1 6.3C BICYCLE STUDY PRIORITIES PAGE 6 Appendix C Complete Bicycle Network Project Prioritization This appendix provides a prioritized list of proposed bicycle facilities within each of the municipalities covered by the bikesheds developed for the Bottineau LRT / Metro Blue Line Extension Bicycle Study. Municipalities are included that do not lie along the Bottineau LRT corridor as the bikesheds extend beyond the corridor. IDENTIFYING PROJECTS FOR PRIORITIZATION For the purposes of the prioritization process, the proposed network needs to be divided into distinct projects. The following are the proposed criteria for distinguishing projects. Criteria Include facilities that are planned by city or county or park agencies, or proposed by this study. Exclude projects that do not touch a bikeshed. In some areas of limited network connectivity, a facility outside of the bikeshed is included as a critical link to close a small gap that would otherwise be left in the proposed network. All facilities proposed on a street or corridor will be considered one project (e.g., bike lanes and a trail proposed for one street). Projects will be split by municipality regardless of who is responsible for the roadway or right of way. Proposed facilities that fill gaps in a network corridor will be considered one project, rather than separate projects. Proposed facilities of the same or different types will be grouped as one project if the facilities are dependent on each other to fully close a gap in the network or reach a destination. PRIORITIZATION CRITERIA Projects identified in the study are ranked and prioritized corridor wide and by municipality using the following criteria in Figure 1. The criteria prioritize projects which create direct connections to proposed LRT stations, improve corridors with a history of bicycle crashes, fill small gaps, as well as connecting jobs, residents, and zero-car households. Proximity to LRT station was calculated using a spatial join. The number of bicycle crashes per mile was calculated by count of crashes along the project corridor. Data on zero car households was collected from the 2013 Census block group level within a 500-foot buffer of project corridors. Similarly, data on residents was collected from the 2010 Census block level and jobs data was collected from the 2013 Census Longitudinal Employer-Household Dynamics (LEHD) program dataset within a 500-foot buffer of projects. To normalize projects of varying distance, the number of residents and jobs was calculated per project mile. The specific metric scores for each project are calculated relative to all projects, not in absolute terms. The data for each metric is aggregated into percentile terms ranging from 0 (lowest) to 10 (highest) among all projects, signifying the relative standing of each project in the LRT corridor. Nelson\Nygaard Consulting Associates Inc. 1
2 6.3C BICYCLE STUDY PRIORITIES PAGE 7 Figure 1 Prioritization Criteria Criteria Notes Value Weighting Is the project located close to an LRT station? Does the project create a direct connection to an LRT station? Does the project address a known safety concern? How many zero car households does the project serve? How many employees and residents does the project serve? Does the project directly serve schools and libraries? Does the project improve connections to the regional trail network and the Metropolitan Council s regional bicycle transportation network? Proximity to LRT station point in GIS Connection to an LRT station Yes = 15 No = 0 Bicycles crashes per mile Assigned zero car households to each project based on adjacent blocks Assigned jobs to each project based on LEHD data points; assigned population to each project based on adjacent blocks Known schools and libraries per mile Proximity to trail or bicycle transportation network segment in GIS PRIORITIZED PROJECTS BY MUNICIPALITY Projects ranked on a scale of 0 to 10 based on employment density (jobs + population per mile) The following pages illustrate prioritized project maps and prioritization scores for all projects in each municipality. Projects are uniquely colored to illustrate project limits only, and do not symbolize additional information for the following municipalities. Values displayed in the tables represent project scores for each criteria category as described in Figure 1. A complete table of the overall project ranks follows. 30% 5% 5% Nelson\Nygaard Consulting Associates Inc. 2
3 Brooklyn Park Figure 4 Brooklyn Park Project Priority Map (North) Projects are uniquely colored to illustrate project limits only, and do not symbolize additional information. Nelson\Nygaard Consulting Associates Inc C BICYCLE STUDY PRIORITIES PAGE 8
