CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:

Size: px
Start display at page:

Download "CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:"

Transcription

1 123, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/ CONTRACT ID: PROJECT: STP 1602(184)MM CONTRACT: AWARD : $7,586, PROJECTED : $7,586, ADJ. PROJECTED : $7,710, CONTRACT: CONTRACTOR: RELMCO, INC. HIGHWAY: IH 10 DISTRICT NAME: San Antonio COUNTY: BEXAR AREA ENGINEER: Marshall Heap, P.E. AREA NUMBER: 054 ESTIMATE NUMBER: 0024 LETTING DATE: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD: 07/26/2018 to 08/25/2018 NOTICE TO PROCEED DATE: 08/04/2016 ESTIMATE TYPE: PROG WORK BEGIN DATE: 10/03/2016 % COMPLETE: ACCEPTED DATE: 00/00/0000 % TIME USED: PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS $6,966, $6,619, PARTICIPATING NON-PARTICIPATING $6,966, $6,619, RETAINAGE LIQUIDATED DAMAGES ($87,75) ($63,00) INCENTIVE $24,00 $24,00 DISINCENTIVE ($69,00) ($69,00) OTHER ADJUSTMENTS $346, $346, ($24,75) PAID TO CONTRACTOR $6,833, $6,511, $322, CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/PROJECT ENGINEER DATE

2 CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 13 CONTRACT TIME STATEMENT WORK BEGIN DATE: 10/03/2016 ASSESSED LIQ DAMAGES: 78 TIME CHARGES BEGIN: 08/28/2016 LIQ DAMAGE RATE: $1, DAYS: 387 LIQUIDATED DAMAGES: 78 C. O. ADJUSTED DAYS: 0 DAYS AT CURRENT DAYS: 387 PER DAY $1, DAYS CHARGED : 465 TOTAL: $87,75 PHYSICAL WORK COMPLETE: 00/00/0000 DAILY BREAKDOWN Date Days or Days Charged Days Credited 07/26/ /27/ /28/ SATURDAY 07/29/ SUNDAY 07/30/ /31/ /01/ /02/ /03/ /04/ SATURDAY 08/05/ SUNDAY 08/06/ /07/ /08/ /09/ /10/ /11/ SATURDAY 08/12/ SUNDAY 08/13/ /14/ /15/ /16/ /17/ /18/ SATURDAY 08/19/ SUNDAY 08/20/ /21/ /22/ /23/ /24/ /25/ SATURDAY Diary Adjustment Date Days or PERIOD SUMMARY Days Charged Days Credited SATURDAY 5 SUNDAY 4

3 CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 13 WORK PERFORMED THIS PERIOD PROJECT STP 1602(184)MM CONTROL CATEGORY 001 ROADWAY S (FEDERAL PART) QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date FURNISHING AND PLACING TOPSOIL (4") SY , $8, , , D-GR HMA TY-C SAC-B PG70-22 TON , $145, ,76 1, RIPRAP (CONC)(4 IN) CY $1, RAIL (TY SSTR) LF $11, , CONC CURB (TY I) LF , $21, , , CONC CURB (TY F2) LF $18, DRIVEWAYS (ACP) SY 40 1, $58, ,72 1, CONC SIDEWALKS (4") SY $16, CURB RAMPS (TY 2) EA 1, $1, CURB RAMPS (TY 10) EA 1, $4, MTL W-BEAM GD FEN (TIM POST) LF ,350 $29, ,05 1, MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1, $3, DOWNSTREAM ANCHOR TERMINAL SECTION EA $1, GUARDRAIL END TREATMENT (INSTALL) EA 2, $12, VEH SIG SEC (12")LED(GRN) EA $2, VEH SIG SEC (12")LED(GRN ARW) EA $ VEH SIG SEC (12")LED(YEL) EA $2, VEH SIG SEC (12")LED(YEL ARW) EA $ VEH SIG SEC (12")LED(RED) EA $1, BACK PLATE (12")(3 SEC) EA $ BACK PLATE (12")(5 SEC) EA $ INS TRF SIG PL AM(S)1 ARM(44')LUM EA 6, $6, INS TRF SIG PL AM(S)1 ARM(48') EA 5,880 0 $5, INS TRF SIG PL AM(S)2 ARM(36-32')LUM EA 7, $7, CATEGORY 004 Fair Oaks PKWY PS QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date RAIL (TY C411) LF $ CATEGORY 005 CONTRACTOR FORCE ACCOUNT WORK QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date MATERIAL ON HAND DOL 0-14, $14, ,00 54, TOTAL EARNINGS THIS ESTIMATE $346,951.31

