Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address
|
|
- Harry Casey
- 5 years ago
- Views:
Transcription
1 CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas / Fax: 254 / Date: 11/6/17 RFB No: Commodity: Sidewalk Improvement Plans Closing Time: 2:00 P.M., November 9, 2017 Opening Time: 2:01 P.M., November 9, 2017 Bid Opening Location: Purchasing Services Office 1415 N. 4 th Street, Waco, TX Addendum No: 1 The above-mentioned bid invitation has been changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time and date with your RFB response. Returning this page signed by your authorized agent will serve to acknowledge this change. All other requirements of the invitation remain unchanged. If you have any questions, please call or stop by the Purchasing Office at the above address. THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES Firm: Address Signature of Person Authorized to Sign Bid: Signor's Name and Title (print or type): Date: Telephone: Fax:
2
3
4 Bid Proposal For Sidewalk Improvement Plans (ST0313, ST0314, ST0315, ST0316) Page 1 of 6 Item Est. Unit Unit Item No. Description Qty. Meas. Price Amount KENDRICK ELEMENTARY SCHOOL (ST0313) 1 MOBILIZATION 1 LS 2 EROSION CONTROL IMPLEMENTATION 1 LS 3 TRAFFIC CONTROL PLAN 1 LS 4 TRAFFIC CONTROL IMPLEMENTATION 1 LS 5 CONSTRUCTION SURVEY STAKING 1 LS 6 REMOVE EXISTING CURB AND GUTTER 146 LF 7 CURB & GUTTER 64 LF 8 REMOVE EXISTING SIDEWALK 1664 SF 9 5' SIDEWALK (NON-REINFORCED) 1871 SF 10 5' SIDEWALK (REINFORCED) 34 SF 11 SIDEWALK (VARYING WIDTH) (REINFORCED) 1110 SF 12 CONCRETE SIDEWALK TIE-IN 20 SF 13 REMOVE EXISTING WHEELCHAIR RAMP 1 EA 14 CONCRETE DRIVE APPROACH 220 SF 15 REMOVE ASPHALT DRIVE APPROACH/SLAB 515 SF 16 CONCRETE DRIVE SLAB 235 SF 17 ASPHALT TIE-IN 34 LF 18 6" TOPSOIL AND BLOCK SOD 951 SF 19 REMOVE EXISTING RETAINING WALL 29 LF 20 6"-WIDE REINFORCED RETAINING WALL (VARYING HEIGHT) 251 LF 21 ADJUST ELECTRICAL JUNCTION BOX LID TO GRADE 1 EA 22 RELOCATE BENCH 1 EA 23 GRASS TIE-IN 10 LF 24 TXDOT TYPE 7 RAMP (REINFORCED) 1 EA 25 TXDOT TYPE 7 RAMP (NON-REINFORCED) 1 EA 26 TXDOT TYPE 10 RAMP (REINFORCED) 1 EA 27 REESTABLISH BOUNDARY PIN 1 EA All Pages of the Bid Proposal Should Be Returned
5 Page 2 of 6 28 ADJUST WATER METER COVER TO GRADE 2 EA 29 RELOCATE FIRE HYDRANT 1 EA 30 REMOVE TOP OF INLET 1 EA 31 REPLACE TOP OF INLET 1 EA TOTAL: TOTAL AMOUNT OF MATERIALS TOTAL AMOUNT OF LABOR & EQUIPMENT I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK: SUBCONTRACTOR TYPE OF WORK Proposal For Sidewalk Improvement Plans Item Description Est. Unit Unit Item No. Qty. Meas. Price Amount MOUNTAINVIEW ELEMENTARY SCHOOL (ST0314) 32 MOBILIZATION 1 LS 33 EROSION CONTROL IMPLEMENTATION 1 LS 34 TRAFFIC CONTROL PLAN 1 LS 35 TRAFFIC CONTROL IMPLEMENTATION 1 LS 36 CONSTRUCTION SURVEY STAKING 1 LS 37 REMOVE EXISTING CURB AND GUTTER 33 LF 38 CURB AND GUTTER 4 LF 39 REMOVE EXISTING SIDEWALK 280 SF 40 5' SIDEWALK (NON-REINFORCED) 1,902 SF 41 CONCRETE SIDEWALK TIE-IN 27 SF 42 TXDOT TYPE 7 RAMP (NON-REINFORCED) 3 EA 43 TXDOT TYPE 10 RAMP (NON-REINFORCED) 2 EA 44 TXDOT TYPE "D" FLUSH LANDING (NON-REINFORCED) 2 EA 45 REMOVE ASPHALT DRIVE 432 SF 46 CONCRETE DRIVE APPROACH 327 SF 47 CONCRETE DRIVE SLAB 105 SF 48 ASPHALT TIE-IN AT DRIVE SLAB 21 LF 49 RELOCATE EXISTING SIGN 1 EA All Pages of the Bid Proposal Should Be Returned
