CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:
|
|
- MargaretMargaret Owen
- 5 years ago
- Views:
Transcription
1 462, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/ CONTRACT ID: PROJECT: IM 0201(189) CONTRACT: AWARD : $11,801, PROJECTED : $12,168, ADJ. PROJECTED : $12,630, CONTRACT: CONTRACTOR: JONES BROS. DIRT & PAVING CONTRACTORS, INC. HIGHWAY: IH 20 DISTRICT NAME: Odessa COUNTY: MIDLAND AREA ENGINEER: Fred Herrera, P.E. AREA NUMBER: 053 ESTIMATE NUMBER: 0038 LETTING DATE: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 05/04/2018 to 05/04/2018 NOTICE TO PROCEED DATE: 06/11/2015 ESTIMATE TYPE: SUPP WORK BEGIN DATE: 08/09/2016 % COMPLETE: ACCEPTED DATE: 05/02/2018 % TIME USED: PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS $12,114, $12,114, PARTICIPATING NON-PARTICIPATING $12,114, $12,114, RETAINAGE LIQUIDATED DAMAGES INCENTIVE DISINCENTIVE OTHER ADJUSTMENTS $1,75 $1,75 PAID TO CONTRACTOR $12,115, $12,114, $1,75 CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/PROJECT ENGINEER DATE
2 CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 10 CONTRACT TIME STATEMENT WORK BEGIN DATE: TIME CHARGES BEGIN: DAYS: C. O. ADJUSTED DAYS: CURRENT DAYS: DAYS CHARGED : 08/09/ /10/ ASSESSED LIQ DAMAGES: LIQ DAMAGE RATE: LIQUIDATED DAMAGES: TOTAL: 0 $1, DAYS AT PER DAY $1, PHYSICAL WORK COMPLETE: 00/00/0000
3 CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 10 WORK PERFORMED THIS PERIOD *** NO EARNINGS THIS ESTIMATE***
4 CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 10 CONTRACT S PROJECT CATEGORY IM 0201(189) CONTROL ROADWAY SUPP $ PREPARING ROW STA 1, , REMOVING CONC (PAV) SY , Added by CO # REMOVING CONC (CURB AND GUTTER) LF , , , REMOVING CONC (RETAINING WALLS) SY , REMOVING CONC (MISC) SY , OBLITERATING ABANDONED ROAD STA 9, , EXCAVATION (ROADWAY) CY , , , , EMBANKMENT (FINAL)(ORD COMP)(TY B) CY , , , BLADING HR , DRILL SEEDING (PERM) (RURAL) (CLAY) AC , PROOF ROLLING HR , FL BS (CMP IN PLC)(TY A GR 4) (6") SY , FL BS(COMPL IN PLACE)(TY A GR4)(16") SY , ,64 263, EMULS AH (PRIME)(AE-P) GAL ,10 24, SUPERPAVE MIXTURES -B PG70-22 TON , ,160 25, ,891, PRODUCTION PAYMENT ADJUSTMENT DOL 0 53, , , PLACEMENT PAYMENT ADJUSTMENT DOL 0 29, , , SUPERPAVE MIXTURES -D SAC-A PG70-22 TON 150 6, , ,052, FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY , , ,474, PLANE AH CONC PAV (2") SY , , , CONC PVMT (CONT REINF - CRCP) (8") SY , Added by CO # CEM STABIL BKFL CY , DRILL SHAFT (NON - REINFORCED) (12 IN) LF DRILL SHAFT (SIGN MTS) (24 IN) LF , DRILL SHAFT (RDWY ILL POLE) (30 IN) LF , DRILL SHAFT (TRF SIG POLE) (48 IN) LF , RETAINING WALL (STONE) SF , RIPRAP (CONC)(5 IN) CY , RIPRAP (MOW STRIP)(4 IN) CY , CONC BOX CULV (5 FT X 2 FT) LF , RC PIPE (CL III)(18 IN) LF , SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C) EA 7, , SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P) EA 11, , SET (TY II) (18 IN) (RCP) (4: 1) (P) EA 1, , CLEAN EXIST CULVERTS EA 3, , REMOV STR (SET) EA 1, , REMOV STR (WINGWALL) EA 1, , REMOV STR (BOX CULVERT) LF , MOBILIZATION LS 601, , MOBILIZATION LS 12, ,50 Added by CO #4
