1 10/23/2017 Header Information Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) Bridge Name: D-02-PR-030A Inspection Date: 12/2/2015 Sufficiency Rating: Inspection Cycle Year: 2015 NBI Reporting ID: D-02-PR-030A Posting status 41: A Inv Rtng Method 65: 5 County Code 3: 31 Service on/un 42A: 3 Inventory Rating 66: 0 Place Code 4: 20,000 Service on/un 42B: 5 Asph/Fill Thick 66T: 0 Feature Intersected 6: SOUTH PLATTE RIVER Main Mat/Desgn 43A: 3 Str. Evaluation 67: 6 Facility Carried 7: N OF 38TH STREET Main Mat/Desgn 43B: 9 Deck Geometry 68: N Location 9: Ped bridge on trail over Platte River, just east of Washington St near 38th St Appr Mat/Desgn 44A: 0 Undrclr Vert/Hor 69: N Custodian 21: 4 Appr Mat/Desgn 44B: 0 Posting 70: 5 Owner 22: 4 Main Spans Unit 45: 2 Waterway Adequacy 71: 8 Functional Class 26: 19 Approach Spans 46: 0 Approach Alignment 72: 8 Year Built 27: 2003 Horiz Clr 47: 999 Insp Team Indicator 90B: Xin/M. Lopez Lanes on 28A: 0 Max Span 48: 85 Inspector Name 90C: M. Lopez Lanes Under 28B: 0 Str Length 49: 170 Frequency 91: 36 ADT 29: 569 Curb Wdth L/R 50A: 0 FC Inspection Date 93A: 12/2/2015 Year of ADT 30: 2,016 Curb Wdth L/R 50B: 0 UW Inspection Date 93B: Design Load 31: Width Curb to Curb 51: 12 SI Date 93C: Apr Rdwy Width 32: Width Out to Out 52: 12 Direction of Traffic 102: 0 Median 33: 0 Deck Area: 2,040 Highway System 104: 0 Skew 34: 90 Min Undrclr Ref 54A: N Deck Type 107: 1 Sfty Rail 36a: 1 Min Undrclr 54B: 9.5 Wearing Surface 108A: 1 Sfty Rail 36b: Min Lat Clrnce Ref R 55A: N Membrane 108B: 0 Sfty Rail 36c: Min Lat Undrclr R 55B: Deck Protection 108C: 0 Sfty Rail 36d: Min Lat Undrclr L 56: Truck ADT 109: 0 Rail ht36h: 42 Deck 58: 6 Pier Protection 111: 1 Hist Signif 37: 5 Super 59: 7 NBIS Length 112: N Sub 60: 7 Scour Critical 113: 8 Channel/Protection 61: 7 Scour Watch 113M: Culvert 62: N CDOT Str Type 120A: Oprtng Rtg Method 63: 5 CDOT Constr Type 120B: Operating Rating 64: 0 Str Rating Date 130: 12/2/ /1
2 Bridge Inspection Cycle Year Inspection Date D 02 PR 030A /2/ Element Element Description Units Corrug/Orthotpc Deck Total Element % Element % Element % Element % Element Qty Element Qty Element Qty Element Qty Quantity State 1 State 2 State 3 State 4 State 1 State 2 State 3 State 4 SF Element Notes 30 sf CS2 rust at west abutment where stay in place form (see photo); CS3 rust rebar exposed) along SW side where stay in place form (see photo); 20 sf CS2 rut at east abutment where stay in place form (see photo) D 02 PR 030A /2/ U/Stl Thru Truss/Bot LF SELF WEATHERING STEEL D 02 PR 030A /2/ U/Stl Thru Truss/Top LF SELF WEATHERING STEEL D 02 PR 030A /2/ Paint Stl Floor Beam LF SELF WEATHERING STEEL D 02 PR 030A /2/ R/Conc Column EA TOP OF COLUMN NOT INSPECTED. D 02 PR 030A /2/ R/Conc Abutment LF D 02 PR 030A /2/ Pourable Joint Seal LF D 02 PR 030A /2/ Compressn Joint Seal LF D 02 PR 030A /2/ Moveable Bearing EA Joint Replaced in Debris needs to be removed. JOINT SEAL