1 DT FROM PORT OF MIAMI PORT OF MIAMI TUNNEL TO SR 836/I NEW ROAD CONSTRUCTION $2,514,664 $790,186 - DESIGN/BUILD LF 2,766 2,849 2,935 3,023 3,113 DESIGN/BUILD GMR 22,152 22,990 24,338 25,357 24,712 OPERATIONS DI 19,107 19,507 19,435 19,729 21,726 DT FROM WEST OF I-95 SR 836/I TO MACARTHUR CAUSEWAY BRIDGE BRIDGE-REPLACE AND ADD LANES $800,474 $680,011 - DESIGN/BUILD DDR DESIGN/BUILD DI 15, DESIGN/BUILD DI 3, DESIGN/BUILD STED 100, DT SR 9A/I-95 SB RAMP TO WB SR INTERCHANGE IMPROVEMENT $41,665 $0 - DESIGN/BUILD DI 0 5, DESIGN/BUILD DIH FY - Approved June 21, 2018 Section A18 - Page 1 of 13
2 DESIGN/BUILD STED 0 35, DT SR 826/PALMETTO EXPRESSWAY SR 826 EB RAMP TO SR 9A/I-95 NB 4.4 INTERCHANGE RAMP (NEW) $187,874 $27,892 - RIGHT OF WAY DI RIGHT OF WAY DSBD 9, CONSTRUCTION ACNP , CONSTRUCTION DDR ,721 5,705 CONSTRUCTION DIH CONSTRUCTION DSBD , DT GOLDEN GLADES INTERCHANGE VARIOUS RAMP IMPROVEMENTS 1.8 INTERCHANGE RAMP (NEW) $56,956 $978 - PRELIMINARY ENGINEERING DDR PRELIMINARY ENGINEERING DS CONSTRUCTION ACNP , CONSTRUCTION DIH FY - Approved June 21, 2018 Section A18 - Page 2 of 13
3 DT SR 9A/I-95 NB 2.2 FROM BISCAYNE RIVER CANAL TO SR 860/MIAMI GARDEN DR WIDEN/RESURFACE EXIST LANES $42,378 $1,052 - RAILROAD & UTILITIES ACNP 0 0 1, CONSTRUCTION ACNP , DT SR 826 CONNECTOR AT GOLDEN GLADES INTERCHG AND VARIOUS RAMPS 1.5 $69,726 $3,793 - RIGHT OF WAY DDR RIGHT OF WAY DIH RIGHT OF WAY DSBD 1, CONSTRUCTION ACNP , CONSTRUCTION SU 0 0 8,737 2,244 0 CONSTRUCTION DDR 0 0 1, CONSTRUCTION DIH CONSTRUCTION DS ,536 1,712 CONSTRUCTION DSBD 0 0 4, ALTERNATIVE CONTRACTING INCENTIVES SU FY - Approved June 21, 2018 Section A18 - Page 3 of 13
4 DT SR 826/PALMETTO EXPRESSWAY FROM I-75 TO N OF CANAL C-8 BRIDGE (APPROX NW 162 ST) 1.9 $234,697 $10,916 - RIGHT OF WAY ACNP 10, RIGHT OF WAY SU 0 8, RIGHT OF WAY DDR RIGHT OF WAY DIH RIGHT OF WAY DSBD , CONSTRUCTION ACNP ,828 14,116 CONSTRUCTION DDR ,320 2,499 CONSTRUCTION DI ,368 0 CONSTRUCTION DIH DT SR 826/PALMETTO EXPRESSWAY FROM N OF CANAL C-8 BRIDGE (NW 162 ST) TO E OF NW 67 AVE 1.6 $121,059 $6,496 - RIGHT OF WAY DDR RIGHT OF WAY DIH RIGHT OF WAY ACNP 4,500 2, RIGHT OF WAY DSBD CONSTRUCTION ACNP ,414 7,399 CONSTRUCTION DI ,737 0 FY - Approved June 21, 2018 Section A18 - Page 4 of 13
5 CONSTRUCTION DIH DT SR 112/I-195 FRONTAGE RD & RAMP REALIGNMENT (MIAMI DESIGN DISTRICT) 0.5 NEW ROAD CONSTRUCTION $6,350 $447 - RAILROAD & UTILITIES LF CONSTRUCTION ACNP 0 4, CONSTRUCTION DDR CONSTRUCTION DIH CONSTRUCTION DIS ALTERNATIVE CONTRACTING INCENTIVES DDR TP WIDEN HEFT - BIRD RD - SR 836(MP ) 6 TO 10 LANES INC EXPRESS LANES 3.1 $155,241 $155,051 - DESIGN/BUILD PKBD 10, TP WIDEN HEFT - SW 288 ST TO SW 216 ST (MP ) 4 TO 6 LANES INC EXPRESS LANES 6.5 $82,220 $81,755 - DESIGN/BUILD PKYI 6, FY - Approved June 21, 2018 Section A18 - Page 5 of 13
