1 Husky Oil Operations Limited 707 8th Avenue S.W. Bus: (403) Box 6525, Station D Fax: (403) Calgary, Alberta, Canada T2P 3G7 October 31, 2014 Sahtu Land &Water Board SLWB File: S13L1-005 Box 1 MWH File: Fort Good Hope, XOE OHO Attention: Bakhtiyor Mukhammadiev, Regulatory Specialist Re: Husky Oil Operations Limited 2014 Summer Site Inspection Report for Water Licence S13L1-005 (Slater River Wellsites and Groundwater Wells) Please consider the following information in response to the requirements outlined under the Terms and Conditions of the Husky Oil Operations Limited (Husky) Water Licence S13L Part B, Subpart 2(fl of the Terms and Conditions states that the Licensee shall submit to the Board, the Annual Summer Site Inspection report, detailing the results of the inspection as set out in Part E, Conditions Applying to Closure and Reclamation, sub-parts (1) to (5) inclusive. Northern EnviroSearch (Tulita) Ltd. (NESTL) was retained by Husky to conduct the Summer Site Inspections (SSI) and prepare a summary of their findings. Site photographs for the Slater River wellsites and monitoring (groundwater and thermistor) wells are attached. The Slater River SSI was conducted on September 16 and September 20, 2014 under mild, dry weather conditions (temperatures averaged C). Little Bear N-9 Wellsite (N64 58' 55.4", W126 31' 26.9") The N-9 wellsite is 23 km from the Government of Northwest Territories (GNWT) winter road and was constructed and drilled during the winter of 2011/2012. The site was cleared of trees using a D6 bulldozer. The bulldozer blades were elevated to reduce the potential for disturbance to the vegetative ground cover and the brush piles were mulched and spread over the lease. The winter access crosses through the centre of the wellsite and there is also asemi-circle detour around the wellsite required for non-wellsite traffic. Operational space on the lease was leveled using a snow and ice pad and minimal disturbance techniques. The well was shut in at the end of the drilling program and all surface equipment was removed. The chained well head and guard rail remain onsite. A permanent metal post with the well identification placard was installed on the well ground. In summer 2012, Husky conducted atwo-day garbage and debris clean-up of the N-9 site. During the winter of 2012/2013, Husky conducted completion activities. The well was shut in at the end of the 2012/203 completions program. A second clean-up of garbage and debris was completed during the summer of 2013.
2 Sahtu Land &Water Board 2014 SSI Report Water Licence S13L1-005 Bakhtiyor Mukhammadiev Husky Oil Operations Limited October 31, 2014 Page 2 of 4 The following items were noted during the 2014 inspection (Photographs 1 to 7): The wellhead was chained and securely locked and all gauges showed no pressure; Standing water was present inside the well cellar; The lease pad was spongy in some areas, but standing water was not observed and natural drainage on the lease seemed undisturbed; New vegetation and signs of regrowth were observed, including on the access road; No erosion or operational impacts were observed at this site; and, Mulched woody debris spread across the lease has provided a measure of erosion control and protection of the underlying ground cover (muskeg) from significant scalping or rutting. Actions Minor trash clean-up was conducted during the site inspection. Recommendation No additional actions are recommended at this time. The site will be inspected again in the summer of Little Bear H-64 Wellsite (N63 53' 28.7", W126 11' 26.9") The H-64 wellsite is approximately 23 km from the N-9 wellsite and was constructed and drilled during the winter of 2011/2012. The site was cleared of trees using a mulcher and the material was spread over the lease. Operational space on the lease was leveled using a snow and ice pad and minimal disturbance techniques. The well was shut in at the end of the drilling program and all surface equipment was removed. The chained well head and guard rail remain onsite. A permanent metal post with the well identification placard was installed on the guard rail. In the summer of 2012, Husky conducted atwo-day garbage and debris clean-up of the H-64 site. During the winter of 2012/2013, Husky conducted completion activities. The well was shut in at the end of the 2012/2013 completions program. A second clean-up of garbage and debris was completed during the summer of The following items were noted during the 2014 summer site inspection (Photographs 8 to 14): The well head was chained and securely locked and all gauges showed no pressure; Minor amounts of garbage and debris were removed from the site; Standing water was present inside the well cellar; New vegetation and signs of regrowth were observed, including on the access road; No erosion or operation impacts were observed at this site; and, Mulched woody debris spread across the lease has provided a measure of erosion control and protection of the underlying ground cover (muskeg) from significant scalping and rutting.
