FOR PRESENTATION AT THE COMMISSION MEETING OF JULY 2, 2018

Size: px
Start display at page:

Download "FOR PRESENTATION AT THE COMMISSION MEETING OF JULY 2, 2018"

Transcription

1 FOR PRESENTATION AT THE COMMISSION MEETING OF JULY 2, 2018 AGENDA ITEM NO. 91 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final September 2018 bid opening for $118,698,012, the tentative October 2018 bid opening for $75,045,802 and the tentative November 2018 bid opening for $238,184,626. The Department recommends Commission approval of the final September 2018, the tentative October 2018 and the tentative November 2018 bid openings. PROJECTS AWARDED PROJECTS AWARDED LETTING MONTH TOTAL LETTING MONTH TOTAL JUNE 2016 $50,739,130 JUNE 2017 $44,401,131 JULY 2016 $118,845,797 JULY 2017 $20,536,828 AUGUST 2016 $107,433,153 AUGUST 2017 $92,196,947 SEPTEMBER 2016 $139,883,887 SEPTEMBER 2017 $125,727,448 OCTOBER 2016 $76,030,927 OCTOBER 2017 $31,449,285 NOVEMBER 2016 $82,510,077 NOVEMBER 2017 $164,048,900 DECEMBER 2016 $0 DECEMBER 2017 $0 JANUARY 2017 $87,097,727 JANUARY 2018 $107,855,999 FEBRUARY 2017 $92,817,116 FEBRUARY 2018 $92,175,995 MARCH 2017 $67,797,535 MARCH 2018 $86,110,674 APRIL 2017 $240,480,104 APRIL 2018 $33,239,635 MAY 2017 $33,983,393 MAY 2018 $78,967,894 TOTAL $1,097,618,846 TOTAL $876,710,736

2 Page 1 of 3 FINAL SEPTEMBER 2018 BID OPENING 30998(04) 5 SH ,035, ,115, ,150, BECKHAM I-40: SH-6 BOTH NB & SB BRIDGES OVER I-40 IN ELK CITY NHPPI (061) PM 32902(04) 5 COBRGE , , , BLAINE CO BR ON EW-065 OVER SPRING CREEK APPROX. 3.0 MI SOUTH AND 3.5 MI WEST OF SH-51/SH-8 JCT. IN OKEENE STP -206D (050) CI 31441(04) 4 ENHAN , , , PEDESTRIAN IMPROVEMENTS CANADIAN YUKON MASTER TRAILS PROGRAM; ON-ROAD/OFF-ROAD TRAIL FACILITIES LAKESHORE DR(OKC TRAIL) & EXT WEST ON SH-66(MAIN ST) TO 3RD ST.(PHASE 1) TAP -255A (334) AG 29731(04) 3 US , , , COAL US-75 OVER BRIAR CREEK, 5.56 MI NORTH OF ATOKA C/L (COLUMN ENCASEMENT & PIER CAP REPAIR) NHPP -215N (028) PM 21904(04) 8 SH ,182, ,045, ,228, CRAIG SH-2: BEGINNING AT US-60 & EXTENDING NORTH TO HOSPITAL ROAD IN VINITA. NHPP -218N (033) PM 24132(04) 8 SH ,155, , ,944, CREEK SH-66: FROM APPROX MILES EAST OF DEPEW, NORTHEAST, ON NEW ALIGNMENT (CURVE CORRECTION) SSP -119C (160) SS 33493(04) , , CUSTER DIVISION 5 BRIDGE PREVENTIVE MAINTENANCE PROJECTS () (80/20 SMC) STP -220F (057) 3B 24147(04) 8 SH ,306, ,076, ,383, DELAWARE SH-85: OVER DUCK CR, 3.2 MILES EAST & NORTH OF THE CRAIG C/L STP -121C (097) SS 30697(04) 5 COBRGE , , , GREER BRIDGE AND APPROACHES (NS-196) OVER TRIBUTARY OF SALT FORK OF RED RIVER, LOCATED 3.8 MI SOUTH AND 2.0 MI EAST OF MANGUM STP -228D (015) CI 31380(04) 3 SH048A , , , JOHNSTON SH-48A OVER BIG SANDY CREEK, 3.4 MI WEST OF JCT SH-48 (REDECK AND SUBSTRUCTURE REPAIR) STP -235C (035) PM 31336(04) 2 US , , LEFLORE US-59 BEGIN AT US-59/SH-128 JCT. EXTEND NORTH 1.5 MILES (DEL FR 04-18, ADD TO 09-18; AS PER DIV 2) (TIED TO 32955(04)) ACNHPP -240N (064) 3P 32955(04) 2 US , , A.D.A. PROJECTS FOR COMPLIANCE LEFLORE US-59: A.D.A. BEGIN 0.2 MI SOUTH OF SH-128 JCT & EXTEND 1.6 MI NORTH (TIED TO 31336(04)) HSIPG -240N (068) AD 33604(05) 7 IS , , BRIDGE REPAIR LOVE I-35 UNDER COUNTY ROAD (JACOBS ROAD) 1.6 MI NORTH OF SH-32 (REPAIR OF VEHICLE IMPACT DAMAGE) SAP (070) 33614(04) 7 SH , , , MURRAY BR PREVENTIVE MAINT FOR DIV 7; ON SH-7 OVER WASHITA RIVER APPROX 0.8 MILE WEST OF US-77 () NHPP -250N (020) 3B

