Riverine Modeling Proof of Concept
|
|
- Gordon Francis
- 5 years ago
- Views:
Transcription
1 Technical Team Meeting Riverine Modeling Proof of Concept Version 2 HEC-RAS Open-water Flow Routing Model April 15-17, 2014 Prepared by R2 Resource Consultants, Brailey Hydrologic, Geovera, Tetra Tech, and HDR 1
2 Open-water HEC-RAS Flow Routing Model V2 2
3 Improvements Coverage New Cross-sections Middle and Lower River Extended Domain - Dam Site (PRM 187.2) to Susitna Station (PRM 29.9) Floodplain coverage XS extended with LiDAR Devils Canyon» LiDAR + Estimated Channel 3
4 4
5 Improvements Coverage New Cross-sections Middle and Lower River Extended Domain - Dam Site (PRM187.2) to Susitna Station (PRM 29.9) Floodplain coverage XS extended with LiDAR Devils Canyon Refined Calibration New XS rating curves and additional points for 2012 XS 5
6 Refined Calibration Middle River Lower River 6
7 Improvements Coverage New Cross-sections Middle and Lower River Extended Domain - Dam Site (PRM187.2) to Susitna Station (PRM 29.9) Floodplain coverage XS extended with LiDAR Devils Canyon Refined Calibration Synthesized Tributary Flows Hourly Accretion 61 year record 7
8 Hourly Flow (cfs) 30,000 28,000 Susitna River at Gold Creek Gage (PRM 140.0) 26,000 24,000 22,000 20,000 18,000 16,000 14,000 Simulated USGS Measured 12,000 10,000 8
9 Hourly Flow (cfs) 75,000 70,000 Susitna River at Sunshine Gage (PRM 88.0) 65,000 60,000 55,000 50,000 45,000 Simulated USGS Measured 40,000 9
10 Hourly Flow (cfs) 135, ,000 Susitna River at Susitna Station Gage (PRM 29.9) 125, , , , , ,000 Simulated USGS Measured 95,000 90,000 10
11 Outputs Hourly flow hydrographs of the Susitna River at any location (including Focus Areas) between the proposed dam site (PRM 187.2) and just downstream from the Yentna River confluence (PRM 29.9). Hourly stage hydrographs of the Susitna River at surveyed river cross-sections (total = 212). 11
12 60000 Existing Conditions Scenario OS-1b Hourly Flow (cfs) Susitna River at Dam Site PRM Dry Year Jul 1, 1975 Oct 1, 1975 Jan 1, 1976 Apr 1, 1976 Jul 1, 1976 Oct 1,
13 60000 Existing Conditions Scenario OS-1b Hourly Flow (cfs) Susitna River at FA-128 PRM Dry Year Jul 1, 1975 Oct 1, 1975 Jan 1, 1976 Apr 1, 1976 Jul 1, 1976 Oct 1,
14 60000 Existing Conditions Scenario OS-1b Hourly Flow (cfs) Susitna River at Dam Site PRM Wet Year Jul 1, 1980 Oct 1, 1980 Jan 1, 1981 Apr 1, 1981 Jul 1, 1981 Oct 1,
15 60000 Existing Conditions Scenario OS-1b Hourly Flow (cfs) Susitna River at FA-128 PRM Wet Year Jul 1, 1980 Oct 1, 1980 Jan 1, 1981 Apr 1, 1981 Jul 1, 1981 Oct 1,
16 Limitations Not applicable during ice covered conditions (October 28 through May 22) One-dimensional Devils Canyon bathymetry estimated No water surface elevations at locations in between surveyed cross-sections. The 2D hydraulic model in the Focus Areas will rely on input from the HEC-RAS Open-water Flow Routing Model to determine water surface elevations in Focus Areas. Output from the HEC-RAS Open-water Flow Routing Model, combined with LiDAR data, may be used to estimate areas of inundation in riparian floodplain zones. 16
Susitna-Watana Hydroelectric Project (FERC No ) Geomorphology Study Study Plan Section Study Implementation Report.
(FERC No. 14241) Geomorphology Study Study Plan Section 6.5 2014-2015 Study Implementation Report Prepared for Prepared by Tetra Tech Watershed GeoDynamics October 2015 TABLE OF CONTENTS 1. Introduction...
