1 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886, , Gateway Construction & Engineering Ltd. 973, , Graham Construction and Engineering Inc. 990, , Minty's Moving Limited 1,043, ,043, Ontario Inc. O/A Sharp Bridges 1,098, ,098, Macaw Macdonald Ltd. 1,177, ,177, Armcon Ltd. REJECTED BID REJECTED BID Ver: Page 1
2 M.D. Steele Construction Ltd. Gateway Construction & Engineering Ltd. Graham Construction and Engineering Inc. Minty's Moving Limited Mobilization of Equipment (Mod) 1 lump sum 130, , , , , , , , Traffic Control Level II (Mod) 1 lump sum 4, , , , , , , , Supply of Field Office Cl "B" (Mod) 1 lump sum 10, , , , , , , , Environmental Management Procedures 1 lump sum 5, , , , , , , , Silt Fence Barrier 130 m , , , , Floating Silt Fence Barrier 25 m , , , , Stream Flow Management 1 lump sum 1, , , , , , , , Dismantle and Salvage Existing Structures 1 lump sum 65, , , , , , , , Structural Excavation 1 lump sum 28, , , , , , , , Supplying Steel H Piles 150 m , , , , Driving Steel H Piles 140 m , , , Supply of Pile Tips 20 each , , , , Installation of Pile Tips 20 each , , , , Supplying & Placing Subsurface Drainage 1 lump sum 3, , , , , , , , Supply/Place Concrete (Substructure) 87 m3 1, , , , , , , Supply/Place Concrete (Superstructure) 48 m3 1, , , , , , , Supplying Reinforcing Steel kg , , , , Placing Reinforcing Steel kg , , , , Permeable Formwork Liner 32 m , , , Supply and Fabricate Miscellaneous Metal 6415 kg , , , , Placing Miscellaneous Metal 6415 kg , , , , Asphalt Damp Proofing 184 m , , , , Supplying & Placing Granular Backfill 2650 t , , , , Supply Bearings 16 each , , , , , Erection of Bearings 16 each , , , Delivery of PP Concrete Girders 8 each 1, , , , , , , , Erection of PP Concrete Girders 8 each 3, , , , , , , , Lateral Stressing 1 lump sum 19, , , , , , , , Miscellaneous Grouting 1 lump sum 14, , , , , , Ver: Page 2
3 M.D. Steele Construction Ltd. Gateway Construction & Engineering Ltd. Graham Construction and Engineering Inc. Minty's Moving Limited Lump Sum Backfill 1 lump sum 12, , , , , , , , Supp & Installation of Geotextile Fabric 165 m S/P ECB Cl1, Type Urban Biodegradable 272 m , , , Stone Rip-Rap, Cl 350 mm 170 m , , , , Granular Base Course Cl "A" 490 t , , , , Stripping Slopes (Mod) 0.7 sta , , , Bench Cuts (Mod) 0.7 sta. 2, , , , , Granular Fill 500 t , , , , Trimming 0.7 sta. 1, , , , , Hot Poured Rubber Asphalt Waterproofing 234 m , , , , Prime Coat (Mod) 490 L , , , Bit Pvmt, Cl "B" (Oils Supp. by Cont.) (Mod) 67 t , , , , Seeding (Mod) 165 m Connect Guardrail to Bridge 4 each , , , Installation of Thrie Beam Guardrail 16 m , , , , Install W Thrie Beam Transition Guardrail 8 each , , , , Installation of W-Beam Guardrail 16 m , , , , Installation of Guardrail End Treatment 4 each 1, , , , , , , , Motor Grader (Min. Group 6) 10 hr , , , , Hydraulic Excavator (Min. Group 9) 10 hr , , , , Wheel Loader (Min Group 7) 10 hr , , , , Extra Work 1 $ 100, , , , , , , , SECTION 1 TOTAL BID TOTAL 886, , , ,043, , , , ,043, Ver: Page 3
4 Ontario Inc. O/A Sharp Bridges Macaw Macdonald Ltd. 0 0 Mobilization of Equipment (Mod) 1 lump sum 126, , , , Traffic Control Level II (Mod) 1 lump sum 10, , Supply of Field Office Cl "B" (Mod) 1 lump sum 17, , , , Environmental Management Procedures 1 lump sum 16, , , , Silt Fence Barrier 130 m , , Floating Silt Fence Barrier 25 m , , Stream Flow Management 1 lump sum 25, , , , Dismantle and Salvage Existing Structures 1 lump sum 50, , , , Structural Excavation 1 lump sum 38, , , , Supplying Steel H Piles 150 m , , Driving Steel H Piles 140 m , , Supply of Pile Tips 20 each , , Installation of Pile Tips 20 