Inspection report. Material: Lining: Category: 1:725 position code observation MPEG photo grade
|
|
- Kelley Richardson
- 5 years ago
- Views:
Transcription
1 Inspection report Date: P.O.#: Weather: Surveyed By: section number: PSR: 08/16/ Dry TIMO 17 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre-Cleaned: rate: LOUIS BERGER GROUP KCMO N No Pre-Cleaning Street: GRACEMOR DR Flow Control: Start MH: City: KCMO-N065 Year Renewed End MH: N N Location Code: Y Yard Tape/Media #: LBG081710TO-2 Total length surveyed: 320 ft Purpose: Use: Drain. Area: A Maintenance Related SS Sanitary Dia/Height: Material: Lining: Category: C Circular 8"/8" VCP Vitrified Clay Pipe Pipe Joint length: Comment: Location details: 1:725 position code observation MPEG photo grade N AMH Manhole, Remark: Start of survey at upstream manhole 206, b 1.00 MWL Water Level, 5 % of cross sectional area 00:00: S1 DAGS Deposits Attached Grease, 5 % of cross sectional area, from 08 to 04 00:02: M 2 o clock, within 8 inch:, start TF Tap Factory Made, at 10 o clock, 4", within 8 inch: 00:02: TFC Tap Factory Made Capped, at 02 o clock, 4", within 8 inch: 00:03: TBD Tap Break-In Defective, at 02 o clock, 4", within 8 inch: 00:04:00 212, b M F1 DAGS Deposits Attached Grease, 5 % of cross sectional area, from 09 to 03 o clock, within 8 inch:, end 00:05:05 M TFD Tap Factory Made Defective, at 10 o clock, 4", within 8 inch: 00:06: M MWLS Water Level, Sag in pipe, 15 % of cross sectional area 00:08: M MWLS Water Level, Sag in pipe, 15 % of cross sectional area 00:09: M TF Tap Factory Made, at 02 o clock, 4", within 8 inch: 00:09: TF Tap Factory Made, at 10 o clock, 4", within 8 inch: 00:10: RFJ Roots Fine Joint, from 12 to 12 o clock, within 8 inch: YES 00:10: M TF Tap Factory Made, at 02 o clock, 4", within 8 inch: 00:12: RFJ Roots Fine Joint, from 11 to 05 o clock, within 8 inch: YES 00:12: M TF Tap Factory Made, at 10 o clock, 4", within 8 inch: 00:12: FM Fracture Multiple, from 02 to 05 o clock, within 8 inch: 00:15: S TBD Tap Break-In Defective, at 02 o clock, 4", within 8 inch: 00:15: M FS Fracture Spiral, from 12 to 12 o clock, within 8 inch: 00:15: S TFC Tap Factory Made Capped, at 02 o clock, 4", within 8 inch: 00:16: TF Tap Factory Made, at 10 o clock, 4", within 8 inch: 00:17: FM Fracture Multiple, from 12 to 12 o clock, within 8 inch: 00:17: S B Broken, from 12 to 12 o clock, within 8 inch: 00:18: S 5 N AMH Manhole, Remark: End of survey at downstream manhole 00:18: QSR QMR SPR MPR OPR SPRI MPRI OPRI A _08_2010.mdb // page: 75
2 Photo: 206, Tape/Media No.: LBG081710TO-2 0FT, Manhole, Remark: Start of survey at upstream manhole Photo: 207, Tape/Media No.: LBG081710TO-2 0FT, Manhole, Remark: Start of survey at upstream manhole Photo: 208, Tape/Media No.: LBG081710TO-2, 00:00:57 1FT, Water Level, 5 % of cross sectional area Photo: 209, Tape/Media No.: LBG081710TO-2, 00:02: FT, Deposits Attached Grease, 5 % of cross sectional area, from 08 to 04 o clock, within 8 inch:, start 16_08_2010.mdb // page: 76
