1 1 Southwest 10/27/15 Looking southwest on Copper Park Lane viewing clearing and grubbing of area south of Copper Park Lane prior to excavation. 2 Southeast 10/29/15 Looking southeast at the sump and pump system dewatering the ditch just east of the North Basin.
2 3 East 10/29/15 Looking east at the sump and pump dewatering system in the East Basin. 4 West 10/30/15 Looking west at the excavation in SSEA- 13.
3 5 10/30/15 Looking downward at the excavated depth in SSEA South 10/30/15 Looking south at the filling of the excavated area of SSEA-14 with A-9 (limestone) material.
4 7 South 11/2/15 Looking south at the tracking pad located west of the East Basin. 8 West 11/2/15 Looking west backfilling SSEA 1 with limestone.
5 9 North 10/3/15 Looking north at long reach excavator excavating to design grades in the East Basin. 10 North 10/3/15 Looking north at surveying depth of excavation in East Basin.
6 11 South 11/4/15 Looking south access to the WDNR Service Center being maintained. 12 South 11/4/15 Looking south material excavated from the East Basin being placed in the West Basin.
7 13 North 11/5/15 Looking north barricades on HWY 27 while excavating SSAE 9, and cleaning out the culvert beneath the HWY. 14 East 11/5/15 Looking east cleaning out the culvert beneath HWY 27.
8 15 West 11/6/15 Looking west placing A-9 (limestone gravel) in the excavation of SSAE North 11/6/15 Looking north topsoil being placed on top of A9 material in SSEA-17.
9 17 East 11/9/15 Looking east North Basin with trench installed. 18 North 11/9/15 Looking north fabric placed below light rip rap between the North Basin (shown) and the East Basin.
10 19 South 11/10/15 Looking south feathering ditch slopes in East Basin /11/15 Looking downward water entering the East Basin from the North Basin through the rip rap.
11 21 North 11/11/15 Looking north light rip rap area at the northeast corner of the East Basin receiving fabric prior to light rip rap installation. 22 East 11/12/15 Looking east Emat placed on the upland sloped area east of the light rip rap area between the North and East Basins.
12 23 South 11/13/15 Looking south 60 culvert being installed across Copper Park Lane. 24 Southeast 11/13/15 Looking southeast former East Basin with Emat placed in ditch and rip rap at the northwest comer.
13 25 West 11/16/15 Looking west A7 material being placed into the Geocell mat on the east berm of the East Basin 26 West 11/17/15 Looking west grading the east-west ditch.
14 27 West 11/18/15 Looking west Emat placed in East-West ditch. 28 East 11/19/15 Looking east at the overflow area from the former East Basin to wetland.
15 29 Southeast 12/3/15 Looking southeast straw mulch covers high-ground to the northwest of the former East Basin. 30 East 12/3/15 Looking east straw mulch cover highground and Emat covers the ditch line in the former North Basin.
16 31 Northwest 6/13/16 Looking northwest at hand spraying herbicide on targeted vegetation in the former east basin and wetland 32 West 6/14/16 Looking west at the grading activities in the west basin. The backhoe fills an off-road haul truck which deposits the fill in front of a dozer for spreading. The pump that dewatered the west basin is shown on the right hand side of the photograph.
17 33 Northwest 6/14/16 Looking northwest at the west basin and the dozer grading fill to grade. Note the GIS antennae on the dozer blade used for grade elevation. 34 Southwest 6/15/16 Looking southwest at Emat placed in center of recently filled ditch north of the west basin.
18 35 South 6/15/16 Looking south at the west basin with Emat installed in the perimeter ditches. 36 Southwest 6/15/16 Looking southwest at the west basin showing the two gradual swales and low areas on the north side of the area. Emat is shown in the ditch lines heading north.
19 37 West 6/15/16 Looking west at careful placement of limestone rip rap in the prescribed area north of the culvert under Copper Park Lane. 38 West 9/16/16 Rio Tinto Erosion control features were removed from the site on 9/16/16. This view shows the area south of Copper Park Lane.
