1 FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE Bridging the Gap163Conference The Dana on Mission Bay San Diego, CA January 28, Joe Forbis, P.E. Chief, Water Management Section Sacramento District, U.S. Army Corps of Engineers The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation

2 AGENDA Background of American River watershed and Folsom Dam Need for Joint Federal Project (JFP) New forecast-based operations at Folsom Dam

3 AMERICAN RIVER HYDROLOGY Steep watershed Rain-on-snow potential Winter snowpack

4 WATER SUPPLY SYSTEM CONTEXT Central Valley Project US Bureau of Reclamation State Water Project CA Department of Water Resources

5 FOLSOM DAM Folsom Lake Gross Pool (100% full): 967,000 ac-ft Flood Control Space: up to 600,000 ac-ft Avg. Annual Unregulated Runoff: 2,788,000 ac-ft Folsom Dam Main spillway with eight radial gates Elevation ~420 ft; Max release capacity ~567,000 cfs River outlets Max release capacity ~28,000 cfs Auxiliary spillway (JFP) Elevation ~370 ft; Max release capacity ~314,000 cfs

6 FOLSOM DAM FLOOD HISTORY 1944 Folsom Dam authorized Designed to provide 500year level of flood protection 1951 Record Flood 1956 Record Flood 1964 Record Flood New level of protection is 120-year 1986 Record Flood New level of protection is 60-year 1997 Record Flood

7 350,000 NEED FOR JFP 5 300,000 Peak Annual Inflow (Unimpaired) , ,000 Flow (cfs) 150, ,000 50,000 0 Year Construction of Original Dam Complete

8 NEED FOR JFP Problems with the existing dam: Only 400,000 acre-feet of authorized flood storage (wasn t sized to include largest storms) Can t pass the Probable Maximum Flood without overtopping 30% of flood storage used when downstream objective release (115,000 cfs) can be achieved Proposed solutions: Additional upstream flood storage Expansion of existing outlets Auxiliary spillway, additional 200,000 ac-ft of variable flood storage, and forecast-based operations potential

9 EXISTING AND JFP OUTLETS Flood space (KAF) Main Dam JFP Remaining Total Top of flood pool 115K cfs without JFP 115K cfs with JFP Main Dam stilling basin floor

10 HISTORY OF FOLSOM OPERATIONS

11 FORECAST-BASED OPERATIONS Theory: foreknowledge of runoff volume and timing enables optimal use of storage and release decisions Concerns: forecast uncertainty generates risk Insufficient releases (increased flood risk) Excessive releases (water supply risk) Challenges: Limited forecast data record Never been done before

12 TWO BASELINES/THREE ALTERNATIVES Flood Space (TAF) 1,000 0 Existing (USACE) 400 TAF Flood Space Basin Wetness 800 Existing (BOR-SAFCA) 400/670 TAF Flood Space Upstream Storage Credit Storage (TAF) Alternative /600 TAF Flood Space Upstream Storage Credit 400 Alternative 2 400/600 TAF Flood Space Upstream Storage Credit + Basin Wetness Alternative /600 TAF Flood Space Forecasted Inflow Volume 200 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

13 1986 event pattern scaled to 200-yr Forecast operation reflects perfect forecast Existing (BOR/SAFCA) JFP + US credit JFP + Forecast-based

14 NEW FOLSOM WCD

15 NEW FOLSOM WCD

16 FORECAST ENSEMBLE 12/22 59 ensemble traces

17 FORECAST ENSEMBLE 12/23

18 FORECAST ENSEMBLE 12/24

19 FORECAST ENSEMBLE 12/25

20 FORECAST ENSEMBLE 12/26

21 FORECAST ENSEMBLE 12/27

22 FORECAST ENSEMBLE 12/28

23 FORECAST ENSEMBLE 12/29

24 FORECAST ENSEMBLE 12/30

25 FORECAST ENSEMBLE 12/31

26 FORECAST ENSEMBLE 1/01

27 FORECAST ENSEMBLE 1/02

28 FORECAST ENSEMBLE 1/03

29 FORECAST INFLOW VOLUMES 3-day volume updated daily 59 ensemble traces 21 probabilistic traces Each trace reflects one value of NonExceedance Probability (NEP)

30 ROBUSTNESS TESTING Identify smallest NEP that routes design event at target release. Identify greatest NEP that routes design event without drawing down reservoir to bottom of variable space. Identify smallest NEP that routes design event given 24hour time shift in forecasted inflow volumes. Identify greatest NEP value that does not result in drawdowns that do not refill (false positives).

