10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

Size: px
Start display at page:

Download "10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %"

Transcription

1

2

3 ACCOUNT NO ACCOUNT NO ACCOUNT NO ACCOUNT NO TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % RAILROAD INSURANCE 1.00 LUMP SUM $3, $3, $ $ $ % MOBILIZATION 1.00 LUMP SUM $17, $17, $ $17, $17, % EXCAVATION CUT C.Y. $20.00 $14, $ $18, $18, % GEOTEXTILE FABRIC TYPE SAS NON- WOVEN (UNDISTRIBUTED) S.Y. $1.70 $ $ $ $ % TOPSOIL 2, S.Y. $2.25 $6, $0.00 4, $9, , $9, % SAWCUT BITUMINOUS PAVEMENT L.F. $2.50 $ $ $ $ % REMOVE CONCRETE CURB & GUTTER L.F. $7.00 $ $ $ $ % REMOVE CONCRETE SIDEWALK & DRIVE 1, S.F. $2.00 $3, $0.00 1, $2, , $2, % REMOVE FENCE L.F. $1.50 $ $ $ $ % CLEARING I.D. $35.00 $ $ $ $ % CLEARING 1.00 LUMP SUM $4, $4, $ $4, $4, % GRUBBING I.D. $15.00 $ $ $ $ % GRUBBING 1.00 LUMP SUM $3, $3, $ $3, $3, % TERRACE SEEDING 3, S.Y. $2.00 $6, $0.00 4, $8, , $8, % EROSION MATTING, CLASS I, URBAN TYPE A EROSION MATTING, CLASS I, URBAN TYPE B 2, S.Y. $1.80 $5, $0.00 4, $7, , $7, % S.Y. $1.80 $ $ $ $ % REMOVE AND REPLACE MAILBOX 1.00 EACH $ $ $ $ $ % TYPE "A" CONCRETE CURB & GUTTER L.F. $45.00 $ $ $ $ % PAGE 2 OF 6

4 30205 TYPE "E" CONCRETE CURB & GUTTER L.F. $36.00 $6, $ $6, $6, % TYPE "H" CONCRETE CURB & GUTTER L.F. $36.00 $3, $ $3, $3, % CONCRETE SIDEWALK S.F. $5.30 $1, $ $2, $2, % CONCRETE SIDEWALK & DRIVE 2, S.F. $6.25 $14, $0.00 2, $13, , $13, % CONCRETE MOUNTABLE MEDIAN ISLAND NOSE CURB RAMP DETECTABLE WARNING FIELDS CRUSHED AGGREGATE BASE COURSE, GRADATION NO. 2 OR NO S.F. $7.00 $ $ $ $ % S.F. $35.00 $2, $ $2, $2, % 1, TON $19.00 $20, $0.00 1, $25, , $25, % HMA PAVEMENT, TYPE E TON $70.75 $20, $ $20, $20, % JOINT TIES 6.00 EACH $ $ $ $ $ % FURNISH & INSTALL 2 PVC (SCHEDULE 80) CONDUIT BY "OPEN TRENCH" METHOD FURNISH & INSTALL 2 PVC (SCHEDULE 40) CONDUIT BY "OPEN TRENCH" METHOD L.F. $8.00 $ $ $ $ % 1, L.F. $7.00 $8, $0.00 1, $8, , $8, % CONSTRUCT LB-2 BASE 8.00 EACH $1, $8, $ $8, $8, % CONSTRUCT TYPE "M" BASE 1.00 EACH $1, $1, $ $1, $1, % CONSTRUCT ELECTRICAL HANDHOLE TYPE 3 LINE, 4- DOUBLE LINE, 4- LINE, 6- LINE, 8- CROSSWALK, 18- ROUNDABOUT EDGE LINE, 18- STOP LINE, EACH $ $ $ $ $ % L.F. $1.50 $ $ $ $ % L.F. $3.00 $1, $ $1, $1, % L.F. $2.00 $1, $ $1, $1, % L.F. $3.00 $ $ $ $ % L.F. $15.10 $ $ $ $ % L.F. $15.50 $ $ $ $ % L.F. $17.00 $1, $ $1, $1, % PAGE 3 OF 6