6 Page 3 of 6 50 RE-ESTABLISH BOUNDARY PIN 1 EA REFL PAV MRK TY I (W) 24" (SLD)(090MIL) 100 LF TOTAL: TOTAL AMOUNT OF MATERIALS TOTAL AMOUNT OF LABOR & EQUIPMENT I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK: SUBCONTRACTOR TYPE OF WORK Proposal For Sidewalk Improvement Plans Item Description Est. Unit Unit Item No. Qty. Meas. Price Amount TENNYSON MIDDLE SCHOOL (ST0315) 52 MOBILIZATION 1 LS 53 EROSION CONTROL IMPLEMENTATION 1 LS 54 TRAFFIC CONTROL PLAN 1 LS 55 TRAFFIC CONTROL IMPLEMENTATION 1 LS 56 CONSTRUCTION SURVEY STAKING 1 LS 57 REMOVE EXISTING CURB AND GUTTER 318 LF 58 CURB AND GUTTER 296 LF 59 REMOVE EXISTING SIDEWALK 1,951 SF 60 6' SIDEWALK (REINFORCED) 395 SF 61 6' SIDEWALK (NON-REINFORCED) 1,863 SF ' SIDEWALK (NON-REINFORCED) 1,900 SF 63 CONCRETE SIDEWALK TIE-IN 21 SF 64 REMOVE EXISTING WHEELCHAIR RAMP 1 EA 65 TXDOT TYPE 7 RAMP (NON-REINFORCED) 2 EA 65A TXDOT TYPE 1 RAMP (NON-REINFORCED) 1 EA 66 TXDOT TYPE "D" FLUSH LANDING 1 EA 67 RELOCATE EXISTING SIGN 4 EA 68 RELOCATE EXISTING BENCH 1 EA 69 ADJUST ELECTRICAL JUNCTION BOX LID TO GRADE 2 EA REFL PAV MRK TY I (W) 24" (SLD)(090MIL) FOR CROSSWALK 170 LF 71 CURB STOP 20 EA All Pages of the Bid Proposal Should Be Returned
7 Page 4 of 6 72 REMOVE INLET TOP 2 EA 73 REPLACE INLET TOP TO CONFORM TO ADA STANDARDS 2 EA TOTAL: TOTAL AMOUNT OF MATERIALS TOTAL AMOUNT OF LABOR & EQUIPMENT I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK: SUBCONTRACTOR TYPE OF WORK Proposal For Sidewalk Improvement Plans Item Description Est. Unit Unit Item No. Qty. Meas. Price Amount WOODGATE INTERMEDIATE SCHOOL (ST0316) 74 MOBILIZATION 1 LS 75 EROSION CONTROL IMPLEMENTATION 1 LS 76 TRAFFIC CONTROL PLAN 1 LS 77 TRAFFIC CONTROL IMPLEMENTATION 1 LS 78 CONSTRUCTION SURVEY STAKING 1 LS 79 REMOVE EXISTING CURB AND GUTTER 220 LF 80 CURB AND GUTTER 161 LF 81 REMOVE EXISTING SIDEWALK 557 SF 82 5' SIDEWALK (NON-REINFORCED) 5826 SF 83 6' SIDEWALK (NON-REINFORCED) 3810 SF 84 TXDOT TYPE 7 RAMP (NON-REINFORCED) 6 EA 85 TXDOT TYPE 10 RAMP (NON-REINFORCED) 1 EA 86 TXDOT TYPE D SHARED FLUSH LANDING (NON-REINFORCED) 1 EA 87 CONCRETE SIDEWALK TIE-IN 10 SF 88 DETECTABLE WARNING STRIP (WHERE NO RAMP IS REQUIRED) 78 SF 89 REMOVE EXISTING WHEELCHAIR RAMP 5 EA 90 REMOVE CONCRETE DRIVE SLAB 472 SF 91 CONCRETE DRIVE SLAB (REINFORCED) 678 SF All Pages of the Bid Proposal Should Be Returned
8 Page 5 of " TOPSOIL AND BLOCK SOD 265 SF 93 RELOCATE EXISTING SIGN 5 EA 94 REMOVE CONCRETE DRIVE APPROACH 897 SF 95 CONCRETE DRIVE APPROACH 707 SF 96 ADJUST ELECTRICAL JUNCTION BOX LID TO GRADE 1 EA 97 BRUSH REMOVAL/ HAUL AWAY NEAR STA ON BOTH SIDES 1 LS 98 CONCRETE DRIVE SLAB TIE-IN 82 SF 99 RE-ESTABLISH BOUNDARY PIN 1 EA 100 PEDESTRIAN DETECT PUSH BUTTON (APS) 2 EA 101 RELOCATE PEDESTRIAN BUTTON ON EX SIGNAL 2 EA 102 REFL PVMT MRK TYI (WORD) (90MIL) 2 EA 103 REMOVE TOP OF INLET 1 EA 104 REPLACE TOP OF INLET (TO ADA STANDARDS) 1 EA 105 RE-GRADE AND STABILIZE GROUND AT HEADWALLS 12 CY 106 4" CONCRETE PAVEMENT AT HEADWALLS 160 SF 107 PEDESTRIAN HANDRAIL 47 LF TOTAL: TOTAL AMOUNT OF MATERIALS TOTAL AMOUNT OF LABOR & EQUIPMENT I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK: SUBCONTRACTOR TYPE OF WORK Proposal For Sidewalk Improvement Plans Item Description Est. Unit Unit Item No. Qty. Meas. Price Amount ADD ALTERNATE #1: KENDRICK RETAINING WALL SAFETY FENCE 108 3' HIGH 8-GAUGE BLACK VINYL FINISH CHAINLINK FABRIC WITH 1 5/8" DQ40 TOP RAIL, 1 7/8" DQ40 LINE POSTS, AND 2 3/8" DQ40 CORNER/END POSTS, SPACED AS RECOMMENDED BY MANUFACTURER " THICK, 6" WIDE CONCRETE MOW STRIP BEHIND RETAINING WALL 240 LF 177 SF All Pages of the Bid Proposal Should Be Returned