More informationGeomorphology Studies
Geomorphology Studies Technical Workgroup Meeting February 14, 2012 Prepared by: Tetra Tech Prepared for: Alaska Energy Authority Overall Goal Geomorphology Studies Two studies Geomorphology Study (RSP
More informationUpdated Fluvial Geomorphology Modeling Approach
(FERC No. 14241) Updated Fluvial Geomorphology Modeling Approach Technical Memorandum Prepared for Prepared by Tetra Tech Original Submitted June 30, 2013 Updated May 2014 Page intentionally left blank
More informationSusitna-Watana Hydroelectric Project (FERC No )
(FERC No. 14241) Development of Sediment-Transport Relationships and an Initial Sediment Balance for the Middle and Lower Susitna River Segments Prepared for Prepared by Tetra Tech February 2013 REPORT
More informationHydraulic and Sediment Transport Modeling Strategy
Appendix B Hydraulic and Sediment Transport Modeling Strategy May 2014 Technical Memorandum Channel Capacity Report January 2015 San Joaquin River Restoration Program Hydraulic and Sediment Transport Modeling
More information9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD
9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD 9.1. Introduction Due to the size of Watana Dam and the economic importance of the Project to the Railbelt, the Probable Maximum Flood (PMF)
More informationUPPER COSUMNES RIVER FLOOD MAPPING
UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe
More informationLower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows ( ) for the Operations Model Don Pedro Project Relicensing
Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows (1970-2010) for the Operations Model Don Pedro Project Relicensing 1.0 Objective Using available data, develop a daily time series
More informationThe Use of Synthetic Floods for Defining the Regulated Volume Duration Frequency Curves for the Red River at Fargo, ND
The Use of Synthetic Floods for Defining the Regulated Volume Duration Frequency Curves for the Red River at Fargo, ND Prepared by the USACE - St. Paul District Hydrology & Water Management Section June
More informationHEC-RAS MODELING OF RAINBOW RIVER MFL TECHNICAL SUPPORT FRESHWATER STREAM FINAL REPORT SWFWMD TWA# 15TW
Appendix I HEC-RAS Modeling of Rainbow River, MFL Technical Support Freshwater Stream. Prepared by Environmental Consulting & Technology, Inc. for the Southwest Florida Water Management District, Brooksville,
More informationUSGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire
USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire NH Water & Watershed Conference Robert Flynn, USGS NH-VT Water Science Center March 23, 2012
More informationTechnical Memorandum No
Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.10 Task: Evaluation of Four Watershed Conditions - Sediment To: PRWFPA Staff Working Group Prepared by: Gregory Morris and
More informationL OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC
L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING PREPARED BY: LandC, etc, LLC TABLE OF CONTENTS 1 Introduction... 1 2 Methods... 1 2.1 Hydraulic Model... 1 2.2
More informationPRELIMINARY DRAFT FOR DISCUSSION PURPOSES
Memorandum To: David Thompson From: John Haapala CC: Dan McDonald Bob Montgomery Date: February 24, 2003 File #: 1003551 Re: Lake Wenatchee Historic Water Levels, Operation Model, and Flood Operation This
More informationRestoration Goals TFG Meeting. Agenda
San Joaquin River Restoration Program Restoration Goals TFG Meeting Reach 2B Update April 28, 2010 Agenda 1. Introductions 2. Program Restoration Goal Context 3. Program Update a) Interim Flows b) EIS/EIR
More informationSummary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,
Appendix N SUMMARY OF HYDRAULIC AND SEDIMENT-TRANSPORT ANALYSIS OF RESIDUAL SEDIMENT: ALTERNATIVES FOR THE SAN CLEMENTE DAM REMOVAL/RETROFIT PROJECT, CALIFORNIA the San Clemente Dam Removal/Retrofit Project,
More informationStudy 16.5 Probable Maximum Flood (PMF)
Initial Study Report Meeting Study 16.5 Probable Maximum Flood (PMF) October 22, 2014 Prepared by 10/22/2014 1 Study 16.5 Objectives Develop a site-specific PMP to be used for the derivation of the PMF
More informationStudy 16.5 Probable Maximum Flood (PMF)
Initial Study Report Meeting Study 16.5 Probable Maximum Flood (PMF) March 30, 2016 Prepared by 3/30/2016 1 Study 16.5 Status ISR documents (ISR Part D Overview): Status: Initial Study Report: Parts A,
More informationREDWOOD VALLEY SUBAREA
Independent Science Review Panel Conceptual Model of Watershed Hydrology, Surface Water and Groundwater Interactions and Stream Ecology for the Russian River Watershed Appendices A-1 APPENDIX A A-2 REDWOOD
More informationEvaluation and Incorporation of USACE HEC-RAS Model of Chicago Waterway System into the Development of the North Branch DWP
M E M O R A N D U M Evaluation and Incorporation of USACE HEC-RAS Model of Chicago Waterway System into the Development of the North Branch DWP TO: FROM: Joseph Spradling, PE, HDR Steven Vassos, PE, FluidClarity
More informationField Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah
Intermountain Center for River Rehabilitation and Restoration, Utah State University 31 July 2018 Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah I.
