Husky Oil Operations Limited

Size: px
Start display at page:

Download "Husky Oil Operations Limited"

Transcription

1 Husky Oil Operations Limited 707 8th Avenue S.W. Bus: (403) Box 6525, Station D Fax: (403) Calgary, Alberta, Canada T2P 3G7 October 31, 2014 Sahtu Land &Water Board SLWB File: S13L1-005 Box 1 MWH File: Fort Good Hope, XOE OHO Attention: Bakhtiyor Mukhammadiev, Regulatory Specialist Re: Husky Oil Operations Limited 2014 Summer Site Inspection Report for Water Licence S13L1-005 (Slater River Wellsites and Groundwater Wells) Please consider the following information in response to the requirements outlined under the Terms and Conditions of the Husky Oil Operations Limited (Husky) Water Licence S13L Part B, Subpart 2(fl of the Terms and Conditions states that the Licensee shall submit to the Board, the Annual Summer Site Inspection report, detailing the results of the inspection as set out in Part E, Conditions Applying to Closure and Reclamation, sub-parts (1) to (5) inclusive. Northern EnviroSearch (Tulita) Ltd. (NESTL) was retained by Husky to conduct the Summer Site Inspections (SSI) and prepare a summary of their findings. Site photographs for the Slater River wellsites and monitoring (groundwater and thermistor) wells are attached. The Slater River SSI was conducted on September 16 and September 20, 2014 under mild, dry weather conditions (temperatures averaged C). Little Bear N-9 Wellsite (N64 58' 55.4", W126 31' 26.9") The N-9 wellsite is 23 km from the Government of Northwest Territories (GNWT) winter road and was constructed and drilled during the winter of 2011/2012. The site was cleared of trees using a D6 bulldozer. The bulldozer blades were elevated to reduce the potential for disturbance to the vegetative ground cover and the brush piles were mulched and spread over the lease. The winter access crosses through the centre of the wellsite and there is also asemi-circle detour around the wellsite required for non-wellsite traffic. Operational space on the lease was leveled using a snow and ice pad and minimal disturbance techniques. The well was shut in at the end of the drilling program and all surface equipment was removed. The chained well head and guard rail remain onsite. A permanent metal post with the well identification placard was installed on the well ground. In summer 2012, Husky conducted atwo-day garbage and debris clean-up of the N-9 site. During the winter of 2012/2013, Husky conducted completion activities. The well was shut in at the end of the 2012/203 completions program. A second clean-up of garbage and debris was completed during the summer of 2013.

2 Sahtu Land &Water Board 2014 SSI Report Water Licence S13L1-005 Bakhtiyor Mukhammadiev Husky Oil Operations Limited October 31, 2014 Page 2 of 4 The following items were noted during the 2014 inspection (Photographs 1 to 7): The wellhead was chained and securely locked and all gauges showed no pressure; Standing water was present inside the well cellar; The lease pad was spongy in some areas, but standing water was not observed and natural drainage on the lease seemed undisturbed; New vegetation and signs of regrowth were observed, including on the access road; No erosion or operational impacts were observed at this site; and, Mulched woody debris spread across the lease has provided a measure of erosion control and protection of the underlying ground cover (muskeg) from significant scalping or rutting. Actions Minor trash clean-up was conducted during the site inspection. Recommendation No additional actions are recommended at this time. The site will be inspected again in the summer of Little Bear H-64 Wellsite (N63 53' 28.7", W126 11' 26.9") The H-64 wellsite is approximately 23 km from the N-9 wellsite and was constructed and drilled during the winter of 2011/2012. The site was cleared of trees using a mulcher and the material was spread over the lease. Operational space on the lease was leveled using a snow and ice pad and minimal disturbance techniques. The well was shut in at the end of the drilling program and all surface equipment was removed. The chained well head and guard rail remain onsite. A permanent metal post with the well identification placard was installed on the guard rail. In the summer of 2012, Husky conducted atwo-day garbage and debris clean-up of the H-64 site. During the winter of 2012/2013, Husky conducted completion activities. The well was shut in at the end of the 2012/2013 completions program. A second clean-up of garbage and debris was completed during the summer of The following items were noted during the 2014 summer site inspection (Photographs 8 to 14): The well head was chained and securely locked and all gauges showed no pressure; Minor amounts of garbage and debris were removed from the site; Standing water was present inside the well cellar; New vegetation and signs of regrowth were observed, including on the access road; No erosion or operation impacts were observed at this site; and, Mulched woody debris spread across the lease has provided a measure of erosion control and protection of the underlying ground cover (muskeg) from significant scalping and rutting.