4 Figure 5 Brooklyn Park Project Priority Map (South) Projects are uniquely colored to illustrate project limits only, and do not symbolize additional information. Nelson\Nygaard Consulting Associates Inc C BICYCLE STUDY PRIORITIES PAGE 9
5 6.3C BICYCLE STUDY PRIORITIES PAGE 10 Figure 6 Brooklyn Park Project Prioritization Local Rank Project Number Municipality Project Location LRT Station Distance Crashes per Mile LRT Station Connection Zero Car Households Population and Jobs Served per Mile Schools and Libraries Trail Connections Brooklyn Park Brooklyn Blvd Brooklyn Park 85th Ave Brooklyn Park West Broadway Brooklyn Park 63rd Ave Brooklyn Park Crystal Lake Regional Trail Brooklyn Park 63rd Ave Brooklyn Park 68th Ave Brooklyn Park Zane Ave to Douglas Dr Brooklyn Park 93rd Ave Brooklyn Park Shingle Creek Dr South Brooklyn Park Maplebrook Ter Brooklyn Park 63rd Ave Brooklyn Park Yates Ave Brooklyn Park 73rd Ave Brooklyn Park Candlewood Dr Brooklyn Park 73rd Ave Brooklyn Park Zane Ave Brooklyn Park West Broadway Brooklyn Park West Broadway Ave Brooklyn Park Brookdale Dr Brooklyn Park Kentucky Ave Brooklyn Park Boone Ave Brooklyn Park Edinbrook Ter Brooklyn Park 65th Ave Brooklyn Park West of Shingle Creek Dr Brooklyn Park Hampshire Ave to Douglas Dr Brooklyn Park Regent Ave Brooklyn Park Wyoming Ave Brooklyn Park West Broadway Brooklyn Park 73rd Ave Brooklyn Park Georgia Ave Brooklyn Park Brooklyn Blvd Note: Values represent scores for each prioritization criteria. See Figure 1 for scoring details. Total Nelson\Nygaard Consulting Associates Inc. 7
6 6.3C BICYCLE STUDY PRIORITIES PAGE 11 Figure 6 Brooklyn Park Project Prioritization (Continued) Local Rank Project Number Municipality Project Location LRT Station Distance Crashes per Mile LRT Station Connection Zero Car Households Population and Jobs Served per Mile Schools and Libraries Trail Connections Brooklyn Park Northeast of College Pkwy Brooklyn Park 74th Ave to Unity Ave Brooklyn Park Idaho Ave Brooklyn Park Setzler Pkwy Brooklyn Park 89th Ave Brooklyn Park Tessman Pkwy Brooklyn Park 73rd Ave Brooklyn Park Winnetka Ave Brooklyn Park East of Boone Ave Trail Brooklyn Park Hampshire Ct Brooklyn Park 93rd Ave Brooklyn Park Douglas Dr Brooklyn Park 83rd Ave to Lad Pkwy Brooklyn Park Hamilton Park Brooklyn Park Xylon Ave Brooklyn Park Tessman Pkwy to Neddersen Pkwy Brooklyn Park Noble Ave Brooklyn Park North of Tessman Ter Brooklyn Park Jefferson Highway Brooklyn Park Shingle Creek Dr Brooklyn Park 101st Ave Brooklyn Park Modern Rd Brooklyn Park Regent Ave to Brooklyn Blvd Brooklyn Park Regent Pkwy Brooklyn Park Winnetka Ave Brooklyn Park 93rd Ave to Pearson Pkwy Brooklyn Park Hampshire Ave Brooklyn Park Xerxes Ave to 74th Ave Brooklyn Park 79th Ave to East Brooklyn Park Cherokee Dr Brooklyn Park Founders Pkwy Brooklyn Park Noble Parkway Note: Values represent scores for each prioritization criteria. See Figure 1 for scoring details. Total Nelson\Nygaard Consulting Associates Inc. 8
7 6.3C BICYCLE STUDY PRIORITIES PAGE 12 Figure 6 Brooklyn Park Project Prioritization (Continued) Local Rank Project Number Municipality Project Location LRT Station Distance Crashes per Mile LRT Station Connection Zero Car Households Population and Jobs Served per Mile Schools and Libraries Trail Connections Brooklyn Park 73rd Ave to Winnetka Ave Brooklyn Park 83rd Ave Brooklyn Park 109th Ave Brooklyn Park 101st Ave Brooklyn Park Edinbrook Pkwy Brooklyn Park Hampshire Ave Brooklyn Park Noble Ave Brooklyn Park Douglas Dr Brooklyn Park Douglas Dr to Regent Pkwy Brooklyn Park Fallgold Pkwy to 94th Ave Brooklyn Park East of Douglas Dr Brooklyn Park 107th Ave to Oxbow Creek Dr Brooklyn Park Inverness Cir Brooklyn Park Edinbrook Ter Brooklyn Park Noble Ave to Brooklyn Blvd Brooklyn Park 81st Ave Brooklyn Park Regent Ave Brooklyn Park 93rd Ave to Windsor Ter Brooklyn Park Regent Ave Brooklyn Park Idaho Ave Brooklyn Park 75th Ave to June Ave Brooklyn Park Kings Ter Brooklyn Park Bass Creek Park Trail Brooklyn Park Edinbrook Ter Brooklyn Park 109th Ave Brooklyn Park 73rd Ave Brooklyn Park Regent Ave to Noble Ave Brooklyn Park Jersey Dr Brooklyn Park 99th Ave Brooklyn Park Bass Creek Park Trail Brooklyn Park 109th Ave to Oxbow Creek Dr Note: Values represent scores for each prioritization criteria. See Figure 1 for scoring details. Total Nelson\Nygaard Consulting Associates Inc. 9
Southwest Light Rail Transit Bicycle Facility Assessment Technical Memorandum #3 Prioritization. July 23, P age
Southwest Light Rail Transit Bicycle Facility Assessment Technical Memorandum 3 Prioritization July 23, 2015 1 P age Contents Introduction... 3 Project Definition... 3 Prioritization Criteria and Data
More information3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS
3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS In order to better determine future roadway expansion and connectivity needs, future population growth and land development patterns were analyzed as part of
More informationTRAFFIC FORECAST METHODOLOGY
CHAPTER 5 TRAFFIC FORECAST METHODOLOGY Introduction Need for County-Level Traffic Forecasting 2030 HC-TSP Model Methodology Model Calibration Future Traffic Forecasts Hennepin County Transportation Systems
More informationNJDOT Pedestrian Safety Analysis Tool 2015 GIS T Conference
NJDOT Pedestrian Safety Analysis Tool 2015 GIS T Conference NJDOT Pedestrian Safety Analysis Tool Justin Furch GIT Department Manager Michael Baker International Pedestrian Safety in NJ: Has the highest
More informationDown East RPO. Strategic Prioritization Office of Transportation Local Input Point Assignment Methodology. Introduction
Down East RPO Introduction Strategic Prioritization Office of Transportation Local Input Point Assignment Methodology The Down East Rural Planning Organization (DERPO) is required by state law to develop
More informationACCESSIBILITY OF INTERMODAL CENTERS STUDY
ACCESSIBILITY OF INTERMODAL CENTERS STUDY Presentation for VDOT Forum - Coordinating Transportation Planning and Land Use Wednesday, April 2, 2014 Vlad Gavrilovic, AICP - Renaissance Planning Group Tasks
More informationTechnical Memorandum #2 Future Conditions
Technical Memorandum #2 Future Conditions To: Dan Farnsworth Transportation Planner Fargo-Moorhead Metro Council of Governments From: Rick Gunderson, PE Josh Hinds PE, PTOE Houston Engineering, Inc. Subject:
More informationPrepared for: San Diego Association Of Governments 401 B Street, Suite 800 San Diego, California 92101
Activity-Based Travel Model Validation for 2012 Using Series 13 Data: Coordinated Travel Regional Activity Based Modeling Platform (CT-RAMP) for San Diego County Prepared for: San Diego Association Of
More informationNon-Motorized Traffic Exploratory Analysis
Non-Motorized Traffic Exploratory Analysis --------------------------------------------------------------- Chao Wu Advisor: Professor Greg Lindsey Humphrey School of Public Affairs University of Minnesota
More informationGIS Analysis of Crenshaw/LAX Line
PDD 631 Geographic Information Systems for Public Policy, Planning & Development GIS Analysis of Crenshaw/LAX Line Biying Zhao 6679361256 Professor Barry Waite and Bonnie Shrewsbury May 12 th, 2015 Introduction
More informationRegional Transit Development Plan Strategic Corridors Analysis. Employment Access and Commuting Patterns Analysis. (Draft)
Regional Transit Development Plan Strategic Corridors Analysis Employment Access and Commuting Patterns Analysis (Draft) April 2010 Contents 1.0 INTRODUCTION... 4 1.1 Overview and Data Sources... 4 1.2
More informationTravel Demand Management Plan
Travel Demand Management Plan Tryg s & Apartment Building 8 West Lake Street Minneapolis, MN AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mr. Johnny Carlson Trammell Crow Chicago Development, Inc. 5 South
More informationUpdating the Urban Boundary and Functional Classification of New Jersey Roadways using 2010 Census data
Updating the Urban Boundary and Functional Classification of New Jersey Roadways using 2010 Census data By: Glenn Locke, GISP, PMP 1 GIS-T May, 2013 Presentation Overview Purpose of Project Methodology
More informationNeighborhood Locations and Amenities
University of Maryland School of Architecture, Planning and Preservation Fall, 2014 Neighborhood Locations and Amenities Authors: Cole Greene Jacob Johnson Maha Tariq Under the Supervision of: Dr. Chao
More informationBROOKINGS May
Appendix 1. Technical Methodology This study combines detailed data on transit systems, demographics, and employment to determine the accessibility of jobs via transit within and across the country s 100
More information2011 South Western Region Travel Time Monitoring Program Congestion Management Process. Executive Summary
2011 South Western Region Travel Monitoring Program Executive Summary Prepared by: South Western Regional Planning Agency 888 Washington Blvd, 3rd Floor Stamford, CT 06901 Telephone: 203.6.5190 Facsimile:
More informationHow GIS Can Help With Tribal Safety Planning
How GIS Can Help With Tribal Safety Planning Thomas A. Horan, PhD Brian Hilton, PhD Arman Majidi, MAIS Center for Information Systems and Technology Claremont Graduate University Goals & Objectives This
More informationEast Bay BRT. Planning for Bus Rapid Transit
East Bay BRT Planning for Bus Rapid Transit Regional Vision Draper Prison The Bottleneck is a State-Level issue, Salt Lake County 2050 Population: 1.5M Draper Prison hopefully with some State-Level funding!