each , , Supplying & Placing Subsurface Drainage 1 lump sum 1, , , , Supply/Place Concrete (Substructure) 87 m3 1, , , , Supply/Place Concrete (Superstructure) 48 m3 1, , , Supplying Reinforcing Steel kg , , Placing Reinforcing Steel kg , , Permeable Formwork Liner 32 m , , Supply and Fabricate Miscellaneous Metal 6415 kg , , Placing Miscellaneous Metal 6415 kg , , Asphalt Damp Proofing 184 m , , Supplying & Placing Granular Backfill 2650 t , , Supply Bearings 16 each , , Erection of Bearings 16 each , , Delivery of PP Concrete Girders 8 each 3, , , , Erection of PP Concrete Girders 8 each 10, , , , Lateral Stressing 1 lump sum 22, , , , Miscellaneous Grouting 1 lump sum 5, , , , Ver: Page 4
5 Ontario Inc. O/A Sharp Bridges Macaw Macdonald Ltd. 0 0 Lump Sum Backfill 1 lump sum 10, , , , Supp & Installation of Geotextile Fabric 165 m , S/P ECB Cl1, Type Urban Biodegradable 272 m , , Stone Rip-Rap, Cl 350 mm 170 m , , Granular Base Course Cl "A" 490 t , , Stripping Slopes (Mod) 0.7 sta. 3, , , Bench Cuts (Mod) 0.7 sta. 3, , , Granular Fill 500 t , , Trimming 0.7 sta. 3, , , , Hot Poured Rubber Asphalt Waterproofing 234 m , , Prime Coat (Mod) 490 L , , Bit Pvmt, Cl "B" (Oils Supp. by Cont.) (Mod) 67 t , , Seeding (Mod) 165 m , Connect Guardrail to Bridge 4 each , , Installation of Thrie Beam Guardrail 16 m , , Install W Thrie Beam Transition Guardrail 8 each , , Installation of W-Beam Guardrail 16 m , , Installation of Guardrail End Treatment 4 each 2, , , , Motor Grader (Min. Group 6) 10 hr , , Hydraulic Excavator (Min. Group 9) 10 hr , , Wheel Loader (Min Group 7) 10 hr , , Extra Work 1 $ 100, , , , SECTION 1 TOTAL BID TOTAL 1,098, ,177, ,098, ,177, Ver: Page 5
TABULATION OF TENDERS
SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering
More informationAverage Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016
Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION
More information20217 CLEAR STONE TON $14.20 $5, $ $ $ %
ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON
More information20217 CLEAR STONE TON $14.20 $5, $ $ $ %
ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON
More informationDESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006
Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment
More informationMaterials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationNew Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS
PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:
27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84
More informationAddendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address
CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing
More informationCulvert and Pipe Phasing
Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report
More information10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %
ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00
More informationSelected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University
Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices
More informationAgenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections
Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental
More informationAppendix C Benchmarking Cost Estimates
REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:
0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 102 CONTRACT ID: 057401029 : BR 2018(319) CONTRACT: 12173211 AWARD : $2,595,950.00 ED : $2,833,949.00 ADJ. ED : $2,833,949.00 CONTRACT: CONTRACTOR:
More informationMar 1, 2018 LAB MANUAL INDEX 1. Table of Contents Laboratory Testing Methods Reducing Aggregate Field Samples to Testing Size (Ver.
