1 Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 2016/2017 Results & 2017/2018 Plan May 2, 2018 Angel Mejia, P.E., Project Manager Oliver Pohl, P.E., Sr. Project Engineer Nicole Kwan, P.E., Associate Engineer
2 Purpose 1. Establish baseline sanitary sewer flows 2. Estimate sewer capacity 3. Isolate I/I response and perform I/I analysis 4. Recommendations for Future I/I Investigations, Identification and Mitigation
3 Seasonal Plan /2016: Basins 3, 4 and /2017: Basins 7 and /2018: Basin /2019: Basins 24 and 26
4 Basins 7 and 8 Legend Top 6 Summary Top 6 Basins: GWI Top 6 Basins: INFLOW Top 6 Basins: RDI Top 6 Basins: Combined I/I Note: Basin 3/4 drawn in for this proposal per the figure provided in the RFP Background: 2012 I/I Study by V&A for Carollo master plan Top Six Basins for Various RDII Parameters
5 12-Dec 28-Dec 13-Jan 29-Jan 14-Feb 2-Mar 18-Mar 3-Apr 19-Apr 5-May 21-May 6-Jun 22-Jun Rain (inches per hour) Monitoring Period December 2016 to June Rainfall Events 1.40 Total Rainfall over Period: inches 1.20 Event 2: 4.55 inches Event 1: 8.01 inches Event 3: 6.25 inches Event 4: 4.17 inches Event 5: 2.77 inches Event 6: 3.24 inches
6 12-Dec 19-Dec 26-Dec 2-Jan 9-Jan 16-Jan 23-Jan 30-Jan 6-Feb 13-Feb 20-Feb 27-Feb 6-Mar 13-Mar 20-Mar 27-Mar 3-Apr 10-Apr 17-Apr 24-Apr 1-May 8-May 15-May 22-May 29-May 5-Jun 12-Jun 19-Jun 26-Jun Rain (inches) Rainfall 99% above historical normal levels 40.0 Period Rainfall Historical Average
7 Inches of Rain Inches of Rain Storm Event Classification All classifiable /2/17-1/12/17 1/18/17-1/23/17 2/2/17-2/9/17 2/16/17-2/21/17 3/20/17-3/26/17 4/6/17-4/20/ February 2-9, 2017: 4-Year, 14-Hour January 2-12, 2017: 5-Year, 10-Day hr 2-hr 3-hr 6-hr 12-hr 24-hr 1/2/17-1/12/17 1/18/17-1/23/17 2/2/17-2/9/17 2/16/17-2/21/17 3/20/17-3/26/17 4/6/17-4/20/17 Season 0 1-day day 10-day 20-day 30-day 45-day 60-day
8 1. Baseline Flow 4 distinct flow curves for each site Site 8G 0.90 Weekdays (Mon-Thu) Friday Saturday Sunday Hour
9 2. Capacity - ADWF
10 2. Capacity Peak Flow N Legend Site Name 1.03 Peak Flow (mgd) Peak Level (Red for Surcharged, d/d) Overflow Line Cross Connection
11 3. Inflow/ Infiltration Roof Vent... Manhole Cover with Holes Deteriorated Manhole Exfiltration from Storm Sewer Tree Root Penetration Area Drain connected to Lateral Deteriorated Lateral Downspout connected to Lateral Cracked or Damaged Pipe Cross-connection from Storm Catch Basin Faulty Lateral Connection to Sanitary Sewer
12 Inflow Ranking Legend Subbasins INFLOW Ranking Rank 1 2 (Top 25%) Rank 3 4 Rank 5 6 Rank 7 8 (Lower 25%)
13 RDI Ranking Legend Subbasins RDI Ranking Rank 1 2 (Top 25%) Rank 3 4 Rank 5 6 Rank 7 8 (Lower 25%)
14 Combined I/I Ranking Legend Subbasins Total I/I Ranking Rank 1 2 (Top 25%) Rank 3 4 Rank 5 6 Rank 7 8 (Lower 25%)
15 Notable Findings 1. All sites, except 8A & 8B, had peaking factor > In general, Basin 7 had worse flow conditions: All Basin 7 sites, except 7G, had d/d >5. Max d/d (Site 7D) was 12.7 Only two Basin 8 sites had d/d > 5: 8C1 & 8F Overflow lines from Basin 8 to Basin 7 did not get fully activated 3. Basin 7A: 2nd for normalized inflow 1st for normalized RDI and combined I/I.
