1 APPENDIX J MODELING TEHCNICAL MEMORANDUM (RESSIM MODELING)

2 Technical Memorandum To: Michael J. Preszler, California Water Consulting From: Marieke Armstrong, Mead & Hunt Rahul Ranade, Mead & Hunt Date: December 7, 2009 Subject: HEC-ResSim Impact Analysis for the El Dorado Water & Power Authority Supplemental Water Rights Project EIR 1.0 Introduction and Background Mead & Hunt has conducted an analysis of the El Dorado Water & Power Authority Supplemental Water Rights Project using HEC-ResSim, a reservoir simulation model. This technical memorandum outlines and describes the ResSim modeling assumptions and operational approach used in generating the hydrologic output. Evaluation of the impact of the Supplemental Water Rights Project has been done through a comparison of the base condition scenario with various projected scenarios, which has also been described in this memorandum. 1.1 Supplemental Water Rights Project The El Dorado Water & Power Authority (EDWPA), a joint powers authority composed of El Dorado County, El Dorado County Water Agency, El Dorado Irrigation District (EID) and Georgetown Divide Public Utility District (GDPUD), has filed an application for supplemental water rights from the upper American River basin. The objective of the application is to establish permitted water rights allowing diversion of water from the American River basin to meet planned future water demands in the EID and GDPUD service areas and other areas located within El Dorado County that are outside of these service areas. EDWPA s filing entails a total withdrawal for use of 40,000 acre-feet (AF) per annum, consistent with the diversion and storage locations allowed under the El Dorado - Sacramento Municipal Utility District (SMUD) Cooperation Agreement. EDWPA has retained California Water Consulting to provide the engineering and draft environmental impact report requirements to support the water rights application. Mead & Hunt is assisting California Water Consulting with the execution of certain technical tasks, including the HEC-ResSim analysis of the impacts of the proposed water rights. 1.2 Project location and components The Supplemental Water Rights Project involves multiple water bodies including several reservoirs and watercourses within the upper American River basin. These are part of the Upper American River Project (UARP) owned and operated by the Sacramento Municipal Utility District (SMUD) and include Union Valley Reservoir, Ice House Reservoir, Loon Lake Reservoir, Gerle Creek at Loon Lake Reservoir, Gerle Creek at Gerle Creek Reservoir, Rubicon River and Rubicon Reservoir, Little Rubicon River at Buck Island Reservoir, South Fork (SF) Rubicon River at Robbs Peak Reservoir, and Silver Creek at Camino

3 Technical Memorandum Michael J. Preszler December 7, 2009 Page 2 Reservoir. The project also includes parts of the South Fork of the American River, White Rock Powerhouse Penstock, and Folsom Reservoir. Figure 1 shows map of the project area. 1.3 HEC-ResSim analysis Owing to the complexity of the project, a numerical computer modeling exercise was necessary to evaluate the impacts of the Supplemental Water Rights Project on existing conditions. HEC-ResSim (Version 3.0.1), a public domain software package developed by the Hydrologic Engineering Center of the U.S. Army Corps of Engineers (HEC) as a decision support tool for reservoir regulators, was used for the purpose. Features of ResSim include: A map-based schematic development environment. A complex reservoir element that can include multiple dams and outlets. An operations scheme that can define the reservoir's operating goals and constraints in terms of pool zones and zone dependent rules. A set of operation rule types that include release requirements and constraints, downstream control requirements and constraints, pool elevation or inflow rate-of-change limits, hydropower requirements, and induced surcharge (emergency gate operation). Operation of multiple reservoirs for a common downstream control, including storage balancing. Alternative builder to allow for a wide range of "what if" analysis. Computation timesteps from 15 minutes to 1 day. Summary Reports and a Release Decision Report. HEC-DSS (a scientific database system developed by HEC) for storage of input and output data. As a starting point, this analysis used an existing ResSim model (Hughes, 2007), jointly developed by the Department of Fish & Game and U.S. Forest Service as part of SMUD s UARP FERC relicensing process. This model is based on the conditions established in the Relicensing Settlement Agreement for the UARP and Chili Bar project between SMUD, Pacific Gas & Electric (PG&E), and various governmental and non-governmental agencies and individuals (SMUD et al, 2007). Following the California Department of Fish and Game (CDFG) model, we selected the period extending from Water Year (WY) 1975 through WY 1999 as our study period because of the availability of observed data and unimpaired flow estimates for this period. Alternate scenarios were created to reflect the various possible withdrawal cases under the proposed water rights and the model was used to verify the environmental boundary conditions associated with EDWPA s proposed diversion and provide a means of determining the potential impact to the reservoirs and watercourses in the project area, relative to those established in the Settlement Agreement. \\Sacd\entp\ \08001\TECH\Memo\Impacts Tech Memo doc

4 Technical Memorandum Michael J. Preszler December 7, 2009 Page Approach The existing ResSim model, with modifications to reflect the diversion at White Rock penstock, was used to generate the time-series for comparison. Because this analysis is based on a pre-existing model, detailed background information on the model construction is not provided here. Such information may be found in the supporting document for the Settlement Agreement ResSim model published by California Department of Fish & Game (Hughes, 2007). The objective of the model is to evaluate the impacts of the proposed EDWPA diversions on the reservoirs and watercourses in the project area. Modifications were made to the model to incorporate the proposed diversion and are described in Section 2.1. The evaluation of the impacts of the diversion was done through a comparison of the base condition (i.e., Settlement Agreement scenario) with four possible diversion scenarios (described in Section 2.2) using various metrics such as power generation, rafting flows, reservoir storage, and lake levels (described in Section 2.3). Computational limitations of the model are discussed in 2.4. Finally, the period of evaluation for the results is presented in Section Model Modifications The ResSim model contains a, which reflects the Relicensing Settlement Agreement and four proposed scenarios. These different diversion scenarios are summarized in Table 1. In all scenarios, the total annual diversion has a monthly distribution in accordance with the Monthly Water Need Schedule table attached in Appendix A. Instantaneous diversion values at White Rock Penstock and Folsom Reservoir are summarized in Tables 2 and 3. The spatial location of the diversion points is shown in Figure 1. The following modifications were made to the UARP model to reflect the White Rock Diversion in physical and operational terms: Diverted Outlet A Diverted Outlet was added at Slab Creek Reservoir (identified as EDWPA Diversion) Operation of Slab Creek Reservoir Operation of Slab Creek Reservoir in the Base Scenario model (formerly ResLevel2 from DFG model) is governed by the operation set RecFlow-6. Copies of this set were made to retain all other parameters, and the copies were then modified to create four new operation sets, each of which reflects one of the four scenarios being studied. These operation sets are: -2 \\Sacd\entp\ \08001\TECH\Memo\Impacts Tech Memo doc

5 Technical Memorandum Michael J. Preszler December 7, 2009 Page Alternatives Under each of these alternatives, eponymous new rules were created to reflect the proposed diversions. These rules operate release from Slab Creek Reservoir through the EDWPA Diversion (entity identified in the model as Slab Creek Reservoir EDWPA Diversion ). Each of these rules contains Release Functions which reflect the monthly flows shown in Table 2. The Release Functions were created using a Date Function EDWPA Null To ensure that no water is diverted to EDWPA Diversion during the base scenario, a rule called EDWPA Null was created under the operation set RecFlow-6 (which operates the Base Scenario alternative). This rule restricts the diversion to zero throughout the year Time-step A time-step of one day was adopted for the model 2.2 Diversion Scenarios The EIR includes the Project and six alternatives including the No Project Alternative. Only some of the alternatives are being evaluated with the ResSim model to represent the base case conditions and the maximum and minimum proposed diversions. It is assumed that all other scenarios would fall within these extremes. The various diversion scenarios considered for this analysis are described below and summarized in Table 1. In all scenarios, the total annual diversion has a monthly distribution in accordance with the Monthly Water Need Schedule table attached in Appendix A. Instantaneous diversion values at White Rock Penstock and Folsom Reservoir are summarized in Tables 2 and 3. The spatial location of the diversion points is shown in Figure No ondition The base case is the same as the Settlement Agreement scenario. The Settlement Agreement has established various environmental thresholds (e.g., minimum instream flows, limits on tunnel diversions, provisions for geomorphic releases etc) which have been followed during the simulation of this scenario. This scenario does not include any additional water diversions and would represent the No project condition. The diversions are assumed to take place throughout the year based on the monthly water need schedule that was developed for the project This alternative scenario entails a total annual diversion of 40,000 AF from the turnout on White Rock Powerhouse Penstock. The diversions are assumed to take place throughout the year based on the monthly water need schedule that was developed for the project. \\Sacd\entp\ \08001\TECH\Memo\Impacts Tech Memo doc

