1 Closure of Remote Historic Underground Mines in Desert Environments James A. Cremeens Agapito Associates, Inc. Michael H. Rauschkolb U.S. Borax, Inc SME Annual Meeting and Exhibit

2 Geotechnical solutions were developed for closure of two historic underground borate mines in the deserts of California The Old Borate mining district located in the Mojave Desert near Barstow California Mined from 1890 to 1907 The Lila C. Mine near Death Valley California Mined from 1907 to 1916 and 1920 to 1926

3 CALIFORNIA N Location of the Old Borate and Lila C. Mine Sites San Francisco Lila C. Mine Site Death Valley Old Borate Mine Site Los Angeles San Bernardino

4 Big Borate Canyon

5 Big Borate Canyon post-1898

6 Haulage Adit

7 Decline Shaft

8 Dugout Dwelling

9 Underground at Old Borate (Circa 1902 from Reynolds 1999)

10 Prevent public access Closure Criteria Protect wildlife Minimize impact to fragile desert landscape Assure environmental compatibility Optimize use of native materials

11 Wildlife Protection Conducted by bat and desert tortoise specialists Daytime internal examination and night bat surveys with night vision equipment and ultrasonic detectors No tortoise sign found within mines Bats or bat sign found in most of the mine openings Mine openings fenced to allow bat exit but not re-entry

12 Pre-Construction Design ADITS Collapse and Regrade Polyurethane Foam SHAFTS and STOPES Pre-Cast Concrete Panel Caps

13 Pre-cast Concrete Panel Design Survey Monument Armor Finished Slope with Cobbles and Boulders Surficial Material Backfill 1 3 Final Grade (3H:1V) Original Ground Extremely Weathered Siltstone Unweathered Siltstone Excavation (1.5H:1V) Precast Concrete Panels Shaft Opening Backfill with Mine Waste Rock (optional) Panel Abutment Joint 48" Typ. 48" Typ. 12" Typ. Prepare Smooth Foundation Surface and Shim Such That Panel Edges are Flush and Panels are Coplanar Panel Foundation Shaft Opening 2L

14 Field Conditions Strength of weak siltstone and claystone did not increase with depth Low bearing capacity Foundation could be easily eroded Ground caved and grew laterally with excavation Excavated mine openings were larger than surface expression Large spans for pre-cast concrete panels Increased number of concrete panels Would have required steel beam support for large spans

15 Final Design SHAFTS and STOPES Boulder Plug ADITS Collapse and Regrade with Boulder Plug Polyurethane foam

16 Components of a Typical Boulder Plug Closure Survey Monument Surficial Material Backfill Final Grade Original Ground Extremely Weathered Siltstone Unweathered Siltstone Excavation (1H:2V) Boulder Plug

17 Typical Adit Boulder Plug Closure Regraded to Original Slope or Flatter Survey Monument Original Ground Adit Portal Excavation (1.5H:1V) (Collapse) Adit Surficial Material Backfill Boulder Backfill

18 Excavating a Stope

19 Typical Boulder Plug Placement Sequence Placing Initial Boulders Completed Boulder Plug

20 Typical Boulder Plug Placement Sequence Beginning Backfill and Regrade Placing Final Soil Cover

21 Summary of Old Borate Closure 120 mine openings closed in 5-week period Boulder plugs satisfied design criteria Closure costs were significantly reduced by using native materials Lower unit costs = more mine openings closed

22 Lila C. Mine Site Circa 1907 AGAPITO AGAPITO ASSOCIATES, ASSOCIATES, INC. INC. Consulting Engineers

23 Main Haulage Level of the Lila C. Mine Circa 1910

24 Stope at Lila C.

25 Decline shaft at Lila C.

26 Open Stope at Lila C.

27 Wildlife Protection Conducted by bat and desert tortoise specialists No tortoise sign found within mines Surveys revealed four species of bats in the mines Two bat Species of Special Concern found Bat accessible designs were included in closure

28 Bat Accessible Closures Bat gates and cupolas designed by specialty contractor to protect bat access, preserve ventilation, and maintain temperature Underground surveys conducted to optimize bat accessible design

29 Closure Design SHAFTS and STOPES Rock Mattress AAI innovation ADITS Collapse and Regrade with Boulder Plug Polyurethane foam

