1 Inspection report Date: P.O.#: Weather: Surveyed By: section number: PSR: 08/16/ Dry TIMO 17 Total Pipe Length: Survey Customer: System Owner: Clean Date: Pre-Cleaned: rate: LOUIS BERGER GROUP KCMO N No Pre-Cleaning Street: GRACEMOR DR Flow Control: Start MH: City: KCMO-N065 Year Renewed End MH: N N Location Code: Y Yard Tape/Media #: LBG081710TO-2 Total length surveyed: 320 ft Purpose: Use: Drain. Area: A Maintenance Related SS Sanitary Dia/Height: Material: Lining: Category: C Circular 8"/8" VCP Vitrified Clay Pipe Pipe Joint length: Comment: Location details: 1:725 position code observation MPEG photo grade N AMH Manhole, Remark: Start of survey at upstream manhole 206, b 1.00 MWL Water Level, 5 % of cross sectional area 00:00: S1 DAGS Deposits Attached Grease, 5 % of cross sectional area, from 08 to 04 00:02: M 2 o clock, within 8 inch:, start TF Tap Factory Made, at 10 o clock, 4", within 8 inch: 00:02: TFC Tap Factory Made Capped, at 02 o clock, 4", within 8 inch: 00:03: TBD Tap Break-In Defective, at 02 o clock, 4", within 8 inch: 00:04:00 212, b M F1 DAGS Deposits Attached Grease, 5 % of cross sectional area, from 09 to 03 o clock, within 8 inch:, end 00:05:05 M TFD Tap Factory Made Defective, at 10 o clock, 4", within 8 inch: 00:06: M MWLS Water Level, Sag in pipe, 15 % of cross sectional area 00:08: M MWLS Water Level, Sag in pipe, 15 % of cross sectional area 00:09: M TF Tap Factory Made, at 02 o clock, 4", within 8 inch: 00:09: TF Tap Factory Made, at 10 o clock, 4", within 8 inch: 00:10: RFJ Roots Fine Joint, from 12 to 12 o clock, within 8 inch: YES 00:10: M TF Tap Factory Made, at 02 o clock, 4", within 8 inch: 00:12: RFJ Roots Fine Joint, from 11 to 05 o clock, within 8 inch: YES 00:12: M TF Tap Factory Made, at 10 o clock, 4", within 8 inch: 00:12: FM Fracture Multiple, from 02 to 05 o clock, within 8 inch: 00:15: S TBD Tap Break-In Defective, at 02 o clock, 4", within 8 inch: 00:15: M FS Fracture Spiral, from 12 to 12 o clock, within 8 inch: 00:15: S TFC Tap Factory Made Capped, at 02 o clock, 4", within 8 inch: 00:16: TF Tap Factory Made, at 10 o clock, 4", within 8 inch: 00:17: FM Fracture Multiple, from 12 to 12 o clock, within 8 inch: 00:17: S B Broken, from 12 to 12 o clock, within 8 inch: 00:18: S 5 N AMH Manhole, Remark: End of survey at downstream manhole 00:18: QSR QMR SPR MPR OPR SPRI MPRI OPRI A _08_2010.mdb // page: 75

2 Photo: 206, Tape/Media No.: LBG081710TO-2 0FT, Manhole, Remark: Start of survey at upstream manhole Photo: 207, Tape/Media No.: LBG081710TO-2 0FT, Manhole, Remark: Start of survey at upstream manhole Photo: 208, Tape/Media No.: LBG081710TO-2, 00:00:57 1FT, Water Level, 5 % of cross sectional area Photo: 209, Tape/Media No.: LBG081710TO-2, 00:02: FT, Deposits Attached Grease, 5 % of cross sectional area, from 08 to 04 o clock, within 8 inch:, start 16_08_2010.mdb // page: 76

3 Photo: 210, Tape/Media No.: LBG081710TO-2, 00:02: FT, Tap Factory Made, at 10 o clock, 4", within 8 inch: Photo: 211, Tape/Media No.: LBG081710TO-2, 00:03: FT, Tap Factory Made Capped, at 02 o clock, 4", within 8 inch: Photo: 212, Tape/Media No.: LBG081710TO-2, 00:04: FT, Tap Break-In Defective, at 02 o clock, 4", within 8 inch: Photo: 213, Tape/Media No.: LBG081710TO-2, 00:04: FT, Tap Break-In Defective, at 02 o clock, 4", within 8 inch: 16_08_2010.mdb // page: 77