16 Notable Findings 4. Peak Flow Event February 7, 2017
17 Recommendations Capacity Restrictions Site 7E/7F: 8.5 feet peak level (SSO potential). Possible Bottlenecks: Basin 7 trunk line between sites 7F and 7G at Market Avenue and 13th St. Basin 8 trunk line between site 8D/8E and site 8F/8G; on Dover Avenue between 14th St and Tyler St between site 7G and the last cross-connection between basin 7F and 7G, on 13th St between Post Avenue and Sutter Avenue.
18 Recommendations Further I/I investigation or prioritization nighttime reconnaissance work smoke testing Basin 7A Basins 8F ranked 1 st for inflow Basins 7F+7G ranked 2 nd for RDI and combined I/I
19 Focus I/I Reduction Efforts 1. Chesley Avenue South: clear trend of high I/I being contributed from Chesley Avenue moving south (Basins 3D, 3E, 3F, 3G, 6A). Chesley Ave.
20 Focus I/I Reduction Efforts 2. Basin 4E: Fairly significant and sustained I/I contribution given the service area. Basin Flows are conveyed away from lines with capacity issues, so future I/I reduction efforts within this area may be less urgent but still should be considered for overall system I/I reduction. Peak I/I Rate (mgd) Inflow Ranking RDI Ranking Combined I/I Ranking 4E F
21 I/I Investigation Methods Nighttime reconnaissance work Basins 3D, 3E, 3F, 3G, 4E and 6A V&A performed 1 night of I/I reconnaissance
22 I/I Investigation Methods Nighttime reconnaissance work Observations (Basin 3/6) Clear Water Flow Infiltration below VCP Inlet (MH Clear water flow (MH )
23 I/I Investigation Methods Nighttime reconnaissance work Observations (Basin 4) Clear Water Flow Infiltration from pipe joint upstream of manhole (MH 12) EBMUD Facility upstream of MH
24 I/I Investigation Methods Nighttime reconnaissance work Observations (Basin 4) Clear Water Flow * - Flow rate estimated from maximum measured rate of 168 gpm
25 2017/2018: Basin 15 Legend Top 6 Summary Top 6 Basins: GWI Top 6 Basins: INFLOW Top 6 Basins: RDI Top 6 Basins: Combined I/I Note: Basin 3/4 drawn in for this proposal per the figure provided in the RFP Background: 2012 I/I Study by V&A for Carollo master plan Top Six Basins for Various RDII Parameters
26 2016/2017: Basins 7, and 8 Flow Monitoring 11 Flow Meters 11 Isolated Basins 10 Individual Manholes
27 2017/2018: Basin 15
28 2017/2018: Basin 15
29 20-Dec 5-Jan 21-Jan 6-Feb 22-Feb Rain (inches per hour) 2017/2018: Basin 15 Rainfall 0.60 Total Rainfall over Period: 6.59 inches 0.45 Event 1: 3.06 inches Event 3: 2.08 inches 0.30 Event 2: 2.44 inches
30 Flow (mgd) Rain (in/hr) Depth (in) 2017/2018: Basin 15 Site 15A Wed Thu Fri Sat Sun Mon Tue 6.0 Peak: 5.23 in Low: 0.66 in Ave: 1.86 in Peak: mgd Low: mgd Ave: mgd Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan
31 Flow (mgd) Rain (in/hr) Depth (in) 2017/2018: Basin 15 Site 15B Wed Thu Fri Sat Sun Mon Tue 9 Peak: 7.85 in Low: 3.00 in Ave: 4.54 in Peak: mgd Low: mgd Ave: mgd Feb 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar
32 Thank you
Appendix A. City of Colusa Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study
Appendix A City of Colusa Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study Site 3 Site 4 Site 5 Site 2 Site 1 SANITARY SEWER FLOW MONITORING AND INFLOW / INFILTRATION STUDY City of Colusa April
More informationWASTEWATER FLOW COMPONENTS
Chapter 3 WASTEWATER FLOW COMPONENTS 3.1 INTRODUCTION A sanitary sewer collection system receives two flow components: dry weather flow (DWF) and wet weather flow (WWF). The Base Wastewater Flow (BWF)
More informationFlow Monitoring in the Collection System September 11, 2014
Flow Monitoring in the Collection System September 11, 2014 FISHBECK, THOMPSON, CARR, & HUBER INC. Lori Lloyd, PE, LEED AP BD+C Definitions Why Flow Monitor? Flow Monitoring Applications Site Selection
More informationPRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017
PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 I hereby certify that this
More informationThe City of Clearwater (City) collection
FWRJ A Matrix Approach to Prioritizing a Sewer Collection System Capital Improvement Plan Amanda Savage, Tara Kivett, Steven Cook, Eric Harold, and Ifetayo Venner The City of Clearwater (City) collection
More informationInflow and Infiltration. John Sorrell, P.E. City of Raleigh Public Utilities Department
Inflow and Infiltration John Sorrell, P.E. City of Raleigh Public Utilities Department 1 Raleigh s History with I&I Our initial system was designed in 1888. Treatment began in the 1950 s What is I & I?