3 Page 2 of 3 FINAL SEPTEMBER 2018 BID OPENING 29714(04) 1 US ,240, , ,800, MUSKOGEE US-62: OVER ABANDONED R.R., APPROX. 2.2 MILES EAST OF SH-162 STP -251B (087) PM 30193(04) 4 CT ST ,240, , ,800, SAFETY IMPROVEMENT OKLAHOMA EDMOND: ITS PHASE 2 STP -255E (475) AG 31102(04) 4 CT ST ,522, , ,905, OKLAHOMA ON BRITTON RD FR MAY AVE EAST TO EAST SIDE OF VILLAGE UNITED METHODIST LOT (INCLUDES RAMPS & SIDEWALKS)(DEL FR 06-17, ADD TO 03-18; AS PER CHAD M.) STP -255C (430) AG 31597(04) 4 CT ST ,522, , ,905, OKLAHOMA ON BRITTON RD FROM THE EAST SIDE OF THE VILLAGE UNITED METHODIST PARKING LOT, EAST TO PENN AVE. (INCLUDES RAMPS & SIDEWALKS) STP -255C (431) AG 33616(04) , , , OKLAHOMA DIVISION 4 BRIDGE PREVENTIVE MAINTENANCE PROJECTS () STP -255F (473) 3B 33616(05) , , , BRIDGE PAINTING OKLAHOMA DIVISION 4 BRIDGE PREVENTIVE MAINTENANCE PROJECTS (BRIDGE PAINTING) STP -NBIP (526) 3B 28967(04) 1 US ,720, , ,150, INTERSECT MODIF OKMULGEE US-75: FROM 7.5 MI NORTH OF US-62 NORTH 4.7 MI (LEFT TURN LANES) NHPP -256N (034) PM 29760(04) 1 US ,600, ,600, INTERSECT MODIF OKMULGEE US-75: SAFETY IMPROVEMENT(LEFT TURN LANES),( BETWEEN OKMULGEE & BEGGS) FROM APPROX. 1.4 MI. N. OF SH-56 LOOP, N. APPROX. 3.5 MI. HSIPG -256N (041) PM 24273(04) 8 US ,232, ,232, OTTAWA US-60: OVER HORSE CREEK, 2.6 MILES NORTH OF THE DELAWARE C/L SSP -158B (119) PM 24323(07) 8 US ,400, ,100, ,500, PAWNEE US-64: FROM 9 MILES EAST OF SH-18 EAST APPROX. 3.1 MILES STP -259C (050) PM 28912(04) 2 SH ,129, ,032, ,162, PITTSBURG SH-31 OVER GAINES CREEK, 7.2 MILES NE OF US-270 STP -261C (071) PM 28986(04) 2 SH ,770, , ,463, PITTSBURG SH-31 OVER ASH CREEK APPROXIMATE 10.7 MILES EAST OF US-270 STP -261C (006) PM 29569(04) 3 US ,128, ,128, POTTAWATOMIE US-270 OVER US-270B APPROX 4.25 MILE SOUTH OF I-40 (SUPERSTRUCTURE REPAIR & RAMP IMPROVEMENT) SSP -263B (062) PM 31480(34) 8 CT ST , , SAFETY IMPROVEMENT ROGERS SRS - INOLA ELM., & MIDDLE SCH. INFRASTRUCTURE SRS -266E (035) ST

4 Page 3 of 3 FINAL SEPTEMBER 2018 BID OPENING 21006(07) 3 US ,122, ,530, ,652, SEMINOLE US-270 OVER WEWOKA CREEK & RAILROAD, FROM 4.89 MI EAST OF SH-270A IN SEMINOLE, EAST 1.2 MI STP -167B (122) PM 28923(04) 3 US ,369, , ,711, SEMINOLE US-270 OVER UNNAMED CREEK, 2.83 MI EAST OF POTTAWATOMIE C/L STP -267B (076) PM 33329(04) 3 US , , SEMINOLE US-270: BEGIN AT JCT SH-9, EXTEND EAST TO SH-270A STP -267A (074) 3P 33657(04) , , , TEXAS DIVISION 6 BRIDGE PREVENTIVE MAINTENANCE PROJECTS () STP -270F (035) 3B 11476(04) 8 SH ,140, , ,925, TULSA TULSA: BA EXPWY/SH 51 OVER LEWIS AVENUE (TIED TO ) NHPP -272N (205) PM 11477(04) 8 SH ,122, ,122, TULSA TULSA: BA EXPWY/SH 51 OVER 15TH STREET EAST AND WESTBOUND & SH-51 OVER MK&T RR (TIED TO ) SSP -272N (206) PM 27291(04) 8 CT ST ,406, , ,351, TULSA SAND SPRINGS: MAIN STREET EXTENSION FROM WILSON AVE(SH-97) & EXT EAST & NORTH TO US-412. STP -172B (484) IG 31938(05) 8 IS ,500, ,500, TULSA I-44 FROM 0.48 MI EAST OF I-244 EXT EAST 1.95 MI SSP (033) PM 31944(04) ,000, ,000, TULSA I-44 EB & WB BRIDGES OVER ARKANSAS RIVER SSP -272N (183) PM 32626(04) 8 IS ,169, ,169, SIGNING TULSA DIVISION 8: REPLACEMENT OF SIGNS ON I-44 I-244 I-444 US169 US75 US412 SH51 IN THE TULSA METRO AREA (DEL FR 04-18, ADD TO 09-18; PLAN REVISIONS) HSIPG -272F (180) TR 33577(04) , , , TULSA BRIDGE PREVENTIVE MAINTENANCE PROJECTS FOR DIV 8 () STP -272F (252) 3B 33689(04) 8 US , , BRIDGE REPAIR TULSA REPAIR VEHICLE OVERHEIGHT DAMAGE ON 129TH W. AVE. IN TULSA CO. SAP -272A (253) 40 PROJECTS GRAND-TOTALS ,382, ,764, ,550, ,698, OTHER FUNDING CATEGORIES: LOCAL /CITY MATCHING FUNDS CO. IMPROVE. ROAD & BRIDGE PREPARED BY PROGRAMS DIVISION

