CASE STUDY SOLIS, SWITZERLAND

Size: px
Start display at page:

Download "CASE STUDY SOLIS, SWITZERLAND"

Transcription

1 SEDIMENT MANAGEMENT CASE STUDY SOLIS, SWITZERLAND Key project features Name: Solis Country: Switzerland Category: bypass channel/tunnel Reservoir volume (original): 4.1 Mm 3 Installed capacity: 64 MW Date of commissioning: 1986 International Hydropower Association Chancery House, St Nicholas Way, Sutton, London SM1 IJB, United Kingdom T: F: E: iha@ The Solis dam was built in 1986 as part of a cascade scheme in the Swiss Alps. By 2012, its total storage volume had been reduced by about 50 per cent due to sedimentation. A sediment bypass tunnel was built to reduce the sedimentation rate and maintain the storage volume. The Electric Power Company of Zurich (ewz) built the Solis arch dam in 1986 to impound a 3 km-long reservoir with a storage volume of 4.1 Mm 3. The Solis dam is the third dam in a cascade scheme in the canton of Grisons in the Swiss Alps as shown in figure 1. The Solis reservoir receives water from the Julia and the Albula Rivers, plus turbined water from the 52 MW Tiefencastel East and the 24 MW Tiefencastel West power plants immediately upstream. While the upstream Albula River basin remains natural, hydropower potential in the Julia River basin has been harnessed with two dams, the Marmorera and the Burvagn reservoirs, and four power plants. The Solis reservoir supplies water to the 26 MW Sils and the 38 MW Rothenbrunnen power plants further downstream. Water storage loss at Solis would decrease the reliability of energy production in the power plants downstream. The reservoir created by the 61 m high arch dam, with a crest length of 75 m, originally had a live storage volume of 1.5 Mm 3. The September 2017 maximum and minimum operating levels are and 816 masl respectively. The catchment tributary to the Solis dam comprises 900 km 2 and contributes about 110,000 m 3 of sediment each year. Due to the Alpine catchment characteristics, the Julia and Albula Rivers convey the majority of sediment during the snowmelt period between May and July, and during the heavy rain periods between June and September. Sediment problems Sediment is trapped in the Solis reservoir and deposited in the topset reach, forming a long delta with a characteristic pivot point. The successive longitudinal profiles obtained from echo-sounding surveys in figure 2 show the delta moving steadily forward towards the dam. Because the range of operating levels has been stable, the delta exhibited little vertical growth; most incoming sediment was being deposited at the delta face, moving it downstream toward the dam.

2 Aerial view of the Solis dam Finer sediment was being deposited downstream of the delta. Bottom outlet flushing in 2006 and 2008 was performed exceptionally to the lower sediment body. Sediment flushing was no longer permitted after With a long-term annual average rate of storage loss of around 80,000 m 3, sedimentation had caused a 1 million m 3 decrease in the reservoir's live Without sediment management measures, the advancing coarse delta sediments could have potentially resulted in the clogging of the bottom outlets. This would have led to a plant shutdown in the long term. Sediment management strategies Before taking the decision to build a sediment bypass tunnel, ewz considered other sediment management strategies. The company considered feasibility studies of strategies including dredging, flushing and sluicing. Dredging was excluded as an option for ecological and economic reasons. Empty flushing was discarded for financial and technical reasons. These included the income loss associated with plant shutdown during the flushing activity, the low capacity of the bottom outlets, and the technical challenge of completely emptying the reservoir through the existing outlets before the arrival of the flood, given that this approach would not allow for the drawing down of the reservoir completely before a flood event in the small steep watershed. Two options based on partial reservoir drawdown were tested through physical modelling at ETH Zurich, Switzerland: partial drawdown sluicing through the existing low-level outlets, and partial drawdown flushing through a sediment bypass tunnel (SBT). Both were found to be technically effective in stabilising the delta by exposing it to scouring action during floods and retaining the live storage volume. However, the bottom outlets that would be used for sluicing have very low capacities to convey the high suspended sediment load and, if blocked by driftwood, it could threaten the dam s operational safety, requiring prolonged shutdown to remove the blockage. The Solis reservoir acts as an important power hub in the region, and if taken out of service it would affect power production at a number of other plants. For this reason, it was particularly important to minimise the risk of plant shutdown. The cost of sluicing was estimated at USD 2 m for initial investment, plus USD

