REQUEST FOR INFORMATION

Size: px
Start display at page:

Download "REQUEST FOR INFORMATION"

Transcription

1 rdmore, P tlantic City, NJ REQUEST FOR INFORMTION PROJECT: Renaissance Hotel Renovations RFI NUMBER:.0 FXB Engineering TTN: David Drake Christy Dr #0 Chadds Ford, P 0phone fax Requested Date: Requested Contractor: Generated By: Response Due By: 0//0 T.N.Ward Company Kenneth Romano 0//0 Response Received: 0/0/0 The required but unavailable information is resulting in a delay in fabrication of material or prosecution of the work in the field. Once the information is received we will advise you as to the impact to the schedule and cost Subject: West Lounge 0" cast iron pipe Reference: Information Requested: while demoing the start of the West lounge. We ran into a existing 0" cast iron pipe. This pipe in this location from center of column to face of wall it is '/" to front of drain. The new contracted walls are from center of column to finish wall is ' /". this will not work. please see pictures of existing conditions. We have proposed an option but if we can core at this location (xray) Response Requested By: Response: Existing 0" pipe to remain in its existing location. Pipe to be left exposed with a painted finish. Finish TBD. Corrdior width to reduce to " at 0" pipe. Per 00 IBC, chapter 0 on Corrdiors, exception #, for an occupant capacity less than 0 (using the corridor), the corridor width can be reduced to ". Based on the egress plan on 00, occupants egress through exit doors on the ground level. Therefore, the corridor by the restrooms would have a egress load less than 0. See attached Lobby RCP plan /0, lobby enlarged restroom plan /00, and overall Lobby floor plan on 0. Updates include: widened the lley soffit added pendant fixture ELEDC0 adjusted restroom L0 and L0 floor plan per field conditions adjusted restroom L0 and L0 lighting plan to align with the revised layout See attached restroom elevation /ID00 for updated sconce locations

2 rdmore, P tlantic City, NJ REQUEST FOR INFORMTION PROJECT: Renaissance Hotel Renovations RFI NUMBER:.0 FXB Engineering TTN: David Drake Christy Dr #0 Chadds Ford, P 0phone fax Requested Date: Requested Contractor: Generated By: Response Due By: 0//0 T.N.Ward Company Kenneth Romano 0//0 Response Received: The required but unavailable information is resulting in a delay in fabrication of material or prosecution of the work in the field. Once the information is received we will advise you as to the impact to the schedule and cost Subject: West Lounge 0" cast iron pipe Reference: Information Requested: while demoing the start of the West lounge. We ran into a existing 0" cast iron pipe. This pipe in this location from center of column to face of wall it is '/" to front of drain. The new contracted walls are from center of column to finish wall is ' /". this will not work. please see pictures of existing conditions. We have proposed an option but if we can core at this location (xray) Response Requested By: Response: Existing 0" pipe to remain in its existing location. Pipe to be left exposed with a painted finish. Finish TBD. Corridor width to reduce to " at 0" pipe. Per 00 IBC, chapter 0 on Corridors, exception #, for an occupant capacity less than 0 (using the corridor), the corridor width can be reduced to. Based on the egress plan on drawing 00, occupants egress through exit doors on the ground level. Therefore, the corridor by the restrooms would have a egress load less than 0. Request CCs: Response CCs: See attached Lobby RCP plan /0 and Lobby enlarged restroom plan /00. Updates include: widened the lley soffit added pendant fixture ELEDC0 adjusted restroom L0 and L0 floor plan per field conditions adjusted restroom L0 and L0 lighting plan to align with the revised layout See attached restroom elevation /ID00 for updated sconce locations. and overall Lobby floor plan on 0.

3 NEW WORK KEY NOTES LOBBY. B. C. D. JONTHN NEHMER + SSOCITES, INC. RCHITECTURE PROJECT MNGEMENT CONSULTNTS CLHOUN PLCE SUITE 0 ROCKVILLE, MRYLND FX B C D E LODING DOCK HOUSEKEEPING L L LUGGGE L. GENERL NOTES / DDITIONL SCOPE ITEMS NOT SHOWN: LUNDRY L HUMN RESOURCES L0. 0 UPPER DINING L L B SERVICE LOBBY L ELEC. RM. L L 0 L B ELEV. # KITCHEN L DINING L STORGE L 00 STIR # L L 0 0 L B L SERVICE CORRIDOR L RECEPTION L ELEV. # BELL CLOSET L L 0 0 F G H J K L LOBBY L FIRE CONTROL ROOM L 0 ELEV. # ELEV. # ELEVTOR LOBBY L LOUNGE WEST L0 MEN'S TOILET L0 L0 CORRIDOR L0 WOMEN'S TOILET L0 L0 MECH L0 0 LOUNGE EST L0 L0 L0 STIR # L0 PNTRY L0 00 L0 B. B C Renaissance Hotel at Independence Park Public Space Renovation 0 Chestnut St. Philadelphia, P 0 DESCRIPTION DTE PROJECT NO: COPYRIGHT: SHEET TITLE LOBBY FLOOR NEW WORK PLN 0 LOBBY LEVEL FLOOR PLN /" = '0" 0

4 NEW WORK KEY NOTES LOBBY. B. C. D. JONTHN NEHMER + SSOCITES, INC. RCHITECTURE PROJECT MNGEMENT CLHOUN PLCE SUITE 0 ROCKVILLE, MRYLND FX CONSULTNTS. GENERL NOTES / DDITIONL SCOPE ITEMS NOT SHOWN: B C D E.. DW0 DW0 F F DW0F DW0 DW0 F F F F F DC0 DC0 F 00 F F F F F DW0 F 00 Ftapelight illuminating stair riser F F F F DC0 DC0 00 F F F F F0 DW0 F F F F F0tapelight illuminating millwork F F F F F, () rows to uplight bottles DC0 F 00 Ftapelight illuminating bar die F F F F F F, typ. DW0 F F F F F F F F F F F F F LOB DC0 LOB DC0 LOB DC0 LOB DC0 F F F F F F New pendant above. Existing downlights to remain F F F F F 0 F ELE DC0 F DW0 F F F F F Discovery Table F G H J K L ELEV. # ELEV. # F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F ELE DC0 F F F F F F F F F F F F 0 F F F F 00 F F F F ELE DC0 LOU DW0 F LOU DC0 LOU DC0 F F F F F F F F F F F F F DW0 DW0 00 F 0 F F ELE DC0 F F F F F F F F F F F F DC F F F F F F DW0 F DW0 F DW0 F F F F 0 F F F F F F LOU DW0 LOU DW0 ELE DW0 F F F F F F F F F Ftapelight illuminating bar die Ftapelight illuminating coffer ceiling F LOU DC EXT DW0 F F F F F 0 F F EXT DW. B C Renaissance Hotel at Independence Park Public Space Renovation 0 Chestnut St. Philadelphia, P 0 DESCRIPTION DTE PROJECT NO: COPYRIGHT: 0 LOBBY LEVEL REFLECTED CEILING PLN /" = '0" SHEET TITLE LOBBY FLOOR REFLECTED CEILING PLN 0

