1 East Tennessee Natural Gas, LLC Planned Service Outage Postings from 07/01/2015 to 07/31/2015 Page 1 of 9

2 TSP: TSP Name: East Tennessee Natural Gas, LLC Critical Desc: Not a critical notice Notice Eff Date/Time: 07/21/ :10:11 PM Notice End Date/Time: 11/14/ :00:00 AM Notice ID: Notice Stat Desc: Initiate Notice Type: Maintenance Post Date/Time: 07/21/ :10:11 PM Prior Notice: Reqrd Rsp Desc: No response required Rsp Date/Time: Subject: ETNG 2015 Maintenance Schedule -- Revised Notice Text: Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the East Tennessee Natural Gas (ETNG) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As ETNG continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date. Lobelville to Lewisburg August 3 - September 5 the Lobelville and Lewisburg Compressor Stations on the 3200 line. During this outage, west to east capacity will be reduced as follows: ***August 4 - August 10: The west to east capacity through Lewisburg will be reduced to approximately 156,000 Dth/d. Depending on nominated quantities, restrictions to gas sourced west to east through Lewisburg is anticipated for interruptible and possibly secondary services. ***August 15 - August 20: The west to east capacity through Lewisburg will be reduced to approximately 156,000 Dth/d. Depending on nominated quantities, restrictions to gas sourced west to east through Lewisburg is anticipated for interruptible and possibly secondary services. During this time the following meter will be unavailable for flow: MR LEWISBURG GAS - INDUSTRIAL PARK ***August 25 - August 29: Receipts sourced from meter El Paso - Lobelville are available for delivery between Meter (MP 0.00) and 3200 Line 16 Milepost However, depending on nominated quantities, restrictions to receipts sourced from meter (MP 0.00) for delivery downstream of 3200 Line 16 Milepost may be required for interruptible and possibly secondary services. Topside to Boyds Creek: September 1 - September 11 the Topside and Boyds Creek Compressor Stations on the 3300 line. The capacity through Boyds Creek will be reduced to zero during this outage. Receipts sourced west of Boyds Creek for delivery east of Boyds Page 2 of 9

3 Creek will be restricted for interruptible and secondary services. Furthermore, restrictions to primary firm services during this outage will be required. During this outage the following meters will be unavailable for flow: MR SEVIER SEYMOUR MR KUB EAST ***Flatwoods to Fordtown: September 1 - September 12 the Flatwoods and Fordtown Compressor Stations on the 3300 line. During this outage, west to east capacity through Fordtown will be reduced to approximately 90,000 Dth/d. Restriction to gas sourced west to east through Fordtown is not anticipated at this time. During this outage the following meter will be unavailable for flow: MR TENNESSEE EASTMAN 2 Flatwoods Compressor Station: September 6 - September 12 ETNG will be conducting compressor station maintenance at its Flatwoods Compressor station on the 3300 line. During this outage, capacity west to east through Boyds Creek will be reduced to approximately 110,000 Dth/d and approximately 94,000 Dth/d west to east through Flatwoods. Depending on nominated quantities, restrictions to gas sourced west to east through Boyds Creek or Flatwoods are anticipated for interruptible and secondary services. Bristol - Glade Springs September 28 - September 29 ETNG will be conducting pipeline maintenance between Bristol and Glade Springs Compressor Stations on the 3300 line. During this outage, west to east capacity through Fordtown will be reduced to approximately 77,000 Dth/d, west to east capacity through Bristol will be reduced to approximately 10,000 Dth/d, west to east capacity through Glade Springs will be reduced to approximately 34,000 Dth/ and west to east capacity through Rural Retreat will be reduced to approximately 409,000 Dth/d. Depending on nominated quantities, restrictions to gas sourced west to east of Glade Springs is anticipated for interruptible and secondary services. Glade Spring Compressor Station: September 28 - October 2 ETNG will be conducting compressor station maintenance at its Glade Spring Compressor station on the 3300 line. During this outage, west to east capacity through Glade Spring will be reduced to approximately 161,000 Dth /d and west to east capacity through Rural Retreat will be reduced to approximately 341,000 Dth/d. Depending on nominated quantities, receipts sourced west of Glade Spring or Rural Retreat for delivery east of Glade Spring or Rural Retreat on the 3300 line are anticipated for interruptible and secondary services. Page 3 of 9

4 Fordtown Compressor Station: October 15 - October 17 ETNG will be conducting compressor station maintenance at its Fordtown Compressor station on the 3300 line. During this outage, capacity west to east through Fordtown will be reduced to approximately 90,000 Dth/d. Depending on nominated quantities, restrictions to gas sourced west to east through Fordtown is anticipated for interruptible and secondary services. Nora Compressor Station: October 19 - October 23 ETNG will be conducting compressor station maintenance at its Nora Compressor station on the 3400 line. During this outage, receipts sourced at the following meter could be restricted MR EQUITABLE - DICKENSON COUNTY 1 At this time, ETNG does not anticipate any capacity restriction. Boyds Creek Compressor Station: October 21 - October 26 ETNG will be conducting compressor station maintenance at its Boyds Creek Compressor station on the 3300 line. During this outage, capacity west to east through Boyds Creek will be reduced to approximately 111,000 Dth/d and capacity west to east through Flatwoods will be reduced to approximately 116,000 Dth/d. Depending on nominated quantities, receipts sourced west of Boyds Creek or Flatwoods for delivery east of Boyds Creek or Flatwoods on the 3300 line are anticipated for interruptible and secondary services. Wartburg to Topside (Line 3111A-100 6") October TBD ETNG will be conducting pipeline maintenance between Wartburg to Topside on the 3111A-100 Line 6". During this outage the following meter will be unavailable for flow: MR LENOIR CITY/HIGHWAY 321, LOUDON CO, TN In-line Tool Runs: ETNG will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the East Tennessee pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, ETNG will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run and an ILI tool run. Also listed below are the dates of possible investigation as a result of the in-line inspection. CaliperILIPossible Run Comp Pipeline SegmentDateDateRepl DtPoss Repl Dt 12" Ln Bristol-Glade-Rural CompComp06/08 Page 4 of 9