3 Photo: 210, Tape/Media No.: LBG081710TO-2, 00:02: FT, Tap Factory Made, at 10 o clock, 4", within 8 inch: Photo: 211, Tape/Media No.: LBG081710TO-2, 00:03: FT, Tap Factory Made Capped, at 02 o clock, 4", within 8 inch: Photo: 212, Tape/Media No.: LBG081710TO-2, 00:04: FT, Tap Break-In Defective, at 02 o clock, 4", within 8 inch: Photo: 213, Tape/Media No.: LBG081710TO-2, 00:04: FT, Tap Break-In Defective, at 02 o clock, 4", within 8 inch: 16_08_2010.mdb // page: 77
4 Photo: 214, Tape/Media No.: LBG081710TO-2, 00:06: FT, Tap Factory Made Defective, at 10 o clock, 4", within 8 inch: Photo: 215, Tape/Media No.: LBG081710TO-2, 00:08: FT, Water Level, Sag in pipe, 15 % of cross sectional area Photo: 216, Tape/Media No.: LBG081710TO-2, 00:09: FT, Water Level, Sag in pipe, 15 % of cross sectional area Photo: 217, Tape/Media No.: LBG081710TO-2, 00:09:44 154FT, Tap Factory Made, at 02 o clock, 4", within 8 inch: 16_08_2010.mdb // page: 78
5 Photo: 218, Tape/Media No.: LBG081710TO-2, 00:10: FT, Tap Factory Made, at 10 o clock, 4", within 8 inch: Photo: 219, Tape/Media No.: LBG081710TO-2, 00:10: FT, Roots Fine Joint, from 12 to 12 o clock, within 8 inch: YES Photo: 220, Tape/Media No.: LBG081710TO-2, 00:12: FT, Tap Factory Made, at 02 o clock, 4", within 8 inch: Photo: 221, Tape/Media No.: LBG081710TO-2, 00:12: FT, Roots Fine Joint, from 11 to 05 o clock, within 8 inch: YES 16_08_2010.mdb // page: 79
6 Photo: 222, Tape/Media No.: LBG081710TO-2, 00:12: FT, Tap Factory Made, at 10 o clock, 4", within 8 inch: Photo: 223, Tape/Media No.: LBG081710TO-2, 00:15: FT, Fracture Multiple, from 02 to 05 o clock, within 8 inch: Photo: 224, Tape/Media No.: LBG081710TO-2, 00:15: FT, Tap Break-In Defective, at 02 o clock, 4", within 8 inch: Photo: 225, Tape/Media No.: LBG081710TO-2, 00:15: FT, Fracture Spiral, from 12 to 12 o clock, within 8 inch: 16_08_2010.mdb // page: 80
7 Photo: 226, Tape/Media No.: LBG081710TO-2, 00:16: FT, Tap Factory Made Capped, at 02 o clock, 4", within 8 inch: Photo: 227, Tape/Media No.: LBG081710TO-2, 00:17: FT, Tap Factory Made, at 10 o clock, 4", within 8 inch: Photo: 228, Tape/Media No.: LBG081710TO-2, 00:17: FT, Fracture Multiple, from 12 to 12 o clock, within 8 inch: Photo: 229, Tape/Media No.: LBG081710TO-2, 00:18: FT, Broken, from 12 to 12 o clock, within 8 inch: 16_08_2010.mdb // page: 81
8 Photo: 230, Tape/Media No.: LBG081710TO-2, 00:18:50 320FT, Manhole, Remark: End of survey at downstream manhole 16_08_2010.mdb // page: 82
Inspection report. 1:50 Position Code Observation Photo Grade Depth: WL Water level 15 % of the vertical dimension
17/03/2014 02CSO007 no rain or snow RAY CRANE 1 X Inspection (U/S) NY07387508 Pipe Length 0.70 m Total length : 10.00 m NY07387508 1.58 1.93 1:50 Position Code Observation Photo Grade Depth: 1.93 0.00
More informationWASTEWATER FLOW COMPONENTS
Chapter 3 WASTEWATER FLOW COMPONENTS 3.1 INTRODUCTION A sanitary sewer collection system receives two flow components: dry weather flow (DWF) and wet weather flow (WWF). The Base Wastewater Flow (BWF)
More informationPRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017
PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 I hereby certify that this