31 ROBUSTNESS 1/200 EVENT (1997)

32 ROBUSTNESS 1/200 EVENT (1997)

33 ROBUSTNESS RESULTS Flood Performance Metric Event, Target Release Minimum Successful NEP 1/ pattern, 115 kcfs 0% (ALL PASS) 1/ pattern, 115 kcfs 0% (ALL PASS) 1/ pattern, 160 kcfs 0% (ALL PASS) 1/ pattern, 160 kcfs 0% (ALL PASS) Drawdown Metric Minimum storage > 367 TAF Maximum Successful NEP 1/ pattern 60% 1/ pattern 80% 1/ pattern 70% 1/ pattern 85%

34 QUESTIONS?

Integrating Weather Forecasts into Folsom Reservoir Operations

Integrating Weather Forecasts into Folsom Reservoir Operations Integrating Weather Forecasts into Folsom Reservoir Operations California Extreme Precipitation Symposium September 6, 2016 Brad Moore, PE US Army Corps of Engineers Biography Brad Moore is a Lead Civil

More information

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Public Workshop May 28, 2015 Library Galleria 828 I Street, Sacramento, CA US Army Corps of Engineers BUILDING STRONG WELCOME &

More information

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Public Workshop May 25, 2016 Sacramento Library Galleria 828 I Street, Sacramento, CA US Army Corps of Engineers BUILDING STRONG

More information

Folsom Dam Water Control Manual Update

Folsom Dam Water Control Manual Update Folsom Dam Water Control Manual Update Public Workshop April 3, 2014 Location: Sterling Hotel Ballroom 1300 H Street, Sacramento US Army Corps of Engineers BUILDING STRONG WELCOME & INTRODUCTIONS 2 BUILDING

More information

Missouri River Basin Water Management Monthly Update

Missouri River Basin Water Management Monthly Update Missouri River Basin Water Management Monthly Update Participating Agencies 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 National Oceanic and Atmospheric

More information

Missouri River Basin Water Management Monthly Update

Missouri River Basin Water Management Monthly Update Missouri River Basin Water Management Monthly Update Participating Agencies 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 National Oceanic and Atmospheric

More information

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving

More information

Missouri River Basin Water Management Monthly Update

Missouri River Basin Water Management Monthly Update Missouri River Basin Water Management Monthly Update Participating Agencies 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 National Oceanic and Atmospheric

More information

2015 Fall Conditions Report

2015 Fall Conditions Report 2015 Fall Conditions Report Prepared by: Hydrologic Forecast Centre Date: December 21 st, 2015 Table of Contents Table of Figures... ii EXECUTIVE SUMMARY... 1 BACKGROUND... 2 SUMMER AND FALL PRECIPITATION...

More information

NRC Workshop Probabilistic Flood Hazard Assessment (PFHA) Jan 29-31, Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc.

NRC Workshop Probabilistic Flood Hazard Assessment (PFHA) Jan 29-31, Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc. Stochastic Event Flood Model (SEFM) Stochastic Modeling of Extreme Floods A Hydrological Tool for Analysis of Extreme Floods Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc. Olympia, WA NRC Workshop

More information

Lake Winnebago Regulation Meeting

Lake Winnebago Regulation Meeting Lake Winnebago Regulation Meeting USACE Detroit District October 9, 2014 US Army Corps of Engineers Agenda Basin Overview Major Stakeholders Maintenance a and Repair Work Weather Conditions 2013-20142014

More information

Missouri River Basin Water Management Monthly Update

Missouri River Basin Water Management Monthly Update Missouri River Basin Water Management Monthly Update Participating Agencies 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 National Oceanic and Atmospheric

More information

Proposal to limit Namakan Lake to 1970 Upper Rule Curve for remainder of summer

Proposal to limit Namakan Lake to 1970 Upper Rule Curve for remainder of summer July 7, 214 Subject: Proposal to limit Namakan Lake to 197 Upper Rule Curve for remainder of summer Background: Flooding in 214 has resulted in the highest water levels on Namakan Lake since 1968, and

More information

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES Memorandum To: David Thompson From: John Haapala CC: Dan McDonald Bob Montgomery Date: February 24, 2003 File #: 1003551 Re: Lake Wenatchee Historic Water Levels, Operation Model, and Flood Operation This

More information

San Francisco Public Utilities Commission Hydrological Conditions Report For April 2014

San Francisco Public Utilities Commission Hydrological Conditions Report For April 2014 San Francisco Public Utilities Commission Hydrological Conditions Report For April 2014 J. Chester, C. Graham, A. Mazurkiewicz, & M. Tsang, May 13, 2014 Snow in the High Country The view from Bond Pass

More information

Water Supply Forecast - THE DALLES http://www.nwrfc.noaa.gov/water_supply/ws_forecasts.php?id=tdao3 Page 1 of 1 3/7/2013 Close Archive Data/Normals Rankings Adjustments Verification Verify All Years Help

More information

Impacts of climate change on flooding in the river Meuse

Impacts of climate change on flooding in the river Meuse Impacts of climate change on flooding in the river Meuse Martijn Booij University of Twente,, The Netherlands m.j.booij booij@utwente.nlnl 2003 in the Meuse basin Model appropriateness Appropriate model

More information

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD 9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD 9.1. Introduction Due to the size of Watana Dam and the economic importance of the Project to the Railbelt, the Probable Maximum Flood (PMF)

More information

APR-SEP. Forecast Are in KAF % Average 10 % 30 Year. Forecast Period

APR-SEP. Forecast Are in KAF % Average 10 % 30 Year. Forecast Period Water Supply Forecast - THE DALLES file://v:\nwrfc_forecast\2013\tdao3\04-05.html Page 1 of 1 4/8/2013 Header for Water Supply Information Page Close Archive Data/Normals Rankings Adjustments Verification

More information

San Francisco Public Utilities Commission Hydrological Conditions Report For March 2016