3 Sahtu Land &Water Board 2014 SSI Report Water Licence S13L1-005 Bakhtiyor Mukhammadiev Husky Oil Operations Limited October 31, 2014 Page 3 of 4 Actions Minor trash clean-up was conducted during the site inspection. Recommendations No additional actions are recommended at this time. The site will be inspected again in the summer of Little Bear G-70 Wellsite (N64 59' 28.3", W126 27' 162") The G-70 wellsite has not been cleared and no drilling activities have occurred Wellsite (N65 0' W126 23' ') The original 0-41 well lease area of 130 m x 200 m (2.6 hectares) was cleared however the 0-41 well was not drilled. The 0-41 well lease area is approved under WL S13L1-006 to be converted into a storage area. The proposed 0-41 location was inspected by air during the spring inspection and via foot during the fall inspection. For details of the inspection please refer to the 2014 Semi-Annual Site Inspection Report under WL S13L Monitoring Wells (Groundwater and Permafrost) Inspection of the permafrost monitoring and groundwater wells were included in the 2014 inspection: MW-01B & MW-01T MW-04T (N64 29' 30.6' W126 19" 59.4') MW-09A/B & MW-09T (N64 53' 20.8" W126 11' 39.6) MW-11T MW-12T MW-16T MW-17T MW-19B & MW-19T The following items were noted during the 2014 summer site inspection (Photographs 15 to 30): Wells were marked with red flags; Subsidence of abandoned well was evident at MW-19 (Photograph 30); No signs of erosion were observed on any of the well sites which had been drilled; and, New vegetation and signs of regrowth were observed, including on the access. Actions No actions were taken during the inspection. Recommendation Areas where subsidence was observed should be filled in, preferably with native material on site, if available.
4 Sahtu Land &Water Board Bakhtiyor Mukhammadiev October 31, SSI Report Water Licence S13L1-005 Husky Oil Operations Limited Paae 4 of 4 These sites will be inspected again in the summer of trust this meets the information requirements for the annual Summer Site Inspection report under Water Licence S13L If you have any questions, please contact the undersigned at (403) or by (Ken.Hansen(a~huskvenergy.com). Regards, HUSKY OIL OPERATIONS LIMITED. ~ Ken Hansen Project Manager -NWT cc: Katherine Ades Water Resource Officer, GNWT-ENR Stephen Deschene A/Regional Superintendent, GNWT-Lands Darren Heck Environmental Project Manager, NESTL Jenica von Kuster Environmental and Regulatory Coordinator -NWT, Husky Attach: 1. Site photographs
5 Photograph ID: 1 Little Bear N-9 Well Site East Aerial view of the N-9 Well Site. Photograph ID: 2 Little Bear N-9 Well Site Southwest View from the northern corner looking SW. Page 1 of 15
6 Photograph ID: 3 Little Bear N-9 Well Site Northeast View from the N-9 lease area north along the winter access route. Photograph ID: 4 Little Bear N-9 Well Site Northwest View from the eastern corner of the site towards the north. Page 2 of 15
7 Photograph ID: 5 Little Bear N-9 Well Site Northeast View from the southern corner of the site towards the NE. Photograph ID: 6 Little Bear N-9 Well Site South View from the N-9 lease area south along the winter access route. Page 3 of 15
8 Photograph ID: 7 Little Bear N-9 Well Site North View of the N-9 well head. Well head was chained and locked. Photograph ID: 8 Little Bear H-64 Well Site West Aerial view of the H-64 Well Site. Page 4 of 15
9 Photograph ID: 9 Little Bear H-64 Well Site South View from the northern corner of the site looking towards the south and access route to MW-19. Photograph ID: 10 Little Bear H-64 Well Site West View from the eastern corner of the site looking towards the west. Page 5 of 15
10 Photograph ID: 11 Little Bear H-64 Well Site North View from the southern corner of the site looking towards the north. Photograph ID: 12 Little Bear H-64 Well Site East View from the western corner of the site looking towards the east. Page 6 of 15
11 Photograph ID: 13 Little Bear H-64 Well Site South View of the H-64 well head signage. Photograph ID: 14 Little Bear H-64 Well Site South View of the H-64 well head. Well head was chained and locked. Page 7 of 15