6 Technical Memorandum Michael J. Preszler December 7, 2009 Page This alternative scenario entails a total annual diversion of 40,000 AF comprised of 30,000 AF from the turnout on White Rock Powerhouse Penstock and 10,000 AF from the American River Pump Station. The diversions are assumed to take place throughout the year based on the monthly water need schedule that was developed for the project This scenario entails a reduced total annual diversion of 20,000 AF from the turnout on White Rock Powerhouse Penstock. The diversions are assumed to take place throughout the year based on the monthly water need schedule that was developed for the project This scenario entails a reduced total annual diversion of 20,000 AF comprised of 15,000 AF from the turnout on White Rock Powerhouse Penstock and 5,000 AF from the American River Pump Station. The diversions are assumed to take place throughout the year based on the monthly water need schedule that was developed for the project. 2.3 Parameters Used for Comparison of Alternatives To quantitatively evaluate the impact of the four alternative scenarios with reference to the base scenario, it was necessary to identify parameters which could be easily discretized for numerical comparison. The parameters chosen for comparison are described below: Power Generation The ResSim model is not specifically designed as a tool to evaluate energy generation impacts; however, the model does report energy generation with sufficient accuracy to be used to evaluate the overall difference in generation between two alternatives (Hughes, 2007). Power generation is calculated separately for each Upper American River Project and Chili Bar Project power plants. For evaluation, we evaluated total generation for both SMUD s Upper American River Project and PG&E s Chili Bar Project Reservoir Storage Annual inflows in the following reservoirs have been evaluated for comparison: Loon Lake Reservoir Union Valley Reservoir Ice House Reservoir Camino Reservoir Slab Creek Reservoir Chili Bar Reservoir \\Sacd\entp\ \08001\TECH\Memo\Impacts Tech Memo doc

7 Technical Memorandum Michael J. Preszler December 7, 2009 Page Reservoir Levels Lake levels in the following lakes have been evaluated from the recreation point of view: Loon Lake Reservoir Union Valley Reservoir Ice House Reservoir Camino Reservoir Slab Creek Reservoir Chili Bar Reservoir Rafting Flows River flows are evaluated in the following reaches of Silver Creek and South Fork (SF) American River, which are popularly used for whitewater rafting: Silver Creek above SF American River SF American River below Slab Creek Reservoir SF American River Below Chili Bar Reservoir 2.4 Model Computational Limitations This analysis is based on a ResSim model for the Upper American River Project created by the CDFG. Operational modifications and addition of physical facilities to the model network were made as necessary to reflect the proposed EDWPA diversions. However, in order to preserve the nature of the model in its original form as created by its original author, we have attempted not to modify any other preexisting model features unless they related directly with the proposed EDWPA diversions. The flip side of this approach is that wherever the original model simulation encountered numerical instabilities, we did not mitigate them since any attempts at improving numerical efficiency of the model would entail modifying the structure or construction of the model, even if slightly. When simulation runs were conducted on the model in its original condition, it appeared there were minor numerical instabilities were found and the model was unable to converge on several instances when computing levels for Camino Reservoir. However, these instabilities were not significant enough to impede the simulation or affect the results. However, after adding the EDWPA diversion at White Rock Penstock, adding the associated rules and operation sets, and running the model over a continuous daily time series from WY 75 through WY 99, these instabilities were found to be amplified to the extent that the model simulation would stall. It appears that when ResSim is unable to converge on a solution after several passes, it automatically refers to the Lookback time-series and picks a value for the particular time-step for which it has been unable to converge. The model for this study is split in four simulations representing sub-periods (WY 75-81, WY 82-88, WY 89-95, WY 95-99). Naturally, each simulation (except the first one) was set to look back on the end result of the previous simulation period for its starting conditions and there was no single \\Sacd\entp\ \08001\TECH\Memo\Impacts Tech Memo doc

8 Technical Memorandum Michael J. Preszler December 7, 2009 Page 7 continuous Lookback time-series for ResSim to refer to in case of a severe numerical instability. This lead to the model stalling because of the lack of a Lookback file when instabilities were found in the middle of a simulation period. To mitigate this situation, all four simulations were programmed to look back at an artificial WY Lookback time-series, rather than just the end results of the preceding time series. The disadvantage of this approach is that the starting condition of simulation periods would not match the ending condition of the previous simulation; however, we have observed that given the constraints imposed by the model Operation Sets, the results would quickly seek out appropriate values in a matter of a few time-steps. Therefore, some unrealistic results are seen at the beginning of each simulation period (except the first), but they do not cause significant impact on aggregated results. Owing to the numerical constraints described above, the model provides results that can be compared across scenarios within a given time period with an acceptable level of confidence. However, we advise that the numerical results should not be used at their absolute values for evaluation of tangible benefits like power generation or flow. If results are required for such application, the model can be modified to improve its numerical stability; these measures were outside the scope of this study. 2.5 Period of Evaluation Unimpaired mean daily data is available for the UARP and Chili Bar Projects from the Hydrology Technical Report (DTA & Hannaford, 2005) prepared as part of the relicensing efforts for the two projects for the period from WY 1974 through WY Though the model was run for the period from WY1975 through WY1999, for the ease of reporting and evaluation, only selected years have been presented in the results. These years have been selected on the basis of the water year type (i.e., based on amount of rainfall) - the Hydrology Technical Report classified each month between WY 1975 and WY 2001 as Critically Dry, Dry, Below Normal, Above Normal, and Wet. For the purpose of this analysis, we have used WY 1977 to represent a Critically Dry year, WY 1992 as Dry, WY 1990 as Below Normal, and WY 1997 as a Wet year. However, in the study period of WY , there is no water year that showed unambiguous qualities in order to be represented as an Above Normal Year (water year-type definitions are based on SMUD Hydrology Technical Report). When Mead & Hunt presented a preliminary draft of this study in early January, we used a study period of WY which had enabled us to use WY 2000 as an Above Normal year since it had consistently Above Normal rainfall in most of its months. However, that study was not run on a continuous time-series; hence it did not encounter the numerical instabilities described in Section 2.4. The current model runs have been programmed to look back at a single Lookback time-series. This time-series which was part of the original CDFG model stops at the end of WY As a result, the latest version of the model cannot be run past WY It was decided to leave out the Above Normal water year since there was no good representation within the dataset and values could be inferred using the Below Normal and Wet data. \\Sacd\entp\ \08001\TECH\Memo\Impacts Tech Memo doc

9 Technical Memorandum Michael J. Preszler December 7, 2009 Page Compliance with El Dorado-SMUD Agreement While the primary purpose of this study was to determine water availability for the various diversion scenarios summarized in Appendix A, it was also necessary to verify that all scenarios considered comply with other terms of the El Dorado-SMUD Cooperation Agreement (2005). Those requirements in the Agreement that have any implication on the proposed operational changes are discussed below. A number of other requirements in the Agreement pertain to non-operational factors such as communication, construction, maintenance, and forecasting, and are not discussed here. Further, some sections pertain to SMUD or El Dorado Emergency Conditions which are a result of unforeseen conditions beyond the control of parties involved; these requirements were not evaluated in the modeling study and are not discussed here. There are a number of terms in the following discussion that have not been explained in this memorandum because they are specific to the El Dorado-SMUD Agreement. These terms have been capitalized and their definitions can be found in Appendix D of the Agreement. Section requires that SMUD supply up to 30,000 AF through 2025 and 40,000 AF thereafter to the El Dorado Parties. This requirement is satisfied through the proposed diversion at Slab Creek Reservoir, which releases water to the El Dorado Parties according to the monthly pattern summarized in Appendix A, totaling up to 40,000 AF per year. Section requires that in any year that the El Dorado Parties are restricted from receiving agreed supplies because of drought or Emergency Conditions, SMUD will deliver water from Carryover Storage. In the period of this analysis ( ), there were no years when agreed supplies could not be provided; hence this condition could not be evaluated. Section requires that at any time when the Daily Net Storage exceeds 150,000 AF, SMUD make deliveries to Carryover Storage in amounts described therein. However, since the condition described in Section was never encountered during the study period, it was assumed that the Carryover Storage is static and will not be required to be replenished on a frequent basis. Further, since the condition of Daily Net Storage exceeding 150,000 AF is a relatively frequent occurrence (87% of days during the study period), flow requirements to meet this condition would be small and distributed in even smaller portions when divided between contributing reservoirs. This number was assumed to be negligible and has not been evaluated in the modeling study. Section requires that all El Dorado Water be delivered by SMUD through the White Rock Penstock interconnection shutoff valve. Because of software limitations, it was not possible to simulate the diversion exactly through the White Rock Penstock. The proposed El Dorado supply was programmed to be diverted directly from Slab Creek Reservoir instead. \\Sacd\entp\ \08001\TECH\Memo\Impacts Tech Memo doc

