1 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT 6-0 HYDROLOGIC AND HYDRAULIC REPORT for SR 3062, SECTION 29S STRASBURG ROAD over WEST BRANCH OF BRANDYWINE CREEK EAST FALLOWFIELD TOWNSHIP, CHESTER COUNTY JULY 2008 Prepared By: TranSystems Lichtenstein One Oxford Valley, Suite 818 Langhorne, Pennsylvania 1904

2 TABLE OF CONTENTS Page CERTIFICATION... 3 INTRODUCTION... 4 SECTION A SITE DATA 1. Project Location Map Project Description and Purpose Existing Structures High Water Marks Environmental Stream Stability Photographs Factors Affecting Water Stages Debris Site Inspection Approvals... 8 SECTION B HYDROLOGIC ANALYSIS... 9 SECTION C HYDRAULIC ANALYSIS Existing Bridge Proposed Rehabilitation Scour Protection Construction Conditions SECTION D RISK ASSESSMENT Overtopping Environmental Risk Summary REFERENCES LIST OF TABLES Table 1: Summary of FEMA Study Discharges for West Branch of Brandywine Creek... 9 Table 2: Summary of Design Discharges for West Branch of Brandywine Creek... 9 Table 3: Comparison of Water Surface Elevations between FEMA Published, FEMA Hec- Ras and Existing Conditions Table 4: Estimated Scour Depths for Proposed Bridge Table 5: Comparison of Water Surface Elevations between Existing and Construction Conditions Table 6: Comparison of Channel Velocities between Existing and Construction Conditions Table 7: Comparison of Water Surface Elevations between Existing, Construction with Centering and Construction with Cofferdam Conditions P:\2268\ENG\HYDR\2268H&H-Report.doc 1

3 LIST OF APPENDICES APPENDIX A APPENDIX B APPENDIX C APPENDIX D APPENDIX E APPENDIX F APPENDIX G APPENDIX H APPENDIX I APPENDIX J APPENDIX K APPENDIX L APPENDIX M APPENDIX N Drainage Area Mapping & Hydrologic Calculations Photographs Hydraulic Calculations for FEMA FIS Model Hydraulic Calculations for Existing Conditions Hydraulic Calculations for Construction Conditions Scour Analysis Proposed Plans Stream Plan, Flood Profiles, Cross Sections, Rating Curve for FEMA FIS Model Stream Plan, Flood Profiles, Cross Sections, Rating Curve for Existing Conditions Stream Plan, Flood Profiles, Cross Sections, Rating Curve for Construction Conditions Summary Data Sheet Cost Estimate Erosion & Sediment Pollution Control Plans and Narrative Flood Insurance Study, Chester County, Pennsylvania P:\2268\ENG\HYDR\2268H&H-Report.doc 2

4

5 INTRODUCTION SR 3062, SECTION 29S This hydrologic and hydraulic study was performed to analyze the hydraulic impacts and floodplain effects by the proposed rehabilitation of the SR 3062 bridge (Strasburg Road) over West Branch Brandywine Creek in East Fallowfield Township, Chester County, Pennsylvania. The project is located on the USGS quadrangle map of Coatesville, PA (see Project Location Map), and is within the Christina River Watershed. The West Branch Brandywine Creek is identified as a creek on the USGS quadrangle. TranSystems Lichtenstein (TSC) obtained the hydrology for the drainage area upstream of the existing bridge based on the guidance and criteria presented in Pennsylvania Department of Transportation (PENNDOT) DM-2, Chapter Criteria for Applicability of Hydrologic and Hydraulic Methodologies (Reference 1). The project area was surveyed in the NGVD29 datum. The USGS PeakFQ program was the hydrologic method selected to develop peak flow rates using information from USGS West Branch Brandywine Creek at Modena, PA. A hydraulic stream model was obtained from FEMA which used the U.S. Army Corps of Engineers (USACE) HEC-RAS Water Surface Profile Program, Version (References 6 and 7), to estimate flow depths and channel velocities for the design storm discharges. It is anticipated that a General Permit 11 will be required for this project. The proposed rehabilitation will not change the bridge geometry or hydraulic opening of the existing structure; therefore, the proposed project will not increase flood hazards on the West Branch Brandywine Creek and an economic analysis of flood damage is not required. In addition, the proposed bridge does not constitute a significant encroachment as per the definition of Item "q" of the Federal Aid Policy Guide, 23 CAR, Part 650, Subpart A, Section P:\2268\ENG\HYDR\2268H&H-Report.doc 4

6 SECTION A. SITE DATA 1. Project Location Map Lunia Brothers Railroad Bridge West Branch of Brandywine Creek Concrete Railroad Bridge Project Location Project Location Map SR 3062 Section 28S USGS Maps: Coatesville, PA Scale: 1 =2200 P:\2268\ENG\HYDR\2268H&H-Report.doc 5