San Francisco Public Utilities Commission Hydrological Conditions Report For March 2016 San Francisco Public Utilities Commission Hydrological Conditions Report For March 2016 J. Chester, C. Graham, A. Mazurkiewicz, & M. Tsang, April 7, 2016 Snow Surveyor Chris Graham crossing Huckleberry

More information

Updated 2018 Restoration Allocation & Default Flow Schedule February 16, 2018

Updated 2018 Restoration Allocation & Default Flow Schedule February 16, 2018 Updated 2018 Restoration Allocation & Default Schedule February 16, 2018 Bureau of Reclamation 2800 Cottage Way, MP-170 Sacramento, California 95825 Introduction The following transmits the updated 2018

More information

Missouri River Basin Water Management

Missouri River Basin Water Management Missouri River Basin Water Management US Army Corps of Engineers Missouri River Navigator s Meeting February 12, 2014 Bill Doan, P.E. Missouri River Basin Water Management US Army Corps of Engineers BUILDING

More information

Albeni Falls Operations Meeting 2015

Albeni Falls Operations Meeting 2015 Albeni Falls Operations Meeting 2015 Katherine Rowden NWS Joel Fenolio Corps of Engineers Agenda Introductions Drought-Weather Conditions Free flow operations Review of Clarified Operations Albeni Falls

More information

3.0 TECHNICAL FEASIBILITY

3.0 TECHNICAL FEASIBILITY 3.0 TECHNICAL FEASIBILITY 3.1 INTRODUCTION To enable seasonal storage and release of water from Lake Wenatchee, an impoundment structure would need to be constructed on the lake outlet channel. The structure

More information

Updated 2018 Restoration Allocation & Default Flow Schedule May 22, 2018

Updated 2018 Restoration Allocation & Default Flow Schedule May 22, 2018 Updated 2018 Restoration Allocation & Default Schedule May 22, 2018 Bureau of Reclamation 2800 Cottage Way, MP-170 Sacramento, California 95825 Introduction The following transmits the updated 2018 Restoration

More information

Operator and Modeler Collaboration on Truckee- Carson River Operations Using Ensembles River Ware User Group Meeting Thursday February 1, 2018

Operator and Modeler Collaboration on Truckee- Carson River Operations Using Ensembles River Ware User Group Meeting Thursday February 1, 2018 Operator and Modeler Collaboration on Truckee- Carson River Operations Using Ensembles River Ware User Group Meeting Thursday February 1, 2018 Caleb Erkman, P.E. PWRE David Wathen Deputy TROA Administrator

More information

Modeling of peak inflow dates for a snowmelt dominated basin Evan Heisman. CVEN 6833: Advanced Data Analysis Fall 2012 Prof. Balaji Rajagopalan

Modeling of peak inflow dates for a snowmelt dominated basin Evan Heisman. CVEN 6833: Advanced Data Analysis Fall 2012 Prof. Balaji Rajagopalan Modeling of peak inflow dates for a snowmelt dominated basin Evan Heisman CVEN 6833: Advanced Data Analysis Fall 2012 Prof. Balaji Rajagopalan The Dworshak reservoir, a project operated by the Army Corps

More information

Appendix B - Alabama-Coosa-Tallapoosa (ACT) Basin

Appendix B - Alabama-Coosa-Tallapoosa (ACT) Basin Appendix B - Alabama-Coosa-Tallapoosa (ACT) Basin 1 ACT BASIN 1.1 DESCRIPTION OF BASIN The headwater streams of the Alabama-Coosa-Tallapoosa (ACT) System rise in the Blue Ridge Mountains of Georgia and

More information

A Review of the 2007 Water Year in Colorado

A Review of the 2007 Water Year in Colorado A Review of the 2007 Water Year in Colorado Nolan Doesken Colorado Climate Center, CSU Mike Gillespie Snow Survey Division, USDA, NRCS Presented at the 28 th Annual AGU Hydrology Days, March 26, 2008,

More information

Reclamation Perspective on Operational Snow Data and Needs. Snowpack Monitoring for Streamflow Forecasting and Drought Planning August 11, 2015

Reclamation Perspective on Operational Snow Data and Needs. Snowpack Monitoring for Streamflow Forecasting and Drought Planning August 11, 2015 Reclamation Perspective on Operational Snow Data and Needs Snowpack Monitoring for Streamflow Forecasting and Drought Planning August 11, 2015 2 Reclamation Operational Modeling 3 Colorado Basin-wide Models

More information

GAMINGRE 8/1/ of 7

GAMINGRE 8/1/ of 7 FYE 09/30/92 JULY 92 0.00 254,550.00 0.00 0 0 0 0 0 0 0 0 0 254,550.00 0.00 0.00 0.00 0.00 254,550.00 AUG 10,616,710.31 5,299.95 845,656.83 84,565.68 61,084.86 23,480.82 339,734.73 135,893.89 67,946.95

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

REDWOOD VALLEY SUBAREA

REDWOOD VALLEY SUBAREA Independent Science Review Panel Conceptual Model of Watershed Hydrology, Surface Water and Groundwater Interactions and Stream Ecology for the Russian River Watershed Appendices A-1 APPENDIX A A-2 REDWOOD

More information

Evapo-transpiration Losses Produced by Irrigation in the Snake River Basin, Idaho

