE - ADD LANES $851,335 $804,835 - - DESIGN/BUILD LF 46,500 0

More information

1 Summary Monetary Component Public Purpose Land Provision Introduction Document Structure...

1 Summary Monetary Component Public Purpose Land Provision Introduction Document Structure... 1 Summary... 1 1.1 Monetary Component... 1 1.2 Public Purpose Land Provision... 1 2 Introduction... 5 2.1 Document Structure... 5 2.2 Planning & Environment Act 1987... 5 2.3 Strategic Planning & Justification...

More information

Highway Research Council

Highway Research Council ON THE USE OF STUDDED TIRES SURVEY THEIR CONTRIBUTION TO PAVEMENT WEAR AND Highway Materials Technician Highway Research Council Virginia Cooperative Organization Sponsored Jointly by the Virginia (A 1974

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF NOVEMBER 6, 2017

FOR PRESENTATION AT THE COMMISSION MEETING OF NOVEMBER 6, 2017 FOR PRESENTATION AT THE COMMISSION MEETING OF NOVEMBER 6, 2017 AGENDA ITEM NO. 148 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final January 2018 bid opening for $189,147,369, the

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF JULY 5, 2017

FOR PRESENTATION AT THE COMMISSION MEETING OF JULY 5, 2017 FOR PRESENTATION AT THE COMMISSION MEETING OF JULY 5, 2017 AGENDA ITEM NO. 96 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final September 2017 bid opening for $144,018,153, the tentative

More information

The Highline Development Traffic Impact Study

The Highline Development Traffic Impact Study The Highline Development Traffic Impact Study Columbia Falls, Montana Prepared For: TD&H Engineering 450 Corporate Drive, Suite 101 Kalispell, MT 59901 June, 2018 130 South Howie Street Helena, Montana

More information

City of Camrose Winter Road Maintenance Policy

City of Camrose Winter Road Maintenance Policy City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.

More information