3 Sahtu Land &Water Board 2014 SSI Report Water Licence S13L1-005 Bakhtiyor Mukhammadiev Husky Oil Operations Limited October 31, 2014 Page 3 of 4 Actions Minor trash clean-up was conducted during the site inspection. Recommendations No additional actions are recommended at this time. The site will be inspected again in the summer of Little Bear G-70 Wellsite (N64 59' 28.3", W126 27' 162") The G-70 wellsite has not been cleared and no drilling activities have occurred Wellsite (N65 0' W126 23' ') The original 0-41 well lease area of 130 m x 200 m (2.6 hectares) was cleared however the 0-41 well was not drilled. The 0-41 well lease area is approved under WL S13L1-006 to be converted into a storage area. The proposed 0-41 location was inspected by air during the spring inspection and via foot during the fall inspection. For details of the inspection please refer to the 2014 Semi-Annual Site Inspection Report under WL S13L Monitoring Wells (Groundwater and Permafrost) Inspection of the permafrost monitoring and groundwater wells were included in the 2014 inspection: MW-01B & MW-01T MW-04T (N64 29' 30.6' W126 19" 59.4') MW-09A/B & MW-09T (N64 53' 20.8" W126 11' 39.6) MW-11T MW-12T MW-16T MW-17T MW-19B & MW-19T The following items were noted during the 2014 summer site inspection (Photographs 15 to 30): Wells were marked with red flags; Subsidence of abandoned well was evident at MW-19 (Photograph 30); No signs of erosion were observed on any of the well sites which had been drilled; and, New vegetation and signs of regrowth were observed, including on the access. Actions No actions were taken during the inspection. Recommendation Areas where subsidence was observed should be filled in, preferably with native material on site, if available.

4 Sahtu Land &Water Board Bakhtiyor Mukhammadiev October 31, SSI Report Water Licence S13L1-005 Husky Oil Operations Limited Paae 4 of 4 These sites will be inspected again in the summer of trust this meets the information requirements for the annual Summer Site Inspection report under Water Licence S13L If you have any questions, please contact the undersigned at (403) or by (Ken.Hansen(a~huskvenergy.com). Regards, HUSKY OIL OPERATIONS LIMITED. ~ Ken Hansen Project Manager -NWT cc: Katherine Ades Water Resource Officer, GNWT-ENR Stephen Deschene A/Regional Superintendent, GNWT-Lands Darren Heck Environmental Project Manager, NESTL Jenica von Kuster Environmental and Regulatory Coordinator -NWT, Husky Attach: 1. Site photographs

5 Photograph ID: 1 Little Bear N-9 Well Site East Aerial view of the N-9 Well Site. Photograph ID: 2 Little Bear N-9 Well Site Southwest View from the northern corner looking SW. Page 1 of 15

6 Photograph ID: 3 Little Bear N-9 Well Site Northeast View from the N-9 lease area north along the winter access route. Photograph ID: 4 Little Bear N-9 Well Site Northwest View from the eastern corner of the site towards the north. Page 2 of 15

7 Photograph ID: 5 Little Bear N-9 Well Site Northeast View from the southern corner of the site towards the NE. Photograph ID: 6 Little Bear N-9 Well Site South View from the N-9 lease area south along the winter access route. Page 3 of 15

8 Photograph ID: 7 Little Bear N-9 Well Site North View of the N-9 well head. Well head was chained and locked. Photograph ID: 8 Little Bear H-64 Well Site West Aerial view of the H-64 Well Site. Page 4 of 15

9 Photograph ID: 9 Little Bear H-64 Well Site South View from the northern corner of the site looking towards the south and access route to MW-19. Photograph ID: 10 Little Bear H-64 Well Site West View from the eastern corner of the site looking towards the west. Page 5 of 15

10 Photograph ID: 11 Little Bear H-64 Well Site North View from the southern corner of the site looking towards the north. Photograph ID: 12 Little Bear H-64 Well Site East View from the western corner of the site looking towards the east. Page 6 of 15

11 Photograph ID: 13 Little Bear H-64 Well Site South View of the H-64 well head signage. Photograph ID: 14 Little Bear H-64 Well Site South View of the H-64 well head. Well head was chained and locked. Page 7 of 15

12 Photograph ID: 15 Monitoring Well MW-04T West View of the MW-04T thermistor monitoring location. All wells were sign posted and flagged. Photograph ID: 16 Monitoring Well MW-12T East View from the SW corner looking east along the access route. Page 8 of 15

13 Photograph ID: 17 Monitoring Well MW-12T Northeast View from the SE corner looking towards the NE corner of the MW-12T well pad. A small clearing was observed adjacent to the MW-12T area. Photograph ID: 18 Monitoring Well MW-12T Moose rutting area observed adjacent to the MW-12T well pad. Page 9 of 15

14 Photograph ID: 19 Monitoring Well MW-12T West View from the NE corner looking towards the NW corner of the site. Photograph ID: 20 Monitoring Well MW-12T Southwest View of the thermistor monitoring location MW-12T from the NE corner. Page 10 of 15

15 Photograph ID: 21 Monitoring Well MW-17T Northeast View from the southern corner looking NE along the access route. Photograph ID: 22 Monitoring Well MW-17T Southeast View of the thermistor monitoring location MW-17T from the western corner looking across the site towards the SE. Page 11 of 15