10 Technical Memorandum Michael J. Preszler December 7, 2009 Page 9 Section 5.7 limits the diversion at the White Rock Delivery Point to a maximum rate of 100 cfs with the caveat that the rate may be increased up to 200 cfs during the period of May 1 through October 31 during the hours of midnight to 6:00 AM. Among the alternative scenarios considered here, flow rates at White Rock exceed 100 cfs only in one scenario () during the months of July and August. The excess flow of 4 cfs during regular hours can be compensated by releasing an additional flow of 12 cfs during the period from midnight to 6:00 AM; hence this condition is met (see following discussion on Section 5.8.1(i)). Section 5.8.1(i) precludes delivery to El Dorado Parties from May 1 through September 30 of any year from 2:00 PM to 7:00 PM. The loss of flow during these hours can be met by releasing additional 87 cfs during the period from midnight to 6:00 AM without violating the condition for maximum flow (Section 5.7). Section 5.8.1(iii) precludes delivery to El Dorado Parties when elevation of Slab Creek Reservoir drops below 1,815 feet. This scenario did not occur during the entire study period ( ). 4.0 Results Raw results generated by HEC-ResSim are voluminous because of the extensive and complex nature of the basin, so efforts have been made to synthesize the results into analyzable form. Instead of presenting daily data, results have been compiled using average or instantaneous monthly/month-end values for clarity. Figures 2 through 5 show monthly comparisons for various parameters (i.e., energy, storage, lake levels, and rafting flows). Further, four figures have been presented for each parameter (e.g., 2A through 2D) for each representative water year. These comparisons have been plotted using absolute values of the results. On the other hand, all values shown in tables are normalized as a change from the base case scenario, so that the magnitude of impact between various alternatives can be easily read off the tables. Similar to the figures, Tables 4 through 10 show monthly comparison for each parameter, with sub-tables (e.g., 2A through 2D) for each representative reservoir and/or water year. Refer to the following Tables and Figures for each comparison of individual parameter: 4.1 Energy Generation: SMUD s Upper American River Project: Tables 4A through 4D and Figures 2A through 2D PG&E s Chili Bar Project: Tables 5A through 5D and Figures 3A through 3D \\Sacd\entp\ \08001\TECH\Memo\Impacts Tech Memo doc

11 Technical Memorandum Michael J. Preszler December 7, 2009 Page Reservoir Storage: Figures 4A through 4D show total storage for the six included reservoirs averaged over the month and presented by Water Year. 4.3 Tables 6.0A -6.0D Tables 6.0A -6.0D represent the total storage for the basin by Water Year with sub-tables for each of the following reservoirs: Loon Lake Reservoir: Tables 6.1A - 6.1D Union Valley Reservoir: Tables 6.2A - 6.2D Ice House Reservoir: Tables 6.3A - 6.3D Camino Reservoir: Tables 6.4A - 6.4D Slab Creek Reservoir: Tables 6.5A - 6.5D Chili Bar Reservoir: Tables 6.6A - 6.6D 4.4 Reservoir levels: Figures 5A through 5D show average reservoir elevation for the six included reservoirs averaged over the month and presented by Water Year. 4.5 Tables 7.0A -7.0D Tables 7.0A -7.0D show average reservoir elevation by Water Year with sub-tables for each of the following reservoirs: Loon Lake Reservoir: Tables 7.1A - 7.1D Union Valley Reservoir: Tables 7.2A - 7.2D Ice House Reservoir: Tables 7.3A - 7.3D Camino Reservoir: Tables 7.4A - 7.4D Slab Creek Reservoir: Tables 7.5A - 7.5D Chili Bar Reservoir: Tables 7.6A - 7.6D 4.6 Rafting Flows: Silver Creek above SF American River Tables 8A through 8D and Figures 6A through 6D. SF American River below Slab Creek Reservoir Tables 9A through 9E and Figures 7A through 7D. SF American River below Chili Bar Reservoir Tables 10A through 10E and Figures 8A through 8D. \\Sacd\entp\ \08001\TECH\Memo\Impacts Tech Memo doc

12 Technical Memorandum Michael J. Preszler December 7, 2009 Page Observations In general, impacts are more pronounced during dry years and tend to be minimal during wet years. The overall trends and comparisons across water years are reflected in the results, but some modeling noise may be observed in the absolute values of the results, thus we advise that the numerical results should not be used at their absolute values for evaluation of tangible benefits. Energy generation impacts are higher for SMUD than for PG&E in terms of total MWh. Energy generation impacts are greater during the summer months (June September). Overall reservoir storage and average reservoir pool elevation impacts are primarily attributed to Slab Creek Reservoir with more minor impacts at Union Valley and Chili Bar. The remaining reservoirs appear unaffected. The rafting flows at Silver Creek Above SF American River rafting flows appear unaffected Impacts to rafting flows at SF American River below Slab Creek seem more pronounced during wet years. The diversions appear to have little effect on the upstream system and are mostly incurred by the river stretches and reservoirs downstream of the diversion point at White Rock Penstock. The following is the range of impacts found across various parameters. To illustrate the worst case scenario, results from the Critically Dry Year (1977) have been used as an example. Naturally, impacts will be lower in years with greater flows. Impact on SMUD energy generation: 1 to 140 MWh Impact on PG&E energy generation: 0 to 12 MWh Impact on Slab Creek reservoir storage: 0 to 500 acre-feet Impact on Slab Creek reservoir levels: 0 to 2.5 feet Impact on Silver Creek above SF American River rafting flows: 0 cfs Impact on SF American River below Slab Creek rafting flows: Critically dry year: 0 cfs Wet year: 0 to 60 cfs Impact on SF American River below Chili Bar rafting flows: 10 to 105 cfs 6.0 Conclusion The diversion impacts appear to correlate with the amount of water diverted. Thus, (40,000 AF withdrawal at White Rock) causes the most severe impacts, while -2 (15,000 AF withdrawal at White Rock) has the lowest. Detailed economic analysis of the impacts may need to be conducted to assist in selection of the most appropriate analysis. \\Sacd\entp\ \08001\TECH\Memo\Impacts Tech Memo doc

13 Technical Memorandum Michael J. Preszler December 7, 2009 Page References DTA and Hannaford, 2005, Hydrology Technical Report for Sacramento Municipal Utility District Upper American River Project and Pacific Gas & Electric Company Chili Bar Project, Version 3, Devine Tarbell & Associates, Inc. and Margaret Hannaford, May El Dorado-SMUD, 2005, El Dorado-SMUD Cooperation Agreement, Various Parties, 2007 Hughes, Robert W., 2007, HEC-ResSim model of the Settlement Agreement Alternative for the Sacramento Municipal Utility District Upper American River Project and Pacific Gas & Electric Company Chili Bar Project, California Department of Fish & Game, January 2007 SMUD et al, 2007, Relicensing Settlement Agreement for the Upper American River Project and Chili Bar Hydroelectric Project, Various parties, January 2007 USACE, 2003, HEC-ResSim Reservoir System Simulation User s Manual Version 2.0, US Army Corps of Engineers, September 2003 \\Sacd\entp\ \08001\TECH\Memo\Impacts Tech Memo doc

14

15 TABLES Table 1: Table 2: Table 3: Tables 4A 4D 1 : Tables 5A 4D: Summary of diversion scenarios Monthly diversions at White Rock Penstock Monthly diversions at Folsom Reservoir SMUD Energy Generation Tables PG&E Energy Generation Tables Tables 6.0A 6.0D: Total Reservoir Storage Tables 6.1A -6.1D Loon Lake Reservoir Tables 6.2A -6.2D Union Valley Reservoir Tables 6.3A -6.3D Ice House Reservoir Tables 6.4A -6.4D Camino Reservoir Tables 6.5A -6.5D Slab Creek Reservoir Tables 6.6A -6.6D Chili Bar Reservoir Tables 7.0A 7.0D: Average Reservoir Pool Elevation Tables 7.1A -7.1D Loon Lake Reservoir Tables 7.2A -7.2D Union Valley Reservoir Tables 7.3A -7.3D Ice House Reservoir Tables 7.4A -7.4D Camino Reservoir Tables 7.5A -7.5D Slab Creek Reservoir Tables 7.6A -7.6D Chili Bar Reservoir Tables 8A - 8D Tables 9A - 9E Tables 10A - 10E Rafting Flows Silver Creek above SF American River Rafting Flows SF American River below Slab Creek Reservoir Rafting Flows SF American River below Chili Bar Reservoir 1 All Project values in Tables 4 through 10 represent change from the listed.