5 Page 1 of 2 TENTATIVE OCTOBER 2018 BID OPENING 33717(04) , , , BRYAN DIVISION 2 PREVENTATIVE BRIDGE MAINT. () STP -207F (082) 3B 32931(04) 7 SH ,918, ,918, CADDO SH-152 OVER LAKE CREEK O'FLOW & WILLOW CREEK APPROX 2.1 MILE & 7.4 MILE EAST OF SH-58 SBR -208C (057) SB 33453(04) 7 US ,426, ,426, CADDO US-281: FROM MM 8.97 EXTEND NORTH 6.6 MILES TO SH-152 (80/20 SMC) STP -208B (064) 3P 33702(04) 4 IS , , BRIDGE REPAIR CANADIAN I-40: REPAIR FIRE DAMAGE TO BRIDGE DECK, APPROX 1.1 MILE EAST OF THE CADDO COUNTY LINE SAP (069) 33701(04) , , , BRIDGE PAINTING CLEVELAND DIV 3 BRIDGE PREVENTIVE MAINTENANCE PROJECT (BRIDGE PAINTING) STP -NBIP (528) 3B 33701(05) , , , CLEVELAND DIV 3 BRIDGE PREVENTIVE MAINTENANCE PROJECT () STP -214F (087) 3B 32940(04) 7 SH , , A.D.A. PROJECTS FOR COMPLIANCE COMANCHE SH-36: A.D.A. FROM TILLMAN C/L, EXT. EAST 0.80 MILES HSIPG -216N (077) AD 30055(04) 5 COBRGE , , , CUSTER CO BR ON (EW-088) OVER LITTLE DEER CREEK, 1.7 MILES WEST OF JCT SH-33/SH-47 **AUTH** STP -220D (050) CI 32935(04) 7 US , , A.D.A. PROJECTS FOR COMPLIANCE GRADY US-81: A.D.A. FROM 0.15 MILES SOUTH OF SH-37, EXT. NORTH 0.51 MILES (DEL FR 03-18) HSIPG -226N (051) AD 32938(04) 7 US , , A.D.A. PROJECTS FOR COMPLIANCE GRADY US-62: A.D.A. FROM 1.3 MI. E. OF US-81N JCT, EXT. E..3 MILES HSIPG -226N (073) AD 33477(04) 7 US ,100, ,100, GRADY US-62 OVER SLWC RR 2.31 WEST OF I-44 SBR -226B (074) SB 33607(04) 7 US ,431, ,431, CABLE BARRIER GRADY CHICKASHA US81 INSTALL LONGITUDINAL CABLE BARRIER BEGIN EW1470 EXTEN TO SH19 JCT HSIPG -011N (102) TR 28828(04) 2 SH ,184, ,932, ,117, MARSHALL SH-99/US-377 OVER LAKE TEXOMA (WILLIS BRIDGE) (PENDING 50% FROM TXDOT) (80/20 SMC) STP -248C (036) PM 33716(04) 1 US , , , BRIDGE PAINTING MUSKOGEE DIVISION 1 PREVENTATIVE BRIDGE MAINT. (BRIDGE PAINTING) US-69 STP -NBIP (529) 3B

6 Page 2 of 2 TENTATIVE OCTOBER 2018 BID OPENING 32091(04) 4 SH ,525, ,525, OKLAHOMA SH-3: FROM 0.78 MILES WEST OF CANADIAN/OKLAHOMA C/L EXTEND EAST 6.86 MILES TO SH-74 NHPP -017N (252) 3P 29385(04) 1 COBRGE , , OKMULGEE CO. BR. ON NS389 OVER OKMULGEE CREEK, 6.2 MI. WEST AND 0.6 MI. SOUTH OF OKMULGEE (CN-149) (CN-148) CIRB -256D (049) RB 30709(04) 8 COBRGE , , OTTAWA CO RD EW 125 OVER MODOC CREEK APPX 2.6 M S AND 2.5 MI E OF SH10/SH10C JCT (2.5 MI W OF SENECA MO) CIRB -258D (051) RB 31710(04) 5 US , , TILLMAN US-70: BEGIN AT THE US-183 JCT & EXT EAST 3.00 MILES STP -271C (061) 3P 18 PROJECTS GRAND-TOTALS ,964, ,546, ,534, ,045, OTHER FUNDING CATEGORIES: CO. IMPROVE. ROAD & BRIDGE PLACE HOLDER STATE OF TEXAS PREPARED BY PROGRAMS DIVISION

7 Page 1 of 2 TENTATIVE NOVEMBER 2018 BID OPENING 16928(17) 1 US ,600, ,400, ,000, ADAIR US-59: FR 6.95 MILES NORTH OF WESTVILLE, NORTH 3.48 MILES THRU WATTS NHPP -101A (052) 28775(04) 5 SH ,774, , ,218, BECKHAM SH-6: OVER SADLER CREEK LOCATED 1.7 MILES NORTH OF SH-55 WEST JCT STP -205B (077) PM 29004(04) 5 IS040B ,344, , ,680, BECKHAM I-40B OVER THE EAST FORK OF ELK CREEK APPROX 1.1 MILE WEST OF I-40 IN ELK CITY (WEST BOUND BRIDGE) STP -205N (078) PM 27004(04) 4 IS040B ,060, ,514, ,574, CANADIAN I-40B: OVER THE UPAC RAILROAD ON THE SOUTH EDGE OF EL RENO NHPP -209N (051) SS 24104(07) 7 SH ,969, ,242, ,212, CARTER SH-53: FROM 6.87 MI EAST OF SH-76, E. APPROX 7.67 MI SURFACING FOR 24104(04) J (007) 31254(04) 3 COBRGE , , , CLEVELAND CO RD(EW-133)(SLAUGHTERVILLE RD) OVER UNNAMED CREEK APPROX 0.3 MILE WEST OF US-77 STP -214D (088) CI 27569(04) 3 SH ,881, , ,602, COAL SH-43 OVER MILL CREEK, 7.04 MI EAST OF US-75 STP -115C (103) 28037(04) 7 SH005A ,799, , ,498, COTTON SH-5A: OVER WEST CACHE CREEK & TWO O'FLOW BRIDGES BEG APPROX 3.45 MI EAST OF US-277 EXT EAST APPROX 0.55 MIS. STP -217C (041) PM 27965(04) 4 US ,616, , ,020, GARFIELD US-64/US-412: EB & WB BRIDGES OVER BLACKBEAR CR MIS. E. OF THE US-81 JCT. NHPP -224N (054) SS 20301(04) 7 SH ,833, ,833, GRADY SH-37: BEGIN 0.8 MIS E. OF US-81 IN MINCO, EXT E. 3.8 MI TO BRAUM'S ROAD W. OF TUTTLE STP -126C (063) 31372(04) 4 US ,100, ,100, GRANT US-81: FROM JCT WITH US-60 IN POND CREEK, EXTEND NORTH 4.2 MILES TO JEFFERSON J (004) SR 27919(04) 5 SH ,966, , ,458, JACKSON SH-5 OVER SANDY CREEK APPROX 2.3 MILE NORTHWEST OF SH-6 STP -233C (038) PM 24432(14) 4 IS ,040, ,010, ,050, KAY I-35: BRIDGE AND APPROACHES OVER US-60 NHPPI (072) PM 15027(04) 5 SH ,050, ,262, ,312, KIOWA SH-6: BEGIN 5.2 MI. S. OF THE SH-55E JCT. IN BECKHAM CO. & EXT. N. 5.0 MI. (4 LANE DIVIDED - TURNKEY), INCLUDES OLD PROJECT 15027(07). STP -038B (232) SS