16 Photograph ID: 23 Monitoring Well MW-17T South View from the northern corner looking south. Photograph ID: 24 Monitoring Well MW-17T Southwest View from the eastern corner looking SW along the access route Page 12 of 15

17 Photograph ID: 25 Monitoring Well MW-19 Northeast Aerial view of the MW-19 well. Photograph ID: 26 Monitoring Well MW-19 North View from the southern corner looking across the well pad towards the north. Page 13 of 15

18 Photograph ID: 27 Monitoring Well MW-19 Southeast View from the western corner looking towards the southern corner of the site. Photograph ID: 28 Monitoring Well MW-19 South View from the northern corner looking across the well pad towards the south. Page 14 of 15

19 Photograph ID: 29 Monitoring Well MW-19 West View from the eastern corner looking towards the northern corner. Photograph ID: 30 Monitoring Well MW-19 Southwest Subsidence of the ground was observed in the centre of the MW-19 well pad. Page 15 of 15

RE: W2013C0005 Submission of Final Plan for Exploration Land Use Permit, Ekati Diamond Mine, NT

RE: W2013C0005 Submission of Final Plan for Exploration Land Use Permit, Ekati Diamond Mine, NT Dominion Diamond Ekati ULC 900-606 4 Street SW (403) 910-1933 Calgary, Alberta T2P 1T1 (403) 910-1934 fax www.ddmines.com 17 December, 2018 Joseph Mackenzie Chair Wek èezhìi Land and Water Board #1, 4905-48

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

RE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H

RE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H November 2, 2017 Rick Spicer Regulatory & Environmental Superintendent Operations BHP Billiton Petroleum, LLC Fayetteville Petroleum Unit 1686 Letona Rd Searcy, AR 72143 RE: AFIN: 23-00000 ADEQ Reference

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

August 10, 2007 File:

August 10, 2007 File: August 10, 2007 File: 15-85-72 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, AB T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL AREA)

More information

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25 ± DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N1\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131207.MXD N1-S11 Tower 10 E-723206, N-6272609 N1-Soils-154

More information

January 17, 2008 File:

January 17, 2008 File: January 17, 2008 File: 15-85-73 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

73-2 have been satisfied; and

73-2 have been satisfied; and RESOLUTION NO. R- 86-104 W'dEREAS, the Board of County Commissioners, as the governing body, pursuant to the authority vested in Chapter 163 and Chapter 125, Florida Statutes, is authorized and empowered

More information

The results of KCB s site inspection observations and our recommendations for further work are presented herein.

The results of KCB s site inspection observations and our recommendations for further work are presented herein. July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited

More information

Tłı chǫ All-season Road Archaeological Site Chance Find Protocol

Tłı chǫ All-season Road Archaeological Site Chance Find Protocol Tłı chǫ All-season Road Archaeological Site Chance Find Protocol Insert applicable LWB project numbers Version 1 Revision History REVISION HISTORY Version Date Notes/Revisions 1 Original version of plan

More information

SHADOW STUDY REPORT REGARDING

SHADOW STUDY REPORT REGARDING SHADOW STUDY REPORT REGARDING an APPLICATION TO REDEVELOP Three 6 Storey Condominiums Regional Road 25 (Ontario Street) and Britannia Road Milton, Ontario KNYMH FILE # 17030 Prepared by: Krista Lilley

More information

September 3, 2009 File: NORTH CENTRAL REGION GEOHAZARD ASSESSMENT HWY 40:28 NORTH OF CADOMIN (NC50) 2009 ANNUAL INSPECTION REPORT

September 3, 2009 File: NORTH CENTRAL REGION GEOHAZARD ASSESSMENT HWY 40:28 NORTH OF CADOMIN (NC50) 2009 ANNUAL INSPECTION REPORT GEOTECHNICAL ENVIRONMENTAL MATERIALS September 3, 2009 File: 15-16-226 Alberta Transportation 2 nd Floor, Provincial Building 111 54 Street Edson, Alberta T7E 1T2 Attention: Mr. Cliff Corner NORTH CENTRAL

More information

¾À 280. ESS Features Heritage. Points of Access* !( Proposed Access Point. !( Archaeological Water. Major Stream Crossing Abandoned Rail Crossing # #

¾À 280. ESS Features Heritage. Points of Access* !( Proposed Access Point. !( Archaeological Water. Major Stream Crossing Abandoned Rail Crossing # # ± DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N1\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131207.MXD 386 N1-S30 385 BURNTWOOD RIVER Coordinate System:

More information

OBSERVATIONS OF PERMAFROST-LANDSCAPE DYNAMICS RELATED TO ANTHROPOGENIC DISTURBANCES, YUKECHI STUDY SITE, CENTRAL YAKUTIA

OBSERVATIONS OF PERMAFROST-LANDSCAPE DYNAMICS RELATED TO ANTHROPOGENIC DISTURBANCES, YUKECHI STUDY SITE, CENTRAL YAKUTIA OBSERVATIONS OF PERMAFROST-LANDSCAPE DYNAMICS RELATED TO ANTHROPOGENIC DISTURBANCES, YUKECHI STUDY SITE, CENTRAL YAKUTIA A.N. Fedorov, P.Ya. Konstantinov, I.S. Vassiliev, N.P. Bosikov, Ya.I. Torgovkin,

More information

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402 October 26, 2017 Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402 Re: Soo Line Dump Site 2017 Annual Soil Cover Inspection Dear Aimee: The purpose of this letter

More information

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81 ± DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N2\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131201.MXD 196 Coordinate System: UTM Zone NAD83 Data Source:

More information

Third Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE

Third Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE 1) Project Overview Third Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE-2007-1130 December 15, 2014 This is the third year of a five year monitoring program

More information

Photographic Log. Photo No. 1. Date: 10/27/15. Direction Photo Taken: Southwest. Photo Taken By: JBH1

Photographic Log. Photo No. 1. Date: 10/27/15. Direction Photo Taken: Southwest. Photo Taken By: JBH1 1 Southwest 10/27/15 Looking southwest on Copper Park Lane viewing clearing and grubbing of area south of Copper Park Lane prior to excavation. 2 Southeast 10/29/15 Looking southeast at the sump and pump

More information

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT February 18, 2003 File: 15-76-11 Alberta Transportation Room 223, Provincial Building 4709 44 Avenue Stony Plain, Alberta T7Z 1N4 Attention: Mr. Rob Lonson, P.Eng. NORTH CENTRAL REGION LANDSLIDE ASSESSMENT

More information

Second Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE

Second Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE 1) Project Overview Second Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE-2007-1130 December 13, 2013 This is the second year of a five year monitoring program

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

Crows Landing Naval Base Easement

Crows Landing Naval Base Easement 1 of 15 West Stanislaus Resource Conservation District Crows Landing Naval Base Easement Annual Reserve Monitoring Report Jamie McFarlin 11/112012 2 of 15 West Stanislaus Resource Conservation District

More information

January 12, 2006 File:

January 12, 2006 File: January 12, 2006 File: 15-85-13 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL

More information

X X X X X X X X. Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist

X X X X X X X X. Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist Name of Permittee: Rock Koshkonong Lake District (RKLD) Construction Site (Project) Name: Lake Koshkonong

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

NIDIS Intermountain West Drought Early Warning System February 12, 2019

NIDIS Intermountain West Drought Early Warning System February 12, 2019 NIDIS Intermountain West Drought Early Warning System February 12, 2019 Precipitation The images above use daily precipitation statistics from NWS COOP, CoCoRaHS, and CoAgMet stations. From top to bottom,

More information

GEOSYNTEC CONSULTANTS

GEOSYNTEC CONSULTANTS GEOSYNTEC CONSULTANTS 2100 Main Street, Suite 150 Huntington Beach, CA 92648 USA Tel (714) 969-0800 Fax (714) 969-0820 15 February 2006 Ms. Tamara Zeier, P.E. Project Manager Project Navigator, Ltd. One

More information

NIDIS Intermountain West Drought Early Warning System April 18, 2017

NIDIS Intermountain West Drought Early Warning System April 18, 2017 1 of 11 4/18/2017 3:42 PM Precipitation NIDIS Intermountain West Drought Early Warning System April 18, 2017 The images above use daily precipitation statistics from NWS COOP, CoCoRaHS, and CoAgMet stations.

More information

NIDIS Intermountain West Drought Early Warning System September 4, 2018

NIDIS Intermountain West Drought Early Warning System September 4, 2018 NIDIS Drought and Water Assessment NIDIS Intermountain West Drought Early Warning System September 4, 2018 Precipitation The images above use daily precipitation statistics from NWS COOP, CoCoRaHS, and

More information

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),

More information

TABLE OF CONTENTS LIST OF TABLES. Page

TABLE OF CONTENTS LIST OF TABLES. Page TABLE OF CONTENTS Page 11.0 EFFECTS OF THE ENVIRONMENT ON THE PROJECT... 11-1 11.1 Weather Conditions... 11-1 11.2 Flooding... 11-2 11.3 Forest Fires... 11-2 11.4 Permafrost and Subsidence Risk... 11-3

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 17, 2018 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0337367 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

CHAPTER 7 GEOLOGY AND SOILS

CHAPTER 7 GEOLOGY AND SOILS CHAPTER 7 GEOLOGY AND SOILS 7.1 General Geology of the Area Based on the Geological map compiled by Cornec (2002) the area consists of Miocene/Pleistocene deposits as seen in figure 7.1. These are geologically

More information

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Cambridge International Examinations Cambridge International General Certificate of Secondary Education Cambridge International Examinations Cambridge International General Certificate of Secondary Education *4694696559* GEOGRAPHY 0460/23 Paper 2 October/November 2015 Candidates answer on the Question Paper.