16 Table 1 Summary of diversion scenarios Location of Diversion Name of scenario White Rock Powerhouse Penstock Folsom Reservoir American River Pump Station (future) Base Scenario , ,000-10, , ,000-5,000 Scenarios that have not been modeled (same as Base Scenario) Project A - 30,000 10,000 Project D - 40,000 - Project A-2-15,000 5,000 Project D-2-20,000 - Note: All values are in Acre-Feet and reflect annual diversions. Monthly distribution is shown in Table 2. X:\ \08001\TECH\Memo\Memo tables doc 1

17 Table 2: Monthly diversions at White Rock Penstock Monthly distribution % 10% 5% 4% 4% 4% 4% 4% 8% 13% 16% 16% 12% 100% Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Total Monthly volume (AF) 4,000 2,000 1,600 1,600 1,600 1,600 1,600 3,200 5,200 6,400 6,400 4,800 40,000 Average flow (cfs) Monthly volume (AF) 3,000 1,500 1,200 1,200 1,200 1,200 1,200 2,400 3,900 4,800 4,800 3,600 30,000 Average flow (cfs) Monthly volume (AF) 2,000 1, ,600 2,600 3,200 3,200 2,400 20,000 Average flow (cfs) Monthly volume (AF) 1, ,200 1,950 2,400 2,400 1,800 15,000 Average flow (cfs) Note: Scenarios with no diversion at White Rock are not shown here X:\ \08001\TECH\Memo\Memo tables doc 2

18 Table 3: Monthly diversions at Folsom Reservoir Monthly distribution % 10% 5% 4% 4% 4% 4% 4% 8% 13% 16% 16% 12% 100% Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Total Project A Monthly volume (AF) 3,000 1,500 1,200 1,200 1,200 1,200 1,200 2,400 3,900 4,800 4,800 3,600 30,000 Average flow (cfs) Project D Monthly volume (AF) 4,000 2,000 1,600 1,600 1,600 1,600 1,600 3,200 5,200 6,400 6,400 4,800 40,000 Average flow (cfs) Project A-2 Monthly volume (AF) 1, ,200 1,950 2,400 2,400 1,800 15,000 Average flow (cfs) Project D-2 Monthly volume (AF) 2,000 1, ,600 2,600 3,200 3,200 2,400 20,000 Average flow (cfs) Note: Scenarios with no diversion at Folsom Reservoir are not shown here X:\ \08001\TECH\Memo\Memo tables doc 3

19 SMUD Energy Generation Tables Table 4A: Total SMUD Daily Energy Generation (MWh) for Critically Dry Year October 2, November 2, December 2, January 2, February March April May June 3, July 2, August 2, September 2, Table 4B: Total SMUD Daily Energy Generation (MWh) for Dry Year October 2, November 2, December 2, January 2, February 1, March 1, April 1, May 1, June 3, July 2, August 2, September 2, Table 4C: Total SMUD Daily Energy Generation (MWh) for Below Normal Year October 4, November 2, December 2, January 3, February 1, March 1, April 1, May 1, June 3, July 2, August 2, September 2, X:\ \08001\TECH\Memo\Memo tables doc 4

20 Table 4D: Total SMUD Daily Energy Generation (MWh) for Wet Year October 5, November 3, December 6, January 11, February 9, March 6, April 3, May 2, June 4, July 3, August 3, September 6, PG&E Energy Generation Tables Table 5A: Total PG&E Daily Energy Generation (MWh) for Critically Dry Year October November December January February March April May June July August September Table 5B: Total PG&E Daily Energy Generation (MWh) for Dry Year October November December January February March April May June July August September X:\ \08001\TECH\Memo\Memo tables doc 5

21 Table 5C: Total PG&E Daily Energy Generation (MWh) for Below Normal Year October November December January February March April May June July August September Table 5D: Total PG&E Daily Energy Generation (MWh) for Wet Year October November December January February March April May June July August September Total Reservoir Storage Tables Table 6.0A: Total Daily Reservoir Storage (Acre-feet) for Critically Dry Year October 168, November 148, December 129, January 111, February 101, March 102, April 111, May 128, June 137, July 114, August 86, September 63, X:\ \08001\TECH\Memo\Memo tables doc 6

22 Table 6.1A: Loon Lake Daily Reservoir Storage (Acre-feet) for Critically Dry Year October 28, November 24, December 20, January 14, February 11, March 11, April 14, May 21, June 28, July 19, August 9, September 5, Table 6.2A: Union Valley Daily Reservoir Storage (Acre-feet) for Critically Dry Year October 95, November 80, December 66, January 55, February 50, March 51, April 56, May 64, June 65, July 51, August 34, September 18, Table 6.3A: Ice House Daily Reservoir Storage (Acre-feet) for Critically Dry Year October 29, November 29, December 28, January 27, February 26, March 25, April 26, May 28, June 29, July 28, August 27, September 25, X:\ \08001\TECH\Memo\Memo tables doc 7

23 Table 6.4A: Camino Daily Reservoir Storage (Acre-feet) for Critically Dry Year October November December January February March April May June July August September Table 6.5A: Slab Creek Daily Reservoir Storage (Acre-feet) for Critically Dry Year October 12, November 12, December 12, January 12, February 11, March 11, April 12, May 12, June 12, July 12, August 12, September 12, Table 6.6A: Chili Bar Daily Reservoir Storage (Acre-feet) for Critically Dry Year October 1, November 1, December 1, January 1, February 1, March 1, April 1, May 1, June 1, July 1, August 1, September 1, X:\ \08001\TECH\Memo\Memo tables doc 8

24 Table 6.0B: Total Average Daily Reservoir Storage (Acre-feet) for Dry Water Year October 228, November 212, December 197, January 181, February 175, March 200, April 242, May 278, June 271, July 245, August 217, September 193, Table 6.1B: Loon Lake Average Daily Reservoir Storage (Acre-feet) for Dry Year October 38, November 37, December 36, January 28, February 23, March 27, April 36, May 47, June 43, July 39, August 36, September 30, Table 6.2B: Union Valley Average Daily Reservoir Storage (Acre-feet) for Dry Year October 144, November 130, December 118, January 111, February 111, March 130, April 158, May 179, June 175, July 155, August 132, September 115, X:\ \08001\TECH\Memo\Memo tables doc 9

25 Table 6.3B: Ice House Average Daily Reservoir Storage (Acre-feet) for Dry Year October 30, November 30, December 28, January 27, February 26, March 28, April 32, May 37, June 36, July 35, August 34, September 32, Table 6.4B: Camino Average Daily Reservoir Storage (Acre-feet) for Dry Year October November December January February March April May June July August September Table 6.5B: Slab Creek Average Daily Reservoir Storage (Acre-feet) for Dry Year October 12, November 12, December 12, January 12, February 12, March 12, April 12, May 12, June 12, July 12, August 12, September 12, X:\ \08001\TECH\Memo\Memo tables doc 10

26 Table 6.6B: Chili Bar Average Daily Reservoir Storage (Acre-feet) for Dry Year October 1, November 1, December 1, January 1, February 1, March 1, April 1, May 1, June 1, July 1, August 1, September 1, Table 6.0C: Total Daily Reservoir Storage (Acre-feet) for Below Normal Water Year October 233, November 217, December 204, January 196, February 194, March 210, April 258, May 304, June 327, July 308, August 280, September 255, Table 6.1C: Loon Lake Average Daily Reservoir Storage (Acre-feet) for Below Normal Water Year October 39, November 37, December 37, January 27, February 17, March 18, April 29, May 43, June 54, July 52, August 48, September 42, X:\ \08001\TECH\Memo\Memo tables doc 11

27 Table 6.2C: Union Valley Average Daily Reservoir Storage (Acre-feet) for Below Normal Water Year October 148, November 134, December 123, January 126, February 135, March 148, April 181, May 210, June 217, July 200, August 179, September 164, Table 6.3C: Ice House Average Daily Reservoir Storage (Acre-feet) for Below Normal Water Year October 30, November 30, December 28, January 27, February 27, March 28, April 32, May 36, June 40, July 40, August 38, September 33, Table 6.4C: Camino Average Daily Reservoir Storage (Acre-feet) for Below Normal Water Year October November December January February March April May June July August September X:\ \08001\TECH\Memo\Memo tables doc 12

28 Table 6.5C: Slab Creek Average Daily Reservoir Storage (Acre-feet) for Below Normal Water Year October 12, November 12, December 12, January 12, February 12, March 12, April 13, May 12, June 13, July 12, August 12, September 12, Table 6.6C: Chili Bar Average Daily Reservoir Storage (Acre-feet) for Below Normal Water Year October 1, November 1, December 1, January 1, February 1, March 1, April 1, May 1, June 1, July 1, August 1, September 1, Table 6.0D: Total Daily Reservoir Storage (Acre-feet) for Wet Water Year October 240, November 221, December 260, January 324, February 284, March 247, April 276, May 352, June 390, July 378, August 346, September 301, X:\ \08001\TECH\Memo\Memo tables doc 13