5 20" Ln Lob-Lew-Estill CompComp06/1507/06 20" Ln Ooltewah to EOL 09/1509/1710/2211/14 As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, ETNG will post on the bulletin board as soon as it is known: Lobelville to Lewisburg (3203A-100 Line) Lobelville to Lewisburg (3203A-400 Line) Download File: ETNG 2015 Maintenance Schedule Ver 10.docx Page 5 of 9

6 TSP: TSP Name: East Tennessee Natural Gas, LLC Critical Desc: Not a critical notice Notice Eff Date/Time: 07/24/ :24:20 PM Notice End Date/Time: 11/14/ :00:00 AM Notice ID: Notice Stat Desc: Initiate Notice Type: Maintenance Post Date/Time: 07/24/ :24:20 PM Prior Notice: Reqrd Rsp Desc: No response required Rsp Date/Time: Subject: ETNG 2015 Maintenance Schedule -- Revised Notice Text: Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the East Tennessee Natural Gas (ETNG) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As ETNG continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date. ***Lobelville to Lewisburg July 28 - August 25 the Lobelville and Lewisburg Compressor Stations on the 3200 line. During this outage, west to east capacity will be reduced as follows: ***July 28 - August 4: The west to east capacity through Lewisburg will be reduced to approximately 156,000 Dth/d. Depending on nominated quantities, restrictions to gas sourced west to east through Lewisburg is anticipated for interruptible and possibly secondary services. ***August 7 - August 14: The west to east capacity through Lewisburg will be reduced to approximately 156,000 Dth/d. Depending on nominated quantities, restrictions to gas sourced west to east through Lewisburg is anticipated for interruptible and possibly secondary services. During this time the following meter will be unavailable for flow: MR LEWISBURG GAS - INDUSTRIAL PARK ***August 19 - August 25: Receipts sourced from meter El Paso - Lobelville are available for delivery between Meter (MP 0.00) and 3200 Line 16 Milepost However, depending on nominated quantities, restrictions to receipts sourced from meter (MP 0.00) for delivery downstream of 3200 Line 16 Milepost may be required for interruptible and possibly secondary services. Topside to Boyds Creek: September 1 - September 11 the Topside and Boyds Creek Compressor Stations on the 3300 line. The capacity through Boyds Creek will be reduced to zero during this outage. Receipts sourced west of Boyds Creek for delivery east of Boyds Page 6 of 9

7 Creek will be restricted for interruptible and secondary services. Furthermore, restrictions to primary firm services during this outage will be required. During this outage the following meters will be unavailable for flow: MR SEVIER SEYMOUR MR KUB EAST Flatwoods to Fordtown: September 1 - September 12 the Flatwoods and Fordtown Compressor Stations on the 3300 line. During this outage, west to east capacity through Fordtown will be reduced to approximately 90,000 Dth/d. Restriction to gas sourced west to east through Fordtown is not anticipated at this time. During this outage the following meter will be unavailable for flow: MR TENNESSEE EASTMAN 2 Flatwoods Compressor Station: September 6 - September 12 ETNG will be conducting compressor station maintenance at its Flatwoods Compressor station on the 3300 line. During this outage, capacity west to east through Boyds Creek will be reduced to approximately 110,000 Dth/d and approximately 94,000 Dth/d west to east through Flatwoods. Depending on nominated quantities, restrictions to gas sourced west to east through Boyds Creek or Flatwoods are anticipated for interruptible and secondary services. Bristol - Glade Springs September 28 - September 29 ETNG will be conducting pipeline maintenance between Bristol and Glade Springs Compressor Stations on the 3300 line. During this outage, west to east capacity through Fordtown will be reduced to approximately 77,000 Dth/d, west to east capacity through Bristol will be reduced to approximately 10,000 Dth/d, west to east capacity through Glade Springs will be reduced to approximately 34,000 Dth/ and west to east capacity through Rural Retreat will be reduced to approximately 409,000 Dth/d. Depending on nominated quantities, restrictions to gas sourced west to east of Glade Springs is anticipated for interruptible and secondary services. Glade Spring Compressor Station: September 28 - October 2 ETNG will be conducting compressor station maintenance at its Glade Spring Compressor station on the 3300 line. During this outage, west to east capacity through Glade Spring will be reduced to approximately 161,000 Dth /d and west to east capacity through Rural Retreat will be reduced to approximately 341,000 Dth/d. Depending on nominated quantities, receipts sourced west of Glade Spring or Rural Retreat for delivery east of Glade Spring or Rural Retreat on the 3300 line are anticipated for interruptible and secondary services. Page 7 of 9

8 Fordtown Compressor Station: October 15 - October 17 ETNG will be conducting compressor station maintenance at its Fordtown Compressor station on the 3300 line. During this outage, capacity west to east through Fordtown will be reduced to approximately 90,000 Dth/d. Depending on nominated quantities, restrictions to gas sourced west to east through Fordtown is anticipated for interruptible and secondary services. Nora Compressor Station: October 19 - October 23 ETNG will be conducting compressor station maintenance at its Nora Compressor station on the 3400 line. During this outage, receipts sourced at the following meter could be restricted MR EQUITABLE - DICKENSON COUNTY 1 At this time, ETNG does not anticipate any capacity restriction. Boyds Creek Compressor Station: October 21 - October 26 ETNG will be conducting compressor station maintenance at its Boyds Creek Compressor station on the 3300 line. During this outage, capacity west to east through Boyds Creek will be reduced to approximately 111,000 Dth/d and capacity west to east through Flatwoods will be reduced to approximately 116,000 Dth/d. Depending on nominated quantities, receipts sourced west of Boyds Creek or Flatwoods for delivery east of Boyds Creek or Flatwoods on the 3300 line are anticipated for interruptible and secondary services. Wartburg to Topside (Line 3111A-100 6") October TBD ETNG will be conducting pipeline maintenance between Wartburg to Topside on the 3111A-100 Line 6". During this outage the following meter will be unavailable for flow: MR LENOIR CITY/HIGHWAY 321, LOUDON CO, TN In-line Tool Runs: ETNG will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the East Tennessee pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, ETNG will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run and an ILI tool run. Also listed below are the dates of possible investigation as a result of the in-line inspection. CaliperILIPossible Run Comp Pipeline SegmentDateDateRepl DtPoss Repl Dt 12" Ln Bristol-Glade-Rural CompComp06/08 Page 8 of 9

