NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

Size: px
Start display at page:

Download "NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:"

Transcription

1 WDFW CONTROL POINT #1 Re-Bar, Elevation Northing Easting WDFW CONTROL POINT #2 Re-Bar, Elevation Northing Easting Spike in Tree Elevation = Elevation = NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: Sheet Index 1 Cover Sheet 2 Erosion Control Plan 3 Erosion Control/General Notes & Details 4 Thunder Road #3 Plan and Prile 5 Stream Channel & Culvert Plan and Prile 6 Dewatering Plan, Notes & Details General Notes & Details FIELD VERIFY AND LOCATE ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AQUATIC ORG PASSAGE: PS 396 OPEN CHANNEL: PS 582 ACCESS ROAD: PS 560 STREAM HABITAT IMPROVEMENT AND MANAGEMENT: PS 395 Lat: N / Long: W Clallam County WRIA: 20, SITE: Section 22, Township 28N, Range 15W Natural Resources Conservation Service Washington Department Fish & Wildlife Quileute Tribe Nicole Rasmussen Water Quality Biologist Quileute Tribe DATUM ASSUMED This is not a boundary survey. Elevations shown are based on an assumed datum. Topographic information was gathered under direction the engineer for the sole purpose design and construction this project. Property lines, easements, and right way locations displayed are approximate based on information obtained from recorded documents, for reference purposes only. Field data collected To the best my pressional knowledge, judgement, and belief, these plans meet all applicable NRCS practice standards. Signature The Drawings, Construction and material Specifications, and Operation and Maintenance Plans for this project have been reviewed with me and are accepted for this installation. I also acknowledge that any modifications prior to review by the NRCS before implimentation may result in NRCS disapproval this installation. I hereby acknowledge receipt a copy(ies) this plan. Owner/Operator Date Donald C. Ponder, PE Environmental Engineering Section Manager Restoration Division, Habitat Program, WDFW Date CHECKED D. Ponder DRAWN T. Godat 1

2 LEGEND NOTES: SEE SHEET (6) FOR DETAILS OF SANDBAG COFFERDAM, FISH EXCLUSION SCREEN, STREAM DIVERSION PIPE SEE SHEET (3) FOR NOTES & DETAILS. ALL EROSION CONTROL, STABILIZATION PER CLALLAM COUNTY STANDARD DETAILS AND NOTES. COFFERDAM / DIVERSION SPECIFICATIONS SITE: MIN. TOP WIDTH COFFERDAM TOP ELEV. COFFERDAM UPSTREAM I.E. DIVERSION PIPE DIVERSION PIPE DIA. 1 ' " 0+25 FISH EXCLUSION SCREEN APPROX. 18 L.F. SANDBAG COFFERDAM APPROX. 18 L.F. APPROX. 140 L.F. (14" DBH RED ALDER) TO BE REMOVED Elev. = THIS IS NOT A BOUNDARY SURVEY. THESE PLANS ARE INTENDED FOR USE AS TOPOGRAPHICAL MAP ONLY ELEVATIONS SHOWN ARE BASED ON LOCAL ASSUMED DATUM Scale: Horiz 1" = 10' CLEARING LIMITS Ex Edge Roadway 0+5 X 12" STREAM DIVERSION PIPE APPROX. 155 LF. APPROX. 80 L.F ROAD CLEARING LIMITS 1+00 THUNDER PRESERVE TREE IN PLACE 1+00 WDFW Re-Bar #1 Elev. = WDFW Re-Bar #2 Elev. = Elev. = APPROX. 40 L.F. FISH EXCLUSION SCREEN APPROX. 40 L.F. WDFW CONTROL POINT #1 Re-Bar, Elevation Northing Easting APPROX. 120 L.F. PRESERVE TREE IN PLACE CLEARING LIMITS SANDBAG COFFERDAM APPROX. 55 L.F. WDFW CONTROL POINT #2 Re-Bar, Elevation Northing Easting " STREAM DIVERSION PIPE APPROX. 155 LF 2+14 Spike in Tree Elevation = Elevation = DIVERSION & EROSION CONTROL PLAN SCALE: 1" = 10' CHECKED DRAWN D. Ponder T. Godat 2