More informationEstimating Sewage System Flows
9 Estimating Sewage System Flows DWSD Wholesale Sewer Rates 201 In this module, you will learn the sources of dry and wet weather flows and how these flows are estimated. Three different tools are used
More information1 LIST OF POTENTIAL PCB SOURCES
Ms. Mary Vanderlaan Supervisor, Lansing District Michigan Department of Environmental Quality Water Resources Division P. O. Box 30242 Lansing, MI 48909 Subject: NPDES Permit No. MI0001597 2016 Annual
More informationCASE STUDIES. Introduction
Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts
More informationStatus Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California
Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California Introduction Beginning in 1999, the University of California,
More informationFlow Monitoring in the Collection System September 11, 2014
Flow Monitoring in the Collection System September 11, 2014 FISHBECK, THOMPSON, CARR, & HUBER INC. Lori Lloyd, PE, LEED AP BD+C Definitions Why Flow Monitor? Flow Monitoring Applications Site Selection
More informationStone Outlet Sediment Trap
3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose
More informationThe City of Clearwater (City) collection
FWRJ A Matrix Approach to Prioritizing a Sewer Collection System Capital Improvement Plan Amanda Savage, Tara Kivett, Steven Cook, Eric Harold, and Ifetayo Venner The City of Clearwater (City) collection
More informationPARTS MANUAL 2 INCH CHIPPER/SHREDDER. SC cc SUBARU
www.bearcatproducts.com 2 INCH CHIPPER/SHREDDER SC2170 170cc SUBARU PARTS MANUAL PN: 1641-00 Rev. 0011 Companion to 1509-00 Range: D01688 - Current Before You Begin DEAR ECHO BEAR CAT CUSTOMER Thank you
More informationSTORMWATER ASSET MANAGEMENT:
STORMWATER ASSET MANAGEMENT: THE ROLE OF GIS IN ASSET MANAGEMENT Janice Lerg, Hubbell, Roth & Clark, Inc. Brian McElroy, Hubbell, Roth & Clark, Inc. Kevin Fowler, Hubbell, Roth & Clark, Inc. IMAGIN CONFERENCE
More informationAppendix A. City of Colusa Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study
Appendix A City of Colusa Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study Site 3 Site 4 Site 5 Site 2 Site 1 SANITARY SEWER FLOW MONITORING AND INFLOW / INFILTRATION STUDY City of Colusa April
More informationWellsgate Terrace SPECIFICATIONS.
GRADING NOTES: 1. LOT GRADING SHALL BE COMPLETED TO PROVE SUFFICIENT DIRT ON EACH PAD TO ACHIEVE THE CRITICAL PAD GRADES AND SPOT GRADES ON EACH LOT. AFTER ACHIEVING CRITICAL PAD GRADES INDICATED ON THIS
More informationJDV CONTROL VALVES CO., LTD. JCT/JCTM Series 3/4 Way Trunnion Type Valve Manual
JCT/JCTM Series 3/4 Way Trunnion Type Valve Manual 1. Please read this manual before installation or servicing. 2. Before installing or servicing, please ensure the line pressure has been relieved and
More informationInflow and Infiltration. John Sorrell, P.E. City of Raleigh Public Utilities Department
Inflow and Infiltration John Sorrell, P.E. City of Raleigh Public Utilities Department 1 Raleigh s History with I&I Our initial system was designed in 1888. Treatment began in the 1950 s What is I & I?