More informationESTIMATING JOINT FLOW PROBABILITIES AT STREAM CONFLUENCES USING COPULAS
ESTIMATING JOINT FLOW PROBABILITIES AT STREAM CONFLUENCES USING COPULAS Roger T. Kilgore, P.E., D. WRE* Principal Kilgore Consulting and Management 2963 Ash Street Denver, CO 80207 303-333-1408 David B.
More informationLower Susquehanna River Reservoir System Proposed Modeling Enhancements
Lower Susquehanna River Reservoir System Proposed Modeling Enhancements Presented at the Chesapeake Bay Program Scientific and Technical Advisory Committee (STAC) Workshop January 13, 2016 Overview Due
More informationHYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED
HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED 1.0 Introduction The Sg. Lui watershed is the upper part of Langat River Basin, in the state of Selangor which located approximately 20
More informationTo: Olivia Dorothy March 9, 2018 Associate Director Upper Mississippi River Basin American Rivers
To: Olivia Dorothy March 9, 2018 Associate Director Upper Mississippi River Basin American Rivers From: Jonathan W.F. Remo Ph.D. Big Muddy Consulting Re: Assessment of flood surcharge related to differences
More informationTechnical Memorandum No Sediment Model
Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.9 Sediment Model Task: Development of Sediment Model To: PRWFPA Staff Working Group Prepared by: Gregory Morris and Elsie Parrilla
More informationALASKA ENERGY AUTHORITY AEA ENGINEERING FEASIBILITY REPORT. Appendix B4. Probable Maximum Flood Study REP_Probable Maximum Flood Study
ENGINEERING FEASIBILITY REPORT Appendix B4 Probable Maximum Flood Study 14-02-REP_Probable Maximum Flood Study Susitna-Watana Hydroelectric Project Alaska Energy Authority FERC Project No. 14241 December
More informationARMSTRONG COUNTY, PA
ARMSTRONG COUNTY, PA Revised Preliminary DFIRM Mapping March 31, 2013 Kevin Donnelly, P.E., CFM GG3, Greenhorne & O Mara, Inc. Presentation Agenda Armstrong County DFIRM Overview - June 25, 2010 DFIRM
More informationJanuary 22, Coronado National Forest 300 West Congress Street Tucson, AZ Jim Upchurch, Forest Supervisor. Dear Mr.
January 22, 2015 Coronado National Forest 300 West Congress Street Tucson, AZ 85701 Attn: Jim Upchurch, Forest Supervisor Dear Mr. Upchurch: In your letter dated January 16, 2015, you requested that Hudbay
More informationLOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON
LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,
More informationLOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON
LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,
More informationSquaw Creek. General Information
General Information is a tributary to the Salmon River. It enters the north side of the river about 0 miles downstream of North Fork, Idaho. The study reach is about a 30 ft length of stream about 2 miles
More informationMEMORANDUM. Situation. David Ford Consulting Engineers, Inc J Street, Suite 200 Sacramento, CA Ph Fx
David Ford Consulting Engineers, Inc. 2015 J Street, Suite 200 Sacramento, CA 95811 Ph. 916.447.8779 Fx. 916.447.8780 MEMORANDUM To: Brad Moore, PE, USACE From: Nathan Pingel, PE (Lic # CA 63242), and
More information2012 AQUATIC HABITAT AND GEOMORPHIC MAPPING OF THE MIDDLE RIVER USING AERIAL PHOTOGRAPHY
2012 AQUATIC HABITAT AND GEOMORPHIC MAPPING OF THE MIDDLE RIVER USING AERIAL PHOTOGRAPHY INTRODUCTION The (AEA) is preparing a License Application that will be submitted to the Federal Energy Regulatory
More informationSusitna-Watana Hydroelectric Project (FERC No ) Riparian Vegetation Study Downstream of the Proposed Susitna-Watana Dam Study Plan Section 11.
