1 Future Rainfall 6/9/2014 Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, CFM, PMP TFMA Spring 2014 Conference Software Overview 2 Processes Hydrometric DB Event Manager Automatic Low = Every 6 hours High = Every 15 minutes 24/7 Runs InfoWorks RS InfoWorks CS InfoWorks SD Source: FloodWorks Version 13.0 Users Manual, Innovyze, July 2012 Bexar County Flood Warning System May System Overview NEXRAD 15 min from NWS Rain Gages Level Gages SAOEM EOC NWS Hydrometric Database Western Configuration Central Configuration Eastern Configuration FloodWorks Server at SARA office XML Website Website Parser SARA Web Server Bexar County Flood Warning System May

2 Warning Locations Selected by SAOEM based on historic operations Upper San Antonio River 46 locations Leon Creek 30 locations Medina River 20 locations Cibolo Creek 13 locations Salado Creek update 14 pilot + 19 new locations Total of 142 locations Upper San Antonio River Scoping Map Bexar County Flood Warning System May RS model available (at 74 locations) Elevation / Depth Flow Velocity Location Map Inundation Map No RS Model (at 68 locations) Flow only Location Map Warning Locations Bexar County Flood Warning System May Hydrology 2 Processes Probability Distributed Model Simplified Runoff Model Probability Distributed Model Estimates soil moisture from gaging station Simplified Runoff Model Uses soil moisture to generate runoff hydrographs at ungaged locations Rainfall and Potential Evaporation Probability Distributed Model (PDM) Soil Runoff Moisture Simplified Runoff Model (SRM) Runoff Routing Reaches RS Hydraulic Model (Olmos Watershed) (SAR Watersheds) Rainfall Bexar County Flood Warning System May

3 Discharge (cfs) Rainfall Rate (in/hr) 1/1/1998 7/2/1998 1/1/1999 7/2/1999 1/1/2000 7/1/ /31/2000 7/1/ /31/2001 7/1/ /31/2002 7/1/ /31/2003 6/30/ /30/2004 6/30/ /30/2005 6/30/ /30/2006 6/30/ /30/2007 6/29/ /29/2008 6/29/ /29/2009 6/29/ /29/2010 6/29/ /29/2011 6/28/ /28/2012 Daily Mean Discharge (cfs) 6/9/2014 Hydrology - PDM Calibration Developed by CEH Wallingford Requires real time gaging station Estimates soil moisture Rainfall Evaporation Probability Distributed Soil Moisture Storage Direct Recharge Runoff Surface Storage Surface Runoff Groundwater Storage Baseflow Total Stream Upper San Antonio River Gages Flow Bexar County Flood Warning System May Hydrology PDM Calibration 18,000 USGS Discharge Data SAR Lower ,000 14,000 SAR Upper Olmos Calibration Event 12,000 10,000 8,000 6,000 4,000 2,000 0 Date Bexar County Flood Warning System May Hydrology PDM Calibration 9, ,000 7,000 Observed Flow (cfs) Computed Flow (cfs) Rainfall Rate (in/hr) ,000 5, , , , , Date / Time Olmos Creek at Dresden Drive - September 2010 Event Bexar County Flood Warning System May

4 Discharge (cfs) Discharge (cfs) Rainfall Rate (in/hr) Rainfall Rate (in/hr) 6/9/2014 Hydrology PDM Calibration 16, ,000 12,000 10,000 Observed Flow (cfs) Computed Flow (cfs) Rainfall Rate (in/hr) , ,000 4,000 2, Date / Time San Antonio River at Mitchell Street - September 2010 Event Bexar County Flood Warning System May Hydrology PDM Calibration 70, ,000 50,000 Observed Flow (cfs) Computed Flow (cfs) Rainfall Rate (in/hr) , , , , Date / Time San Antonio River at Loop September 2010 Event Bexar County Flood Warning System May Hydrology - Simplified Runoff Model Generates runoff hydrographs for each basin Basin average rainfall Effective rainfall Based on soil moisture deficit Converts to runoff Q Q input into InfoWorks RS At a point Distributed over reach Upper San Antonio River Subbasins Bexar County Flood Warning System May

5 Hydraulics - Overview Upper San Antonio River 72 miles Leon Creek 66 miles Medina River 19 miles Cibolo Creek 0 miles Salado Creek 24 miles Total = 181 miles Upper San Antonio River Main RS Bexar County Flood Warning System May Hydraulics Development DFIRM RAS models As detailed as possible Steady peak flow rate Focused on 100-year 1D flow Hydrologic routing English units InfoWorks RS models Match RAS within 0.5 feet Unsteady, Full range of flows Balanced focus (low & high) 1D with multiple flow paths Dynamic channel routing Metric units Bexar County Flood Warning System May Hydraulics - Development Simplified RS models Run within 15 minute window Starts with DFIRM RAS Review / refinement Delete unnecessary sections Import into RS Steady RS (low flows) Unsteady RS (HMS hydrographs) Add structures 1 at a time Compare RAS vs. RS Optimization Bexar County Flood Warning System May

6 Hydraulics - Capabilites Complex split flow areas Martinez Creek Bexar County Flood Warning System May Hydraulics - Capabilities Apache Creek Undersized storm drains 10-year flow in storm drain Rest of 100-year overland Bexar County Flood Warning System May Hydraulics - Capabilities Concepcion Creek 100-year flow is completely contained in a large box culvert system Bexar County Flood Warning System May