30 Native Ground Original Grade Native Ground Partially Collapsed and Backfilled Stope Lila C. Mine Typical Profiles Pre-closure Daylighted Stope Configuration Rock Mattress Excavation and Construction of a Daylighted Stope Closure Final Grade Limits of Excavation (1H:1V) Native Ground Rock Mattress Gabions Backfilled Stope Backfill

31 Top Layer Gabions Bottom Layer Gabions Rock Mattress Construction for a Daylighted Slope Existing Open Stope C L Bottom and Top Layer Gabions In Place

32 attress Construction for a Daylighted Stope a) Pre-construction b) Grading Hanging Wall

33 Rock Construction for a Daylighted Stope c) Wheel Roll Compaction d) Gabion Construction

34 Rock Construction for a Daylighted Stope e) Filling Gabions with Native Rock f) Backfilling Over Gabion Rock Mattress

35 Rock Construction for a Daylighted Stope g) Partially Backfilled Rock Mattress h) Final Grade and Armored Slope

36 Rock Construction for a Shaft Closure Plywood Barrier to Keep Debris out of Shaft During Excavation Rock Debris on Plywood Barrier Shaft Perimeter a) Shaft after Surface Preparation for Rock Mattress

37 Rock Construction for a Shaft Closure Shaft Perimeter b) First Layer of Gabions of Shaft

38 Rock Construction for a Shaft Closure Second Layer of Gabions First Layer of Gabions c) First and Second Layers of Rock-filled Gabions Completed Rock Mattress at Shaft

39 Rock Construction for a Shaft Closure d) Load Test on a Rock Mattress at Shaft

40 Rock Construction for a Shaft Closure Backfill over L26a L26b e) Backfill over Rock Mattress

41 Typical Foam Seal Construction a) Preparing Backing Lattice b) Applying Foam c)completed Foam Application without Backfill

42 Bat Gate

43 Construction and Final Configuration of Bat Cupola a) Landing Ring and First Course Concrete Pipe in Place b) Completed/ Backfilled Shaft Extension And Bat Cupola

44 Cost Comparison (USD-2000) Gabion Rock Mattress with concrete $21,920 Plastic Grid $21,712 Foam Plug $20,890 Gabion Rock Mattress $18,880

45 Thank-You

Design considerations for pillar systems in deep mines. Tobias Ladinig Hannes Blaha Horst Wagner

Design considerations for pillar systems in deep mines. Tobias Ladinig Hannes Blaha Horst Wagner Design considerations for pillar systems in deep mines Tobias Ladinig Hannes Blaha Horst Wagner Content Role of pillars in mining Stope pillar loading approaches Pillar design Pillars in deep open-stoping

More information

ENGINEERING EVALUATION OF THE STANLEY MINE ADVENTURE PARK AREA CLEAR CREEK COUNTY, COLORADO. Prepared for:

ENGINEERING EVALUATION OF THE STANLEY MINE ADVENTURE PARK AREA CLEAR CREEK COUNTY, COLORADO. Prepared for: braun Braun Consulting Engineers ENGINEERING EVALUATION OF THE STANLEY MINE ADVENTURE PARK AREA CLEAR CREEK COUNTY, COLORADO Prepared for: STANLEY MINES ADENTURE PARK 3375 W. POWERS CIRCLE LITTLETON, COLORADO

More information

1. Rock Mechanics and mining engineering

1. Rock Mechanics and mining engineering 1. Rock Mechanics and mining engineering 1.1 General concepts Rock mechanics is the theoretical and applied science of the mechanical behavior of rock and rock masses; it is that branch of mechanics concerned

More information

3/8/17. #20 - Landslides: Mitigation and Case Histories. Questions for Thought. Questions for Thought

3/8/17. #20 - Landslides: Mitigation and Case Histories. Questions for Thought. Questions for Thought #20 - Landslides: Mitigation and Case Histories Web Exercise #3 (Volcanoes) Due Wednesday There is a 2-point penalty for every day the assignment is late. Exam 1 Scores Scores and exam key are posted Vaiont