5 CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 10 CATEGORY 001 ROADWAY SUPP $ BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4, , BIODEG EROSN CONT LOGS (INSTL) (18") LF , ,40 36, BIODEG EROSN CONT LOGS (REMOVE) LF , , CONSTRUCTING DETOURS SY 100 5, , , PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF , ,12 566, PORT CTB (MOVE)(SGL SLP)(TY 1) LF , ,30 57, PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 40 6, ,12 244, CONC CURB & GUTTER (TY II) LF , , , CONC CURB & GUTTER (SLOTTED) LF , RUMBLE STRIPS (SHOULDER) LF , , MTL W-BEAM GD FEN (STEEL POST) LF , ,75 36, MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1, , DOWNSTREAM ANCHOR TERMINAL SECTION EA 1, , REMOVE METAL BEAM GUARD FENCE LF , ,50 3, REMOVE TERMINAL ANCHOR SECTION EA RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA GUARDRAIL END TREATMENT (INSTALL) EA 2, , CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 10, ,00 Added by CO # CRASH CUSH ATTEN (MOVE & RESET) EA 3, , CRASH CUSH ATTEN (REMOVE) EA 1, , RELOCATE RD IL ASM (TRANS-BASE) EA 1, , REMOVE RD IL ASM (TRANS-BASE) EA , IN RD IL AM (TY SA) 40T-8 (250W) S EA 4, , UNIQUE CHANGE ORDER 1 DOL 17, ,75 Mobilization for CO # CONDT (PVC) (SCH 40) (2") LF ,580 2, ,21 49, CONDT (PVC) (SCH 40) (3") LF , CONDT (PVC) (SCH 80) (2") (BORE) LF , , , CONDT (PVC) (SCH 80) (3") (BORE) LF , ELEC CONDR (NO.8) INSULATED LF , , , ELEC CONDR (NO.6) BARE LF , , , , ELEC CONDR (NO.6) INSULATED LF ,580 4, , , GROUND BOX TY A (122311)W/APRON EA 1, , GROUND BOX TY C (162911)W/APRON EA 1, , ELC SRV TY A 240/ (NS)SS(E)(O) EA 7, , ALUMINUM SIGNS (TY G) SF , IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA , IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 1, , IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1, , IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1, , IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT) EA 1, , IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT) EA 1, , IN SM RD SN SUP&AM TYS80(1)SA(U-WC) EA 1, , RELOCATE SM RD SN SUP&AM TY S80 EA REMOVE SM RD SN SUP&AM EA , INSTALL LRSS (STRUCT STEEL) LB , , , REMOVE LRSA EA ,30
6 CONTRACTOR'S ESTIMATE PACKAGE Page 6 of 10 CATEGORY 001 ROADWAY SUPP $ INSTL DEL ASSM (D-SW)SZ 1(FLX)GND EA INSTL DEL ASSM (D-SY)SZ 1(FLX)GND EA INSTL OM ASSM (OM-2Y)(WC)GND EA WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF , , WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI) EA WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF , , WK ZN PAV MRK SHT TERM (TAB)TY W EA , REFL PAV MRK TY I (W)4"(DOT)(100MIL) LF REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF , , , REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF , REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA REFL PAV MRK TY I (Y)12"(SLD)(100MIL) LF , , , RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF , , RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF ,890 1, ,98 27, RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF ,08 1, RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF , , , PREFAB PAV MRK TY C (W) (ARROW) EA , PREFAB PAV MRK TY C (W) (WORD) EA , REFL PAV MRKR TY I-C EA REFL PAV MRKR TY II-A-A EA , , , REFL PAV MRKR TY II-C-R EA , INSTALL HWY TRF SIG (SYSTEM) EA 32, , REMOVING TRAFFIC SIGNALS EA 14, , VEH SIG SEC (12")LED(GRN) EA , VEH SIG SEC (12")LED(GRN ARW) EA , VEH SIG SEC (12")LED(YEL) EA , VEH SIG SEC (12")LED(YEL ARW) EA , VEH SIG SEC (12")LED(RED) EA , VEH SIG SEC (12")LED(RED ARW) EA , BACK PLATE (12")(3 SEC)ALUM EA , TRF SIG CBL (TY A)(12 AWG)(9 CONDR) LF , , , TRF SIG CBL (TY A)(14 AWG)(4 CONDR) LF , ,26 2, INS TRF SIG PL AM(S)1 ARM(50')LUM EA 24, , INS TRF SIG PL AM(S)1 ARM(55')LUM EA 25, , INS TRF SIG PL AM(S)1 ARM(60')LUM EA 27, , DITCH CLEANING AND RESHAPING (FOOT) LF , , PORTABLE CHANGEABLE MESSAGE SIGN EA 20, , VIVDS SET-UP SYSTEM EA 1, , VIVDS COMMUNICATION CABLE (COAXIAL) LF , ,51 10, TM RADAR EED CONTROL MONITOR EA 13, , BBU SYSTEM (EXTERNAL BATT CABINET) EA 9, , AUTO PORT SMRT TRF MONITOR SYS DAY , VIDEO IMAGING AND RAD VEH DETECTION SYS EA 10, , MODIFY EXISTING ELECTRICAL SERVICE EA 1, , CATEGORY 002 CONTRACTOR FORCE ACCOUNT WORK Category Subtotal $12,088,198.35