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Climate Change Adaptation

Climate Change Adaptation Climate Change Adaptation Adriána Hudecz, Technical University of Denmark ROADEX Final Seminar Rovaniemi, 25 April 2012 Climate Change Adaptation Outline: 1. Background/global climate change 2. Climate

More information

CALL FOR NOMINATIONS CENTRAL MACKENZIE VALLEY

CALL FOR NOMINATIONS CENTRAL MACKENZIE VALLEY 2011-2012 CALL FOR NOMINATIONS CENTRAL MACKENZIE VALLEY Closing at 4 P.M. (EST) on January 31, 2012 2011-2012 Call for Nominations CENTRAL MACKENZIE VALLEY Closing date: January 31, 2012 TABLE OF CONTENTS

More information

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE PUBLIC WORKS CANADA HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE KILOMETRE 207.9, LIARD HIGKWAY December 1978 I I f I I I I # Bolter Parish Trimble Ltd. ONLIULTINO Public Works, Canada, 9925-109 Street,

More information

Illinois Drought Update, December 1, 2005 DROUGHT RESPONSE TASK FORCE Illinois State Water Survey, Department of Natural Resources

Illinois Drought Update, December 1, 2005 DROUGHT RESPONSE TASK FORCE Illinois State Water Survey, Department of Natural Resources Illinois Drought Update, December 1, 2005 DROUGHT RESPONSE TASK FORCE Illinois State Water Survey, Department of Natural Resources For more drought information please go to http://www.sws.uiuc.edu/. SUMMARY.

More information

Drilling & Fracking a well near Grass River: Notes from an informal conversation with O.I.L. Energy

Drilling & Fracking a well near Grass River: Notes from an informal conversation with O.I.L. Energy Torch, Clam, & Bellaire Lakes www.3lakes.com Drilling & Fracking a well near Grass River: Notes from an informal conversation with O.I.L. Energy Dean Branson and Gary Knapp, June 26, 2014 Given that Michigan

More information

TESTING FUNCTIONAL RESTORATION OF LINEAR FEATURES PHASE I PROGRESS REPORT WITHIN BOREAL CARIBOU RANGE

TESTING FUNCTIONAL RESTORATION OF LINEAR FEATURES PHASE I PROGRESS REPORT WITHIN BOREAL CARIBOU RANGE TESTING FUNCTIONAL RESTORATION OF LINEAR FEATURES WITHIN BOREAL CARIBOU RANGE PHASE I PROGRESS REPORT Craig DeMars, Ph.D., Department of Biological Sciences, University of Alberta, and Alberta Biodiversity

More information

CITY OF MINOT SNOW REMOVAL PLAN October 2018

CITY OF MINOT SNOW REMOVAL PLAN October 2018 CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

5.2 APPENDIX D2 Geotechnical Report Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development ILINGE AND LESSEYTON CEMETERY DEVELOPMENT - GEOTECHNICAL INVESTIGATION FINAL REPORT SEPTEMBER 2014

More information

Tropical Moist Rainforest

Tropical Moist Rainforest Tropical or Lowlatitude Climates: Controlled by equatorial tropical air masses Tropical Moist Rainforest Rainfall is heavy in all months - more than 250 cm. (100 in.). Common temperatures of 27 C (80 F)

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review

More information

CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015

CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

Major Point/Area Sources Name Type Major Emissions Distance (m) Direction CFB Cold Lake Air Force Base NOx, PM, HC, TRS 3km to aircraft West

Major Point/Area Sources Name Type Major Emissions Distance (m) Direction CFB Cold Lake Air Force Base NOx, PM, HC, TRS 3km to aircraft West Page 1 of 11 Site Documentation: Cold Lake South Continuous Monitoring Station General Site Information Item Description Site ID (CASA ID) LICA01 Station Name Cold Lake South Continuous Monitoring Station

More information

CITY OF MINOT SNOW REMOVAL PLAN November 2017

CITY OF MINOT SNOW REMOVAL PLAN November 2017 CITY OF MINOT SNOW REMOVAL PLAN November 2017 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

APPENDIX N View Impact & Shadow Analysis

APPENDIX N View Impact & Shadow Analysis Permit Application Document TABLE OF CONTENTS 1.0 VIEW IMPACT ANALYSIS... 2 1.1 Overview... 2 1.2 View Impact Assessment Methodology... 2 1.3 Site Description... 3 1.4 Comparative Structure Heights...

More information

2013 GEOLOGICAL ASSESSMENT REPORT SHERIDAN HILL PROPERTY

2013 GEOLOGICAL ASSESSMENT REPORT SHERIDAN HILL PROPERTY 2013 GEOLOGICAL ASSESSMENT REPORT ON THE SHERIDAN HILL PROPERTY NEW WESTMINSTER MINING DIVISION BRITISH COLUMBIA NTS 092G07 49 16 31 NORTH LATITUDE, 122 39 48 WEST LONGITUDE PREPARED FOR Sheridan Hill

More information

Template for Sediment and Erosion Control Plan General Instructions

Template for Sediment and Erosion Control Plan General Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Memorandum. Air Sampling

Memorandum. Air Sampling Memorandum TO: David Yelton, City of Beverly Hills DATE: December 8, 2015 CC: Heidi Rous, PCR Services FROM: Everest Yan and Audrey Vinant Tang, PCR Services RE: BEVERLY HILLS ARSENIC MONITORING MEMO This

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.

