1 Using Dynamic Hydraulic Modeling to Understand Sewer Headspace Dynamics - A Case Study of Metro Vancouver's Highbury Interceptor Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd A Still Creek Drive Burnaby, BC, V5C 6G9, Canada (604) ABSTRACT Metro Vancouver's Highbury Interceptor (HI) is a 6.1 km long 2,900 mm diameter combined sewer with significant odor and headspace pressurization issues identified along its length. During winter storms large amounts of air have been observed expelled from manholes and vents, resulting in howling noise. These events are significant enough that manhole covers have been lifted off and residents have reported observing heaving of the asphalt pavement around the interceptor manholes. Pressure monitoring found that two distinctly different mechanisms are influencing the air pressure within the sewer head space. A fully dynamic computer based hydraulic model in XP-SWMM revealed that the unique characteristics of the Highbury Interceptor profile resulted in the headspace in the sewer becoming completely isolated from upstream, downstream and tributary sewers under certain flow conditions. The results of the hydraulic model correlated well with the monitoring data, revealing that the extreme pressurization events occurred immediately following isolation of the headspace. An air displacement model was created, based on the hydraulic model, to develop the design parameters for an air extraction and odor control facility. KEYWORDS Sewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling. INTRODUCTION The Highbury Interceptor(HI) is one of the principletrunk sewers in Metro Vancouver's (MV's) Vancouver Sewerage Area (VSA). It services the majority of the City of Vancouver and a portion of the City of Burnaby. The VSA is currently a combined sewerage network. In recent years the number of complaints related to significant odor and headspace pressurization issues along the length of the HI have increased. Large volumes of air have been observed expelled from manholes and vents during winter storms. These events are significant enough to result in loud howling sounds, manhole covers being lifted off, and residents having reported seeing heaving of the asphalt pavement around the interceptor manholes. SYSTEM DESCRIPTION The HI is 6.1 km long, starts at 1st Avenue in Vancouver, and travels south along Highbury Street. Figure 1 shows an aerial schematic of the HI. Three major interceptors enter the HI at the upstream end of the system; the English Bay Interceptor (EBI), the 8th Avenue Interceptor (8AI),

2 and the Spanish Bank Interceptor. The EBI is a 2,400 mm diameter pipe that runs along 1st Avenue. The 8AI is a 2,600 mm diameter pipe that enters the HI system at 8th Avenue and Highbury Street. Together EBI and 8AI service the majority of the north side of the City Vancouver and a portion of the City of Burnaby. The Spanish Banks Interceptor is a 1,200 mm pipe that services parts of the University of BritishColumbia Campus and the West Point Grey residential area. In addition, at the upstream end of the HI are two overflow siphons; the Alma- Discovery Street Overflow Siphons. From 4th Avenue, to approximately Marine Drive the HI is a tunnel, which consists of a combination of 2,950 mm dia. circular tunnel sections and 2,900 mm dia. Boston Horseshoe shaped (BHS) tunnel sections. The deepest portion of the tunnel is approximately 100 m below ground level. There are only two 300 mm diameter air vents (at 18thAvenue and 33rd Avenue) along the tunnel portionof the sewer. At Marine Drive, the HI flows southwest through the Musqueam Park and the Musqueam Indian Reserve. Inside the Musqueam Indian Reserve the HI crosses Musqueam Creek. At this point the HI becomes a partial siphonfor approximately 18 m. On either side of the creek crossing are 450 mm diameter vents to atmosphere. The HI continues through the Musqueam Indian Reserve to the North Arm of the FraserRiver, at which point it enters the Fraser River Siphon Chamber, which has three 300 mm diameter vents to atmosphere. The HI subsequently turns into a triple barrel siphon, crosses under the Fraser River, and enters the Iona Island Waste Water Treatment Plant (IIWWTP). The HI is a combined sewer system, and thus conveys both sanitary flows and storm flows. Therefore, the flows and air dynamics in the interceptorare affected by daily sanitary diurnal flow patterns and particularly by storm events. MONITORING In order to determine the headspace dynamics within the sewer a differential pressure monitoring program was carried out. The program consisted of two monitoring periods; first from June 25, 2010 to July 27, 2010 (summer program), and the second from September 29, 2010 to October 28,2010 (fall program). The differential pressure monitors record the difference in pressure between the sewer interior and exterior atmospheric pressure. The differential pressure of a sewer reflects the headspace dynamics of the system with positive pressure corresponding to the release of air and odours to the atmosphere and negative pressure corresponding to air drawing in. The pressure monitor is capable of detecting differential pressures between + 50 mm and 50mm water column (W.C.), with a resolution of mm W.C. Monitors were placed at the following locations: 4lh Avenue Manhole; 33rd Avenue Vent; Marine Drive Manhole; Musqueam Creek Crossing North Side Vent; Musqueam Creek Crossing South Side Vent; and Fraser River Siphon Chamber Vent.