4 Photo: 214, Tape/Media No.: LBG081710TO-2, 00:06: FT, Tap Factory Made Defective, at 10 o clock, 4", within 8 inch: Photo: 215, Tape/Media No.: LBG081710TO-2, 00:08: FT, Water Level, Sag in pipe, 15 % of cross sectional area Photo: 216, Tape/Media No.: LBG081710TO-2, 00:09: FT, Water Level, Sag in pipe, 15 % of cross sectional area Photo: 217, Tape/Media No.: LBG081710TO-2, 00:09:44 154FT, Tap Factory Made, at 02 o clock, 4", within 8 inch: 16_08_2010.mdb // page: 78

5 Photo: 218, Tape/Media No.: LBG081710TO-2, 00:10: FT, Tap Factory Made, at 10 o clock, 4", within 8 inch: Photo: 219, Tape/Media No.: LBG081710TO-2, 00:10: FT, Roots Fine Joint, from 12 to 12 o clock, within 8 inch: YES Photo: 220, Tape/Media No.: LBG081710TO-2, 00:12: FT, Tap Factory Made, at 02 o clock, 4", within 8 inch: Photo: 221, Tape/Media No.: LBG081710TO-2, 00:12: FT, Roots Fine Joint, from 11 to 05 o clock, within 8 inch: YES 16_08_2010.mdb // page: 79

6 Photo: 222, Tape/Media No.: LBG081710TO-2, 00:12: FT, Tap Factory Made, at 10 o clock, 4", within 8 inch: Photo: 223, Tape/Media No.: LBG081710TO-2, 00:15: FT, Fracture Multiple, from 02 to 05 o clock, within 8 inch: Photo: 224, Tape/Media No.: LBG081710TO-2, 00:15: FT, Tap Break-In Defective, at 02 o clock, 4", within 8 inch: Photo: 225, Tape/Media No.: LBG081710TO-2, 00:15: FT, Fracture Spiral, from 12 to 12 o clock, within 8 inch: 16_08_2010.mdb // page: 80

7 Photo: 226, Tape/Media No.: LBG081710TO-2, 00:16: FT, Tap Factory Made Capped, at 02 o clock, 4", within 8 inch: Photo: 227, Tape/Media No.: LBG081710TO-2, 00:17: FT, Tap Factory Made, at 10 o clock, 4", within 8 inch: Photo: 228, Tape/Media No.: LBG081710TO-2, 00:17: FT, Fracture Multiple, from 12 to 12 o clock, within 8 inch: Photo: 229, Tape/Media No.: LBG081710TO-2, 00:18: FT, Broken, from 12 to 12 o clock, within 8 inch: 16_08_2010.mdb // page: 81

8 Photo: 230, Tape/Media No.: LBG081710TO-2, 00:18:50 320FT, Manhole, Remark: End of survey at downstream manhole 16_08_2010.mdb // page: 82

Inspection report. 1:50 Position Code Observation Photo Grade Depth: WL Water level 15 % of the vertical dimension

Inspection report. 1:50 Position Code Observation Photo Grade Depth: WL Water level 15 % of the vertical dimension 17/03/2014 02CSO007 no rain or snow RAY CRANE 1 X Inspection (U/S) NY07387508 Pipe Length 0.70 m Total length : 10.00 m NY07387508 1.58 1.93 1:50 Position Code Observation Photo Grade Depth: 1.93 0.00

More information

WASTEWATER FLOW COMPONENTS

WASTEWATER FLOW COMPONENTS Chapter 3 WASTEWATER FLOW COMPONENTS 3.1 INTRODUCTION A sanitary sewer collection system receives two flow components: dry weather flow (DWF) and wet weather flow (WWF). The Base Wastewater Flow (BWF)

More information

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 I hereby certify that this

More information

Estimating Sewage System Flows

Estimating Sewage System Flows 9 Estimating Sewage System Flows DWSD Wholesale Sewer Rates 201 In this module, you will learn the sources of dry and wet weather flows and how these flows are estimated. Three different tools are used

More information

1 LIST OF POTENTIAL PCB SOURCES

1 LIST OF POTENTIAL PCB SOURCES Ms. Mary Vanderlaan Supervisor, Lansing District Michigan Department of Environmental Quality Water Resources Division P. O. Box 30242 Lansing, MI 48909 Subject: NPDES Permit No. MI0001597 2016 Annual