More informationMountain View Community Shuttle Monthly Operations Report
Mountain View Community Shuttle Monthly Operations Report December 6, 2018 Contents Passengers per Day, Table...- 3 - Passengers per Day, Chart...- 3 - Ridership Year-To-Date...- 4 - Average Daily Ridership
More informationTechnical Memorandum. Bryan Foster City of Manassas Manassas, VA Date: January 18, Subject: Micron Pond Odor Evaluation
To: Bryan Foster City of Manassas Manassas, VA 20110 Date: January 18, 2019 Subject: 1. Introduction Kimley-Horn and Associates, Inc. (Kimley-Horn) was contracted to perform an evaluation of odor concerns
More informationDetermine the trend for time series data
Extra Online Questions Determine the trend for time series data Covers AS 90641 (Statistics and Modelling 3.1) Scholarship Statistics and Modelling Chapter 1 Essent ial exam notes Time series 1. The value
More informationEstimating Sewage System Flows
9 Estimating Sewage System Flows DWSD Wholesale Sewer Rates 201 In this module, you will learn the sources of dry and wet weather flows and how these flows are estimated. Three different tools are used
More informationClark Regional Wastewater District
2016 Clark Regional Wastewater District Infiltration and Inflow Report For Salmon Creek Treatment Plant February 13, 2017 In Compliance with the NPDES Waste Discharge Permit No. WA-002363-9 Special Condition
More informationClimate Adaptation Challenges for Boston s Water and Sewer Systems
National Association of Flood & Stormwater Management Agencies Climate Adaptation Challenges for Boston s Water and Sewer Systems John P Sullivan P.E. October 15,2014 Boston 1630 Boston 1630-2012 Boston
More informationAstrological Calendar. for Central Time
2014 for Central Time January 2014 Capricorn Compliments of: Clayten Tylor Esoteric Astrologer (604)331-0251 Jan 15, 2014 Full Moon 10:53:09 PM CST Jan 1, 2014 New Moon 05:15:21 AM CST January 2014 Sun
More informationCalifornia OES Weather Threat Briefing
California OES Weather Threat Briefing Wednesday, January 16, 2019 9:00 AM PST Day 1: Strong winds, heavy mountain snow and heavy rain with isolated thunderstorms across much of the state through Thursday
More informationJANUARY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY
Vocabulary (01) The Calendar (012) In context: Look at the calendar. Then, answer the questions. JANUARY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY 1 New 2 3 4 5 6 Year s Day 7 8 9 10 11
More informationJanuary 2009 Videmus Stellae
January 2009 January Schedule of Events Sun Mon Tu e Wed Thu Fri Sat Jan 6th: ATM Sub at Paul Lind s Garage at 1900 Jan 9th: SAC General at Grand Canyon University at 1930 in room 105 of the Fleming Bldg.
More informationSanitary Sewer Flow Monitoring Study City of Grandville
Sanitary Sewer Flow Monitoring Study City of Grandville Prepared for: City of Grandville Kent County, Michigan Report by: Moore & Bruggink Consulting Engineers Grand Rapids, Michigan 13169.1 March 214
More informationSYSTEM BRIEF DAILY SUMMARY
SYSTEM BRIEF DAILY SUMMARY * ANNUAL MaxTemp NEL (MWH) Hr Ending Hr Ending LOAD (PEAK HOURS 7:00 AM TO 10:00 PM MON-SAT) ENERGY (MWH) INCREMENTAL COST DAY DATE Civic TOTAL MAXIMUM @Max MINIMUM @Min FACTOR
More informationVILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT
VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT STORM RAINFALL AND RADAR IMAGERY Total rainfall 4.99 inches 2.74 inches between 5:40 and 7:10, then a lull until 9:30 2.04 inches between 9:30
More informationSYSTEM BRIEF DAILY SUMMARY
SYSTEM BRIEF DAILY SUMMARY * ANNUAL MaxTemp NEL (MWH) Hr Ending Hr Ending LOAD (PEAK HOURS 7:00 AM TO 10:00 PM MON-SAT) ENERGY (MWH) INCREMENTAL COST DAY DATE Civic TOTAL MAXIMUM @Max MINIMUM @Min FACTOR
More information2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING. Master Plan Addendum. Union County B&V PROJECT NO PREPARED FOR
Black & Veatch Holding Company 2017. All rights reserved. 2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING Master Plan Addendum B&V PROJECT NO. 195982 PREPARED FOR Union County 7 MARCH 2018 Table of
More informationWEST NORRITON TOWNSHIP
WEST NORRITON TOWNSHIP SANITARY SEWER SYSTEM INFLOW AND INFILTRATION STUDY November 2013 Rettew Associates, Inc. 3020 Columbia Avenue Lancaster, PA 17603 RECOMMENDATIONS The top four priorities for inflow
More informationClark Regional Wastewater District
2017 Clark Regional Wastewater District Infiltration and Inflow Report For Salmon Creek Treatment Plant February 12, 2018 In Compliance with the NPDES Waste Discharge Permit No. WA-002363-9 Special Condition
More informationAttachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins
Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving
More informationChiang Rai Province CC Threat overview AAS1109 Mekong ARCC
Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC This threat overview relies on projections of future climate change in the Mekong Basin for the period 2045-2069 compared to a baseline of 1980-2005.