9 20" Ln Lob-Lew-Estill CompComp06/1507/06 20" Ln Ooltewah to EOL 09/1509/1710/2211/14 As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, ETNG will post on the bulletin board as soon as it is known: Lobelville to Lewisburg (3203A-100 Line) Lobelville to Lewisburg (3203A-400 Line) Download File: ETNG 2015 Maintenance Schedule Ver 11.docx Page 9 of 9

NGTL System & Foothills Pipeline Monthly Outage Forecast September 2017

NGTL System & Foothills Pipeline Monthly Outage Forecast September 2017 NGTL System & Foothills Pipeline Monthly Outage Forecast September 217 September Monthly Outage Forecast The Monthly Outage Forecast is a tool provided by TransCanada to show the estimated operational

More information

NGTL System & Foothills Pipeline Monthly Outage Forecast June 2017

NGTL System & Foothills Pipeline Monthly Outage Forecast June 2017 NGTL System & Foothills Pipeline Monthly Outage Forecast June 2017 June Monthly Outage Forecast The Monthly Outage Forecast is a tool provided by TransCanada to show the estimated operational capability.

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System Page 1 of 10 30-Minute Flex Reserve on the Public Service Company of Colorado System Colorado PUC E-Filings System Prepared by: Xcel Energy Services, Inc. 1800 Larimer St. Denver, Colorado 80202 May 13,

More information

Outage Coordination and Business Practices

Outage Coordination and Business Practices Outage Coordination and Business Practices 1 2007 Objectives What drove the need for developing a planning/coordination process. Why outage planning/coordination is crucial and important. Determining what

More information

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects Information Item Date: June 22, 2015 To: From: Subject: Mayor and City Council Debbie Lee, Communications and Public Affairs Officer Update on Southern California Edison s Capital Improvement Projects

More information

August 25, All Members. Re: Changes to District Codes and Neighbourhood Effective September 1, 2011

August 25, All Members. Re: Changes to District Codes and Neighbourhood Effective September 1, 2011 August 25, 2011 To: All Members Re: Changes to District Codes and Neighbourhood Effective September 1, 2011 On September 1, 2011, a number of changes will be made to the MLS system to address the growing

More information

Winter Preparation for Severe Weather Events

Winter Preparation for Severe Weather Events Winter Preparation for Severe Weather Events Jule Tate, Associate Director, Event Analysis Richard Hackman, Senior Reliability Advisor, Reliability Risk Management Mark Olson, Senior Engineer, Reliability

More information

El Paso Natural Gas Company, L.L.C.; Semi-Annual Activity Report Washington Ranch Storage Facility Docket Nos. RP72-6, et al.

El Paso Natural Gas Company, L.L.C.; Semi-Annual Activity Report Washington Ranch Storage Facility Docket Nos. RP72-6, et al. January 9, 2017 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Semi-Annual Activity

More information

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For TRAFFIC IMPACT STUDY For Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) February 2015 Revised: August 2015 April 2016 July 2016 September 2016 Prepared for: KB Home

More information

Mountain View Community Shuttle Monthly Operations Report

Mountain View Community Shuttle Monthly Operations Report Mountain View Community Shuttle Monthly Operations Report December 6, 2018 Contents Passengers per Day, Table...- 3 - Passengers per Day, Chart...- 3 - Ridership Year-To-Date...- 4 - Average Daily Ridership

More information

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET... 3

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET... 3 2018 SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET... 3 IV. GENERAL FUND 001 DESCRIPTIONS... 4 Background Information The Four

More information

Near-Field Sturgeon Monitoring for the New NY Bridge at Tappan Zee. Quarterly Report October 1 December 31, 2014

Near-Field Sturgeon Monitoring for the New NY Bridge at Tappan Zee. Quarterly Report October 1 December 31, 2014 Near-Field Sturgeon Monitoring for the New NY Bridge at Tappan Zee Quarterly Report October 1 December 31, 2014 Prepared by AKRF, Inc. 7250 Parkway Drive, Suite 210 Hanover, MD 21076 for New York State

More information

International Civil Aviation Organization. Seventh Meeting of CNS/MET Sub-Group of APANPIRG and Tenth Meeting of CNS/ATM IC Sub-Group of APANPIRG

International Civil Aviation Organization. Seventh Meeting of CNS/MET Sub-Group of APANPIRG and Tenth Meeting of CNS/ATM IC Sub-Group of APANPIRG CNS/MET-ATM-IP/8 International Civil Aviation Organization Seventh Meeting of CNS/MET Sub-Group of APANPIRG and Tenth Meeting of CNS/ATM IC Sub-Group of APANPIRG Bangkok, Thailand, 15 21 July 2003 Agenda

More information

Mountain View Community Shuttle Monthly Operations Report

Mountain View Community Shuttle Monthly Operations Report Mountain View Community Shuttle Monthly Operations Report October 9, 2018 Contents Passengers per Day, Table...- 3 - Passengers per Day, Chart...- 3 - Ridership Year-To-Date...- 4 - Average Daily Ridership

More information

EEC Modification Project. Initial Draft Resource Report 10 Alternatives. 569 Brookwood Village Suite 749 Birmingham, Alabama 35209

EEC Modification Project. Initial Draft Resource Report 10 Alternatives. 569 Brookwood Village Suite 749 Birmingham, Alabama 35209 EEC Modification Project Initial Draft Resource Report 10 Alternatives 569 Brookwood Village Suite 749 Birmingham, Alabama 35209 April 2013 INITIAL DRAFT RESOURCE REPORT 10 - ALTERNATIVES INITIAL DRAFT

