1 STUDIU DE FEZABILITATE PENTRU SOLUŢII TEHNICE ALTERNATIVE/COMPLEMENTARE PRIVIND LUCRĂRILE CE SE VOR EXECUTA ÎN PUNCTUL CRITIC 01 BALA DIN CADRUL PROIECTULUI ÎMBUNĂTĂŢIREA CONDIŢIILOR DE NAVIGAŢIE PE DUNĂRE ÎNTRE CĂLĂRAŞI ŞI BRĂILA, KM 375 KM 175 WORKSHOP #2 [Modeling and Sediment Transfers Review of alternative solutions] Bucharest 1
2 Chapter A Project objectives & requirements 1. AFDJ 2. NGOs 2
3 A1. AFDJ A I xxxx P1: Ensure navigation on Old Danube (MWD = 2.5 m) all over the year P2: Preserve river eco-system, including in particular sturgeons migration P3: Reduce maintenance costs (e.g. dredging) by ensuring sediment continuity in the long run P4: Ensure navigation on Bala branch (MWD = 2.5 m), as a safety alternative to Old Danube fairway 3
4 A2. NGOs A I xxxx N1: No disruption of fish migration (e.g. sturgeons) N2: No destruction of sturgeons habitats N3: Preservation of ground water level in floodplain downstream of Bala branch sill N4: Evaluation of sediment dynamics by modelling predictions 4
5 Chapter B Technical solutions reviewed by the work group 1. Alternatives 1 to 8 5
6 B1. Alternative 1: main features Source: IAD (2013) 6
7 B1. Alternative 1: main features No bottom sill at Bala branch inlet Diversion structures on left bank U/S Bala bifurcation (groynes, chevrons and possibly guiding walls) Complementary maintenance dredging works Construction (eventually) of sturgeon passage across Turcescu Island tip Source: IAD (2013) 7
8 B1. Alternative 1: remarks Longitudinal connectivity restauration is the main concern Solution based on upstream flow diversion (dynamic effects) No direct action on initial cause of Bala branch incision questionable efficiency regarding bed-incision control Bala inlet narrowing = obstacle to navigation Source: IAD (2013) 8
9 B1. Alternative 1: analysis Analysis regarding the objectives of the project: Extra roughness on the guiding wall: reduction of Bala inlet P1 attractiveness? Hypothesis: no more incision in Bala inlet P2 Maintain of longitudinal connectivity on Bala branch (N1) (N2) Fish passage through Turcescu Island: restauration of fluvial appendices? Fish passage efficiency has to be established? Poaching concern with the fish passage Dredging to maintain the solution P3 Hypothesis: stopping of incision in Bala branch and restauration of the? channel downstream Old Danube P4 Chevrons upstream Bala inlet N3 Maintain of longitudinal connectivity on Bala branch [?] to be evaluated 9
10 B2. Alternative 2: main features Source/ WWF (2014) 10
11 B2. Alternative 2: main features Redesign of diversion (bifurcation angle, low-water breach ) Deflection of thalweg toward Old Danube using groynes, bed shift (by dredging?) and chevrons Additional large bypass for ecological continuity (2 locations suggested Source/ WWF (2014) Local reduction of fairway width in Old Danube for reducing maintenance costs by dredging 11
12 B2. Alternative 2: remarks Solution based on upstream flow diversion (dynamic effects) No direct action on initial cause of Bala branch incision questionable efficiency regarding bed-incision control Increase of sediment flow towards Bala branch is supported both by the low-water breach and by the change in bifurcation angle Low-water breach effect is Source/ WWF (2014) questionable due to the velocity increasing possibly induced. Especially on: Fish migration Navigation 12
13 B2. Alternative 2: analysis Analysis regarding the objectives of the project: P1 Bed shift has no impact on upper Old Danube navigation as long as structures on the right side preserve the channel width? The construction phasing has to take into account navigation P2 (N1) (N2)? Longitudinal connectivity on Bala branch Fish passage through Braţul Turcescu: restauration of fluvial appendices? Longer upstream fish passage: efficiency compared with Braţul Turcescu bypass?? Fish passage efficiency has to be established? Poaching concern with the fish passages P3 Yearly dredging reduction by local narrowing of the fairway Additional sediment take at Bala inlet will reduce sediments in the lower Old Danube, but without other action on lower Old Danube, long term sediment deposit may go on P4? Stream concentration by low-water breach, in the entrance turn N3 Maintain of discharge (water and sediment) on Bala branch [?] to be evaluated 13
14 B3. Alternative 3: main features 14
15 B3. Alternative 3: main features Bottom sill with crest at 4.2 mbsc Fish pass for (upward) migration: 4 locations suggested Lock for the Bala branch connection. 15
16 B3. Alternative 3: remarks Based on corrections of current solution No direct action on initial cause of Bala branch incision questionable efficiency regarding bed-incision control Limited feedbacks on fish passage facilities for sturgeons Lock = very complex structure requiring safe foundations 16
17 B3. Alternative 3: analysis Analysis regarding the objectives of the project: P1? Hypothesis: no more incision in Bala inlet, which is very doubtful P2 (N1) (N2) Longitudinal connectivity on Bala branch Fish passage through Braţul Turcescu: restauration of fluvial appendices Fish passage on left Puiu Turcului: restauration of fluvial appendices; additional stream attractiveness thanks to the lock Fish passage across the tip of Turcescu Island may be the shortest fish pass The Serban tunnel is considered not to be feasible (IAD 2014)? Fish passage efficiency has to be established? Poaching concern with the fish passages P3 Without any action on lower Old Danube, long-term sediment deposit should go on New maintenance costs for Bala lock P4 Lock construction before sill crest elevation, in order to maintain navigation as far as possible? External energy is needed for lock operation N3 Maintain of discharge (of water; to be evaluated for sediment) on Bala branch [?] to be evaluated 17