7 CONTRACTOR'S ESTIMATE PACKAGE Page 7 of 10 CATEGORY 002 CONTRACTOR FORCE ACCOUNT WORK SUPP $ FORCE ACCOUNT - SAFETY CONTINGENCY DOL 0 257, , , Category Subtotal $25, PROJECT IM 0201(189) CONTROL CATEGORY 001 ROADWAY SUPP ($) PRODUCTION PAYMENT ADJUSTMENT DOL 0 12, PLACEMENT PAYMENT ADJUSTMENT DOL 0 6, CRASH CUSH ATTEN (INSTL) EA 20, INSTL DEL ASSM (D-SW)SZ (BRF)GF1 EA WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF , WK ZN PAV MRK NON-REMOV (W)4"(DOT) LF WK ZN PAV MRK NON-REMOV (W)8"(SLD) LF , WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF WK ZN PAV MRK NON-REMOV(W)(WORD) EA WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF WK ZN PAV MRK NON-REMOV (Y)12"(SLD) LF , WK ZN PAV MRK REMOV (W)(ARROW) EA TEMP TRAF SIGNALS EA 28, MATERIAL ON HAND DOL 0 1, PAYMENT ADJUSTMENT-POS DOL 0 1, PAYMENT ADJUSTMENT-NEG DOL -0 2, CATEGORY 002 CONTRACTOR FORCE ACCOUNT WORK Category Subtotal SUPP ($) FORCE ACCT-EROSION CONTROL MAINTENANCE DOL 0 8, Category Subtotal TOTAL EARNINGS THIS CONTRACT $12,114,135.43
8 CONTRACTOR'S ESTIMATE PACKAGE Page 8 of 10 CONSTRUCTION ESTIMATE COMBINED ($) PREPARING ROW STA 1, , REMOVING CONC (PAV) SY , REMOVING CONC (CURB AND GUTTER) LF ,50 6, , REMOVING CONC (RETAINING WALLS) SY , REMOVING CONC (MISC) SY , OBLITERATING ABANDONED ROAD STA 9, , EXCAVATION (ROADWAY) CY , , , EMBANKMENT (FINAL)(ORD COMP)(TY B) CY , , , BLADING HR , DRILL SEEDING (PERM) (RURAL) (CLAY) AC , PROOF ROLLING HR , FL BS (CMP IN PLC)(TY A GR 4) (6") SY , FL BS(COMPL IN PLACE)(TY A GR4)(16") SY , , , EMULS AH (PRIME)(AE-P) GAL ,100 24, SUPERPAVE MIXTURES -B PG70-22 TON , , ,891, SUPERPAVE MIXTURES -D SAC-A PG70-22 TON 150 6,13 7, ,052, PRODUCTION PAYMENT ADJUSTMENT DOL 0 53, , , PLACEMENT PAYMENT ADJUSTMENT DOL 0 29, , , FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY , , ,474, PLANE AH CONC PAV (2") SY , , , CONC PVMT (CONT REINF - CRCP) (8") SY , CEM STABIL BKFL CY , DRILL SHAFT (NON - REINFORCED) (12 IN) LF DRILL SHAFT (SIGN MTS) (24 IN) LF , DRILL SHAFT (RDWY ILL POLE) (30 IN) LF , DRILL SHAFT (TRF SIG POLE) (48 IN) LF , RETAINING WALL (STONE) SF , RIPRAP (CONC)(5 IN) CY , RIPRAP (MOW STRIP)(4 IN) CY , CONC BOX CULV (5 FT X 2 FT) LF , RC PIPE (CL III)(18 IN) LF , SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C) EA 7, , SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P) EA 11, , SET (TY II) (18 IN) (RCP) (4: 1) (P) EA 1, , CLEAN EXIST CULVERTS EA 3, , REMOV STR (SET) EA 1, , REMOV STR (WINGWALL) EA 1, , REMOV STR (BOX CULVERT) LF , MOBILIZATION LS 12, , MOBILIZATION LS 601, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4, , BIODEG EROSN CONT LOGS (INSTL) (18") LF , ,400 36, BIODEG EROSN CONT LOGS (REMOVE) LF , ,608.00