Evapo-transpiration Losses Produced by Irrigation in the Snake River Basin, Idaho Nov 7, 2007 DRAFT Evapo-transpiration Losses Produced by Irrigation in the Snake River Basin, Idaho Wendell Tangborn and Birbal Rana HyMet Inc. Vashon Island, WA Abstract An estimated 8 MAF (million acre-feet)

More information

Climate Change and Water Supply Research. Drought Response Workshop October 8, 2013

Climate Change and Water Supply Research. Drought Response Workshop October 8, 2013 Climate Change and Water Supply Research Drought Response Workshop October 8, 2013 DWR Photo Oroville Reservoir, 2009 Talk Overview Expectations History Atmospheric Rivers and Water Supply Current Research

More information

Preliminary Viability Assessment (PVA) for Lake Mendocino Forecast Informed Reservoir Operations (FIRO)

Preliminary Viability Assessment (PVA) for Lake Mendocino Forecast Informed Reservoir Operations (FIRO) Preliminary Viability Assessment (PVA) for Lake Mendocino Forecast Informed Reservoir Operations (FIRO) Rob Hartman Consultant to SCWA and CW3E May 30, 2017 Why Conduct a PVA? Key Questions for the PVA

More information

Climate Change and Flood Operations in the Sacramento Basin, California

Climate Change and Flood Operations in the Sacramento Basin, California JULY 2011 Climate Change and Flood Operations in the Sacramento Basin, California Ann D. Willis 1, Jay R. Lund 2, Edwin S. Townsley 3, and Beth A. Faber 4 ABSTRACT Climate warming is likely to challenge

More information

Flooding Performance Indicator Summary. Performance indicator: Flooding impacts on riparian property for Lake Ontario and the Upper St.

Flooding Performance Indicator Summary. Performance indicator: Flooding impacts on riparian property for Lake Ontario and the Upper St. Flooding Performance Indicator Summary Performance indicator: Flooding impacts on riparian property for Lake Ontario and the Upper St. Lawrence River Technical Workgroup: Coastal TWG Research by: Baird

More information

2011 Flood: Technical Review of Lake Manitoba, Lake St. Martin and Assiniboine River Water Levels Summary

2011 Flood: Technical Review of Lake Manitoba, Lake St. Martin and Assiniboine River Water Levels Summary 2011 Flood: Technical Review of Lake Manitoba, Lake St. Martin and Assiniboine River Water Levels Summary October 2013 Introduction Manitoba experienced unprecedented flooding in 2011. While flooding was

More information

A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake

A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake Prepared by: Allan Chapman, MSc, PGeo Hydrologist, Chapman Geoscience Ltd., and Former Head, BC River Forecast Centre Victoria

More information

ResSIMLite vs. ResSIM Model Comparison

ResSIMLite vs. ResSIM Model Comparison ResSIMLite vs. ResSIM Model Comparison 06/05/2013 M. Cox, OSU The outflow calculations represented in the Envision model have been closely modeled after the representation in the USACE HEC ResSIM model

More information

MISSOURI RIVER BASIN WATER MANAGEMENT SPRING 2019 PUBLIC MEETINGS

MISSOURI RIVER BASIN WATER MANAGEMENT SPRING 2019 PUBLIC MEETINGS MISSOURI RIVER BASIN WATER MANAGEMENT SPRING 2019 PUBLIC MEETINGS April 9 11:00 a.m. Fort Peck, MT April 9 6:00 p.m. Bismarck, ND April 10 10:00 a.m. Pierre, SD April 10 4:00 p.m. Sioux City, IA April

More information

January 25, Summary

January 25, Summary January 25, 2013 Summary Precipitation since the December 17, 2012, Drought Update has been slightly below average in parts of central and northern Illinois and above average in southern Illinois. Soil

More information

Hydrologic Conditions in the Delaware River Basin

Hydrologic Conditions in the Delaware River Basin 2017 Hydrologic Conditions in the Delaware River Basin Prepared by Operations Staff June 2018 Hydrologic Highlights Hydrologic Conditions in the Delaware River Basin Annual Report 2017 At the start of

More information

Kootenai Basin Water Supply Update and Sturgeon Flow Augmentation Kootenai Valley Resource Initiative

Kootenai Basin Water Supply Update and Sturgeon Flow Augmentation Kootenai Valley Resource Initiative Kootenai Basin Water Supply Update and Sturgeon Flow Augmentation Kootenai Valley Resource Initiative Greg Hoffman Fishery Biologist / Kootenai River Basin Flood Engineer Libby Dam 15 May 2017 US Army

More information

AN OVERVIEW OF ENSEMBLE STREAMFLOW PREDICTION STUDIES IN KOREA

AN OVERVIEW OF ENSEMBLE STREAMFLOW PREDICTION STUDIES IN KOREA AN OVERVIEW OF ENSEMBLE STREAMFLOW PREDICTION STUDIES IN KOREA DAE-IL JEONG, YOUNG-OH KIM School of Civil, Urban & Geosystems Engineering, Seoul National University, San 56-1, Sillim-dong, Gwanak-gu, Seoul,

More information

Numerical modeling of sediment flushing from Lewis and Clark Lake

Numerical modeling of sediment flushing from Lewis and Clark Lake University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln US Army Research U.S. Department of Defense 2013 Numerical modeling of sediment flushing from Lewis and Clark Lake Jungkyu

More information

Climate also has a large influence on how local ecosystems have evolved and how we interact with them.