AT MIDSPAN. CLEAN DEBRIS D 02 PR 030A /2/ R/Conc Approach Slab SF WEST SLAB CRACKED. D 02 PR 030A /2/ Bridge Wingwalls EA SF erosion at NE corner; Undermining at NE wingwall D 02 PR 030A /2/ Metal Rail Coated LF SELF WEATHERING STEEL, Graffiti to be removed. D 02 PR 030A /2/ Genl Remarks EA Repair corrugated stay in place E. end by abutment; W abutment much lessof a deterioration issue; Rust more E end of bridge; Inspection Nots: ; 11:53 AM; Sunny, 46 F; ML, Xin
3 Figure 1 Longitudinal view Figure 3 Transverse view (downstream) Figure 2 Transverse view (upstream) Figure 4 30sf CS2 rust of stay-in place form at west abutment
4 Figure 5 CS3 rust (rebar exposed) of stay-in place form along SW side Figure 6 Water leaking along SW side near stay-in place form
5 Figure 8 20sf CS2 rust of stay-in place form at east abutment Figure 7 Water leaking along NE side near stay-in place form Figure 9 Erosion at NE corner
6 Figure 10 Undermining at NE wingwall
7 C:\Users\ \Pictures\4a758c02-be6c-4975-a753-0b4a1ebe5a0e.gif D-02-PR-030A N WINGWALLS PLATTE RIVER BIKE PATH 10' 171' FLOW PLAN VIEW TRUSS RAILING ABUTMENTS BRIDGE PIER PLATTE RIVER 171' ELEVATION TRUSS RAILING CONCRETE DECK 10' DECK BRACKETS SECTION Bridge No.: D-02-PR-030A Major or Minor?: Minor Drawn By: KJM Checked By: Date: 06/23/2014 Date: Sheet No. 1 of 1
Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by
Monitoring Scour Critical Bridges During Floods For Local Bridge Owners Presented by SAFETY FIRST DO NOT ENDANGER YOURSELF OR OTHERS WHILE MONITORING BRIDGES DO NOT ENTER FLOOD WATERS FLOOD WATERS INCLUDE
More informationBridge Risk Modeling
time good Bridge Risk Modeling Current Florida DOT Research condition bad Paul D. Thompson, Consultant Background Research team Florida State University John Sobanjo (PI) Paul D. Thompson (co-pi) Florida
More informationTRAFFIC ALERT FOR WEEK OF February 4 8, 2008
TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during
More informationMIGRATION PROBABILITY MATRIX FOR BRIDGE ELEMENT DETERIORATION MODELS
Paul D. Thompson 0 0 MIGRATION PROBABILITY MATRIX FOR BRIDGE ELEMENT DETERIORATION MODELS Paul D. Thompson Consultant 0 NE th Place, Bellevue, WA 00 USA Tel: --; Fax: --; Email: pdt@pdth.com Word count:,
More informationDr. Hatem ElBehairy. Cairo University BMS - Dr. Hatem ElBehairy 1
Bridge Management Systems Dr. Hatem ElBehairy 13.10.2015 Cairo University BMS - Dr. Hatem ElBehairy 1 Infrastructure Asset Management Infrastructure asset management is the integrated, multi- disciplinary
More informationAASHTO-LRFD LIVE LOAD DISTRIBUTION SPECIFICATIONS
AASHTO-LRFD LIVE LOAD DISTRIBUTION SPECIFICATIONS By Toorak Zokaie, 1 Member, ASCE ABSTRACT: The live load distribution factors contained in the AASHTO-LRFD Bridge Design Specification present a major
More informationBlack Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget
Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration
More informationInnovated Technological Trends in Highways. Flood Modelling & Evaluation of Impacts on Infrastructure
Innovated Technological Trends in Highways Flood Modelling & Evaluation of Impacts on Infrastructure Dr. Waheed Uddin Professor and Director CAIT University of Mississippi Contributions from: CAIT and
More informationThe last three sections of the main body of this report consist of:
Threatened and Endangered Species Geological Hazards Floodplains Cultural Resources Hazardous Materials A Cost Analysis section that provides comparative conceptual-level costs follows the Environmental
More informationPreferred practice on semi-integral abutment layout falls in the following order:
GENERAL INFORMATION: This section of the chapter establishes the practices and requirements necessary for the design and detailing of semi-integral abutments. For general requirements and guidelines on
More informationLoad Capacity Evaluation of Pennsylvania s Single Span T-Beam Bridges
Presentation at 2003 TRB Meeting, Washington, D.C. UNIVERSITY Load Capacity Evaluation of Pennsylvania s Single Span T-Beam Bridges F. N. Catbas, A. E. Aktan, K. Ciloglu, O. Hasancebi, J. S. Popovics Drexel
More informationWELCOME APWA How Best to Protect Asphalt Overlays with Interlayers - Delay Deterioration and Extend Pavement Life
WELCOME APWA 2015 How Best to Protect Asphalt Overlays with Interlayers - Delay Deterioration and Extend Pavement Life Dennis Rogers, Tensar Pavement Maintenance Manager, West All Data & analysis courtesy
More informationAppendix F Channel Grade Control Structures
Stream Simulation Appendix F Channel Grade Control Structures This appendix briefly describes permanent grade control structures that are sometimes needed in the upstream and/or downstream reaches adjacent
More informationBlack Gore Creek Total Maximum Daily Load Sediment Source Monitoring 2008 Vail Pass, Colorado. Prepared for: Eagle River Watershed Council
Black Gore Creek Total Maximum Daily Load Sediment Source Monitoring 2008 Vail Pass, Colorado Prepared for: Eagle River Watershed Council Prepared by: RiverRestoration.org I. Introduction This document
More informationHow Can DOT Operations and Maintenance Prepare for Extreme Weather Events?
How Can DOT Operations and Maintenance Prepare for Extreme Weather Events? Gregory C. Johnson, P.E. Chief Operations Officer Michigan Department of Transportation November 17, 2012 Michigan s Climate Four
More informationPuerto Rico Transportation Asset Management Plan
Puerto Rico Transportation Asset Management Plan PR-TAMP April 12, 2018 April 12, 2018 The Project Team Gordon Proctor Shobna Varma Jose Carro, P.E. Zaida Rico, P.E., Ph.D. gordon@proctorassociates.com
More informationAppendix K Design Examples
Appendix K Design Examples Example 1 * Two-Span I-Girder Bridge Continuous for Live Loads AASHTO Type IV I girder Zero Skew (a) Bridge Deck The bridge deck reinforcement using A615 rebars is shown below.