4 CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 13 CONTRACT S PROJECT CATEGORY STP 1602(184)MM CONTROL ROADWAY S (FEDERAL PART) SUPP $ PREPARING ROW STA 6, , EXCAVATION (ROADWAY) CY , ,30 167, EMBANKMENT (FINAL)(ORD COMP)(TY B) CY , , , FURNISHING AND PLACING TOPSOIL (4") SY , , , AGGR (TY-B GR-4) CY , AH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR) GAL , , , D-GR HMA(SQ) TY-B PG64-22 (LEVEL UP) TON , , , D-GR HMA TY-B PG64-22 TON , , , D-GR HMA TY-C SAC-B PG70-22 TON , , , D-GR HMA TY-C PG70-22 TON , , , TEMPORARY L SHORING SF , , , DRILL SHAFT (TRF SIG POLE) (24 IN) LF , DRILL SHAFT (TRF SIG POLE) (36 IN) LF , CL C CONC (RAIL FOUNDATION) CY , RETAINING WALL (MSE) SF , ,25 718, RIPRAP (CONC)(4 IN) CY , RIPRAP (CONC)(5 IN) CY , RIPRAP (MOW STRIP)(4 IN) CY , RAIL (TY SSTR) LF , , RC PIPE (CL III)(24 IN) LF , RC PIPE (CL V)(18 IN) LF , INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT) EA 3, , MANH(COMPL)(TY 1 ) EA 4, , SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 1, , REMOV STR (BRIDGE FT LENGTH) EA 125, , MOBILIZATION LS 650, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5, , CONSTRUCTION EXITS (INSTALL) (TY 1) SY , TEMP SEDMT CONT FENCE (INSTALL) LF , , , TEMP SEDMT CONT FENCE (REMOVE) LF , FORCE ACCT-EROSION CONTROL MAINTENANCE DOL 0 1, , , CONSTRUCTING DETOURS SY , , , PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF , ,94 82, PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF , ,74 25, PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF , PORT CTB (MOVE)(SGL SLP)(TY 1) LF , ,30 20, PORT CTB (MOVE)(LOW PROF)(TY 1) LF , ,74 17, PORT CTB (MOVE)(LOW PROF)(TY 2) LF , , PORT CTB (REMOVE)(SGL SLP)(TY 1) LF , , PORT CTB (REMOVE)(LOW PROF)(TY 1) LF , ,66 24, PORT CTB (REMOVE)(LOW PROF)(TY 2) LF , CONC CURB (TY I) LF , , , CONC CURB (TY F2) LF , DRIVEWAYS (CONC) SY ,334.64

5 CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 13 CATEGORY 001 ROADWAY S (FEDERAL PART) SUPP $ DRIVEWAYS (ACP) SY 40 1, , , CONC SIDEWALKS (4") SY , CURB RAMPS (TY 2) EA 1, , CURB RAMPS (TY 10) EA 1, , MTL W-BEAM GD FEN (TIM POST) LF , ,35 29, MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1, , DOWNSTREAM ANCHOR TERMINAL SECTION EA , REMOVE METAL BEAM GUARD FENCE LF , REMOVE TERMINAL ANCHOR SECTION EA CABLE BARRIER TERMINAL SECTION (TL-3) EA 3, , REMOVE CABLE BARRIER TERMINAL SECTION EA GUARDRAIL END TREATMENT (INSTALL) EA 2, , GUARDRAIL END TREATMENT (REMOVE) EA CRASH CUSH ATTEN (INSTL) EA 7, , CRASH CUSH ATTEN (REMOVE) EA , CONDT (PVC) (SCH 80) (2") LF , CONDT (PVC) (SCH 80) (2") (BORE) LF , Added CO # CONDT (PVC) (SCH 80) (3") LF , CONDT (PVC) (SCH 80) (3") (BORE) LF , Added CO # GROUND BOX TY D (162922)W/APRON EA , WK ZN PAV MRK REMOV (W)4"(SLD) LF , , , WK ZN PAV MRK REMOV (W)8"(SLD) LF , , , WK ZN PAV MRK REMOV (Y)4"(BRK) LF , ,60 1, WK ZN PAV MRK REMOV (Y)4"(SLD) LF , , , VEH SIG SEC (12")LED(GRN) EA , VEH SIG SEC (12")LED(GRN ARW) EA VEH SIG SEC (12")LED(YEL) EA , VEH SIG SEC (12")LED(YEL ARW) EA VEH SIG SEC (12")LED(RED) EA , BACK PLATE (12")(3 SEC) EA BACK PLATE (12")(5 SEC) EA INS TRF SIG PL AM(S)1 ARM(44')LUM EA 6, , INS TRF SIG PL AM(S)1 ARM(48') EA 5, , INS TRF SIG PL AM(S)2 ARM(36-32')LUM EA 7, , PORTABLE CHANGEABLE MESSAGE SIGN DAY , PORTABLE CHANGEABLE MESSAGE SIGN EA 12, , CORE HOLE EA ,00 CORE HOLE- ADDED CO 1 CATEGORY 002 ROADWAY S (FEDERAL NON-PART) Category Subtotal $4,657, SUPP $ CRASH CUSH ATTEN (MOVE & RESET) EA 1, , CRASH CUSHION ATTEN (MOVE & RESET) - ADDED CO 1