3 18th Avenue Vent 300 mm Dia. 33rd Avenue Vent 300 miiii ['..-.: Musquearr Creek Crossinq North Vent 450 mm Dia South Venl 450 rrm Dia Fraser River Siphon Chamber mm Dia Vents Highbury nterceptor Other GVRD Trunk Figure 1 - Layout of the Highbury Interceptor

4 Differential pressure monitoring along the interceptorrevealed that the differential pressure in the sewer typically ranges from -2.5 to 5.0 mm of W.C; however, during some storm events pressure in the sewer increases rapidly, exceeding the differential pressure monitor's range of 50 mm of W.C. Pressures of this magnitude are considered significant and are rarely seen in sewer systems. The data revealed that the pressurization occurs abruptly, indicating a rapid change in displacement in the sewer. Conventional collection system air transport models did not explain this abrupt pressurization (KWL, 2011). Figure 2 shows the differential pressure monitor data for a storm that occurred from October 23-25, 2010, overlaid with the hourly rainfall data. -4th Avenue (0+348) Musqueam Creek South (5+311) -33rd Avenue (3+208) -Fraser River (5+779) Figure 2 - Winter Monitoring Differential Pressure Data -Musqueam Creek North (5+293) Rain Data The following observations are made for each of the time intervals labeled on Figure 2: Period A: This is during the dry weather period, before any rainfall. The graph shows that the 4" Avenue monitor has a distinctly different pattern than any of the other monitors, indicating that its head space is influenced by a different system than the rest of the HI. This makes sense as the 8AI and the EBI are both upstream of the monitor and are influenced by their ventilation dynamics, rather than that of the HI. The four remaining monitors appear to have a similar pattern during normal dry weather flows. Period B: This period occurs during the first portion of the storm event. Up to this point the four monitors, mentioned above, have a similar pattern, however the pressures at 33rd Avenue and Musqueam Creek north abruptly dip to below -50 mm of W.C. and the

5

6

7

Sewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling.

Sewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling. Using Dynamic Hydraulic Modeling to Understand Sewer Headspace Dynamics A Case Study of Metro Vancouver s Highbury Interceptor Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd. 200-4185A Still Creek Drive

More information

Estimating Sewage System Flows

Estimating Sewage System Flows 9 Estimating Sewage System Flows DWSD Wholesale Sewer Rates 201 In this module, you will learn the sources of dry and wet weather flows and how these flows are estimated. Three different tools are used

More information

WEST NORRITON TOWNSHIP

WEST NORRITON TOWNSHIP WEST NORRITON TOWNSHIP SANITARY SEWER SYSTEM INFLOW AND INFILTRATION STUDY November 2013 Rettew Associates, Inc. 3020 Columbia Avenue Lancaster, PA 17603 RECOMMENDATIONS The top four priorities for inflow

More information

Climate Adaptation Challenges for Boston s Water and Sewer Systems

Climate Adaptation Challenges for Boston s Water and Sewer Systems National Association of Flood & Stormwater Management Agencies Climate Adaptation Challenges for Boston s Water and Sewer Systems John P Sullivan P.E. October 15,2014 Boston 1630 Boston 1630-2012 Boston

More information

WASTEWATER FLOW COMPONENTS

WASTEWATER FLOW COMPONENTS Chapter 3 WASTEWATER FLOW COMPONENTS 3.1 INTRODUCTION A sanitary sewer collection system receives two flow components: dry weather flow (DWF) and wet weather flow (WWF). The Base Wastewater Flow (BWF)

More information

Technical Memorandum. Bryan Foster City of Manassas Manassas, VA Date: January 18, Subject: Micron Pond Odor Evaluation

Technical Memorandum. Bryan Foster City of Manassas Manassas, VA Date: January 18, Subject: Micron Pond Odor Evaluation To: Bryan Foster City of Manassas Manassas, VA 20110 Date: January 18, 2019 Subject: 1. Introduction Kimley-Horn and Associates, Inc. (Kimley-Horn) was contracted to perform an evaluation of odor concerns