More informationSanitary Sewer Flow Monitoring and Inflow/Infiltration Study
Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 2016/2017 Results & 2017/2018 Plan May 2, 2018 Angel Mejia, P.E., Project Manager Oliver Pohl, P.E., Sr. Project Engineer Nicole Kwan, P.E.,
More informationComparison of core sampling and visual inspection for assessment of sewer pipe condition
Comparison of core sampling and visual inspection for assessment of sewer pipe condition N. Stanić, C. de Haan, M. Tirion, J. Langeveld and F. Clemens 9 th International Joint IWA/IAHR Conference on Urban
More informationFlow Measurement in Pipes and Ducts COURSE CONTENT
Flow Measurement in Pipes and Ducts Dr. Harlan H. Bengtson, P.E. COURSE CONTENT 1. Introduction This course is about measurement of the flow rate of a fluid flowing under pressure in a closed conduit.
More information2. There is evidence of oil field waste discharged to an unnamed tributary to Bad Luck Creek. This is a violation of 40 CFR Part
September 10, 2008 Bill Fowler Chesapeake Energy Corporation P.O. Box 18496 Oklahoma City, OK 73154 RE: Cooper 7-9, 2-5H, Authorization #2008953 Dear Mr. Fowler: On, September 9, 2008, Eric Fleming and
More informationSewer Lateral Mapping: An Automated Approach
Sewer Lateral Mapping: An Automated Approach MSGIC 2016 Fall Quarterly Meeting David Thaler, GISP david.thaler@ebaengineering.com EBA Engineering, Inc. 6100 Chevy Chase Drive Suite 200 Laurel, MD 20707-2917
More informationAnti-icing is a proactive approach to winter maintenance. This section will explain many of the basic anti-icing concepts.
Anti-icing is a proactive approach to winter maintenance. This section will explain many of the basic anti-icing concepts. 1 Anti-icing is the application of a liquid de-icer prior to a storm or frost
More informationSection A: National Data System Coding
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Washington, D.C. 20460 NPDES Compliance Inspection Report Section A: National Data System Coding Form Approved OMB No. 2040-0003 Approval Expires 7-31-85 Transaction
More informationADDENDUM # 10 BID # FY CITY OF HALLANDALE BEACH INFLOW AND INFILTRATION REMOVAL PHASE 2
ADDENDUM # 10 BID # FY 2017-2018-019 CITY OF HALLANDALE BEACH INFLOW AND INFILTRATION REMOVAL PHASE 2 Please ensure you check the City s website for the latest addendum released for this project. Below
More informationSediment Traps. CAG Meeting May 21, 2012
Sediment Traps CAG Meeting May 21, 2012 Agenda Background Fundamentals of Sediment Transport Sediment Trap Existing Information Next Steps 2 The Site Saginaw River 22 mile river beginning at confluence
More informationCCR Rule Annual Inspection Report (cont.) 2
The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that
More informationSediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.
Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff
More informationStormwater Inlet Sediment Traps
Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable
More informationdesign, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.
design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.
More informationGeosynthetics Applications and Performance Reviews Select Case Histories
Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,
More informationHISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)
HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:
More information12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC
PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE
More informationVillages at Riverdale Thornton, CO
FINAL UTILITY REPORT Villages at Riverdale Thornton, CO October 14, 216 Revised: March 29, 217 JN: 1539 Prepared for: PCS Group, Inc. 11 16 th Street #3 B-18 Denver, CO 8265 P: 33.531.495 Prepared by:
More informationSewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling.