3 TYPICAL DETAIL N.T.S. TYPICAL SECTION VIEW N.T.S. DATA COLLECTION NOTES 1. THIS DATA COLLECTION WAS PREFORMED ON IN SUPPORT OF THE DESIGN AND IS INTENDED TO BE USED FOR THIS PURPOSE. 2. THE VERTICAL DATUM AT TBM 1 IS AN ASSUMED ELEVATION OF 100 FEET. 3. THIS IS NOT A PROPERTY BOUNDARY SURVEY, PROPERTY AND RIGHT OF WAY LINES HAVE NOT BEEN DETERMINED. 4. UNDERGROUND UTILITIES WERE NOT EXAMINED OR CONSIDERED AS PART OF THIS EFFORT. 5. CONTOUR INTERVAL IS 1 FOOT. CONSTRUCTION SEQUENCE 1. CALL FOR A PRE-CONSTRUCTION MEETING WITH THE PROJECT SPONSOR, CONSTRUCTION INSPECTOR AND LANDOWNER. 2. PERFORM CONSTRUCTION STAKING. CONSTRUCTION STAKING WILL BE PERFORMED BY WDFW or NRCS INSPECTOR AND ENGINEER. 3. CONSTRUCT DEWATERING SYSTEM. 4. DEFISH PROJECT SITE, THE CONTRACTOR IS RESPONSIBLE FOR MEETING THIS REQUIREMENT. IF WDFW IS NOT AVAILABLE. 5. REMOVE EXISTING CULVERTS, COMPACT SUBGRADE, PLACE GEOTEXTILE, PLACE SPALLS, PLACE LEVELING COURSE, PLACE FOOTINGS, PLACE ARCH ON FOOTINGS, GROUT, BACKFILL AND COMPACT, INSTALL HEADWALL AND WINGWALLS, COMPLETE BACKFILL, INSTALL SAFETY DELINEATORS AND RIPRAP. 6. REMOVE DEWATERING SYSTEM FOLLOWING INSTALLATION OF CULVERT, FOOTING, CHANNEL MATERIAL, HEADWALLS AND WINGWALLS.. FINAL ROAD SURFACING 8. STABILIZE ALL DISTURBED AREAS WITHIN DAYS OF COMPLETION. REVEGETATE AND REMOVE WASTE MATERIALS FROM SITE AS APPROVED BY THE SPONSOR AND LANDOWNER. GENERAL CONSTRUCTION NOTES 1. ALL PERMITS NECESSARY TO CONSTRUCT THE PROJECT HAVE BEEN OBTAINED BY THE QUILEUTE TRIBE. COPIES OF THE PERMITS SHALL BE MAINTAINED ON SITE BY THE CONTRACTOR AND MADE AVAILABLE WHEN/IF REQUESTED. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL PERMIT TERMS AND CONDITIONS. 3. THE ATTACHED NRCS CONSTRUCTION AND MATERIAL SPECIFICATION ARE PART OF THIS PLAN AND SHALL GOVERN THE INSTALLATION OF THIS PROJECT. 4. THIS PROJECT SHALL BE CONSTRUCTED TO THE LINES AND GRADES SHOWN IN THE AND DETAILED IN THE CONSTRUCTION SPECIFICATIONS. 5. MAINTAIN MINIMUM OF 5' OF CLEARANCE FROM TREES MARKED FOR PRESERVATION. 6. TREE LIMBING MAY BE NECESSARY ON THE TREES MARKED FOR PRESERVATION - HOW MUCH AND HOW WILL BE DISCUSSED WITH THE CONTRACTOR AT THE SITE SHOWING. EROSION CONTROL & GENERAL NOTES & DETAILS CHECKED DRAWN D. Ponder T. Godat 3