5 MEDIAN NOSE SYMBOL, BIKE LANE SYMBOL, LEFT ARROW WORD, ONLY SYMBOL, RAILROAD CROSSING PAVEMENT MARKING REMOVAL, 6- PAVEMENT MARKING REMOVAL, 24- PAVEMENT MARKING REMOVAL, 4" DOUBLE LINE S.F. $4.00 $ $ $ $ % 2.00 EACH $ $ $ $ $ % 1.00 EACH $ $ $ $ $ % 1.00 EACH $ $ $ $ $ % 1.00 EACH $ $ $ $ $ % L.F. $3.00 $1, $ $1, $1, % 5.00 L.F. $15.00 $ $ $ $ % L.F. $6.00 $ $ $ $ % PAVEMENT MARKING REMOVAL, SYMBOL, RAILROAD CROSSING 1.00 EACH $1, $1, $ $1, $1, % MODULAR BLOCK GRAVITY WALL S.F. $99.00 $43, $ $18, $18, % HIGH FRICTION COLORED SURFACE - BIKE LANE GREEN S.F. $14.25 $6, $ $6, $6, % SUBTOTALS $222, $0.00 $207, $207, % ACCOUNT NO CLEAR STONE TON $17.00 $2, $ $ $ % EROSION CONTROL INSPECTION 5.00 EACH $ $2, $ $ $ % CONSTRUCTION ENTRANCE 2.00 EACH $ $ $ $ $ % STREET SWEEPING 1.00 LUMP SUM $ $ $ $ $ % SILT SOCK (8 ) - PROVIDE, INSTALL & MAINTAIN SILT SOCK (8 ) - REMOVE & RESTORE INLET PROTECTION, TYPE D HYBRID - PROVIDE & INSTALL INLET PROTECTION TYPE D HYBRID - MAINTAIN INLET PROTECTION TYPE D HYBRID - REMOVE L.F. $6.00 $3, $ $2, $2, % L.F. $1.00 $ $ $ $ % EACH $ $1, $ $1, $1, % EACH $50.00 $1, $ $ $ % EACH $50.00 $ $ $ $ % PAGE 4 OF 6

6 TYPE II PAVEMENT STORM SEWER PIPE L.F. $57.00 $3, $ $3, $3, % SUBTOTALS $15, $0.00 $10, $10, % ACCOUNT NO UNDERDRAIN L.F. $25.00 $10, $ $10, $10, % LIGHT RIPRAP TON $50.00 $1, $ $ $ % MEDIUM RIPRAP TON $50.00 $8, $ $2, $2, % RIPRAP FILTER FABRIC, TYPE HR 1, S.Y. $3.75 $3, $ $ $ % REMOVE SEWER ACCESS STRUCTURE 1.00 EACH $ $ $ $ $ % REMOVE PIPE L.F. $25.00 $ $ $1, $1, % TYPE I RCP STORM SEWER PIPE 24 TYPE I RCP STORM SEWER PIPE L.F. $60.90 $1, $ $1, $1, % L.F. $70.41 $13, $ $10, $10, % RCP AE 3.00 EACH $1, $3, $ $3, $3, % CONCRETE COLLAR 2.00 EACH $ $ $ $ $ % RCP AE GATE 3.00 EACH $ $2, $ $2, $2, % INLET CAPPING 1.00 L.F. $ $ $ $ $ % FLOW DIVERSION STRUCTURE 1.00 EACH $5, $5, $ $5, $5, % WETPOND EXCAVATION 1.00 LUMP SUM $1, $1, $ $1, $1, % BIORETENTION CONSTRUCTION 1.00 LUMP SUM $13, $13, $ $13, $13, % OUTLET STRUCTURE & GATE 1.00 LUMP SUM $3, $3, $ $3, $3, % SUBTOTALS $72, $0.00 $58, $58, % CONTRACT TOTALS $310, $0.00 $276, $276, % PAGE 5 OF 6

7 CHANGE ORDER #1, ACC'T NOS. (SEE BELOW): IMPORT FILL C.Y. $17.50 $8, $ $7, $7, % RCP AE 1.00 EACH -$1, ($1,158.00) 0.00 $ ($1,158.00) 1.00 ($1,158.00) 100.0% - 24 RCP AE GATE 1.00 EACH -$ ($752.00) 0.00 $ ($752.00) 1.00 ($752.00) 100.0% - 18" AE & GATE 1.00 LUMP SUM $1, $1, $ $1, $1, % SUBTOTAL ($395.00) $0.00 ($395.00) ($395.00) CHANGE ORDER #1 TOTAL $8, $0.00 $6, $6, GRAND TOTALS (CONTRACT TOTALS PLUS CHANGE ORDERS) $318, $0.00 $282, $282, % PAGE 6 OF 6