3 0.35 m in annual maintenance, while the cost of the SBT was USD 38 m plus USD 0.90 m for annual maintenance. The main drawback to the SBT was the high financial cost. A risk analysis was carried out to compare the two options. The risk of plant shutdown due to outlet clogging under the sluicing scenario was converted into an equivalent financial cost, and the two projects were compared on the basis of actual cost plus an imputed cost of risk. Despite the higher initial cost of the SBT, when the cost for risk was assessed in the present value analysis, the performance of the SBT was comparable to sluicing. The SBT was ultimately chosen as the most effective strategy to maintain the active storage capacity of Solis reservoir. In addition, the SBT was considered to have downstream environmental benefits because it would more effectively pass coarse sediment bed material below the dam, offsetting downstream streambed degradation due to coarse sediment trapping in the reservoir. The Solis bypass tunnel was designed with an archway cross-section of 4.40 m by 4.68 m and the tunnel invert is lined with high-performance concrete. The grain size of the bypassed sediment is 6 cm for D50 and 15 cm for D90 and the sediment material has a low quartz content. The tunnel is 968 m long with a steady slope of 1.9 per cent. The tunnel flow is supercritical and only uniform at the end. The maximum bypass flow velocity is 13 m/s, the design discharge is 170 m 3 /s and the minimum discharge is 90 m 3 /s. The general layout of the SBT is shown in figure 3. When the reservoir is partially drawn down, water is diverted into the tunnel entrance by a 140 m long guiding structure that crosses the river section, which is submerged during normal reservoir operations. Physical modelling of the SBT showed that the tunnel would capture and bypass all the sediment, while only large floods that exceed the tunnel capacity and overtop the guide wall would carry suspended material further downstream. Bed load is entirely diverted into the tunnel, even if the design capacity is exceeded. A submerged skimming wall was also provided to prevent driftwood from entering the tunnel. The skimming wall diverts floating debris towards the dam where is mechanically removed or spilled. The tunnel was lined with high-strength concrete and the SBT outlet is a cantilever structure that discharges about 12 m above the Albula river. The Solis bypass tunnel differs from the usual bypass designs in the intake location. Rather than being located at the reservoir head, the intake is 450 m upstream of the dam. This design has the advantage of reducing the tunnel length and avoiding the need to create an acceleration section because the tunnel entrance will be under pressurised conditions. This location also allows the face of the delta to be intercepted. The upstream sedimentation body is lowered down to the desired level according to the partial draw down and the downstream part is unaffected. However, two things are complex in this design: (1) the intake level has to be specified according to the desired sediment free level. Preferably it would be the minimum operating level. (2) The operation becomes more complex because if the partial draw down is not enough, the sediments are not transported, but if the partial draw down is too low, sediment deposits are mobilised. These differences are highlighted in figure 4. The tunnel was lined with high-strength concrete instead of the granite blocks used at some other projects in Switzerland. This option was selected partly because it is easier to repair concrete than to replace a granite block that has been damaged and removed by scour. Sediment bypass tunnel operations The general operational elements and corresponding hydraulic conditions in the Solis reservoir are summarised in the following points and figure 5. In anticipation of high inflow events, the reservoir is drawn down to the minimum operating level of 816 m. This creates scouring flow across the top of the delta and also ensures that the sediment-laden flow is directed into the tunnel intake by the guide wall. Drawdown typically requires 8-10 hours. Refill time is shorter, typically about five hours. Power is normally shut off during a large flood to protect the machinery from sediment abrasion, and by timing the drawdown and bypass event to coincide with floods, the impact on power production is minimised. The bottom outlet is normally opened to control water levels during periods of high inflow. The bottom outlet at the dam can be opened for pressure flushing and venting of density currents at any

4 time with the reservoir at a high level, since this procedure only releases small volumes of sediment. Under the ideal operation, the bottom outlet starts closing after starting the SBT operation. Authorities require >70 m 3 /s for flushing. This requirement minimises downstream environmental impacts as the large flow will help transport the sediment downstream. Clear water is released at the end of the flushing event to clean the riverbed below the dam. The sediment released through the bypass tunnel subsequently passes along the downstream channel as a sediment wave. The challenge for the operators is the need to perform the operation with limited data. The operation is complex and requires a lot of coordination within the company and with downstream authorities. The energy trader, in particular, will want to know exactly when power will be taken offline. Operational personnel were involved in the project design to ensure that the final design met the operational needs of the plant. The first operations of the bypass tunnel took place in May The maximum discharge flow was 110 m 3 /s and the bypass lasted 12 hours. All inflowing sediment was diverted through the tunnel and the top of the delta was scoured. In August 2014, a major flood with a 100-year return period and a peak discharge of 288 m 3 /s occurred. Over 14 hours, the flood was routed through the tunnel achieving a maximum discharge of 179 m 3 /s. The excess flow overpassed the guiding structure and as a result, the aggradation in the reservoir increased by 102,000 m 3. However, this volume represents less than half the deposit volume that resulted from a comparable event in The sediment bypass tunnel, therefore, proved to be effective for both moderate and large floods. The bypass tunnel has worked as planned. The positive effect in controlling delta growth and sustaining live storage volume can be deduced from the sediment profile given by the echo-sound survey in About two thirds of the annual sediment load is now bypassed through the tunnel. Monitoring In addition to real-time hydrologic monitoring in the watershed as required to predict flood inflow, sediment concentrations are measured for ecological reasons both upstream and downstream of the reservoir. Both suspended and bed load are monitored. In 2015, new monitoring systems were installed to measure bedload sediment transport. The monitoring system was located 1.5 km upstream of the reservoir in the Albula River and it consists of 15 accelerometer sensors together with 15 geophone sensors. The abrasion rate on the tunnel floor is monitored by repeated laser scans, and was found not to be significant after the first bypass operations. Several test sections of different types of floor materials were also installed and are being monitored for abrasion. A further scientific study (Auel et al. 2017) 1 suggests the positive effect of long-term SBT operation on the microhabitat of the downstream ecosystem. It revealed that the microhabitat and invertebrate richness increased downstream of the SBT outlet the longer the SBT was in operation. Graphs and figures >