5 JONTHN NEHMER + SSOCITES, INC. RCHITECTURE PROJECT MNGEMENT CLHOUN PLCE SUITE 0 ROCKVILLE, MRYLND FX CONSULTNTS F F F F F 0 F DW DW F F F F F F 0 DW DW LOBBY RESTROOM ENLRGED PLN 00 /" = '0" EVENT RESTROOM ENLRGED PLN /" = '0" 00 EVENT RESTROOM ENLRGED RCP /" = '0" NEW WORK KEY NOTES RESTROOM GENERL NOTES / DDITIONL SCOPE ITEMS NOT SHOWN: Renaissance Hotel at Independence Park Public Space Renovation 0 Chestnut St. Philadelphia, P DESCRIPTION DTE PROJECT NO: COPYRIGHT: 00 LL EMP. LOCKER RM ENLRGED PLN /" = '0" 00 LL GUEST LOCKER RM ENLRGED PLN /" = '0" SHEET TITLE ENLRGED RESTROOM & LOCKER ROOM PLNS 00

6 ID ID ID ID ID ID ID ID00 ID00 ID00 ID00 CONSULTNTS ID00 ENLRGED PUBLIC RESTROOM PLN & ELEVTIONS 0//0 RFI 0/0/0 RFI

7 existing 0" cast iron location, ' /" off center of column

8 There not enough clearance for new proposed hallway

9 Swing the 's, will this clear ceiling requirments?

10 Move over

11 Move over Lower Level electrical main gear room

12 Lobby floor

13 proposed new location if no cables are in the way

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION rdmore, P tlantic City, NJ REQUEST FOR INFORMTION PROJECT: - Renaissance Hotel Renovations RFI NUMER:.0 JONTHN NEHMER & SSOC TTN: Robert Trafton Calhoun Place Suite 0 Rockville, MD 0 0-0--phone 0-0--fax

More information

New Paint in Bowl Area - Paint on Aisles Risers, Walls, Soffits and Railings. Lower Level Platform Riser Seating

New Paint in Bowl Area - Paint on Aisles Risers, Walls, Soffits and Railings. Lower Level Platform Riser Seating R E N O V A T I O N S P H A S E I I K E L L M U Ñ O Z A R C H I T E C T S 0 7. 0 9. 2 0 1 2 C O N C E P T D E S I G N B A S E P R O J E C T S C O P E : R E N O V A T E C O N C O U R S E A N D F I N I

More information

FISHMASTER WARHOUSE EXPANSION

FISHMASTER WARHOUSE EXPANSION FISHMSTER WRHOUSE EXPNSION 0 WLLCE DRIVE FORSYTH, G specifications, are the exclusive property of David R. Woods, I, and checked with David R. Woods, I, prior to fabrication of said work. Project Name

More information

Calif. Comm. Colleges Space Inventory Report 6/29/2015 Unassigned Space Report ( ) (by building) Page 1

Calif. Comm. Colleges Space Inventory Report 6/29/2015 Unassigned Space Report ( ) (by building) Page 1 (by building) Page 1 Room Campus Building Prfx No. Sfx Description Status* GSF ASF Assessment Notes 591 Columbia College 906 DAVIS CABIN A 3 RR N Total Rooms: 1 875 907 BUCKEYE (BUSINESS) A 3 A Storage

More information

EMSL Analytical, Inc.

EMSL Analytical, Inc. EMSL Analytical, Inc. Phone: (856) 303-2500 Fax: (856) 858-4571 Email: 2/21/2017 The following analytical report covers the analysis performed on samples submitted to EMSL Analytical, Inc. on 2/17/2017.

More information

Parallel Requirements of Construction Standards for Accessibility ANSI, UFAS and ADAAG

Parallel Requirements of Construction Standards for Accessibility ANSI, UFAS and ADAAG Total # of spaces: # of accessible spaces: Parallel Requirements of Construction Standards for Accessibility PARKING Cite 4.3 Cite 4.6 Cite 4.6 required number; however, the number of accessible spaces

More information

Hotel Hallway Analysis

Hotel Hallway Analysis Date: Operator: Blacksburg, VA 260 Telephone 5.553.6171 Table of contents Hotel Hallway Analysis Project Cover 1 Table of contents 2 ZUMTOBEL STAFF LIGHTING S5D7108 7108RC S5; S5D; SPEC-5; FORMED STEE...