9 Page 6 of 6 TOTAL: TOTAL AMOUNT OF MATERIALS TOTAL AMOUNT OF LABOR & EQUIPMENT I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK: SUBCONTRACTOR TYPE OF WORK TOTAL AMOUNT OF BID FIRM NAME: BY (SIGNED): TITLE: ADDRESS: Contractor acknowledges and agrees that the official TOTAL AMOUNT OF BID is determined by multiplying the unit bid prices by the respective estimated quantities shown in this bid proposal and then totaling all of the extended amounts. Extended amounts SHOULD NOT be rounded up or down. All dollar amounts should be either written legibly or typed. Any mistakes should be rewritten and initialed by the Contractor. All Pages of the Bid Proposal Should Be Returned
10
11
12
13
14
15
12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC
PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE
More information20217 CLEAR STONE TON $14.20 $5, $ $ $ %
ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON
More information20217 CLEAR STONE TON $14.20 $5, $ $ $ %
ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON
More information10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %
ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:
295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED
More informationFIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES
GENERAL NOTES. NEW & RELOCATED ROADWAY SIGNS NOT SHOWN FOR CLARITY BUT, ARE INCLUDING IN CONCEPTUAL DESIGN COST ESTIMATE. KEYNOTES E X I S T I N G D E V E L O P M E N T. NEW 5' WIDE CONCRETE SIDEWALK.
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:
More informationCritchfield Rd / SR-129
NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:
-58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31
More informationFranklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation
2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,
More informationDesigned by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days
Independent Government Estimate Updated 6/22/18 Title Page Estimated by NAVFAC Cost Designed by Prepared by NAVFAC Cost Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:
3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27
More informationCONTRACTOR'S ESTIMATE PACKAGE
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55
More informationDESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006
Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:
304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED
More informationSample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800)
Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH 45249 Phone: (800) 280-5153 Email: goisales@gisdynamics.com Service Address Corporate America Jim Smith 1 Corporate Way Cincinnati,
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:
0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 102 CONTRACT ID: 057401029 : BR 2018(319) CONTRACT: 12173211 AWARD : $2,595,950.00 ED : $2,833,949.00 ADJ. ED : $2,833,949.00 CONTRACT: CONTRACTOR:
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:
3,933,355.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 791 CONTRACT ID: 628572001 PROJECT: RMC - 628572001 CONTRACT: 05164007 AWARD AMOUNT: $20,967,966.00 PROJECTED AMOUNT: $20,970,966.00 ADJ.