More information

Administration of Mineral Rights

Administration of Mineral Rights Administration of Mineral Rights Deborah Archibald Industry, Tourism and Investment, GNWT Malcolm Robb Aboriginal Affairs and Northern Development Canada Business Today How applications are being treated

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

The weather in Iceland 2012

The weather in Iceland 2012 The Icelandic Meteorological Office Climate summary 2012 published 9.1.2013 The weather in Iceland 2012 Climate summary Sunset in Reykjavík 24th April 2012 at 21:42. View towards west from the balcony

More information

NWS FORM E-5 U.S. DEPARTMENT OF COMMERCE I HYDRO SERVICE AREA NOAA, NATIONAL WEATHER SERVICE I Indianapolis, IN MONTHLY REPORT

NWS FORM E-5 U.S. DEPARTMENT OF COMMERCE I HYDRO SERVICE AREA NOAA, NATIONAL WEATHER SERVICE I Indianapolis, IN MONTHLY REPORT NWS FORM E-5 U.S. DEPARTMENT OF COMMERCE I HYDRO SERVICE AREA NOAA, NATIONAL WEATHER SERVICE I Indianapolis, IN. 1-------------------- MONTHLY REPORT OF RIVER AND FLOOD CONDITIONSI REPORT FOR I November

More information

Observations on Surface Water in the Seminary Fen in Spring, Prepared 6/4/13 by Sam Wetterlin; updated 7/28/13

Observations on Surface Water in the Seminary Fen in Spring, Prepared 6/4/13 by Sam Wetterlin; updated 7/28/13 Observations on Surface Water in the Seminary Fen in Spring, 2013 Prepared 6/4/13 by Sam Wetterlin; updated 7/28/13 Ordinarily, a calcareous fen is primarily dependent on upwelling mineral-rich, oxygen-poor

More information

Introducti on. Land Survey. Geomagnetic Survey. Geomagnetic Results and Interpretati ons - Conclusions and Recommendations C

Introducti on. Land Survey. Geomagnetic Survey. Geomagnetic Results and Interpretati ons - Conclusions and Recommendations C m M 42A86SW8281 63.42 PRICE 010 C O H T E H l 42A86SW828I 63.42 PRICE 010C Introducti on Land Survey Geomagnetic Survey Geomagnetic Results and Interpretati ons - Conclusions and Recommendations - - -

More information

Grade. Why are maps useful? What do maps tell us?

Grade. Why are maps useful? What do maps tell us? ACTIVITY 2.1 Follow That DART Bus! DETAILS TYPE Whole-group TIME 20 minutes plus 20 minutes homework (40 minutes total) PRINTED MATERIALS Handouts (Reading A Map, Follow that DART Bus! map and Follow that

More information

[LLAZC X.L EA0000; AZ SRP ] Notice of Temporary Closures: Selected Public Lands in La Paz County, AZ

[LLAZC X.L EA0000; AZ SRP ] Notice of Temporary Closures: Selected Public Lands in La Paz County, AZ This document is scheduled to be published in the Federal Register on 12/29/2017 and available online at https://federalregister.gov/d/2017-28217, and on FDsys.gov 4310-32 DEPARTMENT OF THE INTERIOR Bureau

More information

January 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols:

January 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols: January 16, 2019 Mr. Andrew Nichols Minnesota Pollution Control Agency Voluntary Investigation and Cleanup Program 520 Lafayette Road Saint Paul, Minnesota 55155 Re: Soo Line Dump Site 2018 Annual Soil

More information

FLOOD REPORT FOR MANITOBA. June 28, A Gale wind warning is in effect for Lake Manitoba and Lake Winnipeg

FLOOD REPORT FOR MANITOBA. June 28, A Gale wind warning is in effect for Lake Manitoba and Lake Winnipeg FLOOD REPORT FOR MANITOBA June 28, 2014 A Gale wind warning is in effect for Lake Manitoba and Lake Winnipeg Flood Warning*: Flood Watch*: High Water Advisory*: - Assiniboine River, from Shellmouth Dam

More information

Construction Exits Vibration grids

Construction Exits Vibration grids Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

Map Skills Unit. Note taking unit

Map Skills Unit. Note taking unit Map Skills Unit Note taking unit Introduction To learn about the Earth, we are going to learn about two geographic tools you can use.globes and maps. Globe A globe is a round model of the planet Earth