More informationHurricane Florence Recovery Report 4:00 PM November 15, 2018
Hurricane Florence Recovery Report 4:00 PM November 5, 208 SCDOT Operations Mode: Recovery Statewide Summary There are 9 road closures on primary and secondary routes due to damage or flooding throughout
More information1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment
1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment 1.1 Background Within the First National Engineering Vulnerability Assessment, the Public Infrastructure Engineering Vulnerability
More informationA.2 AASHTO Type IV, LRFD Specifications
A.2 AASHTO Type IV, LRFD Specifications A.2.1 INTRODUCTION A.2.2 DESIGN PARAMETERS 1'-5.0" Detailed example showing sample calculations for design of typical Interior AASHTO Type IV prestressed concrete
More informationHPMS Rule on Collecting Pavement Condition Data. Roger Smith Sui Tan
HPMS Rule on Collecting Pavement Condition Data Roger Smith Sui Tan Final Rule Issued January Affects Local agencies that have non-state NHS roads/ street For which you report HPMS data to Caltrans 2 Final
More informationCountermeasure Calculations and Design
Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,
More informationTwo Way Beam Supported Slab
Two Way Beam Supported Slab Part 2 The following example was done by Mr. Naim Hassan, 3 rd Year 2 nd Semester Student of CE Dept., AUST 16 The following Example was done by Md. Mahmudun Nobe, ID -.01.03.078,
More informationPEACE RIVER EAST HILL - HWY 2:60 (PH2) SELECT PHOTOGRAPHS August 22, 2007 File: Photo E003. Station May 2007
Photo E003 0+000 Viewing looking upslope at Site 4 from highway. Conditions unchanged from 2006. Photo E018 0+000 Localized erosion within road fill on upslope side of highway. Photo E022 0+250 Looking
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:
More informationBUILDING HOME CONSTRUCTION
1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68
More informationHurricane Florence Recovery Report 4:00 PM October 31, 2018
Hurricane Florence Recovery Report 4:00 PM October 3, 208 SCDOT Operations Mode: Recovery Statewide Summary There are 2 road closures on primary and secondary routes due to damage or flooding throughout
More informationCE415L Applied Fluid Mechanics Laboratory
Applied Fluid Mechanics Laboratory Learning Objective Following completion of this experiment and the analysis of the data, you should be able to 1. generalize results of introducing changes to a natural
More informationScreening & Retrofit Prioritization of Truss Bridges
Screening & Retrofit Prioritization of Truss Bridges Roupen Donikian, P.E. Sr. Associate, T.Y. Lin International Seismic Retrofit of Truss Bridges A Pilot Training Course December 12-14, 2005 St. Louis,
More informationDISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD
HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION
More informationBlack Gore Creek Total Maximum Daily Load Sediment Source Monitoring 2007 Vail Pass, Colorado
Black ore Creek Total Maximum Daily Load Sediment Source Monitoring 2007 Vail Pass, Colorado The photograph above shows the Black ore Creek channel at Mile Marker 183.5 Prepared for: Eagle River Watershed
More informationA STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA
A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA Dr. Gamal A. Sallam 1 and Dr. Medhat Aziz 2 ABSTRACT Bridges are critical structures that require a substantial investment to construct and serve an important
More informationExample Bridge Deck Design for Assign. 3 Summary
Bridge Design Spring 2012 Example Bridge Deck Design for Assign. 3 Summary 1 / 2 Geometry Material Properties N gird 6 f' c 4 ksi S 8.00 ft 1 0.85 b f 0 in f r 0.740 ksi = 0.37 * SQRT( f' c ) L over 3.25
More informationBlack Gore Creek Sediment Source Monitoring and TMDL Sediment Budget
Black Gore Creek 2012 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: The Eagle River Watershed Council Prepared By: RiverRestoration.org - I. Introduction Interstate 70 is a major highway
More informationMr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No
January 17, 2018 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0337367 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS STRUCTURAL ENGINEERING FIRM TO PERFORM A STRUCTURAL EVALUATION OF THE MARKET STREET PARKADE FACILITY REFERENCE RFP 14-148 Addendum Issued: August 22, 2014 ADDENDUM No. 2 Page 1 of
More informationRoadway Grade = m, amsl HWM = Roadway grade dictates elevation of superstructure and not minimum free board requirement.