18 B4. Alternative 4: main features 18
19 B4. Alternative 4: main features Lowering of the bottom sill for meeting velocity requirements regarding fish migration Total or partial decommission of guiding wall (optional) to reduce water head at Bala entrance. 19
20 B4. Alternative 4: remarks Longitudinal connectivity restauration is the main concern No direct action on initial cause of Bala branch incision: Questionable efficiency regarding bed-incision control Bala branch predominance regarding water flow is likely to exacerbate As the new guiding wall contributes significantly to Bala bed incision, question of structure removal or adaptation is thus raised 20
21 B4. Alternative 4: analysis Analysis regarding the objectives of the project: P1 The current situation should worsen P2 (N1) (N2) Maintain of longitudinal connectivity on Bala branch Aging worsening on lower Old Danube P3 Without any action on lower Old Danube, long-term sediment deposit should go on P4 Ok for navigation in Bala branch but it might become the main (unique?) route N3 Maintain of longitudinal connectivity on Bala branch [?] to be evaluated 21
22 B5. Alternative 5: main features 22
23 B5. Alternative 5: main features Bottom sill kept in its initial state (crest level at 0.0 mbsc), or at another level to be determined (bed incision prevention), and enhancement of structure foundations. Groyne field on the right side of Old Danube: Notched type with downstream orientation should be favored for preventing sedimentation and vegetation development as well as preserving good biodiversity conditions Total length between m including m long notches and crest level close to annual flow level 23
24 B5. Alternative 5: remarks Incision in Bala branch is counteracted by: Promoting erosion & transport processes in lower Old Danube Bed incision blockage by Bala branch bottom sill. Development of a deep waterway in the vicinity of the groynes Main interests of notched type groynes: Hinder a development of permanent vegetation Prevent extra flooding hazards Enhance biodiversity (compared to classic solutions) 24
25 B5. Alternative 5: analysis Analysis regarding the objectives of the project: P1 Long term solution No navigation restriction is needed during the construction period P2 (N1) (N2)? Longitudinal connectivity on Bala branch Positive impact for habitats over the groyne field, in the long term P3 Long term solution for sediments Dredging costs reduction as soon as the system reaches its morphological equilibrium P4 Close to initial situation N3 Maintain of discharge (water and sediment) on Bala branch [?] to be evaluated 25
26 B6. Alternative 6: main features 26
27 B6. Alternative 6: main features 1/3 Bottom sill in its initial state (crest level at 0.0 mbsc), or at another level to determine Groyne field on the right side of Old Danube (notched type+d/s orientation) 27
28 B6. Alternative 6: main features 2/3 Fish pass to ensure migration (upward passage of sturgeons). Different locations are suggested. Guiding Wall roughness increasing by short perpendicular structures aiming at moving away main flow from GW 28
29 B6. Alternative 6: main features 3/3 Chevron system for Parjoaia rock effect attenuation Chevron in front of Epuraşu inlet for reducing incision nearby existing breach 29
30 B6. Alternative 6: existing examples Source: PLATINA 30
31 B6. Alternative 6: existing examples Source: PLATINA (Pilot Project Witzelsdorf) 31
32 B6. Alternative 6: existing examples Source: PLATINA Restoration measures at the Rhine river Waal branch near Nijmegen. B. Boekhoven, NL,
33 B6. Alternative 6: remarks Incision in Bala branch is counteracted by: Promoting erosion & transport processes in lower Old Danube Bed incision blockage by Bala branch bottom sill. Development of a deep waterway in the vicinity of the groynes Main interests of notched type groynes: Hinder a development of permanent vegetation Prevent extra flooding hazards Enhance biodiversity (compared to classic solutions) Fish upward migration handled by a specific fish pass (alternative to passage through bottom sill) Chevrons should protect against local stream effects than can destabilize the system. Arrangement proposed allows navigation during work phase 33
34 B6. Alternative 6: analysis Analysis regarding the objectives of the project: P1 Long-term solution No navigation restriction is needed during the construction period P2 (N1) (N2) Restauration of longitudinal connectivity on Bala branch by additional fish pass Positive impact for habitats over the groyne field, in the long term? Fish passage efficiency has to be established? Poaching concern with fish passage P3 Long-term solution for sediments Dredging costs reduction as soon as the system reaches its morphological equilibrium P4 Close to initial situation N3 Maintain of discharge (water and sediment) on Bala branch [?] to be evaluated 34
35 B7. Alternative 7: main features 35