More information

Ahmad Audi, Nanotechnology Department Chair & Professor of Chemistry. Burcin Moehring, Director of Science and Technology

Ahmad Audi, Nanotechnology Department Chair & Professor of Chemistry. Burcin Moehring, Director of Science and Technology March 20th, 2014 VIA EMAIL College of Lake County 19351 West Washington Street Grayslake, Illinois 60030 Re: College of Lake County Master Plan Projects Architect s Project Number: Southlake Chemistry

More information

DA ISSUE THIS DRAWING IS NOT FOR CONSTRUCTION

DA ISSUE THIS DRAWING IS NOT FOR CONSTRUCTION THIS DRWING IS NOT SL EXTENDED TO ROOF LINE 70 TEXTURED FCDE - 2 OPTION 1-2 ED ELEVTION LUNDRY THROOM GRGE ED 2 1 OPTION 1-2 ED FLOOR PLN TO E TRNSPORTLE 3 OPTION 1-2 ED PERSPECTIVE RE SCHEDULE INTERNL

More information

FLORIDA INVENTORY OF SCHOOL HOUSES (FISH)

FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) ORGANIZATION: FACILITY: FACILITY USE: 35-LAKE COUNTY SCHOOL DISTRICT UMATILLA MIDDLE ALL DISTRICT: 35 LAKE COUNTY SCHOOL DISTRICT FACILITY: 41-A UMATILLA MIDDLE Primary Use: MIDDLE Grades Housed: 06-08

More information

Temple City Unified School District Committed to 21 st Century Academic Excellence

Temple City Unified School District Committed to 21 st Century Academic Excellence Temple City Unified School Committed to 21 st Century Academic Excellence Board of Education Members Vinson Bell Kenneth Knollenberg Lawrence A. Marston John Pomeroy Robert S. Ridley Superintendent Kathryn

More information

The Annex is a premier contemporary event and art exhibition space, located in central Hong Kong.

The Annex is a premier contemporary event and art exhibition space, located in central Hong Kong. ABOUT The Annex is a premier contemporary event and art exhibition space, located in central Hong Kong. The Annex lies in the crossroads of art, fashion, film, music and photography worlds. The Annex,

More information

OUR TEAM SHEET INDEX CIVIL C O V E R S H E E T. T H E C O V E A T P A C I F I C A S A N J U A N S a n J u a n C a p i s t r a n o, C A

OUR TEAM SHEET INDEX CIVIL C O V E R S H E E T. T H E C O V E A T P A C I F I C A S A N J U A N S a n J u a n C a p i s t r a n o, C A OUR TEAM SHEET INDEX OWNER/DEVELOPER: PACIFIC POINT DEVELOPMEN PARTNERS LLC CONTACT: MATTHEW LAND 100 SPECTRUM CENTER DR, SUITE 1450 BUSINESS: (949) 341-1237 IRVINE, CA 92618 ARCHITECT / PLANNER: BASSENIAN

More information

SENIOR HOUSING REDEVELOPMENT PROJECT

SENIOR HOUSING REDEVELOPMENT PROJECT THE HISTORIC WILEY H. BATES HIGH SCHOOL Project Team: SENIOR HOUSING REDEVELOPMENT PROJECT Community Preservation and Development Corporation Northern Real Estate, L.L.C. Wiencek + Associates Architects

More information

Sales Date Grantor Convey No. Convey Typ # Parcels Sales Price

Sales Date Grantor Convey No. Convey Typ # Parcels Sales Price Owner Name LOHR DONNA L LOHR DONNA L Prop. Class Land Use R - Residential 550 - CONDOMINIUM UNIT Site Address LegalDescriptions 4714 MERRIFIELD PL BRANFORD VILLAGE CONDOMINIUM BLDG 15 UNIT 70 Tax District

More information

Materials Available Yellow Brass Antiqued Yellow Brass Bronze Antiqued Bronze Aluminum

Materials Available Yellow Brass Antiqued Yellow Brass Bronze Antiqued Bronze Aluminum Classic Antique Vintage Dial Indicators 144 Dial Type Indicators C.J. Anderson & Company can restore, reproduce or provide a new dial type indicator for your project. With cast cover plates that achieve

More information

OUR TEAM SHEET INDEX CIVIL C O V E R S H E E T. T H E C O V E A T P A C I F I C A S A N J U A N S a n J u a n C a p i s t r a n o, C A

OUR TEAM SHEET INDEX CIVIL C O V E R S H E E T. T H E C O V E A T P A C I F I C A S A N J U A N S a n J u a n C a p i s t r a n o, C A OUR TEAM SHEET INDEX OWNER/DEVELOPER: PACIFIC POINT DEVELOPMEN PARTNERS LLC CONTACT: MATTHEW LAND 100 SPECTRUM CENTER DR, SUITE 1450 BUSINESS: (949) 341-1237 IRVINE, CA 92618 ARCHITECT / PLANNER: BASSENIAN

More information

6 2 2 C u r t i s S t r e e t A l b a n y, C A

6 2 2 C u r t i s S t r e e t A l b a n y, C A S e c o n d S t o r y A d d i t i o n 6 C u r t i s S t r e e t A l b a n y, C A architect P r o j e c t D a t a P r o j e c t D e s c r i p t i o n S y m b o l s a n d A b b r e v i a t i o n s I n d

More information

ADMINISTRATION BUILDING

ADMINISTRATION BUILDING TORNADO PROCEDURES Tornadoes are nature s most violent storms, and over a small area, the most destructive. A tornado s whirling winds may reach 300 miles per hour or more. Generally short-lived and fast

More information

2105 Bancroft Way. August 2018

2105 Bancroft Way. August 2018 2105 Bancroft Way August 2018 Entry 2 Elevator Cab 3 Elevator Cab & Lobby Finishes 4 G e n e r a l P a i n t A c c e n t P a i n t W o o d f l o o r i n g E n t r y d o o r / E l e v a t o r c a b c o

More information

SCOPE OF ACCREDITATION

SCOPE OF ACCREDITATION Standards Council of Canada 600-55 Metcalfe Street Ottawa, ON K1P 6L5 Canada Conseil canadien des normes 55, rue Metcalfe, bureau 600 Ottawa, ON K1P 6L5 Canada SCOPE OF ACCREDITATION Transcat Canada, Inc.