4 Elev. = WDFW CONTROL POINT #1 Re-Bar, Elevation Northing Easting WDFW CONTROL POINT #2 Re-Bar, Elevation Northing Easting Spike in Tree Elevation = Elevation = STA ELEVATION 99.0 STA :1 TAPER (TYP.) THUNDER 0+25 Elev. = ROAD STA 1+.00, 1.1'LT SB ELEV WDFW Re-Bar #1 Elev. = 2+50 THUNDER ROAD #3 PLAN VIEW Scale: Horiz 1" = 10' STA , 19.8'RT IE SB ELEV WDFW Re-Bar #2 Elev. = :1 TAPER (TYP.) STA ELEVATION EXISTING ROAD GRADE STA BVCS: BVCE: PVI STA: PVI ELEV: K: LVC: HIGH PT. STA: HIGH PT ELEV: STA 1+.00, 1.1'LT EVCS: EVCE: % -2.6%.00 STA ELEVATION ROAD PROFILE.00 STA , 19.8'RT IE STA ELEVATION SCALE: Horz.1"=10',Vert.1"=5' CHECKED D. Ponder DRAWN T. Godat 4

5 STA END SB ELEV ROAD STA END STREAMBED ELEVATION THUNDER ROAD #3 PLAN VIEW Scale: Horiz 1" = 10' STA BEGIN STREAMBED ELEVATION FILL EXISTING CHANNEL WITH SPOILS TO MATCH NATIVE THUNDER FILL EXISTING CHANNEL WITH SPOILS TO MATCH NATIVE STA END STREAMBED ELEVATION PROPOSED STREAMBED GRADE EXISTING STREAMBED GRADE STA BEGIN STREAMBED ELEVATION STA END SB ELEV :1 ROAD STA ELEVATION :1 STA END STREAMBED ELEVATION STREAM PROFILE SCALE: Horz.1"=10',Vert.1"=5' STA END IE SB ELEV CHECKED D. Ponder DRAWN T. Godat 5

6 TOP BANK TOE STREAM CHANNEL PERFORATED SHEET FISH SCREEN CLEANED DAILY. DAM 3'-0" HIGH MIN. PERFORATED SHEET FISH SCREEN CLEANED DAILY. OR NATIVE STREAM BED GRAVEL PLACED BY HAND. TOE IN FRONT OF PLASTIC INTO STREAM BED 1:1 MIN., 1'-0" DEEP. DEWATERING PIPE ENGINEER TO VERIFY SIZE REQUIREMENT AT TIME OF CONSTRUCTION. ROUND STREAM BED ROCK. 6 MIL. POLYETHYLENE PLASTIC SHEETING. ISOLATED WORK AREA DAM 3'-0" HIGH MIN. 6 MIL. POLYETHYLENE PLASTIC SHEETING. OR NATIVE STREAM BED GRAVEL PLACED BY HAND. STREAM BED CHECKED D. Ponder DRAWN T. Godat 6

7 NEW CHANNEL THALWEG STREAMBED GRAVEL MIX 1.0' MIN. THICKNESS ' MIN. NOTE: ALL SPOIL MATERIAL NOT USED IN SPOIL BERM CONSTRUCTION IS TO BE HAULED TO DESIGNATED SPOIL SITE. PLACE SPOILS ADJACENT TO EXISTING SPOIL MATERIAL. SLOPE TOP TO DRAIN, GRASS SEED AND MULCH. TYPICAL CHANNEL CROSS SECTION Scale: 1" = 3' Horz. & 1" = 2' Vert. 8' (EXTENT OF STREAMBED) SEE THIS SHEET FOR STREAMBED MATERIAL SPEC. SLOPE 3:1 EXISTING ROAD WIDTH SLOPE 3:1 TOE OF BERM C L 14' 2% 2% TYPICAL SPOIL AREA PLAN VIEW NTS VARIES 2:1 MAX. SLOPE 6" MIN. DEPTH SURFACING TOP COURSE TYPICAL ACCESS ROAD SECTION NTS 2:1 MAX. SLOPE VARIES GENERAL NOTES: ALL CONSTRUCTION IN O.H.W. SHALL BE PERFORMED WITHIN THE SPECIFIED IN WATER WORK WINDOW. CONSTRUCT THE CHANNEL TO PROPOSED GRADES, CONTOURS & LINES. ROUGH STREAMBED GRADES TO BE STAKED BY ENGINEER OR REPRESENTATIVE. CONTRACTOR SHALL MATCH THE RECONSTRUCTED PATH GRADE TO THE EXISTING PATH AT PROPOSED LOCATIONS. PROJECT ENGINEER TO DIRECT THE SHAPING OF THE FINAL STREAMBED SURFACE TO INCLUDE HABITAT FEATURES. 1 3 SPOILS TYPICAL CROSS SECTION A-A NTS ' SUBGRADE ALL FINISH PATHWAY GRADING SHALL PROVIDE POSITIVE DRAINAGE TO PREVENT POOLED SURFACES. CHECKED D. Ponder DRAWN T. Godat