20 39 North 9/16/16 Erosion control features were removed from the site on 9/16/16. This view shows the area west of wetland #7.
Materials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationLocal Conditions-NE Minnesota
Local Conditions-NE Minnesota Identifying Regional Stormwater Challenges Selecting BMPs for our area Experience & observations from MNDOT & MPCA BMPs that work / don t work in NE Minnesota Local Conditions-NE
More informationSelected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University
Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices
More informationConverse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services
Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 27, 2017 Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management
More informationAgenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections
Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental
More information**Temporary Erosion Control**
Construction operations And methods **Temporary Erosion Control** The test will more than likely just have a basic word problem dealing with Erosion control, if it has anything on the test. So just review,
More informationCulvert and Pipe Phasing
Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report
More informationU-Shaped Sediment Traps
U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally
More informationGuide to the use of the Erosion and Sediment Control Evaluation Tool
Guide to the use of the Erosion and Sediment Control Evaluation Tool December 2017 If you require content in an alternate format please contact us at 905-895-1281 or by email at Accessibility@LSRCA.on.ca
More informationCONSTRUCTION EXIT SEDIMENT BARRIER
241428_itizen ield Guide_v3 2/22/06 11:09 M Page 1 (1,1) ONSTRUTION EXIT stone pad located where traffic leaves a construction site to eliminate the transport of soil to public streets. SEDIMENT BRRIER
More informationOctober 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402
October 26, 2017 Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402 Re: Soo Line Dump Site 2017 Annual Soil Cover Inspection Dear Aimee: The purpose of this letter
More information1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,
Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER
More informationJanuary 17, 2008 File:
January 17, 2008 File: 15-85-73 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)
More informationSTREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT
STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology
More informationThe results of KCB s site inspection observations and our recommendations for further work are presented herein.
July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited
More informationJanuary 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols:
January 16, 2019 Mr. Andrew Nichols Minnesota Pollution Control Agency Voluntary Investigation and Cleanup Program 520 Lafayette Road Saint Paul, Minnesota 55155 Re: Soo Line Dump Site 2018 Annual Soil
More informationContinuing Education Associated with Maintaining CPESC and CESSWI Certification
Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program
More informationAPPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013
APPENDIX E GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2 Introduction Keystone Restoration Ecology (KRE) conducted geomorphological monitoring in
More informationDecember 11, 2006 File:
December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)
More informationDRAFT DRAFT DRAFT DRAFT DRAFT SEDIMENT CONTROLS Method Application Description BMP Sediment fencing Flat Ground Y Anywhere low flow runoff is Sloping Ground Y Geotextile fabric, buried at the bottom
More informationCASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia
CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia Brushy Fork Dam is a flood control structure built by the Soil Conservation Service southeast of the city of Franklin in Pendleton County, West
More informationArchaeology of East Oxford Project: Minchery Paddock 2012 Trench 1 Excavation Narrative report
Archaeology of East Oxford Project: Minchery Paddock 2012 Trench 1 Excavation Narrative report Julian Stern and Olaf Bayer Introduction & Summary Trench 1 was the northern most of three trenches excavated
More informationAPPENDIX B WORKSHEETS & EXHIBITS
APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions
More informationCCR Rule Annual Inspection Report (cont.) 2
The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that
More informationSediment Control Log (SCL)
Description A sediment control log is a linear roll made of natural materials such as straw, coconut fiber, or other fibrous material trenched into the ground and held with a wooden stake. Sediment control
More informationHusky Oil Operations Limited
Husky Oil Operations Limited 707 8th Avenue S.W. Bus: (403) 298-6111 Box 6525, Station D Fax: (403) 298-6378 Calgary, Alberta, Canada T2P 3G7 October 31, 2014 Sahtu Land &Water Board SLWB File: S13L1-005
More informationFebruary 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT
February 18, 2003 File: 15-76-11 Alberta Transportation Room 223, Provincial Building 4709 44 Avenue Stony Plain, Alberta T7Z 1N4 Attention: Mr. Rob Lonson, P.Eng. NORTH CENTRAL REGION LANDSLIDE ASSESSMENT
More informationProject Location: Usal Road, CR 431 Milepost 10 to 12, Sections 5& 8, T23N, R16W, HB&M
Five Counties Salmonid Conservation Program (5C) P.O. Box 2571 Weaverville, CA 96093-2571 (530) 623-3967 Ext. 111 FAX (530) 623-3979 email: mlancaster@5counties.org January 1, 2012 Summary Report Usal
More informationSediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.
Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff
More informationEROSION PREVENTION AND SEDIMENT CONTROL (EPSC) SPECIALIST INSPECTION REPORT
PROJECT NAME: Sheffield Wind DEC PERMIT NUMBER: EPSC SPECIALIST: DATE AND TIME OF INSPECTION: WEATHER CONDITIONS AT TIME OF INSPECTION: PERSONNEL PRESENT: Ryan Scott (VHB) 12/6/2010; Full Day Snowing.
More informationHow & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units
June 26, 2007: Low Impact Development 1 Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 24, 2012 How & Where does infiltration work? Summary of
More informationEast Branch Grand Calumet River Great Lakes Legacy Act Sediment Remediation and Restoration Project
East Branch Grand Calumet River Great Lakes Legacy Act Sediment Remediation and Restoration Project Jointly funded by the U.S. EPA Great Lakes Legacy Act, Indiana Department of Environmental Management
More informationWellsgate Terrace SPECIFICATIONS.
GRADING NOTES: 1. LOT GRADING SHALL BE COMPLETED TO PROVE SUFFICIENT DIRT ON EACH PAD TO ACHIEVE THE CRITICAL PAD GRADES AND SPOT GRADES ON EACH LOT. AFTER ACHIEVING CRITICAL PAD GRADES INDICATED ON THIS
More informationNRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:
WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation
More informationNRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:
WDFW CONTROL POINT #1 Re-Bar, Elevation Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 Spike in Tree Elevation = 102.95 Elevation
More informationThis report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.
Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site
More informationONE ROCK DAM ORD. capture more sediment. The original ORD becomes the splash apron for the new layer. STEP 4: When ORD fills in, add a new layer
ONE ROCK DAM ORD A low grade control structure built with a single layer of rock on the bed of the channel. ORDs stabilize the bed of the channel by slowing the flow of water, increasing roughness, recruiting
More informationEROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES. City of Moncton Engineering and Environmental Services
EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES City of Moncton Engineering and Environmental Services Revised March 2011 TABLE OF CONTENTS INTRODUCTION... 2 THE EROSION AND SEDIMENT CONTROL
More informationErosion and Sedimentation Basics
Erosion and Sedimentation Basics Coastal San Luis Resource Conservation District G.W. Bates, PE, CPESC Outline: 1. Terms & Concepts 2. Causes of Erosion 3. The Erosion/Sedimentation Process 4. Erosion
More informationAssessment. Assessment
2001 SPRINGBROOK CREEK RESTORATION - THREE YEAR POST-CONSTRUCTION REVIEW - Presented by Bruce Henderson and Andy Harris 2005 River Restoration Northwest Symposium Skamania Lodge, Washington www.hendersonlandservices.com
More informationAppendix C Benchmarking Cost Estimates
REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall
More informationM. Sloat, AAg., CPESC R.J. Redden, R.P.Bio., A.Sc.T., CPESC. EDI Environmental Dynamics Inc Continental Way Prince George, B.C.