More information

25th International Conference on Ground Control in Mining

25th International Conference on Ground Control in Mining ANALYTICAL INVESTIGATION OF SHAFT DAMAGES AT WEST ELK MINE Tim Ross, Senior Associate Agapito Associates, Inc. Golden, CO, USA Bo Yu, Senior Engineer Agapito Associates, Inc. Grand Junction, CO, USA Chris

More information

Sacramento Modesto Roseville Pleasanton September 19, 2013 Marcia Medina GHD Inc. 417 Montgomery Street, Suite 700 San Francisco, CA Subject: GE

Sacramento Modesto Roseville Pleasanton September 19, 2013 Marcia Medina GHD Inc. 417 Montgomery Street, Suite 700 San Francisco, CA Subject: GE Sacramento Modesto Roseville Pleasanton September 19, 2013 Marcia Medina GHD Inc. 417 Montgomery Street, Suite 700 San Francisco, CA 94104 Subject: GEOTECHNICAL REPORT AMENDMENT Stonybrook Creek Crossings

More information

Progress on Defense-Related Uranium Mines Program

Progress on Defense-Related Uranium Mines Program Progress on Defense-Related Uranium Mines Program Russel Edge US Department of Energy (DOE) Office of Legacy Management (LM) John Elmer Navarro Research and Engineering, Inc., Contractor to LM Uranium

More information

GEOLOGY, SOILS, AND SEISMICITY

GEOLOGY, SOILS, AND SEISMICITY 4.9 GEOLOGY, SOILS, AND SEISMICITY 4.9.1 Introduction Information about the geological conditions and seismic hazards in the study area was summarized in the FEIR, and was based on the Geotechnical Exploration

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information

28th International Conference on Ground Control in Mining

28th International Conference on Ground Control in Mining Ground Control Design Challenges at the El Boleo Copper Project David Conover, Senior Physicist Tim Ross, Principal Agapito Associates, Inc. Golden, CO Scott Britton, General Manager - Mining Operations

More information

Early Exploration Permit Activity Information

Early Exploration Permit Activity Information Early Exploration Permit Activity Information Activities That Require an Early Exploration Permit: Line cutting that is a width greater than 1.5 metres Mechanized stripping of a total surface area of greater

More information

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers

NNN99. Rock Engineering for the Next Very Large Underground Detector. D. Lee Petersen CNA Consulting Engineers NNN99 Rock Engineering for the Next Very Large Underground Detector D. Lee Petersen Overview Rock engineering 101 Cavern size & shape Construction methods Feasibility Historical projects Numerical modeling

More information

SYDNEY MARINE TERMINAL Second Berth Progress

SYDNEY MARINE TERMINAL Second Berth Progress SYDNEY MARINE TERMINAL Second Berth Progress Second Berth - Project Proponents Second Berth - Project Partners Second Berth - Key Stakeholder Second Berth Project Components New Second Berth: 1 2 Main

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

US82 ROCKFALL MITIGATION PROJECT May, BY Mohammed Ghweir Engineering Geologist Geotechnical Design Section New Mexico DOT

US82 ROCKFALL MITIGATION PROJECT May, BY Mohammed Ghweir Engineering Geologist Geotechnical Design Section New Mexico DOT US82 ROCKFALL MITIGATION PROJECT May, 2009 BY Mohammed Ghweir Engineering Geologist Geotechnical Design Section New Mexico DOT SACRAMENTO MTS Rock Fall Signs Back Ground US82 Connects the Town of Alamogordo,

More information

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills Construction over Mine Spoil Fills Wayne A. Karem, PhD, PE, PG, D.GE 2014 KSPE Annual Conference Background Strip mining; mountaintop and contour mining Creates huge quantities of mine spoil The mine spoil

More information

THE WILDLIFE SOCIETY CONFERENCE 2015

THE WILDLIFE SOCIETY CONFERENCE 2015 THE WILDLIFE SOCIETY CONFERENCE 2015 Evaluation of Desert Tortoise Habitat Suitability Model Predictions in the Soda Mountain Area, San Bernardino County Susanne Heim Introduction Overview of Species Habitat

More information

Coal Mining Methods. Underground Mining. Longwall & Room and Pillar Mining. Fig. 1: Longwall Mining