12 Photograph ID: 15 Monitoring Well MW-04T West View of the MW-04T thermistor monitoring location. All wells were sign posted and flagged. Photograph ID: 16 Monitoring Well MW-12T East View from the SW corner looking east along the access route. Page 8 of 15
13 Photograph ID: 17 Monitoring Well MW-12T Northeast View from the SE corner looking towards the NE corner of the MW-12T well pad. A small clearing was observed adjacent to the MW-12T area. Photograph ID: 18 Monitoring Well MW-12T Moose rutting area observed adjacent to the MW-12T well pad. Page 9 of 15
14 Photograph ID: 19 Monitoring Well MW-12T West View from the NE corner looking towards the NW corner of the site. Photograph ID: 20 Monitoring Well MW-12T Southwest View of the thermistor monitoring location MW-12T from the NE corner. Page 10 of 15
15 Photograph ID: 21 Monitoring Well MW-17T Northeast View from the southern corner looking NE along the access route. Photograph ID: 22 Monitoring Well MW-17T Southeast View of the thermistor monitoring location MW-17T from the western corner looking across the site towards the SE. Page 11 of 15
16 Photograph ID: 23 Monitoring Well MW-17T South View from the northern corner looking south. Photograph ID: 24 Monitoring Well MW-17T Southwest View from the eastern corner looking SW along the access route Page 12 of 15
17 Photograph ID: 25 Monitoring Well MW-19 Northeast Aerial view of the MW-19 well. Photograph ID: 26 Monitoring Well MW-19 North View from the southern corner looking across the well pad towards the north. Page 13 of 15
18 Photograph ID: 27 Monitoring Well MW-19 Southeast View from the western corner looking towards the southern corner of the site. Photograph ID: 28 Monitoring Well MW-19 South View from the northern corner looking across the well pad towards the south. Page 14 of 15
19 Photograph ID: 29 Monitoring Well MW-19 West View from the eastern corner looking towards the northern corner. Photograph ID: 30 Monitoring Well MW-19 Southwest Subsidence of the ground was observed in the centre of the MW-19 well pad. Page 15 of 15
RE: W2013C0005 Submission of Final Plan for Exploration Land Use Permit, Ekati Diamond Mine, NT
Dominion Diamond Ekati ULC 900-606 4 Street SW (403) 910-1933 Calgary, Alberta T2P 1T1 (403) 910-1934 fax www.ddmines.com 17 December, 2018 Joseph Mackenzie Chair Wek èezhìi Land and Water Board #1, 4905-48
More information1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,
Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER
More informationRE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H
November 2, 2017 Rick Spicer Regulatory & Environmental Superintendent Operations BHP Billiton Petroleum, LLC Fayetteville Petroleum Unit 1686 Letona Rd Searcy, AR 72143 RE: AFIN: 23-00000 ADEQ Reference
More informationThis report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.
Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site
More informationAugust 10, 2007 File:
August 10, 2007 File: 15-85-72 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, AB T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL AREA)
More information1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8
July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along
More information1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8
August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013
More informationBipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25
± DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N1\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131207.MXD N1-S11 Tower 10 E-723206, N-6272609 N1-Soils-154
More informationJanuary 17, 2008 File:
January 17, 2008 File: 15-85-73 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)
More information73-2 have been satisfied; and
RESOLUTION NO. R- 86-104 W'dEREAS, the Board of County Commissioners, as the governing body, pursuant to the authority vested in Chapter 163 and Chapter 125, Florida Statutes, is authorized and empowered
More informationThe results of KCB s site inspection observations and our recommendations for further work are presented herein.