More information

The City of Clearwater (City) collection

The City of Clearwater (City) collection FWRJ A Matrix Approach to Prioritizing a Sewer Collection System Capital Improvement Plan Amanda Savage, Tara Kivett, Steven Cook, Eric Harold, and Ifetayo Venner The City of Clearwater (City) collection

More information

The University of Akron. William Troyer The Dr. Gary B. and Pamela S. Williams Honors College

The University of Akron. William Troyer The Dr. Gary B. and Pamela S. Williams Honors College The University of Akron IdeaExchange@UAkron Honors Research Projects The Dr. Gary B. and Pamela S. Williams Honors College Spring 2018 Applying Control Logic to the End of the Ohio Canal Interceptor Tunnel

More information

Sanitary Sewer Flow Monitoring Study City of Grandville

Sanitary Sewer Flow Monitoring Study City of Grandville Sanitary Sewer Flow Monitoring Study City of Grandville Prepared for: City of Grandville Kent County, Michigan Report by: Moore & Bruggink Consulting Engineers Grand Rapids, Michigan 13169.1 March 214

More information

3301 East 120 th Avenue Assited Living & Memory Care

3301 East 120 th Avenue Assited Living & Memory Care UTILITY REPORT FOR 3301 East 120 th Avenue Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 Prepared for: 3301 E. 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite

More information

Eastlake Assited Living & Memory Care

Eastlake Assited Living & Memory Care UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.

More information

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 I hereby certify that this

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

Hydrology and Hydraulics Design Report. Background Summary

Hydrology and Hydraulics Design Report. Background Summary To: National Park Services Montezuma Castle National Monument Richard Goepfrich, Facility Manager From: Multicultural Technical Engineers Date: Tuesday - February 13, 2018 Subject: 30% Hydrology and Hydraulics

More information

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California Introduction Beginning in 1999, the University of California,

More information

Vancouver-Point Grey (VNP) MAP A - Vancouver-Point Grey Electoral District

Vancouver-Point Grey (VNP) MAP A - Vancouver-Point Grey Electoral District Statement of Votes Point Grey (VNP) MAP A - Point Grey Fraser River Strait of Georgia English Bay MacDonald St West Sea to Sky Dr University Blvd W 16 Ave Blenheim St 6A 6B City of Vancouver Richmond Centre

More information

Local Flood Hazards. Click here for Real-time River Information

Local Flood Hazards. Click here for Real-time River Information Local Flood Hazards Floods of the White River and Killbuck Creek are caused by runoff from general, and/or intense rainfall. Other areas of flooding concern are from the Boland Ditch and Pittsford Ditch.

More information

Modeling Siphon Weirs within EXTRAN

Modeling Siphon Weirs within EXTRAN Modeling Siphon Weirs within EXTRAN William James and Brett C. Young This chapter presents the background for new code for simulating self-priming siphon-weirs within the Extended Transport (EXTRAN) module

More information

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No:

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No: Technical Memorandum 6500 SW Macadam Avenue, Suite 200 Portland, Oregon, 97239 Tel: 503-244-7005 Fax: 503-244-9095 Prepared for: Project Title: City of Salem, Oregon City of Salem, Stormwater Management

More information

Chapter 5 CALIBRATION AND VERIFICATION

Chapter 5 CALIBRATION AND VERIFICATION Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic

More information

VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT

VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT STORM RAINFALL AND RADAR IMAGERY Total rainfall 4.99 inches 2.74 inches between 5:40 and 7:10, then a lull until 9:30 2.04 inches between 9:30

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

SPAWNER SURVEYS 2014

SPAWNER SURVEYS 2014 SPAWNER SURVEYS 2014 Summary Hadden Creek was the star performer, with solid coho returns and outstanding chinook numbers. Both species were found higher up in the creek than seen previously. Chum returns

More information

Jp2g Consultants Inc.