Coal Mining Methods. Underground Mining. Longwall & Room and Pillar Mining. Fig. 1: Longwall Mining Coal Mining Methods Underground Mining Longwall & Room and Pillar Mining Longwall mining and room-and-pillar mining are the two basic methods of mining coal underground, with room-and-pillar being the

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

EAS 664/4 Principle Structural Design

EAS 664/4 Principle Structural Design UNIVERSITI SAINS MALAYSIA 1 st. Semester Examination 2004/2005 Academic Session October 2004 EAS 664/4 Principle Structural Design Time : 3 hours Instruction to candidates: 1. Ensure that this paper contains

More information

Institutional Control Registry - Report

Institutional Control Registry - Report Institutional Control Registry - Report IC REGISTRY ICR # ICR - 01 Date of Acceptance May 11, 2009 Contact Lake Mine Cameco Corporation Cameco Corporation La Ronge 73-P-07 UTM-North 6141199 UTM-East 507983

More information

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation MAD345 - Mining II INTRODUCTION 10 October 2018 Course content MAD345 THEORY Date October, 10 October, 17 October, 24 October, 31 November, 7 November, 14 November, 21 Topic Introduction Prospecting, exploration

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Fluvial Driven Alluvial Fans

Fluvial Driven Alluvial Fans Fluvial Driven Alluvial Fans Restoration Project Evaluations - Examples from the Russian and Napa River Watersheds Mia Docto Masters Thesis UC Berkeley 1. Basic Fan Description 2. Fluvial Driven Fan Characteristics

More information

DIRECTORY OF COAL MINES IN ILLINOIS

DIRECTORY OF COAL MINES IN ILLINOIS DIRECTORY OF COAL MINES IN ILLINOIS Champaign County This directory accompanies the Illinois Coal Mines map or maps for this County. August 2018 Prairie Research Institute Illinois State Geological Survey

More information

4.12 Mineral Resources

4.12 Mineral Resources 4.12.1 Setting Section 2.2, Project Location, provides general information about the Project s regional and local setting. This Section 4.12.1 provides setting information specific to mineral resources.

More information

Module 9 : Foundation on rocks. Content

Module 9 : Foundation on rocks. Content FOUNDATION ON ROCKS Content 9.1 INTRODUCTION 9.2 FOUNDATION TYPES ON ROCKS 9.3 BEARING CAPCITY- SHALLOW FOUNDATION 9.3.1 Ultimate bearing capacity 9.3.2 Safe bearing pressure 9.3.3 Estimation of bearing

More information

Early Exploration Plan Activity Information

Early Exploration Plan Activity Information Early Exploration Plan Activity Information Activities That Require an Early Exploration Plan: Line cutting that is a width of 1.5 metres or less; Geophysical surveys on the ground requiring the use of

More information

NZQA unit standard New US6 to replace and version 1 Page 1 of 5

NZQA unit standard New US6 to replace and version 1 Page 1 of 5 Page 1 of 5 Title Demonstrate knowledge of mining methods, and analyse and select plant for metalliferous underground extraction Level 6 Credits 20 Purpose People credited with this unit standard are able

More information

Drilled Shafts for Bridge Foundation Stability Improvement: Ohio 833 Bridge over the Ohio River. Meigs County, Ohio Mason County, West Virginia

Drilled Shafts for Bridge Foundation Stability Improvement: Ohio 833 Bridge over the Ohio River. Meigs County, Ohio Mason County, West Virginia Drilled Shafts for Bridge Foundation Stability Improvement: Ohio 833 Bridge over the Ohio River Meigs County, Ohio Mason County, West Virginia By Stan Harris, P.E. and Eric Kistner, P.E. FMSM Engineers

More information

16. Mining-induced surface subsidence

16. Mining-induced surface subsidence 16. Mining-induced surface subsidence 16.1 Types and effects of mining-induced subsidence Subsidence - Lowering of the ground surface following underground extraction of an orebody. - Types: continuous

More information

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along

More information

Determination of the transition point from open pit to underground mining

Determination of the transition point from open pit to underground mining Determination of the transition point from open pit to underground mining Strategic Mine planning and Optimisation for Combination Mining Method J Chung, M Asad, E Topal, AK Ghosh Department of Mining