5 Graphs and figures Figure 1 - Julia and Albula River basin and hydropower cascade scheme operated by ewz (ewz) Figure 2 - sedimentation of Solis reservoir (adapted from Auel et al with new data from M. Mueller-Hagmann) 2 Graphs and figures cont. >

6 Figure 3 - Solis bypass tunnel scheme (Auel et al. 2011) Figure 4 - differences between (a) intake design at the reservoir head and (b) intake design in the middle of the reservoir where inflow is under pressure conditions as used at Solis (adapted from Auel et al. 2011) Graphs and figures cont. >

7 Figure 5 - hydraulic performance of reservoir during SBT flushing event (Greg Morris) References Auel, C. and Boes, R Sediment bypass tunnel design - review and outlook. Dams and Reservoirs under Changing Challenges. Editors: Schleiss and Boes. Taylor & Francis Group, London, ISBN Auel, C. et al Effects of sediment bypass tunnels on grain size distribution and benthic habitats in regulated rivers. International Journal River Basin Management. This is part of a series of sediment management case studies collated by International Hydropower Association with support from the South Asia Water Initiative (SAWI), trust funds to the World Bank.

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Reservoir volume

More information

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Binga hydropower

More information

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reforestation/revegetation; upstream sediment trapping; bypass channel/tunnel; reservoir

More information

CASE STUDY NATHPA JHAKRI, INDIA

CASE STUDY NATHPA JHAKRI, INDIA SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reduce sediment production (watershed management); upstream sediment trapping; bypass

More information

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS Strategies for managing sediment in dams Iwona Conlan Consultant to IKMP, MRCS 1 Sediment trapping by dams Active storage capacity Dead storage coarse material (bed load) Fine materials (suspension) Francis

More information

Session: For more information:

Session: For more information: Session: For more information: www.hydropower.org/congress San Juan, Puerto Rico www.glmengineers.com 2015 World Hydropower Congress Sustainable Sediment Management and Hydropower Reservoirs 21 May 2015

More information

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

Tarbela Dam in Pakistan. Case study of reservoir sedimentation Tarbela Dam in Pakistan. HR Wallingford, Wallingford, UK Published in the proceedings of River Flow 2012, 5-7 September 2012 Abstract Reservoir sedimentation is a main concern in the Tarbela reservoir

More information

GTU. Shantilal Shah Engineering College, Bhavnagar

GTU. Shantilal Shah Engineering College, Bhavnagar GTU Shantilal Shah Engineering College, Bhavnagar 2 Around 40,000 large reservoirs worldwide used for water supply, power generation, flood control etc. About 1 % of the total storage volume is lost annually

More information

DEVELOPMENT OF A BEDLOAD TRANSPORT MEASURING SYSTEM FOR SEDIMENT BYPASS TUNNELS IN JAPAN

DEVELOPMENT OF A BEDLOAD TRANSPORT MEASURING SYSTEM FOR SEDIMENT BYPASS TUNNELS IN JAPAN International Symposium on Appropriate technology to ensure proper Development, Operation and Maintenance of Dams in Developing Countries, Johannesburg, South Africa, 18 May 2016 SANCOLD, ISBN 978-0-620-71042-8

More information

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology The 2 nd Regional Stakeholder Forum The Pak Beng Hydropower Project 5 th May 2017

More information

RESERVOIR SEDIMENTATION MANAGEMENT WITH BYPASS TUNNELS IN JAPAN. Keywords: Reservoir sedimentation, Sediment bypass, Diversion tunnel, Abrasion damage

RESERVOIR SEDIMENTATION MANAGEMENT WITH BYPASS TUNNELS IN JAPAN. Keywords: Reservoir sedimentation, Sediment bypass, Diversion tunnel, Abrasion damage Proceedings of the Ninth International Symposium on River Sedimentation October 18 21, 2004, Yichang, China RESERVOIR SEDIMENTATION MANAGEMENT WITH BYPASS TUNNELS IN JAPAN Tetsuya SUMI Graduate School

More information

The SedAlp Project: WP6: INTERACTION WITH STRUCTURES

The SedAlp Project: WP6: INTERACTION WITH STRUCTURES The SedAlp Project: WP6: INTERACTION WITH STRUCTURES 6 th International conference Water in the Alps Herrenchiemsee, 12 th of October, 2016 Jošt Sodnik Contents Structure of SedAlp project (www.sedalp.eu)

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu Modeling Great Britain s Flood Defenses AIRCurrents Editor s note: AIR launched its Inland Flood Model for Great Britain in December 2008. The hazard module captures the physical processes of rainfall-runoff