Climate also has a large influence on how local ecosystems have evolved and how we interact with them. The Mississippi River in a Changing Climate By Paul Lehman, P.Eng., General Manager Mississippi Valley Conservation (This article originally appeared in the Mississippi Lakes Association s 212 Mississippi

More information

APPENDIX J MODELING TEHCNICAL MEMORANDUM (RESSIM MODELING)

APPENDIX J MODELING TEHCNICAL MEMORANDUM (RESSIM MODELING) APPENDIX J MODELING TEHCNICAL MEMORANDUM (RESSIM MODELING) Technical Memorandum To: Michael J. Preszler, California Water Consulting From: Marieke Armstrong, Mead & Hunt Rahul Ranade, Mead & Hunt Date:

More information

ATLANTIC INTRACOASTAL WATERWAY NORFOLK DISTRICT. Joel F. Scussel, Operations Support Section Dismal Swamp Canal July 27, 2017

ATLANTIC INTRACOASTAL WATERWAY NORFOLK DISTRICT. Joel F. Scussel, Operations Support Section Dismal Swamp Canal July 27, 2017 ATLANTIC INTRACOASTAL WATERWAY 1 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 NORFOLK DISTRICT 110 135 120 252 174.59 112 92 56 62 102 130 102 56 48

More information

U.S. ARMY CORPS OF ENGINEERS

U.S. ARMY CORPS OF ENGINEERS CORPS FACTS Regulating Mississippi River Navigation Pools U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Historical Background Federal improvements in the interest of navigation on the Mississippi River

More information

President s Day Weekend Storm Community Meeting and Workshop April 17, 2017

President s Day Weekend Storm Community Meeting and Workshop April 17, 2017 President s Day Weekend Storm Community Meeting and Workshop April 17, 2017 Meeting outline 1. Progress update on the City of San Jose s recovery efforts 2. Water district presentation on: Weather situation

More information

Managing Climate Risks on the Colorado River

Managing Climate Risks on the Colorado River Managing Climate Risks on the Colorado River Balaji Rajagopalan Department of Civil, Environmental and Architectural Engineering & CIRES University of Colorado, Boulder, CO Symposium on Climate Risk Management

More information

Appendix E Plots from the Evaluation of the CNRFC Operational Hydrologic Model

Appendix E Plots from the Evaluation of the CNRFC Operational Hydrologic Model Appendix E Plots from the Evaluation of the CNRFC Operational Hydrologic Model APE-1 2 Trinity Lake Inflow 2 1 Simulated 1 1 1 2 2 Observed Figure APE-1. Simulated daily flow versus observed (FNF) flow

More information

THE STATE OF SURFACE WATER GAUGING IN THE NAVAJO NATION

THE STATE OF SURFACE WATER GAUGING IN THE NAVAJO NATION THE STATE OF SURFACE WATER GAUGING IN THE NAVAJO NATION Aregai Tecle Professor of Hydrology Northern Arizona University Flagstaff, AZ Acknowledgement Many thanks to my research team mates and Elisabeth

More information

Incorporating Large-Scale Climate Information in Water Resources Decision Making

Incorporating Large-Scale Climate Information in Water Resources Decision Making Incorporating Large-Scale Climate Information in Water Resources Decision Making Balaji Rajagopalan Dept. of Civil, Env.. And Arch. Engg.. And CIRES Katrina Grantz, Edith Zagona (CADSWES) Martyn Clark

More information

APPLICATIONS OF DOWNSCALING: HYDROLOGY AND WATER RESOURCES EXAMPLES

APPLICATIONS OF DOWNSCALING: HYDROLOGY AND WATER RESOURCES EXAMPLES APPLICATIONS OF DOWNSCALING: HYDROLOGY AND WATER RESOURCES EXAMPLES Dennis P. Lettenmaier Department of Civil and Environmental Engineering For presentation at Workshop on Regional Climate Research NCAR

More information

Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows ( ) for the Operations Model Don Pedro Project Relicensing

Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows ( ) for the Operations Model Don Pedro Project Relicensing Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows (1970-2010) for the Operations Model Don Pedro Project Relicensing 1.0 Objective Using available data, develop a daily time series

More information

Assessment of the Hood River Delta Hood River, Oregon

Assessment of the Hood River Delta Hood River, Oregon Assessment of the Hood River Delta Hood River, Oregon Pacific Northwest Waterways Association Annual Meeting October 13, 2010 Michael McElwee, Executive Director Port of Hood River Overview U.S. Army Corps

More information

RESERVOIR RELEASE FORECAST MODEL FOR FLOOD OPERATION OF THE FOLSOM PROJECT INCLUDING PRE-RELEASES ABSTRACT

RESERVOIR RELEASE FORECAST MODEL FOR FLOOD OPERATION OF THE FOLSOM PROJECT INCLUDING PRE-RELEASES ABSTRACT RESERVOIR RELEASE FORECAST MODEL FOR FLOOD OPERATION OF THE FOLSOM PROJECT INCLUDING PRE-RELEASES David S. Bowles 1, J. Dean Mathias 2, Sanjay S. Chauhan 3 and Joseph D. Countryman 4 ABSTRACT This paper