More information

A N E X C L U S I V E D E V E L O P M E N T O F T H R E E B E D T E R R A C E D P L U S T H R E E A N D F O U R B E D R O O M D E T A C H E D F A M I

A N E X C L U S I V E D E V E L O P M E N T O F T H R E E B E D T E R R A C E D P L U S T H R E E A N D F O U R B E D R O O M D E T A C H E D F A M I A N E X C L U S I V E D E V E L O P M E N T O F T H R E E B E D T E R R A C E D P L U S T H R E E A N D F O U R B E D R O O M D E T A C H E D F A M I L Y H O M E S P L O T S 1-5 T H E T E R R A C E S 1

More information

11 November 2009, 12:15pm-1:00pm. SUBJECT: Math/Social Sciences Department Schematic Design Meeting No. 2

11 November 2009, 12:15pm-1:00pm. SUBJECT: Math/Social Sciences Department Schematic Design Meeting No. 2 PALO ALTO HIGH SCHOOL Palo Alto Unified School District MEETING NOTES DATE: 11 November 2009, 12:15pm-1:00pm SUBJECT: Math/Social Sciences Department Schematic Design Meeting No. 2 ATTENDEES: Radu Toma,

More information

Fleming County High School Flemingsburg, KY 41041

Fleming County High School Flemingsburg, KY 41041 Fleming County High School Flemingsburg, KY 41041 Date Mon 02/06/2017 Job # Prepared By Clay Barton 02/06/17 02:31PM 02/06/17 02:57PM 02/06/17 03:03PM 02/06/17 03:19PM Weather 6:00 AM:29 F Clear Wind:

More information

DFCM APPROVAL STAMP THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING ALL

DFCM APPROVAL STAMP THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING ALL WEST RENDERED ELEVATION EAST RENDERED ELEVATION SOUTH RENDERED ELEVATION NORTH RENDERED ELEVATION 9 5 s o u t h w e s t t e m p l e s a l t l a k e c i t y, u t a h 8 4 0 p h o n e : (8 0 ) 5-4 4 750 9

More information

conceptdesigns C0NCEPTDESIGNSARCHITETURE.CO.NZ architecture S t a g e Gisborne Beach House

conceptdesigns C0NCEPTDESIGNSARCHITETURE.CO.NZ architecture S t a g e Gisborne Beach House C0NCEPTDESIGNSARCHITETURE.CO.NZ conceptdesigns architecture S t a g e 2 A Gisborne Beach House GISBORNE BEACH BRIEF HOUSE conceptdesigns architecture Beth and Chris want to design and build their forever

More information

Air distribution systems. Linear whirl outlet WL...

Air distribution systems. Linear whirl outlet WL... Air distribution systems Linear whirl outlet WL... DS 0 E 1.013 Preliminary remarks Mode of operation The linear whirl outlet generates turbulent mixing ventilation. It can be installed on or in a wall

More information

FLORIDA INVENTORY OF SCHOOL HOUSES (FISH)

FLORIDA INVENTORY OF SCHOOL HOUSES (FISH) ORGANIZATION: FACILITY: FACILITY USE: 51-PASCO COUNTY SCHOOL DISTRICT SOUTHEAST BUS GARAGE ALL DISTRICT: 51 PASCO COUNTY SCHOOL DISTRICT FACILITY: 55-F SOUTHEAST BUS GARAGE Primary Use: TRANSPORTATION

More information

MEMORANDUM. Trip Generation Analysis

MEMORANDUM. Trip Generation Analysis MEMORANDUM To: RMC Architects From: Matthew Palmer, PE Subject: Trip Generation, Parking Analysis & Level of Service Project: Port of Everett, GTC #13-053 Date: August 25, 2014 The trip generation and

More information

6 Securing of the delivery and acceptance

6 Securing of the delivery and acceptance 6 Securing of the delivery and acceptance Sector/Field Ox activities 1 Building Energy consumption 2 Spaces 3 Envelope, walls, roof, base floors, windows and doors Total energy consumption by types of

More information

Chartered Institute of Building Service Engineers (CIBSE) code for interior lighting design

Chartered Institute of Building Service Engineers (CIBSE) code for interior lighting design Chartered Institute of Building Service Engineers (CIBSE) code for interior lighting design The maintenance factor gives an estimate of how lighting conditions will deteriorate through everyday use. Dust

More information

PROJECT: HFC - 3RD FLR RENOVATION 480/277,3PH,4W+GRD. SURFACE REMARKS 480/277,3PH,4W+GRD. SURFACE REMARKS LP-3A BRANCH CIRC.

PROJECT: HFC - 3RD FLR RENOVATION 480/277,3PH,4W+GRD. SURFACE REMARKS 480/277,3PH,4W+GRD. SURFACE REMARKS LP-3A BRANCH CIRC. PROJECT: HFC - 3RD FLR RENOVATION M.L.O. CLASS: PROJ NO: 67560 DATE: 11/19/14 100A M.C.B. MOUNTING: 1 1 20 SPARE 3 1 20 SPARE 5 1 20 SPARE 7 SPACE 9 SPACE 11 SPACE 13 3 14000 E 15 14000 E T-RP-3A 17 70

More information

Protective Coatings: Non-lead orange paint RAL red (optional) non-lead paint Hot dipped galvanized conforming to ASTM A-153.

Protective Coatings: Non-lead orange paint RAL red (optional) non-lead paint Hot dipped galvanized conforming to ASTM A-153. Technical Services: Tel: (66) 500-76 / Fax: (01) 71-7317 www.grinnell.com Grinnell Mechanical Products Grooved Fittings, Ductile Iron & Fabricated Steel General Description Grooved fittings provide an

More information

Sales Date Grantor Convey No. Convey Typ # Parcels Sales Price

Sales Date Grantor Convey No. Convey Typ # Parcels Sales Price Owner Name FINDLEY FRANK A Prop. Class Land Use C - Commercial 471 - DWELLING CONVERTED TO Site Address LegalDescriptions 2584 BRIGGS RD 2584 BRIGGS RD LOT 89 BLK 2 EUREKA PARK Tax District Sch. District

More information

74'-4" OVERALL A A-4 BASEMENT. 04/ COPYRIGHT 2017 ANTONINO DONATO AIA, NCARB, LEED AP AD architect, Inc. 18'-7" 74'-4" OVERALL

74'-4 OVERALL A A-4 BASEMENT. 04/ COPYRIGHT 2017 ANTONINO DONATO AIA, NCARB, LEED AP AD architect, Inc. 18'-7 74'-4 OVERALL H E F D 59 Walpole treet uite 28 Canton, M 221 617.51.631 35'-8" 1'-" 8'-7" 18'-7" 1'-6" 3'-8" 4" BEMENT 1" 13'-7" 1'-3" 11'-6" 1'-" H 1" 8'-31 4 " 8'-7 4 1 " 2'-5" 3'-4 2 1 " 1" MECH. 4" 1" 1" 3'-4 2