8 Page 2 of 2 TENTATIVE NOVEMBER 2018 BID OPENING 27099(04) 4 SH ,747, , ,433, LOGAN SH 51: OVER WEST BEAVER CREEK 12.6 MILES EAST OF THE KINGFISHER C/L STP -242C (057) SS 27122(04) 4 SH , , ,111, LOGAN SH 51: OVER MIDDLE BEAVER CREEK 13.7 MILES EAST OF THE KINGFISHER C/L STP -242C (058) SS 27958(04) 1 IS ,150, ,287, ,438, MCINTOSH I-40: BRIDGES OVER RAILROAD AND CO RD, 20 MI EAST OF OKMULGEE CO LINE (MP 265.4) NHPPI (066) PM 28558(04) 8 COBRGE , , , NOWATA CO RD(NS-414) OVER DOUBLE CREEK APPX 2.5 MILE SOUTH OF US-60 STP -253D (044) CI 30494(04) 8 COBRGE , , , NOWATA CO RD (EW-27) OVER PANTHER CREEK APPX 5 MI S & 1.75 MI W OF SH-28/US-60 JCT STP -253D (045) CI 09033(27) 4 IS ,640, ,160, ,800, OKLAHOMA I-235: MAINLINE THRU I-44 INTERCHANGE(SEGMENT 8); I-235 NB TO WB & EB FLYOVER BRIDGES I-235/I-44 INTERCHANGE(SEGMENT 2B) NHPPI (009) PM 25528(04) 8 COBRGE ,727, ,727, OSAGE CO BR OVER LITTLE DRUM CREEK APPX 10 MI WEST & 3.5 MI NORTH OF FAIRFAX (DEL FR 02-18, ADD TO 11-18; AS PER J. PRUETT) CIRB -157C (167) RB 27899(04) 5 US ,560, , ,950, ROGER MILLS US-283: OVER DEAD WARRIOR CREEK, 7.4 MILES NORTH OF THE SH-47 WEST JCT. STP -265B (017) SS 21006(04) 3 US ,680, ,920, ,600, SEMINOLE US-270 OVER CARTER & 8 UNNAMED CR, FROM SH-270A IN SEMINOLE, EAST APPROX. 1.0 MILE STP -167B (091) PM 27966(04) 7 SH , , ,086, STEPHENS SH-53: OVER S. FORK DEER CREEK BEGIN 4.1 MIS E. OF US MIS STP -269C (049) SS 32702(04) 8 US , , , SAFETY IMPROVEMENT TULSA US-169 AND 46TH STREET TRAFFIC SIGNALS HSIP -272N (255) PM 17457(20) 6 US ,040, ,759, ,799, WOODWARD US-183/US-270: FROM 10.5 MI. S.E. OF SH-50 S.E. APPROX 3.7 MI. 4 LN DIVIDED & REHAB EXIST LANES NHPP -017N (063) 26 PROJECTS GRAND-TOTALS ,441, ,369, ,373, ,184, OTHER FUNDING CATEGORIES: CO. IMPROVE. ROAD & BRIDGE PREPARED BY PROGRAMS DIVISION

FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 10, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 10, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 10, 2018 AGENDA ITEM NO. 116 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final November 2018 bid opening for $233,251,841,

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF APRIL 2, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF APRIL 2, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF APRIL 2, 2018 AGENDA ITEM NO. 47 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final June 2018 bid opening for $58,352,185, the tentative

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF DECEMBER 3, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF DECEMBER 3, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF DECEMBER 3, 2018 AGENDA ITEM NO. 159 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final February 2019 bid opening for $88,659,936, the

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF JANUARY 3, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF JANUARY 3, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF JANUARY 3, 2018 AGENDA ITEM NO. 9 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final March 2018 bid opening for $112,025,914, the tentative

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF MARCH 5, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF MARCH 5, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF MARCH 5, 2018 AGENDA ITEM NO. 33 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final May 2018 bid opening for $115,638,524, the tentative

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF JULY 5, 2017

FOR PRESENTATION AT THE COMMISSION MEETING OF JULY 5, 2017 FOR PRESENTATION AT THE COMMISSION MEETING OF JULY 5, 2017 AGENDA ITEM NO. 96 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final September 2017 bid opening for $144,018,153, the tentative

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 5, 2017

FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 5, 2017 FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 5, 2017 AGENDA ITEM NO. 121 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final November 2017 bid opening for $186,543,120 and

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF NOVEMBER 6, 2017

FOR PRESENTATION AT THE COMMISSION MEETING OF NOVEMBER 6, 2017 FOR PRESENTATION AT THE COMMISSION MEETING OF NOVEMBER 6, 2017 AGENDA ITEM NO. 148 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final January 2018 bid opening for $189,147,369, the

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF NOVEMBER 7, 2016

FOR PRESENTATION AT THE COMMISSION MEETING OF NOVEMBER 7, 2016 FOR PRESENTATION AT THE COMMISSION MEETING OF NOVEMBER 7, 2016 AGENDA ITEM NO. 162 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final January 2017 bid opening for $111,073,621, the

More information

Appendix A Oklahoma Waterbody Identification (WBID) System

Appendix A Oklahoma Waterbody Identification (WBID) System Appendix A Oklahoma Waterbody Identification (WBID) System Waterbody identification (WBID) numbers are established based on a waterbody s location in the State s Water Quality Management Plan. WBIDs are

More information

Long Form and Short Form Notices, Bid Tabs and Awards, can be accessed on ODOT's Web site

Long Form and Short Form Notices, Bid Tabs and Awards, can be accessed on ODOT's Web site Notice Electronic bid packages are available for the January 22, 2004 Letting. Instructions for using the electronic bidding system (EBS) are available from the Office Engineer's office. Th e printed b

More information

CoalBed Methane Fact and Future In Oklahoma

CoalBed Methane Fact and Future In Oklahoma OKLAHOMA CORPORATION COMMISSION Oil and Gas Conservation Division CoalBed Methane Fact and Future In Oklahoma November 24 Jamal Daneshfar, PE Out Lines:. Fact and figures about Coal bed methane. Regulation

More information

Regional and Sectoral Economic Studies Vol (2010) and Gerben (2004).