More information

City of Hermosa Beach Beach Access and Parking Study. Submitted by. 600 Wilshire Blvd., Suite 1050 Los Angeles, CA

City of Hermosa Beach Beach Access and Parking Study. Submitted by. 600 Wilshire Blvd., Suite 1050 Los Angeles, CA City of Hermosa Beach Beach Access and Parking Study Submitted by 600 Wilshire Blvd., Suite 1050 Los Angeles, CA 90017 213.261.3050 January 2015 TABLE OF CONTENTS Introduction to the Beach Access and Parking

More information

File OF-Surv-Inc April 2014

File OF-Surv-Inc April 2014 File OF-Surv-Inc-2014-33 01 14 April 2014 Mr. Russell K. Girling, President and Chief Executive Officer TransCanada Pipes Limited 450 1 st Street SW Calgary, AB T2P 5H1 Facsimile 403-920-2200 Dear Mr.

More information

El Paso Natural Gas Company, L.L.C.; Semi-Annual Activity Report Washington Ranch Storage Facility Docket Nos. RP72-6, et al., CP79-224, and CP15-516

El Paso Natural Gas Company, L.L.C.; Semi-Annual Activity Report Washington Ranch Storage Facility Docket Nos. RP72-6, et al., CP79-224, and CP15-516 January 8, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: ; Semi-Annual Activity Report Washington Ranch Storage

More information

June 26, Federal. Commissioners: Re: CP Pursuant to. the. Pursuant to. ordering

June 26, Federal. Commissioners: Re: CP Pursuant to. the. Pursuant to. ordering June 26, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Semi-Annual Activity

More information

CITIZENS BOND OVERSIGHT COMMITTEE Meeting Minutes August 22, Vice Chairman Mike Kreeger called the meeting to order at 5:31 p.m.

CITIZENS BOND OVERSIGHT COMMITTEE Meeting Minutes August 22, Vice Chairman Mike Kreeger called the meeting to order at 5:31 p.m. CHINO VALLEY UNIFIED SCHOOL DISTRICT Facilities, Planning, and Operations Division Greg Stachura, Assistant Superintendent Phone (909) 628-1201, Ext. 1200 Fax (909) 548-6034 CITIZENS BOND OVERSIGHT COMMITTEE

More information

Update on Seasonal Conditions & Summer Weather Outlook

Update on Seasonal Conditions & Summer Weather Outlook Update on Seasonal Conditions & Summer Weather Outlook Andy Bryant National Weather Service Portland, Oregon June 6, 2018 Overview Quick review of winter and spring conditions Seasonal water supply forecasts

More information

Interceptor Surveying and Mapping (ISM) Pre-proposal Meeting

Interceptor Surveying and Mapping (ISM) Pre-proposal Meeting Pre-proposal Meeting 127 miles of pipes 2,600 manholes Interceptor Surveying and Mapping Southerly District Big Creek Mill Creek Southerly Easterly District Collinwood Hayden Ivanhoe Lakeshore Nottingham

More information

Algorithms: COMP3121/3821/9101/9801

Algorithms: COMP3121/3821/9101/9801 NEW SOUTH WALES Algorithms: COMP3121/3821/9101/9801 Aleks Ignjatović School of Computer Science and Engineering University of New South Wales TOPIC 4: THE GREEDY METHOD COMP3121/3821/9101/9801 1 / 23 The

More information

Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421)

Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421) Operation Name: China: Anhui

More information

Memo. I. Executive Summary. II. ALERT Data Source. III. General System-Wide Reporting Summary. Date: January 26, 2009 To: From: Subject:

Memo. I. Executive Summary. II. ALERT Data Source. III. General System-Wide Reporting Summary. Date: January 26, 2009 To: From: Subject: Memo Date: January 26, 2009 To: From: Subject: Kevin Stewart Markus Ritsch 2010 Annual Legacy ALERT Data Analysis Summary Report I. Executive Summary The Urban Drainage and Flood Control District (District)

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Iraq Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 27-May-2016

More information

Bus Routes, New York NY, August 2017

Bus Routes, New York NY, August 2017 Page 1 of 6 Metadata format: ISO 19139 Bus Routes, New York NY, August 2017 ISO 19139 metadata content Resource Identification Information Spatial Representation Information Reference System Information

More information

Lower Density Growth Management Metadata

Lower Density Growth Management Metadata Products > BYTES of the BIG APPLE TM Lower Density Growth Management Metadata nyldgma Data Format: Shapefile File or table name: nyldgma Data Projection: NAD_1983_StatePlane_New_York_Long_Island_FIPS_3104_Feet

More information

Temporary College Closure Due to Inclement Weather or Other Adverse Conditions.

Temporary College Closure Due to Inclement Weather or Other Adverse Conditions. OTHER TOPICS Index No. X-1 PROCEDURES MEMORANDUM TO: FROM: SUBJECT: MCC Students and Staff Office of the President Temporary College Closure Due to Inclement Weather or Other Adverse Conditions. DATE:

More information

Opanuku Stream Benchmark Validation 1. Introduction. 2. The Opanuku Stream Model

Opanuku Stream Benchmark Validation 1. Introduction. 2. The Opanuku Stream Model Opanuku Stream Benchmark Validation 1. Introduction The model accuracy benchmark published by the Flood Risk Management Committee of the IAHR in http://members.iahr.org/imis/communitymanagement/communitylayouts/flood_risk_manageme

More information

Oak Ridge Environmental Information System (OREIS): Formalizing the Shapes of Things on the Oak Ridge Reservation 15393

Oak Ridge Environmental Information System (OREIS): Formalizing the Shapes of Things on the Oak Ridge Reservation 15393 Oak Ridge Environmental Information System (OREIS): Formalizing the Shapes of Things on the Oak Ridge Reservation 15393 Patricia J. Halsey, Lacey Wicks (OREM Summer Intern) U.S. Department of Energy Peter