More information

EDITION 1.17 I I

EDITION 1.17 I I SUPERIOR HOSPITALITY LIGHTING SOLUTION EDITION 1.17 I 888.854.6367 I www.motelsupplies.com SEATING COLLECTION RENEWED PALETTES COLLECTION MLOC95 MLOC96 MLOC97 INNOVATIONS SUPPORT ML1231-2R Headboard Light

More information

m e a d o w v i e w H A I L W E S T O N t h r e e e x c l u s i v e d e t a c h e d f a m i l y h o m e s s e t i n a r u r a l l o c a t i o n

m e a d o w v i e w H A I L W E S T O N t h r e e e x c l u s i v e d e t a c h e d f a m i l y h o m e s s e t i n a r u r a l l o c a t i o n m e a d o w v i e w t h r e e e x c l u s i v e d e t a c h e d f a m i l y h o m e s s e t i n a r u r a l l o c a t i o n P L O T O N E F o u r b e d r o o m d e t a c h e d P L O T O N E F o u r b e

More information

Handsome Traditional East Wilmette Home

Handsome Traditional East Wilmette Home p 847.446.9600 T h e h u d s o n c o m p a n y 851 spruce street, Winnetka, Illinois 60093 6 0 6 L a k e A v e n u e Handsome Traditional East Wilmette Home Listing agent Contact mary bradbury and julie

More information

Title: ASML PAS 5500 Job Creation Semiconductor & Microsystems Fabrication Laboratory Revision: D Rev Date: 09/20/2012

Title: ASML PAS 5500 Job Creation Semiconductor & Microsystems Fabrication Laboratory Revision: D Rev Date: 09/20/2012 Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the creation of stepper jobs for the ASML PAS 5500. All users are expected to have read and understood

More information

Air Force Architects Presentation. Dynamic Prototypes: 4-Airmen Dormitories. Dynamic Prototypes: 4-Airmen Dormitories

Air Force Architects Presentation. Dynamic Prototypes: 4-Airmen Dormitories. Dynamic Prototypes: 4-Airmen Dormitories Air Force Architects Presentation Conceptualization of Program by AFCEE Implementation of Prototype + Benefits of BIM Jacobs Integration Architects for AFCEE Dynamic Prototypes Program Conceptualization

More information

ANSI/SPRI ES-1 Test Reports UL Classified Products

ANSI/SPRI ES-1 Test Reports UL Classified Products Introduction to ES-1 The ANSI/SPRI ES-1 Roof Edge Standard is a reference for those who design, specify or install edge materials used with low slope roofs. This standard focuses primarily on design for

More information

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET ALAMEDA ISLES PROPOSED BUDGET FACT SHEET These sheets outline the proposed 2015/2016 budget in two parts. The first part is the operating budget which shows our income and anticipated expenses with a comparative

More information

July 25, ADDENDUM NO. 2 This Addendum and attachments consists of: 9 Pages. RFQ Ravenwood Elementary School Lighting Upgrades

July 25, ADDENDUM NO. 2 This Addendum and attachments consists of: 9 Pages. RFQ Ravenwood Elementary School Lighting Upgrades nchorage chool istrict urchasing Warehouse 4919 Van uren treet nchorage, laska 99517 hone (907) 742-8621 uly 25, 2018 his ddendum and attachments consists of: 9 ages : U: ll lan olders Q 2019-704 avenwood

More information

Restoration Management Company

Restoration Management Company 1 Insured: Sandoval, Evangelina Home: (209) 669-6960 Property: 4112 Summerfield Drive Turlock, CA 95382 Claim Rep.: Pacific Specialty/ Chima, Mandy Business: (916) 637-8231 Fax: (650) 780-4820 E-mail:

More information

T H E M A R I N A S u n n y & B r i g h t M i d - C e n t u r y H o m e 1 3 0 R e t i r o W a y, S a n F r a n c i s c o P r e s e n t e d b y : M a l i n G i d d i n g s & M a x A r m o u r 415.531.5033

More information

Traditional Pendants. Exclusive to Beacon Lighting

Traditional Pendants. Exclusive to Beacon Lighting Traditional Pendants xclusive to eacon Lighting Traditional Pendants lanna... 38 mity... 7 altimore... 19 ernice... 39 oquet... 45 utterfly... 45 heri... 10 hic... 39 xcelsior... 26-29 Gatsby... 44 Geneve...

More information

LIBERTAS HOUSE TO LET 39 ST VINCENT PLACE GLASGOW G1 2ER

LIBERTAS HOUSE TO LET 39 ST VINCENT PLACE GLASGOW G1 2ER LIBERTAS HOUSE 39 ST VINCENT PLACE GLASGOW G1 2ER TO LET 752 SQ FT (70 SQ M) TO 4,275 SQ FT (397 SQ M) CITY CENTRE OFFICE ACCOMMODATION WITH CAR PARKING 39 ST VINCENT PLACE Behind a magnificent Grade B

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 12/03/2012 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 12/03/2012 BUILDING SURVEY DATE 0089 1207 S. FOURTH ST. CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.863 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 3,043,000 CLASSROOMS / LIBRARY BUILDING GROSS SQUARE

More information

Air distribution systems. Adjustable radial outlet RA-V...