July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited
More informationTłı chǫ All-season Road Archaeological Site Chance Find Protocol
Tłı chǫ All-season Road Archaeological Site Chance Find Protocol Insert applicable LWB project numbers Version 1 Revision History REVISION HISTORY Version Date Notes/Revisions 1 Original version of plan
More informationSHADOW STUDY REPORT REGARDING
SHADOW STUDY REPORT REGARDING an APPLICATION TO REDEVELOP Three 6 Storey Condominiums Regional Road 25 (Ontario Street) and Britannia Road Milton, Ontario KNYMH FILE # 17030 Prepared by: Krista Lilley
More informationSeptember 3, 2009 File: NORTH CENTRAL REGION GEOHAZARD ASSESSMENT HWY 40:28 NORTH OF CADOMIN (NC50) 2009 ANNUAL INSPECTION REPORT
GEOTECHNICAL ENVIRONMENTAL MATERIALS September 3, 2009 File: 15-16-226 Alberta Transportation 2 nd Floor, Provincial Building 111 54 Street Edson, Alberta T7E 1T2 Attention: Mr. Cliff Corner NORTH CENTRAL
More information¾À 280. ESS Features Heritage. Points of Access* !( Proposed Access Point. !( Archaeological Water. Major Stream Crossing Abandoned Rail Crossing # #
± DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N1\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131207.MXD 386 N1-S30 385 BURNTWOOD RIVER Coordinate System:
More informationOBSERVATIONS OF PERMAFROST-LANDSCAPE DYNAMICS RELATED TO ANTHROPOGENIC DISTURBANCES, YUKECHI STUDY SITE, CENTRAL YAKUTIA
OBSERVATIONS OF PERMAFROST-LANDSCAPE DYNAMICS RELATED TO ANTHROPOGENIC DISTURBANCES, YUKECHI STUDY SITE, CENTRAL YAKUTIA A.N. Fedorov, P.Ya. Konstantinov, I.S. Vassiliev, N.P. Bosikov, Ya.I. Torgovkin,
More informationOctober 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402
October 26, 2017 Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402 Re: Soo Line Dump Site 2017 Annual Soil Cover Inspection Dear Aimee: The purpose of this letter
More informationBipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81
± DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N2\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131201.MXD 196 Coordinate System: UTM Zone NAD83 Data Source:
More informationThird Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE
1) Project Overview Third Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE-2007-1130 December 15, 2014 This is the third year of a five year monitoring program
More informationPhotographic Log. Photo No. 1. Date: 10/27/15. Direction Photo Taken: Southwest. Photo Taken By: JBH1
1 Southwest 10/27/15 Looking southwest on Copper Park Lane viewing clearing and grubbing of area south of Copper Park Lane prior to excavation. 2 Southeast 10/29/15 Looking southeast at the sump and pump
More informationFebruary 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT
February 18, 2003 File: 15-76-11 Alberta Transportation Room 223, Provincial Building 4709 44 Avenue Stony Plain, Alberta T7Z 1N4 Attention: Mr. Rob Lonson, P.Eng. NORTH CENTRAL REGION LANDSLIDE ASSESSMENT
More informationSecond Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE
1) Project Overview Second Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE-2007-1130 December 13, 2013 This is the second year of a five year monitoring program
More informationWoodford County Erosion Prevention Plan and Permit. Application #
Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance
More informationCrows Landing Naval Base Easement
1 of 15 West Stanislaus Resource Conservation District Crows Landing Naval Base Easement Annual Reserve Monitoring Report Jamie McFarlin 11/112012 2 of 15 West Stanislaus Resource Conservation District
More informationJanuary 12, 2006 File:
January 12, 2006 File: 15-85-13 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL
More informationX X X X X X X X. Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist
Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist Name of Permittee: Rock Koshkonong Lake District (RKLD) Construction Site (Project) Name: Lake Koshkonong
More informationDecember 11, 2006 File:
December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)
More informationNIDIS Intermountain West Drought Early Warning System February 12, 2019
NIDIS Intermountain West Drought Early Warning System February 12, 2019 Precipitation The images above use daily precipitation statistics from NWS COOP, CoCoRaHS, and CoAgMet stations. From top to bottom,
More informationGEOSYNTEC CONSULTANTS
GEOSYNTEC CONSULTANTS 2100 Main Street, Suite 150 Huntington Beach, CA 92648 USA Tel (714) 969-0800 Fax (714) 969-0820 15 February 2006 Ms. Tamara Zeier, P.E. Project Manager Project Navigator, Ltd. One
More informationNIDIS Intermountain West Drought Early Warning System April 18, 2017
1 of 11 4/18/2017 3:42 PM Precipitation NIDIS Intermountain West Drought Early Warning System April 18, 2017 The images above use daily precipitation statistics from NWS COOP, CoCoRaHS, and CoAgMet stations.