9 CONTRACTOR'S ESTIMATE PACKAGE Page 9 of CONSTRUCTING DETOURS SY 100 5,70 5, , PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF ,12 6, , PORT CTB (MOVE)(SGL SLP)(TY 1) LF ,30 2,300 57, PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 40 6,12 6, , CONC CURB & GUTTER (TY II) LF ,05 12, , CONC CURB & GUTTER (SLOTTED) LF , RUMBLE STRIPS (SHOULDER) LF , , MTL W-BEAM GD FEN (STEEL POST) LF , ,750 36, MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1, , DOWNSTREAM ANCHOR TERMINAL SECTION EA 1, , REMOVE METAL BEAM GUARD FENCE LF ,05 1,500 3, REMOVE TERMINAL ANCHOR SECTION EA RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA GUARDRAIL END TREATMENT (INSTALL) EA 2, , CRASH CUSH ATTEN (MOVE & RESET) EA 3, , CRASH CUSH ATTEN (REMOVE) EA 1, , CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 10, , RELOCATE RD IL ASM (TRANS-BASE) EA 1, , REMOVE RD IL ASM (TRANS-BASE) EA , IN RD IL AM (TY SA) 40T-8 (250W) S EA 4, , CONDT (PVC) (SCH 40) (2") LF ,58 7,210 49, CONDT (PVC) (SCH 40) (3") LF , CONDT (PVC) (SCH 80) (2") (BORE) LF ,57 2, , CONDT (PVC) (SCH 80) (3") (BORE) LF , ELEC CONDR (NO.8) INSULATED LF ,35 2, , ELEC CONDR (NO.6) BARE LF , , , ELEC CONDR (NO.6) INSULATED LF ,58 29, , GROUND BOX TY A (122311)W/APRON EA 1, , GROUND BOX TY C (162911)W/APRON EA 1, , ELC SRV TY A 240/ (NS)SS(E)(O) EA 7, , ALUMINUM SIGNS (TY G) SF , IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA , IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 1, , IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1, , IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1, , IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT) EA 1, , IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT) EA 1, , IN SM RD SN SUP&AM TYS80(1)SA(U-WC) EA 1, , RELOCATE SM RD SN SUP&AM TY S80 EA REMOVE SM RD SN SUP&AM EA , INSTALL LRSS (STRUCT STEEL) LB , , , REMOVE LRSA EA , INSTL DEL ASSM (D-SW)SZ 1(FLX)GND EA INSTL DEL ASSM (D-SY)SZ 1(FLX)GND EA INSTL OM ASSM (OM-2Y)(WC)GND EA WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF ,57 2, WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI) EA WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF ,36 1, WK ZN PAV MRK SHT TERM (TAB)TY W EA ,
10 CONTRACTOR'S ESTIMATE PACKAGE Page 10 of REFL PAV MRK TY I (W)4"(DOT)(100MIL) LF REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF ,84 8, , REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF , REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA REFL PAV MRK TY I (Y)12"(SLD)(100MIL) LF ,91 1, , RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF , , RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF ,89 55,980 27, RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF ,080 1, RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF ,38 29, , PREFAB PAV MRK TY C (W) (ARROW) EA , PREFAB PAV MRK TY C (W) (WORD) EA , REFL PAV MRKR TY I-C EA REFL PAV MRKR TY II-A-A EA ,09 1, , REFL PAV MRKR TY II-C-R EA , INSTALL HWY TRF SIG (SYSTEM) EA 32, , REMOVING TRAFFIC SIGNALS EA 14, , VEH SIG SEC (12")LED(GRN) EA , VEH SIG SEC (12")LED(GRN ARW) EA , VEH SIG SEC (12")LED(YEL) EA , VEH SIG SEC (12")LED(YEL ARW) EA , VEH SIG SEC (12")LED(RED) EA , VEH SIG SEC (12")LED(RED ARW) EA , BACK PLATE (12")(3 SEC)ALUM EA , TRF SIG CBL (TY A)(12 AWG)(9 CONDR) LF ,31 2, , TRF SIG CBL (TY A)(14 AWG)(4 CONDR) LF , ,260 2, INS TRF SIG PL AM(S)1 ARM(50')LUM EA 24, , INS TRF SIG PL AM(S)1 ARM(55')LUM EA 25, , INS TRF SIG PL AM(S)1 ARM(60')LUM EA 27, , DITCH CLEANING AND RESHAPING (FOOT) LF , , PORTABLE CHANGEABLE MESSAGE SIGN EA 20, , VIVDS SET-UP SYSTEM EA 1, , VIVDS COMMUNICATION CABLE (COAXIAL) LF , ,510 10, TM RADAR EED CONTROL MONITOR EA 13, , BBU SYSTEM (EXTERNAL BATT CABINET) EA 9, , AUTO PORT SMRT TRF MONITOR SYS DAY , VIDEO IMAGING AND RAD VEH DETECTION SYS EA 10, , MODIFY EXISTING ELECTRICAL SERVICE EA 1, , FORCE ACCOUNT - SAFETY CONTINGENCY DOL 0 257,00 25, , UNIQUE CHANGE ORDER 1 DOL 17, ,75 Mobilization for CO #06 TOTAL EARNINGS $12,114,135.43