7 Hydraulics - Capabilities Flow through neighborhoods Apache Creek Concepcion Creek Series of storage areas in InfoWorks RS Bexar County Flood Warning System May Hydraulics - Capabilities Flood Control Tunnel Operations San Pedro Creek Tunnel San Antonio River Tunnel Bexar County Flood Warning System May Warning Thresholds Established for each location At least 1.0 foot between threshold elevations Stage-discharge rating curve at locations without RS models Bexar County Flood Warning System May

8 Warning Thresholds - Elevations At locations with RS model Used DFIRM RAS models at each location Depth = Elevation Datum (flowline) Detailed spreadsheets to document Bexar County Flood Warning System May Warning Thresholds - Flows Only flows at locations without RS models Stage-discharge rating curve to relate flow and elevation Detailed analysis for San Antonio and Leon Creek watersheds Upper San Antonio River: 100 year - Routing Location Threshold Elevation Threshold Discharge Number Location Name HEC-RAS MODEL Watch Minor Major Watch Minor Major SAN012 D/S of N McCullough Ave & Barbara Dr Tributary A to Airport Tributary SAN044 Babcock Rd & Northill Dr Alazan Unamed Tributary SAN011 N McCullough Ave & Jackson Keller Rd Olmos Creek Lower Point in O SAN006 Avondale Ave & Hillje St State Hospital Creek SAN015 West Ave & Jackson-Keller Rd Olmos Creek Lower Poor RS to SAN039 Senisa Dr & Seeling Blvd Alazan Unamed Tributary SAN043 Overdale Pl & Laddie Pl East Woodlawn Ditch SAN007 School St & Monroe St Rockwood_Creek_LimDetail SAN014 Cornwall Dr & Thames Dr Tributary A to Airport Tributary SAN010 Rosemary Ave & N New Braunfels Ave BroadwayDrain_Detailed SAN009 Barilla Pl & Broadway St BroadwayDrain_Detailed Bexar County Flood Warning System May Warning Thresholds Dam Safety Value added for dam safety in Martinez-B watershed Discharge thresholds Based on SARA design rating curves for pool elevations Q Outflow at Q Outflow at Q Outflow at Aux Spillway 3 feet < Top of Dam Top of Dam Watch Minor Major Martinez 1 Martinez 2 Martinez 3 Martinez 4 Martinez 5 Martinez 6a Rehab 65 2,066 8, , , ,359 10, ,624 14, ,181 51, Bexar County Flood Warning System May

9 Future Rainfall Quantitative Precipitation Forecasts 1 hour to 5 days GIS-based spatial/volume input Forecast information from NWS/NOAA Private sector Wanted to use NWS QPF product 2 total for May 25, 2013 event Actual total = 10 on San Pedro Creek Established flexible procedure with NWS Utilizes NWS WFO s judgment Applied USGS SIR Bexar County Flood Warning System May SAOEM call with NWS WFO in New Braunfels NWS meteorologist discusses storm type, total rainfall and timing SAOEM requests SARA to add Library of profiles in FloodWorks from USGS SIR Future Rainfall Bexar County Flood Warning System May Future Rainfall - General Widespread 6, 12 and 24 hour profiles 6 Hour Distribution Source: USGS Scientific Investigations Report Hour Distribution Bexar County Flood Warning System May

10 Future Rainfall - Convective Thunderstorm Most in 1 st quarter 3, 6, 12 and 24 hour profiles 3 Hour Distribution Source: USGS Scientific Investigations Report Hour Distribution Bexar County Flood Warning System May Future Rainfall - Tropical Landfalling tropical systems Wide variety of historic profiles 1 st, 2 nd, 3 rd and 4 th quartile 24 hour profiles 1 st Quartile Distribution Source: USGS Scientific Investigations Report nd Quartile Distribution Bexar County Flood Warning System May Future Rainfall - Tropical Landfalling tropical systems Wide variety of historic profiles 1 st, 2 nd, 3 rd and 4 th quartile 24 hour profiles 3 rd Quartile Distribution Source: USGS Scientific Investigations Report th Quartile Distribution Bexar County Flood Warning System May

11 Interactive Website at EOC Bexar County Flood Warning System May Details at Warning Location Local web design firm Updated SAOEM site Current and concise data SAOEM EOC SAFD Dispatch Swift Water Rescue SAPD/Sheriff evacuations Bexar County Flood Warning System May Location Maps Bexar County Flood Warning System May

12 Future Rainfall 6/9/2014 Real Time Inundation Mapping Available at RS locations Maximum inundation in 48 hour window Road closures Evacuation limits Water Velocity Water Depth Overall Maximum Bexar County Flood Warning System May System Summary NEXRAD 15 min from NWS Rain Gages Level Gages SAOEM EOC NWS Hydrometric Database Western Configuration Central Configuration Eastern Configuration FloodWorks Server at SARA office XML Website Website Parser SARA Web Server Bexar County Flood Warning System May BCFWS Benefits Uses NEXRAD and reporting gauges for past rainfall Robust and simple procedure to include future rainfall Leverages the wisdom of the NWS WFO meteorologist End user can add to forecast Separate forecasts for Western, Central, Eastern Provides 1 to 5 hours of lead time (NWS call & travel timing) Will save lives of victims and first responders Western Central Eastern Bexar County Flood Warning System May

San Antonio River Authority. San Antonio River Authority Floodworks implementation in the San Antonio River Basin. Nefi Garza, PE, CFM

San Antonio River Authority. San Antonio River Authority Floodworks implementation in the San Antonio River Basin. Nefi Garza, PE, CFM San Antonio River Authority Floodworks implementation in the San Antonio River Basin Nefi Garza, PE, CFM San Antonio River Authority Michael Crenshaw, PE, CFM Anthony J. Henry Wallingford Software, Inc

More information

Pompton Lakes Dam Downstream Effects of the Floodgate Facility. Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner

Pompton Lakes Dam Downstream Effects of the Floodgate Facility. Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner Pompton Lakes Dam Downstream Effects of the Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner ASFPM 2013: Overview Page 2 Overview Page 3 Overview Page 4 Overview Page 5 Overview - Historical Pompton

More information

TRWD Upper Trinity River Flood Operations Decision Support System

TRWD Upper Trinity River Flood Operations Decision Support System TRWD Upper Trinity River Flood Operations Decision Support System TFMA 2012 Fall Conference Rockwall, Texas September 20, 2012 Presented by: Andrew Ickert, PE, CFM & Craig Ottman, PE, CFM (Halff Associates,

More information

INTRODUCTION TO HEC-HMS

INTRODUCTION TO HEC-HMS INTRODUCTION TO HEC-HMS Hydrologic Engineering Center- Hydrologic Modeling System US Army Corps of Engineers Hydrologic Engineering Center HEC-HMS Uses Schematics Enter properties: watershed, rivers (reaches),

More information

Real-Time Flood Forecasting Modeling in Nashville, TN utilizing HEC-RTS

Real-Time Flood Forecasting Modeling in Nashville, TN utilizing HEC-RTS Real-Time Flood Forecasting Modeling in Nashville, TN utilizing HEC-RTS Brantley Thames, P.E. Hydraulic Engineer, Water Resources Section Nashville District, USACE August 24, 2017 US Army Corps of Engineers

More information

Las Colonias Subdivision September 2010 Flood Study

Las Colonias Subdivision September 2010 Flood Study Las Colonias Subdivision September 2010 Flood Study Curtis Beitel, P.E., CFM Scott Muchard, P.E. Project Engineer William Badini, CFM Senior Meteorologist Location Map Background Los Colonias Subdivision

More information

Chapter 5 CALIBRATION AND VERIFICATION

Chapter 5 CALIBRATION AND VERIFICATION Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic

More information

USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire

USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire NH Water & Watershed Conference Robert Flynn, USGS NH-VT Water Science Center March 23, 2012

More information

Speakers: NWS Buffalo Dan Kelly and Sarah Jamison, NERFC Jeane Wallace. NWS Flood Services for the Black River Basin

Speakers: NWS Buffalo Dan Kelly and Sarah Jamison, NERFC Jeane Wallace. NWS Flood Services for the Black River Basin Speakers: NWS Buffalo Dan Kelly and Sarah Jamison, NERFC Jeane Wallace NWS Flood Services for the Black River Basin National Weather Service Who We Are The National Oceanic and Atmospheric Administration

More information

Presented by Jerry A. Gomez, P.E. National Hydropower Association Northeast Regional Meeting - September 17, 2009

Presented by Jerry A. Gomez, P.E. National Hydropower Association Northeast Regional Meeting - September 17, 2009 Presented by Jerry A. Gomez, P.E. National Hydropower Association Northeast Regional Meeting - September 17, 2009 Defining Probable Maximum Precipitation (PMP) PMP is the theoretically greatest depth of

More information

Chapter 10 - Sacramento Method Examples

Chapter 10 - Sacramento Method Examples Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer

More information

Michael Schaffner, Alexander Tardy, Jayme Laber, Carl Unkrich, and David Goodrich,

Michael Schaffner, Alexander Tardy, Jayme Laber, Carl Unkrich, and David Goodrich, Michael Schaffner, Alexander Tardy, Jayme Laber, Carl Unkrich, and David Goodrich, A collaborative effort between NWS Western Region Headquarters, NWS San Diego, NWS Oxnard, and the USDA-ARS Southwest

More information

CONVERTING A NEXRAD MAP TO A FLOODPLAIN MAP. Oscar Robayo, Tim Whiteaker, and David Maidment*

CONVERTING A NEXRAD MAP TO A FLOODPLAIN MAP. Oscar Robayo, Tim Whiteaker, and David Maidment* CONVERTING A NEXRAD MAP TO A FLOODPLAIN MAP Oscar Robayo, Tim Whiteaker, and David Maidment* ABSTRACT: Using ArcGIS 9.0 ArcObjects and the new ModelBuilder environment, a methodology for converting a NEXRAD

More information

Merced Irrigation District Hydrologic and Hydraulic Operations (MIDH2O) Model

Merced Irrigation District Hydrologic and Hydraulic Operations (MIDH2O) Model Merced Irrigation District Hydrologic and Hydraulic Operations (MIDH2O) Model September 05, 2018 Marco Bell, Merced Irrigation District Bibek Joshi, Dewberry Objective Introduce HEC-RTS Benefits of MIDH2O

More information

Leveraging new models and data to improve flood stage forecast. Improving Flood Stage Forecasting in the Feather River Watershed. September 11 th 2015

Leveraging new models and data to improve flood stage forecast. Improving Flood Stage Forecasting in the Feather River Watershed. September 11 th 2015 Leveraging new models and data to improve flood stage forecast Improving Flood Stage Forecasting in the Feather River Watershed September 11 th 2015 Mitch Russo, P.E. (DWR) Ashok Bathulla, P.E., CFM (GEI)

More information

Workshop: Build a Basic HEC-HMS Model from Scratch

Workshop: Build a Basic HEC-HMS Model from Scratch Workshop: Build a Basic HEC-HMS Model from Scratch This workshop is designed to help new users of HEC-HMS learn how to apply the software. Not all the capabilities in HEC-HMS are demonstrated in the workshop