7 2. Project Description and Purpose The project is for the rehabilitation of the existing bridge carrying S.R (Strasburg Road) over the West Branch Brandywine Creek in East Fallowfield Township, Chester County. The existing structure, built in 1826, is a four (4) span-closed spandrel masonry arch structure with an overall length of 220 feet. A dry mill race culvert is located approximately 150 feet east of the bridge and is comprised of a single span masonry arch with a length of approximately 13'-6". The posted speed through the project area is 40 mph with a speed restriction of 25 mph on the bridge. The existing bridge, with a 16'-4" wide roadway, generally carries one eastbound or one westbound traffic lane at a time because of the narrow width. The existing structure is on a tangent horizontal alignment with a relatively steep crest vertical curve. The existing structure is currently posted for a maximum weight limit of 15 tons and is signed as a narrow bridge. The project area includes three historic resources, the Mortonville Hotel, the Mortonville Bridge, and the adjacent Mill Race, which have been individually listed on the National Register of Historic Places. The project is also located within the Mortonville Historic District, a National Register eligible historic district. The district was a locally important milling and agricultural marketing community during the period of and contains commercial and industrial structures that date from the mid-18th through the early 20th century. The design strives to minimize the harm on the historic resources and at the same time harmoniously integrate the construction of the new roadway and bridge in this historic setting. Environmental clearance for the proposed project was provided on September 20, Existing Structures The SR 3062 bridge is a four (4) span-closed spandrel masonry arch structure. The West Branch Brandywine Creek flows in two of the four spans. Span 1 is a river span, 50 feet wide with a rise of approximately Span 2 is a river span 60 feet wide with a rise of Span 3 is 50 feet wide with a rise of approximately 12-1 and Span 4 is feet wide with approximately 8-10 rise. There is a stone dam located approximately 150 feet upstream of the SR 3062 bridge. This dam impacts the flooding at the bridge and is included in the model. The stone rubble dam is oriented perpendicular to the creek and is skewed in comparison to the SR 3062 bridge as the West Branch Brandywine Creek bends left. Brandywine Valley Railroad crosses the West Branch Brandywine Creek upstream and downstream of the bridge. The upstream structure is a 6 span structure modeled as Lunia Brothers Railroad Bridge approximately 2 miles upstream at Section in the FEMA Hec-Ras model. The downstream structure is a 7 span concrete structure modeled at Section approximately 0.6 miles downstream. The bridges are indicated on the location map. P:\2268\ENG\HYDR\2268H&H-Report.doc 6

8 4. High Water Marks SR 3062, SECTION 29S High water mark information at the SR 3062 Culvert over West Branch Brandywine Creek was not available. The FIS states that the greatest flood of record occurred on August 9, 1942 with a peak discharge of 8,600 cfs. According to the records at the USGS Gage No located upstream of the project in Modena, PA, the largest storm occurred in June 29, Environmental A Wetlands Identification & Delineation Report was prepared for this project. The boundary of the limit of wetlands was made by field determination by qualified wetland scientists, using methods and criteria established by the U.S. Army Corps of Engineers 187 Corps of Engineers Wetland Delineation Manual Technical Report Y-87-1, USACE Waterway Experiment Station, Vicksburg, Miss. The wetlands will be temporarily disturbed during construction and will be restored upon completion of construction. According to the Pennsylvania Code, Title 25, Environmental Resources, Chapter 93, Water Quality Standard, the water quality classification of Aquetong Creek basin is WWF, MF (Warm Waters Fishes, Migratory Fishes). 4 West Branch Brandywine Creek Main Stem, Dennis Run to Buck Run Chester WWF, MF None Full consideration as to the effect of the construction on the habitat of fish was included in the evaluation of structures to be built. As a result, the following measures have been or will be incorporated in the design and construction of the structure: a) Construction of the bridge will have no effect on the channel. Disturbances in the channel during the construction will be limited to those required to install and remove centering and placing scour protection. b) No construction equipment will be permitted to operate in the river unless specific written approval has been obtained from the required agencies which include the PA Fish and Boat Commission, the County Conservation District, the PA Department of Environmental Protection and the U.S. Army Corps of Engineers. c) Areas utilizing vegetative stabilization must be seeded in sufficient time to germinate by October 15 of each year. Seeding will be accomplished as specified in Section 804, PENNDOT Specifications Publication 408/2007 (Reference 10). Where required, mulching shall comply with Section 805, PENNDOT Publication 408/2007. d) A complete Erosion and Sediment Pollution Control plan has been developed and included in the Joint Permit Application. The Erosion and Sediment Pollution Control plan has been submitted to the Chester County Soil Conservation District for their determination of adequacy. A copy of the approval letter, the plans and narrative are included in Appendix M. P:\2268\ENG\HYDR\2268H&H-Report.doc 7

9 6. Stream Stability No evidence of significant erosion was noted along the West Branch Brandywine Creek in the vicinity of the bridge; however, there is rock stone slope protection on the right bank approaching the SR 3062 bridge where the creek bends to the left. The overbank areas are well vegetated with thick stands of trees. Silt is evidenced around the piers located within the creek. There is no history of ice accumulation or damage to the structure. 7. Photographs Photographs of the project area taken on November 2, 2006 are presented in Appendix B. 8. Factors Affecting Water Stages Review of the USGS topographic quadrangle of Coatesville, PA and aerial photographs reveals that there are no structural or non-structural flood protection measures or other factors affecting water stages within the drainage area to the bridge. The Act 167 Stormwater Management Plan for Brandywine River Watershed was adopted by East Fallowfield Township municipal-wide. The plan is Brandywine Creek Watershed Action Plan (Reference 15). This plan sets out data and information regarding the conservation of water in the watershed, but does not endorse any one method for obtaining the quantity of flow. A Stormwater Management Plan is not required as the total project area is under one acre. The attached Erosion & Sediment Pollution Control plan was developed in conjunction with the Stormwater Management Plan. All BMP s have been utilized to comply with the Brandywine River Watershed Stormwater Management Plan. FEMA has conducted a Flood Insurance Study (FIS) for Chester County (see Appendix N). The project is located within this detailed FEMA study. The project will not impact 9. Debris Debris does not appear to be a problem at the existing structure. 10. Site Inspections Site inspections occurred on November 2, 2006 and January 24, Approvals The Line and Grade for the proposed project was approved on May 4, 2007 and the Design Field view has been waived by PENNDOT. P:\2268\ENG\HYDR\2268H&H-Report.doc 8