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California Introduction Beginning in 1999, the University of California,

More information

Flow Monitoring in the Collection System September 11, 2014

Flow Monitoring in the Collection System September 11, 2014 Flow Monitoring in the Collection System September 11, 2014 FISHBECK, THOMPSON, CARR, & HUBER INC. Lori Lloyd, PE, LEED AP BD+C Definitions Why Flow Monitor? Flow Monitoring Applications Site Selection

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

The City of Clearwater (City) collection

The City of Clearwater (City) collection FWRJ A Matrix Approach to Prioritizing a Sewer Collection System Capital Improvement Plan Amanda Savage, Tara Kivett, Steven Cook, Eric Harold, and Ifetayo Venner The City of Clearwater (City) collection

More information

PARTS MANUAL 2 INCH CHIPPER/SHREDDER. SC cc SUBARU

PARTS MANUAL 2 INCH CHIPPER/SHREDDER.   SC cc SUBARU www.bearcatproducts.com 2 INCH CHIPPER/SHREDDER SC2170 170cc SUBARU PARTS MANUAL PN: 1641-00 Rev. 0011 Companion to 1509-00 Range: D01688 - Current Before You Begin DEAR ECHO BEAR CAT CUSTOMER Thank you

More information

STORMWATER ASSET MANAGEMENT:

STORMWATER ASSET MANAGEMENT: STORMWATER ASSET MANAGEMENT: THE ROLE OF GIS IN ASSET MANAGEMENT Janice Lerg, Hubbell, Roth & Clark, Inc. Brian McElroy, Hubbell, Roth & Clark, Inc. Kevin Fowler, Hubbell, Roth & Clark, Inc. IMAGIN CONFERENCE

More information

Appendix A. City of Colusa Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study

Appendix A. City of Colusa Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study Appendix A City of Colusa Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study Site 3 Site 4 Site 5 Site 2 Site 1 SANITARY SEWER FLOW MONITORING AND INFLOW / INFILTRATION STUDY City of Colusa April

More information

Wellsgate Terrace SPECIFICATIONS.

Wellsgate Terrace SPECIFICATIONS. GRADING NOTES: 1. LOT GRADING SHALL BE COMPLETED TO PROVE SUFFICIENT DIRT ON EACH PAD TO ACHIEVE THE CRITICAL PAD GRADES AND SPOT GRADES ON EACH LOT. AFTER ACHIEVING CRITICAL PAD GRADES INDICATED ON THIS

More information

JDV CONTROL VALVES CO., LTD. JCT/JCTM Series 3/4 Way Trunnion Type Valve Manual

JDV CONTROL VALVES CO., LTD. JCT/JCTM Series 3/4 Way Trunnion Type Valve Manual JCT/JCTM Series 3/4 Way Trunnion Type Valve Manual 1. Please read this manual before installation or servicing. 2. Before installing or servicing, please ensure the line pressure has been relieved and

More information

Inflow and Infiltration. John Sorrell, P.E. City of Raleigh Public Utilities Department

Inflow and Infiltration. John Sorrell, P.E. City of Raleigh Public Utilities Department Inflow and Infiltration John Sorrell, P.E. City of Raleigh Public Utilities Department 1 Raleigh s History with I&I Our initial system was designed in 1888. Treatment began in the 1950 s What is I & I?

More information

Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study

Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 2016/2017 Results & 2017/2018 Plan May 2, 2018 Angel Mejia, P.E., Project Manager Oliver Pohl, P.E., Sr. Project Engineer Nicole Kwan, P.E.,

More information

Comparison of core sampling and visual inspection for assessment of sewer pipe condition

Comparison of core sampling and visual inspection for assessment of sewer pipe condition Comparison of core sampling and visual inspection for assessment of sewer pipe condition N. Stanić, C. de Haan, M. Tirion, J. Langeveld and F. Clemens 9 th International Joint IWA/IAHR Conference on Urban

More information

Flow Measurement in Pipes and Ducts COURSE CONTENT

Flow Measurement in Pipes and Ducts COURSE CONTENT Flow Measurement in Pipes and Ducts Dr. Harlan H. Bengtson, P.E. COURSE CONTENT 1. Introduction This course is about measurement of the flow rate of a fluid flowing under pressure in a closed conduit.