Example on Design of Slab Bridge Design Data and Specifications Chapter 5 SUPERSTRUCTURES Superstructure consists of 10m slab, 36m box girder and 10m T-girder all simply supported. Only the design of Slab
More informationMultiway Analysis of Bridge Structural Types in the National Bridge Inventory (NBI) A Tensor Decomposition Approach
Multiway Analysis of Bridge Structural Types in the National Bridge Inventory (NBI) A Tensor Decomposition Approach By Offei A. Adarkwa Nii Attoh-Okine (Ph.D) (IEEE Big Data Conference -10/27/2014) 1 Presentation
More informationInvestigating and Improving Bridge Management System Methodologies Under Uncertainty
Utah State University DigitalCommons@USU All Graduate Theses and Dissertations Graduate Studies 12-2016 Investigating and Improving Bridge Management System Methodologies Under Uncertainty Minwoo Chang
More informationConceptual Profile Alternative. Massachusetts Department of Transportation 4-6 December 2010
Figure 4.3-2 Conceptual Profile Alternative Massachusetts Department of Transportation 4-6 Figure 4.3-3 Profile Figure 4.3-4 Typical Cross Section Massachusetts Department of Transportation 4-7 Figure
More informationFormer U.S. 59 Amelia Earhart Memorial Bridge Demolition Project Information *** Third & Final Blast ***
Former U.S. 59 Amelia Earhart Memorial Bridge Demolition Project Information *** Third & Final Blast *** The following information is to provide the public, local residents, businesses and community officials
More informationCCR Rule Annual Inspection Report (cont.) 2
The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that
More informationNORTHUMBERLAND COUNTY, PA
QUAKER RUN Stream and Wetland Restoration As-Built Completion Report and First Year Monitoring Data Coal Township NORTHUMBERLAND COUNTY, PA Upstream Before Upstream After Prepared for: COAL TOWNSHIP 805
More informationCE5510 Advanced Structural Concrete Design - Design & Detailing of Openings in RC Flexural Members-
CE5510 Advanced Structural Concrete Design - Design & Detailing Openings in RC Flexural Members- Assoc Pr Tan Kiang Hwee Department Civil Engineering National In this lecture DEPARTMENT OF CIVIL ENGINEERING
More informationPENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT 6-0 HYDROLOGIC AND HYDRAULIC REPORT. for SR 3062, SECTION 29S STRASBURG ROAD.
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT 6-0 HYDROLOGIC AND HYDRAULIC REPORT for SR 3062, SECTION 29S STRASBURG ROAD over WEST BRANCH OF BRANDYWINE CREEK EAST FALLOWFIELD TOWNSHIP, CHESTER COUNTY
More informationJune 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON
PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western
More informationSHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. UPDATES
More informationHurricane Florence Recovery Report 4:00 PM October 17, 2018
Hurricane Florence Recovery Report 4:00 PM October 17, 2018 SCDOT Operations Mode: Recovery Statewide Summary There are 27 road closures on primary and secondary routes due to damage or flooding throughout
More informationROADWAY DESIGN CALCULATIONS
ROADWAY DESIGN CALCULATIONS Interim Interchange at SR 400 (I-4) and Daryl Carter Parkway FPID: 441113-1-52-01 60% (Phase II) Prepared by: AECOM Technical Services, Inc. 150 North Orange Avenue, Suite 200
More informationFeasibility Study for Potential Removal of McLane & Goldman Dams Souhegan River, Milford, NH. Public Kick-off Meeting
Feasibility Study for Potential Removal of McLane & Goldman Dams Souhegan River, Milford, NH Public Kick-off Meeting Mark Wamser Gomez and Sullivan Engineers, P.C. 603-428-4960 Aug 16, 2010 Agenda Opening
More informationPost-tensioning System of the Precast Network Arches of the West 7 TH Street Bridge. Courtney Holle, P.E.
Post-tensioning System of the Precast Network Arches of the West 7 TH Street Bridge Courtney Holle, P.E. West 7 th Street Bridge Photo Courtesy of Liam Frederick 2 Geometry 23-6 Arch Height 2 Deep Arch
More informationHusky Oil Operations Limited
Husky Oil Operations Limited 707 8th Avenue S.W. Bus: (403) 298-6111 Box 6525, Station D Fax: (403) 298-6378 Calgary, Alberta, Canada T2P 3G7 October 31, 2014 Sahtu Land &Water Board SLWB File: S13L1-005
More informationFlood and Stream Restoration
2 3 4 Pedestrian bridge under construction 3 CSPs perched on DS side Large area of sand deposition Bottom layer of gabions has been scoured out large bar of gabion stone Gabions slumping bank slope failure
More informationBridge deck modelling and design process for bridges
EU-Russia Regulatory Dialogue Construction Sector Subgroup 1 Bridge deck modelling and design process for bridges Application to a composite twin-girder bridge according to Eurocode 4 Laurence Davaine
More informationHigh Friction Surface Treatment on Bridge Safety
High Friction Surface Treatment on Bridge Safety Brian Porter/Rebecca Szymkowski- WisDOT Andrea Bill- UW-Madison TOPS Lab Objectives Weather in WI can be harsh Bridges can be problematic in inclement weather
More informationCritchfield Rd / SR-129
NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2
More informationMunicipal Act, 2001 Loi de 2001 sur les municipalités
Municipal Act, 2001 Loi de 2001 sur les municipalités ONTARIO REGULATION 239/02 MINIMUM MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS Consolidation Period: From January 25, 2013 to the e-laws currency date.