More informationApplication of Real-Time Rainfall Information System to CSO control. 2 October 2011 Naruhito Funatsu METAWATER Co., Ltd.
Application of Real-Time Rainfall Information System to CSO control 2 October 2011 Naruhito Funatsu METAWATER Co., Ltd. Presentation Points Objectives To verify the applicability of the real-time rainfall
More informationSANITARY SEWER EVALUATION OF INFLOW/INFILTRATION REDUCTION TECHNIQUES. Geoffrey Trent VanAllen. A Thesis Submitted to the Faculty of
SANITARY SEWER EVALUATION OF INFLOW/INFILTRATION REDUCTION TECHNIQUES by Geoffrey Trent VanAllen A Thesis Submitted to the Faculty of The College of Engineering and Computer Science in Partial Fulfillment
More informationChampaign-Urbana 2000 Annual Weather Summary
Champaign-Urbana 2000 Annual Weather Summary ILLINOIS STATE WATER SURVEY 2204 Griffith Dr. Champaign, IL 61820 wxobsrvr@sws.uiuc.edu Maria Peters, Weather Observer January: January started on a mild note,
More informationRegression Analysis of the Variation in Rainfall Derived Inflow and Infiltration
3 Regression Analysis of the Variation in Rainfall Derived Inflow and Infiltration Li Zhang, Fang Cheng, Gregory Barden, Hunter Kelly, Timothy Fallara and Edward Burgess Rainfall derived inflow and infiltration
More information2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement
2019 Settlement Calendar for ASX Cash Market Products ASX Settlement Settlement Calendar for ASX Cash Market Products 1 ASX Settlement Pty Limited (ASX Settlement) operates a trade date plus two Business
More informationCalifornia OES Atmospheric River Events Weather Threat Briefing
California OES Atmospheric River Events Weather Threat Briefing 23 February 2017 10:00 AM PST Day 1: Flooding continues along small streams and creeks and some main stem rivers. National Weather Service
More informationDAILY QUESTIONS 28 TH JUNE 18 REASONING - CALENDAR
DAILY QUESTIONS 28 TH JUNE 18 REASONING - CALENDAR LEAP AND NON-LEAP YEAR *A non-leap year has 365 days whereas a leap year has 366 days. (as February has 29 days). *Every year which is divisible by 4
More informationCHAPTER 4 CRITICAL GROWTH SEASONS AND THE CRITICAL INFLOW PERIOD. The numbers of trawl and by bag seine samples collected by year over the study
CHAPTER 4 CRITICAL GROWTH SEASONS AND THE CRITICAL INFLOW PERIOD The numbers of trawl and by bag seine samples collected by year over the study period are shown in table 4. Over the 18-year study period,
More informationWHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities
WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and 2001-2002 Rainfall For Selected Arizona Cities Phoenix Tucson Flagstaff Avg. 2001-2002 Avg. 2001-2002 Avg. 2001-2002 October 0.7 0.0
More informationBRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT
BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital
More informationTypical Hydrologic Period Report (Final)
(DELCORA) (Final) November 2015 (Updated April 2016) CSO Long-Term Control Plant Update REVISION CONTROL REV. NO. DATE ISSUED PREPARED BY DESCRIPTION OF CHANGES 1 4/26/16 Greeley and Hansen Pg. 1-3,
More informationREGULATORY, TECHNICAL AND MODELING CHALLENGES TO DEVELOPING A FREQUENCY BASED SSO CONTROL PROJECT IN WAYNE COUNTY, MICHIGAN
REGULATORY, TECHNICAL AND MODELING CHALLENGES TO DEVELOPING A FREQUENCY BASED SSO CONTROL PROJECT IN WAYNE COUNTY, MICHIGAN Robert Czachorski, P.E., P.H., Orchard, Hiltz & McCliment, Inc. * John Baratta.