Mar 1, 2018 LAB MANUAL INDEX 1 Table of Contents Laboratory Testing Methods 1000 Standard Practices (Ver. Sep 23, 2014) 1001 Receiving and Identifying Samples (Ver. Mar 1, 2018) 1002 Reducing Aggregate
More informationU.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate
Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM
More informationEarly Exploration Permit Activity Information
Early Exploration Permit Activity Information Activities That Require an Early Exploration Permit: Line cutting that is a width greater than 1.5 metres Mechanized stripping of a total surface area of greater
More informationOutline. Introduction. Introduction Accident Damage. Introduction Act of God Damage NATIONAL HIGH PERFORMANCE CONCRETE FOLLOW UP SURVEY RESULTS BY:
BY: NATIONAL FOLLOW UP SURVEY RESULTS Louis N. Triandafilou, P.E. FHWA Resource Center Baltimore Senior Structural Engineer CLAUDE S. NAPIER, Jr., P.E. FHWA Virginia Division Bridge Engineer Outline HPC
More information**Temporary Erosion Control**
Construction operations And methods **Temporary Erosion Control** The test will more than likely just have a basic word problem dealing with Erosion control, if it has anything on the test. So just review,
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:
More informationProject T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox
Compare Responses Event #: 1702 Status: Pending award Event Name: Curb Replacement Project T 841046.05 Number Of s: 7 Fit Excavating Quality Built Construction Dinkel Construction II, LLC Concrete Solutions,LLC
More informationInternal C Unit Dilatanc y
2 Grimsby Sub was not at any time definitively established. The preliminary analysis provided by Thurber Engineering Ltd indicates the slope should be stable with a factor of safety of 1.23 for a deep
More information3 DESCRIPTION OF THE PROPOSED DEVELOPMENT
3 DESCRIPTION OF THE PROPOSED DEVELOPMENT As described in Chapter 2, the Preferred Option for the Bandon River (Bandon) Drainage Scheme comprises a combination of flood defences and dredging. The proposed
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:
304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED
More informationThe results of KCB s site inspection observations and our recommendations for further work are presented herein.
July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited
More informationDepartment of Civil Engineering
UNDERGRADUATE COURSE DESCRIPTIONS Constructional Drawing and Technical Mapping 2 Cr. Introduction to the concept of engineering drawing, orthographic drawing sketching, sections and conventions. Pictorial
More informationGEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 4
More informationErosion and Sediment Control Measures 2.7 Silt Fences
Erosion and Sediment Control Measures Silt fences are designed to intercept sheet flow sediment laden stormwater run-off and filter out both the larger and smaller particles of sediment. Silt fences and
More informationA Fundamental Approach for an Investigation of Behavior Characteristics of the Vegetation Structures Using Seeded Sandbags
A Fundamental Approach for an Investigation of Behavior Characteristics of the Vegetation Structures Using Seeded Sandbags H. T. Kim & S. D. Yoo Dept. of Civil Engineering, Hongik University, Seoul, Korea.
More information1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8
July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along
More informationROCK EXCAVATION (GRADING) OPSS 206 INDEX
206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6
More informationExhibit "A" Date: 1/27/2011
Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:
3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27
More informationBest Management Practices for Coldwater Fisheries Enhancement and Restoration
Best Management Practices for Coldwater Fisheries Enhancement and Restoration MACC Annual Environmental Conference 2017 March 3, 2017 Tim Dexter, MassDOT Highway Division 1 Leading the Nation in Transportation
More informationTom Blackman Project Lead. Mékell Mikell Communications Representative
Sediment Cleanup Middle River Complex, 2016-17 Season 1 Project Photo Tour Updated November 15, 2016 Tom Blackman Project Lead Mékell Mikell Communications Representative 1 Sediment Cleanup - Season 1
More informationNORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES
Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management
More information< < >>>>>> Elastomer Solutions for Industrial Projects <<<<<<
< < < Elastomer Solutions for Industrial Projects
More informationCONTRACTOR'S ESTIMATE PACKAGE
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55