More informationINDOT Office of Traffic Safety
Intro to GIS Spatial Analysis INDOT Office of Traffic Safety Intro to GIS Spatial Analysis INDOT Office of Traffic Safety Kevin Knoke Section 130 Program Manager Highway Engineer II Registered Professional
More informationThe Effects of Flooding on Structures. Or What to Expect when the Drought Ends Violently
The Effects of Flooding on Structures Or What to Expect when the Drought Ends Violently Let s Define Flood Increase in discharge compared to normal level Direct runoff of rainfall (we re talking about
More informationdesign, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.
design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.
More informationCurved Steel I-girder Bridge LFD Guide Specifications (with 2003 Edition) C. C. Fu, Ph.D., P.E. The BEST Center University of Maryland October 2003
Curved Steel I-girder Bridge LFD Guide Specifications (with 2003 Edition) C. C. Fu, Ph.D., P.E. The BEST Center University of Maryland October 2003 Guide Specifications (1993-2002) 2.3 LOADS 2.4 LOAD COMBINATIONS
More informationAppendix J. Example of Proposed Changes
Appendix J Example of Proposed Changes J.1 Introduction The proposed changes are illustrated with reference to a 200-ft, single span, Washington DOT WF bridge girder with debonded strands and no skew.
More informationPRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK
PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation
More informationIntroduction to The Design Example and EN Basis of Design
EUROCODES Bridges: Background and applications St Petersburg April 2011 1 Introduction to The Design Example and EN 1990 - Basis of Design Professor Steve Denton Engineering Director, Parsons Brinckerhoff
More informationFinite Element Modeling of the Load Transfer Mechanism in Adjacent Prestressed. Concrete Box-Beams. a thesis presented to.
Finite Element Modeling of the Load Transfer Mechanism in Adjacent Prestressed Concrete Box-Beams a thesis presented to the faculty of the Russ College of Engineering and Technology of Ohio University
More informationCity of Brainerd, Minnesota Snowplowing Policy
City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control
More informationConstruction Exits Vibration grids
Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]
More informationFULL SCALE TESTS AND STRUCTURAL EVALUATION OF SOIL-STEEL FLEXIBLE CULVERTS FOR HIGH-SPEED RAILWAYS
II European Conference BURIED FLEXIBLE STEEL STRUCTURES Rydzyna 3-4.4.1 FULL SCALE TESTS AND STRUCTURAL EVALUATION OF SOIL-STEEL FLEXIBLE CULVERTS FOR HIGH-SPEED RAILWAYS Andreas ANDERSSON*, Håkan SUNDQUIST**,
More information10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %
ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00
More informationWest Tennessee Construction June 14-21, 2017
FOR IMMEDIATE RELEASE Wednesday, June 14, 2017 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction June 14-21, 2017 BENTON COUNTY, I-40 Truck Climbing Lane Wednesday, June 7 through
More informationAppendix M Preliminary Geotechnical Report, SR 32 Widening Project Study Report
Appendix M Preliminary Geotechnical Report, SR 32 Widening Project Study Report November 3, 2005 Mr. Chris Rockway 7300 Folsom Boulevard, Suite 203 Sacramento, California 95826 Attention: Matt Brogan
More information3.12 Geology and Topography Affected Environment
3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed
More informationAPPENDIX D SUMMARY OF EXISTING SIMPLIFIED METHODS
APPENDIX D SUMMARY OF EXISTING SIMPLIFIED METHODS D-1 An extensive literature search revealed many methods for the calculation of live load distribution factors. This appendix will discuss, in detail,