10 SECTION B. HYDROLOGIC ANALYSIS The West Branch Brandywine Creek is a gaged stream. FEMA has conducted a Flood Insurance Study (FIS) for Chester County (see Appendix N). The FIS Report for Chester County (Reference 3) was issued on March 17, West Branch Brandywine Creek was included in the FIS. Discharges were calculated in the FIS using a USACE method using regression equations to determine flood peak frequency curves, with coefficients developed by the USACE in Hydrologic Study Tropical Storm Agnes Report No. 3. In addition, the FIS from 1984 was used to compare the 100 year discharge values. The FEMA study discharges in Table 1 were published for West Branch of Brandywine Creek. TABLE 1 Summary of FEMA Study Discharges West Branch of Brandywine Creek Location Downstream Township Limits Drainage Area (mi. 2 ) 10 Year (CFS) 50 Year (CFS) 100 Year (CFS) 500 Year (CFS) ,700 9,700 12,385 19,000 Peak flows used in this hydraulic analysis were calculated using the WRC method ( Guidelines for Determining Flood Flow Frequency, Bulletin 17B ). This was the method used in the FEMA analysis. Gage data was taken from Gaging Station West Branch Brandywine Creek at Modena, PA located upstream from the project area. The FEMA study was based on USACE regression equations to determine flood peak frequency. The analysis used in this study incorporates gage data through 2006 which includes two additional floods of significance from 2004 and As a result of the additional data, peak flows in this study are lower than the published FEMA values but are considered to be more accurate based on the 37 years of recorded peak flows. The USGS PeakFQ computer program was used to calculate peak flows at the gaging station and the peak flows were transposed to other locations within the hydraulic analysis by using the method outlined in DM2 Chapter 10.6.C.4.a. TABLE 2 Summary of Design Discharge West Branch of Brandywine Creek Method Drainage Area (mi. 2 ) 10 Year (CFS) 25 Year (CFS) 50 Year (CFS) 100 Year (CFS) 500 Year (CFS) PeakFQ ,997 9,968 12,548 15,791 25,405 Design Storm P:\2268\ENG\HYDR\2268H&H-Report.doc 9

11 The proposed highway is classified as a Rural Major Collector. Therefore, the 25-year storm is the design flood, as per Table , DM-2. Per Chapter , Title 25 of the PA Code, the 100-year flood is the DEP design flood event. The drainage area to the existing bridge is 61.9 square miles and is shown on the mapping included as Exhibit A. A flood frequency Gumbel plot is included in Appendix A. A Stage-Discharge-Frequency Curve at Section is included in Appendix A. P:\2268\ENG\HYDR\2268H&H-Report.doc 10

12 SECTION C. HYDRAULIC ANALYSIS 1. Existing Bridge The West Branch Brandywine Creek is a detailed studied stream. The FEMA Hec-Ras version 2.1 model was obtained. The model was inputted into USACE HEC-RAS Water Surface Profile Program, Version (References 2 and 3), ran and compared with the published results. The model was shortened to represent the project area. The existing bridge, built in 1826, is a four span-closed spandrel masonry arch structure with an overall length of 220 feet. A dry mill race culvert is located approximately 150 feet east of the bridge and is comprised of a single span masonry arch with a length of approximately 13'-6". The existing bridge has a 16-4 wide clear roadway with no shoulders. The existing structure is exhibiting deterioration of the bridge deck, superstructure, parapet walls and spandrel walls, and has a low structure rating. The existing bridge is functionally obsolete based on the existing geometric configuration including narrow roadway widths and the steep vertical grades. A field survey was conducted to develop the existing conditions in the vicinity of the existing bridge. From the bridge inspection conducted to detail existing conditions, field measurements of the bridge, including elevations of top of arch and span lengths, were used to more accurately model the bridge. The survey data was used to compare the cross section at the bridge and were found to be reasonably accurate. Additional sections were not added. To determine Manning n roughness coefficients for the hydraulic model, a site reconnaissance was made and verified with roughness coefficients tables. Based on referencing the FEMA-published values, a field walk-through and the guidelines in the HEC-RAS manuals, a value of 0.08 was used for the overbank areas and was used for the channel. The results of the existing model are slightly lower 100-year water surface elevations. This decrease is due to more accurate survey data and by using the more updated HEC-RAS modeling routines instead of the energy only solution used in the FEMA model. HEC-RAS input/output for the existing structure is presented in Appendix D. HEC-RAS stream cross sections, flood profiles and rating curves for the existing condition are included in Appendix I. A comparison of water surface elevations (Table 3) for the FEMA published, FEMA HEC-RAS and existing conditions follows: P:\2268\ENG\HYDR\2268H&H-Report.doc 11

13 TABLE 3 Comparison of Water Surface Elevations between FEMA FIS Published, FEMA Hec-Ras and Existing Models 100-YEAR WATER SURFACE ELEVATIONS IN FEET CROSS SECTION FEMA FEMA Difference Existing Difference Published Hec-Ras Using published FEMA 100-year flow Upstream of the bridge, the HEC-RAS computed water surface elevations for the existing condition are generally lower than the FEMA published Flood Profile by a maximum of 0.3 feet. Downstream of the bridge, the HEC-RAS computed water surface elevations are generally lower than the FEMA published Flood Profile by a maximum of 0.14 feet. There are several reasons to explain these differences. The FEMA results are based on energy only routines. Furthermore, the HEC-RAS model uses a bridge model based on field measurements and more accurately depicts existing conditions. 2. Proposed Rehabilitation The proposed project is for the rehabilitation of the existing four span masonry arch structure to bring it up to current design standards while maintaining the historic characteristics of the existing bridge. The bridge will be widened above the arches to provide for a wider roadway. The existing bridge is currently weight restricted to 15 tons, and will not have a restriction on weight at the conclusion of the rehabilitation. The project begins approximately 62 feet west of the at-grade Brandywine Valley Railroad crossing and ends just at the intersection with Creek & Laurel Roads. The existing structure would be closed during construction and completely rehabilitated by removing the pavement, fill, parapet walls and spandrel walls. The masonry spandrel walls would be reconstructed; the arch backfilled with flowable fill and a new reinforced concrete deck constructed which cantilevers beyond the spandrel walls to provide for increased roadway width. During construction, centering or temporary false work would be required under the arches P:\2268\ENG\HYDR\2268H&H-Report.doc 12