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:
27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:
29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:
38,587.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 208 5.00 CONTRACT ID: 091800267 : STP 1702(453) CONTRACT: 07173236 AWARD : $1,699,468.03 ED : $1,727,168.03 ADJ. ED : $1,765,756.00 CONTRACT:
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD:
20,521.28 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18-24.00 105 CONTRACT ID: 030001080 PROJECT: NH 1702(331) CONTRACT: 08173204 AWARD AMOUNT: $18,990,864.89 PROJECTED AMOUNT: $18,990,864.89 ADJ.
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:
123,812.90 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 465 CONTRACT ID: 007207068 PROJECT: STP 1602(184)MM CONTRACT: 06163016 AWARD : $7,586,328.53 PROJECTED : $7,586,328.51 ADJ. PROJECTED : $7,710,141.41
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD:
112,067.24 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 167-13.00 35.00 CONTRACT ID: 008701104 PROJECT: NH 2014(565) CONTRACT: 04143012 AWARD : $3,126,804.84 PROJECTED : $3,176,515.84 ADJ. PROJECTED
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:
0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 102 CONTRACT ID: 057401029 : BR 2018(319) CONTRACT: 12173211 AWARD : $2,595,950.00 ED : $2,833,949.00 ADJ. ED : $2,833,949.00 CONTRACT: CONTRACTOR:
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:
15,466.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 136-11.00 2.00 CONTRACT ID: 180801028 PROJECT: STP 1502(152)HES CONTRACT: 05153036 AWARD : $2,602,993.61 PROJECTED : $2,602,993.61 ADJ. PROJECTED
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:
3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27
More informationCONTRACTOR'S ESTIMATE PACKAGE
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:
-58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:
304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:
295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD:
358,904.13 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 841 CONTRACT ID: 007207066 PROJECT: C 72-7-66 CONTRACT: 07153205 AWARD : $31,159,119.31 PROJECTED : $31,159,119.31 ADJ. PROJECTED : $31,518,023.44
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:
140,750.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17-6.00 200 CONTRACT ID: 071801064 PROJECT: C 718-1-64 CONTRACT: 11153002 AWARD : $32,541,855.76 PROJECTED : $33,273,455.77 ADJ. PROJECTED :
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED:
389,480.02 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 294-4.00-17.00 CONTRACT ID: 050601105 PROJECT: NH 1602(416) CONTRACT: 10163002 AWARD : $13,863,443.80 PROJECTED : $14,081,920.80 ADJ. PROJECTED
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 31 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:
241,240.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 444 CONTRACT ID: 016211001 PROJECT: STP 1502(488) CONTRACT: 11153201 AWARD AMOUNT: $105,980,139.92 PROJECTED AMOUNT: $108,981,339.92 ADJ.
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD:
220,119.27 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 124 CONTRACT ID: 054303067 PROJECT: STP 2018(416)MM CONTRACT: 01183201 AWARD AMOUNT: $30,289,272.41 PROJECTED AMOUNT: $31,279,648.40 ADJ.