Jp2g Consultants Inc. Jp2g Consultants Inc. ENGINEERS PLANNERS PROJECT MANAGERS 1150 Morrison Drive, Suite 410 Ottawa, ON K2H 8S9 T 613-828-7800, F 613-828-2600, www.jp2g.com September 20, 2018 City of Ottawa Development Review

More information

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia Brushy Fork Dam is a flood control structure built by the Soil Conservation Service southeast of the city of Franklin in Pendleton County, West

More information

Notes: We all know that Toulmins Spring Branch is a sub-watershed of Three Mile Creek watershed. Some part of it is in Mobile area and rest of it is

Notes: We all know that Toulmins Spring Branch is a sub-watershed of Three Mile Creek watershed. Some part of it is in Mobile area and rest of it is 1 Notes: This presentation is about some of our findings from a study carried out over the last 3-4 months on stormwater management of Toulmins Spring Branch watershed by NEP. The objective of this study

More information

FINAL UTILITY REPORT Creekside Thornton, CO

FINAL UTILITY REPORT Creekside Thornton, CO FINAL UTILITY REPORT Creekside Thornton, CO March 4, 216 Revised: June 27, 216 JN: 1539 Prepared for: HW Sodbusters, LLC 2733 E. Parleys Way, Suite 3 Salt Lake City, UT 8419 P: 81.485.777 Prepared by:

More information

Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study

Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 2016/2017 Results & 2017/2018 Plan May 2, 2018 Angel Mejia, P.E., Project Manager Oliver Pohl, P.E., Sr. Project Engineer Nicole Kwan, P.E.,

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Quarterly Project Status Report September 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update TxDot s contractor has nearly completed the superstructure false work

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Analysis of Hydraulic Impacts on the Schuylkill River

Analysis of Hydraulic Impacts on the Schuylkill River Analysis of Hydraulic Impacts on the Schuylkill River Manayunk Sewer Basin Construction Project and the Venice Island Recreation Center Reconstruction Project Venice Island, Manayunk, Philadelphia, PA

More information

2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING. Master Plan Addendum. Union County B&V PROJECT NO PREPARED FOR

2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING. Master Plan Addendum. Union County B&V PROJECT NO PREPARED FOR Black & Veatch Holding Company 2017. All rights reserved. 2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING Master Plan Addendum B&V PROJECT NO. 195982 PREPARED FOR Union County 7 MARCH 2018 Table of

More information

APPENDIX B DRAINAGE REPORT

APPENDIX B DRAINAGE REPORT APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,

More information

Nine Minimum Controls No. 2

Nine Minimum Controls No. 2 Nine Minimum Controls No. 2 2.0 MAXIMIZATION OF STORAGE IN THE COLLECTION SYSTEM 2.1 OVERVIEW The 2 nd NMC is titled Maximization of Storage in the Collection system. EPA s NMC Guidance explains that this

More information

Regression Analysis of the Variation in Rainfall Derived Inflow and Infiltration

Regression Analysis of the Variation in Rainfall Derived Inflow and Infiltration 3 Regression Analysis of the Variation in Rainfall Derived Inflow and Infiltration Li Zhang, Fang Cheng, Gregory Barden, Hunter Kelly, Timothy Fallara and Edward Burgess Rainfall derived inflow and infiltration

More information

research highlight Wind-Rain Relationships in Southwestern British Columbia Introduction Methodology Figure 2 Lower Mainland meteorological stations

research highlight Wind-Rain Relationships in Southwestern British Columbia Introduction Methodology Figure 2 Lower Mainland meteorological stations research highlight June 2007 Technical Series 07-114 Introduction Building envelope failures in southwestern British Columbia has brought to light the strong influence of wind-driven rain on building envelopes.

More information

REGULATORY, TECHNICAL AND MODELING CHALLENGES TO DEVELOPING A FREQUENCY BASED SSO CONTROL PROJECT IN WAYNE COUNTY, MICHIGAN

REGULATORY, TECHNICAL AND MODELING CHALLENGES TO DEVELOPING A FREQUENCY BASED SSO CONTROL PROJECT IN WAYNE COUNTY, MICHIGAN REGULATORY, TECHNICAL AND MODELING CHALLENGES TO DEVELOPING A FREQUENCY BASED SSO CONTROL PROJECT IN WAYNE COUNTY, MICHIGAN Robert Czachorski, P.E., P.H., Orchard, Hiltz & McCliment, Inc. * John Baratta.

More information

Inflow and Infiltration. John Sorrell, P.E. City of Raleigh Public Utilities Department

Inflow and Infiltration. John Sorrell, P.E. City of Raleigh Public Utilities Department Inflow and Infiltration John Sorrell, P.E. City of Raleigh Public Utilities Department 1 Raleigh s History with I&I Our initial system was designed in 1888. Treatment began in the 1950 s What is I & I?