14 for stability. The proposed bridge roadway width has been set to 26 feet with two 11-foot wide travel lanes and 2-foot shoulders with a normal crown. Bridge deck cantilevered approximately four (4) feet on each fascia but there is no increase to arch barrel or substructure width. Grade changes greater than 6 inches occur within the limits of the walls for the majority of the project. A proposed model was not created as the existing condition hydraulic model indicated that the increased width locations were located above the 100-year flood elevations. This was confirmed during the Chapter 105 pre-application meeting held with Pennsylvania Department of Environmental Protection. 3. Scour Protection Size R-7 rock riprap is proposed in front of the arch structure walls and wingwalls, and along the stream embankments to provide protection from the channel velocities. The 100 year design storm was used to size the riprap as the footings are below the 500 year scour depth. A scour analysis for the proposed structure was performed based on the median grain size (D 50 ). Scour and riprap sizing design calculations are included in Appendix F. The results are given in the following Table 4: TABLE 4 Estimated Scour Depths for Proposed Bridge SUBSTRUCTURE UNIT CONTRACTION SCOUR (FT.) LOCAL SCOUR (FT.) DESIGN (100-YEAR) FLOOD TOTAL SCOUR (FT.) Abutment Pier Pier Pier Abutment SUPER (500-YEAR) FLOOD Abutment Pier Pier Pier Abutment Reduced by 50% for multi-layered riprap 2 Total scour does not include local when multi-layered riprap is used. Scour protection will be the only temporary and permanent fill quantities below ordinary high water. The amount is approximately 55 cubic yards. P:\2268\ENG\HYDR\2268H&H-Report.doc 13

15 4. Construction Conditions The existing structure would be closed during construction and completely rehabilitated by removing the pavement, fill, parapet walls and spandrel walls. The masonry spandrel walls would be reconstructed; the arch backfilled with flowable fill and a new reinforced concrete deck constructed which cantilevers beyond the spandrel walls to provide for increased roadway width. During construction, centering or temporary false work would be required under the arches for stability. Centering A model was created in HEC-RAS to show the effect of the centering. An area of 25% of the arch opening was blocked out around each pier and abutment to simulate the centering. The special provision specification for the centering item will have a statement limiting the blockage of the arch to 25% of the opening. In addition, the special provision specification will also require the contractor to remove any debris once a week and after each storm event. The HEC-RAS input/output for the construction conditions is presented in Appendix E. HEC-RAS stream cross sections, flood profiles and rating curves for the construction condition are included in Appendix J. Comparisons of the existing and construction water surface elevations for the 2.33 year and 10 year storms are included in Table 5. TABLE 5 Comparison of Water Surface Elevations between Existing and Construction Conditions Cross Section Water Surface Elevations in Feet Existing Construction Difference 2.33-year 10-year 2.33-year 10-year 2.33-year 10-year P:\2268\ENG\HYDR\2268H&H-Report.doc 14

16 Design Storm Comparisons of the existing and construction velocities for the 2.33 year and 10 year storms are included in Table 6. Cross Section TABLE 6 Comparison of Velocities between Existing and Construction Conditions Velocities in Feet/Second Existing Construction Difference 2.33-year 10-year 2.33-year 10-year 2.33-year 10-year Design Storm The 2.33 year design storm acting under existing conditions creates a maximum flow depth at the inlet of 6.72 feet, a corresponding water surface elevation of feet, and a water velocity of 3.77 fps. Under construction conditions, the 2.33 year design storm creates a maximum flow depth at the inlet of 6.53 feet, a corresponding water surface elevation of feet, and a water velocity of 6.99 fps. The 10 year storm acting under existing conditions creates a maximum flow depth at the inlet of 9.95 feet, a corresponding water surface elevation of feet, and a water velocity of 4.98 fps. Under the construction conditions, the 10 year storm creates a maximum flow depth at the inlet of 9.49 feet, a corresponding water surface elevation of feet, and a water velocity of 9.45 fps. The increases in water surface elevations during the construction will still be contained within the creek banks. The increases are not expected to impact properties and will remain in place only as long as necessary to remove and reconstruct the arches. The increases in velocities will also be local in nature and will not adversely impact the surrounding area. The dam located directly upstream of the structure will help to restrict the impact during construction to the area immediately upstream of the bridge. The model P:\2268\ENG\HYDR\2268H&H-Report.doc 15

17 used a block obstruction to model the centering. This is conservative as the centering will not be centered around the piers, but will be distributed throughout the span. Cofferdams In order to place and remove the centering, cofferdams will be placed in the stream. The cofferdams will be in place for only as long as it takes to place the centering and will not be in place during the actual rehabilitation work. It is anticipated that the duration will last approximately one week per stage. The cofferdams will be staged to allow for a minimum of one arch to remain unblocked during centering placement. The Hec-Ras model contains four (4) additional construction plans showing the staging. Stage 1 consists cofferdam in Span 1 to construct the centering. Stage 2 consists of centering in Span 1 and cofferdam in Spans 2, 3 & 4 to construct centering. Stage 3 consists of cofferdams in Span 1 to remove the centering with centering in Spans 2, 3 & 4. Stage 4 consists of cofferdams in Spans 2, 3 & 4 to remove the centering. The cofferdams will be constructed across the normal creek channel on the upstream and downstream face of the bridge and will remain in place only during construction of the centering. It will have a top elevation of feet. This top of cofferdam elevation is about eight (8) feet above the minimum creek bed elevation and about 1.0 foot above the normal flow with the cofferdam in place. This is also approximately 4.42 feet above the normal flow elevation of feet. The 2.33 year design storm acting under existing conditions creates a maximum flow depth at the inlet of 6.72 feet, a corresponding water surface elevation of feet, and a water velocity of 3.77 fps. Under construction conditions with the centering in place, the 2.33 year design storm creates a maximum flow depth at the inlet of 6.53 feet, a corresponding water surface elevation of feet, and a water velocity of 6.99 fps. Under construction conditions with both the centering and the cofferdams in Spans 2, 3 & 4 (Stage 2), the 2.33 year design storm creates a maximum flow depth at the inlet of 9.03 feet, a corresponding water surface elevation of feet, and a water velocity of 7.99 fps. The increases in water surface elevations during the use of cofferdams will still be contained within the creek banks. The increases are not expected to impact properties and will remain in place only as long as necessary to install and remove the centering. The increases in velocities will also be local in nature and will not adversely impact the surrounding area. The dam located directly upstream of the structure will help to restrict the impact during construction to the area immediately upstream of the bridge. Comparisons of the existing, construction and Stage 2 centering and cofferdams conditions water surface elevations for the 2.33 year storm are included in Table 7. P:\2268\ENG\HYDR\2268H&H-Report.doc 16