(FERC No. 14241) Riparian Vegetation Study Downstream of the Proposed Susitna-Watana Dam Study Plan Section 11.6 2014 2015 Study Implementation Report Prepared for Prepared by ABR, Inc. Environmental Research
More informationIllinois State Water Survey Division
Illinois State Water Survey Division SURFACE WATER SECTION SWS Miscellaneous Publication 108 SEDIMENT YIELD AND ACCUMULATION IN THE LOWER CACHE RIVER by Misganaw Demissie Champaign, Illinois June 1989
More informationFolsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam
Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Public Workshop May 25, 2016 Sacramento Library Galleria 828 I Street, Sacramento, CA US Army Corps of Engineers BUILDING STRONG
More informationA SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS
A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS ROMAN P., I. 1, OROS C., R. 2 ABSTRACT. A simple GIS method for obtaining flooded areas. This paper presents a method for obtaining flooded areas near to
More informationLake Tahoe Watershed Model. Lessons Learned through the Model Development Process
Lake Tahoe Watershed Model Lessons Learned through the Model Development Process Presentation Outline Discussion of Project Objectives Model Configuration/Special Considerations Data and Research Integration
More informationSection 4: Model Development and Application
Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within
More informationMount St. Helens Project Cowlitz River Levee Systems 2009 Level of Flood Protection Update Summary
Mount St. Helens Project Cowlitz River Levee Systems 2009 Level of Flood Protection Update Summary Cowlitz River at Longview/Kelso, Washington February 4, 2010 Executive Summary USACE periodically updates
More informationZone A Modeling (What Makes A Equal Approximate, Adequate, or Awesome)
Zone A Modeling (What Makes A Equal Approximate, Adequate, or Awesome) ASFPM 2016 GRAND RAPIDS CONFERENCE Kevin Donnelly, P.E., GISP, PMP, CFM June 23, 2016 Agenda 1 Introduction 2 Flood Hazard Analysis
More information3.0 TECHNICAL FEASIBILITY
3.0 TECHNICAL FEASIBILITY 3.1 INTRODUCTION To enable seasonal storage and release of water from Lake Wenatchee, an impoundment structure would need to be constructed on the lake outlet channel. The structure
More informationAPPLICATION OF HEC-RAS MODEL FOR ESTIMATING CHANGES IN WATERCOURSE GEOMETRY DURING FLOODS
Studia Geotechnica et Mechanica, Vol. XXXIV, No. 2, 2012 DOI: 105277/sgm021206 APPLICATION OF HEC-RAS MODEL FOR ESTIMATING CHANGES IN WATERCOURSE GEOMETRY DURING FLOODS JOANNA MARKOWSKA Department of Environmental
More informationChapter 5 CALIBRATION AND VERIFICATION
Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic
More informationApplying GIS to Hydraulic Analysis
Texas A&M University Department of Civil Engineering CVEN689 Applications of GIS to Civil Engineering Instructor: Francisco Olivera, Ph.D., P.E. Applying GIS to Hydraulic Analysis Lim, Chae Kwan April
More informationTHE STATE OF SURFACE WATER GAUGING IN THE NAVAJO NATION
THE STATE OF SURFACE WATER GAUGING IN THE NAVAJO NATION Aregai Tecle Professor of Hydrology Northern Arizona University Flagstaff, AZ Acknowledgement Many thanks to my research team mates and Elisabeth
More informationTRWD Upper Trinity River Flood Operations Decision Support System
TRWD Upper Trinity River Flood Operations Decision Support System TFMA 2012 Fall Conference Rockwall, Texas September 20, 2012 Presented by: Andrew Ickert, PE, CFM & Craig Ottman, PE, CFM (Halff Associates,
More informationHydrogeology and Simulated Effects of Future Water Use and Drought in the North Fork Red River Alluvial Aquifer: Progress Report
Hydrogeology and Simulated Effects of Future Water Use and Drought in the North Fork Red River Alluvial Aquifer: Progress Report Developed in partnership with the Oklahoma Water Resources Board S. Jerrod