36 B7. Alternative 7: main features Elevation of existing bottom sill at Bala branch inlet to redesign so as to divert AMAP discharge toward Lower Old Danube (Bala branch incision prevention) Series of sills in D/S part of Bala branch so as to control channel conveyance (exact number, location and elevation to be optimized). Main constraints are as follows: General slope of Bala branch kept No influence of last sill on Borcea Water depths compliant with navigation Velocity compliant with fish migration Preservation of existing fish (sturgeons) habitats in Bala branch 36
37 B7. Alternative 7: A I Understanding of the river evolution in Critical Point 1 Bala Bala-Borcea branch slope steeper than Old Danube slope meaning: Higher flow velocity Higher exposition to erosion and incision hazards 37
38 B7. Alternative 7: evolution of longitudinal profile after works Current state Alternative 7 38
39 B7. Alternative 7: remarks Corrections of the current solution. No direct action on the initial cause of Bala branch incisio, no guarantee: neither that the incision will stop on Bala nor that Caragheorghe sand bar development will stop River works affect only Bala branch. Sills construction should start from downstream to upstream Higher level downstream sill #1 should limit downstream scour pit development. Additional river works (dykes) might be necessary if the water level raise, upstream of each sill, overtops Bala banks. 39
40 B7. Alternative 7: analysis Analysis regarding the objectives of the project: P1? Hypothesis: no more incision in Bala inlet (should be ok with sill #1 crest level high enough) No navigation restriction is needed during the construction period P2 (N1) (N2) Sills are designed to meet fish migration velocity requirements? Impact of several sills on fish migration has to be evaluated? Impact on habitats has to be evaluated (deep waters are ok for wintering sites) P3? Hypothesis: stopping of incision in Bala branch and restauration of the channel downstream Old Danube (should be ok with sill #1 crest level high enough) P4 Sills are designed to meet water depths requirements for navigation Navigation restriction on Bala branch during the construction period N3 Maintain of discharge (water and sediment) on Bala branch [?] to be evaluated 40
41 B8. Alternative 8 (as a reminder) Source: survey performed in Russia (St Petersburg) in the 1950 s Shifting the mouth of Bala upstream of Parjoaia rock. Execution of a guiding dyke on the left bank of Bala branch. Execution of a dyke in order to block Bala branch and shifting the mouth downstream in the area of Turcescu arm. Removal of Parjoaia rock 41
42 B9. Complementary measures Onboard digital maps regularly updated from bathymetric measurements with multi-beam echo-sounder Quick mini-dredging as soon as a critical situation is locally observed on the fairway Traffic management according to hydrological conditions Adaptation of ship to river and flow characteristics 42
43 B10. Synthesis: solutions favored by consortium Alternative 7 Alternative 6 43
WORKSHOP #2 Modelling and sediment transfers. Bucharest 07 October 2015
STUDIU DE FEZABILITATE PENTRU SOLUŢII TEHNICE ALTERNATIVE/COMPLEMENTARE PRIVIND LUCRĂRILE CE SE VOR EXECUTA ÎN PUNCTUL CRITIC 01 BALA DIN CADRUL PROIECTULUI ÎMBUNĂTĂŢIREA CONDIŢIILOR DE NAVIGAŢIE PE DUNĂRE
More informationImprovement of navigation conditions on the Danube (Calarasi-Braila and Lower Danube) - Ecological concerns?
Improvement of navigation conditions on the Danube (Calarasi-Braila and Lower Danube) - Ecological concerns? Georg Rast, Christine Bratrich, Orieta Hulea WWF Germany/DCPO Topics of the presentation Major
More informationSCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS
DESIGN METHODS B: SEDIMENT TRANSPORT PROCESSES FOR STREAM RESTORATION DESIGN PETER KLINGEMAN OREGON STATE UNIVERSITY CIVIL ENGINEERING DEPT., CORVALLIS 2 ND ANNUAL NORTHWEST STREAM RESTORATION DESIGN SYMPOSIUM
More informationEAGLES NEST AND PIASA ISLANDS
EAGLES NEST AND PIASA ISLANDS HABITAT REHABILITATION AND ENHANCEMENT PROJECT MADISON AND JERSEY COUNTIES, ILLINOIS ENVIRONMENTAL MANAGEMENT PROGRAM ST. LOUIS DISTRICT FACT SHEET I. LOCATION The proposed
More informationCFD Modeling for Structure Designs in Environmental Impacts Mitigation
CFD Modeling for Structure Designs in Environmental Impacts Mitigation June 05 Navid Nekouee, Hugo Rodriguez and Steven Davie Environmental Impact Mitigation Design Savannah Harbor Expansion Project (SHEP)
More informationTechnical Assistance for the Improvement of the Navigation Conditions on the Danube. founded by EU and Romanian Government
Technical Assistance for the Improvement of the Navigation Conditions on the Danube founded by EU and Romanian Government ISPA measure 2002 RO 16 PA 011 Short Presentation Prepared by: Alexandru Balcu
More informationState Water Survey Division SURFACE WATER SECTION
State Water Survey Division SURFACE WATER SECTION AT THE UNIVERSITY OF ILLINOIS Illinois Department of Energy and Natural Resources SWS Miscellaneous Publication 88 SEDIMENTATION OF POOL 19 ON THE MISSISSIPPI
More informationNATURAL RIVER. Karima Attia Nile Research Institute
NATURAL RIVER CHARACTERISTICS Karima Attia Nile Research Institute NATURAL RIVER DEFINITION NATURAL RIVER DEFINITION Is natural stream of water that flows in channels with ih more or less defined banks.