Air distribution systems. Adjustable radial outlet RA-V... Air distribution systems Adjustable radial outlet RA-V... DS E 0.2013 Construction design Preliminary remarks KRANTZ KOMPONENTEN has developed its wellknown, successful radial outlet into an adjustable

More information

TORNADO/high winds *

TORNADO/high winds * TORNADO/high winds * WATCH Bring people inside. Secure outside objects. Clear window ledges & wall hangings Close drapes Protect windows Assemble and check supplies Call in applicable staff Pre-Storm:

More information

RESTAURANT, RETAIL & CREATIVE OFFICE SPACES AVAILABLE FOR LEASE

RESTAURANT, RETAIL & CREATIVE OFFICE SPACES AVAILABLE FOR LEASE RESTURNT, RETIL & CRETIVE SPCES VILBLE FOR LESE 0, SNT MONIC, C 00 INITIL OCCNCY SCHEDULED FOR SUMMER 0 LEE SHPIRO 0-- lshapiro@kennedywilson.com CalBRE #00 MICHEL W. FOLONIS RCHITECTS Santa Monica, California

More information

Tropical E.S. - BUDGET

Tropical E.S. - BUDGET Tropical E.S. - BUDGET Replace HVAC Chiller and Cooling Tower Description Budget COMMENTS GMP Design $45,90.92 Heard Construction $5,885.00 DDC Engineering Sub-Total Overhead @ 0% Profit @ 5% Contingency

More information

ADDENDUM 1. Boiler Masters Inc. Attachments: Pre-Bid Meeting Agenda Project: Guilford County Schools Pre-Bid Meeting Sign-Up

ADDENDUM 1. Boiler Masters Inc. Attachments: Pre-Bid Meeting Agenda Project: Guilford County Schools Pre-Bid Meeting Sign-Up ADDENDUM 1 To: Plan olders: ssued By: Daniel Chay (DC) Star Electric Mechanical Maintenance Date: May 15, 2013 Central Builders Superior Mechanical Services Cc: Tracy Nance, GCS (TN) Jeff argett Mechanical

More information

Temple City Unified School District A District of High Achieving Schools

Temple City Unified School District A District of High Achieving Schools Kathryn E. Perini Superintendent Temple City Unified School A of High Achieving Schools Board of Education John Pomeroy, President Vinson Bell, Vice President Kien C. Tiet, Clerk Kenneth Knollenberg, Member

More information

Burcin Moehring, Director of Science and Technology

Burcin Moehring, Director of Science and Technology November 1st, 2013 VIA EMAIL College of Lake County 19351 West Washington Street Grayslake, Illinois 60030 Re: College of Lake County Master Plan Projects Architect s Project Number: 214011.00 Southlake

More information

Thermal Imaging Survey. Conducted at Nottingham

Thermal Imaging Survey. Conducted at Nottingham Thermal Imaging Survey Conducted at ----------------- Nottingham [This copy has been edited to remove location details. The original document does not have a "Foxit PDF Editor" header on every page.] 27/01/2010

More information

Traditional Pendants. Exclusive to Beacon Lighting

Traditional Pendants. Exclusive to Beacon Lighting Traditional Pendants Exclusive to eacon Lighting Traditional Pendants 2009-2010 lanna 30 mity 7 vignon 25 allet 26 altimore 24 eau 46 ernice 31 oquet 47 utterfly 47 amille 27 heri 10 hic 31 laudia 33 Emma

More information

Accessibility Audit Checklist

Accessibility Audit Checklist Accessibility Audit Checklist Audit: Pre Hotel Booking (Policies & Structural) Date Liaison Hotel Liaison Yes No See Plan Section Policies Fill out Hotel Info & Plan Form PHA 1a Has the hotel provided

More information

HERRON Enterprises USA, Inc.

HERRON Enterprises USA, Inc. Phone (303) 763 9639 HERRON Enterprises USA, Inc. Fax (303) 763 9686 E-Mail Lennie.Herron@comcast.net Hazardous Materials*Mold*Asbestos*Lead Paint www.herron-enterprises.com Environmental Services*Industrial

More information

West Hollywood Park / Community Center S T E E R I N G C O M M I T T E E M E E T I N G T H R E E J U L Y,

West Hollywood Park / Community Center S T E E R I N G C O M M I T T E E M E E T I N G T H R E E J U L Y, West Hollywood Park / Community Center S T E E R I N G C O M M I T T E E M E E T I N G T H R E E J U L Y, 2 0 1 4 1. 2. 3. 4. 5. Meeting Number One Programming Scope Definition Meeting Number Two Programming

More information

Temple City Unified School District Committed to 21 st Century Academic Excellence

Temple City Unified School District Committed to 21 st Century Academic Excellence Temple City Unified School Committed to 21 st Century Academic Excellence Board of Education Members Vinson Bell George M. Goold Kenneth Knollenberg Lawrence A. Marston John Pomeroy Superintendent Kathryn

More information

BUS5 Building structures 5: Fire safety

BUS5 Building structures 5: Fire safety Czech Technical University in Prague FACULTY OF CIVIL ENGINEERING Deptarment of Building Structures BUS5 Building structures 5: Fire safety Excercise 2 Fire Compartments, Fire Risk, Fire Resistance Grades

More information

SY10/100EL11V. General Description. Precision Edge. Features. Pin Names. 5V/3.3V 1:2 Differential Fanout Buffer. Revision 10.0

SY10/100EL11V. General Description. Precision Edge. Features. Pin Names. 5V/3.3V 1:2 Differential Fanout Buffer. Revision 10.0 SY10/100EL11 5/3.3 1:2 Differential Fanout Buffer Revision 10.0 General Description The SY10/100EL11 are 1:2 differential fanout gates. These devices are functionally similar to the E111A/L devices, with

More information

Study Island. 1. The table below represents a linear situation. x f(x)

Study Island. 1. The table below represents a linear situation. x f(x) Study Island Copyright 2014 Edmentum - All rights reserved. 4. A company is holding a dinner reception in a hotel ballroom. The graph represents the total cost of the ballroom rental and dinner. 1. The

More information

P r O P e r t y L I S T I N G. 701 Fifth Avenue, Seattle. The Most Prominent Building in the Seattle Skyline JOHN HANSEN.