More informationCoarse Sediment Traps
Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily
More informationDesigned by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days
Independent Government Estimate Updated 6/22/18 Title Page Estimated by NAVFAC Cost Designed by Prepared by NAVFAC Cost Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:
-58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31
More informationPreferred practice on semi-integral abutment layout falls in the following order:
GENERAL INFORMATION: This section of the chapter establishes the practices and requirements necessary for the design and detailing of semi-integral abutments. For general requirements and guidelines on
More informationFast and Furious Rebuilding and Widening the I-90 West Corridor
Fast and Furious Rebuilding and Widening the I-90 West Corridor Peter Foernssler, P.E., S.E. Deputy Chief, Illinois Tollway Marty Ross, P.E. Design Corridor Manager, TranSystems Jason Wenberg, P.E. Construction
More informationUnderlayment. bonded impact sound insulation
Schlüter -DITRA-SOUND Underlayment 6.3 bonded impact sound insulation Product data sheet Application and Function Schlüter -DITRA-SOUND is a bonded impact sound insulation for tile coverings, made of a
More informationBUILDING HOME CONSTRUCTION
1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68
More informationEvaluation of Geotechnical Hazards
Evaluation of Geotechnical Hazards by Geoffrey R. Martin Appendix B: Evaluation of Geotechnical Hazards Describes Evaluation Procedures Soil Liquefaction Soil Settlement Surface Fault Rupture Flooding
More informationFebruary 22, 2016 AG File No
Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry
More informationFranklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation
2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,
More informationUnderpinning of York Minster
Underpinning of York Minster La Reprise en Sous-oeuvre des Fondations de la Cath6drale d'york J.A. LORD Project Director, Ove Arup & Partners, London, United Kingdom S Y N O P S I S F o l l o w i n g a
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS STRUCTURAL ENGINEERING FIRM TO PERFORM A STRUCTURAL EVALUATION OF THE MARKET STREET PARKADE FACILITY REFERENCE RFP 14-148 Addendum Issued: August 22, 2014 ADDENDUM No. 2 Page 1 of
More informationMONTHLY PROGRESS REPORT FOR THE MONTH OF APRIL ( SEC - A & SEC - B) Specifica tions
Client Independent Engineer Concessionaire EPC Contractor Sub Contractor Sl No. 1 EARTH WORK : OGL : NATIONAL HIGHWAYS AUTHORITY OF INDIA : CDM SMITH Inc JV with WILBUR SMITH ASSOCIATES Pvt Ltd. : HK TOLL
More informationU-Shaped Sediment Traps
U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally
More informationNHBRA SOIL LABORATORY SECTION INTERIM REVISED TEST RATES FOR THE MATERIALS LABORATORY
NHBRA SOIL LABORATORY SECTION INTERIM REVISED TEST RATES FOR THE MATERIALS LABORATORY DATE OF REVISION: ) 10th October 2010 S/N TEST DESCRIPTION UNIT RATE REMARKS 1 Sieve Analysis (wet and dry methods
More informationStone Outlet Sediment Trap
3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose
More informationDesign of a Balanced-Cantilever Bridge
Design of a Balanced-Cantilever Bridge CL (Bridge is symmetric about CL) 0.8 L 0.2 L 0.6 L 0.2 L 0.8 L L = 80 ft Bridge Span = 2.6 L = 2.6 80 = 208 Bridge Width = 30 No. of girders = 6, Width of each girder
More informationWater Street over Eel Pond Channel Falmouth Massachusetts Jeffrey D. Keyt, PE Parsons
Jeffrey D. Keyt, PE Description The existing bridge carried. Eel pond Channel is the inlet from Great Harbor and Vineyard Sound to Eel Pond. Water Street has two 12 foot lanes for highway traffic in both
More informationSHEET PILE WALLS. Mehdi Mokhberi Islamic Azad University
SHEET PILE WALLS Mehdi Mokhberi Islamic Azad University Lateral Support In geotechnical engineering, it is often necessary to prevent lateral soil movements. Tie rod Anchor Sheet pile Cantilever retaining
More informationCity of Forest Hills Profit & Loss for the month and Fiscal Year October 2015
Profit & Loss for the month and Fiscal Year Oct 15 Jul - Oct 15 Ordinary Income/Expense Income 31900- Other Taxes 31910- Franchise Taxes 6,407.61 21,517.61 Total 31900- Other Taxes 6,407.61 21,517.61 31600
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:
29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94
More informationGEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module-5 LECTURE-
More information12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC
PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE
More informationSediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.
Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00
More informationSafety Concepts and Calibration of Partial Factors in European and North American Codes of Practice
Safety Concepts and Calibration of Partial Factors in European and North American Codes of Practice The Dutch approach on Geotechnical Design by Eurocode 7 Adriaan van Seters Hein Jansen Fugro GeoServices
More informationCity of Forest Hills Profit & Loss for the month and Fiscal Year May 2016
Profit & Loss for the month and Fiscal Year May 16 Jul '15 - May 16 Ordinary Income/Expense Income 31900- Other Taxes 31910- Franchise Taxes 18,106.78 121,422.86 Total 31900- Other Taxes 18,106.78 121,422.86
More informationSpecial edition paper
Development of New Aseismatic Structure Using Escalators Kazunori Sasaki* Atsushi Hayashi* Hajime Yoshida** Toru Masuda* Aseismatic reinforcement work is often carried out in parallel with improvement
More informationSTREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT
STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology
More informationKDOT Geotechnical Manual Edition. Table of Contents
KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of
More informationCountermeasure Calculations and Design
Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,
More informationAB Engineering Manual
AB Engineering Manual Allan Block Retaining Walls FOREWORD This manual presents the techniques used by Allan Block in our engineering practice to design retaining walls. It is not intended as a textbook
More informationUpdated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario
Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Submitted to: Brigil Homes 98 rue Lois Gatineau, Quebec J8Y 3R7 Updated Subsurface Investigation
More informationMATERIAL MODELS FOR CRUMB RUBBER AND TDA. California State University, Chico
MATERIAL MODELS FOR CRUMB RUBBER AND TDA California State University, Chico Waste Tire Products for CE Applications Whole Tires Tire Shreds (TDA) Crumb Rubber/Tire Buffings Whole Tires TIRE DERIVED AGGREGATE
More informationALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN
ALUMINUM STRUCTURAL PLATE EADWALLS AASTO LRFD BASIS OF DESIGN LANE ENTERPRISES, INC. www.lane-enterprises.com Required Backfill and Load Cases: ALUMINUM STRUCTURAL PLATE EADWALLS BASIS OF DESIGN Backfill
More information@Copyright 2016 SKAPS Industries.
SKAPS INDUSTRIES 571 Industrial Pkwy, Commerce, GA 30529 Phone: (706) 336 7000 Fax: (706) 336 7007 E Mail: contact@skaps.com SKAPS GEOCOMPOSITE DROP IN SPECIFICATIONS @Copyright 2016 SKAPS Industries www.skaps.com
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:
295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED
More informationRoadway Grade = m, amsl HWM = Roadway grade dictates elevation of superstructure and not minimum free board requirement.
Example on Design of Slab Bridge Design Data and Specifications Chapter 5 SUPERSTRUCTURES Superstructure consists of 10m slab, 36m box girder and 10m T-girder all simply supported. Only the design of Slab
More informationLocal Conditions-NE Minnesota
Local Conditions-NE Minnesota Identifying Regional Stormwater Challenges Selecting BMPs for our area Experience & observations from MNDOT & MPCA BMPs that work / don t work in NE Minnesota Local Conditions-NE
More informationUse of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio
Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio Mitchell W. Weber, P.G. Gannett Fleming Engineers & Architects, P.C. Greg Bachman, P.E., P.S. County of Summit Engineer Robert
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:
More informationGeosynthetics Applications and Performance Reviews Select Case Histories
Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,
More informationTABLE OF CONTENTS SECTION TITLE PAGE 2 PRINCIPLES OF SEISMIC ISOLATION OF BRIDGES 3
TABLE OF CONTENTS SECTION TITLE PAGE 1 INTRODUCTION 1 2 PRINCIPLES OF SEISMIC ISOLATION OF BRIDGES 3 3 ANALYSIS METHODS OF SEISMICALLY ISOLATED BRIDGES 5 3.1 Introduction 5 3.2 Loadings for the Analysis
More informationDecember 11, 2006 File:
December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)
More informationType approval granted by the Finnish Ministry of the Environment
RR Piling Manual 2 Type approval granted by the Finnish Ministry of the Environment 2..02. RR Piling Manual 1. General This manual deals with impact-driven RR piles. It is an abridgement of the RR Piling
More informationWhat Is Water Erosion? Aren t they the same thing? What Is Sediment? What Is Sedimentation? How can Sediment Yields be Minimized?