More information

2. There is evidence of oil field waste discharged to an unnamed tributary to Bad Luck Creek. This is a violation of 40 CFR Part

2. There is evidence of oil field waste discharged to an unnamed tributary to Bad Luck Creek. This is a violation of 40 CFR Part September 10, 2008 Bill Fowler Chesapeake Energy Corporation P.O. Box 18496 Oklahoma City, OK 73154 RE: Cooper 7-9, 2-5H, Authorization #2008953 Dear Mr. Fowler: On, September 9, 2008, Eric Fleming and

More information

Sewer Lateral Mapping: An Automated Approach

Sewer Lateral Mapping: An Automated Approach Sewer Lateral Mapping: An Automated Approach MSGIC 2016 Fall Quarterly Meeting David Thaler, GISP david.thaler@ebaengineering.com EBA Engineering, Inc. 6100 Chevy Chase Drive Suite 200 Laurel, MD 20707-2917

More information

Anti-icing is a proactive approach to winter maintenance. This section will explain many of the basic anti-icing concepts.

Anti-icing is a proactive approach to winter maintenance. This section will explain many of the basic anti-icing concepts. Anti-icing is a proactive approach to winter maintenance. This section will explain many of the basic anti-icing concepts. 1 Anti-icing is the application of a liquid de-icer prior to a storm or frost

More information

Section A: National Data System Coding

Section A: National Data System Coding UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Washington, D.C. 20460 NPDES Compliance Inspection Report Section A: National Data System Coding Form Approved OMB No. 2040-0003 Approval Expires 7-31-85 Transaction

More information

ADDENDUM # 10 BID # FY CITY OF HALLANDALE BEACH INFLOW AND INFILTRATION REMOVAL PHASE 2

ADDENDUM # 10 BID # FY CITY OF HALLANDALE BEACH INFLOW AND INFILTRATION REMOVAL PHASE 2 ADDENDUM # 10 BID # FY 2017-2018-019 CITY OF HALLANDALE BEACH INFLOW AND INFILTRATION REMOVAL PHASE 2 Please ensure you check the City s website for the latest addendum released for this project. Below

More information

Sediment Traps. CAG Meeting May 21, 2012

Sediment Traps. CAG Meeting May 21, 2012 Sediment Traps CAG Meeting May 21, 2012 Agenda Background Fundamentals of Sediment Transport Sediment Trap Existing Information Next Steps 2 The Site Saginaw River 22 mile river beginning at confluence

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Stormwater Inlet Sediment Traps

Stormwater Inlet Sediment Traps Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable

More information

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

Villages at Riverdale Thornton, CO

Villages at Riverdale Thornton, CO FINAL UTILITY REPORT Villages at Riverdale Thornton, CO October 14, 216 Revised: March 29, 217 JN: 1539 Prepared for: PCS Group, Inc. 11 16 th Street #3 B-18 Denver, CO 8265 P: 33.531.495 Prepared by:

More information

Sewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling.

Sewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling. Using Dynamic Hydraulic Modeling to Understand Sewer Headspace Dynamics - A Case Study of Metro Vancouver's Highbury Interceptor Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd. 200-4185A Still Creek

More information

Target Insertion Flowmeter

Target Insertion Flowmeter Principle of Operation Flow is measured in terms of dynamic force acting on a target (solid disk) in the flow stream. Hermetically sealed, bonded strain gages in a bridge circuit configuration mounted

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

Etobicoke Exfiltration System: Monitoring and Evaluation. Tim Van Seters Ryerson University July 24, 2015

Etobicoke Exfiltration System: Monitoring and Evaluation. Tim Van Seters Ryerson University July 24, 2015 Etobicoke Exfiltration System: Monitoring and Evaluation Tim Van Seters Ryerson University July 24, 2015 Presentation Outline Summary of 1994 1995 Candaras Associates study Summary of 1996-1998 SWAMP Study

More information

DOCUMENTATION WORKBOOK FY 2018

DOCUMENTATION WORKBOOK FY 2018 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving

More information

Sewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling.

Sewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling. Using Dynamic Hydraulic Modeling to Understand Sewer Headspace Dynamics A Case Study of Metro Vancouver s Highbury Interceptor Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd. 200-4185A Still Creek Drive

More information

MS4 General Permit City of West Haven 2018 Annual Report Existing MS4 Permittee Permit Number GSM January 1, 2018 December 31, 2018

MS4 General Permit City of West Haven 2018 Annual Report Existing MS4 Permittee Permit Number GSM January 1, 2018 December 31, 2018 MS4 General Permit City of West Haven 2018 Annual Report Existing MS4 Permittee Permit Number GSM 000002 January 1, 2018 December 31, 2018 This report documents City s efforts to comply with the conditions

More information

THREE HOLE SPLICE CLEVIS FOR B52 Standard finishes: ZN, GRN Wt./C 126 Lbs. (57.1 kg)

THREE HOLE SPLICE CLEVIS FOR B52 Standard finishes: ZN, GRN Wt./C 126 Lbs. (57.1 kg) CLEVIS FITTINGS B169 TWO HOLE SPLICE Wt./C 84 Lbs. (38.1 kg) B168 THREE HOLE SPLICE Wt./C 126 Lbs. (57.1 kg) B167 Wt./C 178 Lbs. (80.7 kg) 3 1 /2 (88.9) B170 TWO HOLE SPLICE Wt./C 123 Lbs. (55.8 kg) 5

More information

Inlets to Outlets: You May Be Surprised at What You Find

Inlets to Outlets: You May Be Surprised at What You Find Inlets to Outlets: You May Be Surprised at What You Find TFMA Annual Conference March 10, 2016 Presented by Mike Keenum, PE, CFM Jennifer Davidson, PE Steven Nelson, PE, CFM Erin Atkinson, PE, CFM, GISP

More information

rock mass structure characteristics accurate and precise

rock mass structure characteristics accurate and precise Introduction Geotechnical data provides information on rock mass and structure characteristics which will be relied upon for slope and underground design at the Back River deposits. It is important that

More information

GIS Streamlines Carlton s Sewer Improvement Process Presented by: John M. Langhans, PE Jared W. DeMaster, PE MSA Professional Services, Inc.

GIS Streamlines Carlton s Sewer Improvement Process Presented by: John M. Langhans, PE Jared W. DeMaster, PE MSA Professional Services, Inc. GIS Streamlines Carlton s Sewer Improvement Process Presented by: John M. Langhans, PE Jared W. DeMaster, PE MSA Professional Services, Inc. November 21, 2013 APWA Conference, Brooklyn Park, MN MSA Professional

More information

Chapter 5 CALIBRATION AND VERIFICATION

Chapter 5 CALIBRATION AND VERIFICATION Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic

More information

V-Cone Flowmeter DATASHEET

V-Cone Flowmeter DATASHEET V-Cone Flowmeter ATASHEET JUNHO 013 IntraCone Cone Flow Meter Type: ICM etail: Cone-Element Technical Information 05/011 FLOW THE SPECIALIST IN LEVEL AN FLOW Cone Flow Meter Technical Information Intra-Automation

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

FHWA Headloss in InfoWorks ICM. August 2013

FHWA Headloss in InfoWorks ICM. August 2013 FHWA Headloss in InfoWorks ICM August 2013 Innovyze 1 August 2013 Contents FHWA Headloss... 1 Contents... 2 1. Introduction... 3 2. Step 1, Calculation of E ai... 3 3. Step 2, Adjustment of E ai to Provide

More information

Table of Contents. Specifications 1 Adjustments 2 Using the Reticle 8 Maintenance 16 Troubleshooting 18 SS Warranty 19

Table of Contents. Specifications 1 Adjustments 2 Using the Reticle 8 Maintenance 16 Troubleshooting 18 SS Warranty 19 1 2 Table of Contents Specifications 1 Adjustments 2 Using the Reticle 8 Maintenance 16 Troubleshooting 18 SS Warranty 19 3 Specifications Tube Diameter Length Weight Eye Relief Field of View @ 100 Yards

More information

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, 2014 5:30 p.m. Allison Hollow Road Reconstruction Project A. William Kiehl called the Special Meeting of Tuesday March 11, 2014, at 5:30

More information

VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT

VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT STORM RAINFALL AND RADAR IMAGERY Total rainfall 4.99 inches 2.74 inches between 5:40 and 7:10, then a lull until 9:30 2.04 inches between 9:30