More informationNIDIS Intermountain West Drought Early Warning System September 4, 2018
NIDIS Drought and Water Assessment NIDIS Intermountain West Drought Early Warning System September 4, 2018 Precipitation The images above use daily precipitation statistics from NWS COOP, CoCoRaHS, and
More informationSNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy
Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),
More informationTABLE OF CONTENTS LIST OF TABLES. Page
TABLE OF CONTENTS Page 11.0 EFFECTS OF THE ENVIRONMENT ON THE PROJECT... 11-1 11.1 Weather Conditions... 11-1 11.2 Flooding... 11-2 11.3 Forest Fires... 11-2 11.4 Permafrost and Subsidence Risk... 11-3
More informationMr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No
January 17, 2018 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0337367 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas
More informationCHAPTER 7 GEOLOGY AND SOILS
CHAPTER 7 GEOLOGY AND SOILS 7.1 General Geology of the Area Based on the Geological map compiled by Cornec (2002) the area consists of Miocene/Pleistocene deposits as seen in figure 7.1. These are geologically
More informationCambridge International Examinations Cambridge International General Certificate of Secondary Education
Cambridge International Examinations Cambridge International General Certificate of Secondary Education *4694696559* GEOGRAPHY 0460/23 Paper 2 October/November 2015 Candidates answer on the Question Paper.
More informationFOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP
AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment
More informationMaterials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationClimate Change Adaptation
Climate Change Adaptation Adriána Hudecz, Technical University of Denmark ROADEX Final Seminar Rovaniemi, 25 April 2012 Climate Change Adaptation Outline: 1. Background/global climate change 2. Climate
More informationCALL FOR NOMINATIONS CENTRAL MACKENZIE VALLEY
2011-2012 CALL FOR NOMINATIONS CENTRAL MACKENZIE VALLEY Closing at 4 P.M. (EST) on January 31, 2012 2011-2012 Call for Nominations CENTRAL MACKENZIE VALLEY Closing date: January 31, 2012 TABLE OF CONTENTS
More informationHYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE
PUBLIC WORKS CANADA HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE KILOMETRE 207.9, LIARD HIGKWAY December 1978 I I f I I I I # Bolter Parish Trimble Ltd. ONLIULTINO Public Works, Canada, 9925-109 Street,
More informationIllinois Drought Update, December 1, 2005 DROUGHT RESPONSE TASK FORCE Illinois State Water Survey, Department of Natural Resources
Illinois Drought Update, December 1, 2005 DROUGHT RESPONSE TASK FORCE Illinois State Water Survey, Department of Natural Resources For more drought information please go to http://www.sws.uiuc.edu/. SUMMARY.
More informationDrilling & Fracking a well near Grass River: Notes from an informal conversation with O.I.L. Energy
Torch, Clam, & Bellaire Lakes www.3lakes.com Drilling & Fracking a well near Grass River: Notes from an informal conversation with O.I.L. Energy Dean Branson and Gary Knapp, June 26, 2014 Given that Michigan
More informationTESTING FUNCTIONAL RESTORATION OF LINEAR FEATURES PHASE I PROGRESS REPORT WITHIN BOREAL CARIBOU RANGE
TESTING FUNCTIONAL RESTORATION OF LINEAR FEATURES WITHIN BOREAL CARIBOU RANGE PHASE I PROGRESS REPORT Craig DeMars, Ph.D., Department of Biological Sciences, University of Alberta, and Alberta Biodiversity
More informationCITY OF MINOT SNOW REMOVAL PLAN October 2018
CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More information5.2 APPENDIX D2 Geotechnical Report Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development ILINGE AND LESSEYTON CEMETERY DEVELOPMENT - GEOTECHNICAL INVESTIGATION FINAL REPORT SEPTEMBER 2014
More informationTropical Moist Rainforest
Tropical or Lowlatitude Climates: Controlled by equatorial tropical air masses Tropical Moist Rainforest Rainfall is heavy in all months - more than 250 cm. (100 in.). Common temperatures of 27 C (80 F)
More informationTREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review
More informationCITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015
CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationMajor Point/Area Sources Name Type Major Emissions Distance (m) Direction CFB Cold Lake Air Force Base NOx, PM, HC, TRS 3km to aircraft West
Page 1 of 11 Site Documentation: Cold Lake South Continuous Monitoring Station General Site Information Item Description Site ID (CASA ID) LICA01 Station Name Cold Lake South Continuous Monitoring Station
More informationCITY OF MINOT SNOW REMOVAL PLAN November 2017
CITY OF MINOT SNOW REMOVAL PLAN November 2017 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationAPPENDIX N View Impact & Shadow Analysis
Permit Application Document TABLE OF CONTENTS 1.0 VIEW IMPACT ANALYSIS... 2 1.1 Overview... 2 1.2 View Impact Assessment Methodology... 2 1.3 Site Description... 3 1.4 Comparative Structure Heights...