More informationLongitudinal dams as an alternative to wing dikes in river engineering. Fredrik Huthoff
Longitudinal dams as an alternative to wing dikes in river engineering Fredrik Huthoff Contents Introduction Why consider longitudinal dams? Room for the river in the Netherlands The pilot study The Dutch
More informationUpper Mississippi River Basin Environmental Management Program Workshop
Presentation to the Upper Mississippi River Basin Environmental Management Program Workshop by Michael Rodgers River Engineer US Army Corps of Engineers, St. Louis District August 17, 2007 Engineering
More informationFour Mile Run Levee Corridor Stream Restoration
Four Mile Run Levee Corridor Stream Restoration 30% Design Summary U.S. Army Corps of Engineers, Baltimore District Presentation Outline Four Mile Run 1.) Historic Perspective 2.) Existing Conditions 3.)
More informationADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN
ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN Conor Shea - Hydrologist U.S. Fish and Wildlife Service Conservation Partnerships Program Arcata, CA Learning Objectives Examine
More informationStrategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS
Strategies for managing sediment in dams Iwona Conlan Consultant to IKMP, MRCS 1 Sediment trapping by dams Active storage capacity Dead storage coarse material (bed load) Fine materials (suspension) Francis
More informationRemoval of riverbank protection along the River Rhine (the Netherlands)
RR 2004 3rd European Conference on River Restoration RIVER RESTORATION 2004 Zagreb, Croatia, 17-21 May 2004 Removal of riverbank protection along the River Rhine (the Netherlands) L.J. Bolwidt, H.E.J.
More informationStream Geomorphology. Leslie A. Morrissey UVM July 25, 2012
Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation
More informationRestoring Meanders to Straightened Rivers 1.7 Reconnecting remnant meanders
.7 Reconnecting remnant meanders River Little Ouse Location - Thetford, Norfolk TL87082 Date of construction - 994 Length 900m Cost 5,000 Maximum extent of flooding during winter floods BTO boundary Small
More informationSolutions to Flooding on Pescadero Creek Road
Hydrology Hydraulics Geomorphology Design Field Services Photo courtesy Half Moon Bay Review Solutions to Flooding on Pescadero Creek Road Prepared for: San Mateo County Resource Conservation District
More informationDomino Effect of River Training in Large Sand-Bed Braiding Rivers
6 th International Conference on Structural Engineering and Construction Management 2015, Kandy, Sri Lanka, 11 th -13 th December 2015 SECM/15/176 Domino Effect of River Training in Large Sand-Bed Braiding
More informationSummary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,
Appendix N SUMMARY OF HYDRAULIC AND SEDIMENT-TRANSPORT ANALYSIS OF RESIDUAL SEDIMENT: ALTERNATIVES FOR THE SAN CLEMENTE DAM REMOVAL/RETROFIT PROJECT, CALIFORNIA the San Clemente Dam Removal/Retrofit Project,
More informationStream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)
Stream Restoration and Environmental River Mechanics Pierre Y. Julien Malaysia 2004 Objectives Brief overview of environmental river mechanics and stream restoration: 1. Typical problems in environmental
More informationRunning Water Earth - Chapter 16 Stan Hatfield Southwestern Illinois College
Running Water Earth - Chapter 16 Stan Hatfield Southwestern Illinois College Hydrologic Cycle The hydrologic cycle is a summary of the circulation of Earth s water supply. Processes involved in the hydrologic
More informationWhy Geomorphology for Fish Passage
Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the
More informationTom Ballestero University of New Hampshire. 1 May 2013
Tom Ballestero University of New Hampshire 1 May 2013 1 Hydrology 2 Basic Hydrology Low flows most common Flows that fill the stream to the banks and higher are much less common Filling the stream to the
More informationHAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD, PROJECT CONSTRUCTED IN 1 DAY, MARCH 10, 2009 BY
More informationProject (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2
MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report
More informationStep 5: Channel Bed and Planform Changes
Step 5: Channel Bed and Planform Changes When disturbed, streams go through a series of adjustments to regain equilibrium with the flow and sediment supply of their watersheds. These adjustments often
More informationScheepvaart en ecologische doelstellingen
Scheepvaart en ecologische doelstellingen Margriet Schoor 25 April 2008 The Rhine Delta Rotterdam 2/3 1/3 Scheepvaart en ecologische doelstellingen 2 Germany Navigation on the Rhine Busiest river in Europe
More informationRock Sizing for Waterway & Gully Chutes