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

Module/Unit: Landforms Grade Level: Fifth

Module/Unit: Landforms Grade Level: Fifth Module/Unit: Landforms Grade Level: Fifth PA Academic Standards for Science and Technology and Environment and Ecology: 3.1.7.B Describe the use of models as an application or scientific or technological

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

DIRECTORY OF COAL MINES IN ILLINOIS

DIRECTORY OF COAL MINES IN ILLINOIS DIRECTORY OF COAL MINES IN ILLINOIS Hamilton County This directory accompanies the Illinois Coal Mines map or maps for this County. August 2017 Prairie Research Institute Illinois State Geological Survey

More information

Preliminaries to Erosion: Weathering and Mass Wasting

Preliminaries to Erosion: Weathering and Mass Wasting Preliminaries to Erosion: Weathering & Mass Wasting All things deteriorate in time. Virgil 1 Preliminaries to Erosion: Weathering and Mass Wasting Denudation The Impact of Weathering and Mass Wasting on

More information

Essential Questions. What is erosion? What is mass wasting?

Essential Questions. What is erosion? What is mass wasting? Erosion Essential Questions What is erosion? What is mass wasting? What is Erosion? Erosion The transportation of sediment from one area to another Caused mainly by running water but also caused by glaciers,

More information

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units June 26, 2007: Low Impact Development 1 Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 24, 2012 How & Where does infiltration work? Summary of

More information

APPENDIX G APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE

APPENDIX G APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE March 18, 2003 This page left blank intentionally. March 18, 2003 G-2 FIGURES Page # Figure G.1 Estimated Runoff from Precipitation Over Different

More information

Introduction 3. Basic Mine Fill Materials 13

Introduction 3. Basic Mine Fill Materials 13 C O N T E N T S 1 Introduction 3 2 1.1 Preamble... 3 1.2 Why mine fill?... 3 1.2.1 Ensuring long-term regional stability... 4 1.2.2 Limiting excavation exposure... 5 1.2.3 Waste disposal... 6 1.3 Considerations

More information

Landslide Hazards: A Stealth Threat to the Nation

Landslide Hazards: A Stealth Threat to the Nation Landslide Hazards: A Stealth Threat to the Nation Sponsored by the Geological Society of America Association of Environmental & Engineering Geologists American Society of Civil Engineers In Cooperation

More information

Strong Weighting Events in Shallow Multi-seam Longwall Mining

Strong Weighting Events in Shallow Multi-seam Longwall Mining University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2018 Strong Weighting Events in Shallow Multi-seam Longwall Mining Weibing Zhu China

More information

DIRECTORY OF COAL MINES IN ILLINOIS

DIRECTORY OF COAL MINES IN ILLINOIS DIRECTORY OF COAL MINES IN ILLINOIS Pope County This directory accompanies the Illinois Coal Mines map or maps for this County. August 2018 Prairie Research Institute Illinois State Geological Survey 615

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 27, 2017 Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

Geology and the Aggregate Industry: The Role of Geologists

Geology and the Aggregate Industry: The Role of Geologists Geology and the Aggregate Industry: The Role of Geologists Donald G. Mikulic Illinois State Geological Survey Prairie Research Institute University of Illinois at Urbana-Champaign Outline Importance of

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

LENK, BERNESE ALPS, CH

LENK, BERNESE ALPS, CH Debris Flow & Shallow Landslide Protection LENK, BERNESE ALPS, CH LENK, BERNESE ALPS Debris Flow & Shallow Landslide Protection Project Lenk, Bernese Alps Zip code 3775 Place Lenk Seiten Country/Region

More information

Mass Wasting. Requirements for Mass Wasting. Slope Stability. Geol 104: mass wasting

Mass Wasting. Requirements for Mass Wasting. Slope Stability. Geol 104: mass wasting Mass Wasting Movement of earth materials downslope, driven by Gravitational Forces. Landslides - general term for rock or soil movement. In U.S., on average, mass wasting causes 1 to 2 billion dollars