6 CONTRACTOR'S ESTIMATE PACKAGE Page 6 of 13 CATEGORY 003 IH 10 WB FTRD TA PS Category Subtotal $4, SUPP $ CEM STABIL BKFL CY , DRILL SHAFT (18 IN) LF , DRILL SHAFT (30 IN) LF , DRILL SHAFT (36 IN) LF , CL C CONC (ABUT) CY , CL C CONC (BENT) CY 1, , CL C CONC (COLUMN) CY 1, , REINF CONC SLAB (BOX BEAM) SF , ,58 77, SHEAR KEY CY , PRESTR CONC BOX BEAM (5B40) LF , , , PRESTR CONC BOX BEAM (5B40) (MOD) LF , RAIL (TY C411) LF , SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF , CATEGORY 004 Fair Oaks PKWY PS Category Subtotal $620, SUPP $ CEM STABIL BKFL CY , DRILL SHAFT (36 IN) LF , DRILL SHAFT (42 IN) LF , CL C CONC (ABUT) CY , CL C CONC (BENT) CY 1, , CL C CONC (COLUMN) CY 1, , REINF CONC SLAB SF , ,03 295, BRIDGE SIDEWALK SF , , , PRESTR CONC GIRDER (TX54) LF , , , RAIL (TY C411) LF , SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF , CATEGORY 005 CONTRACTOR FORCE ACCOUNT WORK Category Subtotal $1,402, SUPP $ MATERIAL ON HAND DOL 0 1, , , PAYMENT ADJUSTMENT-POS DOL 0 1, ,00 147, LAW ENFORCEMENT PERSONNEL DOL 0 1, , , FORCE ACCOUNT - SAFETY CONTINGENCY DOL 0 1, , , Category Subtotal $281, PROJECT STP 1602(184)MM CONTROL

7 CONTRACTOR'S ESTIMATE PACKAGE Page 7 of 13 CATEGORY 001 ROADWAY S (FEDERAL PART) SUPP ($) BLOCK SODDING SY , DRILL SEED (TEMP)(WARM OR COOL) SY , DRILL SEEDING (PERM)(WARM OR COOL) SY , VEGETATIVE WATERING MG SOIL RETENTION BLANKETS (CL 1) (TY A) SY , FLOWABLE BACKFILL CY TRENCH EXCAVATION PROTECTION LF RIPRAP (CONC)(6 IN) CY RIPRAP (CONC)(6 IN) CY RAIL (TY PR1) LF ROCK FILTER DAMS (INSTALL) (TY 2) LF ROCK FILTER DAMS (REMOVE) LF CONSTRUCTION EXITS (REMOVE) SY COLORED TEXTURED CONC (4") SY CONC CURB (TY F3) LF CURB RAMPS (TY 5) EA 1, CURB RAMPS (TY 21) EA 1, CURB RAMPS (TY 22) EA 1, FORCE ACCOUNT - CRASH CUSHION REPAIR #1 DOL 0 1, And MBGF repair ELEC CONDR (NO.6) BARE LF , ELEC CONDR (NO.6) INSULATED LF TRAY CABLE (4 CONDR) (12 AWG) LF , ELC SRV TY D 120/ (NS)AL(E)PS(U) EA 4, CONTRACTOR FORCE ACCOUNT 1 DOL 0 1, Cost for Connection Fees ALUMINUM SIGNS (TY A) SF ADDED TO CO # ALUMINUM SIGNS (TY G) SF REPLACE EXISTING ALUMINUM SIGNS(TY A) SF IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA IN SM RD SN SUP&AM TYS80(1)SA(U) EA IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL) EA 1, IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 1, IN SM RD SN SUP&AM (RAIL MOUNT) EA 2, REMOVE SM RD SN SUP&AM EA UNIQUE CHANGE ORDER 1 DOL 1, UNIQUE CO 1- TEMP EXIT SIGNS- ADDED CO INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA INSTL DEL ASSM (D-SY)SZ (BRF)CTB EA INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA WK ZN PAV MRK REMOV (W)4"(BRK) LF WK ZN PAV MRK REMOV (W)4"(DOT) LF , REFL PAV MRK TY I (W)4"(DOT)(100MIL) LF