More informationBushkill Creek 3 rd Street Dam Removal Analysis
Bushkill Creek 3 rd Street Dam Removal Analysis HEC HMS Runoff and Routing Model Stephen Beavan, Melanie DeFazio, David Gold, Peter Mara and Dan Moran CE 421: Hydrology Fall 2010 December 15, 2010 Contents
More informationSemester Project Final Report. Logan River Flood Plain Analysis Using ArcGIS, HEC-GeoRAS, and HEC-RAS
Semester Project Final Report Logan River Flood Plain Analysis Using ArcGIS, HEC-GeoRAS, and HEC-RAS Kedric Curtis, Josh Hogge, Jordan Jarrett, Jared Justensen May 6, 2016 CEE 6190 GIS for Civil Engineers
More informationBeaver Creek Corridor Design and Analysis. By: Alex Previte
Beaver Creek Corridor Design and Analysis By: Alex Previte Overview Introduction Key concepts Model Development Design Accuracy Conclusion Refresh v = Beaver Creek Site = Wittenberg Introduction Low head
More informationMuhammad Rezaul Haider (A ). Date of Submission: Course No.: CEE 6440, Fall 2016.
Use of ArcGIS to extract river geometry as an input to HECRAS model and inundation mapping for the Lower Colorado River (LCR), Texas from Highway 183 to Bastrop. Muhammad Rezaul Haider (A 02196036). Date
More informationWalnut Creek Sedimentation Study
Walnut Creek Sedimentation Study January 10, 2012 Prepared for: U.S. Army Corps of Engineer Sacramento District 1325 J Street Sacramento, CA 95814-2922 Prepared by: Ronald R. Copeland, Ph.D., P.E. Mobile
More informationRobert Shedd Northeast River Forecast Center National Weather Service Taunton, Massachusetts, USA
Robert Shedd Northeast River Forecast Center National Weather Service Taunton, Massachusetts, USA Outline River Forecast Centers FEWS Implementation Status Forcing Data Ensemble Forecasting The Northeast
More informationHEC-RAS Reservoir Transport Simulation of Three Reservoirs in the Lower Susquehanna River Basin. Mike Langland and Ed Koerkle
HEC-RAS Reservoir Transport Simulation of Three Reservoirs in the Lower Susquehanna River Basin Mike Langland and Ed Koerkle Topics Background / Project Objectives Data Selection - Sediment and Geometric
More informationFlow regime, floodplain inundation and floodplain waterbody connectivity at Congaree National Park
Flow regime, floodplain inundation and floodplain waterbody connectivity at Congaree National Park John Kupfer Dept. of Geography Univ. of South Carolina Kimberly Meitzen Duke University Nature Conservancy
More informationHEC-6 Modeling of the Main Stem of the Kankakee River in Illinois from the Stateline Bridge to the Kankakee Dam
Contract Report 2004-04 HEC-6 Modeling of the Main Stem of the Kankakee River in Illinois from the Stateline Bridge to the Kankakee Dam by Nani G. Bhowmik, Christina Tsai, Paminder Parmar, and Misganaw
More informationResults of the Sava River Model
Results of the Sava River Model Jamie G. James, P.E. Nashville District September 2010 US Army Corps of Engineers BUILDING STRONG Discussion Outline Study Goals Model Limitations HEC-RAS Model Results
More informationGravel Transport Study Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington
Final Gravel Transport Study Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No. 2244 Lewis County, Washington Submitted to P.O. Box 968 Richland, Washington 99352-0968 Submitted
More informationLeveraging new models and data to improve flood stage forecast. Improving Flood Stage Forecasting in the Feather River Watershed. September 11 th 2015
Leveraging new models and data to improve flood stage forecast Improving Flood Stage Forecasting in the Feather River Watershed September 11 th 2015 Mitch Russo, P.E. (DWR) Ashok Bathulla, P.E., CFM (GEI)
More informationUnconventional Wisdom and the Effects of Dams on Downstream Coarse Sediment Supply. Byron Amerson, Jay Stallman, John Wooster, and Derek Booth