18 TABLE 7 Comparison of Water Surface Elevations between Existing and Construction with Centering and Construction with Cofferdam Conditions Water Surface Elevation in Feet Cross Construction Construction Section Existing (with Centering) (with Centering & Cofferdam) 2.33-year Difference 2.33-year Difference P:\2268\ENG\HYDR\2268H&H-Report.doc 17

19 SECTION D. 100 YEAR RISK ASSESSMENT 1. Overtopping Based on the hydraulic analysis, the existing structure and approach roadways are overtopped by the 71- year design storm event. The proposed rehabilitation will not change this. 2. Environmental Risk While the project is located within 100-year floodplain within a detailed study area, the proposed project will not change the obstruction and will not impact wither the 100-year floodplain or the floodway. The potential for change to the ecology of the floodplain within the project area is negligible. The damage to the habitat should also be minimal. No significant changes in erosion patterns are anticipated to occur, and deposition of stream borne debris will not be a problem. All impacts to the wetlands will be temporary and will be mitigated upon completion of the project. 3. Summary The proposed structure has been sized to pass the 25-year design storm event in accordance with PennDOT standards and the Scope of Work. Size R-6 rock riprap is proposed in front of the arch structure walls and wingwalls, and along the stream embankments to provide protection from the high channel velocities. No significant long-term risks to public safety or the environment are anticipated as the result of the proposed construction. The rehabilitation of the existing structure will be consistent with the FEMA Regulations for a floodway. In addition, the rehabilitation will produce no increase in risk or adverse affects on natural or beneficial floodplain values. Therefore, the proposed rehabilitation does not constitute a significant encroachment as per the definition of Item "q" of the Federal Aid Policy Guide, 23 CAR, Part 650,Subpart A, Section The proposed design will not adversely impact the public safety, public health or surrounding environment based on the following considerations: The channel will not be modified. The water surface elevations at the culvert will not change. Roadway safety conditions will be improved as a result of the wider roadway and the slightly improved vertical alignment. No significant risks will occur to the environment or public safety as a result of this construction. P:\2268\ENG\HYDR\2268H&H-Report.doc 18

20 REFERENCES SR 3062, SECTION 29S 1. Design Manual Part 2 Highway Design, Publication 13M, Pennsylvania Department of Transportation, July 2002 Edition. 2. Design Manual Part 4 Structures, Publication 15M, Pennsylvania Department of Transportation, September Guidelines for Determining Flood Flow Frequency Bulletin 17B of the Hydrology Subcommittee, U.S. Geological Survey, revised September 1981, editorial corrections March Field Manual of Procedure PSU-IV for Estimating Design Flood Peaks on Ungaged Pennsylvania Watersheds, Department of Civil Engineering and Institute for Research on Land and Water Resources, The Pennsylvania State University, April HEC-RAS River Analysis System User s Manual, Version 3.1.3, U.S. Army Corps of Engineers, November HEC-RAS River Analysis System Hydraulic Reference Manual, Version 3.1.3, U.S. Army Corps of Engineers, November Evaluating Scour at Bridges HEC-18, 4 th Edition, Federal Highway Administration, May The Pennsylvania Code, Commonwealth of Pennsylvania, April 15, Publication 408/2007, Pennsylvania Department of Transportation, Coatesville, PA Quadrangle, 7.5 Minute Topographic Series, U.S. Department of the Interior Geological Survey, Honey Brook, PA Quadrangle, 7.5 Minute Topographic Series, U.S. Department of the Interior Geological Survey, 1955, Photorevised Parkesburg, PA Quadrangle, 7.5 Minute Topographic Series, U.S. Department of the Interior Geological Survey, 1953, Revised Wagontown, PA Quadrangle, 7.5 Minute Topographic Series, U.S. Department of the Interior Geological Survey, Flood Insurance Study, Chester County, PA, Federal Emergency Management Agency, revised April 2, Brandywine Creek Watershed Action Plan, Chester County Water Resources Authority, et al, December 2002 P:\2268\ENG\HYDR\2268H&H-Report.doc 19

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for:

HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for: HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP Prepared for: KCI Technologies, Inc. Mechanicsburg, PA and Pennsylvania Department of Transportation Engineering

More information

UPPER COSUMNES RIVER FLOOD MAPPING

UPPER COSUMNES RIVER FLOOD MAPPING UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe

More information

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT TECHNICAL REPORT Prepared for: City of Livingston 411 East Callender Livingston, MT 59047 Prepared by: Clear Creek Hydrology, Inc. 1627 West Main Street, #294

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation

More information

The last three sections of the main body of this report consist of:

The last three sections of the main body of this report consist of: Threatened and Endangered Species Geological Hazards Floodplains Cultural Resources Hazardous Materials A Cost Analysis section that provides comparative conceptual-level costs follows the Environmental

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by Monitoring Scour Critical Bridges During Floods For Local Bridge Owners Presented by SAFETY FIRST DO NOT ENDANGER YOURSELF OR OTHERS WHILE MONITORING BRIDGES DO NOT ENTER FLOOD WATERS FLOOD WATERS INCLUDE

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

3.11 Floodplains Existing Conditions

3.11 Floodplains Existing Conditions Other stormwater control practices may be needed to mitigate water quality impacts. In addition to detention facilities, other practices such as vegetated basins/buffers, infiltration basins, and bioswales

More information

Dealing with Zone A Flood Zones. Topics of Discussion. What is a Zone A Floodplain?