More information2013 GEOLOGICAL ASSESSMENT REPORT SHERIDAN HILL PROPERTY
2013 GEOLOGICAL ASSESSMENT REPORT ON THE SHERIDAN HILL PROPERTY NEW WESTMINSTER MINING DIVISION BRITISH COLUMBIA NTS 092G07 49 16 31 NORTH LATITUDE, 122 39 48 WEST LONGITUDE PREPARED FOR Sheridan Hill
More informationTemplate for Sediment and Erosion Control Plan General Instructions
Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery
More informationMemorandum. Air Sampling
Memorandum TO: David Yelton, City of Beverly Hills DATE: December 8, 2015 CC: Heidi Rous, PCR Services FROM: Everest Yan and Audrey Vinant Tang, PCR Services RE: BEVERLY HILLS ARSENIC MONITORING MEMO This
More informationWe are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.
We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.
More informationAdministration of Mineral Rights
Administration of Mineral Rights Deborah Archibald Industry, Tourism and Investment, GNWT Malcolm Robb Aboriginal Affairs and Northern Development Canada Business Today How applications are being treated
More informationPW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works
Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees
More informationThe weather in Iceland 2012
The Icelandic Meteorological Office Climate summary 2012 published 9.1.2013 The weather in Iceland 2012 Climate summary Sunset in Reykjavík 24th April 2012 at 21:42. View towards west from the balcony
More informationNWS FORM E-5 U.S. DEPARTMENT OF COMMERCE I HYDRO SERVICE AREA NOAA, NATIONAL WEATHER SERVICE I Indianapolis, IN MONTHLY REPORT
NWS FORM E-5 U.S. DEPARTMENT OF COMMERCE I HYDRO SERVICE AREA NOAA, NATIONAL WEATHER SERVICE I Indianapolis, IN. 1-------------------- MONTHLY REPORT OF RIVER AND FLOOD CONDITIONSI REPORT FOR I November
More informationObservations on Surface Water in the Seminary Fen in Spring, Prepared 6/4/13 by Sam Wetterlin; updated 7/28/13
Observations on Surface Water in the Seminary Fen in Spring, 2013 Prepared 6/4/13 by Sam Wetterlin; updated 7/28/13 Ordinarily, a calcareous fen is primarily dependent on upwelling mineral-rich, oxygen-poor
More informationIntroducti on. Land Survey. Geomagnetic Survey. Geomagnetic Results and Interpretati ons - Conclusions and Recommendations C
m M 42A86SW8281 63.42 PRICE 010 C O H T E H l 42A86SW828I 63.42 PRICE 010C Introducti on Land Survey Geomagnetic Survey Geomagnetic Results and Interpretati ons - Conclusions and Recommendations - - -
More informationGrade. Why are maps useful? What do maps tell us?
ACTIVITY 2.1 Follow That DART Bus! DETAILS TYPE Whole-group TIME 20 minutes plus 20 minutes homework (40 minutes total) PRINTED MATERIALS Handouts (Reading A Map, Follow that DART Bus! map and Follow that
More information[LLAZC X.L EA0000; AZ SRP ] Notice of Temporary Closures: Selected Public Lands in La Paz County, AZ
This document is scheduled to be published in the Federal Register on 12/29/2017 and available online at https://federalregister.gov/d/2017-28217, and on FDsys.gov 4310-32 DEPARTMENT OF THE INTERIOR Bureau
More informationJanuary 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols:
January 16, 2019 Mr. Andrew Nichols Minnesota Pollution Control Agency Voluntary Investigation and Cleanup Program 520 Lafayette Road Saint Paul, Minnesota 55155 Re: Soo Line Dump Site 2018 Annual Soil
More informationFLOOD REPORT FOR MANITOBA. June 28, A Gale wind warning is in effect for Lake Manitoba and Lake Winnipeg
FLOOD REPORT FOR MANITOBA June 28, 2014 A Gale wind warning is in effect for Lake Manitoba and Lake Winnipeg Flood Warning*: Flood Watch*: High Water Advisory*: - Assiniboine River, from Shellmouth Dam
More informationConstruction Exits Vibration grids
Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]
More informationConverse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services
Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North
More informationMap Skills Unit. Note taking unit
Map Skills Unit Note taking unit Introduction To learn about the Earth, we are going to learn about two geographic tools you can use.globes and maps. Globe A globe is a round model of the planet Earth
More informationGEOLOGICAL BRANCH ASSESSMENT REPORT 12. FItE NO: ACTION: THE GOLDEN MINING DIVISION, GOLDEN, Including THE NTS MAP; M82K/15W
ACTION: FItE NO: Including 1990 GEO-CHEM SURVEY RESULTS -- THE AVD CLAIMS - THE GOLDEN MINING DIVISION, GOLDEN, B.C. NTS MAP; M82K/15W Lat. 50 deg. 55 Min. Long 116 deg. 55 min. For GEOLOGICAL BRANCH ASSESSMENT
More informationOXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN
OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN March 27, 2007 Oxford Heights Overview and Historical Conditions Oxford Heights is a medium sized community located on the southern side of Elizabeth