Regional and Sectoral Economic Studies Vol (2010) and Gerben (2004). Regional and Sectoral Economic Studies Vol. 10-2 (2010) SMALL BUSINESS CLUSTERS IN OKLAHOMA: MAR OR JACOBS EFFECTS? NICA, Mihai * Abstract One of the main factors that act as catalysts for small business

More information

FY 2018 Ten Year Capital Plan Review Project List

FY 2018 Ten Year Capital Plan Review Project List FY 2018 Ten Year Capital Plan Review Project List Program Category FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 Highway Roadway/Safety 100,950,000 128,431,766 125,896,635 91,153,571

More information

Hurricane Florence Recovery Report 4:00 PM November 15, 2018

Hurricane Florence Recovery Report 4:00 PM November 15, 2018 Hurricane Florence Recovery Report 4:00 PM November 5, 208 SCDOT Operations Mode: Recovery Statewide Summary There are 9 road closures on primary and secondary routes due to damage or flooding throughout

More information

Hurricane Florence Recovery Report 4:00 PM October 17, 2018

Hurricane Florence Recovery Report 4:00 PM October 17, 2018 Hurricane Florence Recovery Report 4:00 PM October 17, 2018 SCDOT Operations Mode: Recovery Statewide Summary There are 27 road closures on primary and secondary routes due to damage or flooding throughout

More information

Hurricane Florence Recovery Report 4:00 PM October 31, 2018

Hurricane Florence Recovery Report 4:00 PM October 31, 2018 Hurricane Florence Recovery Report 4:00 PM October 3, 208 SCDOT Operations Mode: Recovery Statewide Summary There are 2 road closures on primary and secondary routes due to damage or flooding throughout

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

2010/2011 Winter Weather Summary

2010/2011 Winter Weather Summary 2010/2011 Winter Weather Summary Number of Days of Snow Alerts* Precipitation Snow Rain October 0 6 Trace.91 inches November 0 16 1.1 inches.47 inches December 2 20 17.9 inches 1.54 inches 7.5" first alert

More information

0.00 B9 TRANSIT GRANT CAP IMP (NON- VEHICLE) 0.00 BB TRANSIT VEHICLE PURCHASE CAP IMP (NON- VEHICLE) 0.00 B9 TRANSIT VEHICLE PURCHASE

0.00 B9 TRANSIT GRANT CAP IMP (NON- VEHICLE) 0.00 BB TRANSIT VEHICLE PURCHASE CAP IMP (NON- VEHICLE) 0.00 B9 TRANSIT VEHICLE PURCHASE 842 BB TRF-0047-19A 2019 ROCHESTER SECT 5307: ROCHESTER RR OPERATING 0.00 B9 TRANSIT FTA 11,450,000 - - 2,000,000 - - 9,450,000 ASSISTANCE OPERATIONS 843 BB TRF-0047-19B 2019 ROCHESTER SECT 5307: CITY

More information

STATE TRANSPORTATION IMPROVEMENT PROGRAM FY st Quarter Addendum, October, November and December

STATE TRANSPORTATION IMPROVEMENT PROGRAM FY st Quarter Addendum, October, November and December STATE TRANSPORTATION IMPROVEMENT PROGRAM FY-2018 1 st Quarter Addendum, October, November and December The preparation of this report has been financed in part through grant(s) from the Federal Highway

More information

Washington State S. T. I. P to 2021 (Project Funds to Nearest Dollar)

Washington State S. T. I. P to 2021 (Project Funds to Nearest Dollar) ( Funds to Nearest Dollar) Agency: Bellingham Number PIN ID 17 5565(001) BHAM 40 28 0.210 CE Yes Mahogany Ave Cordata Elementary 1,951,200 Cordata Safe Routes to School Program The project includes bike

More information

The Climate of Grady County

The Climate of Grady County The Climate of Grady County Grady County is part of the Central Great Plains, encompassing some of the best agricultural land in Oklahoma. Average annual precipitation ranges from about 33 inches in northern

More information

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/22/2019 4:20:05 AM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

Palo Pinto County Appraisal District Property Info

Palo Pinto County Appraisal District Property Info Palo Pinto County Appraisal District Property Info Property ID Geo ID Legal: R000036838 030360100.R91786 R000009211 073400000.R91786 Legal: Acres: 396.080, AB 429 TR 13-1 S TOWNSEND (SOUTH OF ) (0.750000

More information

4D Integrated Study Using Geology, Geophysics, Reservoir Modeling & Rock Mechanics to Develop Assessment Models for Potential Induced Seismicity Risk

4D Integrated Study Using Geology, Geophysics, Reservoir Modeling & Rock Mechanics to Develop Assessment Models for Potential Induced Seismicity Risk 1 4D Integrated Study Using Geology, Geophysics, Reservoir Modeling & Rock Mechanics to Develop Assessment Models for Potential Induced Seismicity Risk 12122-91 Jeremy Boak Oklahoma Geological Survey Best

More information

Enrollment Statistics & Demographics

Enrollment Statistics & Demographics University of Central Oklahoma Enrollment Statistics & Demographics Summer 2017 2017 Office of Institutional Research UNIVERSITY OF CENTRAL OKLAHOMA Summer 2017 ENROLLMENT REPORT Regional University System

More information

City of Grand Island Tuesday, August 14, 2018 Council Session

City of Grand Island Tuesday, August 14, 2018 Council Session City of Grand Island Tuesday, August 14, 2018 Council Session Item I-1 #2018-240 - Consideration of Approving Update to Resolution No. 2015-120; Designated Truck Routes within the City of Grand Island

More information

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation #1 Northing 640586.689 / Easting 669419.281 / Elevation 1443.178 Center of bronze cap with UA seal. Located in sidewalk approx. 10 W of curb on Garland Ave. Approx. 24.5 SE of traffic signal post. UA #1

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Quarterly Project Status Report September 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update TxDot s contractor has nearly completed the superstructure false work

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/24/2019 5:16:03 PM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

Local Flood Hazards. Click here for Real-time River Information

Local Flood Hazards. Click here for Real-time River Information Local Flood Hazards Floods of the White River and Killbuck Creek are caused by runoff from general, and/or intense rainfall. Other areas of flooding concern are from the Boland Ditch and Pittsford Ditch.