More informationSusan Clark NRS 509 Nov. 29, 2005
Susan Clark NRS 509 Nov. 29, 2005 The original intent of this project was to look at the role of GIS in the inventory of bicycle and pedestrian facilities. The research, however, indicates a different
More informationAPPENDIX IV MODELLING
APPENDIX IV MODELLING Kingston Transportation Master Plan Final Report, July 2004 Appendix IV: Modelling i TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 OBJECTIVE... 1 3.0 URBAN TRANSPORTATION MODELLING
More informationHigh Speed / Commuter Rail Suitability Analysis For Central And Southern Arizona
High Speed / Commuter Rail Suitability Analysis For Central And Southern Arizona Item Type Reports (Electronic) Authors Deveney, Matthew R. Publisher The University of Arizona. Rights Copyright is held
More informationGIS BASED ANALYSIS OF EXPRESS VS LOCAL STATIONS ON SURROUNDING LAND USES IN NEW YORK CITY
GIS BASED ANALYSIS OF EXPRESS VS LOCAL STATIONS ON SURROUNDING LAND USES IN NEW YORK CITY GIS in Transit Conference, Washington D.C Date: September 2, 2015 1 Subrina Rahman Supervised by Dr. Candace Brakewood
More informationTransit Time Shed Analyzing Accessibility to Employment and Services
Transit Time Shed Analyzing Accessibility to Employment and Services presented by Ammar Naji, Liz Thompson and Abdulnaser Arafat Shimberg Center for Housing Studies at the University of Florida www.shimberg.ufl.edu
More informationCreating a Pavement Management System Using GIS
Christopher Castruita PPD 631 Prof. Barry Waite & Prof. Bonnie Shrewsbury Creating a Pavement Management System Using GIS Problem Definition As is the case with many cities, the city of La Cañada Flintridge
More informationIII. FORECASTED GROWTH
III. FORECASTED GROWTH In order to properly identify potential improvement projects that will be required for the transportation system in Milliken, it is important to first understand the nature and volume
More informationAppendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014
Appendix C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 CONTENTS List of Figures-... 3 List of Tables... 4 Introduction... 1 Application of the Lubbock Travel Demand
More informationStudy Overview. the nassau hub study. The Nassau Hub
Livable Communities through Sustainable Transportation the nassau hub study AlternativeS analysis / environmental impact statement The Nassau Hub Study Overview Nassau County has initiated the preparation
More informationAPPENDIX G Halton Region Transportation Model
APPENDIX G Halton Region Transportation Model Halton Region Transportation Master Plan Working Paper No. 1 - Legislative Context Working Paper No. 2 - Active Transportation Halton Transportation Model
More informationAlternatives Analysis
Alternatives Analysis Prepared for: Metropolitan Atlanta Rapid Transit Authority Prepared by: AECOM/Jacobs-JJG Joint Venture Atlanta, GA November 2012 Page Left Intentionally Blank ii TABLE OF CONTENTS
More informationTRAVEL DEMAND MODEL. Chapter 6
Chapter 6 TRAVEL DEMAND MODEL As a component of the Teller County Transportation Plan development, a computerized travel demand model was developed. The model was utilized for development of the Transportation
More informationCHAPTER 4: INVENTORY & LEVEL OF SERVICE ANALYSIS
CHAPTER 4: INVENTORY & LEVEL OF SERVICE ANALYSIS A. Introduction This section provides an overview and analysis of the parks, recreation, trails, and open space system in Cary, North Carolina. First, the
More informationAPPENDIX C-3 Equitable Target Areas (ETA) Technical Analysis Methodology
APPENDIX C-3 Equitable Target Areas (ETA) Technical Analysis Methodology Contents Introduction... 1 ETA Index Methodology... 1 ETA Index Development... 1 Other EJ Measures... 4 The Limited English Proficiency
More informationHennepin GIS. Tree Planting Priority Areas - Analysis Methodology. GIS Services April 2018 GOAL:
Hennepin GIS GIS Services April 2018 Tree Planting Priority Areas - Analysis Methodology GOAL: To create a GIS data layer that will aid Hennepin County Environment & Energy staff in determining where to
More informationBackground and Planning Context 1.1 INTRODUCTION 1.2 PROJECT LOCATION
Chapter 1: Background and Planning Context 1.1 INTRODUCTION Metro-North Commuter Railroad Company ( Metro-North or the Project Sponsor ) is proposing the construction of a new, expanded parking garage
More informationSTAR COMMUNITY RATING SYSTEM OBJECTIVE EE-4: EQUITABLE SERVICES & ACCESS COMMUNITY LEVEL OUTCOMES FOR KING COUNTY, WA
STAR COMMUNITY RATING SYSTEM OBJECTIVE EE-4: EQUITABLE SERVICES & ACCESS COMMUNITY LEVEL OUTCOMES FOR KING COUNTY, WA OUTCOME I: EQUITABLE ACCESS AND PROXIMITY Background: This analysis has been developed
More informationKing City URA 6D Concept Plan
King City URA 6D Concept Plan King City s Evolution Among the fastest growing cities 2000 Census 1,949 2010 Census 3,111 60% increase 2016 Census estimate 3,817 23% increase Average annual rate 4.3% Surpassing
More informationCrow River Plaza - Retail Development South Diamond Lake Rd. Rogers, MN FOR LEASE 1,024 SF Retail Space. Lease Rate: $16.