More information

Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream

Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream River Flow 2014 Schleiss et al. (Eds) 2014 Taylor & Francis Group, London, ISBN 978-1-138-02674-2 Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream A. Amini

More information

LOCATIONS OF SELECTED MITIGATION SITES IN JAPAN

LOCATIONS OF SELECTED MITIGATION SITES IN JAPAN LOCATIOS OF SELECTED MITIGATIO SITES I JAPA Hyogo prefecture near Kobe, Japan Hyogo province Gifu province Osaka Kobe Gifu prefecture near Takayama, Japan akao Kamikochi ational Park Mount Yake Tateyama

More information

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling Attachment B-1 Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling 1 October 2012 Lower Susquehanna River Watershed Assessment Evaluation of AdH Model Simplifications

More information

Technical Memorandum No

Technical Memorandum No Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.10 Task: Evaluation of Four Watershed Conditions - Sediment To: PRWFPA Staff Working Group Prepared by: Gregory Morris and

More information

Investigation on Dynamics of Sediment and Water Flow in a Sand Trap

Investigation on Dynamics of Sediment and Water Flow in a Sand Trap Investigation on Dynamics of Sediment and Water Flow in a Sand Trap M. R. Mustafa Department of Civil Engineering Universiti Teknologi Petronas 31750 Tronoh, Perak, Malaysia R. B. Rezaur Water Resources

More information

Sedimentation in the Nile River

Sedimentation in the Nile River Advanced Training Workshop on Reservoir Sedimentation Sedimentation in the Nile River Prof. Dr. Abdalla Abdelsalam Ahmed 10-16 Oct. 2007, IRTCES, Beijing, China CWR,Sudan 1 Water is essential for mankind

More information

SUSTAINABLE SEDIMENT MANAGEMENT

SUSTAINABLE SEDIMENT MANAGEMENT SUSTAINABLE SEDIMENT MANAGEMENT Shaping our world A company of OUR EXPERTISE Sediments can make or break a Project Numerous examples of dams and reservoirs can be found throughout the world whose live

More information

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria e-mail: scharlerg@verbund.co.at Abstract Birecik Dam & HEPP on the Euphrates river in Turkey

More information

SEDIMENT MANAGEMENT IN HYDROPOWER PLANTS AN OVERVIEW

SEDIMENT MANAGEMENT IN HYDROPOWER PLANTS AN OVERVIEW International Conference on Hydropower for Sustainable Development Feb 05-07, 2015, Dehradun SEDIMENT MANAGEMENT IN HYDROPOWER PLANTS AN OVERVIEW P.K. Pande, Former Professor of Civil Engineering, University

More information

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits Erosion and Sediment Transport Monitoring Programmes in River Basins (Proceedings of the Oslo Symposium, August 1992). IAHS Publ. no. 210, 1992. 269 Monitoring of suspended sediment concentration in discharge

More information

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS DESIGN METHODS B: SEDIMENT TRANSPORT PROCESSES FOR STREAM RESTORATION DESIGN PETER KLINGEMAN OREGON STATE UNIVERSITY CIVIL ENGINEERING DEPT., CORVALLIS 2 ND ANNUAL NORTHWEST STREAM RESTORATION DESIGN SYMPOSIUM

More information

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams TECHNICAL MEMORANDUM No. 1 TO: Michael Bowen California Coastal Conservancy Geotechnical & Earthquake Engineering Consultants CC: Eric Ginney Philip Williams & Associates PREPARED BY: Paul Grant SUBJECT:

More information

Mekong Sediment from the Mekong River Commission Study

Mekong Sediment from the Mekong River Commission Study Short Technical Note Mekong Sediment from the Mekong River Commission Study Summary The Mekong River flows through China, Myanmar, Lao PDR, Thailand, Cambodia and Viet Nam. The assessment of various water

More information

SPECIFIC DEGRADATION AND RESERVOIR SEDIMENTATION. By Renee Vandermause & Chun-Yao Yang

SPECIFIC DEGRADATION AND RESERVOIR SEDIMENTATION. By Renee Vandermause & Chun-Yao Yang SPECIFIC DEGRADATION AND RESERVOIR SEDIMENTATION By Renee Vandermause & Chun-Yao Yang Outline Sediment Degradation - Erosion vs Sediment Yield - Sediment Yield - Methods for estimation - Defining Sediment

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

How to predict the sedimentological impacts of reservoir operations?