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

WATERCOURSE HARNESSING BANK EROSION AND CONSOLIDATION

WATERCOURSE HARNESSING BANK EROSION AND CONSOLIDATION GUVERNUL MINISTERUL POSDRU MUNCII, FAMILIEI ŞI WATERCOURSE HARNESSING BANK EROSION AND CONSOLIDATION PhD. student: ALUPOAE Daniel Gheorghe Asachi Technical University of Iasi, Faculty of Civil Engineering

More information

A STUDY ON THE BLASTING VIBRATION CONTROL OF CREEP MASS HIGH SLOPE

A STUDY ON THE BLASTING VIBRATION CONTROL OF CREEP MASS HIGH SLOPE A STUDY ON THE BLASTING VIBRATION CONTROL OF CREEP MASS HIGH SLOPE CEN Li, JIANG Cang-ru School of Civil Engineering & Architecture, Wuhan University of Technology, Wuhan 430070, P.R.China Email: myfqp@tom.com

More information

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reduce sediment production (watershed management); upstream sediment trapping; bypass

More information

a division of Teacher Created Materials

a division of Teacher Created Materials Sample Pages from a division of Teacher Created Materials Thanks for checking us out. Please call us at 877-777-3450 with questions or feedback, or to order this product. You can also order this product

More information

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario Prepared For: The Federal Bridge Corporation Limited SPL Project No.: 10001084 Report Date: January

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

MINERALOGY AND CHEMISTRY OF MINE WASTE ROCK PILES IN MINING DISTRICTS IN SOUTHERN COLORADO AND NEW MEXICO

MINERALOGY AND CHEMISTRY OF MINE WASTE ROCK PILES IN MINING DISTRICTS IN SOUTHERN COLORADO AND NEW MEXICO MINERALOGY AND CHEMISTRY OF MINE WASTE ROCK PILES IN MINING DISTRICTS IN SOUTHERN COLORADO AND NEW MEXICO Virginia T. McLemore and Marcus Silva New Mexico Bureau of Geology and Mineral Resources, New Mexico

More information

THE ROLE OF STRUCTURAL RELIABILITY OF GEOTECHNICAL BARRIERS OF AN HLW/SF REPOSITORY IN SALT ROCK WITHIN THE SAFETY CASE

THE ROLE OF STRUCTURAL RELIABILITY OF GEOTECHNICAL BARRIERS OF AN HLW/SF REPOSITORY IN SALT ROCK WITHIN THE SAFETY CASE THE ROLE OF STRUCTURAL RELIABILITY OF GEOTECHNICAL BARRIERS OF AN HLW/SF REPOSITORY IN SALT ROCK WITHIN THE SAFETY CASE N. Müller-Hoeppe, M. Jobmann, M. Polster, H. Schmidt DBE TECHNOLOGY GmbH SAFETY CASES

More information

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

Best Management Practices for Coldwater Fisheries Enhancement and Restoration Best Management Practices for Coldwater Fisheries Enhancement and Restoration MACC Annual Environmental Conference 2017 March 3, 2017 Tim Dexter, MassDOT Highway Division 1 Leading the Nation in Transportation

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

Countermeasure Calculations and Design

Countermeasure Calculations and Design Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,

More information

VDOT Staunton District

VDOT Staunton District Geotechnical Design Parameters for Retaining Walls, Sound Barrier Walls and Non-Critical Slopes VDOT Staunton District Staunton Materials Section Virginia Department of Transportation July 5, 2011 Revised

More information

Shoreline and Climate Change Adaptation Alternatives for The Letter Parcel, Bolinas Lagoon

Shoreline and Climate Change Adaptation Alternatives for The Letter Parcel, Bolinas Lagoon Shoreline and Climate Change Adaptation Alternatives for The Letter Parcel, Bolinas Lagoon Scenic shoreline vista of Bolinas Lagoon and ridges, from Letter Parcel, March 2016 Peter Baye, Coastal Ecologist

More information

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reforestation/revegetation; upstream sediment trapping; bypass channel/tunnel; reservoir

More information

Piles & Chalk. Lessons Learnt the Hard Way

Piles & Chalk. Lessons Learnt the Hard Way Piles & Chalk Lessons Learnt the Hard Way What is Chalk? White Pure Soft & friable What is Chalk? But Can be brown, red, green or grey Can contain clays and other minerals Varies in strength from soft