More information

Souris River Basin Spring Runoff Outlook As of March 1, 2019

Souris River Basin Spring Runoff Outlook As of March 1, 2019 Souris River Basin Spring Runoff Outlook As of March 1, 2019 Prepared by: Flow Forecasting & Operations Planning Water Security Agency Basin Conditions Summer rainfall in 2018 over the Saskatchewan portion

More information

Lu, S., P. Craig, C. Wallen, Z. Liu, A. Stoddard, W. McAnnally and E. Maak. Dynamic Solutions, Knoxville, TN USACOE, Sacramento District

Lu, S., P. Craig, C. Wallen, Z. Liu, A. Stoddard, W. McAnnally and E. Maak. Dynamic Solutions, Knoxville, TN USACOE, Sacramento District An Extended-Delta Hydrodynamic Model Framework for Sea Level Rise Analysis to Support Resource Management Planning for the Sacramento-San Joaquin River Delta Lu, S., P. Craig, C. Wallen, Z. Liu, A. Stoddard,

More information

Colorado s 2003 Moisture Outlook

Colorado s 2003 Moisture Outlook Colorado s 2003 Moisture Outlook Nolan Doesken and Roger Pielke, Sr. Colorado Climate Center Prepared by Tara Green and Odie Bliss http://climate.atmos.colostate.edu How we got into this drought! Fort

More information

Appendix C. Apalachicola-Chattahoochee-Flint (ACF) Basin Detailed Analysis

Appendix C. Apalachicola-Chattahoochee-Flint (ACF) Basin Detailed Analysis Appendix C Apalachicola-Chattahoochee-Flint (ACF) Basin Detailed Analysis Appendix C - Apalachicola-Chattahoochee-Flint Basin Detailed Analysis 1 ACF BASIN 1.1 DESCRIPTION OF BASIN Streams of the Apalachicola-Chattahoochee-Flint

More information

National Integrated Drought Information System. Southeast US Pilot for Apalachicola- Flint-Chattahoochee River Basin 20-March-2012

National Integrated Drought Information System. Southeast US Pilot for Apalachicola- Flint-Chattahoochee River Basin 20-March-2012 National Integrated Drought Information System Southeast US Pilot for Apalachicola- Flint-Chattahoochee River Basin 20-March-2012 Current drought status from Drought Monitor http://www.drought.unl.edu/dm/monitor.html

More information

Upper Missouri River Basin February 2018 Calendar Year Runoff Forecast February 6, 2018

Upper Missouri River Basin February 2018 Calendar Year Runoff Forecast February 6, 2018 Upper Missouri River Basin February 2018 Calendar Year Runoff Forecast February 6, 2018 Calendar Year Runoff Forecast Explanation and Purpose of Forecast U.S. Army Corps of Engineers, Northwestern Division

More information

Merced Irrigation District Hydrologic and Hydraulic Operations (MIDH2O) Model

Merced Irrigation District Hydrologic and Hydraulic Operations (MIDH2O) Model Merced Irrigation District Hydrologic and Hydraulic Operations (MIDH2O) Model September 05, 2018 Marco Bell, Merced Irrigation District Bibek Joshi, Dewberry Objective Introduce HEC-RTS Benefits of MIDH2O

More information

UNDERSTANDING GREAT LAKES WATER LEVEL FLUCTUATIONS AND CURRENT CONDITIONS APRIL 2013

UNDERSTANDING GREAT LAKES WATER LEVEL FLUCTUATIONS AND CURRENT CONDITIONS APRIL 2013 UNDERSTANDING GREAT LAKES WATER LEVEL FLUCTUATIONS AND CURRENT CONDITIONS IL 213 John Allis Chief, Great Lakes Hydraulics and Hydrology Office (313) 226-2137 John.T.Allis@usace.army.mil Keith Kompoltowicz

More information

Maximum 3-Day Reservoir Unimpaired Inflow Volumes For Selected Flood Events... (1,000 Acre-Feet)

Maximum 3-Day Reservoir Unimpaired Inflow Volumes For Selected Flood Events... (1,000 Acre-Feet) Maximum 3-Day Reservoir Unimpaired Inflow Volumes For Selected Flood Events... (1,000 Acre-Feet) 1 Maximum $Day Unregulated Inflow Volumes For Selected Flood Events (1,000 Acre-Feet)...... 1 Maximum SDay

More information

Unconventional Wisdom and the Effects of Dams on Downstream Coarse Sediment Supply. Byron Amerson, Jay Stallman, John Wooster, and Derek Booth

Unconventional Wisdom and the Effects of Dams on Downstream Coarse Sediment Supply. Byron Amerson, Jay Stallman, John Wooster, and Derek Booth Unconventional Wisdom and the Effects of Dams on Downstream Coarse Sediment Supply 3 February 2009 Byron Amerson, Jay Stallman, John Wooster, and Derek Booth Sultan River, WA OBJECTIVE Consider the landscape

More information

Jackson County 2013 Weather Data

Jackson County 2013 Weather Data Jackson County 2013 Weather Data 61 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data