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: 295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED

More information

Exhibit "A" Date: 1/27/2011

Exhibit A Date: 1/27/2011 Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:

More information

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016 Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION

More information

ORIGINATOR: CITY OF MADISON STREETS DIVISION REV. DATE: _ PLOT NAME: _ PLOT SCALE: _ SHORELINE TREATMENT SCHEDULE PROJECT NO. 10332/10529 U-10 SHORELINE TREATMENT SCHEDULE MAINLAND CITY OF MADISON MAINLAND

More information

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation 5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road

More information

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD: -58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation #1 Northing 640586.689 / Easting 669419.281 / Elevation 1443.178 Center of bronze cap with UA seal. Located in sidewalk approx. 10 W of curb on Garland Ave. Approx. 24.5 SE of traffic signal post. UA #1

More information

SAN ANTONIO WATER SYSTEM

SAN ANTONIO WATER SYSTEM G:\TXC\Projects\SAWS\SAWS - Glad\03_CADD\01_Sheets\Glad_Water\01_Sheets\1 GLAD WATR CVR.dwg Sep 13, 2017-1:44pm acalderon SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5025 2017 SMP GLAD FROM PIEDMONT

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

Critchfield Rd / SR-129

Critchfield Rd / SR-129 NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

DOCUMENTATION WORKBOOK FY 2018

DOCUMENTATION WORKBOOK FY 2018 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

401 PLANTMIX BITUMINOUS PAVEMENTS GENERAL Rev. June 10, 2004 401.03.16 SURFACING MISCELLANEOUS AREAS: Surfacing of road approaches and connections, street intersection areas, frontage roads, island areas,

More information

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES GENERAL NOTES. NEW & RELOCATED ROADWAY SIGNS NOT SHOWN FOR CLARITY BUT, ARE INCLUDING IN CONCEPTUAL DESIGN COST ESTIMATE. KEYNOTES E X I S T I N G D E V E L O P M E N T. NEW 5' WIDE CONCRETE SIDEWALK.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00

More information

Appendix C Benchmarking Cost Estimates

Appendix C Benchmarking Cost Estimates REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACTOR'S ESTIMATE PACKAGE CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55

More information

**Temporary Erosion Control**

**Temporary Erosion Control** Construction operations And methods **Temporary Erosion Control** The test will more than likely just have a basic word problem dealing with Erosion control, if it has anything on the test. So just review,

More information

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM

More information

CONSTRUCTION EXIT SEDIMENT BARRIER

CONSTRUCTION EXIT SEDIMENT BARRIER 241428_itizen ield Guide_v3 2/22/06 11:09 M Page 1 (1,1) ONSTRUTION EXIT stone pad located where traffic leaves a construction site to eliminate the transport of soil to public streets. SEDIMENT BRRIER

More information

TABULATION OF TENDERS

TABULATION OF TENDERS SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD: 3,933,355.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 791 CONTRACT ID: 628572001 PROJECT: RMC - 628572001 CONTRACT: 05164007 AWARD AMOUNT: $20,967,966.00 PROJECTED AMOUNT: $20,970,966.00 ADJ.

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes City of New Castle Presentation Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes New Castle Conservation District DNREC August 22, 2012 Agenda Project Background

More information

Summary of Bids Received For

Summary of Bids Received For Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: 10370045 Firm Name Bid Total $ $1,074,100.00 Howell Contractors Inc. $1,083,694.00 Sunesis Construction

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water. Design Manual Chapter - Stormwater D - Storm Sewer Design D- Storm Sewer Sizing A. Introduction The purpose of this section is to outline the basic hydraulic principles in order to determine the storm

More information

Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological Performance and Suspended Solids

Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological Performance and Suspended Solids Concrete Sustainability Conference April 14 th 2010, Tempe, AZ Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological l Performance and Suspended Solids Discharge Luis A. Mata,

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD: 20,521.28 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18-24.00 105 CONTRACT ID: 030001080 PROJECT: NH 1702(331) CONTRACT: 08173204 AWARD AMOUNT: $18,990,864.89 PROJECTED AMOUNT: $18,990,864.89 ADJ.