More informationThe Southwest Second Avenue
The New 2nd Avenue Bridge, when completed, will be the longest bascule span bridge in the State of Florida and will contain one of the longest, widest, and heaviest bascule leafs in the world. The Southwest
More informationPRESS RELEASE For Immediate Release May 1, 2014
Office of Emergency Management 2010 East Preston, Mount Pleasant, MI 48858 www.isabellacounty.org Telephone 989.773.1000 Fax 989.775.1258 PRESS RELEASE For Immediate Release May 1, 2014 Isabella County
More informationDebris Loads, Bridge/Culvert failure, and Climate Change Identifying stream reaches most susceptible to climate-exacerbated debris load
Debris Loads, Bridge/Culvert failure, and Climate Change Identifying stream reaches most susceptible to climate-exacerbated debris load Seth Lawler, Mathew Mampara, Kristine Mosuela, Mathini Sreetharan
More informationSystem Capacity of Vintage Reinforced Concrete Moment Frame Culverts with No Overlay
DCT 252 System Capacity of Vintage Reinforced Concrete Moment Frame Culverts with No Overlay By Timothy Porter Thomas Schumacher August, 2015 Delaware Center for Transportation University of Delaware 355
More informationPredicting Erosion Impact on Highway and Railway Bridge Substructures
Predicting Erosion Impact on Highway and Railway Bridge Substructures by Charles Swann 1 Chris Mullen 2 1 Mississippi Mineral Resources Institute University of Mississippi 111 Brevard Hall University,
More informationProject (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2
MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report
More informationDRAFT Design Hydraulic Study. Bridge 04C-0055, Mattole Road Bridge over Mattole River at Honeydew. Humboldt County. Prepared for:
DRAFT Design Hydraulic Study Bridge 04C-0055, Mattole Road Bridge over Mattole River at Honeydew Humboldt County Prepared for: Morrison Structures Incorporated 1890 Park Marina Drive, Suite 104 Redding,
More informationDesign Hydraulic Study. Bridge 09C-0134, Blairsden-Graeagle Road over Middle Fork Feather River. Plumas County. Prepared for:
Design Hydraulic Study Bridge 09C-0134, Blairsden-Graeagle Road over Middle Fork Feather River Plumas County Prepared for: Quincy Engineering, Inc 3247 Ramos Circle Sacramento, CA 95827-2501 Prepared by:
More informationTRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For
TRAFFIC IMPACT STUDY For Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) February 2015 Revised: August 2015 April 2016 July 2016 September 2016 Prepared for: KB Home
More informationEvaluation of Scour Depth around Bridge Piers with Various Geometrical Shapes
Evaluation of Scour Depth around Bridge Piers with Various Geometrical Shapes Dr. P. D. Dahe * Department of Civil Engineering, SGGSIE&T, Vishnupuri, Nanded (Maharashtra) S. B. Kharode Department of Civil
More informationLandmark LRM. MM and RefPts can be same or different
1 2 This project began in the fall of 2005. At the time CDOT had three different business units maintaining different LRS s. That is, the beginning and ending reference points and the measured length of
More informationFire Analysis of Reinforced Concrete Beams with 2-D Plane Stress Concrete Model
Research Journal of Applied Sciences, Engineering and Technology 5(2): 398-44, 213 ISSN: 24-7459; E-ISSN: 24-7467 Maxwell Scientific Organization, 213 Submitted: April 29, 212 Accepted: May 23, 212 Published:
More informationNRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:
WDFW CONTROL POINT #1 Re-Bar, Elevation Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 Spike in Tree Elevation = 102.95 Elevation
More informationCase Study 14. Rocky Creek Vented Box Culvert Ford