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite

More information

Stream Simulation: A Simple Example

Stream Simulation: A Simple Example Stream Simulation: A Simple Example North Thompson Creek, CO Paul T. Anderson U.S.D.A. Forest Service Here s How We Started May 2011 2-1 USDA-Forest Service Here s How We Finished Forest Service Aquatic

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax: MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA 23149 Phone: 804-758-3382 Fax: 804-758-0061 LAND DISTURBANCE PERMIT SUBMISSION REQUIREMENTS In order to expedite

More information

Design and Construction

Design and Construction Design and Construction Stream Simulation With power point slides shamelessly stolen from: Forest Service AOP Training Course Bob Gubernick Paul Anderson John Kattell USDA Forest Service Interim Directive

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

Case Study 2: Twenty-mile Creek Rock Fords

Case Study 2: Twenty-mile Creek Rock Fords Case Study : Twenty-mile Creek Rock Fords Location Crossing Description Washington. Okanagan National Forest. Methow Valley Ranger District. Chewuch river basin, East Chewuch Road. The Twenty-mile Creek

More information

Fish Passage at Road Crossings

Fish Passage at Road Crossings Fish Passage at Road Crossings 1 Crossing Design Workshop Outline 1:00 to 2:00 Intro, Design Overview, Channel Width 2:00 to 2:15 Break 2:15 to 3:15 No-Slope, Stream Simulation Design 3:15 to 3:30 Break

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

Appendix F Channel Grade Control Structures

Appendix F Channel Grade Control Structures Stream Simulation Appendix F Channel Grade Control Structures This appendix briefly describes permanent grade control structures that are sometimes needed in the upstream and/or downstream reaches adjacent

More information

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District CR AAO Bridge Dead River Flood & Natural Channel Design Mitch Koetje Water Resources Division UP District Old County Road AAO Bridge Map courtesy of Marquette County Silver Lake Basin McClure Basin

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

**Temporary Erosion Control**

**Temporary Erosion Control** Construction operations And methods **Temporary Erosion Control** The test will more than likely just have a basic word problem dealing with Erosion control, if it has anything on the test. So just review,

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

!"#$%&&'()*+#$%(,-./0*)%(!

!#$%&&'()*+#$%(,-./0*)%(! 8:30 Sign in Hoosic River Revival Coalition!"#$%&&'()*+#$%(,-./0*)%(! 12-#30+4/#"5-(60 9:00 Welcome and Introductions 9:15 Goals for Today s Program: A Description of the Planning Process 9:30 First Session:

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

Case Study 14. Rocky Creek Vented Box Culvert Ford

Case Study 14. Rocky Creek Vented Box Culvert Ford Case Study. Rocky Creek Vented Box Culvert Ford Location West Central Arkansas. Ouachita National Forest; Oden Ranger District. Rocky Creek crossing on Forest Road 887 (Muddy Gibbs Road). Crossing Description

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT 6-0 HYDROLOGIC AND HYDRAULIC REPORT. for SR 3062, SECTION 29S STRASBURG ROAD.