More informationTABULATION OF TENDERS
SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering
More informationTaft Stormwater Quest
Taft Stormwater Quest Oregon Coast Quests is an Oregon Sea Grant program based at Oregon State University's Hatfield Marine Science Center. The Oregon Coast Book, 2017 18 Edition 43 Use this map to help
More informationTENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL
SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:
27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84
More informationREQUEST FOR PROPOSALS
West Q Avenue, Kalamazoo, MI P: () - F: () - www.texastownship.org REQUEST FOR PROPOSALS - Winter Snow Removal Services Proposals The Charter Township of Texas, Kalamazoo County Michigan, is requesting
More informationNew Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS
PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB
More informationYORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal
YORK REGION DISTRICT SCHOOL BOARD Procedure #NP464.0, Snow/Ice Clearance and Removal Application The Snow/Ice Clearance and Removal procedure addresses the practices to be followed with regards to the
More informationSAN ANTONIO WATER SYSTEM
G:\TXC\Projects\SAWS\SAWS - Glad\03_CADD\01_Sheets\Glad_Water\01_Sheets\1 GLAD WATR CVR.dwg Sep 13, 2017-1:44pm acalderon SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5025 2017 SMP GLAD FROM PIEDMONT
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:
15,466.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 136-11.00 2.00 CONTRACT ID: 180801028 PROJECT: STP 1502(152)HES CONTRACT: 05153036 AWARD : $2,602,993.61 PROJECTED : $2,602,993.61 ADJ. PROJECTED
More informationBUILDING HOME CONSTRUCTION
1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS 10782 Wattsburg Road Erie, PA 16509 The WATTSBURG AREA SCHOOL DISTRICT invites qualified vendors to submit proposals for CONTRACTED SNOW REMOVAL MANDATORY PRE-SUBMISSION MEETING All
More informationFranklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation
5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road
More informationExhibit "A" Date: 1/27/2011
Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase
More information1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots
City of Mt. Pleasant Administrative Memo #1-85 Issued: January 1, 1985 SUBJECT: Snow and Ice Control Policy SUMMARY: The intent of this policy is to construct a basic guideline to effectively and efficiently
More information401 PLANTMIX BITUMINOUS PAVEMENTS GENERAL Rev. June 10, 2004 401.03.16 SURFACING MISCELLANEOUS AREAS: Surfacing of road approaches and connections, street intersection areas, frontage roads, island areas,
More informationBACKGROUND AND PROJECT DESCRIPTION
June 7, 2017 Applicant: Murdock Builders Location: Approximately 600 West 1200 North Prepared by: Brian Tucker Public Hearing Item: Yes Zone: A-2, RA-2 ATTACHMENTS 1. Findings for Decision. 2. Resolution
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD:
118,116.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 419 9 CONTRACT ID: 074704059 PROJECT: STP 2009(879)MM CONTRACT: 08093020 AWARD AMOUNT: $2,833,448.12 PROJECTED AMOUNT: $2,858,448.12 ADJ.