6 TP WIDEN HEFT - NW 106TH ST TO I-75 (MP 34-39) 6 TO 10 LANES W/EXP LANES Widening of the Turnpike from NW 106th to I-75 from 6 to 10 lanes. Includes 2 new express lanes in each direction 6.2 $111,924 $763 - PRELIMINARY ENGINEERING PKYI 4, RAILROAD & UTILITIES PKYI CONSTRUCTION PKYI 194, , TP WIDEN HEFT - SR 836 TO NW 106TH ST (MP26-34) 6/8 TO 10 LANES INC EXP LANES Widens the Turnpike/SR 821 from the Dolphin Expressway/SR 836 to NW 106th Street from 6 to 10 travel lanes. The new lanes will be express lanes. Work also includes pavement reconstruction, milling 6.0 and resurfacing. $214,030 $6,068 - RAILROAD & UTILITIES PKYI 2, ENVIRONMENTAL PKYI CONSTRUCTION PKYI 230, , TP GOLDEN GLADES INTERCHANGE IMPROVEMENTS (MAINLINE SPUR MP 0X) Implements operational improvments at the Golden Glades Interchange for the movement from the Turnpike Mainline / SR 91 SB to I-95 SB 2.7 INTERCHANGE - ADD LANES $68,461 $3,035 - RIGHT OF WAY PKYI 6, CONSTRUCTION PKBD , CONSTRUCTION PKYI FY - Approved June 21, 2018 Section A18 - Page 6 of 13
7 TP GOLDEN GLADES INTERCHANGE BRIDGE IMPROVEMENT (#870038) 0.1 BRIDGE REPLACEMENT $11,134 $ CONSTRUCTION PKBD 0 0 9, CONSTRUCTION PKYI TP GOLDEN GLADES INTERCHANGE IMPROVEMENT - I-95 SOUTHBOUND 1.1 INTERCHANGE IMPROVEMENT $63,080 $3,328 - RIGHT OF WAY PKYI 1,953 3,830 1, CONSTRUCTION PKBD , CONSTRUCTION PKYI ,200 0 TP GOLDEN GLADES INTERCHANGE IMPROVEMENTS N/B DIRECT CONNECT BRIDGE 0.5 NEW BRIDGE CONSTRUCTION $57,267 $5,038 - CONSTRUCTION PKBD , CONSTRUCTION PKYI FY - Approved June 21, 2018 Section A18 - Page 7 of 13
8 TP GOLDEN GLADES INTERCHANGE IMPROVEMENTS - SPUR 0.5 INTERCHANGE IMPROVEMENT $31,572 $3,282 - CONSTRUCTION PKBD , CONSTRUCTION PKYI TP HEFT & SURFACE ST IMPROVEMENTS FROM HAINLIN MILLS TO US 1 MP INTERCHANGE JUSTIFICA/MODIFICA $30,874 $3,379 - RAILROAD & UTILITIES PKYI ENVIRONMENTAL PKYI CONSTRUCTION PKYI 0 26, XA SR 836/I-95 Interchange Improvements NW 17th Ave I-95 Improvements to SR 836 from NW 17th Avenue to I-95, includes widening and operational improvements to SR 836 EB from NW 17th Ave to I-95 Interchange, widening of the SR 836 bridges over the 2.0 Widening and Operational Improvements $240,884 $61,824 Miami River and improvements to the SR 836 WB mainline, and new connector serving SB I-95 traffic destined WB on SR 836 and to the Civic Center. - RIGHT OF WAY MDX 2, DESIGN/BUILD MDX 40,248 47,204 40,584 41,375 7,182 FY - Approved June 21, 2018 Section A18 - Page 8 of 13
9 XA SR 836 (DOLPHIN) NEW HEFT RAMP CONNECTIONS NORTHBOUND / SOUTHBOUND HEFT EASTBOUND / WESTBOUND SR 836 (DOLPHIN) New connections from SR 836 to the HEFT, includes EB SR 836 to NB HEFT general purpose lanes, and SB HEFT general purpose lanes to WB SR 836, as well as ramps to and from the Dolphin Station 0.0 Park & Ride. Partnership with FTE. New Connector $51,190 $5,233 - DESIGN/BUILD MDX 20,823 15,547 9, XA SR 924 Gratigny West Extension to HEFT SR 826 (Palmetto) / I-75 SR 821 (HEFT) Expressway extension from SR 924 west to the Homestead Extension of the Florida's Turnpike (HEFT). 2.3 System Expansion $292,895 $28,469 - PLANNING MDX 1, RIGHT OF WAY MDX 14,845 3,185 3, DESIGN/BUILD MDX 7,241 24,137 48,273 25,343 15,689 Yearly Totals 735, , , , ,553 5 Year TIP Total $2,196,485 FY - Approved June 21, 2018 Section A18 - Page 9 of 13
10 Multimodal TA GOLDEN GLADES MULTI- MODAL TERMINAL 0.0 INTERMODAL HUB CAPACITY $69,159 $61,421 - DESIGN/BUILD SU 2, DESIGN/BUILD DDR 867 2, DESIGN/BUILD TRIP DESIGN/BUILD TRWR 1, Yearly Totals 5,168 2, Year TIP Total $7,738 FY - Approved June 21, 2018 Section A18 - Page 10 of 13