More information

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING December 31, 2018

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING December 31, 2018 PAGE 001 GENERAL FUND POLICE: PATROL 112-PERSONAL 2,594,667.25 $ 238,555.64 2,086,948.27 $ 0.00 $ 507,718.98 19.6% 112-0THER 509,581.41 5,357.20 387,792.22 85,450.37 36,338.82 7.1% 112-TRANSFERS OUT 0.00

More information

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING August 31, 2018

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING August 31, 2018 PAGE 001 GENERAL FUND POLICE: PATROL 112-PERSONAL 2,326,186.36 $ 152,351.58 1,427,167.46 $ 55,516.82 $ 843,502.08 36.3% 112-0THER 427,540.04 17,954.13 321,938.98 78,936.82 26,664.24 6.2% 112-TRANSFERS

More information

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING October 31, 2018

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING October 31, 2018 PAGE 001 GENERAL FUND POLICE: PATROL 112-PERSONAL 2,326,186.36 $ 63,702.87 1,640,761.23 $ 52,633.26 $ 632,791.87 27.2% 112-0THER 427,540.04 19,133.95 362,966.31 51,203.59 13,370.14 3.1% 112-TRANSFERS OUT

More information

STATIC GAS MONITOR Type SGM/DEW Revision A of 20 aprile 2016

STATIC GAS MONITOR Type SGM/DEW Revision A of 20 aprile 2016 APPLICATIONS Moisture monitoring of air or gas (SF6) Suitable for indoor or outdoor Industrial, medical or aerospace fields HIGHLIGHTS High voltage circuit breakers commonly used for distribution and transmission

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

Procedures for the Installation, Adjustment, Maintenance and. Inspection of CWR as Required by 49 CFR

Procedures for the Installation, Adjustment, Maintenance and. Inspection of CWR as Required by 49 CFR Procedures for the Installation, Adjustment, Maintenance and Inspection of CWR as Required by 49 CFR 213.119 Effective October 09, 2009 Procedures for the Installation, Adjustment, Maintenance and Inspection

More information

Select the appropriate PM to be done and then perform the checklist under that section.

Select the appropriate PM to be done and then perform the checklist under that section. Agilent Preventive Maintenance provides factory recommended service for your analytical systems to ensure reliable operation and the accuracy of your results. Delivered by highly-trained and certified

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

WEST NORRITON TOWNSHIP

WEST NORRITON TOWNSHIP WEST NORRITON TOWNSHIP SANITARY SEWER SYSTEM INFLOW AND INFILTRATION STUDY November 2013 Rettew Associates, Inc. 3020 Columbia Avenue Lancaster, PA 17603 RECOMMENDATIONS The top four priorities for inflow

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii Limited Visual Dam Safety Inspections OA00137 Oahu Reservoir No. 155 Oahu, Hawaii Prepared by: U.S. ARMY CORPS OF ENGINEERS HONOLULU DISTRICT STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES May

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

3301 East 120 th Avenue Assited Living & Memory Care

3301 East 120 th Avenue Assited Living & Memory Care UTILITY REPORT FOR 3301 East 120 th Avenue Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 Prepared for: 3301 E. 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite

More information

Free Chlorine Amperometric 4-20mA Sensors

Free Chlorine Amperometric 4-20mA Sensors Free Chlorine Amperometric 4-20mA Sensors Product Instructions Section 1.0 Theory of Operation 1.0 Free Chlorine Defined Free Chlorine or "freely active chlorine" is defined as the sum of molecular chlorine

More information

Water Science and Technology 2012

Water Science and Technology 2012 Impact of sewer condition on urban flooding: an uncertainty analysis based on field observations and Monte Carlo simulations on full hydrodynamic models M. van Bijnen 1,2*, H. Korving 3,4 and F. Clemens

More information

FRED BURR DAM FEASIBILITY STUDY

FRED BURR DAM FEASIBILITY STUDY FRED BURR DAM FEASIBILITY STUDY Fred Burr Dam Feasibility Study Purpose: Develop pre-feasibility risk reduction alternatives and recommendations for short-term operations and long-term rehabilitation.