Jerald S. Fifield, Ph.D. CISEC HydroDynamics Incorporated Parker, CO 303-841-0377 Aren t they the same thing? What Is Sediment? Soil particles deposited or suspended in water or air The process of depositing
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE
More informationDesign and Construction
Design and Construction Stream Simulation With power point slides shamelessly stolen from: Forest Service AOP Training Course Bob Gubernick Paul Anderson John Kattell USDA Forest Service Interim Directive
More informationPhysics 5B PRACTICE MIDTERM EXAM I-B Winter 2009
Physics 5B PRACTICE MIDTERM EXAM I-B Winter 2009 PART I: Multiple choice questions Only one of the choices given is the correct answer. No explanation for your choice is required. Each multiple choice
More informationAPPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION
APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use
More informationPrepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7
GEOTECHNICAL INVESTIGATION Proposed Verdon Subdivision Part of Lot 16, Concession I (Old Survey) Geographic Township of Clarence Now City of Clarence-Rockland Prepared for Mr. Denis A. Verdon 445, Wilson
More informationMIGRATION PROBABILITY MATRIX FOR BRIDGE ELEMENT DETERIORATION MODELS
Paul D. Thompson 0 0 MIGRATION PROBABILITY MATRIX FOR BRIDGE ELEMENT DETERIORATION MODELS Paul D. Thompson Consultant 0 NE th Place, Bellevue, WA 00 USA Tel: --; Fax: --; Email: pdt@pdth.com Word count:,
More informationTYPE YEAR PROJECT NO. SHEET NO. 4-203.02 D. TRANS ITIONAL MATERIALS TENNESSEE D.O.T. DESIGN DIVISION FILE NO. REPRESENTATIVE OF STATION 14+75 TO STATION 19+00 THIS MATERIAL IS THAT MATERIAL COMPRISED OF
More informationSite Investigation and Landfill Construction I
Site Investigation and Landfill Construction I Gernot Döberl Vienna University of Technology Institute for Water Quality, Resources and Waste Management Contents Site Investigation Base Liners Base Drainage
More informationLimited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results
Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results of the research. The presentation is regarded as fully
More informationCENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM
SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION
More informationTranscendent foundation solutions
Spirit of Krebs Ovesen Session - Challenges in geotechnical engineering XIV ECSMGE Transcendent foundation solutions Jørgen S. Steenfelt, COWI, Denmark 1 Spirit of Krebs Ovesen Session - Challenges in
More informationClosure of Remote Historic Underground Mines in Desert Environments
Closure of Remote Historic Underground Mines in Desert Environments James A. Cremeens Agapito Associates, Inc. Michael H. Rauschkolb U.S. Borax, Inc. 2002 SME Annual Meeting and Exhibit Geotechnical solutions
More informationS E A L E D F L A T E X P A N S I O N J O I N T T A P E S
Uniclass CI/SfB L554 Z R E D L I N E & F L A M L I N E S E A L E D F L A T E X P A N S I O N J O I N T T A P E S R E D L I N E & F L A M L I N E S E A L E D F L AT E X PA N S I O N J O I N T S ROOF-PRO
More informationSchedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots
SNOW AND ICE CONTROL SERVICES - (4) SEPARATE DEPARTMENTS SCHEDULE C REQUEST FOR PROPOSAL 2244 Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots 1.0 General
More informationV S L C O N S T R U C T I O N S Y S T E M S
V S L C O N S T R U C T I O N S Y S T E M S D E S I G N C O N S T R U C T I O N E N G I N E E R I N G S U P P LY I N S TA L L AT I O N C O N T A C T S V S L P R E S T R E S S I N G ( A U S T ) P T Y LT