Case Study. Rocky Creek Vented Box Culvert Ford Location West Central Arkansas. Ouachita National Forest; Oden Ranger District. Rocky Creek crossing on Forest Road 887 (Muddy Gibbs Road). Crossing Description
More informationHow to Prepare for a Tornado
Tornadoes Tornadoes How to Prepare for a Tornado Special Precautions for Mobile Home Dwellers What to Do During a Tornado Warning Responses After a Tornado Inspecting Buildings for Hidden Wind Damage Special
More informationMONITORING TRAFFIC LOADING FOR OPTIMIZED ASSESSMENT OF BRIDGES
MONITORING TRAFFIC LOADING FOR OPTIMIZED ASSESSMENT OF BRIDGES Dr. Aleš Žnidarič Dr. Aleš Žnidarič Slovenian National Building and Civil Engineering Institute Head of Department for Structures ales.znidaric@zag.si
More informationPavement Distress Categories
Pavement Distress Identification Jointed Concrete Pavements Raymond Ong, Purdue University William Flora, INDOT Planning Joyce Stone, INDOT Pavement Engineering Samy Noureldin, INDOT Research Pavement
More informationCity of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229
Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229
More informationInfluence of Vertical Ground Shaking on Design of Bridges Isolated with Friction Pendulum Bearings. PI: Keri Ryan GSR: Rushil Mojidra
Influence of Vertical Ground Shaking on Design of Bridges Isolated with Friction Pendulum Bearings PI: Keri Ryan GSR: Rushil Mojidra 1 Objective/Scope of PEER Pendulum Bearing Study Objective 1: Comprehensively
More informationRapid Earthquake Loss Assessment: Stochastic Modelling and an Example of Cyclic Fatigue Damage from Christchurch, New Zealand
Rapid Earthquake Loss Assessment: Stochastic Modelling and an Example of Cyclic Fatigue Damage from Christchurch, New Zealand John B. Mander 1 and Geoffrey W. Rodgers 2, David Whittaker 3 1 University
More informationAnalysis of Rutting and Roughness Distresses in PCC Pavements Overlaid with Asphalt Concrete
Analysis of Rutting and Roughness Distresses in PCC Pavements Overlaid with Asphalt Concrete Kavussi, A. Associate Professor, Tarbiat Modares University, Tehran, Iran SYNOPSIS Concrete slab pavements overlaid
More informationGeodetic Works during the Estimation of the Vertical Displacement of a Bridge under a Load Test
37 Geodetic Works during the Estimation of the Vertical Displacement of a Bridge under a Load Test Gučević, J., Delčev, S., Ogrizović, V., Pejič, M., Popović, J., and Pejović, M. University of Belgrade,
More information12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC
PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE
More informationMADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015
MADISON, WI STONE HOUSE DEVELOPMENT 1000 E. WASHINGTON AVENUE REDEVELOPMENT TRANSPORTATION STUDY DECEMBER 14, 2015 TABLE OF CONTENTS... 3 Proposed Development... 3 Methodology... 3 Phase 1 Development...
More informationInvestigation of the Vibrations on Overhead Sign Bridges on US290/SH71
PMFSEL REPORT NO. 06-01 April 2006 Investigation of the Vibrations on Overhead Sign Bridges on US290/SH71 by Eric Schell Liang Yu Karl H. Frank conducted for the Texas Department of Transportation Investigation
More informationRock Sizing for Multi-Pipe & Culvert Outlets
Rock Sizing for Multi-Pipe & Culvert Outlets STORMWATER AND WATERWAY MANAGEMENT PRACTICES Photo 1 Rock pad outlet structure at end of a duel stormwater pipe outlet Photo 2 Rock pad outlet structure at
More informationBRACKET CLOCKS. Designing Timetm
BRACKET CLOCKS Designing Timetm bracketclocks 2 Dial Howard Sidewall (2HOW-SIDEWALL) Sidewall Mounted Howard Design Clock available in 18, 24, 30 & 36 standard sizes. LED edge lighted. Lettering on the
More information