More information

Flow Monitoring in the Collection System September 11, 2014

Flow Monitoring in the Collection System September 11, 2014 Flow Monitoring in the Collection System September 11, 2014 FISHBECK, THOMPSON, CARR, & HUBER INC. Lori Lloyd, PE, LEED AP BD+C Definitions Why Flow Monitor? Flow Monitoring Applications Site Selection

More information

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By: HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI Project No.

More information

3.0 ROBERTS BANK TIDAL FLAT MORPHOLOGY

3.0 ROBERTS BANK TIDAL FLAT MORPHOLOGY Vancouver Port Authority Northwest Hydraulic Consultants Ltd. /Triton Consultants Ltd. Roberts Bank Container Expansion File: 33863 Coastal Geomorphology Study - 19 - November 2004 3.0 ROBERTS BANK TIDAL

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Quarterly Project Status Report May 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Construction of North Main Street Bridge by TxDOT s bridge contractor, Texas

More information

Regional Snapshot Series: Transportation and Transit. Commuting and Places of Work in the Fraser Valley Regional District

Regional Snapshot Series: Transportation and Transit. Commuting and Places of Work in the Fraser Valley Regional District Regional Snapshot Series: Transportation and Transit Commuting and Places of Work in the Fraser Valley Regional District TABLE OF CONTENTS Complete Communities Daily Trips Live/Work Ratio Commuting Local

More information

Villages at Riverdale Thornton, CO

Villages at Riverdale Thornton, CO FINAL UTILITY REPORT Villages at Riverdale Thornton, CO October 14, 216 Revised: March 29, 217 JN: 1539 Prepared for: PCS Group, Inc. 11 16 th Street #3 B-18 Denver, CO 8265 P: 33.531.495 Prepared by:

More information

8.1 Attachment 1: Ambient Weather Conditions at Jervoise Bay, Cockburn Sound

8.1 Attachment 1: Ambient Weather Conditions at Jervoise Bay, Cockburn Sound 8.1 Attachment 1: Ambient Weather Conditions at Jervoise Bay, Cockburn Sound Cockburn Sound is 20km south of the Perth-Fremantle area and has two features that are unique along Perth s metropolitan coast

More information

Closed duct flows are full of fluid, have no free surface within, and are driven by a pressure gradient along the duct axis.

Closed duct flows are full of fluid, have no free surface within, and are driven by a pressure gradient along the duct axis. OPEN CHANNEL FLOW Open channel flow is a flow of liquid, basically water in a conduit with a free surface. The open channel flows are driven by gravity alone, and the pressure gradient at the atmospheric

More information

Comparing Climate Features

Comparing Climate Features Long-Term Projects Comparing Climate Features A graph of the monthly temperatures and amounts of precipitation for a region is called a climatograph. Climatographs can be used to compare the climates of

More information

HAIDA GWAII CLIMATE ASSESSMENT 2010 Special Report for MIEDS Franc Pridoehl

HAIDA GWAII CLIMATE ASSESSMENT 2010 Special Report for MIEDS Franc Pridoehl HAIDA GWAII CLIMATE ASSESSMENT 2010 Special Report for MIEDS Franc Pridoehl INTRODUCTION Climatic conditions have varied considerably on Haida Gwaii over the past centuries and millennia (Hebda 2007).

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

Name Date Hour Table. Chapter 12-AP Lesson One

Name Date Hour Table. Chapter 12-AP Lesson One Name Date Hour Table 1. Chapter 12-AP Lesson One 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. Name Date Hour Table Directions: Answer each question to create your word bank.

More information

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water. Design Manual Chapter - Stormwater D - Storm Sewer Design D- Storm Sewer Sizing A. Introduction The purpose of this section is to outline the basic hydraulic principles in order to determine the storm

More information

WELCOME Lake Wabukayne OPEN HOUSE

WELCOME Lake Wabukayne OPEN HOUSE WELCOME Lake Wabukayne Sediment Removal Project OPEN HOUSE We are here to: Update you, the community, on recent developments and activities at Lake Wabukayne Present the preferred alternative and receive

More information

Etobicoke Exfiltration System: Monitoring and Evaluation. Tim Van Seters Ryerson University July 24, 2015

Etobicoke Exfiltration System: Monitoring and Evaluation. Tim Van Seters Ryerson University July 24, 2015 Etobicoke Exfiltration System: Monitoring and Evaluation Tim Van Seters Ryerson University July 24, 2015 Presentation Outline Summary of 1994 1995 Candaras Associates study Summary of 1996-1998 SWAMP Study

More information

Appendix A. City of Colusa Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study