More information

X X X X X X X X. Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist

X X X X X X X X. Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist Name of Permittee: Rock Koshkonong Lake District (RKLD) Construction Site (Project) Name: Lake Koshkonong

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD: 112,067.24 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 167-13.00 35.00 CONTRACT ID: 008701104 PROJECT: NH 2014(565) CONTRACT: 04143012 AWARD : $3,126,804.84 PROJECTED : $3,176,515.84 ADJ. PROJECTED

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD: 123,812.90 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 465 CONTRACT ID: 007207068 PROJECT: STP 1602(184)MM CONTRACT: 06163016 AWARD : $7,586,328.53 PROJECTED : $7,586,328.51 ADJ. PROJECTED : $7,710,141.41

More information

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report Cost Estimate Report Title Page Plan J. without trails Springfield, Missouri Flood Risk Management Feasibility Study Class 4 Cost Estimate P2 Number 354082 Estimated by Designed by Prepared by Cost Engineering

More information

9/12/2014 O V E RV I E W

9/12/2014 O V E RV I E W K E E P I N G T H E N E W M I S S I O N R E AC H C L E A N T R A S H & F L O ATA B L E S B M P S T U D Y Russell Persyn, P.E., Ph.D. (SARA) Cris Parker, P.E., CFM (HDR) September 4, 2014 O V E RV I E W»

More information

BACKGROUND AND PROJECT DESCRIPTION

BACKGROUND AND PROJECT DESCRIPTION June 7, 2017 Applicant: Murdock Builders Location: Approximately 600 West 1200 North Prepared by: Brian Tucker Public Hearing Item: Yes Zone: A-2, RA-2 ATTACHMENTS 1. Findings for Decision. 2. Resolution

More information

Construction Exits Vibration grids

Construction Exits Vibration grids Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]

More information

Westmoreland Conservation District Donohoe Center 218 Donohoe Road Greensburg, PA Tech. FAX:

Westmoreland Conservation District Donohoe Center 218 Donohoe Road Greensburg, PA Tech. FAX: Westmoreland Conservation District Donohoe Center 218 Donohoe Road Greensburg, PA 15601 724-837-5271 Tech. FAX: 724-837-4127 www.wcdpa.com 0 Typical Best Management Practices TABLE OF CONTENTS Mission,

More information

EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES. City of Moncton Engineering and Environmental Services

EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES. City of Moncton Engineering and Environmental Services EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES City of Moncton Engineering and Environmental Services Revised March 2011 TABLE OF CONTENTS INTRODUCTION... 2 THE EROSION AND SEDIMENT CONTROL

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Rock Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent installations

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

Local Conditions-NE Minnesota

Local Conditions-NE Minnesota Local Conditions-NE Minnesota Identifying Regional Stormwater Challenges Selecting BMPs for our area Experience & observations from MNDOT & MPCA BMPs that work / don t work in NE Minnesota Local Conditions-NE

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 5,047,590.65 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 617 289.00 CONTRACT ID: 005006086 PROJECT: NH 1502(184) CONTRACT: 05153002 AWARD AMOUNT: $36,840,375.34 PROJECTED AMOUNT: $37,065,377.33

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD: 220,119.27 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 124 CONTRACT ID: 054303067 PROJECT: STP 2018(416)MM CONTRACT: 01183201 AWARD AMOUNT: $30,289,272.41 PROJECTED AMOUNT: $31,279,648.40 ADJ.

More information

Stormwater Outlet Sediment Traps

Stormwater Outlet Sediment Traps Stormwater Outlet Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Excavated sediment trap just prior to scheduled clean-out (note energy dissipater at end of pipe) Photo 2 A supplementary straw bale barrier

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: 304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED

More information

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation

More information

Contractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587

Contractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587 Property: Any Street Pasadena, TX 77505 Estimator: Butch Bragg Contractor: Business: (281) 998-1800 Company: A- Select Services Business: suite 200 South Houston, TX 77587 Claim Number: Policy Number:

More information

Chutes Part 5: Rock linings

Chutes Part 5: Rock linings Chutes Part 5: Rock linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] Chutes