More informationPRELIMINARY DRAFT FOR DISCUSSION PURPOSES
Memorandum To: David Thompson From: John Haapala CC: Dan McDonald Bob Montgomery Date: February 24, 2003 File #: 1003551 Re: Lake Wenatchee Historic Water Levels, Operation Model, and Flood Operation This
More informationChampaign-Urbana 2001 Annual Weather Summary
Champaign-Urbana 2001 Annual Weather Summary ILLINOIS STATE WATER SURVEY 2204 Griffith Dr. Champaign, IL 61820 wxobsrvr@sws.uiuc.edu Maria Peters, Weather Observer January: After a cold and snowy December,
More informationMotion to Review the Academic Calendar Passed by Admissions and Standards, September 24, 2009
Effective Fall 2010 Motion to Review the Academic Calendar Passed by Admissions and Standards, September 24, 2009 Each final exam will be two hours and thirty minutes. A day has been added to finals period.
More informationEtobicoke Exfiltration System: Monitoring and Evaluation. Tim Van Seters Ryerson University July 24, 2015
Etobicoke Exfiltration System: Monitoring and Evaluation Tim Van Seters Ryerson University July 24, 2015 Presentation Outline Summary of 1994 1995 Candaras Associates study Summary of 1996-1998 SWAMP Study
More informationNine Minimum Controls No. 2
Nine Minimum Controls No. 2 2.0 MAXIMIZATION OF STORAGE IN THE COLLECTION SYSTEM 2.1 OVERVIEW The 2 nd NMC is titled Maximization of Storage in the Collection system. EPA s NMC Guidance explains that this
More informationD. B. G R A Y E N G I N E E R I N G I N C.
STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario Report No. 12020-SWM August 27, 2012 Revised April 21, 2014 Revised December 9, 2014 Revised April 14, 2015 D. B. G R A Y E N G I N E E R
More informationTILT, DAYLIGHT AND SEASONS WORKSHEET
TILT, DAYLIGHT AND SEASONS WORKSHEET Activity Description: Students will use a data table to make a graph for the length of day and average high temperature in Utah. They will then answer questions based
More informationPREDICTING SOIL SUCTION PROFILES USING PREVAILING WEATHER
PREDICTING SOIL SUCTION PROFILES USING PREVAILING WEATHER Ronald F. Reed, P.E. Member, ASCE rreed@reed-engineering.com Reed Engineering Group, Ltd. 2424 Stutz, Suite 4 Dallas, Texas 723 214-3-6 Abstract
More informationIssued by: National Weather Service San Joaquin Valley - Hanford CA. Issue time: 409 AM PST Wed Jan
Forecast Information Location: New_Exchequer_Dam Updated: January 16, 2019, 11:45 am NWS Weather Discussion: Issued by: National Weather Service San Joaquin Valley - Hanford CA Issue time: 409 AM PST Wed
More information-Assessment of current water conditions. - Precipitation Forecast. - Recommendations for Drought Monitor
April 27, 2010 -Assessment of current water conditions - Precipitation Forecast - Recommendations for Drought Monitor 7 Day Precipitation 19-25 April 2010 Month-to-Date Precipitation 1-25 April 2010
More informationFinal Drainage Report
Final Drainage Report Expo Rail Operations and Maintenance Facility Santa Monica, California Prepared for: Exposition Metro Line Construction Authority Prepared by: W2 Design, Inc. 50 S. De Lacey Avenue
More informationDELINEATION OF A POTENTIAL GASEOUS ELEMENTAL MERCURY EMISSIONS SOURCE IN NORTHEASTERN NEW JERSEY SNJ-DEP-SR11-018
DELINEATION OF A POTENTIAL GASEOUS ELEMENTAL MERCURY EMISSIONS SOURCE IN NORTHEASTERN NEW JERSEY SNJ-DEP-SR11-18 PIs: John R. Reinfelder (Rutgers University), William Wallace (College of Staten Island)
More informationEVALUATION OF ALGORITHM PERFORMANCE 2012/13 GAS YEAR SCALING FACTOR AND WEATHER CORRECTION FACTOR
EVALUATION OF ALGORITHM PERFORMANCE /3 GAS YEAR SCALING FACTOR AND WEATHER CORRECTION FACTOR. Background The annual gas year algorithm performance evaluation normally considers three sources of information
More information2015 Fall Conditions Report
2015 Fall Conditions Report Prepared by: Hydrologic Forecast Centre Date: December 21 st, 2015 Table of Contents Table of Figures... ii EXECUTIVE SUMMARY... 1 BACKGROUND... 2 SUMMER AND FALL PRECIPITATION...