Appendix A. City of Colusa Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study Appendix A City of Colusa Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study Site 3 Site 4 Site 5 Site 2 Site 1 SANITARY SEWER FLOW MONITORING AND INFLOW / INFILTRATION STUDY City of Colusa April

More information

AHEAD OF THE STORM: Extreme Weather Resilience in the City of Toronto

AHEAD OF THE STORM: Extreme Weather Resilience in the City of Toronto AHEAD OF THE STORM: Extreme Weather Resilience in the City of Toronto David MacLeod Toronto Environment and Energy Office Environmental Applied Science and Management Symposium 2013 March 21, 2013 Ahead

More information

Seasonal Variations of the Urban Heat Island Effect:

Seasonal Variations of the Urban Heat Island Effect: Seasonal Variations of the Urban Heat Island Effect: Examining the Differences in Temperature Between the City of Philadelphia and its Outlying Suburbs By: Frank Vecchio 1 P a g e We re calling for a high

More information

Presented at WaPUG Spring Meeting 1 st May 2001

Presented at WaPUG Spring Meeting 1 st May 2001 Presented at WaPUG Spring Meeting 1 st May 21 Author: Richard Allitt Richard Allitt Associates Ltd 111 Beech Hill Haywards Heath West Sussex RH16 3TS Tel & Fax (1444) 451552 1. INTRODUCTION The Flood Estimation

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

Future Weather in Toronto and the GTA

Future Weather in Toronto and the GTA Future Weather in Toronto and the GTA Due to Climate Change Electrical Sector Meeting, Nov. 23 rd, 2011 Christopher Ll. Morgan, PhD Toronto Environment Office Contents 2 Introduction (Why We Did What We

More information

CITY OF FLORENCE, SC Monthly Financial Report January 2017

CITY OF FLORENCE, SC Monthly Financial Report January 2017 CITY OF FLORENCE, SC Monthly Financial Report City of Florence Finance Department City of Florence, SC Monthly Financial Report Table of Contents For the Month Ended January 31, 2017 General Fund 2 Water

More information

Drainage Master Plan Update

Drainage Master Plan Update Water Resources City of White Rock Drainage Master Plan Update Final Report Prepared by: AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax www.aecom.com Project

More information

Wayne County Downriver Sewage Disposal System. Annual System Monitoring Report for 2016

Wayne County Downriver Sewage Disposal System. Annual System Monitoring Report for 2016 Annual System Monitoring Report for 26 Report to Wayne County and Communities Prepared By: Applied Science, Inc. 3 River Place, Suite 54 Detroit, MI 4827 and Wayne County Department of Public Services

More information

Erosion Information Paper - South Naknek, Alaska Current as of November 14, 2007

Erosion Information Paper - South Naknek, Alaska Current as of November 14, 2007 U.S. Army Corps of Engineers ALASKA BASELINE EROSION ASSESSMENT Erosion Information Paper - South Naknek, Alaska Current as of November 14, 2007 Community Information South Naknek (NACK-neck), originally

More information

Update on Seasonal Conditions & Summer Weather Outlook

Update on Seasonal Conditions & Summer Weather Outlook Update on Seasonal Conditions & Summer Weather Outlook Andy Bryant National Weather Service Portland, Oregon June 6, 2018 Overview Quick review of winter and spring conditions Seasonal water supply forecasts

More information

Typical Hydrologic Period Report (Final)

Typical Hydrologic Period Report (Final) (DELCORA) (Final) November 2015 (Updated April 2016) CSO Long-Term Control Plant Update REVISION CONTROL REV. NO. DATE ISSUED PREPARED BY DESCRIPTION OF CHANGES 1 4/26/16 Greeley and Hansen Pg. 1-3,

More information

Severe Storm Response Version # 1-0-1

Severe Storm Response Version # 1-0-1 Severe Storm Response Version # 1-0-1 Weather Warnings Environment Canada issues severe weather warnings, watches and advisories Weather Watch Severe weather may develop. Weather Warning Severe weather

More information

Storm and Runoff Calculation Standard Review Snowmelt and Climate Change

Storm and Runoff Calculation Standard Review Snowmelt and Climate Change Storm and Runoff Calculation Standard Review Snowmelt and Climate Change Presented by Don Moss, M.Eng., P.Eng. and Jim Hartman, P.Eng. Greenland International Consulting Ltd. Map from Google Maps TOBM