More information

SEWER FUND BUDGET BYLAW

SEWER FUND BUDGET BYLAW SEWER FUND BUDGET BYLAW CITY OF PARKSVILLE 2018-2022 Final Financial Plan Sewer Utility Fund Budget Bylaw Funding Sources 2018 2019 2020 2021 2022 Sewer Parcel Taxes $ 29,300 $ 30,179 $ 31,084 $ 32,016

More information

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation

More information

NORTHUMBERLAND COUNTY, PA

NORTHUMBERLAND COUNTY, PA QUAKER RUN Stream and Wetland Restoration As-Built Completion Report and First Year Monitoring Data Coal Township NORTHUMBERLAND COUNTY, PA Upstream Before Upstream After Prepared for: COAL TOWNSHIP 805

More information

SANITARY SEWER EVALUATION OF INFLOW/INFILTRATION REDUCTION TECHNIQUES. Geoffrey Trent VanAllen. A Thesis Submitted to the Faculty of

SANITARY SEWER EVALUATION OF INFLOW/INFILTRATION REDUCTION TECHNIQUES. Geoffrey Trent VanAllen. A Thesis Submitted to the Faculty of SANITARY SEWER EVALUATION OF INFLOW/INFILTRATION REDUCTION TECHNIQUES by Geoffrey Trent VanAllen A Thesis Submitted to the Faculty of The College of Engineering and Computer Science in Partial Fulfillment

More information

Red Butte Creek Oil Release Air Monitoring Journal Date Location (Time) Analyte Method Result GPS Location Comment

Red Butte Creek Oil Release Air Monitoring Journal Date Location (Time) Analyte Method Result GPS Location Comment Date Location (Time) Analyte Method Result GPS Location Comment 6/30/10 ~1800 East Sunnyside Ave. (1110-1145) Miller Park, along Red Butte Creek (1150-1210) 0.2-1.0 ppm 1 Upstream of pressure-washing crews.

More information

CIE4491 Lecture. Hydraulic design

CIE4491 Lecture. Hydraulic design CIE4491 Lecture. Hydraulic design Marie-claire ten Veldhuis 19-9-013 Delft University of Technology Challenge the future Hydraulic design of urban stormwater systems Focus on sewer pipes Pressurized and

More information

A. Refer to Appendix F in back of lab manual for list of commonly used geologic map symbols

A. Refer to Appendix F in back of lab manual for list of commonly used geologic map symbols Structural Geology Lab 2: Outcrop Patterns and Structure Contours I. Geologic Map Symbols A. Refer to Appendix F in back of lab manual for list of commonly used geologic map symbols 1. Emphasis: a. strike

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario Report No. 12020-SWM August 27, 2012 Revised April 21, 2014 Revised December 9, 2014 Revised April 14, 2015 D. B. G R A Y E N G I N E E R

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

Eastlake Assited Living & Memory Care

Eastlake Assited Living & Memory Care UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.

More information

System Mapping Case Studies

System Mapping Case Studies System Mapping Case Studies 1. Madison Getting Started Three Step Approach 2. Rocky Hill Maximizing resources 3. Putman Boots on the ground CT Map Rocky Hill Putnam Madison Madison Community Profile Getting

More information

507F. Multi-Port Sanitary Ball Valve. Full Port ISO 5211 Mounting Pad. For Automated & Manual Service. Pharmaceutical. Bio-Technology.

507F. Multi-Port Sanitary Ball Valve. Full Port ISO 5211 Mounting Pad. For Automated & Manual Service. Pharmaceutical. Bio-Technology. 507F Multi- Sanitary Ball Valve Full ISO 5 Mounting Pad For Automated & Manual Service Pharmaceutical Bio-Technology Cosmetic Food & Beverage The 507F Series //5-Way Sanitary Ball Valve The 507F is a true

More information

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed

More information

USING GIS IN WATER SUPPLY AND SEWER MODELLING AND MANAGEMENT

USING GIS IN WATER SUPPLY AND SEWER MODELLING AND MANAGEMENT USING GIS IN WATER SUPPLY AND SEWER MODELLING AND MANAGEMENT HENRIETTE TAMAŠAUSKAS*, L.C. LARSEN, O. MARK DHI Water and Environment, Agern Allé 5 2970 Hørsholm, Denmark *Corresponding author, e-mail: htt@dhigroup.com

More information

IBV Series C Carbon Steel Inverted Bucket Vertical Steam Trap

IBV Series C Carbon Steel Inverted Bucket Vertical Steam Trap Local regulations may restrict the use of this product to below the conditions quoted. In the interests of development and improvement of the product, we reserve the right to change the specification without