More informationMountain View Community Shuttle Monthly Operations Report
Mountain View Community Shuttle Monthly Operations Report October 9, 2018 Contents Passengers per Day, Table...- 3 - Passengers per Day, Chart...- 3 - Ridership Year-To-Date...- 4 - Average Daily Ridership
More informationTotal Market Demand Wed Jan 02 Thu Jan 03 Fri Jan 04 Sat Jan 05 Sun Jan 06 Mon Jan 07 Tue Jan 08
MW This report provides a summary of key market data from the IESO-administered markets. It is intended to provide a quick reference for all market stakeholders. It is composed of two sections: Section
More information2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT
2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT Settlement Calendar for ASX Cash Market Products 1 ASX Settlement Pty Limited (ASX Settlement) operates a trade date plus two Business
More informationNature of Lesson (Lecture/Tutorial) H3 WK No. Day/ Date. Remarks. Duration. 4.00pm 6.30pm ALL. 2.5 hours. Introduction to Semiconductors Lecture 01
JANUARY 2018 INTAKE Subject : Semiconductor Physics & Devices Venue : HCI Schedule : Mondays for Tutorial (3pm 5pm / 5pm 7pm) or Tuesdays for Tutorial (3pm 5pm / 5pm 7pm) and Thursdays for Lecture (4pm-6.30
More informationPublished by ASX Settlement Pty Limited A.B.N Settlement Calendar for ASX Cash Market Products
Published by Pty Limited A.B.N. 49 008 504 532 2012 Calendar for Cash Market Products Calendar for Cash Market Products¹ Pty Limited ( ) operates a trade date plus three Business (T+3) settlement discipline
More informationProposal to limit Namakan Lake to 1970 Upper Rule Curve for remainder of summer
July 7, 214 Subject: Proposal to limit Namakan Lake to 197 Upper Rule Curve for remainder of summer Background: Flooding in 214 has resulted in the highest water levels on Namakan Lake since 1968, and
More informationA Preliminary Severe Winter Storms Climatology for Missouri from
A Preliminary Severe Winter Storms Climatology for Missouri from 1960-2010 K.L. Crandall and P.S Market University of Missouri Department of Soil, Environmental and Atmospheric Sciences Introduction The
More informationGAMINGRE 8/1/ of 7
FYE 09/30/92 JULY 92 0.00 254,550.00 0.00 0 0 0 0 0 0 0 0 0 254,550.00 0.00 0.00 0.00 0.00 254,550.00 AUG 10,616,710.31 5,299.95 845,656.83 84,565.68 61,084.86 23,480.82 339,734.73 135,893.89 67,946.95
More informationThe Northeast Snowfall Impact Scale
The Northeast Snowfall Impact Scale Michael Squires National Climatic Data Center Abstract While the Fujita and Saffir-Simpson Scales characterize tornadoes and hurricanes respectively, there is no widely
More informationJackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center
Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data
More informationJackson County 2014 Weather Data
Jackson County 2014 Weather Data 62 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data
More informationCHAPTER-11 CLIMATE AND RAINFALL
CHAPTER-11 CLIMATE AND RAINFALL 2.1 Climate Climate in a narrow sense is usually defined as the "average weather", or more rigorously, as the statistical description in terms of the mean and variability
More informationParking Study MAIN ST
Parking Study This parking study was initiated to help understand parking supply and parking demand within Oneida City Center. The parking study was performed and analyzed by the Madison County Planning
More informationFolsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam
Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Public Workshop May 28, 2015 Library Galleria 828 I Street, Sacramento, CA US Army Corps of Engineers BUILDING STRONG WELCOME &
More informationSewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling.