Unconventional Wisdom and the Effects of Dams on Downstream Coarse Sediment Supply 3 February 2009 Byron Amerson, Jay Stallman, John Wooster, and Derek Booth Sultan River, WA OBJECTIVE Consider the landscape
More informationSt. Clair River Conveyance Change 2007 to 2012
St. Clair River Conveyance Change 2007 to 2012 Morphologic Change in the St. Clair River 2007 2012 Conveyance Change Report U.S. Army Corps of Engineers, Detroit District Great Lakes Hydraulics and Hydrology
More information6/9/2014. Software Overview. System Overview
Future Rainfall 6/9/2014 Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, CFM, PMP TFMA Spring 2014 Conference Software Overview 2 Processes Hydrometric DB Event Manager Automatic Low =
More informationChiang Rai Province CC Threat overview AAS1109 Mekong ARCC
Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC This threat overview relies on projections of future climate change in the Mekong Basin for the period 2045-2069 compared to a baseline of 1980-2005.
More information60 PERCENT DESIGN REPORT HABITAT RESTORATION OF THE CHELAN RIVER REACH 4 AND TAILRACE
60 PERCENT DESIGN REPORT HABITAT RESTORATION OF THE CHELAN RIVER REACH 4 AND TAILRACE Prepared for Public Utility District Number 1 of Chelan County 327 North Wenatchee Avenue Wenatchee, Washington 98801
More informationAssessment of the Hood River Delta Hood River, Oregon
Assessment of the Hood River Delta Hood River, Oregon Pacific Northwest Waterways Association Annual Meeting October 13, 2010 Michael McElwee, Executive Director Port of Hood River Overview U.S. Army Corps
More informationSimulating Sediment Transport in the Patapsco River following Dam Removal with Dam Removal Express Assessment Model-1 (DREAM-1)
Simulating Sediment Transport in the Patapsco River following Dam Removal with Dam Removal Express Assessment Model-1 (DREAM-1) Prepared for Inter-Fluve 362 Atwood Ave., Suite 3 Madison, WI 53714 www.interfluve.com
More informationLower Susquehanna River Integrated Sediment & Nutrient Monitoring Program
Lower Susquehanna River Integrated Sediment & Nutrient Monitoring Program Presented at the Chesapeake Bay Program Scientific and Technical Advisory Committee (STAC) Workshop January 13, 2016 Background
More informationRapid Flood Mapping Using Inundation Libraries
Rapid Flood Mapping Using Inundation Libraries Jude Kastens, Kevin Dobbs, James Halgren, Katherine Balster 2017 ASFPM Conference May 3, 2017 5 mi Kansas River Valley between Manhattan and Topeka Email:
More informationAPPENDIX J MODELING TEHCNICAL MEMORANDUM (RESSIM MODELING)
APPENDIX J MODELING TEHCNICAL MEMORANDUM (RESSIM MODELING) Technical Memorandum To: Michael J. Preszler, California Water Consulting From: Marieke Armstrong, Mead & Hunt Rahul Ranade, Mead & Hunt Date:
More informationDevelopment of the Hydrologic Model
Kick-off meeting on enhancing hydrological data management and exchange procedures Water and Climate Adaptation Plan (WATCAP) for Sava River Basin Development of the Hydrologic Model David Heywood Team
More informationSusitna-Watana Hydroelectric Project (FERC No ) Groundwater Study Study Plan Section Study Implementation Report
(FERC No. 14241) Groundwater Study Study Plan Section 7.5 2014-2015 Study Implementation Report Appendix C Summary Review of Susitna River Hydrogeologic Studies Conducted in the 1980s with Relevance to
More informationNitrogen and phosphorus dynamics in restored riverine floodplains in intensively managed watersheds
Nitrogen and phosphorus dynamics in restored riverine floodplains in intensively managed watersheds Sara McMillan 1, Alex Johnson 1, Celena Alford 1, Greg Noe 2, Venkatesh Merwade 1, Sayan Dey, 1 Siddharth
More informationStop 1: Marmot Dam Stop 1: Marmot Dam
Stop 1: Marmot Dam Stop 1: Marmot Dam Following the removal of Marmot Dam in 2007, the fate of the reservoir sediments has been monitored through a series of surveys and sediment transport measurements.