More information

National Integrated Drought Information System Southeast US Pilot for Apalachicola- Flint-Chattahoochee River Basin. 22 May 2012

National Integrated Drought Information System Southeast US Pilot for Apalachicola- Flint-Chattahoochee River Basin. 22 May 2012 National Integrated Drought Information System Southeast US Pilot for Apalachicola- Flint-Chattahoochee River Basin 22 May 2012 Outline Welcome Keith Ingram, UF, Southeast Climate Consortium Current drought

More information

Great Lakes Update. Volume 199: 2017 Annual Summary. Background

Great Lakes Update. Volume 199: 2017 Annual Summary. Background Great Lakes Update Volume 199: 2017 Annual Summary Background The U.S. Army Corps of Engineers (USACE) tracks and forecasts the water levels of each of the Great Lakes. This report is primarily focused

More information

Monthly Long Range Weather Commentary Issued: APRIL 18, 2017 Steven A. Root, CCM, Chief Analytics Officer, Sr. VP,

Monthly Long Range Weather Commentary Issued: APRIL 18, 2017 Steven A. Root, CCM, Chief Analytics Officer, Sr. VP, Monthly Long Range Weather Commentary Issued: APRIL 18, 2017 Steven A. Root, CCM, Chief Analytics Officer, Sr. VP, sroot@weatherbank.com MARCH 2017 Climate Highlights The Month in Review The average contiguous

More information

Sierra Weather and Climate Update

Sierra Weather and Climate Update Sierra Weather and Climate Update 2014-15 Kelly Redmond Western Regional Climate Center Desert Research Institute Reno Nevada Yosemite Hydroclimate Workshop Yosemite Valley, 2015 October 8-9 Percent of

More information

Webinar and Weekly Summary February 15th, 2011

Webinar and Weekly Summary February 15th, 2011 Webinar and Weekly Summary February 15th, 2011 -Assessment of current water conditions - Precipitation Forecast - Recommendations for Drought Monitor Upper Colorado Normal Precipitation Upper Colorado

More information

Lower San Joaquin River Committee

Lower San Joaquin River Committee Lower San Joaquin River Committee Briefing of New Melones Project and Vernalis Modeling Dan Steiner January 3, 215 1 Task Demonstrate effects of changed flow and salinity in the San Joaquin River upon

More information

Minnesota s Climatic Conditions, Outlook, and Impacts on Agriculture. Today. 1. The weather and climate of 2017 to date

Minnesota s Climatic Conditions, Outlook, and Impacts on Agriculture. Today. 1. The weather and climate of 2017 to date Minnesota s Climatic Conditions, Outlook, and Impacts on Agriculture Kenny Blumenfeld, State Climatology Office Crop Insurance Conference, Sep 13, 2017 Today 1. The weather and climate of 2017 to date

More information

The Climate of Oregon Climate Zone 4 Northern Cascades

The Climate of Oregon Climate Zone 4 Northern Cascades /05 E55 Unbound issue No. 9/ is Does not circulate Special Report 916 May 1993 The Climate of Oregon Climate Zone 4 Property of OREGON STATE UNIVERSITY Library Serials Corvallis, OR 97331-4503 Agricultural

More information

Cost of Inflow Forecast Uncertainty for Day Ahead Hydropower Production Scheduling

Cost of Inflow Forecast Uncertainty for Day Ahead Hydropower Production Scheduling Cost of Inflow Forecast Uncertainty for Day Ahead Hydropower Production Scheduling HEPEX 10 th University Workshop June 25 th, 2014 NOAA Center for Weather and Climate Thomas D. Veselka and Les Poch Argonne

More information

Hydrologic Conditions in the Delaware River Basin

Hydrologic Conditions in the Delaware River Basin Hydrologic Conditions in the Delaware River Basin April : Flooding in Lambertville, New Jersey Aerial photo used with permission of www.elevated-images.com Annual Report Prepared by Operations Staff June

More information

Souris River Basin Spring Runoff Outlook As of March 15, 2018

Souris River Basin Spring Runoff Outlook As of March 15, 2018 Souris River Basin Spring Runoff Outlook As of March 15, 2018 Prepared by: Flow Forecasting & Operations Planning Water Security Agency Basin Conditions Summer rainfall in 2017 in the Saskatchewan portion

More information

2003 Moisture Outlook

2003 Moisture Outlook 2003 Moisture Outlook Nolan Doesken and Roger Pielke, Sr. Colorado Climate Center Prepared by Tara Green and Odie Bliss http://climate.atmos.colostate.edu Through 1999 Through 1999 Fort Collins Total Water

More information

Highlights of the 2006 Water Year in Colorado

Highlights of the 2006 Water Year in Colorado Highlights of the 2006 Water Year in Colorado Nolan Doesken, State Climatologist Atmospheric Science Department Colorado State University http://ccc.atmos.colostate.edu Presented to 61 st Annual Meeting

More information

Inflow Forecasting for Hydro Catchments. Ross Woods and Alistair McKerchar NIWA Christchurch

Inflow Forecasting for Hydro Catchments. Ross Woods and Alistair McKerchar NIWA Christchurch Inflow Forecasting for Hydro Catchments Ross Woods and Alistair McKerchar NIWA Christchurch Inflows Water flowing into hydro storages Usually measured by monitoring the levels and outflows from hydro storages