How to predict the sedimentological impacts of reservoir operations? ICSE 212 How to predict the sedimentological impacts of reservoir operations? E. Valette EDF CIH eric.valette@edf.fr M. Jodeau EDF R&D LNHE magali.jodeau@edf.fr Presentation of the numerical code Courlis

More information

Appendix O. Sediment Transport Modelling Technical Memorandum

Appendix O. Sediment Transport Modelling Technical Memorandum Appendix O Sediment Transport Modelling Technical Memorandum w w w. b a i r d. c o m Baird o c e a n s engineering l a k e s design r i v e r s science w a t e r s h e d s construction Final Report Don

More information

Subcommittee on Sedimentation Draft Sediment Analysis Guidelines for Dam Removal

Subcommittee on Sedimentation Draft Sediment Analysis Guidelines for Dam Removal Subcommittee on Sedimentation Draft Sediment Analysis Guidelines for Dam Removal August 4, 2011 Jennifer Bountry, M.S., P.E. Tim Randle, M.S., P.E., D.WRE. Blair Greimann, Ph.D., P.E. Sedimentation and

More information

Physical modelling of sediment transport in mountain torrents upstream of open check dams

Physical modelling of sediment transport in mountain torrents upstream of open check dams Physical modelling of sediment transport in mountain torrents upstream of open check dams Authors: Sebastian SCHWINDT Dr. Mário J. FRANCA Check dam in the region of Trent (Italy) Paper Code: EGU2015-6166

More information

Reservoir Sedimentation and Its Control

Reservoir Sedimentation and Its Control Reservoir Sedimentation and Its Control GUO, Qingchao Ph.D, Professor of IWHR International Workshop on Management of Flood Control and Disaster Mitigation June 17-30 2010, Beijing, China Contents Why

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

SEDICON SLUICERS AS EFFECTIVE MEHOD OF SEDIMENT REMOVAL FROM DESILTING TANKS AND CHAMBERS

SEDICON SLUICERS AS EFFECTIVE MEHOD OF SEDIMENT REMOVAL FROM DESILTING TANKS AND CHAMBERS SEDICON SLUICERS AS EFFECTIVE MEHOD OF SEDIMENT REMOVAL FROM DESILTING TANKS AND CHAMBERS Dr. Tom Jacobsen Technical Director SediCon AS, Norway Mr. P.K. Sood Founding Director & Head of Operations INTRODUCTION

More information

The River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant

The River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant The River Restoration Centre therrc.co.uk Understanding Fluvial Processes: supporting River Restoration Dr Jenny Mant Jenny@therrc.co.uk Understanding your catchment Hydrology Energy associated with the

More information

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project, Appendix N SUMMARY OF HYDRAULIC AND SEDIMENT-TRANSPORT ANALYSIS OF RESIDUAL SEDIMENT: ALTERNATIVES FOR THE SAN CLEMENTE DAM REMOVAL/RETROFIT PROJECT, CALIFORNIA the San Clemente Dam Removal/Retrofit Project,

More information

Swift Creek Sediment Management Action Plan (SCSMAP)

Swift Creek Sediment Management Action Plan (SCSMAP) Swift Creek Sediment Management Action Plan (SCSMAP) PHASE 2 PROJECT PLAN PROPOSAL Whatcom County Public Works Department 322 N. Commercial Street, Suite 210 Bellingham, WA 98225 (360) 676-6692 June 2013

More information

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir ISSN 2320-9100 11 International Journal of Advance Research, IJOAR.org Volume 1, Issue 8,August 2013, Online: ISSN 2320-9100 MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq

More information

The effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan

The effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan Erosion, Debris Mows and Environment in Mountain Regions (Proceedings of the Chengdu Symposium, July 1992). IAHS Publ. no. 209, 1992. 423 The effectiveness of check dams in controlling upstream channel

More information

DAM REMOVAL ENGINEERING ISSUES & OPTIONS

DAM REMOVAL ENGINEERING ISSUES & OPTIONS DAM REMOVAL ENGINEERING ISSUES & OPTIONS Presented by: James G. Mac Broom, P.E. Milone & Mac Broom, Inc. October 2011 CLEAR GOALS and OBJECTIVES Fish Passage Habitat Defragmentation Water Quality Dam Failure

More information

U.S. ARMY CORPS OF ENGINEERS

U.S. ARMY CORPS OF ENGINEERS CORPS FACTS Regulating Mississippi River Navigation Pools U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Historical Background Federal improvements in the interest of navigation on the Mississippi River

More information

Why Geomorphology for Fish Passage

Why Geomorphology for Fish Passage Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the

More information

Rock Sizing for Waterway & Gully Chutes

Rock Sizing for Waterway & Gully Chutes Rock Sizing for Waterway & Gully Chutes WATERWAY MANAGEMENT PRACTICES Photo 1 Rock-lined waterway chute Photo 2 Rock-lined gully chute 1. Introduction A waterway chute is a stabilised section of channel

More information

GEOL 1121 Earth Processes and Environments

GEOL 1121 Earth Processes and Environments GEOL 1121 Earth Processes and Environments Wondwosen Seyoum Department of Geology University of Georgia e-mail: seyoum@uga.edu G/G Bldg., Rm. No. 122 Seyoum, 2015 Chapter 6 Streams and Flooding Seyoum,

More information

Rock Sizing for Batter Chutes

Rock Sizing for Batter Chutes Rock Sizing for Batter Chutes STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined batter chute Photo 2 Rock-lined batter chute 1. Introduction In the stormwater industry a chute is a steep drainage channel,