More informationAppendix C Benchmarking Cost Estimates
REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall
More informationUA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation
#1 Northing 640586.689 / Easting 669419.281 / Elevation 1443.178 Center of bronze cap with UA seal. Located in sidewalk approx. 10 W of curb on Garland Ave. Approx. 24.5 SE of traffic signal post. UA #1
More informationAverage Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016
Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION
More informationSNOW CONTROL OPERATIONS
SNOW CONTROL OPERATIONS PUBLIC WORKS TEAM STREET MAINTENANCE DIVISION SNOW CONTROL OPERATIONS Standard Operating Procedures for Snow Removal Operations. 1. Plowing operations will be initiated when snow
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD:
112,067.24 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 167-13.00 35.00 CONTRACT ID: 008701104 PROJECT: NH 2014(565) CONTRACT: 04143012 AWARD : $3,126,804.84 PROJECTED : $3,176,515.84 ADJ. PROJECTED
More informationSnow Melting Design Guide: Heated Walkways and Paths
Snow Melting Design Guide: Heated Walkways and Paths What is a Snow Melting System? Have you ever seen snow fall on an already warm car? It melts instantly. This is the essential idea behind snow melting
More informationMaterials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationBid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services
Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services JOB SITES: GreenTrees of Huntley 11417 E. Main Street Huntley, IL 60142 SilverTrees Apartments 5901 Milwaukee Street Richmond,
More informationSpecifications Whitcomb Elementary School Demolition January 15, 2016
SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,
More informationApril 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213
Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213 Subject: Revised Castle Hills BASIS Charter School Traffic Impact Analysis Review City of Castle Hills,
More informationTown of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY
Town of Bowden Box 338, 2101 20 th Ave Bowden, Alberta, T0M 0K0 Town of Bowden Province of Alberta Policy Document (2019-01) SNOW REMOVAL POLICY 1 INTRODUCTION The purpose of this policy is to establish
More informationProject T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox
Compare Responses Event #: 1702 Status: Pending award Event Name: Curb Replacement Project T 841046.05 Number Of s: 7 Fit Excavating Quality Built Construction Dinkel Construction II, LLC Concrete Solutions,LLC
More information2010/2011 Winter Weather Summary
2010/2011 Winter Weather Summary Number of Days of Snow Alerts* Precipitation Snow Rain October 0 6 Trace.91 inches November 0 16 1.1 inches.47 inches December 2 20 17.9 inches 1.54 inches 7.5" first alert
More informationCITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY
CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works
More information1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8
July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along
More informationEngineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year )
Engineer's Report for the Main Street Business Area Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year 2008-09) Prepared under the provisions of the Benefit Assessment Act of 1982
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:
5,047,590.65 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 617 289.00 CONTRACT ID: 005006086 PROJECT: NH 1502(184) CONTRACT: 05153002 AWARD AMOUNT: $36,840,375.34 PROJECTED AMOUNT: $37,065,377.33
More informationSnow Melting Design Guide: Accessibility Ramps (Concrete and Pavers)
Snow Melting Design Guide: Accessibility Ramps (Concrete and Pavers) What is a Snow Melting System? Have you ever seen snow fall on an already warm car? It melts instantly. This is the essential idea behind
More informationAbitare Homeowners Association. Reserve Management Plan Type 1
Reserve Management Plan Type 1 Reserve Study With On-Site Analysis For 30-Year Projection Period Beginning January 1, 2016 Cover January 1, 2016 Page 2 Abitare Homeowners Association Reserve Management
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD:
20,521.28 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18-24.00 105 CONTRACT ID: 030001080 PROJECT: NH 1702(331) CONTRACT: 08173204 AWARD AMOUNT: $18,990,864.89 PROJECTED AMOUNT: $18,990,864.89 ADJ.
More informationKETCHUM ARTS COMMISSION INTERACTIVE ART CALL FOR ARTISTS Request for Qualifications
KETCHUM ARTS COMMISSION INTERACTIVE ART CALL FOR ARTISTS Request for Qualifications I N T R O D U C T I O N The City of Ketchum, Idaho, invites professional artists, architects or designers to apply for
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:
29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94
More informationThe following emergency snow routes are generally cleared first:
Huxley Snow Removal Policy The City of Huxley Street Department is responsible for the removal of snow accumulations on city streets, alleys and publicly owned sidewalks and parking lots. Street maintenance
More informationRequest for Tenders. Community Development, Parks & Recreation Facility Snow Removal
Request for Tenders Community Development, Parks & Recreation Facility Snow Removal Community Development, Parks & Recreation Yorkton, Saskatchewan Closing Date: Friday October 5, 2018 at 4:00 p.m. The
More informationCOUNCIL POLICY MANUAL
COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:
462,346.70 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 332 13 CONTRACT ID: 000514080 PROJECT: IM 0201(189) CONTRACT: 04153049 AWARD : $11,801,426.99 PROJECTED : $12,168,144.19 ADJ. PROJECTED :
More informationU.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate
Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM
More information2267 N o r t h 1500 W C l i n t o n U T 84015
P l a n n i n g C o m m i s s i o n M e m b e r s C h a i r J a c o b B r i g g s V i c e C h a i r G a r y T y l e r T o n y T h o m p s o n J o l e n e C r e s s a l l A n d y H a l e D e r e c k B a
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED:
389,480.02 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 294-4.00-17.00 CONTRACT ID: 050601105 PROJECT: NH 1602(416) CONTRACT: 10163002 AWARD : $13,863,443.80 PROJECTED : $14,081,920.80 ADJ. PROJECTED
More informationTexas Transportation Institute The Texas A&M University System College Station, Texas
1. Report No. FHWA/TX-03/4150-1 4. Title and Subtitle ANALYSIS OF TXDOT THICKNESS MEASUREMENT PROCEDURES FOR THERMOPLASTIC PAVEMENT MARKINGS Technical Report Documentation Page 2. Government Accession
More informationDOCUMENTATION WORKBOOK FY 2018
DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum
More informationSummary of Bids Received For
Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: 10370045 Firm Name Bid Total $ $1,074,100.00 Howell Contractors Inc. $1,083,694.00 Sunesis Construction
More informationBob Rettig Construction and Consulting
1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,
More informationCity of Grand Island Tuesday, October 13, 2015 Council Session
City of Grand Island Tuesday, October 13, 2015 Council Session Item G-8 #2015-276 - Approving Bid Award for Snow Removal Services 2015/2016 for the Streets Division of the Public Works Department Staff
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:
140,750.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17-6.00 200 CONTRACT ID: 071801064 PROJECT: C 718-1-64 CONTRACT: 11153002 AWARD : $32,541,855.76 PROJECTED : $33,273,455.77 ADJ. PROJECTED :
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 31 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:
241,240.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 444 CONTRACT ID: 016211001 PROJECT: STP 1502(488) CONTRACT: 11153201 AWARD AMOUNT: $105,980,139.92 PROJECTED AMOUNT: $108,981,339.92 ADJ.
More informationADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1
State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,
More informationContractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587
Property: Any Street Pasadena, TX 77505 Estimator: Butch Bragg Contractor: Business: (281) 998-1800 Company: A- Select Services Business: suite 200 South Houston, TX 77587 Claim Number: Policy Number:
More informationBUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)
BUILDING AND SAFETY DIVISION TELEPHONE (949) 724-6300 BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) Payment: When a plan is required by the Administrative Authority to be submitted, a plan check
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:
123,812.90 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 465 CONTRACT ID: 007207068 PROJECT: STP 1602(184)MM CONTRACT: 06163016 AWARD : $7,586,328.53 PROJECTED : $7,586,328.51 ADJ. PROJECTED : $7,710,141.41
More informationTom Blackman Project Lead. Mékell Mikell Communications Representative
Sediment Cleanup Middle River Complex, 2016-17 Season 1 Project Photo Tour Updated November 15, 2016 Tom Blackman Project Lead Mékell Mikell Communications Representative 1 Sediment Cleanup - Season 1
More informationSNOW AND ICE CONTROL GUIDELINES
SNOW AND ICE CONTROL GUIDELINES 2017-2018 I. PERSONNEL All Department of Public Works and Parks and Recreation personnel shall be available for snow and ice control operations. The City may also utilize
More informationBusiness: Address, City, State, zip code
Insured: Property: X X X X X X X X X Reference: Company: XXXXX Sample State Insurance Contractor: xxxxxx xxxx Business: (xxx) xxx-xxxx Company: xxxxx xxxxx xxx. E-mail: xxxxxx@gmail.com Business: Claim
More informationA regular meeting of the Village of Victor Planning Board was held on Wednesday, July 26, 2017, at the Village Hall, 60 East Main Street.