8 CONTRACTOR'S ESTIMATE PACKAGE Page 8 of REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF , REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF , REFL PAV MRK TY I (W)(ARROW)(100MIL) EA REFL PAV MRK TY I(W)(DBL ARROW)(100MIL) EA REFL PAV MRK TY I (W)(WORD)(100MIL) EA REFL PAV MRK TY I (W) (ISLAND) (100MIL) SF REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA REFL PAV MRK TY I (Y)8"(SLD)(100MIL) LF REFL PAV MRK TY I (Y)24"(SLD)(100MIL) LF REFL PAV MRK TY II (Y) 24" (SLD) LF PAVEMENT SEALER 4" LF , PAVEMENT SEALER 8" LF PAVEMENT SEALER 24" LF PAVEMENT SEALER (ARROW) EA PAVEMENT SEALER (WORD) EA PAVEMENT SEALER (DBL ARROW) EA RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF , RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF , RE PM W/RET REQ TY II (W) 4" (SLD) LF RE PM W/RET REQ TY II (Y) 4" (SLD) LF REFL PAV MRKR TY I-C EA REFL PAV MRKR TY II-A-A EA REFL PAV MRKR TY II-C-R EA PAV SURF PREP FOR MRK (4") LF , PAV SURF PREP FOR MRK (8") LF PAV SURF PREP FOR MRK (24") LF PAV SURF PREP FOR MRK (ARROW) EA PAV SURF PREP FOR MRK (DBL ARROW) EA PAV SURF PREP FOR MRK (WORD) EA INSTALL HWY TRF SIG (ISOLATED) EA 15, PED SIG SEC (LED)(COUNTDOWN) EA PED SIG SEC (HOUSING ONLY) EA TRF SIG CBL (TY A)(12 AWG)(4 CONDR) LF , TRF SIG CBL (TY A)(12 AWG)(7 CONDR) LF , TRF SIG CBL (TY C)(14 AWG)(2 CONDR) LF ,070-1, INS TRF SIG PL AM(S)1 ARM(40')LUM EA 6, INS TRF SIG PL AM(S)2 ARM(44-28')LUM EA 8, PED POLE ASSEMBLY EA PED DETECT PUSH BUTTON (STANDARD) EA VIVDS PROCESSOR SYSTEM EA 12, VIVDS CAMERA ASSEMBLY EA 1, VIVDS SET-UP SYSTEM EA VIVDS COMMUNICATION CABLE (COAXIAL) LF , , RADAR PRESENCE DETECTOR EA 7, ADDED TO CO # RADAR PRESENCE DETECTOR COMM CABLE LF ,850 0 ADDED TO CO # RADAR ADVANCED DETECTION DEVICE EA 9, ADDED TO CO #2 Category Subtotal

9 CONTRACTOR'S ESTIMATE PACKAGE Page 9 of 13 CATEGORY 002 ROADWAY S (FEDERAL NON-PART) SUPP ($) FULL - WIDTH MOWING CYC 2, LITTER REMOVAL CYC 2, CATEGORY 003 IH 10 WB FTRD TA PS Category Subtotal SUPP ($) RIPRAP (CONC) (CL B) (4") CY CATEGORY 004 Fair Oaks PKWY PS Category Subtotal SUPP ($) STR STEEL (MISC NON - BRIDGE) LB CATEGORY 005 CONTRACTOR FORCE ACCOUNT WORK Category Subtotal SUPP ($) PAYMENT ADJUSTMENT-NEG DOL -0 3, FORCE ACCOUNT-COMMER LAB USE DEDUCTION DOL -0 1, RUC DAMAGE ONLY DOL -1, IH 10 FRT RD Fair Oaks to Tarpon Dr. (EB) RUC DAMAGE ONLY DOL IH 10 FRT RD Fair Oaks to Tarpon Dr. (WB) RUC DAMAGE ONLY DOL -2, IH 10 Mainlanes EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL " Item EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL " Item EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL " Item EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL " Item EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL " Item EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL " Item EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL " Item EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL " Item

10 CONTRACTOR'S ESTIMATE PACKAGE Page 10 of 13 Category Subtotal TOTAL EARNINGS THIS CONTRACT $6,966,075.62

11 CONTRACTOR'S ESTIMATE PACKAGE Page 11 of 13 CONSTRUCTION ESTIMATE COMBINED ($) PREPARING ROW STA 6, , EXCAVATION (ROADWAY) CY ,30 13, , EMBANKMENT (FINAL)(ORD COMP)(TY B) CY , , , FURNISHING AND PLACING TOPSOIL (4") SY , , , AGGR (TY-B GR-4) CY , AH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR) GAL , , , D-GR HMA(SQ) TY-B PG64-22 (LEVEL UP) TON ,73 2, , D-GR HMA TY-B PG64-22 TON ,16 3, , D-GR HMA TY-C SAC-B PG70-22 TON ,76 1, , D-GR HMA TY-C PG70-22 TON , , , CEM STABIL BKFL CY , TEMPORARY L SHORING SF , , , DRILL SHAFT (18 IN) LF , DRILL SHAFT (30 IN) LF , DRILL SHAFT (36 IN) LF , DRILL SHAFT (42 IN) LF , DRILL SHAFT (TRF SIG POLE) (24 IN) LF , DRILL SHAFT (TRF SIG POLE) (36 IN) LF , CORE HOLE EA ,00 CORE HOLE- ADDED CO CL C CONC (ABUT) CY , CL C CONC (BENT) CY 1, , CL C CONC (COLUMN) CY 1, , CL C CONC (RAIL FOUNDATION) CY , REINF CONC SLAB SF ,03 22, , REINF CONC SLAB (BOX BEAM) SF ,58 8,580 77, BRIDGE SIDEWALK SF , , , SHEAR KEY CY , RETAINING WALL (MSE) SF ,25 16, , PRESTR CONC BOX BEAM (5B40) LF , , , PRESTR CONC GIRDER (TX54) LF , , , PRESTR CONC BOX BEAM (5B40) (MOD) LF , RIPRAP (CONC)(4 IN) CY , RIPRAP (CONC)(5 IN) CY , RIPRAP (MOW STRIP)(4 IN) CY , RAIL (TY SSTR) LF , , RAIL (TY C411) LF , , , SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF , RC PIPE (CL III)(24 IN) LF , RC PIPE (CL V)(18 IN) LF , INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT) EA 3, , MANH(COMPL)(TY 1 ) EA 4, , SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 1, ,60