More information

Great Lakes Update. Volume 194: 2015 Annual Summary

Great Lakes Update. Volume 194: 2015 Annual Summary Great Lakes Update Volume 194: 2015 Annual Summary Background The U.S. Army Corps of Engineers (USACE) tracks and forecasts the water levels of each of the Great Lakes. This report summarizes the hydrologic

More information

Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center

Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data

More information

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and 2001-2002 Rainfall For Selected Arizona Cities Phoenix Tucson Flagstaff Avg. 2001-2002 Avg. 2001-2002 Avg. 2001-2002 October 0.7 0.0

More information

Changing Hydrology under a Changing Climate for a Coastal Plain Watershed

Changing Hydrology under a Changing Climate for a Coastal Plain Watershed Changing Hydrology under a Changing Climate for a Coastal Plain Watershed David Bosch USDA-ARS, Tifton, GA Jeff Arnold ARS Temple, TX and Peter Allen Baylor University, TX SEWRU Objectives 1. Project changes

More information

Missouri River Basin Climate Outlook 1 May Dr. Dennis Todey State Climatologist South Dakota State Univ.

Missouri River Basin Climate Outlook 1 May Dr. Dennis Todey State Climatologist South Dakota State Univ. Missouri River Basin Climate Outlook 1 May 2014 Dr. Dennis Todey State Climatologist South Dakota State Univ. dennis.todey@sdstate.edu 605-688-5141 Photo taken Feb 19, 2013 General Information Providing

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

Upper Missouri River Basin January 2018 Calendar Year Runoff Forecast January 3, 2018

Upper Missouri River Basin January 2018 Calendar Year Runoff Forecast January 3, 2018 Calendar Year Runoff Forecast Upper Missouri River Basin January 2018 Calendar Year Runoff Forecast January 3, 2018 Explanation and Purpose of Forecast U.S. Army Corps of Engineers, Northwestern Division

More information

The Stochastic Event Flood Model Applied to Minidoka Dam on the Snake River, Idaho

The Stochastic Event Flood Model Applied to Minidoka Dam on the Snake River, Idaho The Stochastic Event Flood Model Applied to Minidoka Dam on the Snake River, Idaho K. L. Bullard 1, M. G. Schaeffer 2, B. A. Barker 3, D. Sutley 4, and V. Leverson 5 1 Bureau of Reclamation, Flood Hydrology

More information

Results of Intensity-Duration- Frequency Analysis for Precipitation and Runoff under Changing Climate

Results of Intensity-Duration- Frequency Analysis for Precipitation and Runoff under Changing Climate Results of Intensity-Duration- Frequency Analysis for Precipitation and Runoff under Changing Climate Supporting Casco Bay Region Climate Change Adaptation RRAP Eugene Yan, Alissa Jared, Julia Pierce,

More information

Jackson County 2014 Weather Data

Jackson County 2014 Weather Data Jackson County 2014 Weather Data 62 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data

More information

Water Management for Environmental Restoration Flows In the Big Bend reach, Rio Grande Rio Bravo

Water Management for Environmental Restoration Flows In the Big Bend reach, Rio Grande Rio Bravo University of California, Davis Department of Land, Air and Water Resources Water Management for Environmental Restoration Flows In the Big Bend reach, Rio Grande Rio Bravo 46 th Annual Meeting 8 9 March,

More information

Disentangling Impacts of Climate & Land Use Changes on the Quantity & Quality of River Flows in Southern Ontario

Disentangling Impacts of Climate & Land Use Changes on the Quantity & Quality of River Flows in Southern Ontario Disentangling Impacts of Climate & Land Use Changes on the Quantity & Quality of River Flows in Southern Ontario by Trevor Dickinson & Ramesh Rudra, Water Resources Engineering University of Guelph Acknowledgements

More information

HyMet Company. Streamflow and Energy Generation Forecasting Model Columbia River Basin

HyMet Company. Streamflow and Energy Generation Forecasting Model Columbia River Basin HyMet Company Streamflow and Energy Generation Forecasting Model Columbia River Basin HyMet Inc. Courthouse Square 19001 Vashon Hwy SW Suite 201 Vashon Island, WA 98070 Phone: 206-463-1610 Columbia River

More information

Study 16.5 Probable Maximum Flood (PMF)

Study 16.5 Probable Maximum Flood (PMF) Initial Study Report Meeting Study 16.5 Probable Maximum Flood (PMF) March 30, 2016 Prepared by 3/30/2016 1 Study 16.5 Status ISR documents (ISR Part D Overview): Status: Initial Study Report: Parts A,

More information

Elevation (ft) 50th to 75th Percentile 25th to 50th Percentile Median Observed /1 11/1 12/1 1/1 2/1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 Date

Elevation (ft) 50th to 75th Percentile 25th to 50th Percentile Median Observed /1 11/1 12/1 1/1 2/1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 Date Elevation (ft) 2470 2460 2450 2440 2430 2420 2410 2400 2390 2380 2370 2360 2350 2340 2330 2320 2310 2300 2290 2280 2270 2260 2250 2240 2230 2220 Bars Indicate 5th and 95th percentiles Lake Koocanusa Elevation

More information