29 Table 6.1D: Loon Lake Average Daily Reservoir Storage (Acre-feet) for Wet Water Year October 40, November 37, December 39, January 46, February 26, March 20, April 30, May 53, June 66, July 66, August 57, September 51, Table 6.2D: Union Valley Average Daily Reservoir Storage (Acre-feet) for Wet Water Year October 153, November 138, December 175, January 228, February 218, March 192, April 206, May 246, June 265, July 254, August 233, September 200, Table 6.3D: Ice House Average Daily Reservoir Storage (Acre-feet) for Wet Water Year October 30, November 30, December 29, January 32, February 23, March 18, April 23, May 35, June 42, July 42, August 39, September 34, X:\ \08001\TECH\Memo\Memo tables doc 14

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Public Workshop May 25, 2016 Sacramento Library Galleria 828 I Street, Sacramento, CA US Army Corps of Engineers BUILDING STRONG

More information

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES Memorandum To: David Thompson From: John Haapala CC: Dan McDonald Bob Montgomery Date: February 24, 2003 File #: 1003551 Re: Lake Wenatchee Historic Water Levels, Operation Model, and Flood Operation This

More information

FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE

FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE 255 237 237 237 217 217 217 200 200 200 0 163 131 Bridging the Gap163Conference 255 0 132 255 0 163 122 The Dana on Mission Bay San Diego, CA January 28,

More information

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Public Workshop May 28, 2015 Library Galleria 828 I Street, Sacramento, CA US Army Corps of Engineers BUILDING STRONG WELCOME &

More information

A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake

A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake Prepared by: Allan Chapman, MSc, PGeo Hydrologist, Chapman Geoscience Ltd., and Former Head, BC River Forecast Centre Victoria

More information

Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows ( ) for the Operations Model Don Pedro Project Relicensing

Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows ( ) for the Operations Model Don Pedro Project Relicensing Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows (1970-2010) for the Operations Model Don Pedro Project Relicensing 1.0 Objective Using available data, develop a daily time series

More information

2001 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville

2001 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville 2001 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville Prepared for: Town of Cary Town of Apex Town of Morrisville RTP South/Wake County Submitted to: North

More information

San Francisco Public Utilities Commission Hydrological Conditions Report For March 2016

San Francisco Public Utilities Commission Hydrological Conditions Report For March 2016 San Francisco Public Utilities Commission Hydrological Conditions Report For March 2016 J. Chester, C. Graham, A. Mazurkiewicz, & M. Tsang, April 7, 2016 Snow Surveyor Chris Graham crossing Huckleberry

More information

San Francisco Public Utilities Commission Hydrological Conditions Report For April 2014

San Francisco Public Utilities Commission Hydrological Conditions Report For April 2014 San Francisco Public Utilities Commission Hydrological Conditions Report For April 2014 J. Chester, C. Graham, A. Mazurkiewicz, & M. Tsang, May 13, 2014 Snow in the High Country The view from Bond Pass

More information

REDWOOD VALLEY SUBAREA

REDWOOD VALLEY SUBAREA Independent Science Review Panel Conceptual Model of Watershed Hydrology, Surface Water and Groundwater Interactions and Stream Ecology for the Russian River Watershed Appendices A-1 APPENDIX A A-2 REDWOOD

More information

Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC

Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC This threat overview relies on projections of future climate change in the Mekong Basin for the period 2045-2069 compared to a baseline of 1980-2005.

More information

Integrating Weather Forecasts into Folsom Reservoir Operations

Integrating Weather Forecasts into Folsom Reservoir Operations Integrating Weather Forecasts into Folsom Reservoir Operations California Extreme Precipitation Symposium September 6, 2016 Brad Moore, PE US Army Corps of Engineers Biography Brad Moore is a Lead Civil

More information

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD 9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD 9.1. Introduction Due to the size of Watana Dam and the economic importance of the Project to the Railbelt, the Probable Maximum Flood (PMF)

More information

Missouri River Basin Water Management

Missouri River Basin Water Management Missouri River Basin Water Management US Army Corps of Engineers Missouri River Navigator s Meeting February 12, 2014 Bill Doan, P.E. Missouri River Basin Water Management US Army Corps of Engineers BUILDING

More information

Souris River Basin Spring Runoff Outlook As of March 1, 2019

Souris River Basin Spring Runoff Outlook As of March 1, 2019 Souris River Basin Spring Runoff Outlook As of March 1, 2019 Prepared by: Flow Forecasting & Operations Planning Water Security Agency Basin Conditions Summer rainfall in 2018 over the Saskatchewan portion

More information

3.0 TECHNICAL FEASIBILITY

3.0 TECHNICAL FEASIBILITY 3.0 TECHNICAL FEASIBILITY 3.1 INTRODUCTION To enable seasonal storage and release of water from Lake Wenatchee, an impoundment structure would need to be constructed on the lake outlet channel. The structure

More information

Modeling of peak inflow dates for a snowmelt dominated basin Evan Heisman. CVEN 6833: Advanced Data Analysis Fall 2012 Prof. Balaji Rajagopalan

Modeling of peak inflow dates for a snowmelt dominated basin Evan Heisman. CVEN 6833: Advanced Data Analysis Fall 2012 Prof. Balaji Rajagopalan Modeling of peak inflow dates for a snowmelt dominated basin Evan Heisman CVEN 6833: Advanced Data Analysis Fall 2012 Prof. Balaji Rajagopalan The Dworshak reservoir, a project operated by the Army Corps

More information

2015 Fall Conditions Report

2015 Fall Conditions Report 2015 Fall Conditions Report Prepared by: Hydrologic Forecast Centre Date: December 21 st, 2015 Table of Contents Table of Figures... ii EXECUTIVE SUMMARY... 1 BACKGROUND... 2 SUMMER AND FALL PRECIPITATION...

More information

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving

More information

HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED

HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED 1.0 Introduction The Sg. Lui watershed is the upper part of Langat River Basin, in the state of Selangor which located approximately 20

More information

Project No India Basin Shadow Study San Francisco, California, USA

Project No India Basin Shadow Study San Francisco, California, USA Project No. 432301 India Basin Shadow Study San Francisco, California, USA Numerical Modelling Studies 04 th June 2018 For Build Inc. Report Title: India Basin Shadow Study San Francisco, California, USA

More information

Proposal to limit Namakan Lake to 1970 Upper Rule Curve for remainder of summer

Proposal to limit Namakan Lake to 1970 Upper Rule Curve for remainder of summer July 7, 214 Subject: Proposal to limit Namakan Lake to 197 Upper Rule Curve for remainder of summer Background: Flooding in 214 has resulted in the highest water levels on Namakan Lake since 1968, and

More information

Missouri River Basin Water Management Monthly Update

Missouri River Basin Water Management Monthly Update Missouri River Basin Water Management Monthly Update Participating Agencies 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 National Oceanic and Atmospheric

More information

January 25, Summary

January 25, Summary January 25, 2013 Summary Precipitation since the December 17, 2012, Drought Update has been slightly below average in parts of central and northern Illinois and above average in southern Illinois. Soil

More information

Drought in Southeast Colorado

Drought in Southeast Colorado Drought in Southeast Colorado Nolan Doesken and Roger Pielke, Sr. Colorado Climate Center Prepared by Tara Green and Odie Bliss http://climate.atmos.colostate.edu 1 Historical Perspective on Drought Tourism

More information

Changing Hydrology under a Changing Climate for a Coastal Plain Watershed

Changing Hydrology under a Changing Climate for a Coastal Plain Watershed Changing Hydrology under a Changing Climate for a Coastal Plain Watershed David Bosch USDA-ARS, Tifton, GA Jeff Arnold ARS Temple, TX and Peter Allen Baylor University, TX SEWRU Objectives 1. Project changes

More information

Souris River Basin Spring Runoff Outlook As of March 15, 2018

Souris River Basin Spring Runoff Outlook As of March 15, 2018 Souris River Basin Spring Runoff Outlook As of March 15, 2018 Prepared by: Flow Forecasting & Operations Planning Water Security Agency Basin Conditions Summer rainfall in 2017 in the Saskatchewan portion

More information

Memo. I. Executive Summary. II. ALERT Data Source. III. General System-Wide Reporting Summary. Date: January 26, 2009 To: From: Subject:

Memo. I. Executive Summary. II. ALERT Data Source. III. General System-Wide Reporting Summary. Date: January 26, 2009 To: From: Subject: Memo Date: January 26, 2009 To: From: Subject: Kevin Stewart Markus Ritsch 2010 Annual Legacy ALERT Data Analysis Summary Report I. Executive Summary The Urban Drainage and Flood Control District (District)

More information

Jackson County 2013 Weather Data

Jackson County 2013 Weather Data Jackson County 2013 Weather Data 61 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data

More information

2. PHYSICAL SETTING FINAL GROUNDWATER MANAGEMENT PLAN. 2.1 Topography. 2.2 Climate

2. PHYSICAL SETTING FINAL GROUNDWATER MANAGEMENT PLAN. 2.1 Topography. 2.2 Climate FINAL GROUNDWATER MANAGEMENT PLAN 2. PHYSICAL SETTING Lassen County is a topographically diverse area at the confluence of the Cascade Range, Modoc Plateau, Sierra Nevada and Basin and Range geologic provinces.