FEATURES: - Available in Rogers, MN Lease Rate: $16.00 / psf NNN - Excellent location with freeway signage on I-94! - Near large retailers such as Target, Kohls, & Applebees. Taxes $3.65 / psf Cam $3.20
More information6 th Line Municipal Class Environmental Assessment
6 th Line Municipal Class Environmental Assessment County Road 27 to St John s Road Town of Innisfil, ON September 6, 2016 APPENDIX L: TRAVEL DEMAND FORECASTING MEMORANDUM Accessible formats are available
More informationMapping Accessibility Over Time
Journal of Maps, 2006, 76-87 Mapping Accessibility Over Time AHMED EL-GENEIDY and DAVID LEVINSON University of Minnesota, 500 Pillsbury Drive S.E., Minneapolis, MN 55455, USA; geneidy@umn.edu (Received
More informationCrow River Plaza - Retail Development South Diamond Lake Rd. Rogers, MN FOR LEASE 2,066 SF Retail Space. Lease Rate: $16.
FEATURES: - 2,066 SF End Cap Retail Space Available in Rogers, MN - Excellent location with freeway signage on I-94! - Near large retailers such as Target, Kohls, & Applebees. - Convenient location off
More informationTO THE REPORT: A STRATEGIC PLAN TO REDUCE VEHICLE- ANIMAL ACCIDENTS IN NORTHEAST OHIO
ADDENDUM II TO THE REPORT: A STRATEGIC PLAN TO REDUCE VEHICLE- ANIMAL ACCIDENTS IN NORTHEAST OHIO The report A Strategic Plan to Reduce Vehicle-Animal Accidents in Northeast Ohio published June, 2009 1,
More informationDeveloping Built Environment Indicators for Urban Oregon. Dan Rubado, MPH EPHT Epidemiologist Oregon Public Health Division
Developing Built Environment Indicators for Urban Oregon Dan Rubado, MPH EPHT Epidemiologist Oregon Public Health Division What is the built environment? The built environment encompasses spaces and places
More informationForecasts for the Reston/Dulles Rail Corridor and Route 28 Corridor 2010 to 2050
George Mason University Center for Regional Analysis Forecasts for the Reston/Dulles Rail Corridor and Route 28 Corridor 21 to 25 Prepared for the Fairfax County Department of Planning and Zoning Lisa
More informationGIS for the Non-Expert
GIS for the Non-Expert Ann Forsyth University of Minnesota February 2006 GIS for the Non-Expert 1. Definitions and problems 2. Measures being tested in Twin Cities Walking Study Basic approach, data, variables
More informationAdvancing Transportation Performance Management and Metrics with Census Data
Advancing Transportation Performance Management and Metrics with Census Data Authors: Ivana Tasic, University of Utah, Department of Civil and Environmental Engineering, 110 Central Campus Drive, Salt
More informationHORIZON 2030: Land Use & Transportation November 2005
PROJECTS Land Use An important component of the Horizon transportation planning process involved reviewing the area s comprehensive land use plans to ensure consistency between them and the longrange transportation
More informationInformation for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project
Information for File # 2013-00531-MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Applicant: City of St. Louis Park Corps Contact: Melissa Jenny Address: U.S. Army Corps of Engineers Attn:
More informationAPPENDIX PHASE 1 GREEN INFRASTRUCTURE FRAMEWORK
APPENDIX PHASE 1 GREEN INFRASTRUCTURE FRAMEWORK KANSAS MISSOURI CONTENTS A DATA WISHLIST 4 B PRECEDENTS 7 C WORKSHOP MATERIALS 13 D ANALYSIS PROCESS 124 E ATLAS & PLAYBOOK DETAILS 156 F POLICY ANALYSIS
More informationUnderstanding Land Use and Walk Behavior in Utah
Understanding Land Use and Walk Behavior in Utah 15 th TRB National Transportation Planning Applications Conference Callie New GIS Analyst + Planner STUDY AREA STUDY AREA 11 statistical areas (2010 census)
More informationCom munity Advisor y C ommitte e Meeting
Community Advisor y Committee Meeting J u n e 1 5, 2 0 1 7 Project Scope 14 miles of enhanced service from Downtown Portland to Cleveland Park & Ride 41 Stations with 82 Platforms 1/3 mile approximate
More informationChapter 6. Fundamentals of GIS-Based Data Analysis for Decision Support. Table 6.1. Spatial Data Transformations by Geospatial Data Types
Chapter 6 Fundamentals of GIS-Based Data Analysis for Decision Support FROM: Points Lines Polygons Fields Table 6.1. Spatial Data Transformations by Geospatial Data Types TO: Points Lines Polygons Fields