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

product manual H-4204 Proving Ring Penetrometer

product manual H-4204 Proving Ring Penetrometer 05.09 product manual H-4204 Proving Ring Penetrometer nnmm Handle Proving Ring Extension Rod Coupler Penetration Rod Cone Figure #1 General Information The Proving Ring Penetrometer is a cone type of penetrometer

More information

IBV Series Z Alloy Steel Inverted Bucket Vertical Steam Trap

IBV Series Z Alloy Steel Inverted Bucket Vertical Steam Trap Local regulations may restrict the use of this product to below the conditions quoted. In the interests of development and improvement of the product, we reserve the right to change the specification without

More information

City of Marquette. Geographic Information Systems (GIS) Global Positioning Systems (GPS)

City of Marquette. Geographic Information Systems (GIS) Global Positioning Systems (GPS) City of Marquette Geographic Information Systems (GIS) Global Positioning Systems (GPS) Presented by: Matthew Koss GIS Engineering Technician Email- makoss@mqtcty.org The main focus of my job at the City

More information

A GEOLOGIC TRIP to the SAN ANDREAS FAULT

A GEOLOGIC TRIP to the SAN ANDREAS FAULT A GEOLOGIC TRIP to the SAN ANDREAS FAULT San Andreas Hot Spot Loop Road Hot Spot P Parking San Andreas Fault Interpretive Trail Fault Zone Map: San Andreas Fault Zone During the 25 million years that the

More information

Pavement Distress Categories

Pavement Distress Categories Pavement Distress Identification Jointed Concrete Pavements Raymond Ong, Purdue University William Flora, INDOT Planning Joyce Stone, INDOT Pavement Engineering Samy Noureldin, INDOT Research Pavement

More information

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates Drilled Shaft Foundations in Limestone Dan Brown, P.E., Ph.D. Dan Brown and Associates Foundation Engineering How we teach our students Fundamental understanding of soil and rock behavior (good!) Focus

More information

NCEES FS Practice Exam

NCEES FS Practice Exam NCEES FS Practice Exam Terrametra Resources Lynn Patten 1. One corner of a 60-ft. 120-ft. lot, otherwise rectangular, is a curve with a radius of 20 ft. and a central angle of 90. The area (ft. 2 ) of

More information

Leveraging GIS data and tools for maintaining hydraulic sewer models

Leveraging GIS data and tools for maintaining hydraulic sewer models Leveraging GIS data and tools for maintaining hydraulic sewer models Ben Gamble & Joseph Koran Metropolitan Sewer District of Greater Cincinnati Carl C. Chan & Michael York CDM Smith Ben Gamble Senior

More information

close to performances of the turbine gas meters designed for custody transfer measurements.

close to performances of the turbine gas meters designed for custody transfer measurements. QUANTOMETER DESIGN AND FUNCTION CPT Quantometers have been designed in order to provide our customers with reliable and inexpensive measuring instruments for secondary flow measurements. Our great experience

More information

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.4 SEISMIC SLOPE STABILITY ANALYSES Parsons P:\Honeywell -SYR\444576 2008 Capping\09 Reports\9.3 December 2009_Capping and

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

Historic Cultural Properties Inventory (HCPI) Base Form (FORM 1)

Historic Cultural Properties Inventory (HCPI) Base Form (FORM 1) Historic Cultural Properties Inventory (HCPI) Base Form (FORM 1) Historic Preservation Division, New Mexico Office of Cultural Affairs For HPD Office use only: HCPI No. District No. NRHP: SRCP: Criteria:

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Scattergraph Principles and Practice Evaluating Self-Cleansing in Existing Sewers Using the Tractive Force Method

Scattergraph Principles and Practice Evaluating Self-Cleansing in Existing Sewers Using the Tractive Force Method Scattergraph Principles and Practice Evaluating Self-Cleansing in Existing Sewers Using the Tractive Force Method Kevin L. Enfinger, P.E. and Paul S. Mitchell, P.E. ADS Environmental Services 4940 Research

More information

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # 3805010019 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FEBRUARY 2013 FINAL RATING: MINIMALLY ACCEPTABLE

More information

Powder River Basin Coal Update

Powder River Basin Coal Update Powder River Basin Coal Update Tom Kraemer Group Vice President Coal Southwest Power Pool Regional State Committee October 24, 2005 - Santa Fe, NM Discussion Topics BNSF coal transportation Historic PRB