More information

January 22, Coronado National Forest 300 West Congress Street Tucson, AZ Jim Upchurch, Forest Supervisor. Dear Mr.

January 22, Coronado National Forest 300 West Congress Street Tucson, AZ Jim Upchurch, Forest Supervisor. Dear Mr. January 22, 2015 Coronado National Forest 300 West Congress Street Tucson, AZ 85701 Attn: Jim Upchurch, Forest Supervisor Dear Mr. Upchurch: In your letter dated January 16, 2015, you requested that Hudbay

More information

Missouri River Basin Water Management Monthly Update

Missouri River Basin Water Management Monthly Update Missouri River Basin Water Management Monthly Update Participating Agencies 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 National Oceanic and Atmospheric

More information

DROUGHT IN MAINLAND PORTUGAL

DROUGHT IN MAINLAND PORTUGAL DROUGHT IN MAINLAND Ministério da Ciência, Tecnologia e Ensino Superior Instituto de Meteorologia, I. P. Rua C Aeroporto de Lisboa Tel.: (351) 21 844 7000 e-mail:informacoes@meteo.pt 1749-077 Lisboa Portugal

More information

APPENDIX M LAKE ELEVATION AND FLOW RELEASES SENSITIVITY ANALYSIS RESULTS

APPENDIX M LAKE ELEVATION AND FLOW RELEASES SENSITIVITY ANALYSIS RESULTS APPENDIX M LAKE ELEVATION AND FLOW RELEASES SENSITIVITY ANALYSIS RESULTS Appendix M Lake Elevation and Flow Releases Sensitivity Analysis Results Figure M-1 Lake Jocassee Modeled Reservoir Elevations (Current

More information

INTERNATIONAL JOINT COMMISSION

INTERNATIONAL JOINT COMMISSION INTERNATIONAL JOINT COMMISSION In the Matter of Emergency Regulation of the Level of Rainy Lake and of other Boundary Waters in the Rainy Lake Watershed. CONSOLIDATION of the Order Prescribing Method of

More information

A Review of the 2007 Water Year in Colorado

A Review of the 2007 Water Year in Colorado A Review of the 2007 Water Year in Colorado Nolan Doesken Colorado Climate Center, CSU Mike Gillespie Snow Survey Division, USDA, NRCS Presented at the 28 th Annual AGU Hydrology Days, March 26, 2008,

More information

Multivariate Regression Model Results

Multivariate Regression Model Results Updated: August, 0 Page of Multivariate Regression Model Results 4 5 6 7 8 This exhibit provides the results of the load model forecast discussed in Schedule. Included is the forecast of short term system

More information

Colorado s 2003 Moisture Outlook

Colorado s 2003 Moisture Outlook Colorado s 2003 Moisture Outlook Nolan Doesken and Roger Pielke, Sr. Colorado Climate Center Prepared by Tara Green and Odie Bliss http://climate.atmos.colostate.edu How we got into this drought! Fort

More information

Evapo-transpiration Losses Produced by Irrigation in the Snake River Basin, Idaho

Evapo-transpiration Losses Produced by Irrigation in the Snake River Basin, Idaho Nov 7, 2007 DRAFT Evapo-transpiration Losses Produced by Irrigation in the Snake River Basin, Idaho Wendell Tangborn and Birbal Rana HyMet Inc. Vashon Island, WA Abstract An estimated 8 MAF (million acre-feet)

More information

2011 Flood: Technical Review of Lake Manitoba, Lake St. Martin and Assiniboine River Water Levels Summary

2011 Flood: Technical Review of Lake Manitoba, Lake St. Martin and Assiniboine River Water Levels Summary 2011 Flood: Technical Review of Lake Manitoba, Lake St. Martin and Assiniboine River Water Levels Summary October 2013 Introduction Manitoba experienced unprecedented flooding in 2011. While flooding was

More information

Lake Winnebago Regulation Meeting

Lake Winnebago Regulation Meeting Lake Winnebago Regulation Meeting USACE Detroit District October 9, 2014 US Army Corps of Engineers Agenda Basin Overview Major Stakeholders Maintenance a and Repair Work Weather Conditions 2013-20142014

More information

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and 2001-2002 Rainfall For Selected Arizona Cities Phoenix Tucson Flagstaff Avg. 2001-2002 Avg. 2001-2002 Avg. 2001-2002 October 0.7 0.0

More information

Missouri River Basin Water Management Monthly Update

Missouri River Basin Water Management Monthly Update Missouri River Basin Water Management Monthly Update Participating Agencies 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 National Oceanic and Atmospheric

More information

Climate also has a large influence on how local ecosystems have evolved and how we interact with them.

Climate also has a large influence on how local ecosystems have evolved and how we interact with them. The Mississippi River in a Changing Climate By Paul Lehman, P.Eng., General Manager Mississippi Valley Conservation (This article originally appeared in the Mississippi Lakes Association s 212 Mississippi

More information

Hydrogeology and Simulated Effects of Future Water Use and Drought in the North Fork Red River Alluvial Aquifer: Progress Report

Hydrogeology and Simulated Effects of Future Water Use and Drought in the North Fork Red River Alluvial Aquifer: Progress Report Hydrogeology and Simulated Effects of Future Water Use and Drought in the North Fork Red River Alluvial Aquifer: Progress Report Developed in partnership with the Oklahoma Water Resources Board S. Jerrod

More information

HyMet Company. Streamflow and Energy Generation Forecasting Model Columbia River Basin

HyMet Company. Streamflow and Energy Generation Forecasting Model Columbia River Basin HyMet Company Streamflow and Energy Generation Forecasting Model Columbia River Basin HyMet Inc. Courthouse Square 19001 Vashon Hwy SW Suite 201 Vashon Island, WA 98070 Phone: 206-463-1610 Columbia River

More information

In the Matter of Emergency Regulation of the Level of

In the Matter of Emergency Regulation of the Level of INTERNATIONAL JOINT COMMISSION In the Matter of Emergency Regulation of the Level of Rainy Lake and of other Boundary Waters in the Rainy Lake Watershed. Supplementary Order to the Order Prescribing Method

More information

Hydrologic Conditions in the Delaware River Basin

Hydrologic Conditions in the Delaware River Basin 2017 Hydrologic Conditions in the Delaware River Basin Prepared by Operations Staff June 2018 Hydrologic Highlights Hydrologic Conditions in the Delaware River Basin Annual Report 2017 At the start of

More information

Climate Change and Water Supply Research. Drought Response Workshop October 8, 2013

Climate Change and Water Supply Research. Drought Response Workshop October 8, 2013 Climate Change and Water Supply Research Drought Response Workshop October 8, 2013 DWR Photo Oroville Reservoir, 2009 Talk Overview Expectations History Atmospheric Rivers and Water Supply Current Research

More information

The Colorado Drought of 2002 in Perspective

The Colorado Drought of 2002 in Perspective The Colorado Drought of 2002 in Perspective Colorado Climate Center Nolan Doesken and Roger Pielke, Sr. Prepared by Tara Green and Odie Bliss http://climate.atmos.colostate.edu Known Characteristics of

More information

Merced Irrigation District Hydrologic and Hydraulic Operations (MIDH2O) Model

Merced Irrigation District Hydrologic and Hydraulic Operations (MIDH2O) Model Merced Irrigation District Hydrologic and Hydraulic Operations (MIDH2O) Model September 05, 2018 Marco Bell, Merced Irrigation District Bibek Joshi, Dewberry Objective Introduce HEC-RTS Benefits of MIDH2O

More information

DRAFT. REVISED Draft. Paso Robles Subbasin Groundwater Sustainability Plan Chapter 6

DRAFT. REVISED Draft. Paso Robles Subbasin Groundwater Sustainability Plan Chapter 6 REVISED Draft Paso Robles Subbasin Groundwater Sustainability Plan Chapter 6 Prepared for the Paso Robles Subbasin Cooperative Committee and the Groundwater Sustainability Agencies February 14, 2019 Paso