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

Objective 3: Earth and Space Systems

Objective 3: Earth and Space Systems Name Class Period: Objective 3: Earth and Space Systems 1. The diagram above shows the orbit of the moon around Earth. At which point in the moon s orbit will a person standing on Earth see a waxing crescent

More information

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example

More information

Winning Farm of Winchester

Winning Farm of Winchester Winning Farm of Winchester Planning Board Presentation Winning Farm of Winchester 12.9 acres of undeveloped forest on the former Winning Farm site Located north of Thornberry Road in the northwestern corner

More information

Leveraging GIS data and tools for maintaining hydraulic sewer models

Leveraging GIS data and tools for maintaining hydraulic sewer models Leveraging GIS data and tools for maintaining hydraulic sewer models Ben Gamble & Joseph Koran Metropolitan Sewer District of Greater Cincinnati Carl C. Chan & Michael York CDM Smith Ben Gamble Senior

More information

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design DRAINAGE REPORT Ministry of Transportation and Infrastructure Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design December 14, 2017 Reviewed by: Amanda Rust, P. Eng. Senior Drainage

More information

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT Presentation Overview Review of Flash Flooding and Flooding from High Lake Levels (August 20 th -Present) Lake Level Information Damages FEMA How

More information

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel TO... J. C. Foweraker 2... Head Gr o w a t er S e c t i on... Hyar....og~~~.~.~vis.ion... wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... eernment OF BRITISH COLUMBIA MEMORANDUM II 0 PROM A. P. Kohut, Geological

More information

RR#5 - Free Response

RR#5 - Free Response Base your answers to questions 1 through 3 on the data table below and on your knowledge of Earth Science. The table shows the area, in million square kilometers, of the Arctic Ocean covered by ice from

More information

FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT

FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT Incident Number: 2019-982 Incident Name: I-4 Road Closure Occurred: 2/19/2019 06:35 ET Reported to SWO: 2/19/2019 06:46

More information

Appendix. Pairwise Comparison Results

Appendix. Pairwise Comparison Results ppendix Pairwise Comparison Results This section summarizes method for prioritization of the pump station and force main repair or upgrade projects. Major pump station mechanical, electrical, and plumbing

More information

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses

More information

About places and/or important events Landmarks Maps How the land is, hills or flat or mountain range Connected to maps World Different countries

About places and/or important events Landmarks Maps How the land is, hills or flat or mountain range Connected to maps World Different countries What do you think you know about geography? About places and/or important events Landmarks Maps How the land is, hills or flat or mountain range Connected to maps World Different countries What do you

More information

March 3, 2011 Update. Mike Welvaert National Weather Service La Crosse, WI. March 3, 2011

March 3, 2011 Update. Mike Welvaert National Weather Service La Crosse, WI. March 3, 2011 March 3, 2011 Update Mike Welvaert National Weather Service La Crosse, WI March 3, 2011 Discussion Points Flood Setup A Wet Fall and Snowy Winter 2011 Spring Flood Outlooks Precipitation: Sept 3 2010 March

More information

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B)

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B) 1. When snow cover on the land melts, the water will most likely become surface runoff if the land surface is A) frozen B) porous C) grass covered D) unconsolidated gravel Base your answers to questions

More information

Impact of Inflow and Infiltration on Wastewater Assets

Impact of Inflow and Infiltration on Wastewater Assets Impact of Inflow and Infiltration on Wastewater Assets Nicole van Rooyen Matt Hardin School of Mechanical and Chemical Engineering Richard Forrest, Geoff Hughes and Cheryl Delport CEED Client: Water Corporation

More information

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017 SERVICING BRIEF & STORMWATER MANAGEMENT REPORT 2980 Colonial Road Sarsfield (Ottawa), Ontario Report No. 16033 June 15, 2017 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading &

More information

Storm Sewer Design [2]

Storm Sewer Design [2] Class 5 [1] Storm Sewer Design 9. Check Q < Qf and Vmax > vf > Vmin. Vmin is normally specified to avoid sedimentation. This will normally be 1.0 m/s at pipe full condition. (BS EN 752 suggests that for

More information

Probabilistic forecasting for urban water management: A case study

Probabilistic forecasting for urban water management: A case study 9th International Conference on Urban Drainage Modelling Belgrade 212 Probabilistic forecasting for urban water management: A case study Jeanne-Rose Rene' 1, Henrik Madsen 2, Ole Mark 3 1 DHI, Denmark,

More information

September 18, 2017 Project No.: 5077

September 18, 2017 Project No.: 5077 #109 3011 Underhill Avenue Burnaby, BC V5A 3C2 Phone: (604) 421-3288 Email: info@terrangeo.com September 18, 2017 Project No.: 5077 Kevin Brooks City of Campbell River 301 St. Ann s Road Campbell River,

More information

Create A Watershed Profile

Create A Watershed Profile Name Date Follow the steps below with Chesapeake Bay FieldScope to create a watershed profile for your location. Part 1. Take a trip down your tributaries. Create A Watershed Profile 1. Find your field

More information

The hydrologic service area (HSA) for this office covers Central Kentucky and South Central Indiana.