Using Dynamic Hydraulic Modeling to Understand Sewer Headspace Dynamics - A Case Study of Metro Vancouver's Highbury Interceptor Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd. 200-4185A Still Creek
More informationTarget Insertion Flowmeter
Principle of Operation Flow is measured in terms of dynamic force acting on a target (solid disk) in the flow stream. Hermetically sealed, bonded strain gages in a bridge circuit configuration mounted
More informationWoodford County Erosion Prevention Plan and Permit. Application #
Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance
More informationEtobicoke Exfiltration System: Monitoring and Evaluation. Tim Van Seters Ryerson University July 24, 2015
Etobicoke Exfiltration System: Monitoring and Evaluation Tim Van Seters Ryerson University July 24, 2015 Presentation Outline Summary of 1994 1995 Candaras Associates study Summary of 1996-1998 SWAMP Study
More informationDOCUMENTATION WORKBOOK FY 2018
DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum
More informationAttachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins
Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving
More informationSewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling.
Using Dynamic Hydraulic Modeling to Understand Sewer Headspace Dynamics A Case Study of Metro Vancouver s Highbury Interceptor Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd. 200-4185A Still Creek Drive
More informationMS4 General Permit City of West Haven 2018 Annual Report Existing MS4 Permittee Permit Number GSM January 1, 2018 December 31, 2018
MS4 General Permit City of West Haven 2018 Annual Report Existing MS4 Permittee Permit Number GSM 000002 January 1, 2018 December 31, 2018 This report documents City s efforts to comply with the conditions
More informationTHREE HOLE SPLICE CLEVIS FOR B52 Standard finishes: ZN, GRN Wt./C 126 Lbs. (57.1 kg)
CLEVIS FITTINGS B169 TWO HOLE SPLICE Wt./C 84 Lbs. (38.1 kg) B168 THREE HOLE SPLICE Wt./C 126 Lbs. (57.1 kg) B167 Wt./C 178 Lbs. (80.7 kg) 3 1 /2 (88.9) B170 TWO HOLE SPLICE Wt./C 123 Lbs. (55.8 kg) 5
More informationInlets to Outlets: You May Be Surprised at What You Find
Inlets to Outlets: You May Be Surprised at What You Find TFMA Annual Conference March 10, 2016 Presented by Mike Keenum, PE, CFM Jennifer Davidson, PE Steven Nelson, PE, CFM Erin Atkinson, PE, CFM, GISP
More informationrock mass structure characteristics accurate and precise
Introduction Geotechnical data provides information on rock mass and structure characteristics which will be relied upon for slope and underground design at the Back River deposits. It is important that
More informationGIS Streamlines Carlton s Sewer Improvement Process Presented by: John M. Langhans, PE Jared W. DeMaster, PE MSA Professional Services, Inc.
GIS Streamlines Carlton s Sewer Improvement Process Presented by: John M. Langhans, PE Jared W. DeMaster, PE MSA Professional Services, Inc. November 21, 2013 APWA Conference, Brooklyn Park, MN MSA Professional
More informationChapter 5 CALIBRATION AND VERIFICATION
Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic
More informationV-Cone Flowmeter DATASHEET
V-Cone Flowmeter ATASHEET JUNHO 013 IntraCone Cone Flow Meter Type: ICM etail: Cone-Element Technical Information 05/011 FLOW THE SPECIALIST IN LEVEL AN FLOW Cone Flow Meter Technical Information Intra-Automation
More informationMaterials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationFHWA Headloss in InfoWorks ICM. August 2013
FHWA Headloss in InfoWorks ICM August 2013 Innovyze 1 August 2013 Contents FHWA Headloss... 1 Contents... 2 1. Introduction... 3 2. Step 1, Calculation of E ai... 3 3. Step 2, Adjustment of E ai to Provide
More informationTable of Contents. Specifications 1 Adjustments 2 Using the Reticle 8 Maintenance 16 Troubleshooting 18 SS Warranty 19
1 2 Table of Contents Specifications 1 Adjustments 2 Using the Reticle 8 Maintenance 16 Troubleshooting 18 SS Warranty 19 3 Specifications Tube Diameter Length Weight Eye Relief Field of View @ 100 Yards
More informationTCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project
TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, 2014 5:30 p.m. Allison Hollow Road Reconstruction Project A. William Kiehl called the Special Meeting of Tuesday March 11, 2014, at 5:30
More informationVILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT
VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT STORM RAINFALL AND RADAR IMAGERY Total rainfall 4.99 inches 2.74 inches between 5:40 and 7:10, then a lull until 9:30 2.04 inches between 9:30
More informationCITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING December 31, 2018
PAGE 001 GENERAL FUND POLICE: PATROL 112-PERSONAL 2,594,667.25 $ 238,555.64 2,086,948.27 $ 0.00 $ 507,718.98 19.6% 112-0THER 509,581.41 5,357.20 387,792.22 85,450.37 36,338.82 7.1% 112-TRANSFERS OUT 0.00
More informationCITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING August 31, 2018
PAGE 001 GENERAL FUND POLICE: PATROL 112-PERSONAL 2,326,186.36 $ 152,351.58 1,427,167.46 $ 55,516.82 $ 843,502.08 36.3% 112-0THER 427,540.04 17,954.13 321,938.98 78,936.82 26,664.24 6.2% 112-TRANSFERS
More informationCITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING October 31, 2018
PAGE 001 GENERAL FUND POLICE: PATROL 112-PERSONAL 2,326,186.36 $ 63,702.87 1,640,761.23 $ 52,633.26 $ 632,791.87 27.2% 112-0THER 427,540.04 19,133.95 362,966.31 51,203.59 13,370.14 3.1% 112-TRANSFERS OUT
More informationSTATIC GAS MONITOR Type SGM/DEW Revision A of 20 aprile 2016
APPLICATIONS Moisture monitoring of air or gas (SF6) Suitable for indoor or outdoor Industrial, medical or aerospace fields HIGHLIGHTS High voltage circuit breakers commonly used for distribution and transmission
More informationU-Shaped Sediment Traps
U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally
More informationProcedures for the Installation, Adjustment, Maintenance and. Inspection of CWR as Required by 49 CFR
Procedures for the Installation, Adjustment, Maintenance and Inspection of CWR as Required by 49 CFR 213.119 Effective October 09, 2009 Procedures for the Installation, Adjustment, Maintenance and Inspection
More informationSelect the appropriate PM to be done and then perform the checklist under that section.
Agilent Preventive Maintenance provides factory recommended service for your analytical systems to ensure reliable operation and the accuracy of your results. Delivered by highly-trained and certified
More informationPhoto 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking
More informationWEST NORRITON TOWNSHIP
WEST NORRITON TOWNSHIP SANITARY SEWER SYSTEM INFLOW AND INFILTRATION STUDY November 2013 Rettew Associates, Inc. 3020 Columbia Avenue Lancaster, PA 17603 RECOMMENDATIONS The top four priorities for inflow
More informationConstruction Exits Rock pads
Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor
More informationLimited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii
Limited Visual Dam Safety Inspections OA00137 Oahu Reservoir No. 155 Oahu, Hawaii Prepared by: U.S. ARMY CORPS OF ENGINEERS HONOLULU DISTRICT STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES May
More informationCoarse Sediment Traps
Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily
More information3301 East 120 th Avenue Assited Living & Memory Care
UTILITY REPORT FOR 3301 East 120 th Avenue Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 Prepared for: 3301 E. 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite
More informationFree Chlorine Amperometric 4-20mA Sensors
Free Chlorine Amperometric 4-20mA Sensors Product Instructions Section 1.0 Theory of Operation 1.0 Free Chlorine Defined Free Chlorine or "freely active chlorine" is defined as the sum of molecular chlorine
More informationWater Science and Technology 2012
Impact of sewer condition on urban flooding: an uncertainty analysis based on field observations and Monte Carlo simulations on full hydrodynamic models M. van Bijnen 1,2*, H. Korving 3,4 and F. Clemens
More informationFRED BURR DAM FEASIBILITY STUDY
FRED BURR DAM FEASIBILITY STUDY Fred Burr Dam Feasibility Study Purpose: Develop pre-feasibility risk reduction alternatives and recommendations for short-term operations and long-term rehabilitation.