More information

ARMSTRONG COUNTY, PA

ARMSTRONG COUNTY, PA ARMSTRONG COUNTY, PA Revised Preliminary DFIRM Mapping March 31, 2013 Kevin Donnelly, P.E., CFM GG3, Greenhorne & O Mara, Inc. Presentation Agenda Armstrong County DFIRM Overview - June 25, 2010 DFIRM

More information

A Cloud-Based Flood Warning System For Forecasting Impacts to Transportation Infrastructure Systems

A Cloud-Based Flood Warning System For Forecasting Impacts to Transportation Infrastructure Systems A Cloud-Based Flood Warning System For Forecasting Impacts to Transportation Infrastructure Systems Jon Goodall Associate Professor, Civil and Environmental Engineering Associate Director, Link Lab April

More information

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example

More information

An Overview of Operations at the West Gulf River Forecast Center Gregory Waller Service Coordination Hydrologist NWS - West Gulf River Forecast Center

An Overview of Operations at the West Gulf River Forecast Center Gregory Waller Service Coordination Hydrologist NWS - West Gulf River Forecast Center National Weather Service West Gulf River Forecast Center An Overview of Operations at the West Gulf River Forecast Center Gregory Waller Service Coordination Hydrologist NWS - West Gulf River Forecast

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

Appendix D. Model Setup, Calibration, and Validation

Appendix D. Model Setup, Calibration, and Validation . Model Setup, Calibration, and Validation Lower Grand River Watershed TMDL January 1 1. Model Selection and Setup The Loading Simulation Program in C++ (LSPC) was selected to address the modeling needs

More information

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS By Thomas T. Burke, Jr., PhD, PE Luke J. Sherry, PE, CFM Christopher B. Burke Engineering, Ltd. October 8, 2014 1 SEMINAR OUTLINE Overview of hydrologic

More information

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

Leon Creek Watershed October 17-18, 1998 Rainfall Analysis Examination of USGS Gauge Helotes Creek at Helotes, Texas

Leon Creek Watershed October 17-18, 1998 Rainfall Analysis Examination of USGS Gauge Helotes Creek at Helotes, Texas Leon Creek Watershed October 17-18, 1998 Rainfall Analysis Examination of USGS Gauge 8181400 Helotes Creek at Helotes, Texas Terrance Jackson MSCE Candidate University of Texas San Antonio Abstract The

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

StreamStats: Delivering Streamflow Information to the Public. By Kernell Ries

StreamStats: Delivering Streamflow Information to the Public. By Kernell Ries StreamStats: Delivering Streamflow Information to the Public By Kernell Ries U.S. Department of the Interior U.S. Geological Survey MD-DE-DC District 410-238-4317 kries@usgs.gov StreamStats Web Application

More information

Flood Event Analysis to Estimate the Avoided Damages Due to Flood Improvement Projects & Voluntary Buyout Program

Flood Event Analysis to Estimate the Avoided Damages Due to Flood Improvement Projects & Voluntary Buyout Program Flood Event Analysis to Estimate the Avoided Damages Due to Flood Improvement Projects & Voluntary Buyout Program Ataul Hannan, P.E., CFM Planning Division Director Harris County Flood Control District

More information

Rucker Pond. Background

Rucker Pond. Background Rucker Pond Background The Rucker Basin consists of two subbasins (East and West) that drain to a single area known as Rucker Pond. Both subbasins have the same hydraulic parameters, but have different

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Flash Flood Guidance System On-going Enhancements

Flash Flood Guidance System On-going Enhancements Flash Flood Guidance System On-going Enhancements Hydrologic Research Center, USA Technical Developer SAOFFG Steering Committee Meeting 1 10-12 July 2017 Jakarta, INDONESIA Theresa M. Modrick Hansen, PhD

More information

Flood Hazard Inundation Mapping. Presentation. Flood Hazard Mapping

Flood Hazard Inundation Mapping. Presentation. Flood Hazard Mapping Flood Hazard Inundation Mapping Verne Schneider, James Verdin, and JeradBales U.S. Geological Survey Reston, VA Presentation Flood Hazard Mapping Requirements Practice in the United States Real Time Inundation

More information

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

Next Generation Flood Forecasting and Warning System Evaluation and Work Plan Development

Next Generation Flood Forecasting and Warning System Evaluation and Work Plan Development Next Generation Flood Forecasting and Warning System Evaluation and Work Plan Development March 8, 2018 Nick Lorrain, CET Manager, Capital Projects Toronto and Region Conservation Authority nlorrain@trca.on.ca

More information

Name of NWS Researcher Preparing Report: Karl Jungbluth, Jeff Zogg

Name of NWS Researcher Preparing Report: Karl Jungbluth, Jeff Zogg Final Report for COMET Partners Project University: Iowa State University (ISU) Name of University Researcher Preparing Report: Kristie J. Franz NWS Office: Des Moines Weather Forecast Office (DMX) Name

More information

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD 9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD 9.1. Introduction Due to the size of Watana Dam and the economic importance of the Project to the Railbelt, the Probable Maximum Flood (PMF)

More information

A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS

A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS ROMAN P., I. 1, OROS C., R. 2 ABSTRACT. A simple GIS method for obtaining flooded areas. This paper presents a method for obtaining flooded areas near to

More information

Local Flood Hazards. Click here for Real-time River Information

Local Flood Hazards. Click here for Real-time River Information Local Flood Hazards Floods of the White River and Killbuck Creek are caused by runoff from general, and/or intense rainfall. Other areas of flooding concern are from the Boland Ditch and Pittsford Ditch.