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT 6-0 HYDROLOGIC AND HYDRAULIC REPORT. for SR 3062, SECTION 29S STRASBURG ROAD. PENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT 6-0 HYDROLOGIC AND HYDRAULIC REPORT for SR 3062, SECTION 29S STRASBURG ROAD over WEST BRANCH OF BRANDYWINE CREEK EAST FALLOWFIELD TOWNSHIP, CHESTER COUNTY

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

NORTHUMBERLAND COUNTY, PA

NORTHUMBERLAND COUNTY, PA QUAKER RUN Stream and Wetland Restoration As-Built Completion Report and First Year Monitoring Data Coal Township NORTHUMBERLAND COUNTY, PA Upstream Before Upstream After Prepared for: COAL TOWNSHIP 805

More information

Long Valley Meadow Restoration Project

Long Valley Meadow Restoration Project Long Valley Meadow Restoration Project USDA Forest Service Mogollon Rim Ranger District Coconino National Forest Coconino County, Arizona T13N, R9E, Section 12 and T13N, R10E, Sections 6 and 7 Gila and

More information

LOGAN

LOGAN 21 LOGAN MILL 201+00 Legend Salina Power Pole Existing Stream Existing Survey Building Footprint Centerline Permanent Easement Temporary Easement Existing Right-of-Way Property Line Edge of Roadway Guardrail

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

APPLICATION FOR CONDITIONAL ABSOLUTE WATER STORAGE RIGHT

APPLICATION FOR CONDITIONAL ABSOLUTE WATER STORAGE RIGHT District Court, Water Division, Colorado Court Address: CONCERNING THE APPLICATION FOR WATER RIGHTS OF Applicant: In the River or its Tributaries In COUNTY Attorney or Party Without Attorney (Name and

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

CE415L Applied Fluid Mechanics Laboratory

CE415L Applied Fluid Mechanics Laboratory Applied Fluid Mechanics Laboratory Learning Objective Following completion of this experiment and the analysis of the data, you should be able to 1. generalize results of introducing changes to a natural

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

Best Management Practices for Coldwater Fisheries Enhancement and Restoration Best Management Practices for Coldwater Fisheries Enhancement and Restoration MACC Annual Environmental Conference 2017 March 3, 2017 Tim Dexter, MassDOT Highway Division 1 Leading the Nation in Transportation

More information

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Why Geomorphology for Fish Passage

Why Geomorphology for Fish Passage Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the

More information

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD, PROJECT CONSTRUCTED IN 1 DAY, MARCH 10, 2009 BY

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

UPPER COSUMNES RIVER FLOOD MAPPING

UPPER COSUMNES RIVER FLOOD MAPPING UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe

More information

TSEGI WASH 50% DESIGN REPORT

TSEGI WASH 50% DESIGN REPORT TSEGI WASH 50% DESIGN REPORT 2/28/2014 Daniel Larson, Leticia Delgado, Jessica Carnes I Table of Contents Acknowledgements... IV 1.0 Project Description... 1 1.1 Purpose... 1 Figure 1. Erosion of a Headcut...

More information

Template for Sediment and Erosion Control Plan General Instructions

Template for Sediment and Erosion Control Plan General Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms

Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms Scott Jackson University of Massachusetts Amherst Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms Dams Sub-standard Culverts Excessive Velocities Inlet Drop

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

Chutes Part 5: Rock linings

Chutes Part 5: Rock linings Chutes Part 5: Rock linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] Chutes

More information

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2 MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report

More information

ONE ROCK DAM ORD. capture more sediment. The original ORD becomes the splash apron for the new layer. STEP 4: When ORD fills in, add a new layer

ONE ROCK DAM ORD. capture more sediment. The original ORD becomes the splash apron for the new layer. STEP 4: When ORD fills in, add a new layer ONE ROCK DAM ORD A low grade control structure built with a single layer of rock on the bed of the channel. ORDs stabilize the bed of the channel by slowing the flow of water, increasing roughness, recruiting

More information

Guide to the use of the Erosion and Sediment Control Evaluation Tool

Guide to the use of the Erosion and Sediment Control Evaluation Tool Guide to the use of the Erosion and Sediment Control Evaluation Tool December 2017 If you require content in an alternate format please contact us at 905-895-1281 or by email at Accessibility@LSRCA.on.ca

More information

APPLICATION FOR SIMPLE CHANGE IN SURFACE POINT OF DIVERSION PURSUANT TO (3.5), C.R.S.