Dealing with Zone A Flood Zones. Topics of Discussion. What is a Zone A Floodplain? Dealing with Zone A Flood Zones Topics of Discussion Overview of Zone A Floodplains Permitting Development in Zone A Floodplains Estimating Flood Elevations in Zone A Flood Insurance Implications Letters

More information

Analysis of Hydraulic Impacts on the Schuylkill River

Analysis of Hydraulic Impacts on the Schuylkill River Analysis of Hydraulic Impacts on the Schuylkill River Manayunk Sewer Basin Construction Project and the Venice Island Recreation Center Reconstruction Project Venice Island, Manayunk, Philadelphia, PA

More information

Red River Flooding June 2015 Caddo and Bossier Parishes Presented by: Flood Technical Committee Where the Rain Falls Matters I-30 versus I-20 I-20 Backwater and Tributary Floods (Localized) 2016 Flood

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards. GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS A. GOALS: To protect life and property from natural disasters and hazards. B. POLICIES: 1. Floodplains shall be maintained as natural drainage-ways.

More information

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Appendix E Guidance for Shallow Flooding Analyses and Mapping Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding

More information

JOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology VOLUME

JOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology VOLUME JOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology VOLUME 18 2010 REDUCED CHANNEL CONVEYANCE ON THE WICHITA RIVER AT WICHITA FALLS, TEXAS,

More information

DRAFT Design Hydraulic Study. Bridge 04C-0055, Mattole Road Bridge over Mattole River at Honeydew. Humboldt County. Prepared for:

DRAFT Design Hydraulic Study. Bridge 04C-0055, Mattole Road Bridge over Mattole River at Honeydew. Humboldt County. Prepared for: DRAFT Design Hydraulic Study Bridge 04C-0055, Mattole Road Bridge over Mattole River at Honeydew Humboldt County Prepared for: Morrison Structures Incorporated 1890 Park Marina Drive, Suite 104 Redding,

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012 Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation

More information

NORTHUMBERLAND COUNTY, PA

NORTHUMBERLAND COUNTY, PA QUAKER RUN Stream and Wetland Restoration As-Built Completion Report and First Year Monitoring Data Coal Township NORTHUMBERLAND COUNTY, PA Upstream Before Upstream After Prepared for: COAL TOWNSHIP 805

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Design Hydraulic Study. Bridge 09C-0134, Blairsden-Graeagle Road over Middle Fork Feather River. Plumas County. Prepared for:

Design Hydraulic Study. Bridge 09C-0134, Blairsden-Graeagle Road over Middle Fork Feather River. Plumas County. Prepared for: Design Hydraulic Study Bridge 09C-0134, Blairsden-Graeagle Road over Middle Fork Feather River Plumas County Prepared for: Quincy Engineering, Inc 3247 Ramos Circle Sacramento, CA 95827-2501 Prepared by:

More information

REDWOOD VALLEY SUBAREA

REDWOOD VALLEY SUBAREA Independent Science Review Panel Conceptual Model of Watershed Hydrology, Surface Water and Groundwater Interactions and Stream Ecology for the Russian River Watershed Appendices A-1 APPENDIX A A-2 REDWOOD

More information

NEWS RELEASE UNDER SECTION 404 OF THE CLEAN WATER ACT (33 USC 1344) ACTION NUMBER SPA ABQ

NEWS RELEASE UNDER SECTION 404 OF THE CLEAN WATER ACT (33 USC 1344) ACTION NUMBER SPA ABQ PUBLIC NOTICE Public Notice Issue Date: //6/07 Albuquerque District Comments due: /6/08 NEWS RELEASE UNDER SECTION 0 OF THE CLEAN WATER ACT ( USC ) ACTION NUMBER SPA-06-00-ABQ BANK STABILIZATION ALONG

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

TSEGI WASH 50% DESIGN REPORT

TSEGI WASH 50% DESIGN REPORT TSEGI WASH 50% DESIGN REPORT 2/28/2014 Daniel Larson, Leticia Delgado, Jessica Carnes I Table of Contents Acknowledgements... IV 1.0 Project Description... 1 1.1 Purpose... 1 Figure 1. Erosion of a Headcut...

More information

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Raymond Rogozinski and Maged Aboelata The City of Bristol and Towns of Plainville and

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

Emergency Action Plan (EAP) Tata Pond Dam

Emergency Action Plan (EAP) Tata Pond Dam For Official Use Only Not for Public Distribution 02/03/16 Emergency Action Plan (EAP) Tata Pond Dam State of Connecticut Dam ID: 0000 Town or City, County, Connecticut Name of Dam Owner Dam Hazard Classification

More information

CE415L Applied Fluid Mechanics Laboratory

CE415L Applied Fluid Mechanics Laboratory Applied Fluid Mechanics Laboratory Learning Objective Following completion of this experiment and the analysis of the data, you should be able to 1. generalize results of introducing changes to a natural

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

Chapter 5 CALIBRATION AND VERIFICATION

Chapter 5 CALIBRATION AND VERIFICATION Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic

More information

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Information for File # 2013-00531-MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Applicant: City of St. Louis Park Corps Contact: Melissa Jenny Address: U.S. Army Corps of Engineers Attn:

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

Roger Andy Gaines, Research Civil Engineer, PhD, P.E.