More informationSpeakers: Jeff Price, Federal Transit Administration Linda Young, Center for Neighborhood Technology Sofia Becker, Center for Neighborhood Technology
Speakers: Jeff Price, Federal Transit Administration Linda Young, Center for Neighborhood Technology Sofia Becker, Center for Neighborhood Technology Peter Haas, Center for Neighborhood Technology Craig
More informationEllis County-Midlothian to Waxahachie Trail Corridor Research
Ellis County- to Trail Corridor Research The University of Texas at Arlington Program in Landscape Architecture, School of Architecture and The Institute of Urban Studies, The School of Urban and Public
More informationAPPENDIX C-6 - TRAFFIC MODELING REPORT, SRF CONSULTING GROUP
APPENDIX C-6 - TRAFFIC MODELING REPORT, SRF CONSULTING GROUP Scott County 2030 Comprehensive Plan Update Appendix C Scott County Traffic Model Final Report and Documentation March 2008 Prepared for: Scott
More informationCTR Employer Survey Report
CTR Employer Survey Report Thank you for completing your Commute Trip Reduction survey. This report contains the survey results. Employer Id : E10983 Employer : WA State Dept. of Enterprise Services Worksite
More informationAccess Across America: Transit 2017
Access Across America: Transit 2017 Final Report Prepared by: Andrew Owen Brendan Murphy Accessibility Observatory Center for Transportation Studies University of Minnesota CTS 18-12 1. Report No. CTS
More informationSouth Western Region Travel Time Monitoring Program Congestion Management Process Spring 2008 Report
South Western Region Travel Monitoring Program Congestion Management Process Spring 2008 Report Prepared by: South Western Regional Planning Agency 888 Washington Boulevard Stamford, CT 06901 Telephone:
More informationUnited Growth s Revitalizing Neighborhoods Indicator Project
United Growth s Revitalizing Neighborhoods Indicator Project Group Members: Prachi Kulkarni Mark O Neall Kent Harding Megan O Brien Paris Howard Blake Hamilton Kerry Hoo http://www.city-data.com/picfilesc/picc32475.php
More informationLOCAL GOVERNMENT ADMINISTRATION SERIES
Public Policy Research Center University of Missouri St. Louis LOCAL GOVERNMENT ADMINISTRATION SERIES ISSUE #3 MARCH 2017 THE GOVERNOR IN GOVERNANCE: KEEPING THE PACE by Mark Tranel, Director, Public Policy
More informationKnowledge claims in planning documents on land use and transport infrastructure impacts
Knowledge claims in planning documents on land use and transport infrastructure impacts Presentation at the Final Workshop of the research project "Innovations for sustainable public transport in Nordic
More informationAnalyzing the Market Share of Commuter Rail Stations using LEHD Data
Analyzing the Market Share of Commuter Rail Stations using LEHD Data Using Census Data for Transportation Applications Conference, Irvine, CA October 26, 2011 1. What is the size of Metrolink s commute
More informationCity of Hermosa Beach Beach Access and Parking Study. Submitted by. 600 Wilshire Blvd., Suite 1050 Los Angeles, CA
City of Hermosa Beach Beach Access and Parking Study Submitted by 600 Wilshire Blvd., Suite 1050 Los Angeles, CA 90017 213.261.3050 January 2015 TABLE OF CONTENTS Introduction to the Beach Access and Parking
More informationTREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review
More informationSensitivity of estimates of travel distance and travel time to street network data quality
Sensitivity of estimates of travel distance and travel time to street network data quality Paul Zandbergen Department of Geography University of New Mexico Outline Street network quality Approaches to
More informationAccess Across America: Transit 2016
Access Across America: Transit 2016 Final Report Prepared by: Andrew Owen Brendan Murphy Accessibility Observatory Center for Transportation Studies University of Minnesota David Levinson School of Civil
More informationIntercity Bus Stop Analysis
by Karalyn Clouser, Research Associate and David Kack, Director of the Small Urban and Rural Livability Center Western Transportation Institute College of Engineering Montana State University Report prepared
More informationTRANSPORTATION AND TRAFFIC ANALYSIS REPORT
Square One Drive Extension Municipal Class Environmental Assessment Environmental Study Report Appendix B Transportation and Traffic Analysis Report TRANSPORTATION AND TRAFFIC ANALYSIS REPORT FINAL DRAFT