P r O P e r t y L I S T I N G. 701 Fifth Avenue, Seattle. The Most Prominent Building in the Seattle Skyline JOHN HANSEN. 701 Fifth Avenue, Seattle The Most Prominent Building in the Seattle Skyline F e A T u r e s At 76 stories high, this skyscraper boasts unparalleled 360 degree views of Puget Sound, the Olympic Mountains,

More information

Cast Brass Lanterns and Indicators

Cast Brass Lanterns and Indicators Cast Brass Lanterns and Indicators Hall Lantern - Cast Brass Alloy Model P1-10 Surface antique medium Cast brass arrow indicator 264 x 130 mm outer edges polished, middle face cast raw Surface variants:

More information

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),

More information

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006 DRAFT TRAFFIC IMPACT STUDY FOR PHASED DEVELOPMENT OF TAMU CC Prepared for 3D/International, Inc. 1900 West Loop South, Suite 400 Houston, Texas 77027 November 2006 Interim Review Only Document Incomplete:

More information

Hazard Communications

Hazard Communications 1 Hazard Communications 1 2 Hazard Communication Program Table of Contents 1. Purpose of the Hazard Communication Program 2. Access to Written Program 3. Responsibilities 4. Hazard Recognition/Determination

More information

A Unique, Educational SELL-OUT EVENT. September 15, 2018 Convention Center 10am-3pm at the Empire State Plaza 2018 EXHIBITOR INFORMATION

A Unique, Educational SELL-OUT EVENT. September 15, 2018 Convention Center 10am-3pm at the Empire State Plaza 2018 EXHIBITOR INFORMATION September 15, 2018 Convention Center 10am-3pm at the Empire State Plaza 2018 EXHIBITOR INFORMATION Celebrity Announcement Coming Soon! A Look Back... A Unique, Educational SELL-OUT EVENT Are you looking

More information

1040 SLIDING MALL FRONT

1040 SLIDING MALL FRONT APRIL, 00 00 SLIDING MALL FRONT INDEX INDEX... ELEVATIONS/VERTICAL SECTION DETAILS... HORIZONTAL SECTION DETAILS... EGRESS DOOR... - STACK AREA LAYOUT... - SIZE LIMITATIONS... HARDWARE...0 LAWS AND BUILDING

More information

ST. DAVID S COURT DUBLIN 5

ST. DAVID S COURT DUBLIN 5 ST. DAVID S COURT DUBLIN 5 ST. DAVID S COURT DUBLIN 5 St. David s Court is a modern development of four and five-bedroom family homes nestled in a quiet suburban setting located off the Malahide Road.

More information

Business: Address, City, State, zip code

Business: Address, City, State, zip code Insured: Property: X X X X X X X X X Reference: Company: XXXXX Sample State Insurance Contractor: xxxxxx xxxx Business: (xxx) xxx-xxxx Company: xxxxx xxxxx xxx. E-mail: xxxxxx@gmail.com Business: Claim

More information

The greater the thickness the darker the colour may appear, as less light can transfer through.

The greater the thickness the darker the colour may appear, as less light can transfer through. T h e s p e c i f i e r s g u i d e t o P r o d u c t s u m m a r y P r o d u c t i o n F a b r i c a t i o n S h e e t s i z e s C u s t o m s h e e t s F i n i s h e s C o l o u r s Marblo * is a cross-linked

More information

G-FIRE GROOVED FITTINGS

G-FIRE GROOVED FITTINGS G-FIRE GROOVED FITTINGS 29 Pictorial Table of Contents Figure 510 90 Cast Elbows Page 32 Figures 212 & 312 22 1 2 Elbows Page 35 Figure 501 45 Cast Elbows Page 32 Figures 211 & 311 11 1 4 Elbows Page 36

More information

BID TABULATION Bids Opened and Read Aloud by:

BID TABULATION Bids Opened and Read Aloud by: Bids Opened and Read Aloud by: Robert Ruppe pg.1 Y Y Y Y Y Y Y Y Y Y Y Y $142,900.00 $183,000.00 X Baumann Precision Env. Foti Contracting Valentine Contractors $231,900.00 $394,000.00 X no bid $9,800.00

More information

17 th Annual GeoElections User s Conference

17 th Annual GeoElections User s Conference 17 th Annual GeoElections User s Conference When: December 12 th, December 13 th, and December 14 th, 2018 Where: Embassy Suites Hotel Tampa-Brandon 10220 Palm River Road Tampa, FL 33619 Tel: 813-653-1905

More information

Exhibit A Description of Services Section 37 Floodplain Storage Design

Exhibit A Description of Services Section 37 Floodplain Storage Design Exhibit A Description of Services Section 37 Floodplain Storage Design Singhofen & Associates, Inc. (SAI, Consultant) is pleased to present this scope of services to the City of Palm Coast Engineering

More information

October By Kimberly Paarlberg, RA, Senior Staff Architect and Dave Bowman, Manager of Codes, ICC

October By Kimberly Paarlberg, RA, Senior Staff Architect and Dave Bowman, Manager of Codes, ICC 45 Be Prepared to Weather the Storm New Scoping in the 2015 IBC for Storm Shelters Using the ICC 500 ICC/NSSA Standard for the Design and Construction of Storm Shelters By Kimberly Paarlberg, RA, Senior

More information

2018 North Carolina Residential Code Prescriptive Tables for Selection of Support Elements for Beams, Girders, and Headers: Example Problems

2018 North Carolina Residential Code Prescriptive Tables for Selection of Support Elements for Beams, Girders, and Headers: Example Problems 2018 North Carolina Residential Code Prescriptive Tables for Selection of Support Elements for Beams, Girders, and Structural Building Components Association (SBCA) August 10, 2018 SBCA is an APPROVED

More information

Eastlake Assited Living & Memory Care

Eastlake Assited Living & Memory Care UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.

More information

Project. Project Location. Catalog #

Project. Project Location. Catalog # Location Catalog # A. Description Aris is a low-profile luminaire that is ideal for undercabinet, task and display case lighting in both residential and commercial applications. Its 0." high x." cross-section

More information

Air distribution systems. Radial outlet RA-N2...

Air distribution systems. Radial outlet RA-N2... Air distribution systems Radial outlet RA-N... DS E 0.01 Radial outlet RA-N Preliminary remark KRANTZ KOMPONENTEN radial outlets RA-N have fixed radial vanes and are available with circular or square face.