More informationConverse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services
Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 27, 2017 Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management
More informationSouris River Basin Spring Runoff Outlook As of March 1, 2019
Souris River Basin Spring Runoff Outlook As of March 1, 2019 Prepared by: Flow Forecasting & Operations Planning Water Security Agency Basin Conditions Summer rainfall in 2018 over the Saskatchewan portion
More information[LLAZC03000.L EA0000 LVRCA13SA A, AZ SRP Notice of Temporary Closures of Public Lands in La Paz County, AZ
This document is scheduled to be published in the Federal Register on 01/15/2013 and available online at http://federalregister.gov/a/2013-00542, and on FDsys.gov 4310-32-P DEPARTMENT OF THE INTERIOR Bureau
More informationNIDIS Intermountain West Drought Early Warning System November 21, 2017
NIDIS Drought and Water Assessment NIDIS Intermountain West Drought Early Warning System November 21, 2017 Precipitation The images above use daily precipitation statistics from NWS COOP, CoCoRaHS, and
More informationR.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973
El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING
More informationENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )
PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS
More informationTown of Georgetown Founded Incorporated 1912
SPECIFICATION FOR SNOW REMOVAL & ICE CONTROL 7.1 Kilometers of Undesignated Streets Season 2017-18 SNOW REMOVAL 1. Snow removal to be carried out before regular business hours to allow normal movement
More informationAthabasca Oil Sands Corp.
2011 ABERCB 012 Athabasca Oil Sands Corp. Requests for Interim Shut-in of Gas Liege Field Athabasca Oil Sands Area May 10, 2011 ENERGY RESOURCES CONSERVATION BOARD Decision 2011 ABERCB 012: Athabasca Oil
More informationCambridge International Examinations Cambridge International General Certificate of Secondary Education
Cambridge International Examinations Cambridge International General Certificate of Secondary Education *1391603277* GEOGRAPHY 0460/23 Paper 2 May/June 2015 Candidates answer on the Question Paper. Additional
More informationWHITE PAPER. Winter Tires
WHITE PAPER Winter Tires WHITE PAPER Introduction According to the Federal Highway Administration accidents caused by winter weather result in 150,000 injuries and 2,000 deaths each year on average. In
More informationSeptember 21,
September 21, 2017 2000-4535-59240-09 Pete Beskas, P.Eng. Manager Northwest Alberta and BC Whitecap Resources Inc. 3800, 525-8th Ave S.W. CALGARY, AB T2P 1G1 Dear Mr. Beskas: RE: PRESSURE MAINTENANCE WATERFLOOD
More informationTechnical Memorandum. City of Salem, Stormwater Management Design Standards. Project No:
Technical Memorandum 6500 SW Macadam Avenue, Suite 200 Portland, Oregon, 97239 Tel: 503-244-7005 Fax: 503-244-9095 Prepared for: Project Title: City of Salem, Oregon City of Salem, Stormwater Management
More informationA Preliminary Geophysical Reconnaissance Mapping of Emirau Ground Water Resource, Emirau Island, New Ireland Province, PNG
A Preliminary Geophysical Reconnaissance Mapping of Emirau Ground Water Resource, Emirau Island, New Ireland Province, PNG Geological Survey Division of Mineral Resources Authority (MRA) Papua New Guinea
More informationSummary of Rover Metals Geologic Mapping Program at the Up Town Gold Project, Northwest Territories
October 13, 2017 Summary of Rover Metals Geologic Mapping Program at the Up Town Gold Project, Northwest Territories Vancouver, British Columbia, Canada - Rover Metals Corp., Rover, is pleased to provide
More informationSnow and Ice Removal
Policy # 6.6 Procedure # - Replaces 5.10 & 5.10A Revises - Date Approved February 10, 2014 Method of Approval Resolution #17 1. PRINCIPLES The City of Dauphin desires to maintain the City streets, lanes,
More informationSeptember 17, OGC
OGC OIL A N D GAS C O M M ISSIO N September 17, 2004 9000-2855-32640-02 OGC - 04269 Natalie Sanders Subsurface Regulatory Application Coordinator Shell Canada Limited 400-4th Avenue SW P.O. Box 100 Station
More informationClimate Change Adaptation
Climate Change Adaptation Adriána Hudecz, Technical University of Denmark ROADEX Final Seminar Inverness, 22 May 2012 Climate Change Adaptation Outline: 1. Background/global climate change 2. Climate change
More informationOrica Australia Pty Ltd Ammonium Nitrate Facility Upgrade
Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies
More informationIf you have any questionsj please contact Mike at ext. 24 or myself at Ext 21.