More informationSEWER FUND BUDGET BYLAW
SEWER FUND BUDGET BYLAW CITY OF PARKSVILLE 2018-2022 Final Financial Plan Sewer Utility Fund Budget Bylaw Funding Sources 2018 2019 2020 2021 2022 Sewer Parcel Taxes $ 29,300 $ 30,179 $ 31,084 $ 32,016
More informationPRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK
PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation
More informationNORTHUMBERLAND COUNTY, PA
QUAKER RUN Stream and Wetland Restoration As-Built Completion Report and First Year Monitoring Data Coal Township NORTHUMBERLAND COUNTY, PA Upstream Before Upstream After Prepared for: COAL TOWNSHIP 805
More informationSANITARY SEWER EVALUATION OF INFLOW/INFILTRATION REDUCTION TECHNIQUES. Geoffrey Trent VanAllen. A Thesis Submitted to the Faculty of
SANITARY SEWER EVALUATION OF INFLOW/INFILTRATION REDUCTION TECHNIQUES by Geoffrey Trent VanAllen A Thesis Submitted to the Faculty of The College of Engineering and Computer Science in Partial Fulfillment
More informationRed Butte Creek Oil Release Air Monitoring Journal Date Location (Time) Analyte Method Result GPS Location Comment
Date Location (Time) Analyte Method Result GPS Location Comment 6/30/10 ~1800 East Sunnyside Ave. (1110-1145) Miller Park, along Red Butte Creek (1150-1210) 0.2-1.0 ppm 1 Upstream of pressure-washing crews.
More informationCIE4491 Lecture. Hydraulic design
CIE4491 Lecture. Hydraulic design Marie-claire ten Veldhuis 19-9-013 Delft University of Technology Challenge the future Hydraulic design of urban stormwater systems Focus on sewer pipes Pressurized and
More informationA. Refer to Appendix F in back of lab manual for list of commonly used geologic map symbols
Structural Geology Lab 2: Outcrop Patterns and Structure Contours I. Geologic Map Symbols A. Refer to Appendix F in back of lab manual for list of commonly used geologic map symbols 1. Emphasis: a. strike
More informationD. B. G R A Y E N G I N E E R I N G I N C.
STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario Report No. 12020-SWM August 27, 2012 Revised April 21, 2014 Revised December 9, 2014 Revised April 14, 2015 D. B. G R A Y E N G I N E E R
More informationBRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT
BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital
More informationEastlake Assited Living & Memory Care
UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.
More informationSystem Mapping Case Studies
System Mapping Case Studies 1. Madison Getting Started Three Step Approach 2. Rocky Hill Maximizing resources 3. Putman Boots on the ground CT Map Rocky Hill Putnam Madison Madison Community Profile Getting
More information507F. Multi-Port Sanitary Ball Valve. Full Port ISO 5211 Mounting Pad. For Automated & Manual Service. Pharmaceutical. Bio-Technology.