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

Today s A/C systems include:

Today s A/C systems include: * www.sgvenergywise.org Replac ing your A/C system REQUIRES a permit from your c ity - it s important. WHY? Because A/C (air conditioning) is a SYSTEM, not just one piece of equipment. The thermostat,

More information

REPORT. Limited Asbestos Survey Plaza Latina Stage Two Norcross, Georgia Gwinnett County. Project Number: Report Date: January 18, 2017

REPORT. Limited Asbestos Survey Plaza Latina Stage Two Norcross, Georgia Gwinnett County. Project Number: Report Date: January 18, 2017 REPORT Limited Asbestos Survey Plaza Latina Stage Two Norcross, Georgia Gwinnett County Project Number: 06.69.0 Report Date: January 8, 07 UNITED CONSULTING 65 Holcomb Bridge Road Norcross, GA 3007 (770)

More information

ADDENDUM NUMBER 04. This Addendum consists of three (3) pages and the following Specifications and Drawings: No. Section Title Issue Date

ADDENDUM NUMBER 04. This Addendum consists of three (3) pages and the following Specifications and Drawings: No. Section Title Issue Date DOCUMENT 00 09 0 ADDENDUM NUMBER 0 DOCUMENT 00 09 0 ADDENDUM NUMBER 0 DATE: April, 0 PROJECT: Eighth South PROJECT NUMBER: 07 OWNER: Eighth South, LLC McMinnville, TN 70 ARCHITECT: TO: 07 Westgate Circle,

More information

Real Estate Investor Calculator Project Workbook. Quick Estimate Factors MAIN DATA ENTRY

Real Estate Investor Calculator Project Workbook. Quick Estimate Factors MAIN DATA ENTRY MAIN DATA ENTRY 1 2 Current List / Asking Price: $ 175,000.00 Project Updated: 12/18/17 Original or Current Appraised / Market Value / AsIs: $ 180,000.00 AsIs Date: 12/18/17 Est. Resale Value / Post Renovations

More information

Space Objects. Section. When you finish this section, you should understand the following:

Space Objects. Section. When you finish this section, you should understand the following: GOLDMC02_132283433X 8/24/06 2:21 PM Page 97 Section 2 Space Objects When you finish this section, you should understand the following: How to create a 2D Space Object and label it with a Space Tag. How

More information

UNIVERSITY OF WISCONSIN-PARKSIDE TORNADO WARNINGS AND ALERT POLICY ADMINISTRATIVE POLICY NUMBER 39 TABLE OF CONTENTS

UNIVERSITY OF WISCONSIN-PARKSIDE TORNADO WARNINGS AND ALERT POLICY ADMINISTRATIVE POLICY NUMBER 39 TABLE OF CONTENTS UNIVERSITY OF WISCONSIN-PARKSIDE TORNADO WARNINGS AND ALERT POLICY ADMINISTRATIVE POLICY NUMBER 39 TABLE OF CONTENTS Page 1. PURPOSE 2 2. DEFINITIONS 2 3. GENERAL OVERVIEW 2 4. SPECIFIC PROCEDURES 3 4.1

More information

Artificial light calculation

Artificial light calculation 56 1- Point-by-point method Exercise: Find E at point a & b due to: 1- only one lamp above point a. 2- The 3 lamps shown in the figure 3- E at 85 for both points 1- Ea= 562.5 lx Eb= 85.7 lx 2- Ea= 648.2

More information

F a l l W i n t e r

F a l l W i n t e r F a l l W i n t e r 2 0 1 2 About Us TMC is committed to the importance of strong design, lasting quality and exceptional service to our customers. Since introducing our unique, colorful, laser-cut furniture

More information

S P E C I F I C A T I O N S

S P E C I F I C A T I O N S F I N E L I T E S P E R S O N A L L I G H T I N G S Y S T E M S P E C I F I C A T I O N S 2.5 0.8 A C T U A L S I Z E ld 3 W D E S K L A M P Initial illuminance values in footcandles calculated using LM79

More information

Source: % % FINANCING SHORT TERM HOLDING / RESALE. 30 Maximun Offer to Resell (Fix/Flip): $ 424,000.00

Source: % % FINANCING SHORT TERM HOLDING / RESALE. 30 Maximun Offer to Resell (Fix/Flip): $ 424,000.00 MAIN DATA ENTRY Current List / Asking Price: $ 499,000.00 Project Updated: 11/15/17 Original or Current Appraised / Market Value / AsIs: $ 520,000.00 AsIs Date: 11/1/17 Est. Resale Value / Post Renovations

More information

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637 December 16, 2015 Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637 RE: Response to SWFWMD Supplemental Information Request Dear Mr.

More information

A Survey on Changing Socio-Spatial Pattern in Contemporary Housing of Iran

A Survey on Changing Socio-Spatial Pattern in Contemporary Housing of Iran A Survey on Changing Socio-Spatial Pattern in Contemporary Housing of Samira Forouzmand Assoc. Prof. Dr. Hifsiye Pulhan Defense of thesis, January 2013 Eastern Mediterranean University Department of Architecture

More information

Simple Building Estimating. Example Reports

Simple Building Estimating. Example Reports Simple Building Estimating Example Reports Image franckito / 123RF Stock Photo Table of Contents Software and data Snape Computers Ltd 1996 2017 Full Labour, Material, Plant, SubContract, etc Detailed

More information

P E R S O N A L L I G H T I N G S Y S T E M

P E R S O N A L L I G H T I N G S Y S T E M ld3 W D E S K L A M P P E R S O N A L L I G H T I N G S Y S T E M All measurements in footcandles based on the distance between the lamp head to the desk surface at 10, 12 and 14. 11 17 10-42 12-34 14-27

More information

Claim Rep.: Don Draughon Business: (818) Estimator: Michael Miller Business: (760)

Claim Rep.: Don Draughon Business: (818) Estimator: Michael Miller Business: (760) 1 Insured: Property: Venice Motel 1114 N. Golden State Blvd Turlock, CA 95380 Claim Rep.: Don Draughon Business: (818) 721-4280 Estimator: Michael Miller Business: (760) 985-9951 Contractor: Business:

More information

S a c r a m e n t o S t r e e t, S a n F r a n c i s c o. M a l i n G i d d i n g s & M a x A r m o u r

S a c r a m e n t o S t r e e t, S a n F r a n c i s c o. M a l i n G i d d i n g s & M a x A r m o u r PAC I F I C H E I G H T S H i s t o r i c Q u e e n A n n e M a n s i o n 2 2 2 0 S a c r a m e n t o S t r e e t, S a n F r a n c i s c o P r e s e n t e d b y : M a l i n G i d d i n g s & M a x A r

More information