11 Road DT SW 312 ST/CAMPBELL DR 0.8 FROM SR 997/KROME AVE TO SR 5/US 1 (TRUCK BYPASS) FLEXIBLE PAVEMENT. $45,125 $6,471 - RAILROAD & UTILITIES LF 2, RIGHT OF WAY ACNP 1, RIGHT OF WAY ACSA 4, RIGHT OF WAY SA 3,400 7, RIGHT OF WAY SU 3, CONSTRUCTION ACSU CONSTRUCTION SA CONSTRUCTION SU 12,479 2, ALTERNATIVE CONTRACTING INCENTIVES SU DT SR 25/OKEECHOBEE RD FROM BROWARD COUNTY LINE TO WEST OF HEFT 4.6 $52,635 $5,042 - RIGHT OF WAY DDR 4,100 2, RIGHT OF WAY DIH CONSTRUCTION DDR ,123 0 CONSTRUCTION DI ,072 0 CONSTRUCTION DIH FY - Approved June 21, 2018 Section A18 - Page 11 of 13
12 Road DT SR 25/OKEECHOBEE RD 1.8 FROM E OF NW 107 AVE TO E OF NW 116 WAY (CONCRETE) REHABILITATE PAVEMENT $134,720 $13,301 - RIGHT OF WAY BNDS RIGHT OF WAY BNIR 3,144 11, RIGHT OF WAY DI 7, RIGHT OF WAY DIH CONSTRUCTION ACNP , CONSTRUCTION DIH CONSTRUCTION STED , DT SR 25/OKEECHOBEE RD 0.8 FROM W OF NW 138 ST TO E OF NW 107 AVE (CONCRETE) REHABILITATE PVMNT $33,134 $2,781 - CONSTRUCTION DDR 1, CONSTRUCTION DIH CONSTRUCTION DIS 11, CONSTRUCTION SIWR 3, CONSTRUCTION PKYI 14, FY - Approved June 21, 2018 Section A18 - Page 12 of 13
13 Road DT FROM SW 296 ST SR 997/KROME AVE TO S OF SW 232 ST 3.7 $96,030 $27,817 - RIGHT OF WAY DDR 6,555 5, RIGHT OF WAY DIH RIGHT OF WAY DSBD 10, RAILROAD & UTILITIES LF CONSTRUCTION ACNP 36,027 5, CONSTRUCTION DDR 1, ALTERNATIVE CONTRACTING INCENTIVES ACNP ALTERNATIVE CONTRACTING INCENTIVES DDR Yearly Totals 129,338 33,716 99,314 43, Year TIP Total $306,232 TOTAL COST - ALL PROJECTS Yearly Totals - 870, , , , ,553 5 Year TIP Total 2,510,455 FY - Approved June 21, 2018 Section A18 - Page 13 of 13
MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS
Freeway DT2495811 SR 826/SR 836 2495811 FROM N OF SW 8 ST And from NW 87 to 57 Avenues 4.8 TO S OF NW 25 ST & FM NW 87 TO 57 AVE' INTERCHANGE - ADD LANES $851,335 $804,835 - - DESIGN/BUILD LF 46,500 0
More informationFUND THAN THAN ALL CODE YEARS
PAGE 1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/20/2012 HIGHWAYS ITEM NUMBER:230724 1 PROJECT DESCRIPTION:ANDREWS AVE EXT FROM POMPANO PARK PLACE TO S. OF ATLANTIC BLVD *NON-SIS* DISTRICT:04 COUNTY:BROWARD
More informationROADWAY ID: PROJECT LENGTH:.000 LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 FUND THAN THAN ALL CODE YEARS
PAGE 1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/03/2017 ITEM NUMBER:430947 1 PROJECT DESCRIPTION:ITS EQUIPMENT REPLACEMENT CONSULTANT / GRANT *SIS* DISTRICT:04 COUNTY:BROWARD TYPE OF WORK:ITS
More informationAPPENDIX (R) Committed Developments Documentation
APPENDIX 21-10 (R) Committed Developments Documentation Revised October 2008 Committed Developments Trip Generation Beacon Countyline DRI Development Location Land Use Approved Built Remaining PM Peak
More informationFUND THAN THAN ALL CODE YEARS
PAGE 1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 HIGHWAYS ITEM NUMBER:434452 1 PROJECT DESCRIPTION:SR 11 (MOODY BLVD) RAIL CROSSING # 271908-S REHABILITATION *NON-SIS* DISTRICT:05 COUNTY:FLAGLER
More informationMarket Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management
Transportation Impact Analysis Market Street PDP Nassau County, Florida Submitted to Nassau County Growth Management Prepared for TerraPointe Services, Inc. Prepared by VHB/Vanasse Hangen Brustlin, Inc.