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:
5,047,590.65 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 617 289.00 CONTRACT ID: 005006086 PROJECT: NH 1502(184) CONTRACT: 05153002 AWARD AMOUNT: $36,840,375.34 PROJECTED AMOUNT: $37,065,377.33
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD:
118,116.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 419 9 CONTRACT ID: 074704059 PROJECT: STP 2009(879)MM CONTRACT: 08093020 AWARD AMOUNT: $2,833,448.12 PROJECTED AMOUNT: $2,858,448.12 ADJ.
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: IH 10 COUNTY: 05/02/2017 ESTIMATE PAID: AWARD DATE: 05/25/2017 ESTIMATE PERIOD:
262,998.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 247 6.00 CONTRACT ID: 007207041 PROJECT: NH 2017(990) CONTRACT: 05173001 AWARD : 63,063,378.38 PROJECTED : 63,063,378.38 ADJ. PROJECTED :
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:
231,995.19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 579 6 CONTRACT ID: 002407058 PROJECT: NH 1502(164) CONTRACT: 05153203 AWARD : 22,716,470.32 PROJECTED : 22,716,470.31 ADJ. PROJECTED : 22,948,465.50
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD:
455,691.25 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 542 59.00 CONTRACT ID: 000505102 PROJECT: DMO 2012(263) CONTRACT: 05133202 AWARD : 18,434,933.58 PROJECTED : 18,604,933.60 ADJ. PROJECTED
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:
3,933,355.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 791 CONTRACT ID: 628572001 PROJECT: RMC - 628572001 CONTRACT: 05164007 AWARD AMOUNT: $20,967,966.00 PROJECTED AMOUNT: $20,970,966.00 ADJ.
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:
2,852.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 49 CONTRACT ID: 001607132 PROJECT: IM 0352(341) CONTRACT: 02133206 AWARD : $287,874.50 PROJECTED : $287,874.50 ADJ. PROJECTED : $290,726.58
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD:
1,554,603.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 792 73 CONTRACT ID: 629050001 PROJECT: SUP - 629050001 CONTRACT: 10154031 AWARD AMOUNT: $1,697,780.64 PROJECTED AMOUNT: $1,697,780.64 ADJ.
More informationFranklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation
2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,
More information20217 CLEAR STONE TON $14.20 $5, $ $ $ %
ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON
More information12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC
PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE
More information10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %
ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00
More information20217 CLEAR STONE TON $14.20 $5, $ $ $ %
ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON
More informationNew Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS
PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB
More informationAddendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address
CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing
More informationAverage Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016
Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION
More informationFranklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation
5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road
More informationMaterials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationTENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL
SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.
More informationDOCUMENTATION WORKBOOK FY 2018
DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum
More informationDISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD
HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION
More informationExhibit "A" Date: 1/27/2011
Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase
More informationTABULATION OF TENDERS
SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering
More informationTRAFFIC ALERT FOR WEEK OF February 4 8, 2008
TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during
More informationCritchfield Rd / SR-129
NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2
More informationDESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006
Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment
More informationSummary of Bids Received For
Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: 10370045 Firm Name Bid Total $ $1,074,100.00 Howell Contractors Inc. $1,083,694.00 Sunesis Construction
More informationBUILDING HOME CONSTRUCTION
1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68
More informationProvide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.
Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and
More informationISSUED FOR CONSTRUCTION
PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite
More informationROCK EXCAVATION (GRADING) OPSS 206 INDEX
206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6
More informationWhat s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description
What s New in the World of Winter Maintenance Technology Dennis Burkheimer Winter Operations Administrator Iowa Department of Transportation John Scharffbillig Fleet Manager Minnesota Department of Transportation
More informationUse of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio
Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio Mitchell W. Weber, P.G. Gannett Fleming Engineers & Architects, P.C. Greg Bachman, P.E., P.S. County of Summit Engineer Robert
More informationSpecifications Whitcomb Elementary School Demolition January 15, 2016
SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,
More informationROAD DISTRICT RESIDENT HANDBOOK