More informationExpanding the GSATS Model Area into
Appendix A Expanding the GSATS Model Area into North Carolina Jluy, 2011 Table of Contents LONG-RANGE TRANSPORTATION PLAN UPDATE 1. Introduction... 1 1.1 Background... 1 1.2 Existing Northern Extent of
More informationCHAPTER 1 INTRODUCTION
CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION A. Project History The Southwest Warren County Transportation Study was initiated by local elected officials concerned about the area s burgeoning development
More informationCITY OF VESTAVIA HILLS
CITY OF VESTAVIA HILLS FLOODPLAIN MANAGEMENT PLAN FMPC Meeting #3 September 29, 2015 ORGANIZATION OF 2015 FMP 2015 Floodplain Management Plan Structure Chapter 1 Introduction Chapter 2 Community Profile
More informationMetro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles
Metro Emergency Security Operations Center (ESOC) 410 Center Street City of Los Angeles Traffic Study August 31, 2015 AECOM 515 South Flower Street, 4 th Floor Los Angeles, CA 90071 Job Number: 60323255
More informationIntroducing GIS analysis
1 Introducing GIS analysis GIS analysis lets you see patterns and relationships in your geographic data. The results of your analysis will give you insight into a place, help you focus your actions, or
More informationDensity and Walkable Communities
Density and Walkable Communities Reid Ewing Professor & Chair City and Metropolitan Planning University of Utah ewing@arch.utah.edu Department of City & Metropolitan Planning, University of Utah MRC Research
More informationCommittee Meeting November 6, 2018
Committee Meeting November 6, 2018 Agenda Where we are in the process Land Use Plan Transportation Element Housing & Neighborhoods Elements Next Steps Schedule November 6: Plan Elements December: Plan
More informationMarket Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management
Transportation Impact Analysis Market Street PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for TerraPointe Services, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc.
More informationPortland, Oregon P O R T L A N D O R E G O N. G O V / T R A N S P O R T A T I O N 1
Portland, Oregon P O R T L A N D O R E G O N. G O V / T R A N S P O R T A T I O N 1 Portland Christchurch Credit: Travel Portland P O R T L A N D O R E G O N. G O V / T R A N S P O R T A T I O N 2 Portland,
More information1600 Prairie Drive , FAX
Hennepin County Transportation Department Transportation Department 612-596-0300, Phone 1600 Prairie Drive 612-321-3410, FAX Medina, MN 55340-5421 www.hennepin.us December 30, 2015 Subject: Bottineau Boulevard
More informationTransportation Models and Data Initiative
New York Metropolitan Transportation Council The Metropolitan Planning Organization Transportation Models and Data Initiative Technical Memorandum Tasks 11.4 Development of Best Practice Regional Zone
More informationFHWA GIS Outreach Activities. Loveland, Colorado April 17, 2012
FHWA GIS Outreach Activities Loveland, Colorado April 17, 2012 GIS for Improved Decision Making FHWA believes that geographic information systems and other geospatial technologies (remote sensing and GPS)
More informationCRP 608 Winter 10 Class presentation February 04, Senior Research Associate Kirwan Institute for the Study of Race and Ethnicity
CRP 608 Winter 10 Class presentation February 04, 2010 SAMIR GAMBHIR SAMIR GAMBHIR Senior Research Associate Kirwan Institute for the Study of Race and Ethnicity Background Kirwan Institute Our work Using
More informationFigure 8.2a Variation of suburban character, transit access and pedestrian accessibility by TAZ label in the study area
Figure 8.2a Variation of suburban character, transit access and pedestrian accessibility by TAZ label in the study area Figure 8.2b Variation of suburban character, commercial residential balance and mix
More informationMAPPING THE RAINFALL EVENT FOR STORMWATER QUALITY CONTROL
Report No. K-TRAN: KU-03-1 FINAL REPORT MAPPING THE RAINFALL EVENT FOR STORMWATER QUALITY CONTROL C. Bryan Young The University of Kansas Lawrence, Kansas JULY 2006 K-TRAN A COOPERATIVE TRANSPORTATION
More informationMADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015
MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015 TABLE OF CONTENTS... 3 Proposed Development... 3 Methodology... 3 Phase 1 Development...