More informationThe Sunland Park flyover ramp is set to close the week of March 19 until early summer
March 2, 2018 The Sunland Park flyover ramp is set to close the week of March 19 until early summer GO 10 is targeting the week of March 19 to close the Sunland Park Drive flyover entrance ramp to I 10
More informationWest Tennessee Construction June 14-21, 2017
FOR IMMEDIATE RELEASE Wednesday, June 14, 2017 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction June 14-21, 2017 BENTON COUNTY, I-40 Truck Climbing Lane Wednesday, June 7 through
More informationTransportation Improvement Program
Transportation Improvement Program FISCAL YEARS 2017/2018-2021/2022 Draft: May 10, 2017 The preparation of this document has been financed in part through a grant from the U.S. Department of Transportation
More informationSubmittal/Approval Letter
Submittal/Approval Letter To: Patrick Muench, P.E. Date: May 1, 2017 Turnpike Design Engineer Financial Project ID: 436517-1-52-01 & 436517-3-52-01 New Construction ( ) RRR ( ) Federal Aid : Not Applicable
More informationFY 2018 Ten Year Capital Plan Review Project List
FY 2018 Ten Year Capital Plan Review Project List Program Category FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 Highway Roadway/Safety 100,950,000 128,431,766 125,896,635 91,153,571
More informationProject Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County
Project Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County TIP No. U-2827 B WBS # 34872.1.1 June 2013 Prepared for North Carolina Department of Transportation Prepared by Project
More informationFINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005
FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005 Prepared For: EDAW, Inc. 1420 Kettner Boulevard, Suite 620
More informationWEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project
WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 Executive Summary Page 2.0 Introduction 2.1 DEVELOPMENT
More informationFY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission
FY 2010 Continuing i Planning Program Product Report Local Transportation and Traffic Data Travel Time and Delay Data for Belpre and Marietta, Ohio Wood-Washington-Wirt Interstate Planning Commission CONTINUING
More informationA Study of Red Light Cameras in Kansas City, MO
A Study of Red Light s in Kansas City, MO Prepared by the Special Operations Division Executive Summary This paper will analyze the crash data for the 29 red light cameras located in 17 intersections in
More informationS.170 th Street Micro-Simulation Seattle-Tacoma International Airport Port of Seattle/Aviation Planning
Seattle-acoma International Airport Port of Seattle/Aviation Planning Port of Seattle PO OF SEAE Aviation Planning Airport Operations January 24, 2013 Summary he Port is planning to relocate the cell phone
More informationVHD Daily Totals. Population 14.5% change. VMT Daily Totals Suffolk 24-hour VMT. 49.3% change. 14.4% change VMT
6.9 Suffolk 6-54 VMT Population and Travel Characteristics Population 14.5% change 2014 1,529,202 VHD Daily Totals 2014 251,060 49.3% change 2040 1,788,175 2040 374,850 VMT Daily Totals 2014 39,731,990
More informationAPPENDIX IV MODELLING
APPENDIX IV MODELLING Kingston Transportation Master Plan Final Report, July 2004 Appendix IV: Modelling i TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 OBJECTIVE... 1 3.0 URBAN TRANSPORTATION MODELLING
More informationSubmittal/Approval Letter
Submittal/Approval Letter To: Patrick Muench, P.E. Date: May 1, 2017 Turnpike Design Engineer Financial Project ID: 436517-1-52-01 & 436517-3-52-01 New Construction ( ) RRR ( ) Federal Aid : Not Applicable
More informationTRAFFIC IMPACT STUDY MANUFACTURING COMPANY
TRAFFIC IMPACT STUDY For MANUFACTURING COMPANY Prepared For: Airway Heights, WA Prepared By: SUNBURST ENGINEERING, P. S. 4310 S. Ball Dr. Veradale, WA 99037 April, 2013 TRAFFIC IMP ACT STUDY Manufacturing
More informationSubmittal/Approval Letter
Submittal/Approval Letter To: Patrick Muench, P.E. Date: June 14, 2017 Turnpike Design Engineer Financial Project ID: 436517-1-52-01 & 436517-3-52-01 New Construction ( ) RRR ( ) Federal Aid : Not Applicable
More informationI-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov February 9, 2018 I-10 East at Redd closes for 24 hours this Sunday, Feb 11
More informationFLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT
FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT Incident Number: 2018-6664 Incident Name: Southbound I-75 Closed Occurred: 10/26/2018 01:26 ET Reported to SWO: 10/26/2018
More informationAASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response
AASHTO Committee on Maintenance 2018 Annual Meeting July 25, 2018 Hurricane Irma- Preparation and Response Rudy Powell Director, Office of Maintenance Satellite Aerial Image (September 10, 2017) Hurricane
More informationJEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:
JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH 45243 Email: jackpflum1@gmail.com Telephone: 513.919.7814 MEMORANDUM REPORT Traffic Impact Analysis Proposed Soccer
More informationCVS Derwood. Local Area Transportation Review
CVS Derwood Montgomery County, Maryland May 27, 2016 Local Area Transportation Review Prepared for: JC Bar Properties, Inc. Steve Fleming, PE 415 Fallowfield Road, Suite 301 Camp Hill, Pennsylvania 17011
More informationFINAL REPORT. City of Toronto. Contract Project No: B
City of Toronto SAFETY IMPACTS AND REGULATIONS OF ELECTRONIC STATIC ROADSIDE ADVERTISING SIGNS TECHNICAL MEMORANDUM #2B BEFORE/AFTER COLLISION ANALYSIS AT MID-BLOCK LOCATIONS FINAL REPORT 3027 Harvester
More informationTRAFFIC ALERT FOR WEEK OF February 4 8, 2008
TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during
More informationTraffic Impact Analysis. for the STARBUCKS STORE. Located at 9900 BALBOA BOULEVARD. Submitted to CITY OF LOS ANGELES. January 2017.