OVERVIEW OF BEST PRACTICES FOR SURFACE EROSION PROTECTION AND SEDIMENT CONTROL FOR THE DEVELOPMENT PHASE OF SURFACE MINING FOR COAL IN NORTHEAST BRITISH COLUMBIA M. Sloat, AAg., CPESC R.J. Redden, R.P.Bio.,
More informationStormwater Inlet Sediment Traps
Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable
More informationSnead Pond Restoration
Snead Pond Restoration Project overview Location: Crewe, VA Date of Project: Summer 2016 Scope of work: Construction of check dam & hydraulic dredging of 530 cubic yards of in situ sediment utilizing geotubes
More informationB805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805
B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff
More informationRE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H
November 2, 2017 Rick Spicer Regulatory & Environmental Superintendent Operations BHP Billiton Petroleum, LLC Fayetteville Petroleum Unit 1686 Letona Rd Searcy, AR 72143 RE: AFIN: 23-00000 ADEQ Reference
More informationFOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP
AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment
More informationPermeable Treatment Wall Project
West Valley Demonstration Project West Valley Environmental Services Permeable Treatment Wall Project 20614_1 John Chamberlain May 26, 2010 West Valley Citizen Task Force Meeting West Valley Demonstration
More informationGround Penetrating Radar Survey Report: Follow-up Ground Truth Study
Ground Penetrating Radar Survey Report: Follow-up Ground Truth Study 2005 Tell es-safi/gath Archaeological Project Figure 1: Tell es-safi GPR ground-truth study. Data Acquired August 4, 2005 Report compiled
More informationAnalysis of Road Sediment Accumulation to Monumental Creek using the GRAIP Method
Analysis of Road Sediment Accumulation to Monumental Creek using the GRAIP Method Introduction (from http://www.neng.usu.edu/cee/faculty/dtarb/graip/#over): The Geomorphologic Road Analysis and Inventory
More informationTemplate for Sediment and Erosion Control Plan General Instructions. Section Instructions
Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery
More informationConstruction Exits Rock pads
Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor
More informationBedrock Associated with the Ranch House at the Tallgrass Prairie National Preserve, Chase County, Kansas
Bedrock Associated with the Ranch House at the Tallgrass Prairie National Preserve, Chase County, Kansas KGS OPEN-FILE REPORT 2008-10 KANSAS GEOLOGICAL SURVEY 1930 Constant Ave. - Campus West Lawrence,
More informationA p p l i c a t i o n D r a w i n g s : R e v i s i o n B Updated in response to submissions
: R e v i s i o n Updated in response to submissions C o n t e n t s 1. Existing Site Plan 2. Proposed Site Plan 3. Proposed Circulation Plan 4. Proposed uildings and Driveways 5. Proposed Vegetation Strategy
More informationGeosynthetics Applications and Performance Reviews Select Case Histories
Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,
More informationDecoding Topographic Maps
Name: Date: 1. Base your answer(s) to the following question(s) on the topographic map below and on your knowledge of Earth science. Letters A through F represent locations on the map. What is the contour
More informationBackground. Valley fills Sites in the Area. Construction over Mine Spoil Fills
Construction over Mine Spoil Fills Wayne A. Karem, PhD, PE, PG, D.GE 2014 KSPE Annual Conference Background Strip mining; mountaintop and contour mining Creates huge quantities of mine spoil The mine spoil
More informationTYPE YEAR PROJECT NO. SHEET NO. 4-203.02 D. TRANS ITIONAL MATERIALS TENNESSEE D.O.T. DESIGN DIVISION FILE NO. REPRESENTATIVE OF STATION 14+75 TO STATION 19+00 THIS MATERIAL IS THAT MATERIAL COMPRISED OF
More informationConstruction Exits Vibration grids
Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS
IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed
More informationStone Outlet Sediment Trap
3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose
More informationISSUED FOR CONSTRUCTION
PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite
More informationFranklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation
2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,
More informationX X X X X X X X. Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist
Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist Name of Permittee: Rock Koshkonong Lake District (RKLD) Construction Site (Project) Name: Lake Koshkonong
More informationSHADOW STUDY REPORT REGARDING
SHADOW STUDY REPORT REGARDING an APPLICATION TO REDEVELOP Three 6 Storey Condominiums Regional Road 25 (Ontario Street) and Britannia Road Milton, Ontario KNYMH FILE # 17030 Prepared by: Krista Lilley
More informationWhy Geomorphology for Fish Passage
Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the
More informationAcronyms. Section 10. Acronyms, Glossary and Bibliography. Following is a list of acronyms used in this Manual:
Acronyms Following is a list of acronyms used in this Manual: APEN Air Pollutant Emission Notice ASTM American Society of Testing Materials BMP Best Management Practice CB Compost Blanket CD Check Dam
More informationENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )
PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS
More informationMEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel
TO... J. C. Foweraker 2... Head Gr o w a t er S e c t i on... Hyar....og~~~.~.~vis.ion... wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... eernment OF BRITISH COLUMBIA MEMORANDUM II 0 PROM A. P. Kohut, Geological
More informationAPPENDIX B: REPORT ON GEOPHYSICAL SURVEY, JULY 1998
APPENDIX B: REPORT ON GEOPHYSICAL SURVEY, JULY 1998 by Andy Payne Introduction A geophysical survey was carried out at Le Yaudet, Ploulec h, Brittany as part of the ongoing investigation into the archaeology
More informationTPDES: Soil, Erosion and Sedimentation Methods
SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common
More informationELECTRICAL RESISTIVITY SURVEY OF INTREPID POTASH INJECTION WELL SITE: EDDY COUNTY, NEW MEXICO
NCKRI REPORT OF INVESTIGATION 3 ELECTRICAL RESISTIVITY SURVEY OF INTREPID POTASH INJECTION WELL SITE: EDDY COUNTY, NEW MEXICO www.nckri.org NATIONAL CAVE AND KARST RESEARCH INSTITUTE REPORT OF INVESTIGATION
More informationPrepared By: John Blair Sean Donahue Celeste Hoffman Kimberly Klinkers Megan Slater
Prepared By: John Blair Sean Donahue Celeste Hoffman Kimberly Klinkers Megan Slater Green River Basin Location Green River Basin Stratigraphic Correlation Chart showing Study Map Units Sample of Existing
More informationTom Blackman Project Lead. Mékell Mikell Communications Representative
Sediment Cleanup Middle River Complex, 2016-17 Season 1 Project Photo Tour Updated November 15, 2016 Tom Blackman Project Lead Mékell Mikell Communications Representative 1 Sediment Cleanup - Season 1
More informationSWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING
SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 9 NOVEMBER 13 TH TO NOVEMBER 17 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1
More informationChapter 3 Erosion in the Las Vegas Wash
Chapter 3 Erosion in the Las Vegas Wash Introduction As described in Chapter 1, the Las Vegas Wash (Wash) has experienced considerable change as a result of development of the Las Vegas Valley (Valley).
More information1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8
August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013
More informationErosion and Sediment Control Measures 2.7 Silt Fences
Erosion and Sediment Control Measures Silt fences are designed to intercept sheet flow sediment laden stormwater run-off and filter out both the larger and smaller particles of sediment. Silt fences and
More informationSediment and Erosion Control Techniques on Stream Restoration Projects
Sediment and Erosion Control Techniques on Stream Restoration Projects D. R. Clinton, G. D. Jennings, R. A. McLaughlin, D. A. Bidelspach 1 ABSTRACT Erosion control, sediment loss and turbidity control
More informationTopographic Maps and Profiles
Name: Date: Period: Earth Science Foundations The Physical Setting: Earth Science CLASS NOTES! Topographic Maps [contour maps] -! Topographic maps show three-dimensional shapes in two dimensions Elevation
More informationHUDSON BAY MINING AND SMELTING CO., LIMITED FLIN FLON TAILINGS IMPOUNDMENT SYSTEM. Dust Control Guidelines
HUDSON BAY MINING AND SMELTING CO., LIMITED FLIN FLON TAILINGS IMPOUNDMENT SYSTEM Dust Page 1 of 10 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 DEFINITIONS OF TERMINOLOGY... 3 3.0 METHODS OF DUST CONTROL...