APPLICATION FOR SIMPLE CHANGE IN SURFACE POINT OF DIVERSION PURSUANT TO (3.5), C.R.S. District Court, Water Division, Colorado Court Address: CONCERNING THE APPLICATION FOR WATER RIGHTS OF Applicant: In the River or its Tributaries In COUNTY COURT USE ONLY Attorney or Party Without Attorney

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable

More information

Fluvial Driven Alluvial Fans

Fluvial Driven Alluvial Fans Fluvial Driven Alluvial Fans Restoration Project Evaluations - Examples from the Russian and Napa River Watersheds Mia Docto Masters Thesis UC Berkeley 1. Basic Fan Description 2. Fluvial Driven Fan Characteristics

More information

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah Intermountain Center for River Rehabilitation and Restoration, Utah State University 31 July 2018 Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah I.

More information

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX STREAM RESTORATION 2016 AWRA Summer Specialty Conference, GIS and Water Resources IX Innovative Use of 2D Hydraulic Modeling in Stream Restoration Design Presented by: Li Gao, PE and Robert Scrafford,

More information

Appendix C Benchmarking Cost Estimates

Appendix C Benchmarking Cost Estimates REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall

More information

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012 Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation

More information

APPLICATION FOR CHANGE OF WATER RIGHT

APPLICATION FOR CHANGE OF WATER RIGHT District Court, Water Division, Colorado Court Address: CONCERNING THE APPLICATION FOR WATER RIGHTS OF Applicant: In the River or its Tributaries In COUNTY COURT USE ONLY Attorney or Party Without Attorney

More information

NEWS RELEASE UNDER SECTION 404 OF THE CLEAN WATER ACT (33 USC 1344) ACTION NUMBER SPA ABQ

NEWS RELEASE UNDER SECTION 404 OF THE CLEAN WATER ACT (33 USC 1344) ACTION NUMBER SPA ABQ PUBLIC NOTICE Public Notice Issue Date: //6/07 Albuquerque District Comments due: /6/08 NEWS RELEASE UNDER SECTION 0 OF THE CLEAN WATER ACT ( USC ) ACTION NUMBER SPA-06-00-ABQ BANK STABILIZATION ALONG

More information

EAGLES NEST AND PIASA ISLANDS

EAGLES NEST AND PIASA ISLANDS EAGLES NEST AND PIASA ISLANDS HABITAT REHABILITATION AND ENHANCEMENT PROJECT MADISON AND JERSEY COUNTIES, ILLINOIS ENVIRONMENTAL MANAGEMENT PROGRAM ST. LOUIS DISTRICT FACT SHEET I. LOCATION The proposed

More information

Degradation Concerns related to Bridge Structures in Alberta

Degradation Concerns related to Bridge Structures in Alberta Degradation Concerns related to Bridge Structures in Alberta Introduction There has been recent discussion regarding the identification and assessment of stream degradation in terms of how it relates to

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS APPENDIX A: EROSION & SEDIMENT CONTROL FORMS Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL FORMS Appendix-1 This page intentionally left blank. Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL

More information

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES Gully erosion A complex of processes whereby the removal of soil is characterised by incised channels in the landscape. NSW Soil Conservation Service,

More information

Field Methods to Determine/ Verify Bankfull Elevation, XS Area & Discharge

Field Methods to Determine/ Verify Bankfull Elevation, XS Area & Discharge Module # 6 Field Methods to Determine/ Verify Bankfull Elevation, XS Area & Discharge Iowa s River Restoration Toolbox Level 1 / Base Training Overview of Basic Field Data Collection Site Map Cross Sections

More information

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2012 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: The Eagle River Watershed Council Prepared By: RiverRestoration.org - I. Introduction Interstate 70 is a major highway