Rock Sizing for Waterway & Gully Chutes WATERWAY MANAGEMENT PRACTICES Photo 1 Rock-lined waterway chute Photo 2 Rock-lined gully chute 1. Introduction A waterway chute is a stabilised section of channel
More informationThe Danube River. Hydrological Connectivity and Human Influence. By: Pat O Connell, Pat Wilkins, Tiana Royer, and Kevin Gaitsch
The Danube River Hydrological Connectivity and Human Influence By: Pat O Connell, Pat Wilkins, Tiana Royer, and Kevin Gaitsch Danube River Characteristics Length: 2860 km Drainage Area: 816,000 km 2 Peak
More informationStreams. Stream Water Flow
CHAPTER 14 OUTLINE Streams: Transport to the Oceans Does not contain complete lecture notes. To be used to help organize lecture notes and home/test studies. Streams Streams are the major geological agents
More informationDAM REMOVAL ENGINEERING ISSUES & OPTIONS
DAM REMOVAL ENGINEERING ISSUES & OPTIONS Presented by: James G. Mac Broom, P.E. Milone & Mac Broom, Inc. October 2011 CLEAR GOALS and OBJECTIVES Fish Passage Habitat Defragmentation Water Quality Dam Failure
More informationAvoiding Geohazards in the Mid-Atlantic Highlands by Using Natural Stream Principles
Avoiding Geohazards in the Mid-Atlantic Highlands by Using Natural Stream Principles J. Steven Kite, WVU Neal Carte, WVDOT Will Harman, Michael Baker Corp. Donald D. Gray, WVU Photo: W. Gillespie North
More informationTechnical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth
Technical Memorandum To: From: Greg Laird, Courtney Moore Kevin Pilgrim and Travis Stroth 5777 Central Avenue Suite 228 Boulder, CO 80301 www.otak.com Copies: [Electronic submittal] Date: 10/19/2017 Subject:
More informationConsequences of river regulation works: altered fluvial processes + increasing flood hazard
Consequences of river regulation works: altered fluvial processes + increasing flood hazard Dr. Tímea Kiss assistant professor Department of Physical Geography and Geoinformatics, University of Szeged,
More informationAquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.
Aggradation raising of the streambed by deposition that occurs when the energy of the water flowing through a stream reach is insufficient to transport sediment conveyed from upstream. Alluvium a general
More informationStop 1: Marmot Dam Stop 1: Marmot Dam
Stop 1: Marmot Dam Stop 1: Marmot Dam Following the removal of Marmot Dam in 2007, the fate of the reservoir sediments has been monitored through a series of surveys and sediment transport measurements.
More informationGriswold Creek August 22, 2013
Creek August 22, 2013 1 Lake Erie Protection Fund Creek Study ver Evaluate the overall condition of Creek Determine stable channel dimensions & appropriate restoration techniques Starting Stat gpoint for
More informationFish Passage at Road Crossings
Fish Passage at Road Crossings 1 Crossing Design Workshop Outline 1:00 to 2:00 Intro, Design Overview, Channel Width 2:00 to 2:15 Break 2:15 to 3:15 No-Slope, Stream Simulation Design 3:15 to 3:30 Break
More informationThe River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant
The River Restoration Centre therrc.co.uk Understanding Fluvial Processes: supporting River Restoration Dr Jenny Mant Jenny@therrc.co.uk Understanding your catchment Hydrology Energy associated with the
More informationThe last three sections of the main body of this report consist of:
Threatened and Endangered Species Geological Hazards Floodplains Cultural Resources Hazardous Materials A Cost Analysis section that provides comparative conceptual-level costs follows the Environmental
More informationUpper Drac River restoration project
Upper Drac River restoration project Restoration of a braided river bed incised in clay substratum through sediment reloading and bed widening SHF Conference, Nantes, 6 & 7 october 2014 Small scale morphological
More informationAnnotated Bibliography of River Avulsions Pat Dryer Geography 364 5/14/2007
Annotated Bibliography of River Avulsions Pat Dryer Geography 364 5/14/2007 1 Table of Contents Introduction 2 Annotations I. River avulsions and their deposits 2 II. Channel avulsion on alluvial fans
More informationENGINEERING APPROACHES TO SHORELINE PLACEMENT FROM COAST TO COAST
ENGINEERING APPROACHES TO SHORELINE PLACEMENT FROM COAST TO COAST 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 83 36 118 110 135 120 112 92 56 62 102 130 Comparing
More informationPaper 114 Validation of Actual Depth Measurements by Inland Vessels
Paper 114 Validation of Actual Depth Measurements by Inland Vessels VAN DER MARK C.F. 1 ; VIJVERBERG T. 2 ; OTTEVANGER W. 1 1 Deltares, Delft, the Netherlands 2 Royal HaskoningDHV, Amersfoort, the Netherlands
More information[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.
Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of
More informationEvaluation of Public Safety at Run-of-River Dams
Evaluation of Public Safety at Run-of-River Dams - An Illinois Statewide Program By G. Nicholas Textor, PE, CFM Daniel W. Tornil Lee Von Gynz-Guethle, CFM Authority Section 23a of the Rivers, Lakes and
More informationICHE 2014, Hamburg - Lehfeldt & Kopmann (eds) Bundesanstalt für Wasserbau ISBN
ICHE 2014, Hamburg - Lehfeldt & Kopmann (eds) - 2014 Bundesanstalt für Wasserbau ISBN 978-3-939230-32-8 Comparison of Physical Model Predictions and Prototype Measurements of Fluvial Morphodynamics in
More informationJ-river engineering for Vietnam
J-river engineering for Vietnam Workshop on erosion control in the Mekong Delta Soc Trang, June 2015 Onga river, Japan Dr. MATSUKI Trung: JICA Expert 1 Project for Building Disaster Resilient Society in
More informationSEDIMENTATION STUDY OF THE MIDDLE MISSISSIPPI RIVER AT BUFFALO ISLAND RIVER MILES 28.0 TO 22.0 HYDRAULIC MICRO MODEL INVESTIGATION
Technical Report M29 SEDIMENTATION STUDY OF THE MIDDLE MISSISSIPPI RIVER AT BUFFALO ISLAND RIVER MILES 28.0 TO 22.0 HYDRAULIC MICRO MODEL INVESTIGATION By Jasen L. Brown Michael T. Rodgers Dawn M.Lamm
More informationRiver Restoration and Rehabilitation. Pierre Y. Julien
River Restoration and Rehabilitation Pierre Y. Julien Department of Civil and Environmental Engineering Colorado State University Fort Collins, Colorado River Mechanics and Sediment Transport Lima Peru
More informationLaboratory Investigation of Submerged Vane Shapes Effect on River Banks Protection
Australian Journal of Basic and Applied Sciences, 5(12): 1402-1407, 2011 ISSN 1991-8178 Laboratory Investigation of Submerged Vane Shapes Effect on River Banks Protection Touraj Samimi Behbahan Department
More informationCR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District
CR AAO Bridge Dead River Flood & Natural Channel Design Mitch Koetje Water Resources Division UP District Old County Road AAO Bridge Map courtesy of Marquette County Silver Lake Basin McClure Basin
More informationTechnical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology
Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology The 2 nd Regional Stakeholder Forum The Pak Beng Hydropower Project 5 th May 2017
More informationHydraulics of bendway weirs
River Basin Management IV 389 Hydraulics of bendway weirs C. Thornton 1, S. Abt 1, D. Baird 2 & R. Padilla 3 1 Colorado State University, Fort Collins, CO, USA 2 U.S. Bureau of Reclamation, Denver, CO,
More informationPirai river (Bolivia)
Pirai river (Bolivia) Confluent of the Amazon river which average discharge is only 6 m3/s, but with peak discharge over 5000 m3/s, a challenge for river basin management and for flood control HYDROEUROPE
More informationSecuring Manoeuverability of a Deep Draft Ship in a Sediment loaded Tidal River Berth
Securing Manoeuverability of a Deep Draft Ship in a Sediment loaded Tidal River Berth O. Stoschek 1, A. Matheja 1 & C. Zimmermann 1 1 Franzius-Institute for Hydraulic, Waterways and Coastal Engineering,
More information3.0 ROBERTS BANK TIDAL FLAT MORPHOLOGY
Vancouver Port Authority Northwest Hydraulic Consultants Ltd. /Triton Consultants Ltd. Roberts Bank Container Expansion File: 33863 Coastal Geomorphology Study - 19 - November 2004 3.0 ROBERTS BANK TIDAL
More informationDevelopment and application of demonstration MIKE 21C morphological model for a bend in Mekong River
Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River September 2015 0 Table of Contents 1. Introduction... 2 2. Data collection... 3 2.1 Additional data...
More informationMATHEMATICAL MODELING OF FLUVIAL SEDIMENT DELIVERY, NEKA RIVER, IRAN. S.E. Kermani H. Golmaee M.Z. Ahmadi
JOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology On the World Wide Web at http://www.hydroweb.com VOLUME 16 2008 MATHEMATICAL MODELING
More informationDo you think sediment transport is a concern?
STREAM RESTORATION FRAMEWORK AND SEDIMENT TRANSPORT BASICS Pete Klingeman 1 What is Your Restoration Project Like? k? Do you think sediment transport is a concern? East Fork Lewis River, WA Tidal creek,
More informationES 105 Surface Processes I. Hydrologic cycle A. Distribution % in oceans 2. >3% surface water a. +99% surface water in glaciers b.
ES 105 Surface Processes I. Hydrologic cycle A. Distribution 1. +97% in oceans 2. >3% surface water a. +99% surface water in glaciers b. >1/3% liquid, fresh water in streams and lakes~1/10,000 of water
More informationGeomorphology Geology 450/750 Spring Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26
Geomorphology Geology 450/750 Spring 2004 Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26 This exercise is intended to give you experience using field data you collected
More informationAnnual transport rates at two locations on the fore-slope.
Sediment Transport by Currents Fore-slope Sediment transport rates and sediment concentrations were computed from the hydrodynamic model runs as well as from direct measurements of current velocities at
More informationRiver floodplain regime and stratigraphy. Drs. Nanette C. Kingma.