More information

State Water Survey Division SURFACE WATER SECTION

State Water Survey Division SURFACE WATER SECTION State Water Survey Division SURFACE WATER SECTION AT THE UNIVERSITY OF ILLINOIS Illinois Department of Energy and Natural Resources SWS Miscellaneous Publication 88 SEDIMENTATION OF POOL 19 ON THE MISSISSIPPI

More information

In-channel coarse sediment trap Best Management Practice

In-channel coarse sediment trap Best Management Practice In-channel coarse sediment trap Best Management Practice By Henry R. Hudson July 2002 Environmental Management Associates Ltd., Christchurch Complexity Environmental Value Cost Low Moderate High Low Moderate

More information

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE WP2. BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE Kjetil Arne Vaskinn, Sweco Gröner Norway Aslak Løvoll, Norconsult AS Norway Kaare Höeg, Norwegian Geotechnical Institute (NGI), Norway WP2. BREACH FORMATION

More information

Island Design. UMRS EMP Regional Workshop. Presentation for the

Island Design. UMRS EMP Regional Workshop. Presentation for the Island Design Presentation for the UMRS EMP Regional Workshop by Jon Hendrickson Hydraulic Engineer Regional Technical Specialist, Water Quality and Habitat Restoration August 17 19, 2005 Project Delivery

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Rock Sizing for Small Dam Spillways

Rock Sizing for Small Dam Spillways Rock Sizing for Small Dam Spillways STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined spillway on a construction site sediment basin Photo 2 Rock-lined spillway on a small farm dam 1. Introduction A chute

More information

Numerical modeling of sediment flushing from Lewis and Clark Lake

Numerical modeling of sediment flushing from Lewis and Clark Lake University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln US Army Research U.S. Department of Defense 2013 Numerical modeling of sediment flushing from Lewis and Clark Lake Jungkyu

More information

National Hydrology committee of Afghanistan (NHCA) Sedimentation in Reservoire

National Hydrology committee of Afghanistan (NHCA) Sedimentation in Reservoire National Hydrology committee of Afghanistan (NHCA) Sedimentation in Reservoire OCt.2007 Prof. Mohammad Qasem Seddeqy KPU بسم االله الرحمن الرحيم وجعلنامن الماءکل شي ء حی 30 واز ا ب هر چيزی رازنده گردانيدیم

More information

Sedimentation problems and management strategies of Sanmenxia Reservoir, Yellow River, China

Sedimentation problems and management strategies of Sanmenxia Reservoir, Yellow River, China WATER RESOURCES RESEARCH, VOL. 41,, doi:10.1029/2004wr003919, 2005 Sedimentation problems and management strategies of Sanmenxia Reservoir, Yellow River, China Guangqian Wang, Baosheng Wu, and Zhao-Yin

More information

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction

More information

Sediment Management for Dam Removals

Sediment Management for Dam Removals Sediment Management for Dam Removals As Presented To: Sediment Management for Dam Removals, A Hands on Workshop on the Latest Techniques for Dam Modification and Removal, Purdue University Calumet, IN,

More information

7.3 Sediment Delivery Analysis

7.3 Sediment Delivery Analysis 7.3 Sediment Delivery Analysis In order to evaluate potential changes in sedimentation patterns that could occur due to impacts from the FCP and LPP alignments, sediment assessment models were constructed

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

Improvement of navigation conditions on the Danube (Calarasi-Braila and Lower Danube) - Ecological concerns?

Improvement of navigation conditions on the Danube (Calarasi-Braila and Lower Danube) - Ecological concerns? Improvement of navigation conditions on the Danube (Calarasi-Braila and Lower Danube) - Ecological concerns? Georg Rast, Christine Bratrich, Orieta Hulea WWF Germany/DCPO Topics of the presentation Major

More information

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

Best Management Practices for Coldwater Fisheries Enhancement and Restoration Best Management Practices for Coldwater Fisheries Enhancement and Restoration MACC Annual Environmental Conference 2017 March 3, 2017 Tim Dexter, MassDOT Highway Division 1 Leading the Nation in Transportation

More information

Evaluation of Public Safety at Run-of-River Dams

Evaluation of Public Safety at Run-of-River Dams Evaluation of Public Safety at Run-of-River Dams - An Illinois Statewide Program By G. Nicholas Textor, PE, CFM Daniel W. Tornil Lee Von Gynz-Guethle, CFM Authority Section 23a of the Rivers, Lakes and

More information

Management Alternatives to Combat Reservoir Sedimentation

Management Alternatives to Combat Reservoir Sedimentation Abstract Management Alternatives to Combat Reservoir Sedimentation Gregory L. Morris Many techniques are available to actively manage reservoir sedimentation, and an equally important suite of adaptive

More information

Sediment trapping efficiency of modular steel check dam in laboratory experiment and field observation

Sediment trapping efficiency of modular steel check dam in laboratory experiment and field observation Sediment trapping efficiency of modular steel check dam in laboratory experiment and field observation Su-Chin CHEN 1, Hiroshi KOKURYO 2, Shuan-Pei AN 1, Sheng-Jui LU 1, and Hui-Kai HUANG 1* 1 Department