Traffic Impact Analysis for the STARBUCKS STORE Located at 9900 BALBOA BOULEVARD Submitted to CITY OF LOS ANGELES January 2017 Submitted By January 5, 2017 Ken A. Aitchison, P.E. Transportation Engineering
More informationAppendix C STAMSON Noise Model Output File for Tunnel Alternative (Alternative 3)
Appendix C STAMSON Noise Model Output File for Tunnel Alternative (Alternative 3) Detroit River International Crossing Study STAMSON 5.0 NORMAL REPORT Date: 21-02-2007 01:14:41 MINISTRY OF ENVIRONMENT
More informationMADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015
MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015 TABLE OF CONTENTS... 3 Proposed Development... 3 Methodology... 3 Phase 1 Development...
More informationMEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections:
MEMORANDUM DATE: JULY 6, 2012 TO: FROM: RE: CC: MELANIE KNIGHT BRAD BYVELDS/ JENNIFER LUONG 1050 SOMERSET STREET PRELIMINARY TRAFFIC ANALYSIS OUR FILE NO. 111152 NEIL MALHOTRA The purpose of this memo
More informationFY Transportation Improvement Program
FY 2009-2013 Transportation Improvement Program Adopted July 10, 2008 Amended 9/11/2008; 4/09/09; 7/29/09 Space Coast Transportation Planning Organization Transportation Improvement Program - FY 2008/09
More informationDISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD
HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION
More informationFocused Traffic Analysis for the One Lincoln Park Project
September 15, 2015 Mr. Bill Johnson Coldwell Banker 511 Sir Francis Drake Boulevard Greenbrae, CA 94904 Focused Traffic Analysis for the One Lincoln Park Project Dear Mr. Johnson; As requested, W-Trans
More informationCONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors]
CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors] Travel Time and Delay Analysis for Belpre (OH) and Marietta (OH) Fiscal Year 2009 Report WOOD WASHINGTON
More informationNORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet September 2015 RECOMMENDED ALTERNATIVES Environmental Impact Statement (EIS) Project Divided into 3 Segments Segment 1:
More informationWelcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager
Welcome to the Business Owner Task Force Selma Stockstill SouthGate Constructors Public Information Manager Interim Project Limits SH 183 SH 121 to IH 35E SH 114 International Parkway to SH 183 Loop 12
More informationOREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM
OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/22/2019 4:20:05 AM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only
More informationI-95/I-85 INTERCHANGE ROADWAY SAFETY ASSESSMENT
FINAL REPORT I-95/I-85 INTERCHANGE ROADWAY SAFETY ASSESSMENT Prepared for: Prepared by: 117306012.B MARCH 2013 Final Report March 2013 I-95/I-85 Interchange ROADWAY SAFETY ASSESSMENT Prepared for: Prepared
More informationNORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Planning for a Mega Project in a Metropolitan Area TxDOT Short Course October 13, 2015 RECOMMENDED ALTERNATIVES Environmental Impact Statement (EIS) Project
More informationFLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT
FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT Incident Number: 2019-705 Occurred: 2/5/2019 06:00 ET Reported to SWO: 2/5/2019 06:13 ET Affecting: Hillsborough Summary:
More informationOREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM
OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/24/2019 5:16:03 PM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only
More informationThe Highline Development Traffic Impact Study
The Highline Development Traffic Impact Study Columbia Falls, Montana Prepared For: TD&H Engineering 450 Corporate Drive, Suite 101 Kalispell, MT 59901 June, 2018 130 South Howie Street Helena, Montana
More informationLIC SR INTERCHANGE OPERATIONS STUDY
LIC SR 16 18.20 - INTERCHANGE OPERATIONS STUDY Project Summary Location SR 16 & W. Church St. Interchange Newark, Ohio Licking County PID 99478 Study Sponsor ODOT District 5 Proposed Work Add Left Turn
More informationMonroe County: Key West and Lower Keys
FDOT PROJECT UPDATES June 15-21, 2015 Monroe County: Key West and Lower Keys Monroe County projects website: www.fdotmonroe.com Opt Out: If you no longer wish to receive these weekly notifications, please
More informationWinter Maintenance on Provincial Highways
Winter Maintenance on Provincial Highways Thunder Bay District Municipal League Wayne Prystanski, A/Regional Director, Northwestern Region February 27, 2015 Outline 1. AMC s in NW Region 2. Winter Maintenance
More informationSignalized Intersections
Signalized Intersections Kelly Pitera October 23, 2009 Topics to be Covered Introduction/Definitions D/D/1 Queueing Phasing and Timing Plan Level of Service (LOS) Signal Optimization Conflicting Operational
More informationCom munity Advisor y C ommitte e Meeting
Community Advisor y Committee Meeting J u n e 1 5, 2 0 1 7 Project Scope 14 miles of enhanced service from Downtown Portland to Cleveland Park & Ride 41 Stations with 82 Platforms 1/3 mile approximate
More informationTable of Contents Introduction... 4 Study Area... 5
Table of Contents Introduction... 4 Study Area... 5 Streets and s... 5 Traffic Volumes... 8 Recent and Anticipated Development... 10 Crash Analysis... 10 Projected Traffic Volumes... 11 Trip Generation...