507F Multi- Sanitary Ball Valve Full ISO 5 Mounting Pad For Automated & Manual Service Pharmaceutical Bio-Technology Cosmetic Food & Beverage The 507F Series //5-Way Sanitary Ball Valve The 507F is a true
More informationHorizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE
Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed
More informationUSING GIS IN WATER SUPPLY AND SEWER MODELLING AND MANAGEMENT
USING GIS IN WATER SUPPLY AND SEWER MODELLING AND MANAGEMENT HENRIETTE TAMAŠAUSKAS*, L.C. LARSEN, O. MARK DHI Water and Environment, Agern Allé 5 2970 Hørsholm, Denmark *Corresponding author, e-mail: htt@dhigroup.com
More informationIBV Series C Carbon Steel Inverted Bucket Vertical Steam Trap
Local regulations may restrict the use of this product to below the conditions quoted. In the interests of development and improvement of the product, we reserve the right to change the specification without
More informationIN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION
IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity
More informationproduct manual H-4204 Proving Ring Penetrometer
05.09 product manual H-4204 Proving Ring Penetrometer nnmm Handle Proving Ring Extension Rod Coupler Penetration Rod Cone Figure #1 General Information The Proving Ring Penetrometer is a cone type of penetrometer
More informationIBV Series Z Alloy Steel Inverted Bucket Vertical Steam Trap
Local regulations may restrict the use of this product to below the conditions quoted. In the interests of development and improvement of the product, we reserve the right to change the specification without
More informationCity of Marquette. Geographic Information Systems (GIS) Global Positioning Systems (GPS)
City of Marquette Geographic Information Systems (GIS) Global Positioning Systems (GPS) Presented by: Matthew Koss GIS Engineering Technician Email- makoss@mqtcty.org The main focus of my job at the City
More informationA GEOLOGIC TRIP to the SAN ANDREAS FAULT
A GEOLOGIC TRIP to the SAN ANDREAS FAULT San Andreas Hot Spot Loop Road Hot Spot P Parking San Andreas Fault Interpretive Trail Fault Zone Map: San Andreas Fault Zone During the 25 million years that the
More informationPavement Distress Categories
Pavement Distress Identification Jointed Concrete Pavements Raymond Ong, Purdue University William Flora, INDOT Planning Joyce Stone, INDOT Pavement Engineering Samy Noureldin, INDOT Research Pavement
More informationDrilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates
Drilled Shaft Foundations in Limestone Dan Brown, P.E., Ph.D. Dan Brown and Associates Foundation Engineering How we teach our students Fundamental understanding of soil and rock behavior (good!) Focus
More informationNCEES FS Practice Exam
NCEES FS Practice Exam Terrametra Resources Lynn Patten 1. One corner of a 60-ft. 120-ft. lot, otherwise rectangular, is a curve with a radius of 20 ft. and a central angle of 90. The area (ft. 2 ) of
More informationLeveraging GIS data and tools for maintaining hydraulic sewer models
Leveraging GIS data and tools for maintaining hydraulic sewer models Ben Gamble & Joseph Koran Metropolitan Sewer District of Greater Cincinnati Carl C. Chan & Michael York CDM Smith Ben Gamble Senior
More informationclose to performances of the turbine gas meters designed for custody transfer measurements.
QUANTOMETER DESIGN AND FUNCTION CPT Quantometers have been designed in order to provide our customers with reliable and inexpensive measuring instruments for secondary flow measurements. Our great experience
More informationDRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES
DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES Parsons P:\Honeywell -SYR\444576 2008 Capping\09 Reports\9.3 December 2009_Capping and
More informationCITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY
CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of
More informationHistoric Cultural Properties Inventory (HCPI) Base Form (FORM 1)
Historic Cultural Properties Inventory (HCPI) Base Form (FORM 1) Historic Preservation Division, New Mexico Office of Cultural Affairs For HPD Office use only: HCPI No. District No. NRHP: SRCP: Criteria:
More informationENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods
ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design
More informationScattergraph Principles and Practice Evaluating Self-Cleansing in Existing Sewers Using the Tractive Force Method
Scattergraph Principles and Practice Evaluating Self-Cleansing in Existing Sewers Using the Tractive Force Method Kevin L. Enfinger, P.E. and Paul S. Mitchell, P.E. ADS Environmental Services 4940 Research
More informationSAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #
SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # 3805010019 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FEBRUARY 2013 FINAL RATING: MINIMALLY ACCEPTABLE
More informationPowder River Basin Coal Update
Powder River Basin Coal Update Tom Kraemer Group Vice President Coal Southwest Power Pool Regional State Committee October 24, 2005 - Santa Fe, NM Discussion Topics BNSF coal transportation Historic PRB
More information