... -- - ---... ~~ - -... --- --=--c.-e~--. 1,1 Government or Gouvernemerit d~ Northwest Territories Territoires du Nord-Quest Telephone: 867-872-2558 ext. 24 Fax: 867-872-3472 December 18, 2018 Pine Point
More informationNIDIS Intermountain West Drought Early Warning System December 4, 2018
12/4/2018 NIDIS Drought and Water Assessment NIDIS Intermountain West Drought Early Warning System December 4, 2018 Precipitation The images above use daily precipitation statistics from NWS COOP, CoCoRaHS,
More informationGEOPHYSICAL REPORT. Airborne Magnetometer Survey. of the SHEEP-GOAT GROUP OF MINERAL CLAIMS. near Li l looet, B.C.
GEOPHYSICAL REPORT 977 Airborne Magnetometer Survey of the SHEEP-GOAT GROUP OF MINERAL CLAIMS near Li l looet, B.C. Lillooet Mining Division (Lat.51 'lot Long. 122 40' 7 5t0[2L05E. for DUFFEY LAKES MINES
More informationJune 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON
PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western
More informationC-62 RELATED ACTS. Priv. Acts 1955, Ch. 275, "An Act to redefine the boundaries of the City of Belle Meade... C-63
C-62 RELATED ACTS Priv. Acts 1955, Ch. 275, "An Act to redefine the boundaries of the City of Belle Meade... C-63 C-63 CHAPTER NO. 275 1 HOUSE BILL NO. 758 (By Davidson Delegation) AN ACT to redefine the
More informationNorth Slope Tundra Travel and Ice Road Construction By Alaska Department of Natural Resources. Wyn Menefee & Gary Schultz
North Slope Tundra Travel and Ice Road Construction By Alaska Department of Natural Resources Wyn Menefee & Gary Schultz Exploratory and Production Wells on the North Slope Ice Road Construction Cross
More informationNIDIS Intermountain West Drought Early Warning System February 6, 2018
NIDIS Intermountain West Drought Early Warning System February 6, 2018 Precipitation The images above use daily precipitation statistics from NWS COOP, CoCoRaHS, and CoAgMet stations. From top to bottom,
More informationIV.B. VISUAL RESOURCES SHADE SHADOW
IV.B. VISUAL RESOURCES SHADE SHADOW INTRODUCTION This section identifies and describes the visual characteristics of the Project site and surrounding area and evaluates the potential change in the existing
More informationEROSION PREVENTION AND SEDIMENT CONTROL (EPSC) SPECIALIST INSPECTION REPORT
PROJECT NAME: Sheffield Wind DEC PERMIT NUMBER: EPSC SPECIALIST: DATE AND TIME OF INSPECTION: WEATHER CONDITIONS AT TIME OF INSPECTION: PERSONNEL PRESENT: Ryan Scott (VHB) 12/6/2010; Full Day Snowing.
More informationImpact of the Danube River on the groundwater dynamics in the Kozloduy Lowland
GEOLOGICA BALCANICA, 46 (2), Sofia, Nov. 2017, pp. 33 39. Impact of the Danube River on the groundwater dynamics in the Kozloduy Lowland Peter Gerginov Geological Institute, Bulgarian Academy of Sciences,
More informationADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1
State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,
More information