More information

Demand Estimation Sub-Committee MOD330 Phase 1 and 2. 7 th November 2012

Demand Estimation Sub-Committee MOD330 Phase 1 and 2. 7 th November 2012 Demand Estimation Sub-Committee MOD330 Phase 1 and 2 7 th November 2012 DESC: Phase 1 Update (1 of 2) 2 Teleconference took place on 18 th October to obtain DESC confirmation of scope of weather data requirements

More information

PUBLIC UTILITY COMMISSION OF TEXAS DOCKET NO

PUBLIC UTILITY COMMISSION OF TEXAS DOCKET NO Application of CenterPoint Energy Houston Electric, LLC for a Certificate of Convenience and Necessity for a Proposed 138 kv Transmission Line within Harris County, Texas PUBLIC UTILITY COMMISSION OF TEXAS

More information

Hydraulic modeling assessment Copyright 2010, Optimized Technical Solutions, LLC

Hydraulic modeling assessment Copyright 2010, Optimized Technical Solutions, LLC Hydraulic modeling assessment Copyright 2010, Optimized Technical Solutions, LLC Name: Date: Please answer the following questions with the complete piping configuration shown in Figure 1 below. Assume

More information

SUMMARY OF RESEARCH; UNNAMED ROAD # $ - USGS Topo Proof Map FLPMA The use of and jurisdiction of UNNAMED ROAD # pre-dates the

SUMMARY OF RESEARCH; UNNAMED ROAD # $ - USGS Topo Proof Map FLPMA The use of and jurisdiction of UNNAMED ROAD # pre-dates the SUMMARY OF RESEARCH; UNNAMED ROAD #927 107 195$ - USGS Topo Proof Map 1976- FLPMA The use of and jurisdiction of UNNAMED ROAD #927107 pre-dates the Bureau of Land Management. Historical records of the

More information

Winter Season Resource Adequacy Analysis Status Report

Winter Season Resource Adequacy Analysis Status Report Winter Season Resource Adequacy Analysis Status Report Tom Falin Director Resource Adequacy Planning Markets & Reliability Committee October 26, 2017 Winter Risk Winter Season Resource Adequacy and Capacity

More information

City of Camrose Winter Road Maintenance Policy

City of Camrose Winter Road Maintenance Policy City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.

More information

OREGON POPULATION FORECAST PROGRAM

OREGON POPULATION FORECAST PROGRAM OREGON POPULATION FORECAST PROGRAM PROGRAM OVERVIEW BACKGROUND Beginning in 1973 with the passage of Senate Bill (SB) 100, Oregon s growth management system has relied on population forecasts as the primary

More information

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT:

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT: RESOLUTION 2017-08 A RESOLUTION OF THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT APPROVING PROPOSED BUDGET(S) FOR FISCAL YEAR 2017/2018 AND SETTING A PUBLIC HEARING THEREON

More information

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Section 5 TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Rev. 5/10/2010 1 Section 5 Form for Event ID and Event Type Number Data TO s

More information

Organized Chain-Up and VSL

Organized Chain-Up and VSL Organized Chain-Up and VSL Jim Mahugh, PE WSDOT SC Region Traffic Engineer North/West Passage VSL Peer Exchange January 28, 2015 Snoqualmie Pass 2 Limits of VSL EB: MP 48.12 to 66.56 WB: MP 46.69 to 66.90

More information

LRS Task Force June 13, REVISION HISTORY

LRS Task Force June 13, REVISION HISTORY North Carolina Department of Transportation Geographic Information Systems (GIS) Unit LINEAR REFERENCING SYSTEM (LRS) PROJECT DEFINITION Version 1.0 REVISION HISTORY Date Document Manager Revision Purpose

More information

2013 Summer Weather Outlook. Temperatures, Precipitation, Drought, Hurricanes and why we care

2013 Summer Weather Outlook. Temperatures, Precipitation, Drought, Hurricanes and why we care 2013 Summer Weather Outlook Temperatures, Precipitation, Drought, Hurricanes and why we care Role of the ERCOT Meteorologist Forecasts Develop temperature input for hourly load forecasts (next day, days

More information

Reed School/Westover Library U USE PERMIT AMENDMENT. Staff Presentation to the County Board November 17, 2018

Reed School/Westover Library U USE PERMIT AMENDMENT. Staff Presentation to the County Board November 17, 2018 Reed School/Westover Library U-3175-07-1 USE PERMIT AMENDMENT Staff Presentation to the County Board November 17, 2018 Site Location 2 Background 1644 N. McKinley Road 1938: Walter Reed Elementary School

More information

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared November 13, 2015

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared November 13, 2015 Report on Reliability of ComEd Electrical Service within Downers Grove Prepared November 13, 2015 1 Executive Summary Since 2011, the Village of Downers Grove has worked closely with ComEd to improve electrical

More information

Madison City Schools Budget. FY 2018 Proposed Budget 2nd Public Hearing August 31,

Madison City Schools Budget. FY 2018 Proposed Budget 2nd Public Hearing August 31, Madison City Schools 2018 Budget FY 2018 Proposed Budget 2nd Public Hearing August 31, 2017 1 Budget Process State mandated process designed to develop a tool for the school system to use in order to provide

More information

SEPTEMBER 1991 MONTHLY REPORT. Scientific Observation Hole (SOH) Geothermal Resource Permit: GRP TMK: :01; :02; and :32

SEPTEMBER 1991 MONTHLY REPORT. Scientific Observation Hole (SOH) Geothermal Resource Permit: GRP TMK: :01; :02; and :32 SEPTEMBER 1991 MONTHLY REPORT Scientific Observation Hole (SOH) Program Geothermal Resource Permit: GRP 89-1 Lilewa, Kapoho, and Halekamahina, Hawaii TMK: 1-2-10:01; 1-4-01:02; and 1-4-02:32 Hawaii Natural

More information

WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY

WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY MONTHLY REPORT October 15, 2007 Black & Veatch Project: 144374 Prepared by: Black & Veatch Corporation 6300 S. Syracuse Way