Using Dynamic Hydraulic Modeling to Understand Sewer Headspace Dynamics A Case Study of Metro Vancouver s Highbury Interceptor Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd. 200-4185A Still Creek Drive
More information2018 Annual Review of Availability Assessment Hours
2018 Annual Review of Availability Assessment Hours Amber Motley Manager, Short Term Forecasting Clyde Loutan Principal, Renewable Energy Integration Karl Meeusen Senior Advisor, Infrastructure & Regulatory
More informationProject Appraisal Guidelines
Project Appraisal Guidelines Unit 16.2 Expansion Factors for Short Period Traffic Counts August 2012 Project Appraisal Guidelines Unit 16.2 Expansion Factors for Short Period Traffic Counts Version Date
More informationJackson County 2013 Weather Data
Jackson County 2013 Weather Data 61 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data
More informationMonday, October 19, CDT Brian Hoeth
Monday, October 19, 2015 1400 CDT Brian Hoeth Some of the briefing presented is worstcase scenario and may differ in detail from local NWS Weather Forecast Offices. National Weather Service Southern Region
More informationWinter Season Resource Adequacy Analysis Status Report
Winter Season Resource Adequacy Analysis Status Report Tom Falin Director Resource Adequacy Planning Markets & Reliability Committee October 26, 2017 Winter Risk Winter Season Resource Adequacy and Capacity
More informationISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training
Training Calendar 2014 Public s (ISO LSS PMP BPI ERM IT Sales Training) www.excelledia.com (ISO, LSS, PMP, BPI, ERM, IT, Sales Public s) 1 Schedule Registration JANUARY FEBRUARY 2 days 26 JAN 27 JAN 3
More informationProject Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details
Project Description File Name... 323 - Att Pond 3 East PIPES ONLY.SPF Project Options Flow Units... Elevation Type... Hydrology Method... EPA SWMM Infiltration Method... Link Routing Method... Enable Overflow
More informationWEEKLY WEATHER OUTLOOK BELIZE, CENTRAL AMERICA
WEEKLY WEATHER OUTLOOK BELIZE, CENTRAL AMERICA PERIOD: Sunday, July 1 until Monday, July 9, 2012 DATE ISSUED: Sunday, July 1, 2012 3:00 pm RFrutos EcoSolutions & Services SYNOPSIS: The features of interest
More informationChart Discussion: Fri-03-Mar-2017 (Harvey Stern) Chart Discussion: Fri-03-Mar-2017
Chart Discussion: Fri-03-Mar-2017 1 MSL Analysis/Sat Image (Thursday) http://www.cpc.ncep.noaa.gov/products/analysis_monitoring/enso_update/gsstanim.gif http://www.bom.gov.au 2 Review of Last Week s Model
More informationAtmospheric River Simulation
Atmospheric River Simulation One of the most impressive AR setups forecasters have seen in years Saturday AM Saturday PM Sunday AM Sunday PM Peak intensity! Integrated Vapor Transport (wind energy + moisture)
More informationAS 203 Principles of Astronomy 2 Introduction to Stellar and Galactic Astronomy Syllabus Spring 2012
AS 203 Principles of Astronomy 2 Introduction to Stellar and Galactic Astronomy Syllabus Spring 2012 Instructor Prof. Elizabeth Blanton Room: CAS 519 Email: eblanton@bu.edu Phone: 617-353-2633 Office hours:
More informationDay Ahead Hourly Load and Price Forecast in ISO New England Market using ANN
23 Annual IEEE India Conference (INDICON) Day Ahead Hourly Load and Price Forecast in ISO New England Market using ANN Kishan Bhushan Sahay Department of Electrical Engineering Delhi Technological University
More informationCSO Post-Construction Monitoring and Performance Assessment
Massachusetts Water Resources Authority CSO Post-Construction Monitoring and Performance Assessment Jeremy R. Hall, Project Manager Operations/Engineering & Construction Wastewater Advisory Committee December
More informationWEEKLY WEATHER OUTLOOK BELIZE, CENTRAL AMERICA
WEEKLY WEATHER OUTLOOK BELIZE, CENTRAL AMERICA PERIOD: Sunday, June 17 until Monday, June 25, 2012 DATE ISSUED: Sunday, June 17, 2012; 3:00 pm RFrutos EcoSolutions & Services SYNOPSIS: An upper level trough
More informationMathematics (Linear) 43651F. (JUN F01) WMP/Jun12/43651F. General Certificate of Secondary Education Foundation Tier June 2012.
Centre Number Surname Candidate Number For Examiner s Use Other Names Candidate Signature Examiner s Initials General Certificate of Secondary Education Foundation Tier June 2012 Pages 2 3 4 5 Mark Mathematics
More informationWEEKEND WEATHER OUTLOOK BELIZE, CENTRAL AMERICA
WEEKEND WEATHER OUTLOOK BELIZE, CENTRAL AMERICA PERIOD: Friday, July 6 until Monday, July 9, 2012 DATE ISSUED: Friday, July 6, 2012; 9:00 am RFrutos SYNOPSIS: An active tropical wave (TW) just west of
More informationHurricane Matthew. National Weather Service Wilmington NC. Steven Pfaff, WCM.