More informationYELLOWSTONE RIVER FLOOD STUDY REPORT TEXT
YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT TECHNICAL REPORT Prepared for: City of Livingston 411 East Callender Livingston, MT 59047 Prepared by: Clear Creek Hydrology, Inc. 1627 West Main Street, #294
More informationDelaware River Basin Flood Analysis Model Independent External Peer Review Report
Delaware River Basin Flood Analysis Model Independent External Peer Review Report Map source: DRBC Prepared for: Federal Emergency Management Agency, Region III Delaware River Basin Commission Prepared
More informationChehalis Basin Strategy
Chehalis Basin Strategy Geomorphology, Sediment Transport, and Large Woody Debris Report Reducing Flood Damage and Restoring Aquatic Species Habitat Prepared by Watershed GeoDynamics and Anchor QEA, LLC
More informationMapping of Future Coastal Hazards. for Southern California. January 7th, David Revell, Ph.D. E.
Mapping of Future Coastal Hazards for Southern California January 7th, 2014 David Revell, Ph.D. drevell@esassoc.com E. Vandebroek, 2012 Outline Coastal erosion hazard zones Flood hazard zones: Coastal
More informationModeling of peak inflow dates for a snowmelt dominated basin Evan Heisman. CVEN 6833: Advanced Data Analysis Fall 2012 Prof. Balaji Rajagopalan
Modeling of peak inflow dates for a snowmelt dominated basin Evan Heisman CVEN 6833: Advanced Data Analysis Fall 2012 Prof. Balaji Rajagopalan The Dworshak reservoir, a project operated by the Army Corps
More informationTechnical Report Draft
Technical Report Draft of the Lower Stillaguamish River and Assessment of Selected Restoration and Flood Management Options Prepared for: Snohomish County Department of Public Works Surface Water Management
More informationIntegrating Weather Forecasts into Folsom Reservoir Operations
Integrating Weather Forecasts into Folsom Reservoir Operations California Extreme Precipitation Symposium September 6, 2016 Brad Moore, PE US Army Corps of Engineers Biography Brad Moore is a Lead Civil
More informationTypical Hydrologic Period Report (Final)
(DELCORA) (Final) November 2015 (Updated April 2016) CSO Long-Term Control Plant Update REVISION CONTROL REV. NO. DATE ISSUED PREPARED BY DESCRIPTION OF CHANGES 1 4/26/16 Greeley and Hansen Pg. 1-3,
More information7.3 Sediment Delivery Analysis
7.3 Sediment Delivery Analysis In order to evaluate potential changes in sedimentation patterns that could occur due to impacts from the FCP and LPP alignments, sediment assessment models were constructed
More informationMerritt Smith Consulting, Environmental Science and Communication
UPPER TUOLUMNE RIVER ECOSYSTEM PROJECT Preliminary Analysis of Available Data for Modeling Temperature in the Hetch Hetchy Reach (O Shaughnessy Dam to Cherry Creek) Technical Memorandum Merritt Smith Consulting,
More informationProposal for Lower Susquehanna River Reservoir System Model Enhancements in Support of the 2017 Chesapeake Bay TMDL Midpoint Assessment January 2016
Proposal for Lower Susquehanna River Reservoir System Model Enhancements in Support of the 2017 Chesapeake Bay TMDL Midpoint Assessment January 2016 Exelon Generation Company, LLC (Exelon) submits this
More informationSwift Creek Sediment Management Action Plan (SCSMAP)
Swift Creek Sediment Management Action Plan (SCSMAP) PHASE 2 PROJECT PLAN PROPOSAL Whatcom County Public Works Department 322 N. Commercial Street, Suite 210 Bellingham, WA 98225 (360) 676-6692 June 2013
More informationGREENE COUNTY, PA. Revised Preliminary DFIRM Mapping FEMA. Kevin Donnelly, P.E., CFM GG3, Greenhorne & O Mara, Inc. April 10, 2013