More informationSpatiotemporal Analysis of Commuting Patterns in Southern California Using ACS PUMS, CTPP and LODES
Spatiotemporal Analysis of Commuting Patterns in Southern California Using ACS PUMS, CTPP and LODES 2017 ACS Data Users Conference May 11-12, 2017 Alexandria, VA Jung Seo, Tom Vo, Frank Wen and Simon Choi
More informationDevelopment of Criteria to Identify Pedestrian High Crash Locations in Nevada
NDOT Research Report Report No: RDT04-048 Development of Criteria to Identify Pedestrian High Crash Locations in Nevada August 2004 Prepared by Research Division Nevada Department of Transportation 1263
More informationPublic Transit Accessibility vs. Employment: A Comparative Assessment of Counties/Cities in Northern Virginia
Public Transit Accessibility vs. Employment: A Comparative Assessment of in Northern Virginia MAJID KHALILIKHAH, Ph.D., E.I.T KEVIN HEASLIP, Ph.D., P.E. Why To Develop Public Transit Service? 2 Why To
More informationCreation of built environment indices
Creation of built environment indices Daniel A. Rodriguez, Ph.D Department of City and Regional Planning, University of North Carolina, Chapel Hill with Lawrence J. Frank, Ph.D. Department of Community
More informationCITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA
CITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA Location and Acreage Approximately 1,863 acres of land in San Patricio County, located in the ETJ northwest of the existing City Limits. Metes and
More informationCITY OF CAMBRIDGE Growth & Intensification Study Secondary Plan Stakeholder Session June 26th, 2017
CITY OF CAMBRIDGE Growth & Intensification Study Secondary Plan Stakeholder Session June 26th, 2017 Dillon Consulting Limited Watson & Associates Economists Curtis Planning Inc. Tim Welch Consulting Inc.
More informationThe paper is based on commuting flows between rural and urban areas. Why is this of
Commuting 1 The paper is based on commuting flows between rural and urban areas. Why is this of interest? Academically, extent of spread of urban agglomeration economies, also the nature of rural-urban
More informationApril 18, Accessibility and Smart Scale: Using Access Scores to Prioritize Projects
Accessibility and Smart Scale: Using Access Scores to Prioritize Projects April 18, 2017 Accessibility and Smart Scale: Using Access Scores to Prioritize Projects State Smart Transportation Initiative
More informationKeywords: Air Quality, Environmental Justice, Vehicle Emissions, Public Health, Monitoring Network
NOTICE: this is the author s version of a work that was accepted for publication in Transportation Research Part D: Transport and Environment. Changes resulting from the publishing process, such as peer
More informationInitial Findings from Regional Initiatives Planning Enhancement Fair Housing & Equity Assessment
NEW YORK AND CONNECTICUT SUSTAINABLE COMMUNITIES Initial Findings from Regional Initiatives Planning Enhancement Fair Housing & Equity Assessment July 30, 2013 White Plains Library Federal grant to improve
More informationAPPENDIX I: Traffic Forecasting Model and Assumptions
APPENDIX I: Traffic Forecasting Model and Assumptions Appendix I reports on the assumptions and traffic model specifications that were developed to support the Reaffirmation of the 2040 Long Range Plan.
More informationFINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005
FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005 Prepared For: EDAW, Inc. 1420 Kettner Boulevard, Suite 620
More informationGet Over, and Beyond, the Half-Mile Circle (for Some Transit Options)
Get Over, and Beyond, the Half-Mile Circle (for Some Transit Options) Arthur C. Nelson, Ph.D., FAICP Associate Dean for Research & Discovery College of Architecture, Planning and Landscape Architecture
More informationCity of Brainerd, Minnesota Snowplowing Policy
City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control
More informationUsing GIS to Identify Pedestrian- Vehicle Crash Hot Spots and Unsafe Bus Stops
Using GIS to Identify Pedestrian-Vehicle Crash Hot Spots and Unsafe Bus Stops Using GIS to Identify Pedestrian- Vehicle Crash Hot Spots and Unsafe Bus Stops Long Tien Truong and Sekhar V. C. Somenahalli
More informationA GIS TOUR OF DES MOINES PRESENTED BY ANNA WHIPPLE, GIS MANAGER APRIL 20, 2015
A GIS TOUR OF DES MOINES PRESENTED BY ANNA WHIPPLE, GIS MANAGER APRIL 20, 2015 Welcome to Des Moines! Capital of Iowa Among 100 largest metropolitan areas Insurance, biotech, healthcare, and entertainment
More information