12 CONTRACTOR'S ESTIMATE PACKAGE Page 12 of REMOV STR (BRIDGE FT LENGTH) EA 125, , MOBILIZATION LS 650, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5, , CONSTRUCTION EXITS (INSTALL) (TY 1) SY , TEMP SEDMT CONT FENCE (INSTALL) LF , , , TEMP SEDMT CONT FENCE (REMOVE) LF , CONSTRUCTING DETOURS SY ,19 12, , PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF ,61 2,940 82, PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF ,44 2,740 25, PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF , PORT CTB (MOVE)(SGL SLP)(TY 1) LF ,98 3,300 20, PORT CTB (MOVE)(LOW PROF)(TY 1) LF ,04 2,740 17, PORT CTB (MOVE)(LOW PROF)(TY 2) LF , , PORT CTB (REMOVE)(SGL SLP)(TY 1) LF , , PORT CTB (REMOVE)(LOW PROF)(TY 1) LF ,44 2,660 24, PORT CTB (REMOVE)(LOW PROF)(TY 2) LF , CONC CURB (TY I) LF , , , CONC CURB (TY F2) LF , DRIVEWAYS (CONC) SY , DRIVEWAYS (ACP) SY 40 1,72 1, , CONC SIDEWALKS (4") SY , CURB RAMPS (TY 2) EA 1, , CURB RAMPS (TY 10) EA 1, , MTL W-BEAM GD FEN (TIM POST) LF ,05 1,350 29, MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1, , DOWNSTREAM ANCHOR TERMINAL SECTION EA , REMOVE METAL BEAM GUARD FENCE LF , REMOVE TERMINAL ANCHOR SECTION EA CABLE BARRIER TERMINAL SECTION (TL-3) EA 3, , REMOVE CABLE BARRIER TERMINAL SECTION EA GUARDRAIL END TREATMENT (INSTALL) EA 2, , GUARDRAIL END TREATMENT (REMOVE) EA CRASH CUSH ATTEN (INSTL) EA 7, , CRASH CUSH ATTEN (MOVE & RESET) EA 1, , CRASH CUSHION ATTEN (MOVE & RESET) - ADDED CO CRASH CUSH ATTEN (REMOVE) EA , CONDT (PVC) (SCH 80) (2") LF , CONDT (PVC) (SCH 80) (2") (BORE) LF , Added CO # CONDT (PVC) (SCH 80) (3") LF , CONDT (PVC) (SCH 80) (3") (BORE) LF , Added CO # GROUND BOX TY D (162922)W/APRON EA , WK ZN PAV MRK REMOV (W)4"(SLD) LF , , , WK ZN PAV MRK REMOV (W)8"(SLD) LF ,32 2, , WK ZN PAV MRK REMOV (Y)4"(BRK) LF , ,600 1, WK ZN PAV MRK REMOV (Y)4"(SLD) LF , , , VEH SIG SEC (12")LED(GRN) EA , VEH SIG SEC (12")LED(GRN ARW) EA

13 CONTRACTOR'S ESTIMATE PACKAGE Page 13 of VEH SIG SEC (12")LED(YEL) EA , VEH SIG SEC (12")LED(YEL ARW) EA VEH SIG SEC (12")LED(RED) EA , BACK PLATE (12")(3 SEC) EA BACK PLATE (12")(5 SEC) EA INS TRF SIG PL AM(S)1 ARM(44')LUM EA 6, , INS TRF SIG PL AM(S)1 ARM(48') EA 5, , INS TRF SIG PL AM(S)2 ARM(36-32')LUM EA 7, , PORTABLE CHANGEABLE MESSAGE SIGN DAY , PORTABLE CHANGEABLE MESSAGE SIGN EA 12, , MATERIAL ON HAND DOL 0 1,00 54, , PAYMENT ADJUSTMENT-POS DOL 0 1,00 147, , LAW ENFORCEMENT PERSONNEL DOL 0 1,00 59, , FORCE ACCT-EROSION CONTROL MAINTENANCE DOL 0 1,00 4, , FORCE ACCOUNT - SAFETY CONTINGENCY DOL 0 1,00 20, , TOTAL EARNINGS $6,966,075.62

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 462,346.70 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 332 13 CONTRACT ID: 000514080 PROJECT: IM 0201(189) CONTRACT: 04153049 AWARD : $11,801,426.99 PROJECTED : $12,168,144.19 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 38,587.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 208 5.00 CONTRACT ID: 091800267 : STP 1702(453) CONTRACT: 07173236 AWARD : $1,699,468.03 ED : $1,727,168.03 ADJ. ED : $1,765,756.00 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 102 CONTRACT ID: 057401029 : BR 2018(319) CONTRACT: 12173211 AWARD : $2,595,950.00 ED : $2,833,949.00 ADJ. ED : $2,833,949.00 CONTRACT: CONTRACTOR:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD: 20,521.28 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18-24.00 105 CONTRACT ID: 030001080 PROJECT: NH 1702(331) CONTRACT: 08173204 AWARD AMOUNT: $18,990,864.89 PROJECTED AMOUNT: $18,990,864.89 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACTOR'S ESTIMATE PACKAGE CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD: 358,904.13 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 841 CONTRACT ID: 007207066 PROJECT: C 72-7-66 CONTRACT: 07153205 AWARD : $31,159,119.31 PROJECTED : $31,159,119.31 ADJ. PROJECTED : $31,518,023.44