More information

Water Temperature Monitoring of the Klamath River Mainstem

Water Temperature Monitoring of the Klamath River Mainstem Water Temperature Monitoring of the Klamath River Mainstem Progress Report #3 Prepared by Robert Rohde and Leaf Hillman with assistance provided by Susan Smith and William Tripp Karuk Tribe of California

More information

Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center

Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center Doug Mayo Jackson County Extension Director 1952-2008 Rainfall Data

More information

2003 Moisture Outlook

2003 Moisture Outlook 2003 Moisture Outlook Nolan Doesken and Roger Pielke, Sr. Colorado Climate Center Prepared by Tara Green and Odie Bliss http://climate.atmos.colostate.edu Through 1999 Through 1999 Fort Collins Total Water

More information

NATIONAL WEATHER SERVICE

NATIONAL WEATHER SERVICE January 2016 February 9, 2016 This was a dry month across the HSA despite one large and several smaller snowfalls. Most locations ended up 1-2 inches below normal for the month. The driest locations at

More information

MEMORANDUM. Jerry Conrow, Ojai Basin Groundwater Management Agency

MEMORANDUM. Jerry Conrow, Ojai Basin Groundwater Management Agency MEMORANDUM TO: FROM: Jerry Conrow, Ojai Basin Groundwater Management Agency Gregory Schnaar, PhD, Stephen J. Cullen, PhD, PG, DATE: August 6, 2014, 2014 SUBJECT: Ojai Basin Groundwater Model - Extended

More information

Upper Missouri River Basin February 2018 Calendar Year Runoff Forecast February 6, 2018

Upper Missouri River Basin February 2018 Calendar Year Runoff Forecast February 6, 2018 Upper Missouri River Basin February 2018 Calendar Year Runoff Forecast February 6, 2018 Calendar Year Runoff Forecast Explanation and Purpose of Forecast U.S. Army Corps of Engineers, Northwestern Division

More information

SACRAMENTO MUNICIPAL UTILITY DISTRICT UPPER AMERICAN RIVER PROJECT (FERC Project No. 2101) and

SACRAMENTO MUNICIPAL UTILITY DISTRICT UPPER AMERICAN RIVER PROJECT (FERC Project No. 2101) and SACRAMENTO MUNICIPAL UTILITY DISTRICT UPPER AMERICAN RIVER PROJECT (FERC Project No. 2101) and PACIFIC GAS AND ELECTRIC COMPANY CHILI BAR PROJECT (FERC Project No. 2155) STREAM HABITAT MAPPING TECHNICAL

More information

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA Document Prepared By: Cauvery Hydro Energy Limited Contact Information Cauvery Hydro Energy Limited 67, Lavina Courts,

More information

NORTHUMBERLAND COUNTY, PA

NORTHUMBERLAND COUNTY, PA QUAKER RUN Stream and Wetland Restoration As-Built Completion Report and First Year Monitoring Data Coal Township NORTHUMBERLAND COUNTY, PA Upstream Before Upstream After Prepared for: COAL TOWNSHIP 805

More information

February 10, Mr. Jeff Smith, Chairman Imperial Valley Water Authority E County Road 1000 N Easton, IL Dear Chairman Smith:

February 10, Mr. Jeff Smith, Chairman Imperial Valley Water Authority E County Road 1000 N Easton, IL Dear Chairman Smith: February 1, 1 Mr. Jeff Smith, Chairman Imperial Valley Water Authority 8 E County Road 1 N Easton, IL Dear Chairman Smith: The Illinois State Water Survey (ISWS), under contract to the Imperial Valley

More information

Promoting Rainwater Harvesting in Caribbean Small Island Developing States Water Availability Mapping for Grenada Preliminary findings

Promoting Rainwater Harvesting in Caribbean Small Island Developing States Water Availability Mapping for Grenada Preliminary findings Promoting Rainwater Harvesting in Caribbean Small Island Developing States Water Availability Mapping for Grenada Preliminary findings National Workshop Pilot Project funded by The United Nations Environment

More information

CHAPTER 4 CRITICAL GROWTH SEASONS AND THE CRITICAL INFLOW PERIOD. The numbers of trawl and by bag seine samples collected by year over the study

CHAPTER 4 CRITICAL GROWTH SEASONS AND THE CRITICAL INFLOW PERIOD. The numbers of trawl and by bag seine samples collected by year over the study CHAPTER 4 CRITICAL GROWTH SEASONS AND THE CRITICAL INFLOW PERIOD The numbers of trawl and by bag seine samples collected by year over the study period are shown in table 4. Over the 18-year study period,

More information

PRELIMINARY ASSESSMENT OF SURFACE WATER RESOURCES - A STUDY FROM DEDURU OYA BASIN OF SRI LANKA

PRELIMINARY ASSESSMENT OF SURFACE WATER RESOURCES - A STUDY FROM DEDURU OYA BASIN OF SRI LANKA PRELIMINARY ASSESSMENT OF SURFACE WATER RESOURCES - A STUDY FROM DEDURU OYA BASIN OF SRI LANKA THUSHARA NAVODANI WICKRAMAARACHCHI Hydrologist, Water Resources Secretariat of Sri Lanka, Room 2-125, BMICH,

More information

The Climate of Oregon Climate Zone 4 Northern Cascades

The Climate of Oregon Climate Zone 4 Northern Cascades /05 E55 Unbound issue No. 9/ is Does not circulate Special Report 916 May 1993 The Climate of Oregon Climate Zone 4 Property of OREGON STATE UNIVERSITY Library Serials Corvallis, OR 97331-4503 Agricultural

More information

WOLF CREEK GARRARD DITCH DIVESION GRINNELL DITCH DIVERSION ON WOLF CREEK

WOLF CREEK GARRARD DITCH DIVESION GRINNELL DITCH DIVERSION ON WOLF CREEK WOLF CREEK GARRARD DITCH DIVESION GRINNELL DITCH DIVERSION ON WOLF CREEK WOLF CREEK DRAINAGE INTRODUCTION BIG PICTURE Wolf Creek flows out of the east slope of the Bighorn Mountains, between the tributaries

More information

2018 Annual Review of Availability Assessment Hours

2018 Annual Review of Availability Assessment Hours 2018 Annual Review of Availability Assessment Hours Amber Motley Manager, Short Term Forecasting Clyde Loutan Principal, Renewable Energy Integration Karl Meeusen Senior Advisor, Infrastructure & Regulatory

More information

Folsom Dam Water Control Manual Update

Folsom Dam Water Control Manual Update Folsom Dam Water Control Manual Update Public Workshop April 3, 2014 Location: Sterling Hotel Ballroom 1300 H Street, Sacramento US Army Corps of Engineers BUILDING STRONG WELCOME & INTRODUCTIONS 2 BUILDING

More information

Operator and Modeler Collaboration on Truckee- Carson River Operations Using Ensembles River Ware User Group Meeting Thursday February 1, 2018

Operator and Modeler Collaboration on Truckee- Carson River Operations Using Ensembles River Ware User Group Meeting Thursday February 1, 2018 Operator and Modeler Collaboration on Truckee- Carson River Operations Using Ensembles River Ware User Group Meeting Thursday February 1, 2018 Caleb Erkman, P.E. PWRE David Wathen Deputy TROA Administrator

More information

Illinois State Water Survey Division

Illinois State Water Survey Division Illinois State Water Survey Division SURFACE WATER SECTION SWS Miscellaneous Publication 108 SEDIMENT YIELD AND ACCUMULATION IN THE LOWER CACHE RIVER by Misganaw Demissie Champaign, Illinois June 1989

More information

Weather History on the Bishop Paiute Reservation

Weather History on the Bishop Paiute Reservation Weather History on the Bishop Paiute Reservation -211 For additional information contact Toni Richards, Air Quality Specialist 76 873 784 toni.richards@bishoppaiute.org Updated 2//214 3:14 PM Weather History

More information

STATISTICAL FORECASTING and SEASONALITY (M. E. Ippolito; )

STATISTICAL FORECASTING and SEASONALITY (M. E. Ippolito; ) STATISTICAL FORECASTING and SEASONALITY (M. E. Ippolito; 10-6-13) PART I OVERVIEW The following discussion expands upon exponential smoothing and seasonality as presented in Chapter 11, Forecasting, in

More information

Mountain View Community Shuttle Monthly Operations Report

Mountain View Community Shuttle Monthly Operations Report Mountain View Community Shuttle Monthly Operations Report December 6, 2018 Contents Passengers per Day, Table...- 3 - Passengers per Day, Chart...- 3 - Ridership Year-To-Date...- 4 - Average Daily Ridership

More information

Missouri River Basin Water Management Monthly Update

Missouri River Basin Water Management Monthly Update Missouri River Basin Water Management Monthly Update Participating Agencies 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 National Oceanic and Atmospheric