River floodplain regime and stratigraphy. Drs. Nanette C. Kingma. Formation of floodplain. Formation of floodplains: lateral channel migration in channel deposition suspended-load fall out during higher
More informationThe Imperative of Sediment Management Concepts in River Basin Management Plans
The Imperative of Sediment Management Concepts in River Basin Management Plans Stefan Vollmer, Thomas Hoffmann, Gudrun Hillebrand, Ina Quick, Axel Winterscheid Department M3 Groundwater, Geology, River
More informationKatarina Holubova & Franz Steiner. Joint efforts for cross-border restoration of the Morava river
Katarina Holubova & Franz Steiner Joint efforts for cross-border restoration BACKGROUND INFORMATION AUSTRIA LOCALITY THE MORAVA RIVER IS THE DANUBE LEFT SIDE TRIBUTARY IN THE LENGTH OF 70 KM FORMS INTERNATIONALLY
More informationDam Removal Analysis Guidelines for Sediment
A review of: Dam Removal Analysis Guidelines for Sediment Joe Rathbun (Retired) rathbunj@sbcglobal.net Some Potential Sediment Issues Reservoir restoration Downstream water quality Downstream deposition
More informationAppendix F Channel Grade Control Structures
Stream Simulation Appendix F Channel Grade Control Structures This appendix briefly describes permanent grade control structures that are sometimes needed in the upstream and/or downstream reaches adjacent
More informationWetland & Floodplain Functional Assessments and Mapping To Protect and Restore Riverine Systems in Vermont. Mike Kline and Laura Lapierre Vermont DEC
Wetland & Floodplain Functional Assessments and Mapping To Protect and Restore Riverine Systems in Vermont Mike Kline and Laura Lapierre Vermont DEC NWI+ Hydro-Geomorphic Characterization of Wetlands and
More informationThe how, why, and lessons learned
The how, why, and lessons learned emulates natural river systems integrates fluvial processes over temporal and spatial scales of self-formed and self-maintained natural rivers reestablish the physical,
More informationSHORELINE AND BEACH PROCESSES: PART 2. Implications for Coastal Engineering
SHORELINE AND BEACH PROCESSES: PART 2 Implications for Coastal Engineering Objectives of the lecture: Part 2 Show examples of coastal engineering Discuss the practical difficulties of ocean engineering
More informationRestoration Goals TFG Meeting. Agenda
San Joaquin River Restoration Program Restoration Goals TFG Meeting Reach 2B Update April 28, 2010 Agenda 1. Introductions 2. Program Restoration Goal Context 3. Program Update a) Interim Flows b) EIS/EIR
More informationErosion Surface Water. moving, transporting, and depositing sediment.
+ Erosion Surface Water moving, transporting, and depositing sediment. + Surface Water 2 Water from rainfall can hit Earth s surface and do a number of things: Slowly soak into the ground: Infiltration
More informationVICTORIA BEND HYDRAULIC SEDIMENT RESPONSE MODEL INVESTIGATION LOWER MISSISSIPPI RIVER MILES
Technical Report M48 VICTORIA BEND HYDRAULIC SEDIMENT RESPONSE MODEL INVESTIGATION LOWER MISSISSIPPI RIVER MILES 600-590 By Peter M. Russell, P.E. Jasen L. Brown, P.E Edward J. Brauer, P.E. Robert D. Davinroy,
More informationSediment transport and river bed evolution
1 Chapter 1 Sediment transport and river bed evolution 1.1 What is the sediment transport? What is the river bed evolution? System of the interaction between flow and river beds Rivers transport a variety
More informationGEOL 1121 Earth Processes and Environments
GEOL 1121 Earth Processes and Environments Wondwosen Seyoum Department of Geology University of Georgia e-mail: seyoum@uga.edu G/G Bldg., Rm. No. 122 Seyoum, 2015 Chapter 6 Streams and Flooding Seyoum,
More informationAppendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan
Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan 4 Sediment Supply Management Requirements Permit Order R9-2013-0001 as amended by Order No. R9-2015-0001Section
More informationInfluence of the Major Drainages to the Mississippi River and Implications for System Level Management
Influence of the Major Drainages to the Mississippi River and Implications for System Level Management Brian M. Vosburg Geologist Louisiana Coastal Protection and Restoration Authority brian.vosburg@la.gov
More informationERDC/LAB TR-0X-X 100. Figure 7-3 Maximum velocity magnitudes for existing conditions for 100-year flood event
ERDC/LAB TR-0X-X 100 Figure 7-3 Maximum velocity magnitudes for existing conditions for 100-year flood event ERDC/LAB TR-0X-X 101 Figure 7-4 Model schematization of Option 1 Figure 7-5 Bed displacement
More informationGully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion
Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES Gully erosion A complex of processes whereby the removal of soil is characterised by incised channels in the landscape. NSW Soil Conservation Service,
More informationConnecticut Coastal Management Program
Connecticut Coastal Management Program Fact Sheet for SHORELINE FLOOD AND EROSION CONTROL STRUCTURES What are Shoreline Flood and Erosion Control Structures? The Connecticut General Statutes (CGS) define
More informationAssessment. Assessment