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 140,750.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17-6.00 200 CONTRACT ID: 071801064 PROJECT: C 718-1-64 CONTRACT: 11153002 AWARD : $32,541,855.76 PROJECTED : $33,273,455.77 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: 304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD: 112,067.24 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 167-13.00 35.00 CONTRACT ID: 008701104 PROJECT: NH 2014(565) CONTRACT: 04143012 AWARD : $3,126,804.84 PROJECTED : $3,176,515.84 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: 295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD: -58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 31 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 31 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 241,240.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 444 CONTRACT ID: 016211001 PROJECT: STP 1502(488) CONTRACT: 11153201 AWARD AMOUNT: $105,980,139.92 PROJECTED AMOUNT: $108,981,339.92 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD: 118,116.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 419 9 CONTRACT ID: 074704059 PROJECT: STP 2009(879)MM CONTRACT: 08093020 AWARD AMOUNT: $2,833,448.12 PROJECTED AMOUNT: $2,858,448.12 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 15,466.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 136-11.00 2.00 CONTRACT ID: 180801028 PROJECT: STP 1502(152)HES CONTRACT: 05153036 AWARD : $2,602,993.61 PROJECTED : $2,602,993.61 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 231,995.19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 579 6 CONTRACT ID: 002407058 PROJECT: NH 1502(164) CONTRACT: 05153203 AWARD : 22,716,470.32 PROJECTED : 22,716,470.31 ADJ. PROJECTED : 22,948,465.50

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED: 389,480.02 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 294-4.00-17.00 CONTRACT ID: 050601105 PROJECT: NH 1602(416) CONTRACT: 10163002 AWARD : $13,863,443.80 PROJECTED : $14,081,920.80 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD: 220,119.27 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 124 CONTRACT ID: 054303067 PROJECT: STP 2018(416)MM CONTRACT: 01183201 AWARD AMOUNT: $30,289,272.41 PROJECTED AMOUNT: $31,279,648.40 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: IH 10 COUNTY: 05/02/2017 ESTIMATE PAID: AWARD DATE: 05/25/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: IH 10 COUNTY: 05/02/2017 ESTIMATE PAID: AWARD DATE: 05/25/2017 ESTIMATE PERIOD: 262,998.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 247 6.00 CONTRACT ID: 007207041 PROJECT: NH 2017(990) CONTRACT: 05173001 AWARD : 63,063,378.38 PROJECTED : 63,063,378.38 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 5,047,590.65 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 617 289.00 CONTRACT ID: 005006086 PROJECT: NH 1502(184) CONTRACT: 05153002 AWARD AMOUNT: $36,840,375.34 PROJECTED AMOUNT: $37,065,377.33

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD: 2,852.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 49 CONTRACT ID: 001607132 PROJECT: IM 0352(341) CONTRACT: 02133206 AWARD : $287,874.50 PROJECTED : $287,874.50 ADJ. PROJECTED : $290,726.58

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD: 455,691.25 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 542 59.00 CONTRACT ID: 000505102 PROJECT: DMO 2012(263) CONTRACT: 05133202 AWARD : 18,434,933.58 PROJECTED : 18,604,933.60 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD: 3,933,355.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 791 CONTRACT ID: 628572001 PROJECT: RMC - 628572001 CONTRACT: 05164007 AWARD AMOUNT: $20,967,966.00 PROJECTED AMOUNT: $20,970,966.00 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD: 1,554,603.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 792 73 CONTRACT ID: 629050001 PROJECT: SUP - 629050001 CONTRACT: 10154031 AWARD AMOUNT: $1,697,780.64 PROJECTED AMOUNT: $1,697,780.64 ADJ.

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

DOCUMENTATION WORKBOOK FY 2018

DOCUMENTATION WORKBOOK FY 2018 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

TABULATION OF TENDERS

TABULATION OF TENDERS SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation 5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Exhibit "A" Date: 1/27/2011

Exhibit A Date: 1/27/2011 Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase

More information

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1. Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and

More information

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016 Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION

More information

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.

More information

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results of the research. The presentation is regarded as fully

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION

More information

SAN ANTONIO WATER SYSTEM

SAN ANTONIO WATER SYSTEM G:\TXC\Projects\SAWS\SAWS - Glad\03_CADD\01_Sheets\Glad_Water\01_Sheets\1 GLAD WATR CVR.dwg Sep 13, 2017-1:44pm acalderon SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5025 2017 SMP GLAD FROM PIEDMONT

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Critchfield Rd / SR-129

Critchfield Rd / SR-129 NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2

More information

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units)

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) 10/23/2017 Header Information Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) Bridge Name: D-02-PR-030A Inspection Date: 12/2/2015 Sufficiency Rating: Inspection