More information

Prepared by the North American Ice Service. 4 December Seasonal Outlook Great Lakes Winter

Prepared by the North American Ice Service. 4 December Seasonal Outlook Great Lakes Winter Prepared by the North American Ice Service A collaboration of the Canadian Ice Service and the National/Naval Ice Center 4 December 2008 Seasonal Outlook Great Lakes Winter 2008-2009 - 1 - Table of contents

More information

Powder River Basin Coal Update

Powder River Basin Coal Update Powder River Basin Coal Update Tom Kraemer Group Vice President Coal Southwest Power Pool Regional State Committee October 24, 2005 - Santa Fe, NM Discussion Topics BNSF coal transportation Historic PRB

More information

T-12 / Informed Traveller

T-12 / Informed Traveller T-12 Informed Traveller Paul McMahon Route Managing Director, Freight & National Passenger Operators Transport Focus Board 15 May 2018 1 A brief recap on context Network Rail offered May 2018 TT in November

More information

What s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description

What s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description What s New in the World of Winter Maintenance Technology Dennis Burkheimer Winter Operations Administrator Iowa Department of Transportation John Scharffbillig Fleet Manager Minnesota Department of Transportation

More information

IN-NETWORK CHLORINE RESIDUAL MANAGEMENT

IN-NETWORK CHLORINE RESIDUAL MANAGEMENT IN-NETWORK CHLORINE RESIDUAL MANAGEMENT Using GIS to assess flush point efficacy Ian Toohey, P.E. Systems Planning Austin Water TABLE OF CONTENTS 1. Background 3. Surface Creation 2. Residual Sampling

More information

ROAD INVENTORY FOR CERTIFICATION OF MILEAGE

ROAD INVENTORY FOR CERTIFICATION OF MILEAGE ROD INVENTORY FOR CERTIFICTION OF MILEGE Kay F outs Road Inventory Supervisor, IS H C ISHC ROD IN V E N T O R Y SECTIO N ND DT C O L L E C T IO N s provided in the Indiana Code, the Indiana State Highway

More information

REVISED UPDATED PREPARED DIRECT SAFETY ENHANCEMENT COST ALLOCATION TESTIMONY OF GARY LENART SAN DIEGO GAS & ELECTRIC COMPANY AND

REVISED UPDATED PREPARED DIRECT SAFETY ENHANCEMENT COST ALLOCATION TESTIMONY OF GARY LENART SAN DIEGO GAS & ELECTRIC COMPANY AND Application No: Exhibit No.: Witness: A.--00 ) In the Matter of the Application of San Diego Gas & ) Electric Company (U 0 G) and Southern California ) Gas Company (U 0 G) for Authority to Revise ) Their

More information

PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES

PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES PACIFIC GAS AND ELECTRIC COMPANY PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES SEPTEMBER 2018 1 PACIFIC GAS AND ELECTRIC COMPANY PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES SEPTEMBER 2018

More information

INCLEMENT WEATHER CLOSING CODES

INCLEMENT WEATHER CLOSING CODES INCLEMENT WEATHER CLOSING CODES Code 0 Code 1 Code 2 Code 3 Code 4 Code 5 Code 6 ALL operations are closed and no employees should report to work. Transportation personnel, maintenance personnel, ALL custodial

More information

Colorado CoCoRaHS. Colorado CoCoRaHS. Because Every Drop Counts! November 2014 Volume 2, Issue 11

Colorado CoCoRaHS. Colorado CoCoRaHS. Because Every Drop Counts! November 2014 Volume 2, Issue 11 U.S. PRECIPITATION (% OF AVERAGE) LOOKING BACK AT OCTOBER 2014 October was a fairly dry month for much of the nation with the exception of the Pacific Northwest, portions of New England and the Tennessee

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 7 ARCHIVED on

More information

2010 Growing Season. Prince Edward County Report

2010 Growing Season. Prince Edward County Report 2010 Growing Season Prince Edward County Report WIN Staff November 10, 2010 Overview It is always remarkable how each growing season is unique as a result of yearly variations in weather. Changes occur

More information

UPDATE ELECTRICITY STATEMENT OF OPPORTUNITIES FOR THE NATIONAL ELECTRICITY MARKET

UPDATE ELECTRICITY STATEMENT OF OPPORTUNITIES FOR THE NATIONAL ELECTRICITY MARKET UPDATE ELECTRICITY STATEMENT OF OPPORTUNITIES FOR THE NATIONAL ELECTRICITY MARKET Published: 26 October 2015 ELECTRICITY STATEMENT OF OPPORTUNITIES IMPORTANT NOTICE Purpose AEMO publishes the Electricity

More information

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 Peterborough Distribution Inc. 1867 Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 November 15, 2017 Ontario Energy Board PO Box 2319 27 th Floor, 2300 Yonge St Toronto ON M4P 1E4

More information

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES Memorandum To: David Thompson From: John Haapala CC: Dan McDonald Bob Montgomery Date: February 24, 2003 File #: 1003551 Re: Lake Wenatchee Historic Water Levels, Operation Model, and Flood Operation This

More information

Regional Haze Metrics Trends and HYSPLIT Trajectory Analyses. May 2017

Regional Haze Metrics Trends and HYSPLIT Trajectory Analyses. May 2017 Regional Haze Metrics Trends and HYSPLIT Trajectory Analyses May 2017 Principal Contributors: Tom Downs, CCM, ME DEP Project manager Martha Webster, ME DEP Trajectory analyses and GIS mapping Rich Greves,

More information

Susitna-Watana Hydroelectric Project (FERC No ) Geomorphology Study Study Plan Section Study Implementation Report.

Susitna-Watana Hydroelectric Project (FERC No ) Geomorphology Study Study Plan Section Study Implementation Report. (FERC No. 14241) Geomorphology Study Study Plan Section 6.5 2014-2015 Study Implementation Report Prepared for Prepared by Tetra Tech Watershed GeoDynamics October 2015 TABLE OF CONTENTS 1. Introduction...