More information

Kootenai River Habitat Restoration Program Update

Kootenai River Habitat Restoration Program Update Kootenai River Habitat Restoration Program Update Kootenai Tribe of Idaho Kootenai Valley Resource Initiative November 19, 2012 Bonners Ferry, Idaho Changes to Kootenai Basin Beaver trapping Floodplain

More information

April 9, Phosphate Mining and Reclamation Overview

April 9, Phosphate Mining and Reclamation Overview April 9, 2012 Phosphate Mining and Reclamation Overview Business & Mission Mosaic produces the majority of the phosphate used by American farmers Employs approximately 7,000 people worldwide, 3,000 in

More information

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along

More information

Photographic Log. Photo No. 1. Date: 10/27/15. Direction Photo Taken: Southwest. Photo Taken By: JBH1

Photographic Log. Photo No. 1. Date: 10/27/15. Direction Photo Taken: Southwest. Photo Taken By: JBH1 1 Southwest 10/27/15 Looking southwest on Copper Park Lane viewing clearing and grubbing of area south of Copper Park Lane prior to excavation. 2 Southeast 10/29/15 Looking southeast at the sump and pump

More information

Use of Bioengineering Techniques for Revegetation of Riparian Areas: Colomac Mine Remediation Project, NWT

Use of Bioengineering Techniques for Revegetation of Riparian Areas: Colomac Mine Remediation Project, NWT Use of Bioengineering Techniques for Revegetation of Riparian Areas: Colomac Mine Remediation Project, NWT McPherson, M. 1, Vanderspiegel, R. 2, Breadmore, R. 2, and Hewitt, M. 3 2012 RPIC Federal Contaminated

More information

In-channel coarse sediment trap Best Management Practice

In-channel coarse sediment trap Best Management Practice In-channel coarse sediment trap Best Management Practice By Henry R. Hudson July 2002 Environmental Management Associates Ltd., Christchurch Complexity Environmental Value Cost Low Moderate High Low Moderate

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

EROSION CONTROL FIELD GUIDE By Craig Sponholtz & Avery C. Anderson

EROSION CONTROL FIELD GUIDE By Craig Sponholtz & Avery C. Anderson WORKING WITH NATURE TO HEAL EROSION Soil loss caused by flowing water diminishes the fertility, productivity and healing capacity of the land. This guide was created to empower landowners and managers

More information

Rock Sizing for Waterway & Gully Chutes

Rock Sizing for Waterway & Gully Chutes Rock Sizing for Waterway & Gully Chutes WATERWAY MANAGEMENT PRACTICES Photo 1 Rock-lined waterway chute Photo 2 Rock-lined gully chute 1. Introduction A waterway chute is a stabilised section of channel

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth Technical Memorandum To: From: Greg Laird, Courtney Moore Kevin Pilgrim and Travis Stroth 5777 Central Avenue Suite 228 Boulder, CO 80301 www.otak.com Copies: [Electronic submittal] Date: 10/19/2017 Subject:

More information

Name of Applicant Mailing Address address Telephone Number

Name of Applicant Mailing Address  address Telephone Number District Court, Water Division, Colorado Court Address: CONCERNING THE APPLICATION FOR WATER RIGHTS OF Applicant: In the River or its Tributaries In COUNTY Attorney or Party Without Attorney (Name and

More information

Colony Creek Colony Mountain Drive Sediment Management and Flood Protection Evaluation Final Report

Colony Creek Colony Mountain Drive Sediment Management and Flood Protection Evaluation Final Report Colony Creek Colony Mountain Drive Sediment Management and Flood Protection Evaluation Final Report Prepared for: Skagit County Department of Public Works Surface Water Prepared by: northwest hydraulic

More information

Little Blackfoot TPA 2009 Sediment and Habitat Assessment QAQC Review March 9, 2010

Little Blackfoot TPA 2009 Sediment and Habitat Assessment QAQC Review March 9, 2010 Little Blackfoot TPA 2009 Sediment and Habitat Assessment QAQC Review March 9, 2010 1.0 PROJECT OVERVIEW Sediment and habitat monitoring in the Little Blackfoot TPA was conducted in July of 2009 as outlined