More information

GEOLOGICAL BRANCH ASSESSMENT REPORT 12. FItE NO: ACTION: THE GOLDEN MINING DIVISION, GOLDEN, Including THE NTS MAP; M82K/15W

GEOLOGICAL BRANCH ASSESSMENT REPORT 12. FItE NO: ACTION: THE GOLDEN MINING DIVISION, GOLDEN, Including THE NTS MAP; M82K/15W ACTION: FItE NO: Including 1990 GEO-CHEM SURVEY RESULTS -- THE AVD CLAIMS - THE GOLDEN MINING DIVISION, GOLDEN, B.C. NTS MAP; M82K/15W Lat. 50 deg. 55 Min. Long 116 deg. 55 min. For GEOLOGICAL BRANCH ASSESSMENT

More information

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN March 27, 2007 Oxford Heights Overview and Historical Conditions Oxford Heights is a medium sized community located on the southern side of Elizabeth

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 27, 2017 Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management

More information

Souris River Basin Spring Runoff Outlook As of March 1, 2019

Souris River Basin Spring Runoff Outlook As of March 1, 2019 Souris River Basin Spring Runoff Outlook As of March 1, 2019 Prepared by: Flow Forecasting & Operations Planning Water Security Agency Basin Conditions Summer rainfall in 2018 over the Saskatchewan portion

More information

[LLAZC03000.L EA0000 LVRCA13SA A, AZ SRP Notice of Temporary Closures of Public Lands in La Paz County, AZ

[LLAZC03000.L EA0000 LVRCA13SA A, AZ SRP Notice of Temporary Closures of Public Lands in La Paz County, AZ This document is scheduled to be published in the Federal Register on 01/15/2013 and available online at http://federalregister.gov/a/2013-00542, and on FDsys.gov 4310-32-P DEPARTMENT OF THE INTERIOR Bureau

More information

NIDIS Intermountain West Drought Early Warning System November 21, 2017

NIDIS Intermountain West Drought Early Warning System November 21, 2017 NIDIS Drought and Water Assessment NIDIS Intermountain West Drought Early Warning System November 21, 2017 Precipitation The images above use daily precipitation statistics from NWS COOP, CoCoRaHS, and

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS

More information

Town of Georgetown Founded Incorporated 1912

Town of Georgetown Founded Incorporated 1912 SPECIFICATION FOR SNOW REMOVAL & ICE CONTROL 7.1 Kilometers of Undesignated Streets Season 2017-18 SNOW REMOVAL 1. Snow removal to be carried out before regular business hours to allow normal movement

More information

Athabasca Oil Sands Corp.

Athabasca Oil Sands Corp. 2011 ABERCB 012 Athabasca Oil Sands Corp. Requests for Interim Shut-in of Gas Liege Field Athabasca Oil Sands Area May 10, 2011 ENERGY RESOURCES CONSERVATION BOARD Decision 2011 ABERCB 012: Athabasca Oil

More information

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Cambridge International Examinations Cambridge International General Certificate of Secondary Education Cambridge International Examinations Cambridge International General Certificate of Secondary Education *1391603277* GEOGRAPHY 0460/23 Paper 2 May/June 2015 Candidates answer on the Question Paper. Additional

More information

WHITE PAPER. Winter Tires

WHITE PAPER. Winter Tires WHITE PAPER Winter Tires WHITE PAPER Introduction According to the Federal Highway Administration accidents caused by winter weather result in 150,000 injuries and 2,000 deaths each year on average. In

More information

September 21,

September 21, September 21, 2017 2000-4535-59240-09 Pete Beskas, P.Eng. Manager Northwest Alberta and BC Whitecap Resources Inc. 3800, 525-8th Ave S.W. CALGARY, AB T2P 1G1 Dear Mr. Beskas: RE: PRESSURE MAINTENANCE WATERFLOOD

More information

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No:

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No: Technical Memorandum 6500 SW Macadam Avenue, Suite 200 Portland, Oregon, 97239 Tel: 503-244-7005 Fax: 503-244-9095 Prepared for: Project Title: City of Salem, Oregon City of Salem, Stormwater Management

More information

A Preliminary Geophysical Reconnaissance Mapping of Emirau Ground Water Resource, Emirau Island, New Ireland Province, PNG

A Preliminary Geophysical Reconnaissance Mapping of Emirau Ground Water Resource, Emirau Island, New Ireland Province, PNG A Preliminary Geophysical Reconnaissance Mapping of Emirau Ground Water Resource, Emirau Island, New Ireland Province, PNG Geological Survey Division of Mineral Resources Authority (MRA) Papua New Guinea

More information

Summary of Rover Metals Geologic Mapping Program at the Up Town Gold Project, Northwest Territories

Summary of Rover Metals Geologic Mapping Program at the Up Town Gold Project, Northwest Territories October 13, 2017 Summary of Rover Metals Geologic Mapping Program at the Up Town Gold Project, Northwest Territories Vancouver, British Columbia, Canada - Rover Metals Corp., Rover, is pleased to provide