More information

Case GLT Doc 1037 Filed 08/30/17 Entered 08/30/17 09:45:30 Desc Main Document Page 1 of 5

Case GLT Doc 1037 Filed 08/30/17 Entered 08/30/17 09:45:30 Desc Main Document Page 1 of 5 Case 17-22045-GLT Doc 1037 Filed 08/30/17 Entered 08/30/17 09:45:30 Desc Main Document Page 1 of 5 IN THE UNITED STATES BANKRUPTCY COURT FOR THE WESTERN DISTRICT OF PENNSYLVANIA In re: rue 21, inc., et

More information

Report on El Paso Electric Company Weather-Related Issues in February 2011

Report on El Paso Electric Company Weather-Related Issues in February 2011 2011 Report on El Paso Electric Company Weather-Related Issues in February 2011 Staff of the Public Utility Commission of Texas May 2011 1 Table of Contents I. Executive Summary... 3 II. EPE Preparations

More information

Sources of Hourly Surface Data and Weather Maps for the U.S.

Sources of Hourly Surface Data and Weather Maps for the U.S. Sources of Hourly Surface Data and Weather Maps for the U.S. An alternative source to Plymouth State University to get hourly observations is the National Weather Service (NWS). Hourly surface observations

More information

CHAPTER IV WORKPAPER SUMMARY Transmission Pipeline Enhancement Plan

CHAPTER IV WORKPAPER SUMMARY Transmission Pipeline Enhancement Plan SUMMARY Transmission Pipeline Enhancement Plan SoCalGas Workpaper Workpaper Testimony Section Corresponding Testimony Tables Workpaper Page Phase 1A Pipeline Miles and Subprioritization IV.D.1 and IV.D.4

More information

Third Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE

Third Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE 1) Project Overview Third Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE-2007-1130 December 15, 2014 This is the third year of a five year monitoring program

More information

Selection and Ranking of Canals in the Gulf Coast Irrigation Division by Expected Seepage and/or Other Types of Losses APPENDIXES

Selection and Ranking of Canals in the Gulf Coast Irrigation Division by Expected Seepage and/or Other Types of Losses APPENDIXES Selection and Ranking of Canals in the Gulf Coast Irrigation Division by Expected Seepage and/or Other Types of Losses APPENDIXES Final Report Submitted to the Lower Colorado River Authority September

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS STRUCTURAL ENGINEERING FIRM TO PERFORM A STRUCTURAL EVALUATION OF THE MARKET STREET PARKADE FACILITY REFERENCE RFP 14-148 Addendum Issued: August 22, 2014 ADDENDUM No. 2 Page 1 of

More information

PR122A NARRATIVE Updated 25 July 2014

PR122A NARRATIVE Updated 25 July 2014 PR122A NARRATIVE Updated 25 July 2014 Cross section PR122A was established in 1979 across a new cutoff channel that had formed during the 1978 flood across the neck of a meander bend in Powder River at

More information

G.1. Motion to approve Project Calendar regarding Planning and Development Department Payments as follows:

G.1. Motion to approve Project Calendar regarding Planning and Development Department Payments as follows: G.1.a council memo DATE: Wednesday, January 31, 2018 TO: FROM: RE: Mayor and City Council Tracey Bellach, Administrative Assistant G.1. Motion to approve Project Calendar regarding Planning and Development

More information

Colorado CoCoRaHS. Colorado CoCoRaHS. December 2013 Volume 1, Issue 8 NOVEMBER PRECIPITATION NOVEMBER TEMPERATURES

Colorado CoCoRaHS. Colorado CoCoRaHS. December 2013 Volume 1, Issue 8 NOVEMBER PRECIPITATION NOVEMBER TEMPERATURES NOVEMBER PRECIPITATION The month of November brought a flip-flop in precipitation patterns to some areas compared to the previous month, especially for locations in the foothills north of I-70 and in south-central

More information

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s PJM Interconnection 2750 Monroe Boulevard Norristown, PA 19403-2497 Steven R. Pincus Associate General Counsel 610.666.4370 fax 610.666.8211 steven.pincus@pjm.com July 31, 2017 Honorable Kimberly D. Bose

More information

Localized Aviation Model Output Statistics Program (LAMP): Improvements to convective forecasts in response to user feedback

Localized Aviation Model Output Statistics Program (LAMP): Improvements to convective forecasts in response to user feedback Localized Aviation Model Output Statistics Program (LAMP): Improvements to convective forecasts in response to user feedback Judy E. Ghirardelli National Weather Service Meteorological Development Laboratory

More information

October 16, Dear Mr. Hawkins:

October 16, Dear Mr. Hawkins: IBI GROUP 101 410 Albert Street Waterloo ON N2L 3V3 Canada tel 519 585 2255 fax 519 585 2269 October 16, 2017 Mr. Trevor Hawkins Manager of Applications and Implementation Integrated Planning and Public

More information

Statewide State Roads Layer Michigan Geographic Framework Field Definitions

Statewide State Roads Layer Michigan Geographic Framework Field Definitions Statewide State Roads Layer Michigan Geographic Framework Field Definitions (Shapefile Attribute Table) (June 1, 2012 Version 12b) The following field definitions make up the shapefile attribute table

More information

The World Bank IN Maharashtra Rural Water Supply and Sanitation Program (P126325)

The World Bank IN Maharashtra Rural Water Supply and Sanitation Program (P126325) Public Disclosure Authorized SOUTH ASIA India Water Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 5 ARCHIVED on 23-Jun-2016 ISR24264 Implementing Agencies: Public Disclosure Authorized Program

More information

AASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response

AASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response AASHTO Committee on Maintenance 2018 Annual Meeting July 25, 2018 Hurricane Irma- Preparation and Response Rudy Powell Director, Office of Maintenance Satellite Aerial Image (September 10, 2017) Hurricane

More information

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses

More information

SUMMARY OF RESEARCH; EASY CHAIR CRATER ROAD # USGS Topo Proof Map FLPMA The use of and jurisdiction of EASY CHAIR CRATER ROAD