2001 SPRINGBROOK CREEK RESTORATION - THREE YEAR POST-CONSTRUCTION REVIEW - Presented by Bruce Henderson and Andy Harris 2005 River Restoration Northwest Symposium Skamania Lodge, Washington www.hendersonlandservices.com
More informationNatural Shoreline Landscapes on Michigan Inland Lakes
Natural Shoreline Landscapes on Michigan Inland Lakes Excerpts from Chapters 2 and 3 Photo Photo by Jane by Jane Herbert Herbert Did you know? Twenty-four species of amphibians, 25 species of reptiles,
More informationSediment Management for Dam Removals
Sediment Management for Dam Removals As Presented To: Sediment Management for Dam Removals, A Hands on Workshop on the Latest Techniques for Dam Modification and Removal, Purdue University Calumet, IN,
More informationSurface Water and Stream Development
Surface Water and Stream Development Surface Water The moment a raindrop falls to earth it begins its return to the sea. Once water reaches Earth s surface it may evaporate back into the atmosphere, soak
More informationLandscape Development
Landscape Development Slopes Dominate Natural Landscapes Created by the interplay of tectonic and igneous activity and gradation Deformation and uplift Volcanic activity Agents of gradation Mass wasting
More informationModel experiments: Influence of floods on sediment deposits in rivers equipped with groynes
Model experiments: Influence of floods on sediment deposits in rivers equipped with groynes H. Friedrich, B.W. Melville The University of Auckland, New Zealand R. Gasset Ecole Nationale des Travaux Publics
More informationU.S. ARMY CORPS OF ENGINEERS
CORPS FACTS Regulating Mississippi River Navigation Pools U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Historical Background Federal improvements in the interest of navigation on the Mississippi River
More informationDanube Sediment Management Restoration of Sediment Balance in the Danube A still ongoing project preparation
Annual Steakholder Seminar Protecting the Environment EU SDR Budapest, 6 November, 2012 Danube Sediment Management Restoration of Sediment Balance in the Danube A still ongoing project preparation Values
More informationStream Simulation: A Simple Example
Stream Simulation: A Simple Example North Thompson Creek, CO Paul T. Anderson U.S.D.A. Forest Service Here s How We Started May 2011 2-1 USDA-Forest Service Here s How We Finished Forest Service Aquatic
More informationIsland 32 Erosion. prepared for Ministry of Environment, Lands and Parks A Street Surrey, British Columbia, V3R 7P8. and
Island 32 Erosion prepared for Ministry of Environment, Lands and Parks 10334 152A Street Surrey, British Columbia, V3R 7P8 and District of Chilliwack 8550 Young Road Chilliwack, British Columbia, V2P
More informationGeomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River
Geomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River Scott McBain and Bill Trush McBain & Trush, Inc. Clavey River and Cherry Creek vicinity
More informationCase Study: Hydraulic Model Study for Abandoned Channel Restoration
Engineering, 2013, 5, 989-996 Published Online December 2013 (http://www.scirp.org/journal/eng) http://dx.doi.org/10.4236/eng.2013.512120 Case Study: Hydraulic Model Study for Abandoned Channel Restoration
More informationCASE STUDY SOLIS, SWITZERLAND
SEDIMENT MANAGEMENT CASE STUDY SOLIS, SWITZERLAND Key project features Name: Solis Country: Switzerland Category: bypass channel/tunnel Reservoir volume (original): 4.1 Mm 3 Installed capacity: 64 MW Date
More informationLong Valley Meadow Restoration Project
Long Valley Meadow Restoration Project USDA Forest Service Mogollon Rim Ranger District Coconino National Forest Coconino County, Arizona T13N, R9E, Section 12 and T13N, R10E, Sections 6 and 7 Gila and
More informationMay 7, Roger Leventhal, P.E. Marin County Public Works Laurel Collins Watershed Sciences
May 7, 2013 Roger Leventhal, P.E. Marin County Public Works Laurel Collins Watershed Sciences Background Funded in 2009 under EPA 2100 Grant for $30k and managed by SFEP Project Goals: Update original
More informationCase Study 2: Twenty-mile Creek Rock Fords
Case Study : Twenty-mile Creek Rock Fords Location Crossing Description Washington. Okanagan National Forest. Methow Valley Ranger District. Chewuch river basin, East Chewuch Road. The Twenty-mile Creek
More informationNATURE OF RIVERS B-1. Channel Function... ALLUVIAL FEATURES. ... to successfully carry sediment and water from the watershed. ...dissipate energy.
1 2 Function... Sevier River... to successfully carry sediment and water from the watershed....dissipate energy. 3 ALLUVIAL FEATURES 4 CHANNEL DIMENSION The purpose of a stream is to carry water and sediment
More informationPilot-Project Project Bad Deutsch Altenburg:
Pilot-Project Project Bad Deutsch Altenburg: River Restoration and Prevention of Riverbed-Erosion in the Danube Floodplain National Park (Austria) Stefan Schneeweihs Mohács, 2013 11 18 Pictures: F. Kovacs,
More informationThe importance of sediment supply data to modelling river morphodynamics
The importance of sediment supply data to modelling river morphodynamics Wilbers & Ten Brinke (2003) bed elevation (m NAP) Pannerden channel Astrid Blom Delft University of Technology Netherlands Waal
More information