More information

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519 January 12, 2018 Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519 Re: Proposed Reserve at Rivertown Mixed-Use Development Updated Trip Generation and Site Driveway

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/13/2019 2:54:03 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/13/2019 2:54:03 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/13/2019 2:54:03 PM 57 56 @ Corvallis - Newport Hwy OR34 HWY372 22 22 Mount Bachelor Ski Area I-5 10 13

More information

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone: JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH 45243 Email: jackpflum1@gmail.com Telephone: 513.919.7814 MEMORANDUM REPORT Traffic Impact Analysis Proposed Soccer

More information

Welcome to the Public Meeting Red Bluff Road from Kirby Boulevard to State Highway 146 Harris County, Texas CSJ No.: December 15, 2016

Welcome to the Public Meeting Red Bluff Road from Kirby Boulevard to State Highway 146 Harris County, Texas CSJ No.: December 15, 2016 Welcome to the Public Meeting Red Bluff Road from Kirby Boulevard to State Highway 146 Harris County, Texas CSJ No.: 0912-72-340 December 15, 2016 No formal presentation will be made. Seabrook Intermediate

More information

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov February 9, 2018 I-10 East at Redd closes for 24 hours this Sunday, Feb 11

More information

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),

More information

Oklahoma Central. Fecha Final AGRA 121 NORTH MAIN STREET 05/15/17 6/8/2017 L M MIE J V 7:45-8:30 11:00-12:00

Oklahoma Central. Fecha Final AGRA 121 NORTH MAIN STREET 05/15/17 6/8/2017 L M MIE J V 7:45-8:30 11:00-12:00 Oklahoma Central de AGRA 121 NORTH MAIN STREET 05/15/17 6/8/2017 L M MIE J V 7:45-8:30 11:00-12:00 ALEX 209 S 2ND STREET 05/22/17 07/28/17 L M MIE J V 8:00-8:30 12:00-12:45 BETHANY 3400 N MUELLER 06/05/17

More information

CVS Derwood. Local Area Transportation Review

CVS Derwood. Local Area Transportation Review CVS Derwood Montgomery County, Maryland May 27, 2016 Local Area Transportation Review Prepared for: JC Bar Properties, Inc. Steve Fleming, PE 415 Fallowfield Road, Suite 301 Camp Hill, Pennsylvania 17011

More information

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Information for File # 2013-00531-MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Applicant: City of St. Louis Park Corps Contact: Melissa Jenny Address: U.S. Army Corps of Engineers Attn:

More information

New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study

New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study Overview Prepared for: June 26, 2018 Introduction Overview of Pilot Study New Jersey s Climate New Jersey s Transportation

More information

Hurricane Michael Operations Report 4:00 PM October 10, 2018

Hurricane Michael Operations Report 4:00 PM October 10, 2018 Hurricane Michael Operations Report 4:00 PM October 10, 2018 SCDOT Operations Mode: Preparation Statewide Summary SCDOT is prepared and ready to respond to the potential effects of Hurricane Michael. Currently,

More information

Annual Collision Report

Annual Collision Report 2016 Annual Collision Report Contents The Annual Collision Report is a summary of statistics associated with traffic collisions that occurred in the City of Winnipeg. This information is provided by Manitoba

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Quarterly Project Status Report May 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Construction of North Main Street Bridge by TxDOT s bridge contractor, Texas

More information

Brownfields Program Public Record Updated January 30, 2019

Brownfields Program Public Record Updated January 30, 2019 Brownfields Program Public Record Updated January 30, 2019 The following sites have completed the Oklahoma Brownfield Program: Duralast Rubber Products, Inc. (aka UNR Industries) East 13 th Street South

More information

TRAFFIC IMPACT STUDY MANUFACTURING COMPANY

TRAFFIC IMPACT STUDY MANUFACTURING COMPANY TRAFFIC IMPACT STUDY For MANUFACTURING COMPANY Prepared For: Airway Heights, WA Prepared By: SUNBURST ENGINEERING, P. S. 4310 S. Ball Dr. Veradale, WA 99037 April, 2013 TRAFFIC IMP ACT STUDY Manufacturing

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet September 2015 RECOMMENDED ALTERNATIVES Environmental Impact Statement (EIS) Project Divided into 3 Segments Segment 1:

More information

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006 DRAFT TRAFFIC IMPACT STUDY FOR PHASED DEVELOPMENT OF TAMU CC Prepared for 3D/International, Inc. 1900 West Loop South, Suite 400 Houston, Texas 77027 November 2006 Interim Review Only Document Incomplete:

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Planning for a Mega Project in a Metropolitan Area TxDOT Short Course October 13, 2015 RECOMMENDED ALTERNATIVES Environmental Impact Statement (EIS) Project

More information

Septem ber 28, 2016 EL PASO, Texas

Septem ber 28, 2016 EL PASO, Texas September 28, 2016 EL PASO, Texas Crews from Paso del Norte Trackworks will finalize underground utility work and begin laying rail on a portion of Kansas Street thru Downtown El Paso in the coming weeks,

More information

FUND THAN THAN ALL CODE YEARS

FUND THAN THAN ALL CODE YEARS PAGE 1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/20/2012 HIGHWAYS ITEM NUMBER:230724 1 PROJECT DESCRIPTION:ANDREWS AVE EXT FROM POMPANO PARK PLACE TO S. OF ATLANTIC BLVD *NON-SIS* DISTRICT:04 COUNTY:BROWARD

More information

Monroe County: Key West and Lower Keys

Monroe County: Key West and Lower Keys FDOT PROJECT UPDATES June 15-21, 2015 Monroe County: Key West and Lower Keys Monroe County projects website: www.fdotmonroe.com Opt Out: If you no longer wish to receive these weekly notifications, please

More information

West Tennessee Construction June 14-21, 2017

West Tennessee Construction June 14-21, 2017 FOR IMMEDIATE RELEASE Wednesday, June 14, 2017 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction June 14-21, 2017 BENTON COUNTY, I-40 Truck Climbing Lane Wednesday, June 7 through

More information

Enrollment Statistics & Demographics

Enrollment Statistics & Demographics University of Central Oklahoma Enrollment Statistics & Demographics Spring 2016 Office of Institutional Research UNIVERSITY OF CENTRAL OKLAHOMA Spring 2016 ENROLLMENT REPORT Regional University System

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS DT2511563 2511563 FROM PORT OF MIAMI PORT OF MIAMI TUNNEL TO SR 836/I-395 0.5 NEW ROAD CONSTRUCTION $2,514,664 $790,186 - DESIGN/BUILD LF 2,766 2,849 2,935 3,023 3,113 DESIGN/BUILD GMR 22,152 22,990 24,338

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/10/2019 7:20:01 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/10/2019 7:20:01 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/10/2019 7:20:01 PM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