SUMMARY OF RESEARCH; EASY CHAIR CRATER ROAD # USGS Topo Proof Map FLPMA The use of and jurisdiction of EASY CHAIR CRATER ROAD SUMMARY OF RESEARCH; EASY CHAIR CRATER ROAD #955540 1967 - USGS Topo Proof Map 1976 - FLPMA The use of and jurisdiction of EASY CHAIR CRATER ROAD #955540 pre-dates the Bureau of Land Management. Historical

More information

Flood Scenario Worksheet

Flood Scenario Worksheet Flood Scenario Worksheet Scenario adapted from: http://www.epa.gov/watersecurity/tools/trainingcd/simple/source/scenario-8/ssc8-0.pdf Simple Tabletop Exercise, Interdependency Natural Disaster Scenario,

More information

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION rdmore, P tlantic City, NJ REQUEST FOR INFORMTION PROJECT: Renaissance Hotel Renovations RFI NUMBER:.0 FXB Engineering TTN: David Drake Christy Dr #0 Chadds Ford, P 0phone 0000000000fax Requested Date:

More information

A Regional Database Tracking Fire Footprint Each Year within the South Atlantic Region: Current Database Description and Future Directions

A Regional Database Tracking Fire Footprint Each Year within the South Atlantic Region: Current Database Description and Future Directions A Regional Database Tracking Fire Footprint Each Year within the South Atlantic Region: Current Database Description and Future Directions Last Updated on September 30, 2018 Contributors: NatureServe,

More information

AMUR MINERALS CORPORATION (AIM: AMC) Kubuk Drilling To Upgrade and Expand Resource

AMUR MINERALS CORPORATION (AIM: AMC) Kubuk Drilling To Upgrade and Expand Resource 14 September 2017 AMUR MINERALS CORPORATION (AIM: AMC) Kubuk Drilling To Upgrade and Expand Resource New Mineralisation Expands Kubuk Deposit by 50% to 1,500 Metres Amur Minerals Corporation ( Amur or

More information

Vegetation and Wildlife Habitat Mapping Study in the Upper and Middle Susitna Basin Study Plan Section 11.5

Vegetation and Wildlife Habitat Mapping Study in the Upper and Middle Susitna Basin Study Plan Section 11.5 (FERC No. 14241) Vegetation and Wildlife Habitat Mapping Study in the Upper and Middle Susitna Basin Study Plan Section 11.5 Initial Study Report Part C: Executive Summary and Section 7 Prepared for Prepared

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review

More information

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. UPDATES

More information

Sources of Hourly Surface Data and Weather Maps for the U.S.

Sources of Hourly Surface Data and Weather Maps for the U.S. Sources of Hourly Surface Data and Weather Maps for the U.S. Weather Underground Weather Underground http://www.wunderground.com/history/ maintains a deep archive of hourly reports for around the world.

More information

Superstorm Sandy What Risk Managers and Underwriters Learned

Superstorm Sandy What Risk Managers and Underwriters Learned Superstorm Sandy What Risk Managers and Underwriters Learned Gary Ladman Vice President, Property Underwriting AEGIS Insurance Services, Inc. Superstorm Sandy Change in the Weather Recent years appears

More information

REQUEST FOR PROPOSALS CLOSING DATE:

REQUEST FOR PROPOSALS CLOSING DATE: Request for Proposals 110 Westlake Drive City of West Lake Hills 110 Westlake Drive REQUEST FOR PROPOSALS CLOSING DATE: Tuesday, October 23, 2018 City of West Lake Hills Request for Proposals 1 I. INTRODUCTION

More information

Home About Us Articles Press Releases Image Gallery Contact Us Media Kit Free Subscription 10/5/2006 5:56:35 PM

Home About Us Articles Press Releases Image Gallery Contact Us Media Kit Free Subscription 10/5/2006 5:56:35 PM Home About Us Articles Press Releases Image Gallery Contact Us Media Kit Free Subscription 10/5/2006 5:56:35 PM Industry Resources Industry Directory NASA Links Missions/Launches Calendar Human development

More information

MOTION REGARDING PARENTING TIME FOC 65

MOTION REGARDING PARENTING TIME FOC 65 Mecosta County Friend the Court 400 Elm Street P.O. Box 508 Big Rapids, MI 49307 (231) 592-0115 USE THIS FORM IF: MOTION REGARDING PARENTING TIME FOC 65 You have a court order through the Mecosta County

More information

SHAWN J. MUELLER 2003

SHAWN J. MUELLER 2003 SHAWN J. MUELLER 2003 2238 7 th Ave. N.W. Calgary, AB T2N 0Z6 Canada Telephone: 403.220.0635 Email: sjmuelle@ucalgary.ca Citizenship: Canadian Languages: English (mother tongue), German (read, write, speak)

More information

WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report

WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report Gary Lee Moore, P.E., City Engineer Vince Jones, P.E., Deputy City Engineer WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report White Point Landslide Geotechnical Investigation

More information

INTERNATIONAL NIAGARA BOARD OF CONTROL. Minutes of the March 20, 2013 Meeting Chicago, IL

INTERNATIONAL NIAGARA BOARD OF CONTROL. Minutes of the March 20, 2013 Meeting Chicago, IL INTERNATIONAL NIAGARA BOARD OF CONTROL Minutes of the March 20, 2013 Meeting Chicago, IL BG Burcham called the meeting to order at 8:05 am in a conference room of the US Army Corps of Engineers, Chicago

More information

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030)

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030) Operation Name:

More information

Acquisition of Multi-Function Equipment at DIA: Conditions, Factors, Considerations & Integration. Presented by Mike Carlson September 20, 2012

Acquisition of Multi-Function Equipment at DIA: Conditions, Factors, Considerations & Integration. Presented by Mike Carlson September 20, 2012 Acquisition of Multi-Function Equipment at DIA: Conditions, Factors, Considerations & Integration Presented by Mike Carlson September 20, 2012 1 Denver International Airport 5 Runways 12,000 /. (3,658m)

More information