More information

MODELING STUDIES WITH HEC-HMS AND RUNOFF SCENARIOS IN YUVACIK BASIN, TURKIYE

MODELING STUDIES WITH HEC-HMS AND RUNOFF SCENARIOS IN YUVACIK BASIN, TURKIYE MODELING STUDIES WITH HEC-HMS AND RUNOFF SCENARIOS IN YUVACIK BASIN, TURKIYE Yener, M.K. Şorman, A.Ü. Department of Civil Engineering, Middle East Technical University, 06531 Ankara/Türkiye Şorman, A.A.

More information

Arkansas-Red Basin River Forecast Center Operations. RRVA Conference Durant, OK 8/22/2013 Jeff McMurphy Sr. Hydrologist - ABRFC

Arkansas-Red Basin River Forecast Center Operations. RRVA Conference Durant, OK 8/22/2013 Jeff McMurphy Sr. Hydrologist - ABRFC Arkansas-Red Basin River Forecast Center Operations RRVA Conference Durant, OK 8/22/2013 Jeff McMurphy Sr. Hydrologist - ABRFC NWS River Forecast Centers NWS Weather Forecast Offices Operations Staffing

More information

The Geometric and Hydraulic Simulation of Detention Dams by Integrating HEC-HMS and GIS (Case Study: Neka River Drainage Basin)

The Geometric and Hydraulic Simulation of Detention Dams by Integrating HEC-HMS and GIS (Case Study: Neka River Drainage Basin) Current World Environment Vol. 10(Special Issue 1), 842-851 (2015) The Geometric and Hydraulic Simulation of Detention Dams by Integrating HEC-HMS and GIS (Case Study: Neka River Drainage Basin) Arman

More information

Objectives: After completing this assignment, you should be able to:

Objectives: After completing this assignment, you should be able to: Data Analysis Assignment #1 Evaluating the effects of watershed land use on storm runoff Assignment due: 21 February 2013, 5 pm Objectives: After completing this assignment, you should be able to: 1) Calculate

More information

GREENE COUNTY, PA. Revised Preliminary DFIRM Mapping FEMA. Kevin Donnelly, P.E., CFM GG3, Greenhorne & O Mara, Inc. April 10, 2013

GREENE COUNTY, PA. Revised Preliminary DFIRM Mapping FEMA. Kevin Donnelly, P.E., CFM GG3, Greenhorne & O Mara, Inc. April 10, 2013 GREENE COUNTY, PA Revised Preliminary DFIRM Mapping April 10, 2013 Kevin Donnelly, P.E., CFM GG3, Greenhorne & O Mara, Inc. Presentation Agenda Greene County DFIRM Overview September 30, 2010 DFIRM Countywide

More information

Floodplain Mapping & Flood Warning Applications in North Carolina

Floodplain Mapping & Flood Warning Applications in North Carolina Floodplain Mapping & Flood Warning Applications in North Carolina Marc Stanard, IT Project Manager Ken Ashe, Assistant Director David Herlong, Flood Warning Program Manager NC Crime Control & Public Safety

More information

Operational modelling & forecasting in urban catchments. Richard Body Product Sector Leader Operational Forecasting

Operational modelling & forecasting in urban catchments. Richard Body Product Sector Leader Operational Forecasting Operational modelling & forecasting in urban catchments Richard Body Product Sector Leader Operational Forecasting Contents What is operational forecasting Innovyze software ICMLive components Benefits

More information

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design Scholars' Mine Masters Theses Student Theses and Dissertations Spring 2010 The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention

More information

CWMS Modeling for Real-Time Water Management

CWMS Modeling for Real-Time Water Management Hydrologic Engineering Center Training Course on CWMS Modeling for Real-Time Water Management August 2018 Davis, California The Corps Water Management System (CWMS) is a software and hardware system to

More information

Pompton Lake Dam. March 12 15, 2010 Nor easter Post-Flood Report

Pompton Lake Dam. March 12 15, 2010 Nor easter Post-Flood Report Pompton Lake Dam March 12 15, 2010 Nor easter Post-Flood Report 31 July 2010 EXECUTIVE SUMMARY This report documents the meteorologic, hydrologic, and hydraulic aspects of flooding along the Ramapo River

More information

Operational Perspectives on Hydrologic Model Data Assimilation

Operational Perspectives on Hydrologic Model Data Assimilation Operational Perspectives on Hydrologic Model Data Assimilation Rob Hartman Hydrologist in Charge NOAA / National Weather Service California-Nevada River Forecast Center Sacramento, CA USA Outline Operational

More information

Lessons Learned and Shared

Lessons Learned and Shared Lessons Learned and Shared Plan for the worst. Hope for the best. Remember that hope is not a strategy. Agnes 8 Lessons 1. Identify Susceptible Communities 2. Develop a Plan 3. Threat Recognition 4. Review

More information

Bushkill Creek 3 rd Street Dam Removal Analysis

Bushkill Creek 3 rd Street Dam Removal Analysis Bushkill Creek 3 rd Street Dam Removal Analysis HEC HMS Runoff and Routing Model Stephen Beavan, Melanie DeFazio, David Gold, Peter Mara and Dan Moran CE 421: Hydrology Fall 2010 December 15, 2010 Contents

More information

Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows ( ) for the Operations Model Don Pedro Project Relicensing

Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows ( ) for the Operations Model Don Pedro Project Relicensing Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows (1970-2010) for the Operations Model Don Pedro Project Relicensing 1.0 Objective Using available data, develop a daily time series

More information

Designing a Dam for Blockhouse Ranch. Haley Born

Designing a Dam for Blockhouse Ranch. Haley Born Designing a Dam for Blockhouse Ranch Haley Born CE 394K GIS in Water Resources Term Paper Fall 2011 Table of Contents Introduction... 1 Data Sources... 2 Precipitation Data... 2 Elevation Data... 3 Geographic

More information

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Raymond Rogozinski and Maged Aboelata The City of Bristol and Towns of Plainville and

More information

Delaware River Basin Flood Analysis Model Independent External Peer Review Report

Delaware River Basin Flood Analysis Model Independent External Peer Review Report Delaware River Basin Flood Analysis Model Independent External Peer Review Report Map source: DRBC Prepared for: Federal Emergency Management Agency, Region III Delaware River Basin Commission Prepared

More information

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS Routing MODULE - ROUTING METHODS Routing is the process of find the distribution of flow rate and depth in space and time along a river or storm sewer. Routing is also called Flow routing or flood routing.