Committee Meeting November 6, 2018

Committee Meeting November 6, 2018 Committee Meeting November 6, 2018 Agenda Where we are in the process Land Use Plan Transportation Element Housing & Neighborhoods Elements Next Steps Schedule November 6: Plan Elements December: Plan

More information

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 Executive Summary Page 2.0 Introduction 2.1 DEVELOPMENT

More information

1. Departmental Presentation - Away Goes Trouble Down the Drain - Highway Division. 3. Continued Discussion an Ordinance for Disorderly Residences

1. Departmental Presentation - Away Goes Trouble Down the Drain - Highway Division. 3. Continued Discussion an Ordinance for Disorderly Residences City of Keene New Hampshire MUNICIPAL SERVICES, FACILITIES AND INFRASTRUCTURE COMMITTEE AGENDA Council Chambers B October 11, 2017 6:00 PM Janis O. Manwaring Randy L. Filiault Robert J. O'Connor Stephen

More information

Red River Levee Panel

Red River Levee Panel Red River Levee Panel Mississippi River Commission Monday, August 9, 2017 Red River Levees in LA & AR NONE along TX & OK Boarder Red River Levee Issues Caddo Levee Cherokee Park Authorization Bossier Levee

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR 257.73(c)(1)(i)-(xii) (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Gadsden

More information

MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015

MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015 MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015 TABLE OF CONTENTS... 3 Proposed Development... 3 Methodology... 3 Phase 1 Development...

More information

NORTHWOOD MIDDLE SCHOOL

NORTHWOOD MIDDLE SCHOOL NORTHWOOD MIDDLE SCHOOL Tracking the Panthers INTRODUCTION AND PURPOSE The purpose of this booklet is to provide an answer to the problem of how to get THERE from here. This directory includes all schools

More information

Com munity Advisor y C ommitte e Meeting

Com munity Advisor y C ommitte e Meeting Community Advisor y Committee Meeting J u n e 1 5, 2 0 1 7 Project Scope 14 miles of enhanced service from Downtown Portland to Cleveland Park & Ride 41 Stations with 82 Platforms 1/3 mile approximate

More information

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS 3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS In order to better determine future roadway expansion and connectivity needs, future population growth and land development patterns were analyzed as part of

More information

Hydrogeology and Simulated Effects of Future Water Use and Drought in the North Fork Red River Alluvial Aquifer: Progress Report

Hydrogeology and Simulated Effects of Future Water Use and Drought in the North Fork Red River Alluvial Aquifer: Progress Report Hydrogeology and Simulated Effects of Future Water Use and Drought in the North Fork Red River Alluvial Aquifer: Progress Report Developed in partnership with the Oklahoma Water Resources Board S. Jerrod

More information

New Geographic Distribution Records for Millipeds (Diplopoda) from Oklahoma

New Geographic Distribution Records for Millipeds (Diplopoda) from Oklahoma New Geographic Distribution Records for Millipeds (Diplopoda) from Oklahoma 7 Chris T. McAllister Science and Mathematics Division, Eastern Oklahoma State College, Idabel, OK 74745 Henry W. Robison 9717

More information

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013 Report on Reliability of ComEd Electrical Service within Downers Grove Prepared September 1, 2013 1 Executive Summary Since 2011, the Village of Downers Grove has worked closely with ComEd to improve electrical

More information

STREET LIGHTING AUSTIN ENERGY ILLUMINATION DEPARTMENT

STREET LIGHTING AUSTIN ENERGY ILLUMINATION DEPARTMENT STREET LIGHTING AUSTIN ENERGY ILLUMINATION DEPARTMENT http://www.austinenergy.com/ Physical Address: 4411 Meinardus Drive Austin, Texas 78744 Hours of Operation: Monday Friday 6am to 3pm Key Contact: Joyce

More information

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Subject: Revised Castle Hills BASIS Charter School Traffic Impact Analysis Review City of Castle Hills,

More information

SNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT

SNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT ITASCA COUNTY TRANSPORTATION DEPARTMENT Effective Date: November 1, 1989 Revised: November 18, 2014 Policy Number: Operations 89-4 Distribution: Commissioner's Office Engineer's Office All Garages Number

More information

Report TR-CW That staff be authorized to install signage on roads identified in Schedule A as excluded from By-law ; and

Report TR-CW That staff be authorized to install signage on roads identified in Schedule A as excluded from By-law ; and Report TR-CW-30-17 To: Warden Barfoot and Committee of the Whole From: Pat Hoy, Director of Transportation Services Meeting Date: October 26, 2017 Subject: ATV Access on Grey County Roads Status: Recommendation(s)

More information

ACTIVE SINGLE FAMILY SUBDIVISIONS CITY OF BURLESON January 2011

ACTIVE SINGLE FAMILY SUBDIVISIONS CITY OF BURLESON January 2011 ACTIVE SINGLE FAMILY SUBDIVISIONS CITY OF BURLESON January 2011 SUBDIVISION TOTAL LOTS VACANT LOTS ALSBURY ESTATES EAST - PHASE II 45 1 ALSBURY MEADOWS - PHASE II 112 1 BROAD VALLEY FARMS 1 2 CASTLE HILL

More information

The Climate of Pontotoc County

The Climate of Pontotoc County The Climate of Pontotoc County Pontotoc County is part of the Crosstimbers. This region is a transition region from the Central Great Plains to the more irregular terrain of southeast Oklahoma. Average

More information

The Climate of Kiowa County

The Climate of Kiowa County The Climate of Kiowa County Kiowa County is part of the Central Great Plains, encompassing some of the best agricultural land in Oklahoma. Average annual precipitation ranges from about 24 inches in northwestern

More information

The Sunland Park flyover ramp is set to close the week of March 19 until early summer

The Sunland Park flyover ramp is set to close the week of March 19 until early summer March 2, 2018 The Sunland Park flyover ramp is set to close the week of March 19 until early summer GO 10 is targeting the week of March 19 to close the Sunland Park Drive flyover entrance ramp to I 10

More information

VHD Daily Totals. Population 14.5% change. VMT Daily Totals Suffolk 24-hour VMT. 49.3% change. 14.4% change VMT

VHD Daily Totals. Population 14.5% change. VMT Daily Totals Suffolk 24-hour VMT. 49.3% change. 14.4% change VMT 6.9 Suffolk 6-54 VMT Population and Travel Characteristics Population 14.5% change 2014 1,529,202 VHD Daily Totals 2014 251,060 49.3% change 2040 1,788,175 2040 374,850 VMT Daily Totals 2014 39,731,990