Hurricane Matthew Threat Assessment for northeast South Carolina & southeast North Carolina National Weather Service Wilmington NC 730 AM EDT Tuesday October 4, 2016 Steven Pfaff, WCM Steven.Pfaff@noaa.gov
More informationFORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE
FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE 255 237 237 237 217 217 217 200 200 200 0 163 131 Bridging the Gap163Conference 255 0 132 255 0 163 122 The Dana on Mission Bay San Diego, CA January 28,
More informationCIMA Professional 2018
CIMA Professional 2018 Interactive Timetable Version 16.25 Information last updated 06/08/18 Please note: Information and dates in this timetable are subject to change. A better way of learning that s
More informationCIMA Professional
CIMA Professional 201819 Manchester Interactive Timetable Version 3.1 Information last updated 12/10/18 Please note: Information and dates in this timetable are subject to change. A better way of learning
More informationCIMA Professional
CIMA Professional 201819 Birmingham Interactive Timetable Version 3.1 Information last updated 12/10/18 Please note: Information and dates in this timetable are subject to change. A better way of learning
More informationEast Bay Plain Basin. EBMUD & City of Hayward. Groundwater Reliability Partnership Meeting March 22, 2017
East Bay Plain Basin EBMUD & City of Hayward Groundwater Reliability Partnership Meeting March 22, 2017 Agenda Overview of the East Bay Plain Basin EBMUD s Bayside Groundwater Project EBMUD s Activities
More informationWill it rain tomorrow?
Will it rain tomorrow? Bilal Ahmed - 561539 Department of Computing and Information Systems, The University of Melbourne, Victoria, Australia bahmad@student.unimelb.edu.au Abstract With the availability
More informationISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training
Training Calendar 2014 Public s (ISO LSS PMP BPI ERM IT Sales Training) (ISO, LSS, PMP, BPI, ERM, IT, Sales Public s) 1 Schedule Registration JANUARY ) FEBRUARY 2 days 26 JAN 27 JAN 3 days 28 JAN 30 JAN
More informationAPPENDIX B DRAINAGE REPORT
APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,
More informationCIMA Professional 2018
CIMA Professional 2018 Newcastle Interactive Timetable Version 10.20 Information last updated 12/06/18 Please note: Information and dates in this timetable are subject to change. A better way of learning
More informationISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training
Training Calendar 2014 Public s (ISO LSS PMP BPI ERM IT Sales Training) (ISO, LSS, PMP, BPI, ERM, IT, Sales Public s) 1 Schedule Registration JANUARY IMS ) FEBRUARY 2 days 26 JAN 27 JAN 3 days 28 JAN 30
More informationNatGasWeather.com Daily Report
NatGasWeather.com Daily Report Issue Time: 5:15 pm EST Sunday, February 28 th, 2016 for Monday, Feb 29 th 7-Day Weather Summary (February 28 th March 5 th ): High pressure will dominate much of the US
More informationThe Huong River the nature, climate, hydro-meteorological issues and the AWCI demonstration project
The Huong River the nature, climate, hydro-meteorological issues and the AWCI demonstration project 7th GEOSS AP Symposium, the AWCI parallel session May 27, 214, Tokyo National Centre for Hydro-Meteorological
More informationClimate also has a large influence on how local ecosystems have evolved and how we interact with them.
The Mississippi River in a Changing Climate By Paul Lehman, P.Eng., General Manager Mississippi Valley Conservation (This article originally appeared in the Mississippi Lakes Association s 212 Mississippi
More informationChanging Climate. An Engineering challenge for today and the future. Milwaukee School of Engineering December 2, 2015
Changing Climate An Engineering challenge for today and the future David S. Liebl UW- Madison, EPD; UW-Extension; Wisconsin Initiative on Climate change Impacts Milwaukee School of Engineering December
More informationSewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling.
Using Dynamic Hydraulic Modeling to Understand Sewer Headspace Dynamics - A Case Study of Metro Vancouver's Highbury Interceptor Yuko Suda, P.Eng. Kerr Wood Leidal Associates Ltd. 200-4185A Still Creek
More informationDesign Data 17. Partial Flow Conditions of Box Culverts
Design Data 17 Partial Flow Conditions of Box Culverts Sewers, both sanitary and storm, are designed to carry a peak flow based on anticipated land development. The hydraulic capacity of sewers or culverts
More informationJackson County 2019 Weather Data 68 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center
Jackson County 2019 Weather Data 68 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data
More information