More information

Snow and Ice Removal

Snow and Ice Removal Policy # 6.6 Procedure # - Replaces 5.10 & 5.10A Revises - Date Approved February 10, 2014 Method of Approval Resolution #17 1. PRINCIPLES The City of Dauphin desires to maintain the City streets, lanes,

More information

September 17, OGC

September 17, OGC OGC OIL A N D GAS C O M M ISSIO N September 17, 2004 9000-2855-32640-02 OGC - 04269 Natalie Sanders Subsurface Regulatory Application Coordinator Shell Canada Limited 400-4th Avenue SW P.O. Box 100 Station

More information

Climate Change Adaptation

Climate Change Adaptation Climate Change Adaptation Adriána Hudecz, Technical University of Denmark ROADEX Final Seminar Inverness, 22 May 2012 Climate Change Adaptation Outline: 1. Background/global climate change 2. Climate change

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

If you have any questionsj please contact Mike at ext. 24 or myself at Ext 21.

If you have any questionsj please contact Mike at ext. 24 or myself at Ext 21. ... -- - ---... ~~ - -... --- --=--c.-e~--. 1,1 Government or Gouvernemerit d~ Northwest Territories Territoires du Nord-Quest Telephone: 867-872-2558 ext. 24 Fax: 867-872-3472 December 18, 2018 Pine Point

More information

NIDIS Intermountain West Drought Early Warning System December 4, 2018

NIDIS Intermountain West Drought Early Warning System December 4, 2018 12/4/2018 NIDIS Drought and Water Assessment NIDIS Intermountain West Drought Early Warning System December 4, 2018 Precipitation The images above use daily precipitation statistics from NWS COOP, CoCoRaHS,

More information

GEOPHYSICAL REPORT. Airborne Magnetometer Survey. of the SHEEP-GOAT GROUP OF MINERAL CLAIMS. near Li l looet, B.C.

GEOPHYSICAL REPORT. Airborne Magnetometer Survey. of the SHEEP-GOAT GROUP OF MINERAL CLAIMS. near Li l looet, B.C. GEOPHYSICAL REPORT 977 Airborne Magnetometer Survey of the SHEEP-GOAT GROUP OF MINERAL CLAIMS near Li l looet, B.C. Lillooet Mining Division (Lat.51 'lot Long. 122 40' 7 5t0[2L05E. for DUFFEY LAKES MINES

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

C-62 RELATED ACTS. Priv. Acts 1955, Ch. 275, "An Act to redefine the boundaries of the City of Belle Meade... C-63

C-62 RELATED ACTS. Priv. Acts 1955, Ch. 275, An Act to redefine the boundaries of the City of Belle Meade... C-63 C-62 RELATED ACTS Priv. Acts 1955, Ch. 275, "An Act to redefine the boundaries of the City of Belle Meade... C-63 C-63 CHAPTER NO. 275 1 HOUSE BILL NO. 758 (By Davidson Delegation) AN ACT to redefine the

More information

North Slope Tundra Travel and Ice Road Construction By Alaska Department of Natural Resources. Wyn Menefee & Gary Schultz

North Slope Tundra Travel and Ice Road Construction By Alaska Department of Natural Resources. Wyn Menefee & Gary Schultz North Slope Tundra Travel and Ice Road Construction By Alaska Department of Natural Resources Wyn Menefee & Gary Schultz Exploratory and Production Wells on the North Slope Ice Road Construction Cross

More information

NIDIS Intermountain West Drought Early Warning System February 6, 2018

NIDIS Intermountain West Drought Early Warning System February 6, 2018 NIDIS Intermountain West Drought Early Warning System February 6, 2018 Precipitation The images above use daily precipitation statistics from NWS COOP, CoCoRaHS, and CoAgMet stations. From top to bottom,

More information

IV.B. VISUAL RESOURCES SHADE SHADOW

IV.B. VISUAL RESOURCES SHADE SHADOW IV.B. VISUAL RESOURCES SHADE SHADOW INTRODUCTION This section identifies and describes the visual characteristics of the Project site and surrounding area and evaluates the potential change in the existing

More information

EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) SPECIALIST INSPECTION REPORT

EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) SPECIALIST INSPECTION REPORT PROJECT NAME: Sheffield Wind DEC PERMIT NUMBER: EPSC SPECIALIST: DATE AND TIME OF INSPECTION: WEATHER CONDITIONS AT TIME OF INSPECTION: PERSONNEL PRESENT: Ryan Scott (VHB) 12/6/2010; Full Day Snowing.

More information

Impact of the Danube River on the groundwater dynamics in the Kozloduy Lowland

Impact of the Danube River on the groundwater dynamics in the Kozloduy Lowland GEOLOGICA BALCANICA, 46 (2), Sofia, Nov. 2017, pp. 33 39. Impact of the Danube River on the groundwater dynamics in the Kozloduy Lowland Peter Gerginov Geological Institute, Bulgarian Academy of Sciences,

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information