A regular meeting of the Village of Victor Planning Board was held on Wednesday, July 26, 2017, at the Village Hall, 60 East Main Street. MEMBERS PRESENT: Chairperson Meg CHaides Vice Chairperson Peter
More informationAM01 - System Offices. Purchase Order
Page 1 of 6 AM01 - System Offices Purchase Order P.O. Date: 12/16/2016 Purchase Order Number AM01-17-P041212 SHOW THIS NUMBER ON ALL PACKAGES, INVOICES AND SHIPPING PAPERS. V E N D O R Vendor Number: 00001945
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:
38,587.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 208 5.00 CONTRACT ID: 091800267 : STP 1702(453) CONTRACT: 07173236 AWARD : $1,699,468.03 ED : $1,727,168.03 ADJ. ED : $1,765,756.00 CONTRACT:
More informationPW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works
Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees
More informationReadyGEN K-2 Alcott College Prep
ReadyGEN K-2 Alcott College Prep School Information: School/District Name Address City / State / ZIP Phone Number Purchase Summary Description Amount Free Amount Charged ReadyGEN2014 $5444.31 $46466.27
More informationSNOW REMOVAL GUIDE. City Of Orange Township. Public Works Snow Removal Hotline: (973) My Orange Hotline: (973)
Mayor Dwayne D. Warren, Esq. And The Orange Municipal Council MOVING ORANGE FORWARD City Of Orange Township SNOW REMOVAL GUIDE Public Works Snow Removal Hotline: (973) 266-4030 My Orange Hotline: (973)
More informationDISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD
HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD:
220,119.27 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 124 CONTRACT ID: 054303067 PROJECT: STP 2018(416)MM CONTRACT: 01183201 AWARD AMOUNT: $30,289,272.41 PROJECTED AMOUNT: $31,279,648.40 ADJ.
More informationSNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy
Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),
More informationCITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION
CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION The responsibility for providing snow and ice control on East Peoria s 240 lane miles of streets and alleys rests with the Street Divisions
More informationLumber Supplies and Equipment. South Texas Moulding DBA Texas Wood Supply. McCoy's Building Supply. Precision Saw & Tooltex, Inc.
Regular Lumber 2X4 Pre cut studs 1 200 Each 2x4-8' White pine 2 200 Each 2x4-12' White pine 3 200 Each 2x4-14' White pine 4 200 Each 2x4-16' White pine 5 200 Each 2x6-8' White pine 6 200 Each 2.88 0.29
More informationTAKE ROLL CALL TO DETERMINE IF THERE IS A QUORUM OF MEMBERS PRESENT
LAWRENCE SIGN CODE BOARD OF APPEALS AGENDA JULY 5, 2018 6:35 P.M., CITY COMMISSION MEETING ROOM, FIRST FLOOR OF CITY HALL, SIXTH AND MASSACHUSETTS STREET, LAWRENCE, KANSAS CALL THE MEETING TO ORDER TAKE
More informationTEEN DRIVER SEAT BELT OBSERVATION FORM
TEEN DRIVER SEAT BELT OBSERVATION FORM High Schools will count only teen drivers and passengers. If the vehicle is being driven by an adult, only count teen passengers. DO NOT notify students that counts
More informationCity of Lee s Summit Public Works Operations
City of Lee s Summit Public Works Operations 2015 2016 Snow Operations August 3, 2015 GOAL The City of Lee s Summit s snow and ice goal is to provide a high level of customer service to our citizens within
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS STRUCTURAL ENGINEERING FIRM TO PERFORM A STRUCTURAL EVALUATION OF THE MARKET STREET PARKADE FACILITY REFERENCE RFP 14-148 Addendum Issued: August 22, 2014 ADDENDUM No. 2 Page 1 of
More informationTown of Georgetown Founded Incorporated 1912
SPECIFICATION FOR SNOW REMOVAL & ICE CONTROL 7.1 Kilometers of Undesignated Streets Season 2017-18 SNOW REMOVAL 1. Snow removal to be carried out before regular business hours to allow normal movement
More informationASPHALT PAVING WEATHER RESTRICTIONS - REQUESTS November 19, 2015
1 ASPHALT PAVING WEATHER RESTRICTIONS - REQUESTS November 19, 2015 Committed to: - Safe, Smooth, Sustainable, Long Lasting Pavements! PA Asphalt Pavement Association - Charles Goodhart, Executive Director
More informationOGRA Managing Winter Operations Workshop. Winter Service Response to Sidewalks in the City of Toronto
OGRA Managing Winter Operations Workshop Winter Service Response to Sidewalks in the City of Toronto Thursday, October 19, 2017 Mississauga Grand Banquet Centre Rob Burlie, P.Eng. Manager, Road Operations
More informationNEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #
SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805030008 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: AUGUST 2014 PERIODIC
More informationCity of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016
Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist
More informationGRADE 11 NOVEMBER 2014 MATHEMATICAL LITERACY P2
NATIONAL SENIOR CERTIFICATE GRADE 11 NOVEMBER 2014 MATHEMATICAL LITERACY P2 MARKS: 100 TIME: 2 hours *imlit2* This question paper consists of 9 pages including a 1 page annexure. 2 MATHEMATICAL LITERACY
More information