More informationa) Piedmont: e) Monument: f) Plateau: g) Mesa: h) Butte: i) Playa: j) Perennial Stream:
Name: Lab day: Tuesday Wednesday CEEES/SC 10110L-20110L Planet Earth Laboratory Laboratory #11: Arid Environments & Landforms Readings: See handout at http://www.nd.edu/~cneal/physicalgeo/lab-deserts/index.html.
More informationBlack Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget
Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration
More informationRock & Aggregate Drop Inlet Protection
Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils
More informationTrawsfynydd, Gwynedd
949 Tomen y Mur: Trawsfynydd, Gwynedd Archaeological Survey and Record GAT Project No. 2190 Report No. 949 May, 2011 Ymddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust Craig Beuno, Ffordd
More information20217 CLEAR STONE TON $14.20 $5, $ $ $ %
ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON
More informationSediment Trap. At multiple locations within the project site where sediment control is needed.
Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control
More informationTemplate for Sediment and Erosion Control Plan General Instructions
Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery
More informationStormwater Outlet Sediment Traps
Stormwater Outlet Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Excavated sediment trap just prior to scheduled clean-out (note energy dissipater at end of pipe) Photo 2 A supplementary straw bale barrier
More informationAPPENDIX A M&T/Llano Seco Long-Term Water Reliability Study These photos are examples of rock spurs in use throughout the United States
APPENDIX A M&T/Llano Seco Long-Term Water Reliability Study These photos are examples of rock spurs in use throughout the United States Glenn Colusa Irrigation District completed a Sacramento River project
More informationPOLICY MANUAL. Hamlets/Residential named hamlets within the County of Grande Prairie whose roads are hard surfaced.
POLICY MANUAL Legal References: Policy department: Public Works Department Cross References: N7 Adoption Date: January 19, 2005 Revision Date: June 20, 2005 Motion# 06/662/2005 October 20, 2014 Motion#
More informationATTACHMENT D SNOW REMOVAL AND DE-ICING PROCEDURES
Interstate Reliability Project 345-kV Transmission Lines Development & Management Plan Volume 2 ATTACHMENT D SNOW REMOVAL AND DE-ICING PROCEDURES INTERSTATE RELIABILITY PROJECT The Interstate Reliability
More informationConverse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services
Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North
More informationSOLUT TO AUGUST 25 T SPREAD 7 AUGUST 20 TH
MANITOBA METIS FEDER ATION MATRIX SOLUT IONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 7 AUGUST 20 TH TO AUGUST 25 T T H 1 1. PURPOSE OF THIS REPORT The report is a weekly
More informationShoreline and Climate Change Adaptation Alternatives for The Letter Parcel, Bolinas Lagoon
Shoreline and Climate Change Adaptation Alternatives for The Letter Parcel, Bolinas Lagoon Scenic shoreline vista of Bolinas Lagoon and ridges, from Letter Parcel, March 2016 Peter Baye, Coastal Ecologist
More information5.5 GEOLOGY/SOILS EXISTING CONDITIONS. Regulatory Setting
5.5 GEOLOGY/SOILS This section describes existing environmental conditions related to geology and soils in the project area, including W-19, the disposal site, and beach placement sites proposed as part
More informationLocation Restriction Demonstration
Location Restriction Demonstration R.M. Heskett Station Coal Ash Landfill Prepared for Montana-Dakota Utilities Company October 2018 Minneapolis, MN, Bismarck, ND Location Restrictions Demonstration October
More informationSpecifications Whitcomb Elementary School Demolition January 15, 2016
SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,
More informationAssignment 1. Measuring River Characteristics- Vernon Creek. Applied Fluvial Geomorphology Field Techniques EESc 435
Assignment 1 Measuring River Characteristics- Vernon Creek Applied Fluvial Geomorphology Field Techniques EESc 435 Amanda Jardine 30100093 Jaime McDonald 14177083 Erica Massey 50870088 April 28, 2012 Introduction
More informationApproximately how many inches of average yearly precipitation does Rochester, New York, receive?
1. Base your answer to the following question on the isoline map below, which shows the average yearly precipitation, in inches, across New York State. Approximately how many inches of average yearly precipitation
More information