Roger Andy Gaines, Research Civil Engineer, PhD, P.E. Roger Andy Gaines, Research Civil Engineer, PhD, P.E. Research Civil Engineer/Regional Technical Specialist Memphis District August 24, 2010 Objectives Where we have been (recap of situation and what s

More information

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # 3805010019 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FEBRUARY 2013 FINAL RATING: MINIMALLY ACCEPTABLE

More information

STABILIZATION OF THE H&CT RAILWAY STONE DAM WALTER E. SKIPWITH, PE, JOYCE CRUM, AIA AND JOHN BAUMGARTNER, PE. Introduction.

STABILIZATION OF THE H&CT RAILWAY STONE DAM WALTER E. SKIPWITH, PE, JOYCE CRUM, AIA AND JOHN BAUMGARTNER, PE. Introduction. STABILIZATION OF THE H&CT RAILWAY STONE DAM WALTER E. SKIPWITH, PE, JOYCE CRUM, AIA AND JOHN BAUMGARTNER, PE I. A. Introduction General The Old Stone Dam is located in the upper reach of Cottonwood Creek

More information

Countermeasure Calculations and Design

Countermeasure Calculations and Design Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING PREPARED BY: LandC, etc, LLC TABLE OF CONTENTS 1 Introduction... 1 2 Methods... 1 2.1 Hydraulic Model... 1 2.2

More information

Fish Passage at Road Crossings

Fish Passage at Road Crossings Fish Passage at Road Crossings 1 Crossing Design Workshop Outline 1:00 to 2:00 Intro, Design Overview, Channel Width 2:00 to 2:15 Break 2:15 to 3:15 No-Slope, Stream Simulation Design 3:15 to 3:30 Break

More information

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

EAGLES NEST AND PIASA ISLANDS

EAGLES NEST AND PIASA ISLANDS EAGLES NEST AND PIASA ISLANDS HABITAT REHABILITATION AND ENHANCEMENT PROJECT MADISON AND JERSEY COUNTIES, ILLINOIS ENVIRONMENTAL MANAGEMENT PROGRAM ST. LOUIS DISTRICT FACT SHEET I. LOCATION The proposed

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project, Appendix N SUMMARY OF HYDRAULIC AND SEDIMENT-TRANSPORT ANALYSIS OF RESIDUAL SEDIMENT: ALTERNATIVES FOR THE SAN CLEMENTE DAM REMOVAL/RETROFIT PROJECT, CALIFORNIA the San Clemente Dam Removal/Retrofit Project,

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

Red River Levee Panel

Red River Levee Panel Red River Levee Panel Mississippi River Commission Monday, August 9, 2017 Red River Levees in LA & AR NONE along TX & OK Boarder Red River Levee Issues Caddo Levee Cherokee Park Authorization Bossier Levee

More information

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations. CHAPTER 19.07 GEOLOGICALLY HAZARDOUS AREAS 19.07.010 Applicability. Geologically hazardous areas may pose a threat to the health and safety of citizens when incompatible development is sited in areas of

More information

Bank stabilization by redirective structures on the Santa Clara River, Ventura County, CA

Bank stabilization by redirective structures on the Santa Clara River, Ventura County, CA 116 Alex Yescas Senior Water Resources Engineer Atkins North America Bank stabilization by redirective structures on the Santa Clara River, Ventura County, CA Abstract The Santa Clara River is one of the

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

Minimum Standards for Wetland Delineations

Minimum Standards for Wetland Delineations Minimum Standards for Wetland Delineations Jason Gipson Chief, Utah/Nevada Regulatory Branch Sacramento District Regulatory Program Workshop 16 Mar 2016 US Army Corps of Engineers Delineation Report Minimum

More information

Bank Erosion and Morphology of the Kaskaskia River

Bank Erosion and Morphology of the Kaskaskia River Bank Erosion and Morphology of the Kaskaskia River US Army Corps Of Engineers St. Louis District Fayette County Soil and Water Conservation District Team Partners : Carlyle Lake Ecosystem Partnership Vicinity

More information

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District CR AAO Bridge Dead River Flood & Natural Channel Design Mitch Koetje Water Resources Division UP District Old County Road AAO Bridge Map courtesy of Marquette County Silver Lake Basin McClure Basin

More information

Chapter 3 Erosion in the Las Vegas Wash

Chapter 3 Erosion in the Las Vegas Wash Chapter 3 Erosion in the Las Vegas Wash Introduction As described in Chapter 1, the Las Vegas Wash (Wash) has experienced considerable change as a result of development of the Las Vegas Valley (Valley).

More information

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review

Appendix I. Dredged Volume Estimates. Draft Contractor Document: Subject to Continuing Agency Review Appendix I Dredged Volume Estimates Draft Contractor Document: Subject to Continuing Agency Review Interoffice Correspondence Date: April 6, 2007 To: L. Bossi (WHI) Copy: S. Thompson (WHI), B. Fidler (NNJ)

More information

Technical Memorandum No

Technical Memorandum No Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.10 Task: Evaluation of Four Watershed Conditions - Sediment To: PRWFPA Staff Working Group Prepared by: Gregory Morris and

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes City of New Castle Presentation Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes New Castle Conservation District DNREC August 22, 2012 Agenda Project Background

More information

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 Spike in Tree Elevation = 102.95 Elevation

More information

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805030008 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: AUGUST 2014 PERIODIC

More information

North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015

North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015 North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015 INTRODUCTION Emergency Action Plans (EAPs) are critical to reducing the risks

More information

Ground Water Protection Council 2017 Annual Forum Boston, Massachusetts. Ben Binder (303)

Ground Water Protection Council 2017 Annual Forum Boston, Massachusetts. Ben Binder (303) Ground Water Protection Council 2017 Annual Forum Boston, Massachusetts Protecting Groundwater Sources from Flood Borne Contamination Ben Binder (303) 860-0600 Digital Design Group, Inc. The Problem Houston

More information

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire

USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire NH Water & Watershed Conference Robert Flynn, USGS NH-VT Water Science Center March 23, 2012