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager Welcome to the Business Owner Task Force Selma Stockstill SouthGate Constructors Public Information Manager Interim Project Limits SH 183 SH 121 to IH 35E SH 114 International Parkway to SH 183 Loop 12

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Case Histories and Practical Examples

Case Histories and Practical Examples SUMMER SCHOOL SIIV 2012 - ROAD SAFETY MANAGEMENT Theoretical principles and practical application in the framework of the European Directive 2008/96/CE Catania 24-28 September 2012 Case Histories and Practical

More information

File E28476 Vol. 7 Sec. 44 Page 1 Issued: Vol. 23 Sec. 18 Revised: Vol. 67 Sec. 4 and Report D E S C R I P T I O N

File E28476 Vol. 7 Sec. 44 Page 1 Issued: Vol. 23 Sec. 18 Revised: Vol. 67 Sec. 4 and Report D E S C R I P T I O N File E28476 Vol. 7 Sec. 44 Page 1 Issued: 1990-08-07 Vol. 23 Sec. 18 Revised: 2014-04-18 PRODUCT COVERED: USR - Series SL.156 Connectors. D E S C R I P T I O N USR - SL-156 Connectors, Receptacle Part

More information

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management

More information

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 MISSOURI RIVER FLOOD OF 2011 M I C H A E L J. K E N N E R L Y P. E. D I R E C T O R O F T H E O F F I C E O F D E S I G N I O W A D

More information

Rapid Response Team, LLC

Rapid Response Team, LLC 1 Insured: Cordero, Esther Home: (407) 433-6956 Property: 602 Green Dr. Kissimmee, FL 34759 Claim Rep.: Taye Garnett Business: (561) 988-9170 x 3612 Position: Claims Adjuster E-mail: tgarnett@peoplestrustinsurance.

More information

Tropical E.S. - BUDGET

Tropical E.S. - BUDGET Tropical E.S. - BUDGET Replace HVAC Chiller and Cooling Tower Description Budget COMMENTS GMP Design $45,90.92 Heard Construction $5,885.00 DDC Engineering Sub-Total Overhead @ 0% Profit @ 5% Contingency

More information

County: Any Design: BRG Date: 9/2007 Hwy: Any Ck Dsn: BRG Date: 9/2007. For prestr. beams, assume 12" top flange, therefore take 4" from CL Gird.

County: Any Design: BRG Date: 9/2007 Hwy: Any Ck Dsn: BRG Date: 9/2007. For prestr. beams, assume 12 top flange, therefore take 4 from CL Gird. County: Any Design: BRG Date: 9/2007 Hwy: Any Ck Dsn: BRG Date: 9/2007 SLAB DESIGN EXAMPLE Design: Using AASHTO LRFD Bridge Design Specifications - 4 th Ed. and TxDOT LRFD Bridge Design Manual 8" Slab

More information

West Tennessee Construction June 14-21, 2017

West Tennessee Construction June 14-21, 2017 FOR IMMEDIATE RELEASE Wednesday, June 14, 2017 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction June 14-21, 2017 BENTON COUNTY, I-40 Truck Climbing Lane Wednesday, June 7 through

More information

Guardrail and accessories catalog

Guardrail and accessories catalog Table of contents Steel beam guardrails Guardrail end sections for speeds LESS than 0 km/h End section anchor system for speeds LESS than 0 km/h Flared guardrail end terminals for speeds HIGHER than 0

More information

Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border

Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border Brook Brosi, CPG, PG USACE Lisa Nowicki Perks, PG USACE Kimberly Heenan, PE AECOM US Army Corps of Engineers BUILDING

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

OC Public Works El Niño Storm Preparation 2015

OC Public Works El Niño Storm Preparation 2015 OC Public Works El Niño Storm Preparation 2015 December 8, 2015 Overview About OC Public Works Storm Preparation Pre-Storm During Storm Post-Storm Storm Preparation Canyon and Burn Areas County Department

More information

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES GENERAL NOTES. NEW & RELOCATED ROADWAY SIGNS NOT SHOWN FOR CLARITY BUT, ARE INCLUDING IN CONCEPTUAL DESIGN COST ESTIMATE. KEYNOTES E X I S T I N G D E V E L O P M E N T. NEW 5' WIDE CONCRETE SIDEWALK.

More information

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox Compare Responses Event #: 1702 Status: Pending award Event Name: Curb Replacement Project T 841046.05 Number Of s: 7 Fit Excavating Quality Built Construction Dinkel Construction II, LLC Concrete Solutions,LLC

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report Cost Estimate Report Title Page Plan J. without trails Springfield, Missouri Flood Risk Management Feasibility Study Class 4 Cost Estimate P2 Number 354082 Estimated by Designed by Prepared by Cost Engineering

More information

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226 1 Insured: Property: SHANE KATZ 198 S. HOLLAND ST. LAKEWOOD, CO 80226 Estimator: James Mosel Business: (720) 456-8329 Business: E-mail: james@trinityconstructionserv Aurora, CO 80017 ices.com Claim Number:

More information

9/12/2014 O V E RV I E W

9/12/2014 O V E RV I E W K E E P I N G T H E N E W M I S S I O N R E AC H C L E A N T R A S H & F L O ATA B L E S B M P S T U D Y Russell Persyn, P.E., Ph.D. (SARA) Cris Parker, P.E., CFM (HDR) September 4, 2014 O V E RV I E W»

More information

Contractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587

Contractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587 Property: Any Street Pasadena, TX 77505 Estimator: Butch Bragg Contractor: Business: (281) 998-1800 Company: A- Select Services Business: suite 200 South Houston, TX 77587 Claim Number: Policy Number:

More information

CABLE GUARDRAIL. Interim Report June Report No. CDOT-DTD-R Final Report. William (Skip) Outcalt

CABLE GUARDRAIL. Interim Report June Report No. CDOT-DTD-R Final Report. William (Skip) Outcalt Report No. CDOT-DTD-R-2004-10 Final Report CABLE GUARDRAIL William (Skip) Outcalt Interim Report June 2004 COLORADO DEPARTMENT OF TRANSPORTATION RESEARCH BRANCH The contents of this report reflect the

More information

Measurement of effective stress shear strength of rock

Measurement of effective stress shear strength of rock Measurement of effective stress shear strength of rock R. A. Failmezger, P.E., F. ASCE In-Situ Soil Testing, L.C., Lancaster, Virginia USA D. J. White, Ph. D., P.E. Iowa State University, Ames, Iowa USA

More information

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes City of New Castle Presentation Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes New Castle Conservation District DNREC August 22, 2012 Agenda Project Background

More information

Business: Address, City, State, zip code

Business: Address, City, State, zip code Insured: Property: X X X X X X X X X Reference: Company: XXXXX Sample State Insurance Contractor: xxxxxx xxxx Business: (xxx) xxx-xxxx Company: xxxxx xxxxx xxx. E-mail: xxxxxx@gmail.com Business: Claim

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 17, 2018 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0337367 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

WELCOME APWA How Best to Protect Asphalt Overlays with Interlayers - Delay Deterioration and Extend Pavement Life

WELCOME APWA How Best to Protect Asphalt Overlays with Interlayers - Delay Deterioration and Extend Pavement Life WELCOME APWA 2015 How Best to Protect Asphalt Overlays with Interlayers - Delay Deterioration and Extend Pavement Life Dennis Rogers, Tensar Pavement Maintenance Manager, West All Data & analysis courtesy

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

S E C T I O N 1 2 P R O D U C T S E L E C T I O N G U I D E - H E L I C A L S C R E W P I L E F O U N D A T I O N S

S E C T I O N 1 2 P R O D U C T S E L E C T I O N G U I D E - H E L I C A L S C R E W P I L E F O U N D A T I O N S 1. P R O D U C T S E L E C T I O N G U I D E - H E L I C A L S C R E W P I L E F O U N D A T I O N S Helical foundation pile includes a lead and extension(s). The lead section is made of a central steel

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

WARNING. INJURY HAZARD Failure to observe these instructions could lead to severe injury or death.

WARNING. INJURY HAZARD Failure to observe these instructions could lead to severe injury or death. INSTALLATION INSTRUCTIONS ATV Front Plow Mount Kit Part Number: 80031 Applications: 2007+ Honda Rancher 420 2007+ Honda Rancher ES 420 2009+ Honda Rancher AT 420 *Not compatible with 2.5ci or A2000 winches

More information

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES TAKING THE MYSTERY OUT OF USACE S ER 1110-1-1807 DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS 10782 Wattsburg Road Erie, PA 16509 The WATTSBURG AREA SCHOOL DISTRICT invites qualified vendors to submit proposals for CONTRACTED SNOW REMOVAL MANDATORY PRE-SUBMISSION MEETING All

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

PILOT STUDY: PAVEMENT VISUAL CONDITION AND FRICTION AS A PERFORMANCE MEASURE FOR WINTER OPERATIONS

PILOT STUDY: PAVEMENT VISUAL CONDITION AND FRICTION AS A PERFORMANCE MEASURE FOR WINTER OPERATIONS 1 PILOT STUDY: PAVEMENT VISUAL CONDITION AND FRICTION AS A PERFORMANCE MEASURE FOR WINTER OPERATIONS Nishantha Bandara, Ph.D., P.E. Department of Civil Engineering Lawrence Technological University 21000

More information

BUILDING HOME CONSTRUCTION

BUILDING HOME CONSTRUCTION 1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68

More information

2/23/ WIND PRESSURE FORMULA 2. PERCENT OF ALLOWABLE STRESS 3. FATIGUE DESIGN

2/23/ WIND PRESSURE FORMULA 2. PERCENT OF ALLOWABLE STRESS 3. FATIGUE DESIGN Original Title Presented by Northwest Signal copyright 2010 Designing & Building Structural Steel Products since 1976 Primary Users Traffic Signal Strain & Mast Arm Poles Cantilever & Bridge Sign Structures

More information

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM

More information

Preferred practice on semi-integral abutment layout falls in the following order:

Preferred practice on semi-integral abutment layout falls in the following order: GENERAL INFORMATION: This section of the chapter establishes the practices and requirements necessary for the design and detailing of semi-integral abutments. For general requirements and guidelines on

More information