More information

Taft Stormwater Quest

Taft Stormwater Quest Taft Stormwater Quest Oregon Coast Quests is an Oregon Sea Grant program based at Oregon State University's Hatfield Marine Science Center. The Oregon Coast Book, 2017 18 Edition 43 Use this map to help

More information

Clover Ridge Drive Extension/Frey Property (Chaska Creek Boulevard)

Clover Ridge Drive Extension/Frey Property (Chaska Creek Boulevard) Feasibiity Report Amendment For Cover Ridge Drive Extension/Frey Property (Chaska Creek Bouevard) Prepared for: City of Chaska, Minnesota May 19, 2017 Stantec Project No. 193802563 Stantec Consuting Services

More information

Stormwater Inlet Sediment Traps

Stormwater Inlet Sediment Traps Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD: 358,904.13 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 841 CONTRACT ID: 007207066 PROJECT: C 72-7-66 CONTRACT: 07153205 AWARD : $31,159,119.31 PROJECTED : $31,159,119.31 ADJ. PROJECTED : $31,518,023.44

More information

APPENDIX B DRAINAGE REPORT

APPENDIX B DRAINAGE REPORT APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 462,346.70 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 332 13 CONTRACT ID: 000514080 PROJECT: IM 0201(189) CONTRACT: 04153049 AWARD : $11,801,426.99 PROJECTED : $12,168,144.19 ADJ. PROJECTED :

More information

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite

More information

TENNESSEE EROSION & SEDIMENT CONTROL HANDBOOK

TENNESSEE EROSION & SEDIMENT CONTROL HANDBOOK TENNESSEE EROSION & SEDIMENT CONTROL HANDBOOK A Guide for Protection of State Waters through the use of Best Management Practices during Land Disturbing Activities Second Edition MARCH 2002 TENNESSEE EROSION

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

Maintenance Guide for Permeable Interlocking Concrete Pavements

Maintenance Guide for Permeable Interlocking Concrete Pavements Tech Spec 23 Maintenance Guide for Permeable Interlocking Concrete Pavements Introduction Permeable interlocking concrete pavements (PICP) are a proven method for reducing stormwater runoff and pollutants

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

Design Data 17. Partial Flow Conditions of Box Culverts

Design Data 17. Partial Flow Conditions of Box Culverts Design Data 17 Partial Flow Conditions of Box Culverts Sewers, both sanitary and storm, are designed to carry a peak flow based on anticipated land development. The hydraulic capacity of sewers or culverts

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils Sediment Weirs SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Type 3 classification

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 140,750.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17-6.00 200 CONTRACT ID: 071801064 PROJECT: C 718-1-64 CONTRACT: 11153002 AWARD : $32,541,855.76 PROJECTED : $33,273,455.77 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84

More information

Tom Blackman Project Lead. Mékell Mikell Communications Representative

Tom Blackman Project Lead. Mékell Mikell Communications Representative Sediment Cleanup Middle River Complex, 2016-17 Season 1 Project Photo Tour Updated November 15, 2016 Tom Blackman Project Lead Mékell Mikell Communications Representative 1 Sediment Cleanup - Season 1

More information

WELCOME APWA How Best to Protect Asphalt Overlays with Interlayers - Delay Deterioration and Extend Pavement Life

WELCOME APWA How Best to Protect Asphalt Overlays with Interlayers - Delay Deterioration and Extend Pavement Life WELCOME APWA 2015 How Best to Protect Asphalt Overlays with Interlayers - Delay Deterioration and Extend Pavement Life Dennis Rogers, Tensar Pavement Maintenance Manager, West All Data & analysis courtesy

More information

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION The responsibility for providing snow and ice control on East Peoria s 240 lane miles of streets and alleys rests with the Street Divisions

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED: 389,480.02 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 294-4.00-17.00 CONTRACT ID: 050601105 PROJECT: NH 1602(416) CONTRACT: 10163002 AWARD : $13,863,443.80 PROJECTED : $14,081,920.80 ADJ. PROJECTED

More information

Marking the Approach- ends. of Channelization

Marking the Approach- ends. of Channelization Marking the Approach- ends of Channelization OBJECTIVES This report deals with a method of approach-end treatment to provide advance warning of physical barriers, such as channelizing islands and ramp

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information