More information

FLOOD REPORT FOR MANITOBA. June 28, A Gale wind warning is in effect for Lake Manitoba and Lake Winnipeg

FLOOD REPORT FOR MANITOBA. June 28, A Gale wind warning is in effect for Lake Manitoba and Lake Winnipeg FLOOD REPORT FOR MANITOBA June 28, 2014 A Gale wind warning is in effect for Lake Manitoba and Lake Winnipeg Flood Warning*: Flood Watch*: High Water Advisory*: - Assiniboine River, from Shellmouth Dam

More information

United States Multi-Hazard Early Warning System

United States Multi-Hazard Early Warning System United States Multi-Hazard Early Warning System Saving Lives Through Partnership Lynn Maximuk National Weather Service Director, Central Region Kansas City, Missouri America s s Weather Enterprise: Protecting

More information

USING GIS TO MODEL AND ANALYZE HISTORICAL FLOODING OF THE GUADALUPE RIVER NEAR NEW BRAUNFELS, TEXAS

USING GIS TO MODEL AND ANALYZE HISTORICAL FLOODING OF THE GUADALUPE RIVER NEAR NEW BRAUNFELS, TEXAS USING GIS TO MODEL AND ANALYZE HISTORICAL FLOODING OF THE GUADALUPE RIVER NEAR NEW BRAUNFELS, TEXAS ASHLEY EVANS While the state of Texas is well-known for flooding, the Guadalupe River Basin is one of

More information

Riverine Modeling Proof of Concept

Riverine Modeling Proof of Concept Technical Team Meeting Riverine Modeling Proof of Concept Version 2 HEC-RAS Open-water Flow Routing Model April 15-17, 2014 Prepared by R2 Resource Consultants, Brailey Hydrologic, Geovera, Tetra Tech,

More information

Detailed Storm Rainfall Analysis for Hurricane Ivan Flooding in Georgia Using the Storm Precipitation Analysis System (SPAS) and NEXRAD Weather Radar

Detailed Storm Rainfall Analysis for Hurricane Ivan Flooding in Georgia Using the Storm Precipitation Analysis System (SPAS) and NEXRAD Weather Radar Detailed Storm Rainfall Analysis for Hurricane Ivan Flooding in Georgia Using the Storm Precipitation Analysis System (SPAS) and NEXRAD Weather Radar Ed Tomlinson, PhD and Bill Kappel Applied Weather Associates

More information

PECKMAN RIVER BASIN, NEW JERSEY FLOOD RISK MANAGEMENT FEASIBILITY STUDY. Hydrology Appendix. New York District

PECKMAN RIVER BASIN, NEW JERSEY FLOOD RISK MANAGEMENT FEASIBILITY STUDY. Hydrology Appendix. New York District PECKMAN RIVER BASIN, NEW JERSEY FLOOD RISK MANAGEMENT FEASIBILITY STUDY Hydrology Appendix New York District May 2018 Table of Contents 1.0 OBJECTIVE OF STUDY... 1 2.0 WATERSHED DESCRIPTION... 1 3.0 PRIOR

More information

Hydrologic Evaluation of the Blanchard River

Hydrologic Evaluation of the Blanchard River Hydrologic Evaluation of the Blanchard River Hancock County Flood Risk Reduction Program Prepared for: Maumee Watershed Conservancy District 1464 Pinehurst Dr. Defiance, Ohio 43512 Prepared by: Stantec

More information

GAM Run by Ali H. Chowdhury Ph.D., P.G. Texas Water Development Board Groundwater Resources Division (512)

GAM Run by Ali H. Chowdhury Ph.D., P.G. Texas Water Development Board Groundwater Resources Division (512) GAM Run 7-18 by Ali H. Chowdhury Ph.D., P.G. Texas Water Development Board Groundwater Resources Division (512) 936-0834 July 13, 2007 EXECUTIVE SUMMARY The groundwater availability model for the Hill

More information

A GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner

A GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner Texas A&M University Zachry Department of Civil Engineering CVEN 658 Civil Engineering Applications of GIS Instructor: Dr. Francisco Olivera A GIS-based Approach to Watershed Analysis in Texas Author:

More information

Model Calibration and Forecast Error for NFIE-Hydro

Model Calibration and Forecast Error for NFIE-Hydro Corey Van Dyk C E 397 Flood Forecasting 5/8/15 Model Calibration and Forecast Error for NFIE-Hydro Introduction The forecasting component of the National Flood Interoperability Experiment (NFIE), like

More information

Folsom Dam Water Control Manual Update

Folsom Dam Water Control Manual Update Folsom Dam Water Control Manual Update Public Workshop April 3, 2014 Location: Sterling Hotel Ballroom 1300 H Street, Sacramento US Army Corps of Engineers BUILDING STRONG WELCOME & INTRODUCTIONS 2 BUILDING

More information

KINEROS2/AGWA. Fig. 1. Schematic view (Woolhiser et al., 1990).