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

ENGINEERING HYDROLOGY

ENGINEERING HYDROLOGY ENGINEERING HYDROLOGY Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati VNIT,

More information

The impact of sediment on reservoir life. J. D. PITT & G. THOMPSON Binnie & Partners, Artillery House, Artillery Row, London SW1P IPX, UK

The impact of sediment on reservoir life. J. D. PITT & G. THOMPSON Binnie & Partners, Artillery House, Artillery Row, London SW1P IPX, UK Challenges in African Hydrology and Water Resources (Proceedings of the Harare Symposium, July 1984). IAHS Publ. no. 144. The impact of sediment on reservoir life INTRODUCTION J. D. PITT & G. THOMPSON

More information

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation) Stream Restoration and Environmental River Mechanics Pierre Y. Julien Malaysia 2004 Objectives Brief overview of environmental river mechanics and stream restoration: 1. Typical problems in environmental

More information

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration

More information

Technical Memorandum No Sediment Model

Technical Memorandum No Sediment Model Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.9 Sediment Model Task: Development of Sediment Model To: PRWFPA Staff Working Group Prepared by: Gregory Morris and Elsie Parrilla

More information

Study on Flushing Mechanism of Dam Reservoir Sedimentation and Recovery of Riffle-Pool in Downstream Reach by a Flushing Bypass Tunnel

Study on Flushing Mechanism of Dam Reservoir Sedimentation and Recovery of Riffle-Pool in Downstream Reach by a Flushing Bypass Tunnel Study on Flushing Mechanism of Dam Reservoir Sedimentation and Recovery of -Pool in Downstream Reach by a Flushing Bypass Tunnel Tomoo Fukuda Department of Science and Engineering, Chuo University, Tokyo,

More information

Technical Memorandum

Technical Memorandum 2855 Telegraph Avenue, Suite 4, Berkeley, CA 9475, Phone (51) 848-898, Fax (51) 848-8398 Technical Memorandum Date: September 6, 27 To: Mr. Michael Bowen, Project Manager From: Yantao Cui, Ph.D., Hydraulic

More information

Morphological Changes of Reach Two of the Nile River

Morphological Changes of Reach Two of the Nile River ICHE 2014, Hamburg - Lehfeldt & Kopmann (eds) - 2014 Bundesanstalt für Wasserbau ISBN 978-3-939230-32-8 Morphological Changes of Reach Two of the Nile River E. Said Egyptian Environmental Affairs Agency,

More information

Instream Sediment Control Systems

Instream Sediment Control Systems Instream Sediment Control Systems INSTREAM PRACTICES Photo 1 Photo 2 Modular sediment The information contained within this series of fact sheets deals only with the design of temporary instream sediment

More information

EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA

EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA EFFECTIVE DAM OPERATION METHOD BASED ON INFLOW FORECASTING FOR SENANAYAKA SAMUDRA RESERVOIR, SRI LANKA Muthubanda Appuhamige Sanath Susila GUNASENA (MEE13632) Supervisors: Dr. Mamoru Miyamoto, Dr. Duminda

More information

Evaluation of Deposition Pattern of Wonogiri Reservoir Sedimentation

Evaluation of Deposition Pattern of Wonogiri Reservoir Sedimentation International Journal of Civil & Environmental Engineering IJCEE-IJENS Vol: 15 No: 02 15 Evaluation of Deposition Pattern of Wonogiri Reservoir Sedimentation D.A. Wulandari 1, D. Legono 2 & S. Darsono

More information

A FLOOD RETENTION BASIN IN AN ABANDONED STONE QUARRY - EVALUATING THE STABILITY OF A SUBMERGED ROCK SLOPE

A FLOOD RETENTION BASIN IN AN ABANDONED STONE QUARRY - EVALUATING THE STABILITY OF A SUBMERGED ROCK SLOPE A FLOOD RETENTION BASIN IN AN ABANDONED STONE QUARRY - EVALUATING THE STABILITY OF A SUBMERGED ROCK SLOPE Stephan Vollsinger 1*, Rainer Poisel 2, Alexander Preh 2, Michael Mölk 3 ABSTRACT Flood mitigation

More information

A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE

A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE YASUO NIHEI AND YUICHI IMASHIMIZU Department of Civil Eng., Tokyo University of Science, 2641 Yamazaki, Noda-shi 278-851,

More information

(3) Sediment Movement Classes of sediment transported

(3) Sediment Movement Classes of sediment transported (3) Sediment Movement Classes of sediment transported Dissolved load Suspended (and wash load ) Important for scouring algae Bedload (5-10% total load Moves along bed during floods Source of crushing for

More information

Upgrading Feasibility Study on the Upper Seti Storage Hydroelectric Project in Nepal

Upgrading Feasibility Study on the Upper Seti Storage Hydroelectric Project in Nepal 6.5 Evaporation Evaporation is measured at No. 815 meteorological station, EL. 5 m, in the Seti River basin. The average monthly evaporation from 1977 to 1997 is as shown in Table 6.5-1. Table 6.5-1 Average