GREENE COUNTY, PA Revised Preliminary DFIRM Mapping April 10, 2013 Kevin Donnelly, P.E., CFM GG3, Greenhorne & O Mara, Inc. Presentation Agenda Greene County DFIRM Overview September 30, 2010 DFIRM Countywide
More informationSediment and Water Quality in HEC-RAS. Mark Jensen
Sediment and Water Quality in HEC-RAS Mark Jensen The HEC-RAS Modeling System 1D River Hydraulics Graphical User Interface Steady & Unsteady Flow Bridges, Culverts, Dams, weirs, gates, etc Data storage/management
More informationOpportunity for Spill Management on the Dolores River in 2017: A Collaboration of 'Spill Science. Dolores River Downstream of McPhee Reservoir
Opportunity for Spill Management on the Dolores River in 2017: A Collaboration of 'Spill Science Dolores River Downstream of McPhee Reservoir Opportunity for Spill Management on the Dolores River in 2017:
More informationApplying 1D Sediment Models to Reservoir Flushing Studies: Measuring, Monitoring, and Modeling the Spencer Dam Sediment Flush with HEC-RAS
Applying 1D Sediment Models to Reservoir Flushing Studies: Measuring, Monitoring, and Modeling the Spencer Dam Sediment Flush with HEC-RAS by Paul Boyd and Stanford Gibson PURPOSE: The purposes of this
More informationConceptual Design Report for Cottonwood Slough Restoration Project
Conceptual Design Report for Cottonwood Slough Restoration Project Prepared for: Skagit Conservation District Mt. Vernon, WA Prepared by: Northwest Hydraulic Consultants Seattle, WA January 11 Table of
More informationAppendix O. Sediment Transport Modelling Technical Memorandum
Appendix O Sediment Transport Modelling Technical Memorandum w w w. b a i r d. c o m Baird o c e a n s engineering l a k e s design r i v e r s science w a t e r s h e d s construction Final Report Don
More informationFloodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece
Floodplain modeling Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece Scientific Staff: Dr Carmen Maftei, Professor, Civil Engineering Dept. Dr Konstantinos
More informationJOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology VOLUME
JOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology VOLUME 18 2010 REDUCED CHANNEL CONVEYANCE ON THE WICHITA RIVER AT WICHITA FALLS, TEXAS,
More informationJuneau Jokulhlaup Inundation Report
2015 Juneau Jokulhlaup Inundation Report 3 November 2015 Alaska Silver Jackets Contents Contents... 2 1. Introduction... 3 a. Project Overview and Purpose... 3 b. Site Description... 3 c. Flood History...
More informationIMPLEMENTATION OF AN ICE JAM PREDICTOR WITH USER INTERFACE
Ice in the Environment: Proceedings of the 16th IAHR International Symposium on Ice Dunedin, New Zealand, 2nd 6th December 2002 International Association of Hydraulic Engineering and Research IMPLEMENTATION
More informationHydraulic Modeling of the Missoula Ice Dam Failure. Christopher R. Goodell, P.E., D.WRE WEST Consultants, Salem, OR
Hydraulic Modeling of the Missoula Ice Dam Failure Christopher R. Goodell, P.E., D.WRE WEST Consultants, Salem, OR 1 Introduction 10-40 thousand years ago during the last ice age Image courtesy gis4geomorphology.com
More informationWillamette River Basin Temperature TMDL Modeling Study
Willamette River Basin Temperature TMDL Modeling Study Scott A. Wells, Chris J. Berger, Robert L. Annear Jr, Michael McKillip, Sher Jamal Department of Civil and Environmental Engineering Portland State
More information2015 Fall Conditions Report
2015 Fall Conditions Report Prepared by: Hydrologic Forecast Centre Date: December 21 st, 2015 Table of Contents Table of Figures... ii EXECUTIVE SUMMARY... 1 BACKGROUND... 2 SUMMER AND FALL PRECIPITATION...
More information