The hydrologic service area (HSA) for this office covers Central Kentucky and South Central Indiana. MONTH YEAR January 2011 February 15, 2011 X An X inside this box indicates that no flooding occurred within this hydrologic service area. January 2011 was drier than normal in all locations in the area.

More information

Roadway Traffic Noise Feasibility Assessment. 315 Chapel Street. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. 315 Chapel Street. Ottawa, Ontario Roadway Traffic Noise Feasibility Assessment 315 Chapel Street Ottawa, Ontario REPORT: GWE17-002 - Traffic Noise Prepared For: Leanne Moussa Allsaints 10 Blackburn Avenue K1N 6P8 Ottawa, Ontario Prepared

More information

2015 Fall Conditions Report

2015 Fall Conditions Report 2015 Fall Conditions Report Prepared by: Hydrologic Forecast Centre Date: December 21 st, 2015 Table of Contents Table of Figures... ii EXECUTIVE SUMMARY... 1 BACKGROUND... 2 SUMMER AND FALL PRECIPITATION...

More information

SIMMER WORKSHOP (Science, Policy & Heat-Health Decision Making) Toronto

SIMMER WORKSHOP (Science, Policy & Heat-Health Decision Making) Toronto SIMMER WORKSHOP (Science, Policy & Heat-Health Decision Making) Toronto Weather & Climate Modelling in Toronto & The Significant Results for Public Health October 24, 2013 Christopher Ll. Morgan, PhD Program

More information

Section A: National Data System Coding

Section A: National Data System Coding UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Washington, D.C. 20460 NPDES Compliance Inspection Report Section A: National Data System Coding Form Approved OMB No. 2040-0003 Approval Expires 7-31-85 Transaction

More information

PREDICTING THE WEATHER

PREDICTING THE WEATHER NAME DATE PARTNER(S) PREDICTING THE WEATHER How well does your local weatherman do in predicting the weather? Is he or she more accurate for the next day or for a week in the future? Why do you think that

More information

RISK ASSESSMENT COMMUNITY PROFILE NATURAL HAZARDS COMMUNITY RISK PROFILES. Page 13 of 524

RISK ASSESSMENT COMMUNITY PROFILE NATURAL HAZARDS COMMUNITY RISK PROFILES. Page 13 of 524 RISK ASSESSMENT COMMUNITY PROFILE NATURAL HAZARDS COMMUNITY RISK PROFILES Page 13 of 524 Introduction The Risk Assessment identifies and characterizes Tillamook County s natural hazards and describes how

More information

Summary of the 2017 Spring Flood

Summary of the 2017 Spring Flood Ottawa River Regulation Planning Board Commission de planification de la régularisation de la rivière des Outaouais The main cause of the exceptional 2017 spring flooding can be described easily in just

More information

ATS 351, Spring 2010 Lab #9 Weather Radar - 55 points

ATS 351, Spring 2010 Lab #9 Weather Radar - 55 points ATS 351, Spring 2010 Lab #9 Weather Radar - 55 points 1. (5 points) If a radar has a maximum unambiguous range of 300km, what is its PRF? (The speed of light, c, is equal to 3x10 8 m/s) 2. (5 points) Explain

More information

Clark Regional Wastewater District

Clark Regional Wastewater District 2016 Clark Regional Wastewater District Infiltration and Inflow Report For Salmon Creek Treatment Plant February 13, 2017 In Compliance with the NPDES Waste Discharge Permit No. WA-002363-9 Special Condition

More information

Flood Scenario Worksheet

Flood Scenario Worksheet Flood Scenario Worksheet Scenario adapted from: http://www.epa.gov/watersecurity/tools/trainingcd/simple/source/scenario-8/ssc8-0.pdf Simple Tabletop Exercise, Interdependency Natural Disaster Scenario,

More information

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215

More information