More information

Hydraulics Prof. Dr. Arup Kumar Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati

Hydraulics Prof. Dr. Arup Kumar Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati Hydraulics Prof. Dr. Arup Kumar Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati Module No. # 04 Gradually Varied Flow Lecture No. # 07 Rapidly Varied Flow: Hydraulic Jump

More information

Pirai river (Bolivia)

Pirai river (Bolivia) Pirai river (Bolivia) Confluent of the Amazon river which average discharge is only 6 m3/s, but with peak discharge over 5000 m3/s, a challenge for river basin management and for flood control HYDROEUROPE

More information

mountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output

mountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output mountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output strong interaction between streams & hillslopes Sediment Budgets for Mountain Rivers Little

More information

Calculating the suspended sediment load of the Dez River

Calculating the suspended sediment load of the Dez River Erosion and Sediment Transport Monitoring Programmes in River Basins (Proceedings of the Osio Symposium, August 1992). IAHS Publ. no. 210, 1992. 219 Calculating the suspended sediment load of the Dez River

More information

Influence of geometry shape factor on trapping and flushing efficiencies

Influence of geometry shape factor on trapping and flushing efficiencies Reservoir Sedimentation Schleiss et al (Eds) 2014 Taylor & Francis Group, London, ISBN 978-1-138-02675-9 Influence of geometry shape factor on trapping and flushing efficiencies SA Kantoush Civil Engineering

More information

Remaining Capacity in Great Lakes Reservoirs

Remaining Capacity in Great Lakes Reservoirs US Army Corps of Engineers Detroit District Remaining Capacity in Great Lakes Reservoirs Storage Capacity Behind Great Lakes Dams Field Data and Modeling Motivation for project Project overview Data and

More information

Fact sheet: Glacial rivers (all Europe)

Fact sheet: Glacial rivers (all Europe) Fact sheet: Glacial rivers (all Europe) General description Valleyplanform Hydrology and The valley form varies from a gorge to a V-shaped valley and the single-thread channel is mainly characterized by

More information

Stream Simulation: A Simple Example

Stream Simulation: A Simple Example Stream Simulation: A Simple Example North Thompson Creek, CO Paul T. Anderson U.S.D.A. Forest Service Here s How We Started May 2011 2-1 USDA-Forest Service Here s How We Finished Forest Service Aquatic

More information

Towards an integrated and cooperative management of fine sediment fluxes in a large trans-boundary basin: the case of Upper Rhône River

Towards an integrated and cooperative management of fine sediment fluxes in a large trans-boundary basin: the case of Upper Rhône River SedNet Conference Krakow Solving societal challenges Poland 23-26 September 2015 Working with sediments Towards an integrated and cooperative management of fine sediment fluxes in a large trans-boundary

More information

An investigation on the impacts of density currents on the sedimentation in dam reservoirs using TCM model; case study: Maroon dam

An investigation on the impacts of density currents on the sedimentation in dam reservoirs using TCM model; case study: Maroon dam University of Wollongong Research Online Faculty of Engineering and Information Sciences - Papers: Part A Faculty of Engineering and Information Sciences 2013 An investigation on the impacts of density

More information

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA Dr. Gamal A. Sallam 1 and Dr. Medhat Aziz 2 ABSTRACT Bridges are critical structures that require a substantial investment to construct and serve an important

More information

EFFECT OF SAND MINING ACTIVITY ON THE SEDIMENT CONTROL SYSTEM (A CASE STUDY OF SOMBE-LEWARA RIVER, DONGGALA, INDONESIA)

EFFECT OF SAND MINING ACTIVITY ON THE SEDIMENT CONTROL SYSTEM (A CASE STUDY OF SOMBE-LEWARA RIVER, DONGGALA, INDONESIA) Civil Engineering Forum Volume XXI/1 - January 01 EFFECT OF SAND MINING ACTIVITY ON THE SEDIMENT CONTROL SYSTEM (A CASE STUDY OF SOMBE-LEWARA RIVER, DONGGALA, INDONESIA) Y. A. Bawias Agency of Public Works,

More information

Rock Sizing for Multi-Pipe & Culvert Outlets

Rock Sizing for Multi-Pipe & Culvert Outlets Rock Sizing for Multi-Pipe & Culvert Outlets STORMWATER AND WATERWAY MANAGEMENT PRACTICES Photo 1 Rock pad outlet structure at end of a duel stormwater pipe outlet Photo 2 Rock pad outlet structure at

More information

Case Study 2: Twenty-mile Creek Rock Fords

Case Study 2: Twenty-mile Creek Rock Fords Case Study : Twenty-mile Creek Rock Fords Location Crossing Description Washington. Okanagan National Forest. Methow Valley Ranger District. Chewuch river basin, East Chewuch Road. The Twenty-mile Creek

More information

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS? Martin WIELAND 1 ABSTRACT For large dam projects a site-specific seismic hazard analysis is usually recommended.

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving

More information