KINEROS2/AGWA. Fig. 1. Schematic view (Woolhiser et al., 1990). KINEROS2/AGWA Introduction Kineros2 (KINematic runoff and EROSion) (K2) model was originated at the USDA-ARS in late 1960s and released until 1990 (Smith et al., 1995; Woolhiser et al., 1990). The spatial

More information

Overview of a Changing Climate in Rhode Island

Overview of a Changing Climate in Rhode Island Overview of a Changing Climate in Rhode Island David Vallee, Hydrologist in Charge, National Weather Service Northeast River Forecast Center, NOAA Lenny Giuliano, Air Quality Specialist, Rhode Island Department

More information

Watershed simulation and forecasting system with a GIS-oriented user interface

Watershed simulation and forecasting system with a GIS-oriented user interface HydroGIS 96: Application of Geographic Information Systems in Hydrology and Water Resources Management (Proceedings of the Vienna Conference, April 1996). IAHS Publ. no. 235, 1996. 493 Watershed simulation

More information

Near Real-Time Runoff Estimation Using Spatially Distributed Radar Rainfall Data. Jennifer Hadley 22 April 2003

Near Real-Time Runoff Estimation Using Spatially Distributed Radar Rainfall Data. Jennifer Hadley 22 April 2003 Near Real-Time Runoff Estimation Using Spatially Distributed Radar Rainfall Data Jennifer Hadley 22 April 2003 Introduction Water availability has become a major issue in Texas in the last several years,

More information

UPPER COSUMNES RIVER FLOOD MAPPING

UPPER COSUMNES RIVER FLOOD MAPPING UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe

More information

GIS Techniques for Floodplain Delineation. Dean Djokic

GIS Techniques for Floodplain Delineation. Dean Djokic GIS Techniques for Floodplain Delineation Dean Djokic (ddjokic@esri.com) Content What is a floodplain? How to get a floodplain? What can GIS do for floodplain modeling? Simple GIS techniques for floodplain

More information

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving

More information

National Weather Service Flood Forecast Needs: Improved Rainfall Estimates

National Weather Service Flood Forecast Needs: Improved Rainfall Estimates National Weather Service Flood Forecast Needs: Improved Rainfall Estimates Weather Forecast Offices Cleveland and Northern Indiana Ohio River Forecast Center Presenter: Sarah Jamison, Service Hydrologist

More information

Operational Hydrologic Ensemble Forecasting. Rob Hartman Hydrologist in Charge NWS / California-Nevada River Forecast Center

Operational Hydrologic Ensemble Forecasting. Rob Hartman Hydrologist in Charge NWS / California-Nevada River Forecast Center Operational Hydrologic Ensemble Forecasting Rob Hartman Hydrologist in Charge NWS / California-Nevada River Forecast Center Mission of NWS Hydrologic Services Program Provide river and flood forecasts

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

Study 16.5 Probable Maximum Flood (PMF)

Study 16.5 Probable Maximum Flood (PMF) Initial Study Report Meeting Study 16.5 Probable Maximum Flood (PMF) March 30, 2016 Prepared by 3/30/2016 1 Study 16.5 Status ISR documents (ISR Part D Overview): Status: Initial Study Report: Parts A,

More information

Operational water balance model for Siilinjärvi mine

Operational water balance model for Siilinjärvi mine Operational water balance model for Siilinjärvi mine Vesa Kolhinen, Tiia Vento, Juho Jakkila, Markus Huttunen, Marie Korppoo, Bertel Vehviläinen Finnish Environment Institute (SYKE) Freshwater Centre/Watershed

More information

Forecast Methods, Products, and Services for the San Joaquin River Basin. Mission of NWS Hydrologic Services Program

Forecast Methods, Products, and Services for the San Joaquin River Basin. Mission of NWS Hydrologic Services Program NOAA s s National Weather Service California-Nevada River Forecast Center Forecast Methods, Products, and Services for the San Joaquin River Basin Rob Hartman Hydrologist in Charge Mission of NWS Hydrologic

More information

The Stochastic Event Flood Model Applied to Minidoka Dam on the Snake River, Idaho

The Stochastic Event Flood Model Applied to Minidoka Dam on the Snake River, Idaho The Stochastic Event Flood Model Applied to Minidoka Dam on the Snake River, Idaho K. L. Bullard 1, M. G. Schaeffer 2, B. A. Barker 3, D. Sutley 4, and V. Leverson 5 1 Bureau of Reclamation, Flood Hydrology

More information

George Mason University Department of Civil, Environmental and Infrastructure Engineering

George Mason University Department of Civil, Environmental and Infrastructure Engineering George Mason University Department of Civil, Environmental and Infrastructure Engineering Dr. Celso Ferreira Prepared by Lora Baumgartner December 2015 Revised by Brian Ross July 2016 Exercise Topic: Getting

More information

Predictive Model of Rainfall-Runoff: A Case Study of the Sanaga Basin at Bamendjin Watershed in Cameroon

Predictive Model of Rainfall-Runoff: A Case Study of the Sanaga Basin at Bamendjin Watershed in Cameroon Predictive Model of Rainfall-Runoff: A Case Study of the Sanaga Basin at Bamendjin Watershed in Cameroon Terence Kibula Lukong (Corresponding author) Hydrology Division, AES SONEL Douala, P.O. Box 433,

More information

Hydrological forecasting and decision making in Australia

Hydrological forecasting and decision making in Australia Hydrological forecasting and decision making in Australia Justin Robinson, Jeff Perkins and Bruce Quig Bureau of Meteorology, Australia The Bureau's Hydrological Forecasting Services Seasonal Forecasts

More information

ISSN Vol.03,Issue.10 May-2014, Pages:

ISSN Vol.03,Issue.10 May-2014, Pages: www.semargroup.org, www.ijsetr.com ISSN 2319-8885 Vol.03,Issue.10 May-2014, Pages:2187-2191 YIN YIN HTWE 1, AYE AYE THANT 2 1 Dept of Civil Engineering, Mandalay Technological University, Mandalay, Myanmar,

More information

Lake Tahoe Watershed Model. Lessons Learned through the Model Development Process

Lake Tahoe Watershed Model. Lessons Learned through the Model Development Process Lake Tahoe Watershed Model Lessons Learned through the Model Development Process Presentation Outline Discussion of Project Objectives Model Configuration/Special Considerations Data and Research Integration

More information

Talk Overview. Concepts. Climatology. Monitoring. Applications

Talk Overview. Concepts. Climatology. Monitoring. Applications Atmospheric Rivers Talk Overview Concepts Climatology Monitoring Applications Satellite View Where is the storm? Where is the impact? Atmospheric Rivers Plume or fire hose of tropical moisture Heavy precipitation

More information

Climatic Change Implications for Hydrologic Systems in the Sierra Nevada

Climatic Change Implications for Hydrologic Systems in the Sierra Nevada Climatic Change Implications for Hydrologic Systems in the Sierra Nevada Part Two: The HSPF Model: Basis For Watershed Yield Calculator Part two presents an an overview of why the hydrologic yield calculator

More information

REMOTE SENSING AND GEOSPATIAL APPLICATIONS FOR WATERSHED DELINEATION

REMOTE SENSING AND GEOSPATIAL APPLICATIONS FOR WATERSHED DELINEATION REMOTE SENSING AND GEOSPATIAL APPLICATIONS FOR WATERSHED DELINEATION Gaurav Savant (gaurav@engr.msstate.edu) Research Assistant, Department of Civil Engineering, Lei Wang (lw4@ra.msstate.edu) Research

More information

Study 16.5 Probable Maximum Flood (PMF)

Study 16.5 Probable Maximum Flood (PMF) Initial Study Report Meeting Study 16.5 Probable Maximum Flood (PMF) October 22, 2014 Prepared by 10/22/2014 1 Study 16.5 Objectives Develop a site-specific PMP to be used for the derivation of the PMF

More information

The Beleaguered Figure 15

The Beleaguered Figure 15 The Beleaguered Figure 15 TFMA 2015 Fall Technical Summit After the Floods: Texas Rising Craig Loftin, PE, CFM US Weather Bureau Technical Paper No. 40, Figure 15 Village Creek Watershed 1 100-Year 30-Minute

More information

The Beleaguered Figure 15 TFMA 2015 Fall Technical Summit After the Floods: Texas Rising

The Beleaguered Figure 15 TFMA 2015 Fall Technical Summit After the Floods: Texas Rising The Beleaguered Figure 15 TFMA 2015 Fall Technical Summit After the Floods: Texas Rising Craig Loftin, PE, CFM US Weather Bureau Technical Paper No. 40, Figure 15 Village Creek Watershed 100-Year 30-Minute

More information

FFGS Advances. Initial planning meeting, Nay Pyi Taw, Myanmar February, Eylon Shamir, Ph.D,

FFGS Advances. Initial planning meeting, Nay Pyi Taw, Myanmar February, Eylon Shamir, Ph.D, FFGS Advances Initial planning meeting, Nay Pyi Taw, Myanmar 26-28 February, 2018 Eylon Shamir, Ph.D, EShamir@hrcwater.org Hydrologic Research Center San Diego, California FFG System Enhancements The following

More information

National Weather Service Greenville-Spartanburg, Forecast Office

National Weather Service Greenville-Spartanburg, Forecast Office National Weather Service Greenville-Spartanburg, Forecast Office CoCoRaHS Presentation: NC CERT Conference May, 2017 Introduction- who we are. Federal Agency Within the U.S. Dept. of Commerce Introduction-

More information

Coastal Flooding in Brevard County, Florida

Coastal Flooding in Brevard County, Florida Helen Gerlach CE 394K.3 December 4, 2015 Coastal Flooding in Brevard County, Florida Introduction My project was to create a model of the coastal flooding that occurred in Brevard County, Florida in August

More information

Development of the Hydrologic Model

Development of the Hydrologic Model Kick-off meeting on enhancing hydrological data management and exchange procedures Water and Climate Adaptation Plan (WATCAP) for Sava River Basin Development of the Hydrologic Model David Heywood Team

More information

HEC & GIS Modeling of the Brushy Creek HEC & GIS Watershed Modeling of the

HEC & GIS Modeling of the Brushy Creek HEC & GIS Watershed Modeling of the HEC & GIS Modeling of the Brushy Creek HEC & GIS Watershed Modeling of the By Cassandra Fagan 5, December 2014 http://ubcwatershedstudy.ursokr.com/images/ Contents Introduction... 3 Figure 1: 24-hour rainfall

More information

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT TECHNICAL REPORT Prepared for: City of Livingston 411 East Callender Livingston, MT 59047 Prepared by: Clear Creek Hydrology, Inc. 1627 West Main Street, #294

More information

January 25, Summary

January 25, Summary January 25, 2013 Summary Precipitation since the December 17, 2012, Drought Update has been slightly below average in parts of central and northern Illinois and above average in southern Illinois. Soil

More information

12 SWAT USER S MANUAL, VERSION 98.1

12 SWAT USER S MANUAL, VERSION 98.1 12 SWAT USER S MANUAL, VERSION 98.1 CANOPY STORAGE. Canopy storage is the water intercepted by vegetative surfaces (the canopy) where it is held and made available for evaporation. When using the curve

More information