More information

The Climate of Haskell County

The Climate of Haskell County The Climate of Haskell County Haskell County is part of the Hardwood Forest. The Hardwood Forest is characterized by its irregular landscape and the largest lake in Oklahoma, Lake Eufaula. Average annual

More information

APPENDIX (R) Committed Developments Documentation

APPENDIX (R) Committed Developments Documentation APPENDIX 21-10 (R) Committed Developments Documentation Revised October 2008 Committed Developments Trip Generation Beacon Countyline DRI Development Location Land Use Approved Built Remaining PM Peak

More information

LTAP. News. Oklahoma. County Road Crews Face Series of Emergencies. Volume 11, No. 2 Spring 2007 Record Rains Create New Disaster

LTAP. News. Oklahoma. County Road Crews Face Series of Emergencies. Volume 11, No. 2 Spring 2007 Record Rains Create New Disaster Oklahoma LTAP News Volume 11, No. 2 Spring 2007 Record Rains Create New Disaster County Road Crews Face Series of Emergencies After record-breaking wildfires last summer, and a winter of devastating ice

More information

MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM

MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM 2018-2021 April, 2017 FISCAL YEARS 2018-2021 MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM FOR THE GRAND FORKS - EAST GRAND FORKS METROPOLITAN

More information

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management Transportation Impact Analysis Market Street PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for TerraPointe Services, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc.

More information

Elevation and ickness of the Ordovician Arbuckle Group in Oklahoma and Surrounding States

Elevation and ickness of the Ordovician Arbuckle Group in Oklahoma and Surrounding States Oklahoma Geological Survey Jeremy Boak, Director Open-File Report 2-218 Elevation and ickness of the Ordovician Arbuckle Group in Oklahoma and Surrounding States January 218 Oklahoma Geological Survey

More information

collision analyses...

collision analyses... collision analyses. 28 INJURY SUMMARY YEAR COLLISION NON-INJURY INJURY FATAL TOTAL TOTAL PERCENT TOTAL PERCENT TOTAL PERCENT 2004 7410 5124 69.15% 2259 30.49% 27 0.36% 2005 6767 4538 67.06% 2214 32.72%

More information

Organized Chain-Up and VSL

Organized Chain-Up and VSL Organized Chain-Up and VSL Jim Mahugh, PE WSDOT SC Region Traffic Engineer North/West Passage VSL Peer Exchange January 28, 2015 Snoqualmie Pass 2 Limits of VSL EB: MP 48.12 to 66.56 WB: MP 46.69 to 66.90

More information

COUNCIL POLICY MANUAL

COUNCIL POLICY MANUAL COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs

More information

City of Brainerd, Minnesota Snowplowing Policy

City of Brainerd, Minnesota Snowplowing Policy City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS West Q Avenue, Kalamazoo, MI P: () - F: () - www.texastownship.org REQUEST FOR PROPOSALS - Winter Snow Removal Services Proposals The Charter Township of Texas, Kalamazoo County Michigan, is requesting

More information

The Climate of Seminole County

The Climate of Seminole County The Climate of Seminole County Seminole County is part of the Crosstimbers. This region is a transition region from the Central Great Plains to the more irregular terrain of southeastern Oklahoma. Average

More information

Project Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County

Project Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County Project Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County TIP No. U-2827 B WBS # 34872.1.1 June 2013 Prepared for North Carolina Department of Transportation Prepared by Project

More information

ANSWER KEY. Part I: Synoptic Scale Composite Map. Lab 12 Answer Key. Explorations in Meteorology 54

ANSWER KEY. Part I: Synoptic Scale Composite Map. Lab 12 Answer Key. Explorations in Meteorology 54 ANSWER KEY Part I: Synoptic Scale Composite Map 1. Using Figure 2, locate and highlight, with a black dashed line, the 500-mb trough axis. Also, locate and highlight, with a black zigzag line, the 500-mb

More information

PCI by Road Section - District 4 (A to Z) PCI for Road Maintenance District 4 (A to Z)

PCI by Road Section - District 4 (A to Z) PCI for Road Maintenance District 4 (A to Z) MULTNOMAH COUNTY 1620 SE 190th Avenue Portland, OR 97233 (503) 988-5050 PCI by Section - District 4 (A to Z) PCI for Maintenance District 4 (A to Z) Number Name Funct. Class Surface Type Begin Location

More information

Salvaging the ties in Albion. Here behind the former M&StL depot in Albion, the ties are salvaged. This view is to the south.

Salvaging the ties in Albion. Here behind the former M&StL depot in Albion, the ties are salvaged. This view is to the south. Salvaging the ties in Albion. Here behind the former M&StL depot in Albion, the ties are salvaged. This view is to the south. The ties in the foreground are loose, some ties in the background have already

More information

Morgantown, West Virginia. Adaptive Control Evaluation, Deployment, & Management. Andrew P. Nichols, PhD, PE

Morgantown, West Virginia. Adaptive Control Evaluation, Deployment, & Management. Andrew P. Nichols, PhD, PE Morgantown, West Virginia Adaptive Control Evaluation, Deployment, & Management Andrew P. Nichols, PhD, PE Program Director of ITS Nick J. Rahall II, Appalachian Transportation Inst. Marshall University

More information

Drought Characterization. Examination of Extreme Precipitation Events

Drought Characterization. Examination of Extreme Precipitation Events Drought Characterization Examination of Extreme Precipitation Events Extreme Precipitation Events During the Drought For the drought years (1999-2005) daily precipitation data was analyzed to find extreme

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/8/ :16:05 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/8/ :16:05 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/8/2019 12:16:05 PM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

One of the coldest places in the country - Peter Sinks yet again sets this year s coldest temperature record for the contiguous United States.

One of the coldest places in the country - Peter Sinks yet again sets this year s coldest temperature record for the contiguous United States. One of the coldest places in the country - Peter Sinks yet again sets this year s coldest temperature record for the contiguous United States. In the early morning of February 22, 2010 the temperature

More information

Fast and Furious Rebuilding and Widening the I-90 West Corridor

Fast and Furious Rebuilding and Widening the I-90 West Corridor Fast and Furious Rebuilding and Widening the I-90 West Corridor Peter Foernssler, P.E., S.E. Deputy Chief, Illinois Tollway Marty Ross, P.E. Design Corridor Manager, TranSystems Jason Wenberg, P.E. Construction

More information