More informationMarch Grade Crossing Analysis
March 2014 Grade Crossing Analysis T E C H N I C A L M E M O R A N D U M South Florida Freight and Passenger Rail Enhancement Study Phase 1A - Rehabilitate Existing Northwood Connection; FPID: 434948-1
More informationOREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/10/2019 7:20:01 PM
OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/10/2019 7:20:01 PM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only
More informationWashington State S. T. I. P to 2021 (Project Funds to Nearest Dollar)
( Funds to Nearest Dollar) Agency: Bellingham Number PIN ID 17 5565(001) BHAM 40 28 0.210 CE Yes Mahogany Ave Cordata Elementary 1,951,200 Cordata Safe Routes to School Program The project includes bike
More informationFLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT
FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT Incident Number: 2018-7172 Incident Name: Dense Fog Advisory Occurred: 11/20/2018 05:02 ET Reported to SWO: 11/20/2018
More information3. THE TRANSPORTATION AND TRANSIT MASTER PLAN
The Master Plan Report Page 3-1 3. THE TRANSPORTATION AND TRANSIT MASTER PLAN 3.1 The Strategy Through the technical and consultation processes "A Balanced Road and Transit System" has been defined as
More informationTOWN OF JUPITER. Overview Map. Commuter Mode of Choice QUICK FACTS. 46 Median Age. 61,388 Residents. 19.6% Traditionally Underserved
TOWN OF $76,687 Median Income 19.6% Traditionally Underserved 7.17% Growth from 2010 92.9% H/GED 43.7% Bachelors 24,915 Households 63.3% Labor Force Jupiter Palm Beach County Commuter Mode of Choice 46
More informationState Highway Log. Planning Report Olympic Region. Washington State Department of Transportation. Strategic Planning Division
State Highway Log Planning Report 2009 Olympic Region Washington State Department of Transportation Strategic Planning Division March 8, 2010 Highway Log Users Re: 2009 State Highway Log Dear User: The
More informationTrip Generation Calculations
Trip Generation Calculations A HORIZON AIR ALLEGIANT AI R EMPLOYEES Daily Trip Generation Daily Trip Generation Daily Trip Generation Directional Flights (per day): 20 Directional Flights (per day): 2.8
More informationInformation for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project
Information for File # 2013-00531-MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Applicant: City of St. Louis Park Corps Contact: Melissa Jenny Address: U.S. Army Corps of Engineers Attn:
More informationAppendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014
Appendix C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 CONTENTS List of Figures-... 3 List of Tables... 4 Introduction... 1 Application of the Lubbock Travel Demand
More informationTRAFFIC STUDY FOR THE GAFFEY POOL PROJECT LOS ANGELES, CALIFORNIA CITY OF LOS ANGELES, BUREAU OF ENGINEERING OCTOBER 2013 PREPARED FOR PREPARED BY
TRAFFIC STUDY FOR THE GAFFEY POOL PROJECT LOS ANGELES, CALIFORNIA OCTOBER 2013 PREPARED FOR CITY OF LOS ANGELES, BUREAU OF ENGINEERING PREPARED BY DRAFT TRAFFIC STUDY FOR THE GAFFEY POOL PROJECT October
More informationUS 169/I-70 North Loop Planning & Environmental Linkages Study
US 169/I-70 North Loop Planning & Environmental Linkages Study VISSIM Calibration Document Draft April 13, 2018 Page i Table of Contents 1. Overview... 1 2. Data Types... 2 3. Model Parameter Adjustments...
More informationFOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 10, 2018
FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 10, 2018 AGENDA ITEM NO. 116 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final November 2018 bid opening for $233,251,841,
More informationROADWAY DESIGN CALCULATIONS
ROADWAY DESIGN CALCULATIONS Interim Interchange at SR 400 (I-4) and Daryl Carter Parkway FPID: 441113-1-52-01 60% (Phase II) Prepared by: AECOM Technical Services, Inc. 150 North Orange Avenue, Suite 200
More informationTRANSPORTATION IMPROVEMENT PROGRAM
TRANSPORTATION IMPROVEMENT PROGRAM Fiscal Years 2015/16 2019/20 DRAFT APRIL 27, 2015 1022 Prudential Drive Jacksonville, FL 32207 T: (904) 306.7500 F: (904) 306.7501 www.northfloridatpo.com Table of Contents
More informationFreeway Work Zone Lane Capacity
Report Title Report Date: 2009 Freeway Work Zone Lane Capacity Principle Investigator Vendor Name and Address Name Drakopoulos, Alex «Vendor» Affiliation Marquette University Address 263 Haggerty Hall
More informationVILLAGE OF WELLINGTON
VILLAGE OF $83,270 Median Income 25.8% Traditionally Underserved 5.93% Growth from 2010 95.1% HS/GED 44.5% Bachelors 20,301 Households 67% Labor Force Lake Okeechobee Wellington Palm Beach County Commuter
More information3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS
3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS In order to better determine future roadway expansion and connectivity needs, future population growth and land development patterns were analyzed as part of
More informationAppendix B.1 EMME Model Calibration Memo
Appendix B.1 EMME Model Calibration Memo itrans 144 Front Street West, Suite 655 Toronto, ON M5J 2L7 Tel: (416) 847-0005 Fax: (905) 882-1557 www.hdrinc.com www.itransconsulting.com File: 2.0 Memorandum
More informationTABLE 2 FDOT ADOPTED WORK PROGRAM - VOLUSIA COUNTY PROJECTS FOR FISCAL YEARS 2014/ /19
1 240836-1 SR 40 FROM SR 15 US 17 TO SR 11 ADD LANES & RECONSTRUCT ENVIRO CONSULTANT 461918 0 0 0 0 2 240837-1 SR 40 FROM W OF SR 11 TO W OF CONE ROAD ADD LANES & RECONSTRUCT PE IN-HOUSE 4363 0 0 0 0 3
More informationOREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/13/2019 2:54:03 PM
OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/13/2019 2:54:03 PM 57 56 @ Corvallis - Newport Hwy OR34 HWY372 22 22 Mount Bachelor Ski Area I-5 10 13
More informationCOUNTY COMMISSION DISTRICT 3
COUNTY COMMISSION DISTRICT 44 Mdian Ag $7,241 Houshold Incom 41% Traditionally Undrsrvd 609% Growth from 2010 777% HS/GED 192% Bachlors District 806% Labor Forc Commutr Mod of Choic 71, 218 Housholds Lak
More informationFreeway Work Zone Lane Capacity
Freeway Work Zone Lane Capacity Thomas Notbohm, P.E. Wisconsin Department of Transportation Thomas.Notbohm@dot.state.wi.us Alex Drakopoulos Department of Civil & Environmental Engineering Marquette University,
More informationGreater Toronto Area Cordon Count Summary Analysis of Traffic Trends 1985 to 2011
Greater Toronto Area Cordon Count Summary Analysis of Traffic Trends 1985 to 2011 Prepared by: Data Management Group Department of Civil Engineering University of Toronto Telephone: (416) 978-3916 Table
More informationPrepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006
DRAFT TRAFFIC IMPACT STUDY FOR PHASED DEVELOPMENT OF TAMU CC Prepared for 3D/International, Inc. 1900 West Loop South, Suite 400 Houston, Texas 77027 November 2006 Interim Review Only Document Incomplete:
More informationNew Jersey Department of Transportation Extreme Weather Asset Management Pilot Study
New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study Overview Prepared for: June 26, 2018 Introduction Overview of Pilot Study New Jersey s Climate New Jersey s Transportation
More informationIII. FORECASTED GROWTH
III. FORECASTED GROWTH In order to properly identify potential improvement projects that will be required for the transportation system in Milliken, it is important to first understand the nature and volume
More informationTier 2 Final Environmental Assessment I-66 Transportation Technical Report. Appendix E. Travel Demand Forecasting Model Validation Memorandum
Tier 2 Final Environmental Assessment I-66 Transportation Technical Report Appendix E Travel Demand Forecasting Model Validation Memorandum FINAL AUGUST 216 MEMORANDUM To: Robert Josef, VDOT Northern Virginia
More informationAppendix C Traffic Study
Final Environmental Impact Statement Appendix C Traffic Study Schofield Generating Station Project, Hawaii October 2015 C-1 Final Environmental Impact Statement This page intentionally left blank. Schofield
More informationAppendix B. Traffic Analysis Report
Appendix B Traffic Analysis Report Report No. 14369/TR/WN02 August 2007 SALLINS BYPASS BYPASS OPTIONEERING ANALYSIS - TRAFFIC REPORT Kildare County Council Áras Chill Dara, Devoy Park, Naas, Co Kildare
More informationTREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review
More informationAppendix I: Traffic Study
City of Fontana Sierra Lakes Commerce Center Draft EIR Appendix I: Traffic Study FirstCarbon Solutions H:\Client (PN JN)\0144\01440050\EIR\1 ADEIR\01440050 Sec99 99 Appendix Dividers.doc THIS PAGE INTENTIONALLY
More informationFOR PRESENTATION AT THE COMMISSION MEETING OF DECEMBER 3, 2018
FOR PRESENTATION AT THE COMMISSION MEETING OF DECEMBER 3, 2018 AGENDA ITEM NO. 159 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final February 2019 bid opening for $88,659,936, the
More informationCoefficient of Thermal Expansion of Concrete Pavements
Coefficient of Thermal Expansion of Concrete Pavements Erwin Kohler Ramon Alvarado David Jones University of California Pavement Research Center TRB Annual Meeting, Washington D.C. January 24 th, 2007
More informationTraffic Impact Study
Traffic Impact Study Statham DRI One University Parkway Prepared for: Barrow County Prepared by: October 2012 Table of Contents Executive Summary i Section 1. Introduction 1 Project Description 1 Methodology
More informationPCI by Road Section - District 4 (A to Z) PCI for Road Maintenance District 4 (A to Z)
MULTNOMAH COUNTY 1620 SE 190th Avenue Portland, OR 97233 (503) 988-5050 PCI by Section - District 4 (A to Z) PCI for Maintenance District 4 (A to Z) Number Name Funct. Class Surface Type Begin Location
More informationMnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output
MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output Rev. April 29, 2005 MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output Table of
More informationAPPENDIX. Sutter Street Bicycle Lanes Stockton, CA January 2010
APPENDIX reet Bicycle Lanes Stockton, CA January 2010 1. Traffic count locations 2. Turning movement counts o AM PEAK - El Dorado Street at Ingram Street o PM PEAK - El Dorado Street at Ingram Street o
More informationDOLLAR GENERAL PROJECT FOCUSED TRAFFIC ANALYSIS (REVISED) May 20, 2015
DOLLAR GENERAL PROJECT FOCUSED TRAFFIC ANALYSIS (REVISED) May 20, 2015 May 20, 2015 Mr. Dan Biswas, VP of Development CJS DEVELOPMENT II, LLC 5111 North Scottsdale Road, Suite 200 Scottsdale, CA 85250
More informationTRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For
TRAFFIC IMPACT STUDY For Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) February 2015 Revised: August 2015 April 2016 July 2016 September 2016 Prepared for: KB Home
More informationOutstanding Owner/User Opportunity 1515 NW 167th Street, Miami Gardens FL Four Office Buildings Totaling ± 50,889 Square Feet
Buildings 4-7 Four Single Story Office Buildings Fronting the Palmetto Expressway Corporate Campus Setting, Buildings Surround Central Courtyard Liberal Planned Corridor District Zoning ± 9,485 Square
More information2011 South Western Region Travel Time Monitoring Program Congestion Management Process. Executive Summary
2011 South Western Region Travel Monitoring Program Executive Summary Prepared by: South Western Regional Planning Agency 888 Washington Blvd, 3rd Floor Stamford, CT 06901 Telephone: 203.6.5190 Facsimile:
More informationPLAZA MEXICO RESIDENCES
PLAZA MEXICO RESIDENCES TRAFFIC STUDY PREPARED FOR: 3000 E. IMPERIAL, LLC. 6940 Beach Boulevard, D-501 Buena Park, California 90621 PREPARED BY: OCTOBER 5, 2017 translutions the transportatio n solutions
More informationTRAFFIC IMPACT STUDY FOR SOUTH BAY SALT POND RESTORATION PROJECT PHASE 2
APPENDIX G TRAFFIC IMPACT STUDY FOR SOUTH BAY SALT POND RESTORATION PROJECT PHASE 2 South Bay Salt Pond Restoration Project Phase II May 2015 Draft Environmental Impact Statement/Report Traffic Impact
More informationTRANSPORTATION IMPACT STUDY WHEELER STREET CLOSURE
TRANSPORTATION IMPACT STUDY WHEELER STREET CLOSURE Village of Greene, Chenango County, New York Prepared for: VILLAGE OF GREENE 49 Genesee Street Greene, NY 13778 Prepared by: LARSON DESIGN GROUP 1000
More information6 th Line Municipal Class Environmental Assessment
6 th Line Municipal Class Environmental Assessment County Road 27 to St John s Road Town of Innisfil, ON September 6, 2016 APPENDIX L: TRAVEL DEMAND FORECASTING MEMORANDUM Accessible formats are available
More informationCritchfield Rd / SR-129
NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2
More informationPublic Agency Quarterly Report
Public Agency Quarterly Report SLC Salt Lake City International Salt Lake City, UT NM/DEN P (L) Salt Lake City Corporation Selection Criteria: Region: NM, State: UT, LOCID: SLC, Qtrly End Date: 09/30/2016
More informationTRB First International Conference on Surface Transportation Resilience
TRB First International Conference on Surface Transportation Resilience Applying the Sea-Level Scenario Sketch Planning Tool to Enhance the Resilience of Long-Range Transportation Plans: Lessons Learned
More information