More information

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION DEPARTMENT OF THE ARMY SAN FRANCISCO DISTRICT, U.S. ARMY CORPS OF ENGINEERS 1455 MARKET STREET SAN FRANCISCO, CALIFORNIA 94103-1398 SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS

More information

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD, PROJECT CONSTRUCTED IN 1 DAY, MARCH 10, 2009 BY

More information

U.S. ARMY CORPS OF ENGINEERS

U.S. ARMY CORPS OF ENGINEERS CORPS FACTS Regulating Mississippi River Navigation Pools U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Historical Background Federal improvements in the interest of navigation on the Mississippi River

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2 MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report

More information

Suitable Applications Sediment traps should be considered for use:

Suitable Applications Sediment traps should be considered for use: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Why Geomorphology for Fish Passage

Why Geomorphology for Fish Passage Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the

More information

PolyMet NorthMet Project

PolyMet NorthMet Project RS 26 Draft-01 December 8, 2005 RS26 Partridge River Level 1 Rosgen Geomorphic Survey Rosgen Classification Partridge River from Headwaters to Colby Lake Prepared for PolyMet NorthMet Project December

More information

Hydraulics of bendway weirs

Hydraulics of bendway weirs River Basin Management IV 389 Hydraulics of bendway weirs C. Thornton 1, S. Abt 1, D. Baird 2 & R. Padilla 3 1 Colorado State University, Fort Collins, CO, USA 2 U.S. Bureau of Reclamation, Denver, CO,

More information

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir ISSN 2320-9100 11 International Journal of Advance Research, IJOAR.org Volume 1, Issue 8,August 2013, Online: ISSN 2320-9100 MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq

More information

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii Limited Visual Dam Safety Inspections OA00137 Oahu Reservoir No. 155 Oahu, Hawaii Prepared by: U.S. ARMY CORPS OF ENGINEERS HONOLULU DISTRICT STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES May

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Tom Ballestero University of New Hampshire. 1 May 2013

Tom Ballestero University of New Hampshire. 1 May 2013 Tom Ballestero University of New Hampshire 1 May 2013 1 Hydrology 2 Basic Hydrology Low flows most common Flows that fill the stream to the banks and higher are much less common Filling the stream to the

More information

ARMSTRONG COUNTY, PA

ARMSTRONG COUNTY, PA ARMSTRONG COUNTY, PA Revised Preliminary DFIRM Mapping March 31, 2013 Kevin Donnelly, P.E., CFM GG3, Greenhorne & O Mara, Inc. Presentation Agenda Armstrong County DFIRM Overview - June 25, 2010 DFIRM

More information

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth Technical Memorandum To: From: Greg Laird, Courtney Moore Kevin Pilgrim and Travis Stroth 5777 Central Avenue Suite 228 Boulder, CO 80301 www.otak.com Copies: [Electronic submittal] Date: 10/19/2017 Subject:

More information

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax: MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA 23149 Phone: 804-758-3382 Fax: 804-758-0061 LAND DISTURBANCE PERMIT SUBMISSION REQUIREMENTS In order to expedite

More information

Issue 44: Phase II & III H&H Issues Date: 07/03/2006 Page 1

Issue 44: Phase II & III H&H Issues Date: 07/03/2006 Page 1 Background Phase I of the NCFMP studies have primarily focused on the coastal plain and sandhills physiographic regions in of the State. Phase II and III study areas will focus on the piedmont, foothills,

More information

Four Mile Run Levee Corridor Stream Restoration

Four Mile Run Levee Corridor Stream Restoration Four Mile Run Levee Corridor Stream Restoration 30% Design Summary U.S. Army Corps of Engineers, Baltimore District Presentation Outline Four Mile Run 1.) Historic Perspective 2.) Existing Conditions 3.)

More information

Solutions to Flooding on Pescadero Creek Road

Solutions to Flooding on Pescadero Creek Road Hydrology Hydraulics Geomorphology Design Field Services Photo courtesy Half Moon Bay Review Solutions to Flooding on Pescadero Creek Road Prepared for: San Mateo County Resource Conservation District

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

Low Low Water in Puget Sound vs. Mean Sea Level. What do the flood event gauge readings at Sedro Woolley really mean?

Low Low Water in Puget Sound vs. Mean Sea Level. What do the flood event gauge readings at Sedro Woolley really mean? Low Low Water in Puget Sound vs. Mean Sea Level What do the flood event gauge readings at Sedro Woolley really mean? When you make the adjustment of 8.93 feet to the published values and then subtract

More information

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation) Stream Restoration and Environmental River Mechanics Pierre Y. Julien Malaysia 2004 Objectives Brief overview of environmental river mechanics and stream restoration: 1. Typical problems in environmental

More information

1 INTRODUCTION AND MAJOR FINDINGS... 1

1 INTRODUCTION AND MAJOR FINDINGS... 1 Memorandum To: Lindsey Clark, Stillwater Valley Watershed Council Coordinator From: Chad Raisland, Pioneer Technical Services, Inc. and Karin Boyd, Applied Geomorphology, Inc. CC: Tanya Lester, Stillwater

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

Development of a Fluvial Erosion Hazard Mitigation Program for Indiana

Development of a Fluvial Erosion Hazard Mitigation Program for Indiana Development of a Fluvial Erosion Hazard Mitigation Program for Indiana Indiana Watersheds Webinar Series October 12,2011 Robert Barr Center for Earth and Environmental Science Department of Earth Sciences

More information

Template for Sediment and Erosion Control Plan General Instructions

Template for Sediment and Erosion Control Plan General Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling Attachment B-1 Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling 1 October 2012 Lower Susquehanna River Watershed Assessment Evaluation of AdH Model Simplifications

More information

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA Dr. Gamal A. Sallam 1 and Dr. Medhat Aziz 2 ABSTRACT Bridges are critical structures that require a substantial investment to construct and serve an important

More information