More information

Lower San Joaquin River Committee

Lower San Joaquin River Committee Lower San Joaquin River Committee Briefing of New Melones Project and Vernalis Modeling Dan Steiner January 3, 215 1 Task Demonstrate effects of changed flow and salinity in the San Joaquin River upon

More information

A. Identification of Temperature as the Cause of Non-Attainment

A. Identification of Temperature as the Cause of Non-Attainment VIII. DETERMINATION OF ATTAINMENT IN WATER BODIES The following section presents a procedure for determining whether a particular stream segment is attaining a site-specific temperature standard. Identification

More information

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement 2019 Settlement Calendar for ASX Cash Market Products ASX Settlement Settlement Calendar for ASX Cash Market Products 1 ASX Settlement Pty Limited (ASX Settlement) operates a trade date plus two Business

More information

2 Precipitation and Evaporation

2 Precipitation and Evaporation Zone 7 Water Agency 2.1 Program Description 2 Precipitation and Evaporation This section describes Zone 7's Climatological Monitoring Program which tracks rainfall and evaporation in the Valley. Zone 7

More information

The Climate of Bryan County

The Climate of Bryan County The Climate of Bryan County Bryan County is part of the Crosstimbers throughout most of the county. The extreme eastern portions of Bryan County are part of the Cypress Swamp and Forest. Average annual

More information

Missouri River Flood Task Force River Management Working Group Improving Accuracy of Runoff Forecasts

Missouri River Flood Task Force River Management Working Group Improving Accuracy of Runoff Forecasts Missouri River Flood Task Force River Management Working Group Improving Accuracy of Runoff Forecasts Kevin Grode, P.E. Reservoir Regulation Team Lead Missouri River Basin Water Management Northwestern

More information

Restoration Goals TFG Meeting. Agenda

Restoration Goals TFG Meeting. Agenda San Joaquin River Restoration Program Restoration Goals TFG Meeting Reach 2B Update April 28, 2010 Agenda 1. Introductions 2. Program Restoration Goal Context 3. Program Update a) Interim Flows b) EIS/EIR

More information

AN ASSESSMENT OF THE RELATIONSHIP BETWEEN RAINFALL AND LAKE VICTORIA LEVELS IN UGANDA

AN ASSESSMENT OF THE RELATIONSHIP BETWEEN RAINFALL AND LAKE VICTORIA LEVELS IN UGANDA AN ASSESSMENT OF THE RELATIONSHIP BETWEEN RAINFALL AND LAKE VICTORIA LEVELS IN UGANDA BY CATHERINE MULINDE BA (Environmental Management), PGD (Meteorology) Teaching Assistant Department of Geography, Meteorology

More information

NATIONAL HYDROPOWER ASSOCIATION MEETING. December 3, 2008 Birmingham Alabama. Roger McNeil Service Hydrologist NWS Birmingham Alabama

NATIONAL HYDROPOWER ASSOCIATION MEETING. December 3, 2008 Birmingham Alabama. Roger McNeil Service Hydrologist NWS Birmingham Alabama NATIONAL HYDROPOWER ASSOCIATION MEETING December 3, 2008 Birmingham Alabama Roger McNeil Service Hydrologist NWS Birmingham Alabama There are three commonly described types of Drought: Meteorological drought

More information

NRC Workshop Probabilistic Flood Hazard Assessment (PFHA) Jan 29-31, Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc.

NRC Workshop Probabilistic Flood Hazard Assessment (PFHA) Jan 29-31, Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc. Stochastic Event Flood Model (SEFM) Stochastic Modeling of Extreme Floods A Hydrological Tool for Analysis of Extreme Floods Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc. Olympia, WA NRC Workshop

More information

Valenciano Reservoir Safe Yield Study. Prepared by: CSA Architects & Engineers, LLP

Valenciano Reservoir Safe Yield Study. Prepared by: CSA Architects & Engineers, LLP Valenciano Reservoir Safe Yield Study Prepared by: CSA Architects & Engineers, LLP CSA Group Prepared for: Puerto Rico Aqueduct and Sewer Authority Planning TABLE OF CONTENTS 1 Introduction...1 1.1 Safe

More information

Drought Characterization. Examination of Extreme Precipitation Events

Drought Characterization. Examination of Extreme Precipitation Events Drought Characterization Examination of Extreme Precipitation Events Extreme Precipitation Events During the Drought For the drought years (1999-2005) daily precipitation data was analyzed to find extreme

More information

UPPER COSUMNES RIVER FLOOD MAPPING

UPPER COSUMNES RIVER FLOOD MAPPING UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe

More information

Rainfall Observations in the Loxahatchee River Watershed

Rainfall Observations in the Loxahatchee River Watershed Rainfall Observations in the Loxahatchee River Watershed Richard C. Dent Loxahatchee River District September 1997 Introduction Rain is a common occurrence in south Florida, yet its presence or absence

More information

Water Supply Forecast - THE DALLES http://www.nwrfc.noaa.gov/water_supply/ws_forecasts.php?id=tdao3 Page 1 of 1 3/7/2013 Close Archive Data/Normals Rankings Adjustments Verification Verify All Years Help

More information

Updated 2018 Restoration Allocation & Default Flow Schedule February 16, 2018

Updated 2018 Restoration Allocation & Default Flow Schedule February 16, 2018 Updated 2018 Restoration Allocation & Default Schedule February 16, 2018 Bureau of Reclamation 2800 Cottage Way, MP-170 Sacramento, California 95825 Introduction The following transmits the updated 2018

More information

Geostatistical Analysis of Rainfall Temperature and Evaporation Data of Owerri for Ten Years

Geostatistical Analysis of Rainfall Temperature and Evaporation Data of Owerri for Ten Years Atmospheric and Climate Sciences, 2012, 2, 196-205 http://dx.doi.org/10.4236/acs.2012.22020 Published Online April 2012 (http://www.scirp.org/journal/acs) Geostatistical Analysis of Rainfall Temperature

More information

The Climate of Seminole County

The Climate of Seminole County The Climate of Seminole County Seminole County is part of the Crosstimbers. This region is a transition region from the Central Great Plains to the more irregular terrain of southeastern Oklahoma. Average

More information

2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT

2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT 2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT Settlement Calendar for ASX Cash Market Products 1 ASX Settlement Pty Limited (ASX Settlement) operates a trade date plus two Business

More information

CFCAS project: Assessment of Water Resources Risk and Vulnerability to Changing Climatic Conditions. Project Report II.

CFCAS project: Assessment of Water Resources Risk and Vulnerability to Changing Climatic Conditions. Project Report II. CFCAS project: Assessment of Water Resources Risk and Vulnerability to Changing Climatic Conditions Project Report II. January 2004 Prepared by and CFCAS Project Team: University of Western Ontario Slobodan

More information

National Integrated Drought Information System. Southeast US Pilot for Apalachicola- Flint-Chattahoochee River Basin 20-March-2012

National Integrated Drought Information System. Southeast US Pilot for Apalachicola- Flint-Chattahoochee River Basin 20-March-2012 National Integrated Drought Information System Southeast US Pilot for Apalachicola- Flint-Chattahoochee River Basin 20-March-2012 Current drought status from Drought Monitor http://www.drought.unl.edu/dm/monitor.html

More information

CHAPTER-11 CLIMATE AND RAINFALL

CHAPTER-11 CLIMATE AND RAINFALL CHAPTER-11 CLIMATE AND RAINFALL 2.1 Climate Climate in a narrow sense is usually defined as the "average weather", or more rigorously, as the statistical description in terms of the mean and variability

More information

Local Ctimatotogical Data Summary White Hall, Illinois

Local Ctimatotogical Data Summary White Hall, Illinois SWS Miscellaneous Publication 98-5 STATE OF ILLINOIS DEPARTMENT OF ENERGY AND NATURAL RESOURCES Local Ctimatotogical Data Summary White Hall, Illinois 1901-1990 by Audrey A. Bryan and Wayne Armstrong Illinois

More information

Appendix B - Alabama-Coosa-Tallapoosa (ACT) Basin

Appendix B - Alabama-Coosa-Tallapoosa (ACT) Basin Appendix B - Alabama-Coosa-Tallapoosa (ACT) Basin 1 ACT BASIN 1.1 DESCRIPTION OF BASIN The headwater streams of the Alabama-Coosa-Tallapoosa (ACT) System rise in the Blue Ridge Mountains of Georgia and

More information

Monthly Magnetic Bulletin

Monthly Magnetic Bulletin BRITISH GEOLOGICAL SURVEY Ascension Island Observatory Monthly Magnetic Bulletin December 2008 08/12/AS Crown copyright; Ordnance Survey ASCENSION ISLAND OBSERVATORY MAGNETIC DATA 1. Introduction Ascension

More information