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

Sediment Control Log (SCL)

Sediment Control Log (SCL) Description A sediment control log is a linear roll made of natural materials such as straw, coconut fiber, or other fibrous material trenched into the ground and held with a wooden stake. Sediment control

More information

PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM NAD 83 COORDINATES N 6,178,811 E 403,309

PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM NAD 83 COORDINATES N 6,178,811 E 403,309 PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER GP-4a LEGAL DESCRIPTION LSD 12-10-78-4-W6M SITE NAME Burnt River Bridge - West Approach Slide HIGHWAY & KM Hwy 49:06

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Duralie Open Pit Modification

Duralie Open Pit Modification Duralie Open Pit Modification Environmental Assessment SECTION 5 REHABILITATION STRATEGY TABLE OF CONTENTS 5 REHABILITATION STRATEGY 5-1 5.1 EXISTING DCM REHABILITATION 5-1 5.1.1 Rehabilitation Principles

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # 3805010019 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FEBRUARY 2013 FINAL RATING: MINIMALLY ACCEPTABLE

More information

Hydraulics of bendway weirs

Hydraulics of bendway weirs River Basin Management IV 389 Hydraulics of bendway weirs C. Thornton 1, S. Abt 1, D. Baird 2 & R. Padilla 3 1 Colorado State University, Fort Collins, CO, USA 2 U.S. Bureau of Reclamation, Denver, CO,

More information

The results of KCB s site inspection observations and our recommendations for further work are presented herein.

The results of KCB s site inspection observations and our recommendations for further work are presented herein. July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

APPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011

APPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011 APPENDIX A REACH DECRIPTIONS Basin 615, South Fork of Quantico Creek - Project Reach Descriptions Reach Name: 615-A Coordinates (NAD 83, Virginia State Plane North): 11796510.57, 6893938.95 to 11801555.79,

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information

-- Lessons from a successful salmon stream and estuary relocation on Gravina Island

-- Lessons from a successful salmon stream and estuary relocation on Gravina Island Re-inventing Government Creek -- Lessons from a successful salmon stream and estuary relocation on Gravina Island Jon Houghton, Ph.D. and Derek Ormerod, M.S., P.E. - Pentec Environmental/Hart Crowser,

More information

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION

More information

Project Location: Usal Road, CR 431 Milepost 10 to 12, Sections 5& 8, T23N, R16W, HB&M

Project Location: Usal Road, CR 431 Milepost 10 to 12, Sections 5& 8, T23N, R16W, HB&M Five Counties Salmonid Conservation Program (5C) P.O. Box 2571 Weaverville, CA 96093-2571 (530) 623-3967 Ext. 111 FAX (530) 623-3979 email: mlancaster@5counties.org January 1, 2012 Summary Report Usal

More information

Connecticut Coastal Management Program

Connecticut Coastal Management Program Connecticut Coastal Management Program Fact Sheet for SHORELINE FLOOD AND EROSION CONTROL STRUCTURES What are Shoreline Flood and Erosion Control Structures? The Connecticut General Statutes (CGS) define

More information

Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study

Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study 2015 Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study Appendix B Civil Design USACE Chicago District August 2015 TABLE OF CONTENTS INTRODUCTION... 3 General...

More information

F or most landowners, production incentives and the economics of soil loss require

F or most landowners, production incentives and the economics of soil loss require RANGELAND MONITORING SERIES Publication 8014 Sediment Delivery Inventory and Monitoring A Method for Water Quality Management in Rangeland Watersheds UNIVERSITY OF CALIFORNIA Division of Agriculture and

More information

Sediment Weirs (Instream)

Sediment Weirs (Instream) Sediment Weirs (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows [1] Deep Water [1] Sediment weirs

More information

Erosion and Sediment Control Measures 2.7 Silt Fences

Erosion and Sediment Control Measures 2.7 Silt Fences Erosion and Sediment Control Measures Silt fences are designed to intercept sheet flow sediment laden stormwater run-off and filter out both the larger and smaller particles of sediment. Silt fences and

More information