ROAD DISTRICT RESIDENT HANDBOOK REV. 2 12-11-15 A Message From the Road District Dear Resident: The Wheatland Township Road District is pleased to provide this resident handbook. The handbook addresses
More informationLimited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results
Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results of the research. The presentation is regarded as fully
More informationCITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY
CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works
More informationCENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM
SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION
More informationFOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP
AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment
More informationJanuary 17, 2008 File:
January 17, 2008 File: 15-85-73 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)
More informationALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN
ALUMINUM STRUCTURAL PLATE EADWALLS AASTO LRFD BASIS OF DESIGN LANE ENTERPRISES, INC. www.lane-enterprises.com Required Backfill and Load Cases: ALUMINUM STRUCTURAL PLATE EADWALLS BASIS OF DESIGN Backfill
More informationPrint Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report
Cost Estimate Report Title Page Plan J. without trails Springfield, Missouri Flood Risk Management Feasibility Study Class 4 Cost Estimate P2 Number 354082 Estimated by Designed by Prepared by Cost Engineering
More informationCulvert and Pipe Phasing
Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report
More informationSAN ANTONIO WATER SYSTEM
G:\TXC\Projects\SAWS\SAWS - Glad\03_CADD\01_Sheets\Glad_Water\01_Sheets\1 GLAD WATR CVR.dwg Sep 13, 2017-1:44pm acalderon SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5025 2017 SMP GLAD FROM PIEDMONT
More informationAppendix C Benchmarking Cost Estimates
REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall
More informationTrinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226
1 Insured: Property: SHANE KATZ 198 S. HOLLAND ST. LAKEWOOD, CO 80226 Estimator: James Mosel Business: (720) 456-8329 Business: E-mail: james@trinityconstructionserv Aurora, CO 80017 ices.com Claim Number:
More informationColorado Department of Transportation Structure Inspection and Inventory Report (English Units)
10/23/2017 Header Information Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) Bridge Name: D-02-PR-030A Inspection Date: 12/2/2015 Sufficiency Rating: Inspection
More information401 PLANTMIX BITUMINOUS PAVEMENTS GENERAL Rev. June 10, 2004 401.03.16 SURFACING MISCELLANEOUS AREAS: Surfacing of road approaches and connections, street intersection areas, frontage roads, island areas,
More informationB805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805
B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff
More informationBRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT
BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital
More informationCase Histories and Practical Examples
SUMMER SCHOOL SIIV 2012 - ROAD SAFETY MANAGEMENT Theoretical principles and practical application in the framework of the European Directive 2008/96/CE Catania 24-28 September 2012 Case Histories and Practical
More informationHydrology Study Report
Hafeez Consulting www.hafeezconsulting.com Civil/ Structural Engineering, Design & Construction 1451 S. Hacienda St. Anaheim CA 92804 (714) 225-4565 Fax (714)917-2977 engineer@hafeezconsulting.com Hydrology
More informationBob Rettig Construction and Consulting
1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,
More informationAmistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border
Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border Brook Brosi, CPG, PG USACE Lisa Nowicki Perks, PG USACE Kimberly Heenan, PE AECOM US Army Corps of Engineers BUILDING
More informationTHREE HOLE SPLICE CLEVIS FOR B52 Standard finishes: ZN, GRN Wt./C 126 Lbs. (57.1 kg)
CLEVIS FITTINGS B169 TWO HOLE SPLICE Wt./C 84 Lbs. (38.1 kg) B168 THREE HOLE SPLICE Wt./C 126 Lbs. (57.1 kg) B167 Wt./C 178 Lbs. (80.7 kg) 3 1 /2 (88.9) B170 TWO HOLE SPLICE Wt./C 123 Lbs. (55.8 kg) 5
More informationCONSTRUCTION EXIT SEDIMENT BARRIER
241428_itizen ield Guide_v3 2/22/06 11:09 M Page 1 (1,1) ONSTRUTION EXIT stone pad located where traffic leaves a construction site to eliminate the transport of soil to public streets. SEDIMENT BRRIER
More informationContractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587
Property: Any Street Pasadena, TX 77505 Estimator: Butch Bragg Contractor: Business: (281) 998-1800 Company: A- Select Services Business: suite 200 South Houston, TX 77587 Claim Number: Policy Number:
More informationSPECIFICATION FOR RAMM UPDATING OF ROADS
SPECIFICATION FOR RAMM UPDATING OF ROADS 1. SCOPE This specification sets out the general requirements for consultants specialising in, and being fully conversant with Road Assessment and Maintenance Management
More informationPEACE REGION (PEACE RIVER- HIGH LEVEL AREA) GEOHAZARD ASSESSMENT CALL-OUT PH56: EMBANKMENT FAILURE ON HWY 35:08 SOUTHWEST OF MEIKLE RIVER CROSSING
( (/)...,. - (D
More informationFile E28476 Vol. 7 Sec. 44 Page 1 Issued: Vol. 23 Sec. 18 Revised: Vol. 67 Sec. 4 and Report D E S C R I P T I O N
File E28476 Vol. 7 Sec. 44 Page 1 Issued: 1990-08-07 Vol. 23 Sec. 18 Revised: 2014-04-18 PRODUCT COVERED: USR - Series SL.156 Connectors. D E S C R I P T I O N USR - SL-156 Connectors, Receptacle Part
More informationFIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES
GENERAL NOTES. NEW & RELOCATED ROADWAY SIGNS NOT SHOWN FOR CLARITY BUT, ARE INCLUDING IN CONCEPTUAL DESIGN COST ESTIMATE. KEYNOTES E X I S T I N G D E V E L O P M E N T. NEW 5' WIDE CONCRETE SIDEWALK.
More informationNRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:
WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation
More informationOC Public Works El Niño Storm Preparation 2015
OC Public Works El Niño Storm Preparation 2015 December 8, 2015 Overview About OC Public Works Storm Preparation Pre-Storm During Storm Post-Storm Storm Preparation Canyon and Burn Areas County Department
More informationProject T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox
Compare Responses Event #: 1702 Status: Pending award Event Name: Curb Replacement Project T 841046.05 Number Of s: 7 Fit Excavating Quality Built Construction Dinkel Construction II, LLC Concrete Solutions,LLC
More informationRapid Response Team, LLC
1 Insured: Cordero, Esther Home: (407) 433-6956 Property: 602 Green Dr. Kissimmee, FL 34759 Claim Rep.: Taye Garnett Business: (561) 988-9170 x 3612 Position: Claims Adjuster E-mail: tgarnett@peoplestrustinsurance.
More informationU.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate
Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM
More informationVehicle Motion Equations:
1 Vehicle Motion Equations: v = at + v (2.2.4) x x = v2 2 v 2a (2.2.6) v 2 = v 2 + 2a(x x ) (2.2.6) x = 1 2 at2 + v t + x (2.2.7) D b = x cos α (2.2.10) x = vt D b = v 2 v 2 2g(f G) (2.2.14) e + f s =
More informationCommonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for
Commonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation 14 Pages LABORATORY TESTING SECTION Method of Test for SAMPLING ROADWAY BITUMINOUS CONCRETE 1. SCOPE 1.1 This method covers
More informationAgenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections
Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental
More informationCCR Rule Annual Inspection Report (cont.) 2
The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that
More informationAPPENDIX B WORKSHEETS & EXHIBITS
APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions
More informationSaganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study
2015 Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study Appendix B Civil Design USACE Chicago District August 2015 TABLE OF CONTENTS INTRODUCTION... 3 General...
More informationTown of Cheektowaga. I. Call to Order
Tw Ckw Wk S 3301 Bw Ckw, NY 14227 ://www.w.kw.. ~ A ~ A Mk 716-686-3400 T, J 10, 2012 6:00 PM O I. C O 6:00 PM M J 10, 2012 O, Rm, Ckw, NY. A Nm P A L A S M Hz mm P Jwwz mm Jm Rwk mm C Mk mm S Kzwk mm
More informationMINNESOTA DEPARTMENT OF TRANSPORTATION OFFICE OF LAND MANAGEMENT SURVEYING AND MAPPING SECTION PHOTOGRAMMETRY UNIT
JULY 1, 2001 MINNESOTA DEPARTMENT OF TRANSPORTATION OFFICE OF LAND MANAGEMENT SURVEYING AND MAPPING SECTION PHOTOGRAMMETRY UNIT SPECIAL PROVISIONS FOR: GROUP 3: DIGITAL TERRAIN MODEL/DIGITAL ELEVATION
More informationHow Can DOT Operations and Maintenance Prepare for Extreme Weather Events?
How Can DOT Operations and Maintenance Prepare for Extreme Weather Events? Gregory C. Johnson, P.E. Chief Operations Officer Michigan Department of Transportation November 17, 2012 Michigan s Climate Four
More informationS E C T I O N 1 2 P R O D U C T S E L E C T I O N G U I D E - H E L I C A L S C R E W P I L E F O U N D A T I O N S
1. P R O D U C T S E L E C T I O N G U I D E - H E L I C A L S C R E W P I L E F O U N D A T I O N S Helical foundation pile includes a lead and extension(s). The lead section is made of a central steel
More informationdesign, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.
design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.
More informationDecember 11, 2006 File:
December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)
More informationManaging an Extreme Weather Event of Prolonged Duration May 22, 2013
Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 MISSOURI RIVER FLOOD OF 2011 M I C H A E L J. K E N N E R L Y P. E. D I R E C T O R O F T H E O F F I C E O F D E S I G N I O W A D