More information

CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository

CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository T. Son Nguyen Geoscience Specialist Brugg, Switzerland May 13, 2016 e-doc 4972224 nuclearsafety.gc.ca Content Ontario Power Generation

More information

DIRECTORY OF COAL MINES IN ILLINOIS

DIRECTORY OF COAL MINES IN ILLINOIS DIRECTORY OF COAL MINES IN ILLINOIS Marion County This directory accompanies the Illinois Coal Mines map or maps for this County. August 2018 Prairie Research Institute Illinois State Geological Survey

More information

9/13/2011 CHAPTER 9 AND SUBSIDENCE. Case History: La Conchita Landslide. Introduction

9/13/2011 CHAPTER 9 AND SUBSIDENCE. Case History: La Conchita Landslide. Introduction CHAPTER 9 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE Case History: La Conchita Landslide La Conchita: small coastal community 80 km (50 mi) northwest of Los Angeles Landslide occurred on January 10, 2005

More information

Provincial Standards for Early Exploration

Provincial Standards for Early Exploration Introduction Provincial Standards for Early Exploration Effective April 10, 2018 These Provincial Standards have been developed as part of the implementation of the graduated regulatory regime for early

More information

TREASURE EXCAVATION MANAGEMENT PLAN. PREPARED FOR: MPE INC. PO BOX 2429 PARK CITY, UTAH

TREASURE EXCAVATION MANAGEMENT PLAN. PREPARED FOR: MPE INC. PO BOX 2429 PARK CITY, UTAH TREASURE EXCAVATION MANAGEMENT PLAN PREPARED FOR: MPE INC. PO BOX 2429 PARK CITY, UTAH 84060 psbro23@mac.com December 15, 2008 December 15, 2008 Park City Municipal Corporation Planning Commission P.O.

More information

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 Regional Workshop on Volcanic, Seismic, and Tsunami Hazard Assessment Related to NPP Siting Activities and

More information

July 2, Re: Governor Mine: Review of geological data and field reconnaissance, TerraMins Project No

July 2, Re: Governor Mine: Review of geological data and field reconnaissance, TerraMins Project No July 2, 2014 T. A. Bishara Century 21 Bright Horizons 3110 E. Garvey Ave. S. West Covina, CA 91791 Re: Governor Mine: Review of geological data and field reconnaissance, Dear Mr. Bishara, This letter is

More information

Logistics and Performance of a Large-Diameter Crossover TBM for the Akron Ohio Canal Interceptor Tunnel

Logistics and Performance of a Large-Diameter Crossover TBM for the Akron Ohio Canal Interceptor Tunnel Logistics and Performance of a Large-Diameter Crossover TBM for the Akron Ohio Canal Interceptor Tunnel Pablo Salazar Robbins Connor Maxon Kenny-Obayashi JV ABSTRACT: The Ohio Canal Interceptor Tunnel

More information

Four Mile Run Levee Corridor Stream Restoration

Four Mile Run Levee Corridor Stream Restoration Four Mile Run Levee Corridor Stream Restoration 30% Design Summary U.S. Army Corps of Engineers, Baltimore District Presentation Outline Four Mile Run 1.) Historic Perspective 2.) Existing Conditions 3.)

More information

Deep Mill Level Zone, PT Freeport Indonesia From Feasibility to Production. May 2016

Deep Mill Level Zone, PT Freeport Indonesia From Feasibility to Production. May 2016 Deep Mill Level Zone, PT Freeport Indonesia From Feasibility to Production May 2016 Contents Location and Topography Geology and History Reserves and Strategic Timing Timeline/Mine Overview Conveyor Decline

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Haulage Drift Stability Analysis- A Sensitivity Approach

Haulage Drift Stability Analysis- A Sensitivity Approach Haulage Drift Stability Analysis- A Sensitivity Approach W. Abdellah University of Assiut, Assiut, Egypt ABSTRACT Haulage drifts are the primary access to the mining blocks of an ore body in a multi-level

More information

EXAMINATION PAPER MEMORANDUM

EXAMINATION PAPER MEMORANDUM EXAMINATION PAPER MEMORANDUM SUBJECT: CERTIFICATE IN ROCK MECHANICS PAPER 3.1 : HARD ROCK TABULAR EXAMINER: PJ LE ROUX SUBJECT CODE: COMRMC EXAMINATION DATE: MAY 2015 TIME: MODERATOR: WM BESTER TOTAL MARKS:

More information

9/23/2013. Introduction CHAPTER 7 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE. Case History: La Conchita Landslide

9/23/2013. Introduction CHAPTER 7 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE. Case History: La Conchita Landslide Introduction CHAPTER 7 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE Landslide and other ground failures posting substantial damage and loss of life In U.S., average 25 50 deaths; damage more than $3.5 billion

More information

ENGINEERING GEOLOGY AND ROCK ENGINEERING

ENGINEERING GEOLOGY AND ROCK ENGINEERING 1 ENGINEERING GEOLOGY AND ROCK ENGINEERING HANDBOOK NO. 2 Norwegian Group for Rock Mechanics (NBG) www.bergmekanikk.com Prepared in co-operation with Norwegian Tunnelling Society (NFF) Issued in 2000 SECRETARIAT:

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Microclimate Effects from Closing Abandoned Mines with Culvert Bat Gates

Microclimate Effects from Closing Abandoned Mines with Culvert Bat Gates University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln U.S. Bureau of Land Management Papers U.S. Department of the Interior 2005 Microclimate Effects from Closing Abandoned Mines

More information

ROSE OF DENMARK MINE RE-DEVELOPMENT COMMENCES

ROSE OF DENMARK MINE RE-DEVELOPMENT COMMENCES Friday, 1 October 2010 ROSE OF DENMARK MINE RE-DEVELOPMENT COMMENCES Redevelopment of Key Regional target Rose of Denmark Mine Rose of Denmark is a High Grade shallow depth opportunity Multiple samples

More information

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY EXECUTIVE SUMMARY This report presents the results of a program of further research into the use of a combined approach of numerical and centrifuge modeling in assessing the stability of deep open pit

More information

Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario

Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario September 6 REPORT ON Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario Submitted to: Claridge Homes Corporation - Gladstone Avenue Ottawa, ON KP Y6 REPORT Report Number:

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

The Velenje mining method

The Velenje mining method The Velenje mining method The Velenje mining method Introduction Velenje Coal Mine is a technologically highly-developed company, strongly integrated in the Slovenian energy industry and environment with

More information

Entrance exam Master Course

Entrance exam Master Course - 1 - Guidelines for completion of test: On each page, fill in your name and your application code Each question has four answers while only one answer is correct. o Marked correct answer means 4 points

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

GERMAN MILITARY GEOLOGY:

GERMAN MILITARY GEOLOGY: GERMAN MILITARY GEOLOGY: BETWEEN THE WARS BY J. David Rogers and Gary Bonham Evaluating Crater Effects Dependent on projectile, objective, rock, and the effect produced. Swamp and Moor Deep penetration

More information

GB3 (Revised): Rock Cut Slope and Catchment Design

GB3 (Revised): Rock Cut Slope and Catchment Design Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director GB3 (Revised): Rock Cut Slope and Catchment Design Steve Taliaferro, P.E., OGE April 19, 2011 TYPICAL TEMPLATE CUT DESIGN

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

Geology, Soils, and Seismicity

Geology, Soils, and Seismicity Section 3.8 Geology, Soils, and Seismicity Introduction This section generally evaluates the effects of the alternatives analyzed in this Supplemental DEIS with regard to geology, soils and seismicity.

More information

Topic 6: Weathering, Erosion and Erosional-Deposition Systems (workbook p ) Workbook Chapter 4, 5 WEATHERING

Topic 6: Weathering, Erosion and Erosional-Deposition Systems (workbook p ) Workbook Chapter 4, 5 WEATHERING Topic 6: Weathering, Erosion and Erosional-Deposition Systems (workbook p. 95-125) Workbook Chapter 4, 5 THE BIG PICTURE: Weathering, erosion and deposition are processes that cause changes to rock material

More information

Introduction and Background

Introduction and Background Introduction and Background Itasca Consulting Group, Inc. (Itasca) has been participating in the geomechanical design of the underground 118-Zone at the Capstone Minto Mine (Minto) in the Yukon, in northwestern

More information